Environment Management Plan of Guilin Integrated Environment Management Project of the World Bank Funded E4566 REV Guilin Integrated Environment Management Project Of the World Bank Funded Environment Management Plan Prepared by: The Environment Protection Science Academy of Guangxi Zhuang Autonomous Region Certificate No: Guohuanpinzheng Jiazi No. 2902 Date: June 2014 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 1 Environment Management Plan of Guilin Integrated Environment Management Project of the World Bank Funded Table of Contents ABBREVIATIONS ............................................................................................................................................... 3 1 FOREWORD .................................................................................................................................................. - 4 - 1.1 INTRODUCTION OF PROJECT ................................................................................................................... - 4 - 1.2 ADOPTED ENVIRONMENTQUALITY STANDARDS AND EMISSION STANDARDS ...................................... - 6 - 1.3 ENVIRONMENT SENSITIVE SITES AND PROTECTION TARGETS............................................................ - 11 - 2 THE ENVIRONMENTMANAGEMENT INSTITUTES AND RESPONSIBILITIES ......................... - 13 - 2.1 THE PURPOSE OF ENVIRONMENTMANAGEMENT PLAN ....................................................................... - 13 - 2.2 THE ENVIRONMENT MANAGEMENT INSTITUTES AND RESPONSIBILITIES .......................................... - 13 - 3 ENVIRONMENTIMPACT MITIGATION MEASURES ....................................................................... - 18 - 4 ENVIRONMENT MONITORING PLAN ................................................................................................. - 35 - 4.1 THE PURPOSE FOR ENVIRONMENT MONITORING ................................................................................ - 35 - 4.2 ENVIRONMENT MONITORING AGENCIES ............................................................................................. - 35 - 5 ENVIRONMENT MANAGEMENT TRAINING PLAN ......................................................................... - 49 - 5.1 THE PURPOSE FOR ENVIRONMENT MANAGEMENT CAPACITY TRAINING .......................................... - 49 - 5.2 TRAINING PLAN AND CONTENTS........................................................................................................... - 49 - 6 THE REPORTING MECHANISM AND REQUIREMNT FOR THE ENVIRONMENT MANAGEMENT PLAN (EMP) .................................................................................................................... - 50 - Maps Attached: Attached Map 1: Distribution Plan of the Environment Sensitive Points around the Project WWTPs Attached Map 2: Distribution Plan of the Environment Sensitive Points around the Project Boosting Pumping Stations Attached Map 3: Distribution Plan of the Environment Sensitive Points around the Project Water Supply Network 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 2 Environment Management Plan of Guilin Integrated Environment Management Project of the World Bank Funded Abbreviations (1) DC: Drainage Company (2) EHS: Environment Health Safety (3) EIA: Environment Impact Assessment (4) EP: Environment Protection (5) EPA: Environment Protection Agengy (6) EPB : Environment Protection Bureau (7) PIU: Project Implementation Unit (8) PMO: Project Management Office (9) PS: Pumping Stations (10) WSC: Water Supply Company (11) WWTP: Wastewater Treatment Plant 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 3 Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded 1 Foreword 1.1 Introduction of Project Guilin City launched a comprehensive environment management project funded by the World Bank (WB), including water supply component, wastewater and sludge component as well as water environment monitoring and pollution control component, with the aim to enhance Guilin City’s water supply and environmentsanitation service development level, improve its investment environment, accelerate its urban and rural economic and social development, and achieve good social, environmentand economic benefits. Because Guilin City is an economically underdeveloped city in western areas of China, and features an instable industrial base, limited fiscal revenue and capital shortage, it is of significant importance for it to develop infrastructure construction, strengthen comprehensive environmentgovernance, and improve ecological environment by the use of the WB loan. The project consists of following components: Component 1: Guilin City Water Supply Network The component aims to meet the increasing demands for the production and domestic water during the urbanization progress, and enhance the safety and reliability of urban water supply in Guilin City. The main contents are (i) the construction of the new DN500-DN1600 water supply pipeline network with a length of 37km; (ii) the construction of the new booster PS on Airport Road (nearly 40,000 m3/d); (iii) the purchase of relevant water quality detection instruments and daily pipeline network maintenance and repair equipment to enhance the urban water supply safety; (iv) the construction of the comprehensive water supply operation platform. Component 2: The Upgrading of the City Wastewater Treatment Plants, Drainage Pumping Stations, and the Urban Drainage Network The component aims to enhance the efficiency of the waste water treatment plants (WWTPs) and drainage pumping stations (PSs), ensure the normal and efficient operation of wastewater treatment facilities, increase the wastewater collection efficiency, reduce the energy consumption for treatment, and mitigate the impact of treatment facilities on the surroundings. The main contents are as follows: 1. The Upgrading of the WWTPs in the Urban Areas 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -4- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded The work aims to upgrade and reconstruct the existing WWTPs, update part of equipment, deodorize plant areas, and reconstruct sludge dewatering facilities. The specific contents are (i) the reconstruction of Shangyao WWTP with a capacity of 145,000 m3/d, including increase of treatment standards, updating of treatment equipment, odor collection and treatment, and reconstruction of sludge dewatering facilities; (ii) the reconstruction of Qilidian WWTP phase I with a capacity of 60,000 m3/d (which shrank to 45,000 m3/d), including increase of treatment standards, updating of treatment equipment, odor collection and treatment, reconstruction of sludge dewatering facilities, enhance of treatment standards for phase II with a capacity of 100,000 m3/d and deodorization of biological tank; (iii) the reconstruction of Beichong WWTP with a capacity of 30,000 m3/d, including increase of treatment standards, reconstruction of influent pump houses, odor collection and treatment, reconstruction of sludge dewatering facilities; (iv) the reconstruction of Yanshan WWTP with a capacity of 20,000 m3/d, including increase of treatment standards, and odor collection and treatment; (iv) the deodorization of biological tank in Lingui WWTP with a capacity of 30,000 m3/d. 2. The Upgrading of the Drainage Pumping Stations in the Urban Areas Its main contents include the upgrading of the equipments (grille, water pump, electrics and automatic control) in the existing 18 wastewater PSs and two rainwater PSs, and odor collection and treatment. 3. The Upgrading of the City Drainage Network Its main contents include (i) the repair or updating of DN300-DN1200 natural flow wastewater pipe with a length of about 34.6km in Guilin downtown (including inspection shaft); the repair or updating of DN600 wastewater pressure pipe with a total length of about 5.5km in Guilin downtown; (ii) the construction of the new DN500-DN800 wastewater pipeline with a length of about 1.7km in the cluster on Bali Street, Lingchuan County; (iii) the construction of the new DN300-DN1200 wastewater pipeline with a length of about 12.3km in old town of Lingui County. 4. Equipments for Water Quality Monitoring and Network Management and Maintenance The work aims to improve and enhance the works of Guilin City Water Drainage Co., Ltd. in terms of water quality (including sludge) monitoring and water drainage pipeline network maintenance, including (i) the purchase of water quality (including sludge) monitoring equipment for daily monitoring and management; (ii) the purchase of pipeline network 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -5- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded maintenance equipment, including pipeline detection equipment (such as intelligent robot and detection system), blocking and dredging equipment; (iii) the general survey on water drainage pipeline network and the establishment of the pipeline network information system for daily maintenance and management. Component 3: Sludge Disposal Engineering The component aims at the innocent and resourceful treatment of sludge produced from WWTPs, with a capacity of producing 130t/d of sludge compost and drying 130t/d of sludge by solar energy. Dewatered sludge produced from all of WWTPs in Guilin City are concentrated for composting or drying, and finally used for landscaping. Component 4: Water Environment Monitoring and Pollution Source Management Information System (MIS) of Guilin City The main contents of the component are (i) the establishment and improvement of Guilin City Water Environment Monitoring Information Management System; (ii) the establishment of the pollution source management information system for environmentprotection departments; (iii) the launch of the pollution source analysis work in Lijiang River Basin (Guilin downtown). Component 5: Capacity Building and Project Implementation Support The component includes (i) the employment of a professional consultant (company) to help the project office in implementing the project management, including the review of design documents and bidding documents, the implementation of project management, construction supervision and social and environment support measure monitoring, the establishment of the project monitoring system, the assessment, the reporting and the preparation of project completion report; (ii) the organization of personnel training and site inspection for the project management office (PMO) and the project implementation unit; (iii) the supply of office facilities for PMO and the project implementation unit. 1.2 Adopted EnvironmentQuality Standards and Emission Standards 1.2.1 Air Environment 1.2.1.1 Air Environment Quality Standards The air environment complies with the grade II standards in Ambient Air Quality Standard 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -6- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded (GB3095-1996). See Table 1.2-1 for standards for various components. Table 1.2-1 Standard Values in Ambient Air Quality Standard (Excerpt) Unit: mg/Nm³ Value Limit of Assessment Value-reading Grade II Components Involved Factor Time Standard Total Annual mean 0.20 Suspended Daily mean 0.30 Particulates Hourly 0.90 (TSP) mean* Annual mean 0.10 Inhalable Daily mean 0.15 Particles Water supply component (Guilin City Water Supply Hourly (PM10) 0.45 Pipeline Network Component), wastewater component mean* (City WWTP, Water Drainage PS and Urban Water Annual mean 0.06 Sulfur Drainage Pipeline Network Reconstruction Daily mean 0.15 Component), sludge disposal component Dioxide Hourly (SO2) 0.50 mean* Annual mean 0.08 Nitrogen Daily mean 0.12 Dioxide Hourly (NO2) 0.24 mean* 1.2.1.2 Air Pollutant Emission Standards The air pollutant emission complies with the grade II standards in Integrated Emission Standard of Air Pollutants (GB16297-1996), the maximum allowable concentration standards for waste gas emission at boundary (at the edge of the protective belt) in Discharge Standard of Pollutants for Municipal WWTP (GB 18918-2002), and the grade II emission standards for new construction, reconstruction and expansion projects in Emission Standards for Odor Pollutants (GBl4554-93). See Table 1.2-2-1.2-4 for standard values. Table 1.2-2 Standard Values in Integrated Emission Standard of Air Pollutants (Excerpt) Unit: (mg/Nm³) Assessment Factor TSP Grade/Class Unorganized emissions Value Limit of Standard Concentration 5 Water supply component (Guilin City Water Supply Network Component), wastewater component (WWTPs, Drainage PS and Components Involved Urban Drainage Network Reconstruction Component), sludge disposal component Table 1.2-3 Air Pollutant Emission Standard Values for Municipal WWTPs Unit: mg/m3 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -7- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded Odor Concentration Items Ammonia Sulfuretted Hydrogen (Dimensionless) Standard Value 1.5 0.06 20 Components Wastewater component (the upgrading of the WWTPs) Involved Table 1.2-4 Standard Values in Emission Standards for Odor Pollutants (Excerpt) Unit: (mg/Nm³) Assessment Factor NH3 Odor H2S Grade/Class Grade II Value Limit of Standard Concentration 1.5 20 0.06 Wastewater component (drainage PSs, city drainage network Components Involved upgrading), sludge disposal component 1.2.2 Surface Water Environment 1.2.2.1 Surface Water Environment Quality Standards The surface water environment quality standard complies with the class III and IV standards in Surface Water Environment Quality Standard (GB3838-2002). See Table 1.2-5 for standard values. Table 1.2-5 Standard Values in Surface Water Environment Quality Standard (Excerpt) Unit: (mg/L) Items Class III Class IV Standard NH3-N≤ 1.0 1.5 Water bodies involved: Taohua River (the Total Phosphorus 0.2 Water bodies involved: 0.3 water body for assimilating pollutants Total Nitrogen 1.0 Xiaotaiping River (the 1.5 from Beichong WWTP ), Lijiang River water body for SS 30 60 (the water body for assimilating assimilating pollutants DO≥ 5 3 pollutants from Qilidian WWTP ), from Lingui WWTP), COD≤ 20 30 Nanwan River (the water body for branches of Taiping Permanganate assimilating pollutants from Shangyao 6 River (a water body 10 Index ≤ around the sludge WWTP), Liangfeng River (the water BOD5≤ 4 disposalcomponent) 6 body for assimilating pollutants from Fecal Coliform 10000 20000 Yanshan WWTP) 1.2.2.2 Water Pollutant Discharge Standards The wastewater discharge of the WWTP component complies with the Grade I Category A standards in Discharge Standard of Pollutants for Municipal WWTPs (GB18918-2002). See Table 1.2-6 for standard values. The wastewater discharge of other components complies with the Grade I standards in Integrated Wastewater Discharge Standard (GB8978-1996). See Table 1.2-7 for standard values. