The World Bank Report No: ISR11507 Implementation Status & Results Brazil Mato Grosso do Sul State Road Transport Project (P118410) Public Disclosure Copy Operation Name: Mato Grosso do Sul State Road Transport Project (P118410) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 22-Dec-2013 Country: Brazil Approval FY: 2010 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 04-May-2010 Original Closing Date 30-Jun-2015 Planned Mid Term Review Date 15-Oct-2012 Last Archived ISR Date 15-May-2013 Effectiveness Date 23-Nov-2010 Revised Closing Date 30-Jun-2015 Actual Mid Term Review Date 24-Oct-2012 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project development objective is to improve the efficiency of the Borrower#s road network in the Project area. Efficiency improvement is expected as a result of the Project#s financial support to selected investments of the state investment program in road infrastructure and to activities that seek to strengthen the State Government#s overall capacity to manage the road network, including planning preparation, execution and monitoring of work programs at the administrative, engineering and environment levels. Efficiency gains are expected to result in inter alia improved accessibility and safety, and reduced logistics costs. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost State Road Rehabilitation and Surfacing 290.00 Institutional Strengthening 10.00 Overall Ratings Public Disclosure Copy Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Project implementation continues satisfactory with an efficient execution of the work component and activities under the institutional strengthening component that are ramping up. Locations Page 1 of 5 The World Bank Report No: ISR11507 Country First Administrative Division Location Planned Actual Brazil Not Entered Naviraí Public Disclosure Copy Brazil Not Entered Estado de Mato Grosso do Sul Brazil Not Entered Inocência Brazil Not Entered Cassilândia Brazil Not Entered Camapuã Brazil Not Entered Bataiporã Brazil Not Entered Anaurilândia Brazil Not Entered Água Clara Brazil Not Entered Amandina Brazil Not Entered Angélica Brazil Not Entered Brasilândia Brazil Not Entered Chapadão do Sul Brazil Not Entered Deodápolis Brazil Not Entered Figueirão Brazil Not Entered Indápolis Brazil Not Entered Ipezal Brazil Not Entered Ivinhema Brazil Not Entered Nova Andradina Public Disclosure Copy Results Project Development Objective Indicators Page 2 of 5 The World Bank Report No: ISR11507 Indicator Name Core Unit of Measure Baseline Current End Target Reduction of operating costs to vehicle users, Percentage Value 0.00 -5.00 per average vehicle-km on state network Date 31-Dec-2008 01-Nov-2013 Public Disclosure Copy Comments Road User Costs* on the Evaluation expected later in state paved roads(Program- execution, upon contracting of wide): 1.035 BRL/VK (2008) the consultant in charge of the road management system Increase in use of road transport infrastructure Percentage Value 0.00 15.00 on Project surfaced roads Date 31-Dec-2008 01-Nov-2013 Comments Vehicle km on Project Evaluation expected later in surfaced roads: 114,800 execution, upon contracting of (2008) the consultant in charge of the road management system which was delayed due to a procurement issue. Contract now expected in May 2014. Roads in good and fair condition as a share of Percentage Value 49.00 66.00 total classified roads Date 31-Dec-2008 01-Nov-2013 30-Jun-2015 Comments Percentage of roads in good Evaluation expected upon Percentage of roads in good conditions contracting of the consultant conditions in charge of the road management system which was delayed due to a procurement issue. Contract now expected in May 2014. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Pilot of a result-based maintenance and Yes/No Value No Yes Yes rehabilitation contract implemented (CREMA) Date 01-Jun-2010 01-Nov-2013 30-Jun-2015 in AGESUL Public Disclosure Copy Comments Pilot CREMA has been Results based contract contracted. Target achieved. operational. Integrated monitoring and evaluation system of Yes/No Value No No Yes state investments and/or spending in SEMAC Date 01-Jun-2010 01-Nov-2013 Comments No integration between Ongoing. Investment Integrated system operational systems monitoring system ("Kronos") including investment is implanted. But results monitoring system, results based practices and Page 3 of 5 The World Bank Report No: ISR11507 increased PPP are only based practices, private starting. sector participation. 2 Modern management tools in AGESUL Yes/No Value No Yes Yes Public Disclosure Copy Date 01-Jun-2010 01-Nov-2013 Comments Lack of sufficient 2 management tools At least 2 new management management tools. envisioned, "SGP" (the above systems in operation/studies PMS for road management) executed. and "Kronos" (for financial management). Kronos implanted and the SGP contracting underway. Number km of Road Sections improved as part Kilometers Value 0.00 592.72 750.00 of the Project Date 01-Jun-2010 01-Nov-2013 30-Jun-2015 Comments km rehabilitated under the km rehabilitated under the km rehabilitated under the Project Project as of October 2013. Project. Number of km of roads paved as part of the Kilometers Value 0.00 287.50 450.00 Project Date 01-Jun-2010 01-Nov-2013 30-Jun-2015 Comments km paved under the Project km paved under the Project km paved under the Project as of October 2013. Integrated road management system Yes/No Value No No Yes Date 01-Jun-2010 01-Nov-2013 30-Jun-2015 Comments Tendering process almost concluded. Consolidated environmental management tools Yes/No Value No No Yes Date 01-Jun-2010 01-Nov-2013 30-Jun-2015 Comments Tendering process almost Consolidated tools in place . concluded. NO to contract award was given during October 2013 mission. Public Disclosure Copy Data on Financial Performance (as of 22-Jun-2012) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P118410 IBRD-78720 Effective 04-May-2010 16-Sep-2010 23-Nov-2010 30-Jun-2015 30-Jun-2015 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P118410 IBRD-78720 Effective USD 300.00 300.00 0.00 296.39 3.61 99.00 Page 4 of 5 The World Bank Report No: ISR11507 Disbursement Graph Public Disclosure Copy Key Decisions Regarding Implementation N.A. Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Public Disclosure Copy Page 5 of 5