Procurement Plan Central Bank Of Myanmar Financial Sector Development Project I. General 1. Bank’s approval Date of the procurement Plan :1st Version in STEP 2. Date of General Procurement Notice: Aug 17, 2017 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement (US $ ) Works (Including turnkey supply and installation of plant and 2,000,000 equipment and PPP) ( 2 million) Goods, information technology and non-consulting services 1,000,000 ( 1million) Consultant firms 300,000 Consultant Individuals 200,000 Type of Market Approaches Thresholds Procurement (US $ in million) International National- National Comments Open RFQ (Shopping) Works (Including 3 and above Less than 3 Less than 1 Recommended to turnkey supply and advertise for 7 days for installation of plant RFQ above 0.5 and equipment and PPP) Goods, information 1 and above Less than 1 Less than 0.5 Recommended to technology and non- advertise for 7 days for consulting services RFQ above 0.05 Consultants (Firms) 0.1 and above Less than 0.1 Not CQS method may be applicable used up to 0.5. Use of full RFP mandatory for CQS above 0.3. Limits on market approaches do not July 9, 2010 apply to individual consultants. 2. Reference to (if any) Project Operational Manual (POM): is under preparation and to be acceptable to the World Bank. 3. Any Other Special Procurement Arrangements: N/A 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) 1 Summary of 1 1 No Prior the NCB (Works) 2 Summary of 0.7 4 No Post Shopping (Goods) 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) 1 Summary of 1.5 1 Prior number of contracts that will be let under QCBS 2 Summary of 1.36 11 Prior/Pos CQS and number of t Individual contracts that Consultant will be let selection under other methods July 9, 2010 July 9, 2010 PROCUREMENT Myanmar : Myanmar Financial Sector Development Project PLAN General Information Country: Myanmar Bank’s Approval Date of the Original Procurement Plan: 2017-08-17 2020-01-13 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154389 GPN Date: 2017-08-17 Project Name: Myanmar Financial Sector Development Project Loan / Credit No: IDA / 59300 Executing Agency(ies): Central Bank of Myanmar WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CW-2 / CBM Training Center -- Design and Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 50,000.00 0.00 Canceled 2018-03-23 2018-03-28 2018-05-09 2018-06-08 2018-07-13 2019-01-09 Supervision of and financial infrastructure Proposals Envelope Renovation(YGN) CW-3 / CBM Training Center -- Design and Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 50,000.00 0.00 Canceled 2018-03-23 2018-03-28 2018-05-09 2018-06-08 2018-07-13 2019-01-09 Supervision of and financial infrastructure Proposals Envelope Renovation(NPT) CW-1 / CBM Training Center - Physical Modernization of the CBM Single Stage - One IDA / 59300 Prior Request for Bids Open - National 1,000,000.00 0.00 Canceled 2018-07-23 2018-07-28 2018-09-08 2018-10-08 2018-11-12 2019-05-11 refurbishment of 2 office and financial infrastructure Envelope spaces (Yangon and NPT) CW-4 / CBM Training Modernization of the CBM Request for Single Stage - One Center - Physical IDA / 59300 Post Open - National 500,000.00 464,979.76 Signed 2019-01-30 2019-03-27 2019-09-23 and financial infrastructure Quotations Envelope Refurbishment (Yangon) CBM/ CW-5 / CBM Pending Modernization of the CBM Request for Single Stage - One Training Center - Physical IDA / 59300 Post Open - National 300,000.00 0.00 Implementati 2020-04-03 2020-05-29 2020-11-25 and financial infrastructure Quotations Envelope refurbishment ,NPT on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-6 / Currency Management Application Under Modernization of the CBM Upgrade (Upgrade of existing IDA / 59300 Post Direct Selection Direct 35,000.00 0.00 Implementati 2018-05-23 2018-05-28 2018-07-02 2018-12-29 and financial infrastructure software) non-consulting on services G-8 / 50 Mbps Fiber Internet Line (Initial Cost) Modernization of the CBM IDA / 59300 Post Direct Selection Direct 1,000.00 0.00 Canceled 2018-05-23 2018-05-28 2018-07-02 2018-12-29 (MPT – current internet and financial infrastructure cable connection in CBM) G-9 / Centralized Internet Access Monitoring (Hardware devices such as Firewall, Modernization of the CBM Request for Single Stage - One Access Controller, Access IDA / 59300 Post Open - National 250,000.00 0.00 Canceled 2018-08-23 2018-08-28 2018-10-09 2018-11-08 2018-12-13 2019-06-11 and financial infrastructure Proposals