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -8- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded Table 1.2-6 Standard Values in Discharge Standard of Water Pollutants for Municipal WWTPs Unit: mg/L, except for pH Total Total Animal and Factor pH SS COD BOD5 NH3-N Phosph Nitrogen Vegetable Oil orus Standard 6~9 10 50 10 5 (8) 0.5 15 1 Value Total Fecal coliform Factor Petroleum Mn Cu Zn As Cd lead (piece/L) Standard 1 0.1 2.0 0.5 1.0 0.1 0.01 103 Value Components Wastewater component (City WWTP Reconstruction Component) Involved Table 1.2-7 Standard Values in Integrated Wastewater Discharge Standard Unit: mg/L, except for pH Phospha Petroleu Volatile Factor pH SS COD BOD5 NH3-N Mn Cu Zn te m Penol Standard 6~9 70 60 20 15 0.5 2.0 0.5 2.0 5 0.5 Value Water supply component (Guilin City Water Supply Network Component), wastewater component Components (WWTPs, Drainage PS and Urban Drainage Network Reconstruction Component), sludge disposal Involved component Regarding the discharge of landfill leachate, the discharge standard applied in China for municipal domestic landfill sites is “Pollution Control Codes for Municipal Domestic Landfill Sites” (GB16889-2008), and the “EHS Guildelines for Waste Management Facilities” of the World Bank also prescribes the discharge standard for hazardous waste landfills and municipal domestic waste landfills. The standard limiting values are compared below in Table 1.2-8. Table1.2-8 Comparison of the Standard Limiting Values for Water Pollutant Discharge from Municipal Waste Landfills between Those of China and of World Bank EHS Guideline No. Control Pollutants China Standard World Bank EHS Standard 1 Chorma (Diluent Fold) 40 -- 2 CODCr (mg/L) 100 -- 3 BOD5 (mg/L) 30 37 4 SS (mg/L) 30 27 5 TN (mg/L) 40 -- 6 NH3-N(mg/L) 25 5 7 TP(mg/L) 3 -- 8 Fecal coliform (piece/L) 10000 -- 9 Total Hg (mg/L) 0.001 -- 10 Total Cd(mg/L) 0.01 -- 11 Total Cr(mg/L) 0.1 -- 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 -9- Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded 12 Chromate (mg/L) 0.05 -- 13 Total As(mg/L) 0.1 -- 14 Total Pb(mg/L) 0.1 -- Note: The monitoring points of the pollutant discharge are rountine discharge outlets for waste water treatment facilities. From Table 1.2-8 above, for the pollution factors requested in both Standards, BOD5, SS, and NH3-N, China’s standard limit value on BOD5 in “Pollution Control Codes for Municipal Domestic Landfill Sites (GB16889-2008), is stricter than that in the World Bank ESH Guidelines on Waste Management Facilities; whereas, the limiting values for SS and NH3-N is relatively lower. 1.2.3 Acoustic Environment 1.2.3.1 Acoustic Environment Quality Standard The acoustic environment of various components complies with the class 2 standards in Acoustic Environment Quality Standard (GB3096-2008). See Table 1.2-8 for standard values. Table 1.2-8 Standard Values in Acoustic Environment Quality Standard (Excerpt) Unit: dB (A) Class Daytime Nighttime Components Involved Water supply component (Guilin City Water Supply Network Component), Class 2 60 50 wastewater component (WWTPs, Drainage PS and Urban Drainage Network Reconstruction Component), sludge disposal component 1.2.3.2 Noise Emission Standards The noise emission of components complies with the class 2 standards in Noise Limits for Construction Site (GB12523-2011) and Emission Standard for Industrial Enterprises Noise at Boundary (GB12348-2008). See Table 1.2-9 and Table 1.2-10 for standard values. Table 1.2-9 Standard Values in Noise Limits for Construction Site Unit: dB (A) Name of Standard Items Standard Value Emission Standard of Environment Daytime [dB (A)] 70 Noise for Boundary of Construction Nighttime [dB (A)] 55 Site (GB12523-2011) Water supply component (Guilin City Water Supply Network Component), Components Involved wastewater component (WWTPs, Drainage PS and Urban Drainage 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 10 - Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded Network Reconstruction Component), sludge disposal component Table 1.2-10 Standard Values in Emission Standard for Industrial Enterprises Noise at Boundary (Excerpt) Unit: dB(A) Class Daytime Nighttime Components Involved Water supply component (Guilin City Water Supply Network Class 2 Component), wastewater component (WWTPs, Drainage PS and Urban 60 50 Standard Drainage Network Reconstruction Component), sludge disposal component Comparing with the EHS General Guideling of the Bank on the noise standard ( i.e. Tables 1.7.1 and 2.3.1 of the General Guideline), the national standard above is either stricter or almost the same; hence, if the national standard could be met in the project implementation, then the Bank’s standard on noise could be met. 1.3 Environment Sensitive Sites and Protection Targets See Table 1.4-1 and Table 1.4-8 for main environmentsensitive sites around various components. For the area around the pipeline network, we only investigated special sensitive sites, such as school, hospital and sanatorium. Table 1.4-1 Sensitive Sites around Shangyao WWTP No. Sensitive Site Orientation Distance (m) Number of People 1 Yangjialing Village East 50 300 2 Jietou Village Southwest 350 580 3 Yaotou Village East 250 580 Table 1.4-2 Sensitive Sites around Qilidian WWTP No. Sensitive Site Orientation Distance (m) Number of People 1 Changshengshidai Plaza Northeast 50 780 2 Yiji Community Northwest 250 750 Guangxi EnvironmentGeology 3 North 50 180 Research Institute Table 1.4-3 Sensitive Sites around Beichong WWTP No. Sensitive Site Orientation Distance (m) Number of People 1 Guangxi Culinary School East 30 350 2 Panshan Mountain Southeast 60 870 3 Guilin Garden Southwest 250 780 Table 1.4-4 Sensitive Sites around Lingui WWTP No. Sensitive Site Orientation Distance (m) Number of People 1 Shanzhao Village East 500 680 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 11 - Environment Management Plan of Guilin Integrated 1 Foreword Environment Management Project of the World Bank Funded Table 1.4-5 Sensitive Sites around Yanshan WWTP No. Sensitive Site Orientation Distance (m) Number of People 1 Jiemeiqiao Village North 350 480 2 Jiangjiaba Village West 250 350 Table 1.4-6 Sensitive Sites around Sludge Disposal Component No. Sensitive Site Orientation Distance (m) Number of People 1 Shuikou Brigade Farm Southwest 1000 730 2 Baotang Village Southeast 1100 380 Table 1.4-7 Sensitive Sites around Airport Booster PS No. Sensitive Site Orientation Distance (m) Number of People 1 Tangjia Village Northwest 50 320 2 Yaoherongyu Community East 80 1480 Table 1.4-8 Special Sensitive Points around the Water Supply Pipelines to Be Built No. Sensitive Site Function of Sensitive Site 1 Chengjian School School 2 Tuomu Town Health Center Hospital Guilin City No.18 High School School Technician Training School School Mingxing Elementary School School Hongpingguo Kindergarten School Beiteer Kindergarten School No.301 Kindergarten School No.301 Hospital Hospital Yangguangmeidi Kindergarten School Lingchuan Town Health Center Damian Branch Hospital 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 12 - Environment Management Plan of Guilin Integrated 2 The EnvironmentManagement Environment Management Project of the World Bank Funded Institutes and Responsibilities 2 The EnvironmentManagement Institutes and Responsibilities 2.1 The Purpose of EnvironmentManagement Plan As per the administration authority stipulated in the EnvironmentProtection Law of the People’s Republic of China and the Management Regulations for EnvironmentProtection for Construction Projects, the EIA report of this Project is reviewed and approved by Guilin Municipal EnvironmentProtection Bureau (EPB). Guilin Municipal EPB is the environmentmanagement institute for this Project. Its main functions are to put forward requirement on environmentprotection as the EIA report, to coordinate the environmentmanagement between all the agencies concerned, and organize the “Three Simultaneous” check and acceptance work on environmentprotection facilities. Under the overall administrative management institutional framework, the project management office of the World Bank funded is managing the implementation of the whole project, under the leadership of Guilin Municipal Government, and the project clients are responsible for the implementation of each specific activity. In order to ensure the smooth implementation of the project environmentmanagement action, a certain number of full time or part time professional environmentmanagement staff will be manned in the PMO, project clients, contractors and operating agencies to be in charge of the implementation of the EMP. The purpose of the EMP is to provide correspondent mitigation measures for all the potential environment impacts identified in the EIA, adverse impacts in particular; propose the environmentmanagement system to ensure the implementation of these measures; make sure the roles and responsibilities of the concerned parties in the project; put forward the training plan; strengthen the capacity for implementation of this EMP; and provide environmentmonitoring plan for evaluating the implementation results. 2.2 The Environment Management Institutes and Responsibilities 2.2.1 The Environment Management Institutes Because there are relatively big differences in the environmentmanagement contents between the construction period and operation period, and the working limit is different: one is temporary and one is permanent; so based on the difference of the periods, the contractor and 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 13 - Environment Management Plan of Guilin Integrated 2 The EnvironmentManagement Environment Management Project of the World Bank Funded Institutes and Responsibilities operator should establish their own respective organizations and adopt the approach of being responsible for different periods. Once the construction period is completed, the correspondent organization should be withdrawn immediately and the organization for the operation period should start their work. Based on the actual situation, there should allow a certain overlapping period. See Fig.2.2-1 and Fig.2.2-2 for the environmentmanagement organization arrangement for the Project. High level environment World Bank PMO management agencies Environment Protection Bureau, Water Local environment Conservation Bureau and Land & Resource monitoring agencies Bureau of Guilin Municipality Water Supply Company and Drainage Company of Guilin Municipality Responsible Agencies for Environmental Measures Municipal Environment Environment Environment Designing Construction Monitoring Assessment Monitoring Institutes Contractors Agency Agencies Station Fig 2.2-1 Environment Management Organization Chart for Construction Period 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 14 - Environment Management Plan of Guilin Integrated 2 The EnvironmentManagement Environment Management Project of the World Bank Funded Institutes and Responsibilities High level environment World Bank PMO management agencies Local environment Environment Protection Bureau monitoring agencies Responsible Agencies Water Supply Company for Environmental Drainage Company of Guilin Municipality Measures Municipal Administration Bureau Monitoring Agencies Fig 2.2-2 Environment Management Organization Chart for Operation Period 2.2.2 Environment Management Responsibilities and Contents See Table 2.1-1 for the environment management contents and staffing details of each environmentmanagement agency at different stages. Table2.2-1 Summary Table for EnvironmentManagement Agencies Project Relevant Stages Main Environment Responsibilities Staffing Parties Contacting with the government agencies to coordinate the implementation PMO 2 of the environmentmanagement issues 1. environmentmanagement work in the project design and preparation stage; Design & Preparation 2. Make sure the fund for environmentprotection is available; Clients 3 3. Contacting with the concerned government agencies to coordinate the implementation of the environmentmanagement issues; 4. Hire supervision agencies and collect and keep records. 1. Integrate the environmentmeasures into the design and budget; Designing 2. Integrate the mitigation measures in the EMP into the technical 2 Institutes specification of the bidding document. 1. Provide technical support on environmentprotection of the engineering EIA Agencies design; 4 2. Develop EIA documents; 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 15 - Environment Management Plan of Guilin Integrated 2 The EnvironmentManagement Environment Management Project of the World Bank Funded Institutes and Responsibilities Project Relevant Stages Main Environment Responsibilities Staffing Parties 3. Develop DMP. 1. Review the preliminary design of EP and EA; Local EPB 2. Review the EIA report; 2 3. Ensure the EP investment. 1. Be responsible for a series of EP management work and make sure the fund for EP is available for the construction period; 2. Conduct management and supervision o the EP work during the construction period; investigate and tackle polluting problems or those that bother the local residents; Clients 3. Be responsible for contacting with the EP authorities of the government, 3 coordinate and make sure the environment management issues be sorted out; 4. Track the implementation status of the EMP and report to the agencies in charge, PMO and the World Bank periodically; 5. Take and handle public complaints/grievance redress. 1. Carry out and ensure the EP measures and work in the construction period is in place as per the bidding documents, contract and this EMP etc.; 2. Adopt the guidance and supervision of the environmentstaff of the project clients, environmentsupervision engineer and the relevant authorities of the government; Contractors 3. Adopt the technical support provided by the EP consulting agencies; 2 4. Take safety protection measures, e.g. put up reminding sign at the construction site; set up enclosure fence along the boundary of the construction site; establish the communication channel with the public and ensure the safety of the construction; 5. Implement the EMP. 1. Supervise routinely the Contractor to fulfill their tasks on the Construction Engineering / environment measures as requested in the Contract and the EMP; environmentSupe 2. Conduct on site daily supervision on the implementation situation, and 4 rvisors cooperate with the construction agencies to work on environment management well. 1. As being entrusted by the project clients and the EMP put forward in the Subject EnvironmentMon EIA, fulfill the environment monitoring work for the construction period; to the itoring Agency 2. In case of any abnormal situation emerged, being requested by the Clients ToR to conduct monitoring on the abnormal situation. 1.Conduct random check on the EP measures of the clients and the construction agencies; 2. Provide the clients and the PMO implementation status report on the EMP; 3. Check the restoration of the land temporarily occupied due to the construction, restoration of vegetation and environment; 4. Check the dust and noise pollution control measures, and define the Local EPB construction time; 2 5. Check the emission of air pollutants; 6. Check the discharge and disposal of the domestic wastewater and waste engine oil in the construction sites; 7. Check the “three simultaneous” measures of EP and decide the deadline for final completion; 8. Check EP facilities if they meet the requirement or not; 9. Recovery and treatment of the borrow pits and the spoil disposal site; 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 16 - Environment Management Plan of Guilin Integrated 2 The EnvironmentManagement Environment Management Project of the World Bank Funded Institutes and Responsibilities Project Relevant Stages Main Environment Responsibilities Staffing Parties 10. Accept public complaint and coordinate to solve the problems. Culture Relic In case any cultural relics is found in the construction process, take rescue Management and protection action. 2 Agency Traffic When the road is partically closed for construction, develop the plan for Management traffic regulation, decongestion and diversion; and set up traffic warning 2 Agency signs and lights wherever necessary. 1. Provide technical support on the EP work during construction period as being requested by the project clients, the EIA, and the results of the EP TA/Consulting design; No limit Firm 2. Provide technical support on the EP work to the contractors and provide training on EP during the construction period. 1. Be responsible for the EP work in the operation stage, and ensure the mitigation and monitoring in the EMP to be implemented in the operation; 2. Be responsible for contacting with the government agency in charge and Client or coordinate to ensure the EP work to be done; Operation 2 3. Emergency response for environment accidents; Agency 4. Conduct staff training on a periodical basis to improve their capacity; meanwhile, and conduct EP technical and experience sharing and communication activities so as to improve the environmentmanagement. 1. Complete the environment monitoring work in the operation period as Subject EnvironmentMon being entrusted by the project clients and the EMP provided in the EIA; to the itoring Agency 2. Conduct the routine monitoring related to the Project. ToR 1. Conduct check and acceptance for EP project; 2. Conduct management and supervision on the environmentcompliance in the operation period; Operation 3. Conduct supervision and inspection on the performance of the supporting EP facilities for the built plants; 4. Integrate the supervision and management of the routine pollution sources; 5. Inspect the implementation of the EMP in the operation period; Local EPB 2 6. Inspect the implementation of the monitoring plan 7. Check all the sensitive points where further EP measures need to take (possibly unexpected environmentproblems); 8. Check if the environment quality of the sensitive points meet the requirement of those relevant standard; 9. Strengthen the supervision and prevent incidents; prepare response scheme to emergency incidents, so that in case of any incident, actions could be taken to handle it. City Planning Control the functions of the structures within the health protection distance 1 Department Civil Society or Social Supervision No limit NGOs (Note: EP=environment protection, EPA=enviromental protection agency) 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 17 - Environment Management Plan of Guilin Integrated 3E Environment Management Project of the World Bank Funded 3 EnvironmentImpact Mitigation Measures The project is mainly comprised of water supply network components, WWTPs, pump stations and drainage pipeline component and sludge disposal components. According to domestic laws and regulations, based on past experience in similar projects and by reference to the General Guidelines on Environment, Health and Safety, the Guidelines on Water Supply and Drainage Environment, Health and Safety and the Environment, Health and Safety Guidelines of Waste Management Facilities of the World Bank, we hereby put forward the following countermeasures and mitigation measures for early-stage preparations, construction periods and operation periods of different kinds of components, as shown in Tables 3.1-1, 3.1-2 and 3.1-3. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 18 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Table 3.1-1 Mitigation Measures for Water Supply and Drainage Network Components Estimated Envi. Main Negative Stage Mitigation/Prevention Measures Performers Supervisors Investment Activities Impacts 4 (RMB 10 Y) EIA Units; Feasibility Comparison of alternatives, to avoid potential negative impacts during construction FS Approval study (FS) and operation, design environmentfacilities and engineering facilities at the same FS consulting Departments; 0 site selection time, and include the expenses of environmentmeasures into project investment party Guilin City and layout estimate WSC; (1) Blend the environmentmanagement plan (EMP) into detailed design, and incorporate environmentmeasures into technical specifications of bidding documents, so as to ensure the effective execution of the EMP; (2) The contractor and the construction supervisor must receive trainings concerning environmentprotection and environment management plan before construction; (3) Environmentimpact mitigation measures during the construction period shall be included in the contractor’s bidding document and finally in the construction Design contract as requirements on the project contractor. Guilin City Stage (4) The contractor is required to monitor its environmentactivities according to the WSC, Guilin Guilin City Bidding and monitoring plan. The project office and the construction supervision team shall City WDC WSC and contract 0 supervise and review these records. and their Guilin City management (5) The contractor shall allocate each component with at least one full-time bidding DC environment staff. These environment staff shall receive trainings in accordance agents with the training plan, so as to be competent at their work. (6) In the process of construction, the contractor shall communicate and consult with the masses in the region where the project locates, set up a bulletin board in each construction unit, and inform the general public of specific construction activities and construction time. Meanwhile, the name of the contact person and the contact number thereof shall be provided, so that the general public may complain and offer suggestions regarding construction activities. Construction Write into 1. In the process of construction, the contractor shall reinforce the management, save water, technical the water and reduce the quantity of construction effluent generated; Construction foundation pit Water specifications Constru 2. Construct a effluent sedmentation basin, all wastewater muste be treated there Supervisors, 3 wastewater pollution for execution ction prior to dischrage; Local EPAs and sanitary of the Stage 3. No construction garbage may be dumped into nearby rivers. wastewater contractor Excavation, Air 1. To ease the impact of dust generated from water supply network construction on Write into Construction 10 fill and pollution the air quality of all environmentsensitive sites and surrounding environment, and to technical Supervisors, 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 19 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Envi. Main Negative Stage Mitigation/Prevention Measures Performers Supervisors Investment Activities Impacts 4 (RMB 10 Y) exhaust gas alleviate the impact of dust generated on surrounding environment, there shall be specifications Local EPAs emission of temporary barricades installed circumjacent to the pipe network; for execution construction 2. Under strongly windy (above wind force 4) weather, earthwork construction shall of the organizations be suspended; contractor 3. Sprinkle water on the exposed surface within the construction site at regular intervals, maintain the soil moisture, and suppress surface dust; 4. Throwing and sprinkling of loading and unloading muck, cement and so on are strictly prohibited; enclosed carriages shall be used in vehicles for bulk materials transportation operations, so as to avoid the generation of dust when materials are scattered; 5. In main operation sites where dust may be generated, such as concrete yards, there must be covers, or temporary enclosures or wind shields should be installed peripherally, so as to prevent dusting and diffusion; 6. Waste soil (stones) generated in the foundation excavation process shall be cleared on the generation day; 7. The construction schedule shall be reasonably arranged, try to shorten the construction period, and establish segregation and maintenance facilities according to related construction requirements; 8. Waste soil shall be disposed on the spot or timely cleared and transported if local disposal is unenforceable, shorten the yarding time and reduce the yarding amount, cover transportation vehicles and control the running speed according to relevant requirements. During dry season construction, sprinkle water on earth excavation places. Main operation sites where dust may be generated, such as concrete yards, shall be established in the downwind direction, powdery material banks shall be covered or peripheral temporary enclosures or wind shields should be installed, so as to prevent dusting and diffusion. 1. Civilized construction is advocated, a waste disposal and transportation plan Earthwork, should be formulated, so as to prevent solid waste from scattering along streets due Write into transportation to overburden of transportation vehicles and to avoid secondary pollution; technical and disposal Solid Construction 2. Abandoned building materials should be classified and uniformly stockpiled, sell specifications of waste soil, waste Supervisors, 5 the part of recycled building materials to recyclers, transport the part of building for execution generation of pollution Local EPAs materials that can’t be recycled to designated building rubble stacks, mixed disposal of the living solid with household garbage and discarding at will are prohibited. contractor waste 3. We suggest backfilling the waste cubic meter of earth generated from construction 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 20 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Envi. Main Negative Stage Mitigation/Prevention Measures Performers Supervisors Investment Activities Impacts 4 (RMB 10 Y) on the spot, and transporting surplus cubic meter of earth and stones to other construction sites for filling or to designated places as required by local environmentprotection departments if no project has such needs, dumping into nearby rivers should be completely eradicated, as timely and orderly transportation to relevant departments for innocent treatment and utilization will bring no adverse influence to the surrounding environment. 1. Low-noise equipment should be adopted; no honking during night transportation; strengthen the environmentprotection education on constructors, so as to achieve civilized construction and to reduce the pollution on the surrounding environment brought by noisy operations and living noises. 2. During water supply network construction, the working hours of various construction machineries must be reasonably arranged to mitigate the impact of Write into Construction construction noises on protection objects. For example, during constructions technical machinery Construction Noise adjacent to schools or kindergartens, all kinds of pile drivers and other strong noise specifications and Supervisors, 10 pollution construction equipment are prohibited from working between 8:00 and 22:00 for execution transportation Local EPAs (daytime), and constructions should be suspended during examination periods. of the vehicles 3. Constructions adjacent to hospitals and residential areas between 22:00 and 8:00 contractor the next morning (nighttime) are strictly prohibited. 4. In the construction process, effective noise reduction and vibration mitigation measures should be taken, such as stacking up elastic cushions, cladding, acoustic shields and so on. Honking of motor vehicles when accessing into and out of the construction site is forbidden. 1. Reasonably arrange the construction period, endeavor to avoid large-scale earth rock excavation and backfill in rainstorm seasons, so as to protect the surface earth Land Write into against rainwater erosion and damage. occupation for technical 2. Recover temporary land occupation in a timely manner. Construction construction, Soil specifications 3. Timely clear and transport waste slag. Reasonably select construction process, Supervisors, 8 removing erosion for execution when stacking temporary slag charges, put surface soil which is vulnerable to soil Local EPAs surface soil of the erosion in the middle of the stacking place, put dimension stones generated from vegetations contractor excavation around to serve as temporary blocks, and randomly discard is strictly forbidden. Populati 1. Carry out disinfection and simple sedimentation treatment regarding sanitary Write into Construction Construction on wastewater and faeces generated by constructors, so as to avoid the occurrence and technical Supervisors, 4 operations health transmission of infectious diseases and to mitigate the impact on water quality; specifications Local EPAs 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 21 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Envi. Main Negative Stage Mitigation/Prevention Measures Performers Supervisors Investment Activities Impacts 4 (RMB 10 Y) 2. Frequently dispose swales generated from construction, carry out deinsectization, for execution mosquito eradication and other environmenthealth work, and implement individual of the labor protection; contractor 3. Attach importance to environmentprotection during construction, for example, apply the wet process to earth rock excavation, regularly sprinkle water on construction sites and roads, etc.; 4. Workers in strong noise construction sections should wear earplugs to reduce noise nuisance. 1. The pipeline engineering should be conducted by sections or road sides, and try to complete excavation and backfill as soon as possible, so as to avoid full-face tunneling of the entire road; 2. During constructions adjacent to hospitals, schools, stations and other public Environmente facilities, pay special attention to setting up temporary shortcuts, and avoid ngineers from transporting materials in peak traffic hours to ease the traffic stream pressure; supervision 3. Set up billboards in construction sites, specifying contents and time of units of construction, requesting the general public to tolerate the convenience brought by Guilin City construction, and disclosing contact persons and complaint hotline, etc.; Pipeline Social Write into WSC and 4. Bypass peak traffic hours during pipeline construction, or request the traffic police Construction impact technical Guilin City to dredge and dispatch in peak traffic hours, so as to ensure unimpeded pass by specifications DC, local pedestrians and vehicles, to reduce traffic congestions, and to ease the impact on 8 for execution EPAs, and residents’ travel; of the competent 5. Strengthen construction management and training of constructors on contractor transport environmentprotection; agencies 6. If any cultural relic is found, the construction must be suspended, the scene must be preserved, local cultural relics preservation departments must be timely informed, and the excavation may not be resumed before the completion of cultural relic identification and protection. Physical The construction must be suspended once PCR was found, and the contractor must competent Cultural preserve the site immediately and reported to the cultural relics preservation cultural relics Reseources department timely. No construction can be resumed until the identification and preservation (PCR) preservation works have been completed. departments Operati Operation of 1. In the process of engineering operation management, wash out water supply lines Local Water Guilin City on water supply at regular intervals, so as to clear away sediments or other impurities accumulated in environmentp 20 pollution WSC Stage pipelines pipelines. rotection 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 22 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Envi. Main Negative Stage Mitigation/Prevention Measures Performers Supervisors Investment Activities Impacts 4 (RMB 10 Y) 2. Work out detailed risk prevention and sudden water quality pollution treatment agencies and plans, and allocate corresponding emergency supplies, to sure the water quality social safety of water sources. supervision from surrounding communities 1. Set out a system component list including the following information: number of years, building materials, discharge area served, height, etc.; 2. Clean sewer lines at regular intervals and clear away greese, coarse sand and other debris that may block sewers. Do such cleaning work more frequently in areas with Local EPAs problems. Maintenance Guilin City and social 3. Check conditions of the sewer structure and define areas that require repair or of water Water Water supervision maintenance. 20 drainage pollution Draining from 4. In case of spilling, spillage or overflow, prevent wastewater from entering into the pipelines Company surrounding storm drain-off system by covering or blocking entrances of storm drains, taking communities leakproof and diversion measures regarding open waterways and other storm drain facilities or other means (using sandbags, inflatable dams, etc.). Use vacuum equipment or take other measures to clean up wastewater, and lead it back to the sewerage system. (Please note, in the table above and tables below, WSC=Water Supply Company; DC=Drainage Company; EPAs=environment protection agencies) 3.1-2 Mitigation Measures for WWTP and Pump Station Projects Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) Feasibility 1. Comparison of alternatives, to avoid potential negative impacts during construction and EIA study (FS) operation, design environmentfacilities and engineering facilities at the same time, and FS Organizations; site include the expenses of environmentmeasures into project investment estimate Consulting FS Approval 0 Design selection 2. The selection of wastewater treatment process shall meet with requirements of Party Departments; Stage and layout up-to-standard discharge Guilin City DC Risk 1. Adopt dual power supply to prevent accident discharge due to power failure. FS EIA 0 prevention 2. Establish necessary preliminary system or equipment: Set up by-pass pipelines within Consulting Organizations; 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 23 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) design of WWTPs, so that the wastewater can bypass part of or all structures and enter into the next Party FS Approval WWTPs level of structures or overflow accidentally in case of accident; Departments; 3. Build at least 2 pools for each unit of wastewater treatment process, so that upon Guilin City DC overhauling due to accident, when one pool is out of service, the remaining pools can still function properly under increased capacity, and define the size of each pool based on the impact of such disadvantage on effluent quality. 4. There should be 1-2 sets of standby equipment for major power equipment of WWTPs, such as water pump, sludge pump and so on, so that they can be timely replaced in case of equipment failure. WWTPs shall adopt dual power supply, so as to minimize the occurrence of power outage. 5. To make sure the wastewater can flow smoothly between processing structures, elevations of all processing structures must be determined, especially for two or more structures with parallel operations, take into account of the circumstance that when certain structure breaks down, the remaining structures must bear all flows. Therefore, there must be sufficient room left when determining elevations, so as to prevent water burst and keep normal operations of structures from being affected in case of insufficient waterheads. 1. Integrate the environment management plan (EMP) into detailed design, and incorporate environmentmeasures into technical specifications of bidding documents, so as to ensure the effective execution of the EMP; 2. The contractors and construction supervisors must receive trainings concerning environmentprotection and environment management plan before construction; 3. Environmentimpact mitigation measures during the construction period shall be included in bidding documents of contractors and finally in construction contracts as Bidding and Guilin City requirements on project contractors. contract DC and its 4. The contractor is required to monitor its environmentactivities according to the Guilin City DC 0 managemen bidding monitoring plan. The project office and the construction supervision team shall supervise t agent and review these records. 5. The contractor shall allocate each component with at least one full-time environment staff. These environment staff shall receive trainings in accordance with the training plan, so as to be competent at their work. 6. In the process of construction, the contractor shall communicate and consult with the masses in the region where the project locates, set up a bulletin board in each construction unit, and inform the general public of specific construction activities and construction 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 24 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) time. Meanwhile, the name of the contact person and the contact number thereof shall be provided, so that the general public may complain and offer suggestions regarding construction activities. Constructio 1. In the process of construction, the contractor shall reinforce the management, save the Write into Environment n water, water and reduce the quantity of construction wastewater generated; technical engineers from Constru foundation 2. During construction, the domestic sewage from the construction workers hasll be specificatio Water Guilin City DC ction pit waste disposed by using the disposal facilites near by so as to make sure the sewage is ns for 2 pollution and supervision Stage water and discharged properly; execution units as well as sanitary 3. No construction waste may be poured into waste discharge rivers of wastewater plants of the local EPAs wastewater or nearby rivers. contractor 1. To prevent the impact of dust generated from WWTP construction and water drainage pipeline construction on the air quality of all environmentsensitive sites and surrounding environment, and to alleviate the impact of dust generated on surrounding environment, there shall be temporary barricades and curtains installed circumjacent to construction sites; 2. Under strongly windy (above wind force 4) weather, earthwork construction shall be suspended; 3. Sprinkle water on the exposed surface within the construction site at regular intervals, Excavation, maintain the soil moisture, and suppress surface dust; Write into fill and Environment 4. Throwing and sprinkling of loading and unloading muck, cement and so on are strictly technical exhaust gas engineers from Constru prohibited; enclosed carriages shall be used in vehicles for bulk materials transportation specificatio emission of Air Guilin City DC ction operations, so as to avoid the generation of dust when materials are scattered; ns for 15 constructio pollution and supervision Stage 5. In main operation sites where dust may be generated, such as concrete yards, there must execution n units as well as be covers, or temporary enclosures or wind shields should be installed peripherally, so as of the organizatio local EPAs to prevent dusting and diffusion; contractor ns 6. Waste soil (stones) generated in the foundation excavation process shall be cleared on the generation day. 7. The construction schedule shall be reasonably arranged, try to shorten the construction period, and establish segregation and maintenance facilities according to related construction requirements; 8. Waste soil shall be disposed on the spot or timely cleared and transported if local disposal is unenforceable, shorten the yarding time and reduce the yarding amount, cover transportation vehicles and control the running speed according to relevant requirements. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 25 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) During dry season construction, sprinkle water on earth excavation places. Main operation sites where dust may be generated, such as concrete yards, shall be established in the downwind direction, powdery material banks shall be covered or peripheral temporary enclosures or wind shields should be installed, so as to prevent dusting and diffusion. 1. Civilized construction is advocated, a waste disposal and transportation plan should be formulated, so as to prevent solid waste from scattering along streets due to overburden of transportation vehicles and to avoid secondary pollution; Earthwork, 2. Abandoned building materials should be classified and uniformly stockpiled, sell the transportati part of recycled building materials to recyclers, transport the part of building materials that Environmenteng on and can’t be recycled to designated building rubble stacks, mixed disposal with household ineers from Solid Write into disposal of garbage and discarding at will are prohibited. Guilin City DC waste technical waste soil, 3. We suggest backfilling the waste cubic meter of earth generated from construction on and supervision pollution specificatio generation the spot, and transporting surplus cubic meter of earth and stones to other construction units as well as ns for 10 of living sites for filling or to designated places as required by local environmentprotection local EPAs execution solid waste departments if no project has such needs, dumping into nearby waste discharge rivers and of the other domestic rivers should be completely eradicated, as timely and orderly transportation contractor to relevant departments for innocent treatment and utilization will bring no adverse influence to the surrounding environment. Physical The construction must be suspended once PCR was found, and the contractor must competent Cultural preserve the site immediately and reported to the cultural relics preservation department cultural relics Reseources timely. No construction can be resumed until the identification and preservation works preservation (PCR) have been completed. departments 1. Low-noise equipment should be adopted; no honking during night transportation; strengthen the environmentprotection education on constructors, so as to achieve civilized construction and to reduce the pollution on the surrounding environment brought by noisy Write into Constructio Environment operations and living noises. technical n engineers from Constru 2. The working hours of various construction machineries must be reasonably arranged to specificatio machinery Noise Guilin City DC ction mitigate the impact of construction noises on protection objects. For example, during ns for 10 and pollution and supervision Stage constructions adjacent to schools or kindergartens, all kinds of pile drivers and other execution transportati units as well as strong noise construction equipment are prohibited from working between 8:00 and 22:00 of the on vehicles local EPAs (daytime), and constructions should be suspended during examination periods. contractor 3. Constructions adjacent to hospitals and residential areas between 22:00 and 8:00 the next morning (nighttime) are strictly prohibited. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 26 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) 4. In the construction process, effective noise reduction and vibration mitigation measures should be taken, such as stacking up elastic cushions, cladding, acoustic shields and so on. Honking of motor vehicles when accessing into and out of the construction site is forbidden. 1. Reasonably arrange the construction period, endeavor to avoid large-scale earth rock Environment Land Write into excavation and backfill in rainstorm seasons, so as to protect the surface earth against engineers from occupation technical rainwater erosion and damage. Guilin City DC for specificatio Soil 2. Recover temporary land occupation in a timely manner. and supervision constructio ns for 10 erosion 3. Timely clear and transport waste slag. Reasonably select construction process, when units as well as n, removing execution stacking temporary slag charges, put surface soil which is vulnerable to soil erosion in the local Water surface soil of the middle of the stacking place, put dimension stones generated from excavation around to Resources vegetations contractor serve as temporary blocks, and randomly discard is strictly forbidden. Bureau 1. Complete operational procedures should be formulated and strictly implemented, carry Wastewater out inflow water and effluent quality monitoring, so as to guarantee the stable operation of treatment production, and endeavor to avoid abnormal situations. Set up emergency pools, deal with Local EPAs and equipment, abnormities in a timely manner, avoid accident discharge, and guarantee up-to-standard social Operati sanitary effluent quality. Prevent the effluent quality after treatment from failing to meet design Guilin City Water supervision on wastewater requirements and from realizing decrement of all pollutants due to improper operations or Draining 10 pollution from Stage of water control. Company surrounding drainage 2. All sanitary wastewater generated by WWTPs and waste water generated by structures, communities plant equipment and so on shall be disposed in the wastewater treatment system rather than employees directly discharged; strengthen the management, safeguard wastewater pipelines, regularly clear up sewers and keep pipelines smooth. 1. Timely transport the sludge after dewatering and reduce the stock of sludge; Local EPAs, 2. Strengthen operation management and control the fermentation of sludge in social Internal concentration basins. supervision operations 3 Reinforce the afforestation, cultivate protection forests along plant boundaries, the from Operati Air and of WWTPs afforestation shall be comprised of arbor, shrub and grass, primarily tall and leafy arbor Guilin City surrounding on odor 50 Operations species with strong adsorption capacity, so as to reinforce the odor absorption function; DC communities, Stage pollution of pump 4. We suggest the construction unit to report to the local planning department in writing, Environment stations and no residence or any other environmentally sensitive target may be built within the Health protection distance. Administrative Note: The protection distance is takend from the EA review and approval comments of the Office of Guilin 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 27 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) WWTPs of the year. Due to the differences of the construction period, and construction Municipal scope, the protection distance varies (150-200m). And no protection distance is requested Government in Beichong WWTP. After the renovation of WWTP, and installation of odor removal equipment to control the odor, it is suggested to set the protection distance of Shangyao, Qilidian, Beichong, Yanshan and Lingui WWTPs as 50m, 1. Solid waste in WWTPs, especially sludge, may not be discarded at will, but must be properly collected, stored and transported to the sludge disposal center for disposal. 2. It is forbidden to discharge sludge of urban WWTPs to any ground water body and Local EPAs, waterfront, valley, depression, karst cave, farmland and any other general solid waste social stacking site. supervision Treatment 3. Foundation seepage-proofing, leaching and scouring prevention measures must be taken from of to temporary sludge storing areas within WWTPs, prevent malodorous gas from gathering surrounding sediment, Solid in stacking sheds and from emitting outwards, and take other measures to prevent soil Guilin City communities, precipitated waste erosion and secondary pollution. 20 DC Environment sand and pollution 4. Canopies must be covered on the top of sludge stacking sheds within WWTPs, the Health sludge in ground of stacking sheds must be thoroughly hardened, set up cofferdams, drainage Administrative plants ditches and collection wells around stacking sheds, and transport the water discharged in Office of Guilin the sludge stockpiling process to the wastewater treatment system for disposal. Municipal 5. Closed tank trucks should be adopted for outward transportation of sludge. Government 6. Advanced sludge thickening and dehydration equipment should be selected for sludge reduction measures, reduce the moisture content of sludge to below 60%, so as to reduce the generation of biochemical sludge and facilitate the reclamation of sludge. 1. As to WWTPs, operation management procedures for WWTP equipment, work post responsibility, regulations concerning rewards and disciplinary sanctions as well as other rules and regulations shall be formulated, standardized and institutionalized management Local EPAs shall be implemented, operating personnel must take appointment with certificates, Social operation management regulations must be strictly abided by, and endeavor to control the Guilin City Environm supervision Hard to WWTPs probability of accident waste water discharge caused by misoperation. DC ent risks from estimate 2. Formulate a timely accident handling plans: Work out an accident handling emergency surrounding plan, set up accident handling organizations, allocate responsibilities of administrative communities staff from all parts, all positions and all operations, and on occurrence of accident, timely take handling measures and notify environmentprotection, municipal administration and water management departments to clear the trouble in the shortest possible time. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 28 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) 1. Advanced low-noise equipment should be adopted, and use submerged pumps as slush pumps and sludge pumps; try to place air blowers and other equipment with high noise intensity indoor, isolate noises by buildings, and increase noise reduction measures; reinforce the afforestation around the plant area, form green belts, and gradually form sound insulation belts. Operations 2. Reinforce management measures: There must be specialized environmentprotection Local EPAs of organizations set in WWTPs, being responsible for environmentprotection and Social wastewater afforestation work during the project operation period and for environmentprotection Guilin City Noise supervision treatment education and propaganda among employees, and for environmentsupervision over the DC 30 pollution from equipment project in cooperation with environmentprotection departments; surrounding within 3. Standardization construction must be carried out to the discharge outlet of the WWTP, communities plants there may only be one discharge outlet established, and clear signs should be set up; an online monitoring system should be established for the WWTP discharge outlet, to meet with the need of environmentprotection departments to supervise and manage the project as a “pollution discharge enterprise”; reinforce the management and make sure there is no Operati inflow industrial wastewater within the waste discharge scope; on 4. Strengthen the management and maintenance of pipelines. Stage 1. When purchasing mechanical equipment, select mechanical equipment with excellent processing property and low noise value; endeavor to take some vibration isolation and prevention measures and reduce the noise in the installation and using process; 2. As a water pump is long running equipment, the base of the pump body should be constructed firm and grout uniformly, so that the water pump can absorb all kinds of vibrations, and there can be a firm tough supporting point on the base; Local EPAs 3. Strengthen the maintenance of water pumps, regularly check the concentricity of the Guilin City Social Operations Noise motor and the pump axis, so as to excellently lubricate the bearings and reduce the WSC and supervision of pump 8 pollution abrasion of parts in pumps; Guilin City from stations 4. Reasonably place acoustic materials and vibration dampers around interior walls, on the DC surrounding roofs, on the grounds and beside machine sets in pumping rooms, such as asbestos sheets, communities absorbers and so on, so as to effectively control and eliminate the transmission and reflection of noises; 5. Plant afforestation isolation belts peripheral to pumping rooms, with intercropping of arbors and shrubs, it is better to plant more highly anti-pollution tree species, so as to improve the landscape and to relieve the impact of exhaust gas, noise and odor on the 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 29 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Estimated Main Negative Envi. Stage Mitigation/Prevention Measures Performers Supervisors Activities Impacts Investment 4 (RMB 10 Y) environment. 1. Install guardrails around all processing tanks and pits. When working within guardrails, the staff are required to use lifelines and personal floatation devices, and make sure relevant lifebelts and survival kits are available in case of accident; 2. Use anti-dropping protective equipment for high-altitude operations; 3. Preserve the working area and reduce slipping and stumble risks; The 4. Train operating personnel who get in touch with chlorine and ammonia, offer Environment appropriate personal protective equipment (such as independent oxygen supply equipment), provide trainings on proper equipment use and maintenance, and prepare Health Health evacuation plans; Administrative WWTPs 5. Ventilate the enclosed processing area and equipment before maintenance; hazards Office, the and 6. Dining, smoking and drinking water beyond designated places are prohibited; and Guilin City Health Bureau Hard to wastewater 7. In operations of different treatment plants, a shift system should be adopted to the staff, potential lifting so as to reduce the inhalation of chemicals and aerosol used for air purge and other DC and the Safety estimate risks of pumping potentially hazardous materials. employee Supervision stations 8. Incorporate safe use and personal hygiene specifications in safety training plans for s Bureau of staff, so as to reduce the exposure to pathogens and germ carriers; 9. Use vacuum trucks or tractors to clear the sludge, rather than the manual mode; Guilin 10. Provide and require the use of appropriate personal protective clothing and equipment, Municipal so as to prevent the contact with waste water (such as rubber gloves, aprons, boots and so Government on). Particularly, offer timely medical treatment, bind up any skin trauma in a timely manner, such as cut and scrape, to prevent infection; use protective clothing and glasses to prevent the exposure to splash; 11. Provide the staff with shower and dressing areas, so that the staff may take a shower and change their clothes before going off duty. Table 3.1-3 Mitigation Measures for Sludge Disposal Components Estimated Envi. Stage Activities Impact Mitigation Measures Performer Supervisor Investment 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 30 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded 4 (RMB 10 Yuan) 1. Comparison of alternatives, to avoid potential negative impacts during construction EIA ; Feasibility study and operation, design environmentfacilities and engineering facilities at the same time, FS Approval (FS) site and include the expenses of environmentmeasures into project investment estimate; FS Departments 35 selection and 2. Analyze the feasibility of sludge composting, sludge drying and sludge Consultants and Guilin layout deodorization of WWTPs, and analyze the rationality and feasibility of setting up City DC centralized sludge disposal centers. (1) Blend the environmentmanagement plan (EMP) into detailed design, and incorporate environmentmeasures into technical specifications of bidding documents, so as to ensure the effective execution of the EMP; (2) The contractors and construction supervisors must receive trainings concerning environmentprotection and environment management plan before construction; (3) The above-mentioned environmentimpact mitigation measures during the Design construction period shall be included in bidding documents of contractors and finally Stage in construction contracts as requirements on project contractors. (4) The contractor is required to monitor its environmentactivities according to the Bidding and Guilin City monitoring plan. The project office and the construction supervision team shall Guilin City contract DC and its 0 supervise and review these records. DC management bidding agent (5) The contractor shall allocate each component with at least one full-time environment staff. These environment staff shall receive trainings in accordance with the training plan, so as to be competent at their work. (6) In the process of construction, the contractor shall communicate and consult with the masses in the region where the project locates, set up a bulletin board in each construction unit, and inform the general public of specific construction activities and construction time. Meanwhile, the name of the contact person and the contact number thereof shall be provided, so that the general public may complain and offer suggestions regarding construction activities. 1. Strengthen the project management, accomplish daily mechanical maintenance, and Environm put an end to evaporating, emitting, dripping and leaking; besides, cover and keep entengineers various machineries from rain in rainy days. from Guilin Write into 2. In order to prevent the impact of construction effluent on surrounding surface water City DC and Constr technical Water environment, there shall be a construction effluent sedimentation basin built within the supervision uction Earthwork specifications 5 pollution construction site, try to recycle the effluent generated in the construction process after units as well Stage for execution sedimentation treatment, and make sure no construction effluent is discharged. as local of the 3. No concentrated construction camp may be established, and throughout the entire environmentpr contractor urban area, make sure there is no increase of sanitary wastewater, and discharge the otection sanitary wastewater generated by constructors through the sewerage system of agencies, and 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 31 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded wastewater treatment stations under existing cement plants. competent 1. Reinforce the control over smoke in construction sites, and strictly prohibit cultural relics discharge of poisonous smoke and gas in construction sites; intensify the maintenance preservation and timely repair transport vehicles, excavators and other mechanical equipment used, departments and use qualified fuel to reduce glue gas generated by construction machineries. (?) Excavation, fill 2. Spray water on working surface which may generate reentrainment, and regularly and exhaust gas Air arrange employees to spray water on construction sites to reduce dust emission. emission of 3 pollution 3. Reasonably arrange the construction time, endeavor to shorten the construction construction period, and mitigate the influence scope and influence time of construction exhaust organizations gas. 4. Timely cover, clear and transport spoil, construction waste and building materials; if any temporary stacking site is required to be established, cover materials that tend to Constr raise dust. uction The construction must be suspended once PCR was found, and the contractor must Stage Physical Cultural preserve the site immediately and reported to the cultural relics preservation Reseources department timely. No construction can be resumed until the identification and (PCR) preservation works have been completed. 1. Select low-noise equipment and process to the greatest extent and strengthen Construction equipment maintenance and service. machineries, 2. The working hours of various construction machineries must be reasonably transport Noise arranged to mitigate the impact of construction noises on protection objects. vehicles, 2 pollution 3. In the construction process, effective noise reduction and vibration mitigation vibration of measures should be taken, such as stacking up elastic cushions, cladding, acoustic construction shields and so on. Honking of motor vehicles when accessing into and out of the machineries construction site is forbidden. 1. Transport with enclosed transport vehicles and restrain the malodorous gas within transport vehicles. 2. Keep the sludge stock bin in a negative pressure condition, to prevent malodorous Sludge storage gas from overflowing. Local EPAs and 3. Use specially designed windrow rotating equipment to reduce odor emission; Social Operati transportation, 4. Use enclosed loading bunkers with brakes in work sections with heavy odor; use Guilin City supervision on Odor 50 transfer of stock automatic fast-moving doors in work sections with relatively light odor (limit the DC from Stage bin, composting switch times at a minimum level). surrounding and so on 5. Minimize the volume of water added into compost (such as through covering communities composting materials), to avoid conditions for anaerobes generation. 6. Workshops should be equipped with biological deodorization devices and odor collection systems. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 32 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded Sludge transportation, 1. Make sure there are wastewater collection devices in vehicle design, and always waste water from Waste reserve the wastewater in wastewater tanks before arriving at emission locations; cleaning of water 2. Transport the small quantity of staff sanitary wastewater and industrial wastewater 2 sludge pollution generated from operations to wastewater treatment stations of the landfills for transportation treatment. belts, sludge filtrate, etc. 1. Select low-noise equipment and process and strengthen equipment maintenance and service; endeavor to take some vibration isolation and prevention measures to reduce noises. 2. Reasonably place acoustic materials and vibration dampers around interior walls, on Sludge Noise the roofs, on the grounds and beside machine sets in pumping rooms, such as asbestos dewatering 2 pollution sheets, absorbers and so on, so as to effectively control and eliminate the transmission pumping rooms and reflection of noises. 3. Plant afforestation isolation belts peripheral to pumping rooms, with intercropping of arbors and shrubs, it is better to plant more highly anti-pollution tree species, so as to improve the landscape and to relieve the impact on the environment. 1. Avoid the generation of conditions causing spontaneous combustion (such as the humidity being 24%~45%, or the temperature being above 93℃. For example, the height of the windrow can be restrained within three meters, and turn the windrow over when the temperature goes above 60℃); Composting area Fire risk 2. Collect and utilize or process the methane (such as energy recovery or burning); Hard to estimate 3. Install fire alarm systems, including installing temperature probes on the waste being processed; 4. Design the area to facilitate the use of fire fighting equipment, including clearing the aisles between windrows, and make sure there are sufficient water sources nearby. 1. Provide the staff with appropriate protective clothing, gloves and breathing masks, The offer transportation employees with antiskid shoes, and provide all employees with Environment Health hurt. Provide noise prevention devices to employees working near highly noisy Health hazards equipment. Also provide safety helmets to employees working near heavy mobile Guilin City Administrative and All production devices, buckets and cranes and employees working near loading and uploading Water Office, the potential Hard to estimate sections places; Draining Health Bureau risks of 2. Design and formulate designing and material specifications to reduce exposure to Company and the Safety employe hazards (such as ventilation, air conditioning, enclosed conveyor belt, low load and Supervision es classified heights, abrasive floor, stairs and safety fence along galleries, spilling Bureau of protection and leakproof, noise control, dust prevention measures, gas alarm system, Guilin 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 33 - Environment Management Plan of Guilin Integrated 3 EnvironmentImpact Mitigation Measures Environment Management Project of the World Bank Funded fire alarm and control system, evacuation facilities and so on). Municipal 7. Maintain adequate temperature and retention time for composting, so as to kill the Government 3. Provide the staff with appropriate personal facilities, including cleaning and dressing areas before and after work; 4. Ventilate enclosed processing areas; 5. Dining, smoking and drinking water beyond designated places are prohibited; 6. Isolate the staff from bacteria transmission channels through turning over the machineries (such as using tractors or front end loaders with cockpits equipped with enclosed air conditioning or a heating system). When turning over the machineries in a manually way, it is better to use the ventilation system; pathogens; 8. Under dry and dusty conditions, provide and require the use of dust masks or respirators (such as when turning the compost over). Meanwhile, respirators with activated carbon can also adsorb the odor breathed; 9. Offer immediate medical care in case of cut and scrape. Bind up any wound. Guilin City Sale of Land Water by-product and applicati To enter agreement with end user NOT to use by-product for plantation of any crop. Hard to estimate Draining reuse on Company 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 34 - Environment Management Plan of Guilin Integrated Environment Management Project of the World Bank Funded 4 Environment Monitoring Plan 4.1 The Purpose for Environment Monitoring Environment monitoring covers two stages: construction period and operation period. The purpose is to provide scientific basis for understanding the pollution dynamics of the proposed project in a complete and timely manner; understanding the variation degree of the environment quality and the impact scope of the proposed project on the areas where the project is located, and the environment quality dynamics in the operation stage; and providing timely feedback information to the authorities in charge, and for the environment management. 4.2 Environment Monitoring Agencies The environment monitoring of construction and operation periods is undertaken by the environmentmonitoring stations requested by the project contractors or operators from the prefecture/municipality where they are located. The undertaking agencies should hold the national qualification certificate for environmentmonitoring with complete equipment, rich technical strength to fulfill the environmentmonitoring tasks. Based on the projection result of the monitoring, the relatively more evident and sensitive points would be defined as the monitoring points to track and monitor the pollution status during the project construction and operation periods. The monitoring contents selected should be those of noise, air environment and surface water that have severe impacts to the environment. The monitoring indicators should be defined as per the engineering pollution features. The methodology adopted for different projects should be the correspondent monitoring and analysis methods prescribed in the “Technical Specification for EnvironmentMonitoring Technology” issued by the State Environment Protection Department. The evaluation criteria should be the national standard confirmed in the EIA of each component of the Project 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 35 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded . 4.3 EnvironmentMonitoring Plan and Budget For the details of the monitoring plan and budget for each component, please refer to Table 4.3-1~4.3-8. Table 4.3-1 Guilin City Guilin City Water Supply Network Component Monitoring Environment Monitoring Monitoring Unit Price Annual Cost Cost/Phase Total Monitorin Monitoring Points (No) Period Element Items Frequency (Y/Phase) (Y/Year) (Yuan) (Y) g Institutes Set 13 monitoring sites: Chengjian School, Tuomu Town Health Center, Guilin City No.18 High School, Technician Training School, Mingxing Elementary School, The owner 4 phases/year, Hongpingguo Kindergarten, Beiteer implement Ambient air TSP 2 days/phase, 2300 9200 18400 Kindergarten, No.301 Kindergarten, s the 1 time/day No.301 Hospital, Yangguangmeidi monitoring Constructio Kindergarten, Lingchuan Town 3680 by itself or n Period Health Center Damian Branch, 0 employ (2 years) Tangjia Village, Yaoherongyu qualified Community environme 4 phases/year, ntmonitori 1 day/phase, 2 ng unit times/day, Noise Same as above LeqdB (A) 2300 9200 18400 once in daytime and once in 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 36 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded nighttime Subtotal (Yuan) 18400 36800 4 phases/year, 1 day/phase, 2 Employ times/day, Operation Set 2 monitoring sites: Qintanyan qualified Noise LeqdB (A) once in 440 1760 5280 Period Village, Yaoherongyu Community 5280 environme daytime and (3 years) ntmonitori once in ng unit. nighttime Subtotal (Yuan) 1760 5280 4208 Total (yuan) 0 Table 4.3-2 The Upgrading of Shangyao WWTP Setting of Monitoring Environment Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Site Monitoring Institute Period Element Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) (Number) Set 6 monitoring sites: boundaries of 4 phases/year, 2 The owner Ambient air the construction site TSP days/phase, 1 1220 4880 9760 implements the Construction (4), Yaotou Village, time/day monitoring by itself Period Jietou Village 19520 or employ qualified (2 years) Set 6 monitoring 4 phases/year, 1 environment sites: boundaries of day/phase, 2 Noise LeqdB (A) 1220 4880 9760 monitoring unit. the WWTP (4), times/day, once Yaotou Village, in daytime and 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 37 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded Jietou Village once in nighttime Subtotal (Yuan) 9760 19520 Set 2 monitoring sites: Upper and H2S, NH3, 4 phases/year, 1 Ambient air down wind to the , odor day/phase, 4 5280 21120 63360 boundaries of the concentration times/day WWTP pH, DO, Except for COD, BOD5, COD under NH3-N, TP, online TN, SS, monitoring, the Set 1 monitoring Water animal & remaining items site: outlet of the 1540 6160 18480 quality vegetable oil, are manually WWTP Operation petroleum, monitored, 4 Employ qualified Period chromaticity, phases/year, 2 93060 environment (3 years) fecal days/phase, 1 monitoring unit. coliform time/day Set 6 monitoring 4 phases/year, 1 sites: Yangjialing day/phase, 2 Village, Yaotou times/day, once Noise LeqdB (A) 720 2880 8640 Village, four in daytime and boundaries of the once in WWTP nighttime Set 1 monitoring Heavy metal 2 phases/year, 1 site: discharged Sludge (As, Hg, Pb, day/phase, 1 430 860 2580 sludge from the Cr, Cd, Cu) time/day sludge tank 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 38 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded Subtotal (Yuan) 31020 93060 Total (yuan) 112580 Table 4.3-3 The Upgrading of Qilidian WWTP Monitoring Environment Setting of Monitoring Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Institute Period Element Site (Number) Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) Set 2 monitoring sites: 4 phases/year, Upper and down wind Ambient air TSP 2 days/phase, 1 1220 4880 9760 to the , boundaries of time/day the WWTP The owner implements Construction 4 phases/year, the monitoring by Period 1 day/phase, 2 13600 itself or employ Set 4 monitoring sites: (2 years) times/day, once qualified environment Noise boundaries of the LeqdB (A) 480 1920 3840 in daytime and monitoring unit. construction site once in nighttime Subtotal (Yuan) 6800 13600 Set 6 monitoring sites: four boundaries of the wastewater purification H2S, NH3, 4 phases/year, plant, Ambient air odor 1 day/phase, 4 5280 21120 63360 Operation Changshengshidai Employ qualified concentration times/day Period Plaza, Guangxi 90180 environment (3 years) EnvironmentGeology monitoring unit. Research Institute pH, DO, Except for Set 1 monitoring site: Water quality COD, BOD5, COD under 1540 6160 18480 outlet of the WWTP NH3-N, TP, online 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 39 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded TN, SS, monitoring, the animal & remaining vegetable oil, items are petroleum, manually chromaticity, monitored, 4 fecal coliform phases/year, 2 days/phase, 1 time/day 4 phases/year, Set 4 monitoring sites: 1 day/phase, 2 four boundaries of the times/day, once Noise LeqdB (A) 480 1920 5760 wastewater purification in daytime and plant once in nighttime Set 1 monitoring site: Heavy metal 2 phases/year, sludge discharged sludge from (As, Hg, Pb, 1 day/phase, 1 430 860 2580 the sludge tank Cr, Cd, Cu) time/day Subtotal (Yuan) 30060 90180 Total (yuan) 103780 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 40 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded Table 4.3-4 The Upgrading of Beichong WWTP Monitoring Environment Setting of Monitoring Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Period Element Site No. Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) Institute Set 7 monitoring sites: boundaries of the construction site (4), 4 phases/year, 2 Ambient air Guangxi Culinary TSP days/phase, 1 1340 5360 10720 The owner School, Panshan time/day implements the Mountain, Guilin Construction monitoring by Garden Period 16480 itself or employ Set 6 monitoring sites: 4 phases/year, 1 (2 years) qualified boundaries of the day/phase, 2 environment construction site (4), times/day, once Noise LeqdB (A) 720 2880 5760 monitoring unit. Guangxi Culinary in daytime and School, Panshan once in Mountain nighttime Subtotal (Yuan) 8240 16480 Set 2 monitoring sites: H2S, NH3, 4 phases/year, 1 Upper and down wind Ambient air odor day/phase, 4 5280 21120 63360 to the , boundaries of concentration times/day the WWTP Employ Operation pH, DO, Except for COD qualified Period COD, BOD5, under online 93060 environment (3 years) NH3-N, TP, monitoring, the Water Set 1 monitoring site: monitoring unit. TN, SS, remaining items 1540 6160 18480 quality outlet of the WWTP animal and are manually vegetable oil, monitored, 4 petroleum, phases/year, 2 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 41 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded chromaticity, days/phase, 1 fecal time/day coliform Set 6 monitoring sites: 4 phases/year, 1 four boundaries of the day/phase, 2 wastewater times/day, once Noise purification plant, LeqdB (A) 720 2880 8640 in daytime and Guangxi Culinary once in School, Panshan nighttime Mountain Set 1 monitoring site: Heavy metal 2 phases/year, 1 Sludge discharged sludge (As, Hg, Pb, day/phase, 1 430 860 2580 from the sludge tank Cr, Cd, Cu) time/day Subtotal (Yuan) 31020 93060 Total (Yuan) 109540 Table 4.3-5 Yanshan WWTP Setting of Monitoring Environment Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Monitoring Site Period Element Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) Institute (No) Set 4 monitoring 4 phases/year, 2 The owner Ambient air sites: boundary of TSP days/phase, 1 980 3920 7840 implements the Construction construction sites time/day monitoring by Period 4 phases/year, 1 11680 itself or Set 4 monitoring (2 years) day/phase, 2 employ Noise sites: boundary of LeqdB (A) 480 1920 3840 times/day, once in qualified construction sites daytime and once environment 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 42 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded in nighttime monitoring Subtotal (Yuan) 5840 11680 unit. Set 2 monitoring sites: Upper and H2S, NH3, 4 phases/year, 1 Ambient air down wind to the , odor day/phase, 4 5280 21120 63360 boundaries of the concentration times/day WWTP pH, DO, Except for COD COD, BOD5, under online NH3-N, TP, monitoring, the Set 1 monitoring TN, SS remaining items are Water site: outlet of the animal & manually 1540 6160 18480 quality Employ WWTP vegetable oil, monitored, 4 Operation qualified petroleum, phases/year, 2 Period 90180 environment chromaticity, days/phase, 1 (3 years) monitoring fecal coliform time/day unit. 4 phases/year, 1 Set 4 monitoring day/phase, 2 sites: four Noise LeqdB (A) times/day, once in 480 1920 5760 boundaries of the daytime and once WWTP in nighttime Set 1 monitoring Heavy metal 2 phases/year, 1 site: discharged Sludge (As, Hg, Pb, day/phase, 1 430 860 2580 sludge from the Cr, Cd, Cu) time/day sludge tank Subtotal (Yuan) 30060 90180 Total (yuan) 101860 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 43 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded Table 4.3-6 Lingui WWTP Setting of Monitoring Environment Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Monitoring Period Element Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) Institute Site (No) Set 4 monitoring sites: 4 phases/year, 2 Ambient air boundaries of TSP days/phase, 1 980 2940 7840 The owner the time/day implements the construction Construction monitoring by site Period 11680 itself or employ Set 4 (2 years) 4 phases/year, 1 qualified monitoring day/phase, 2 environment sites: Noise LeqdB (A) times/day, once in 480 1920 3840 monitoring unit. boundary of daytime and once construction in nighttime sites Subtotal (Yuan) 4860 11680 Set 2 monitoring sites: Upper H2S, NH3, 4 phases/year, 1 Ambient air and down odor day/phase, 4 5280 21120 63360 Operation Employ qualified wind to the , concentration times/day Period 90180 environment boundaries of (3 years) monitoring unit. the WWTP Set 1 pH, DO, COD, Except for COD Water quality monitoring BOD5, Nh3-N, under online 1540 6160 18480 site: outlet of TN, TP, SS, monitoring, the 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 44 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded the WWTP animal & remaining items vegetable oil, are manually petroleum, monitored, 4 chromaticity, phases/year, 2 fecal coliform days/phase, 1 time/day Set 4 4 phases/year, 1 monitoring day/phase, 2 Noise sites: four LeqdB (A) times/day, once in 480 1920 5760 boundaries of daytime and once the WWTP in nighttime Set 1 monitoring site: Heavy metal 2 phases/year, 1 Sludge discharged (As, Hg, Pb, day/phase, 1 430 860 2580 sludge from Cr, Cd, Cu) time/day the sludge tank Subtotal (Yuan) 30060 90180 Total (Yuan) 101860 Table 4.3-7 Pumping Station Reconstruction Monitoring Environment Setting of Monitoring Site Monitoring Monitoring Unit Price Annual Cost Time-phased Total Monitoring Period Element (Number) Items Frequency (Yuan/Phase) (Yuan/Year) Cost (Yuan) (Yuan) Institutes Set 20 noise monitoring sites at 4 phases/year, The owner Construction boundaries of Qingfeng PS, 1 day/phase, 2 implements Period Noise LeqdB (A) 5300 21200 42400 42400 Panshanxiang PS, Guihu PS, times/day, the (2 years) Longyinqiao Wastewater PS, once in monitoring 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 45 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded Jianganlu PS, Dongzhan PS, daytime and by itself or Nanzhouqiao PS, once in employ YingcaiyuanWastewater PS, nighttime qualified TieshanyuanWastewater PS, environment Yifenglu PS, Yiwulu PS, Anxin monitoring PS, Nanmenqiao Wastewater unit. PS, Mantoushan PS, Pingshan PS, Guniushan Wastewater PS, Yangjiang PS, Wanfulu Wastewater PS, Shanghailu Rainwater PS, Minzulu Rainwater PS Subtotal (yuan) 21200 42400 Set 3 waste gas emission H2S, NH3, 4 phases/year, monitoring sites at boundaries of Ambient air odor 1 day/phase, 4 7920 31680 95040 Qingfeng PS, Mantoushan PS, concentration times/day Pingshan PS Set 20 noise monitoring sites at boundaries of Qingfeng PS, Employ Operation Panshanxiang PS, Guihu PS, 4 phases/year, qualified Period Longyinqiao Wastewater PS, 1 day/phase, 2 158640 environment (3 years) Jianganlu PS, Dongzhan PS, times/day, monitoring Noise Nanzhouqiao PS, LeqdB (A) once in 5300 21200 42400 unit. YingcaiyuanWastewater PS, daytime and TieshanyuanWastewater PS, once in Yifenglu PS, Yiwulu PS, Anxin nighttime PS, Nanmenqiao Wastewater PS, Mantoushan PS, Pingshan 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 46 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded PS, Guniushan Wastewater PS, Yangjiang PS, Wanfulu Wastewater PS, Shanghailu Rainwater PS, Minzulu Rainwater PS Subtotal (yuan) 52880 158640 Total (yuan) 201040 Table 4.3-8 Sludge Disposal Setting of Monitoring Environment Monitoring Unit Price Annual Cost Time-phased Monitoring Monitoring Site Monitoring Frequency Total (Yuan) Period Element Items (Yuan/Phase) (Yuan/Year) Cost (Yuan) Institutes (No) Set 4 monitoring sites: 4 phases/year, 2 The owner Ambient air TSP 980 2940 7840 boundaries of days/phase, 1 time/day implements the the construction monitoring by Construction site itself or Period Set 4 11680 employ 4 phases/year, 1 (2 years) monitoring qualified day/phase, 2 sites: environment Noise LeqdB (A) times/day, once in 480 1920 3840 boundaries of monitoring daytime and once in the construction unit. nighttime site Subtotal (Yuan) 6800 11680 Operation Set 4 monitoring H2S, NH3, 4 phases/year, 1 Employ Period Ambient air sites: four odor day/phase, 4 16060 64240 192720 198480 qualified (3 years) boundaries of concentration times/day environment 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 47 - Environment Management Plan of Guilin Integrated 4 Environment Monitoring Plan Environment Management Project of the World Bank Funded the Sludge monitoring Disposal Center unit. Set 4 monitoring 4 phases/year, 1 sites: four day/phase, 2 Noise boundaries of LeqdB (A) times/day, once in 480 1920 5760 the Sludge daytime and once in Disposal Center nighttime Subtotal (Yuan) 66160 198480 Total (yuan) 210160 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 48 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) 5 Environment Management Training Plan 5.1 The Purpose for Environment Management Capacity Training Environment capacity building/training is one part for the technical support to the project. The major targets of the environmentcapacity building are environment managers and supervisors. In order to ensure the smooth and effective implementation of the environment management, training on EMP and relevant knowledge and skills should be provided to the staff of the stakeholder agencies, i.e. project clients/implementation agencies, operation agencies, contractors, construction supervision companies, local PMOs, and EPBs. Training should be done as well targeting at different positions and roles. 5.2 Training Plan and Contents The environment protection (EP) training of the project covers training for the contractors and their EP staff, group leaders, construction supervision engineers on the construction site, and staff of the clients, operation agencies and their environmentmanagement staff. For the specific EP training plan, see the Table below in 5.2-1: Table 5.2-1: Project EP Training Plan Duration Cost Target groups Training Contents persons 4 (Days) (RMB 10 Yuan) Simplified noise monitoring and 2 from each controlling methods during construction construction 4 period (self monitoring) Contractors and section their on-site EP Relevant measures and requirement in the EMP for the construction period, 2 staff and group enviromment protevction laws and 2 from each leaders regulations, contrstuction plan, construction 1 supervision shedule, occupational health, sanitation and safety measures section and attentions. Environment air monitoring and 1-2 from each controlling technology, noise construction 1 monitoring and controlling technology section 1. Measures for the operation period in Supervision the EMP and the operation and 2 engineers maintenance of EP facilities; 1-2 from each 2. Management procedures and reporting mechanism of the World Bank construction 1 projects. section 3. Monitoring standard, testing, method, sample transfer, quality control of data, 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 49 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) equipment use, etc. 4. Emergency response measures for environment risks. 5. Occupational health, sanitation and safety. PMO/Clients/Oper Simplified noise etc monitoring and ation Agencies and controlling methods (self monitoring); A certain 3 6 their EP Staff occupational health, sanitation and number safety during operation period. Total / 10 9 6 The Reporting Mechanism and Requiremnt for the Environment Management Plan (EMP) The contractors, operators, monitoring agencies, environment supervision engineers, and the PMOs should keep a record of the project progress status, the implementation status of the EMP, and the monitoring results of the environment quality etc and report them to the agencies concerned in time in order to ensure the relevant requirement and measures in the EMP to be implemented, and find, analyze and learn from the problems, so as to control the unfavorable environment impacts in the following work of the project. For the operation situation of the water supply and drainage network, wastewater PSs and WWTPs and the sludge disposal status involved in the linked projects and due diligence, the monitoring record should also be collected and sorted out in a regular basis, and the concerning requirement should be integrated into the monitoring plan. It mainly covers the following six tasks (1)The project environmentengineer shall keep a detail record on the implementation of the EMP, and submit the weekly an monthly reports to the project clients and the municipal PMO in time. The weekly and monthly reports should include information on the implementation situation of the environmentprotection measures, the implementation situation of the environmentmonitoring and the monitoring data. (2)The contractors and operators shall keep a record on the project progress status and the implementation status of the EMP on a quarterly basis; and submit the quarterly report to the PMO in time; and at the same time, have the municipal EPB copied on. (3)The monitoring agency when completing the entrusted monitoring task shall in time submit the monitoring report to the contractors (operators) and the environmentsupervision engineers. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 50 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) (4)The contractors and operators shall in time submit the project environment monitoring report to Guilin Municipal EPB and Guilin Municipal PMO. Guilin PMO shall in time submit the monthly, quarterly and annual reports of the implementation of the project EMP to Guilin Municipal EPB and the agencies concerned, and submit them to the World Bank if deemed necessary. (5) In case of any non-compliance in environment protection occurred, the environmentsupervision engineer and the PMO shall notify the local environment protection authorities, and if deemed necessary, report to the higher level agencies. (6)A semi-annual report on the implementation of the EMP shall be furnished to the World Bank, which could cover the following main contents: a. the implementation of the training plan; b. project progress status, such as the river alignment engineering, road surface engineering, the length completed for the network laying etc; c. the execution status of the project environment protection measures, the status of the environmentmonitoring and the main outcomes from the monitoring; d. In case there is a public complaint, the main contents of the complaint, solution to the complaint and the public satisfactory level should be recorded; e. the implementation plan of the EMP for the next half year. The project clients shall request the project contractors, supervisors and environment monitoring agencies to report in time to the project clients and the local EPBs on any environment pollution incident actually occurred in the project implementation stage and its correction situation as well. Under normal circumstance, the construction supervisor must reflect the actual situation of the EMP in the monthly construction supervision report; moreover, the environmentsupervision engineers of the project clients and the supervision agencies must develop a periodical report on the execution of the EMP and submit it to the environment protection authorities, and then submit the report to the World Bank via the PMO. 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 51 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) Attached Map 1: Distribution Plan of the Environment Sensitive Points around the Project WWTPs 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 52 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) Attached Map 2: Distribution Plan of the Environment Sensitive Points around the Project Boosting Pumping Stations 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 53 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 54 - Environment Management Plan of Guilin Integrated 6 The Reporting Mechanism and Requiremnt for Environment Management Project of the World Bank Funded the Environment Management Plan (EMP) Attached Map 3: Distribution Plan of the Environment Sensitive Points around the Project Water Supply Network 中国·广西环境保护科学研究院 地址:广西南宁市教育路 5 号 电话:0771-5331497 邮编:530022 Environmental Protection Research Academy of GuangXi.P.R.China Add:5JiaoYu Road Nanning GuangXi Tel:0771-5331497 Post:530022 - 55 -