Envelope Switch, AP,license fees and Installation charges) (NPT and YGN) Page 1 G-10 / Customized HR Software with Flat Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 160,000.00 0.00 Canceled 2018-08-23 2018-08-28 2018-10-09 2018-11-08 2018-12-13 2019-06-11 gate(4Lot) access control and financial infrastructure Proposals Envelope (NPT and YGN) G-12 / Central bank Accounting System – Enterprise Business Suit Modernization of the CBM Single Stage - One IDA / 59300 Prior Request for Bids Open - National 2,200,000.00 0.00 Canceled 2018-08-23 2018-08-28 2018-10-09 2018-11-08 2018-12-13 2019-06-11 (EBS) upgrading and and financial infrastructure Envelope implementation (including license fee for oracle) G-1 / CBM Training Center Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 100,000.00 60,200.04 Signed 2019-03-27 2019-05-22 2019-11-18 - Furniture (YGN) and financial infrastructure Quotations Envelope G-2 / CBM Training Center Under Modernization of the CBM Request for Single Stage - One equipment - Video and IT IDA / 59300 Post Open - National 150,000.00 0.00 Implementati 2019-03-27 2019-05-22 2019-11-18 and financial infrastructure Quotations Envelope facilities (Yangon) on G-5 / Note Processing Modernization of the CBM Open - Single Stage - One IDA / 59300 Prior Request for Bids 6,000,000.00 5,888,888.00 Signed 2019-03-22 2019-03-27 2019-05-08 2019-06-07 2019-07-12 2020-01-08 Machine and financial infrastructure International Envelope G-9R / Centralized Internet Access Monitoring - Modernization of the CBM Request for Single Stage - One Hardware devices, license IDA / 59300 Post Open - National 250,000.00 191,053.49 Signed 2019-03-27 2019-05-22 2019-11-18 and financial infrastructure Quotations Envelope and Installation fees, NPT and YGN G-15 / Hardware Requirement (Storage, Server, etc) for HR Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 450,000.00 426,953.95 Signed 2019-03-27 2019-05-22 2019-11-18 Application (Application and financial infrastructure Quotations Envelope Server, DB Server, Chassis, Rack, SAN Drive, etc) Pending G-18 / CBM PCU- IT and Project coordination and Request for Single Stage - One IDA / 59300 Post Open - National 10,000.00 0.00 Implementati 2019-05-01 2019-06-26 2019-12-23 Office Equipment monitoring Quotations Envelope on G-7 / CBM Mail Server Modernization of the CBM Single Stage - One IDA / 59300 Post Request for Bids Open - National 660,000.00 0.00 Canceled 2018-06-22 2018-06-27 2018-08-08 2018-09-07 2018-10-12 2019-04-10 (On Premise Plan) and financial infrastructure Envelope G-3 / CBM PCU- IT and Project coordination and Request for Single Stage - One IDA / 59300 Post Open - National 10,000.00 8,530.87 Completed 2018-02-28 2018-04-25 2018-10-22 office equipment monitoring Quotations Envelope Project coordination and Request for Single Stage - One G-4 / CBM-PCU Furniture IDA / 59300 Post Open - National 5,000.00 4,198.58 Completed 2018-02-28 2018-04-25 2018-10-22 monitoring Quotations Envelope G-11 / SWIFT Fin Test (installation fee+ annual fee Modernization of the CBM + 3 servers + window IDA / 59300 Post Direct Selection Direct 650,000.00 0.00 Canceled 2018-12-06 2018-12-11 2019-01-15 2019-07-14 and financial infrastructure license + oracle license fee ) (1Euro=$1.18) Project coordination and Request for Single Stage - One G-19 / CBM-PCU Furniture IDA / 59300 Post Open - National 5,000.00 0.00 Canceled 2019-05-01 2019-06-26 2019-12-23 monitoring Quotations Envelope Pending G-10R / Flap Barrier , Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 70,000.00 0.00 Implementati 2020-02-28 2020-04-24 2020-10-21 NPT and YGN and financial infrastructure Quotations Envelope on CBM/G-11B / Hardware Requirement for SWIFT Fin Scope, 6 Servers+ Pending Modernization of the CBM Request for Single Stage - One Hardware+ window license + IDA / 59300 Post Open - National 120,000.00 0.00 Implementati 2019-06-26 2019-08-21 2020-02-17 and financial infrastructure Quotations Envelope oracle license fee+ N/W on Device+ Online UPS & Accessories Page 2 G-13 / Maintenance fee of Pending Customized HR software Modernization of the CBM IDA / 59300 Post Direct Selection Direct 20,000.00 0.00 Implementati 2020-07-26 2020-07-31 2020-09-04 2021-03-03 with Flat Gate (4lot) access and financial infrastructure on control (NPT and YGN) G-14 / Maintenance fee of Centralized Internet Access Monitoring (Hardware Pending devices such as Firewall, Modernization of the CBM IDA / 59300 Post Direct Selection Direct 50,000.00 0.00 Implementati 2020-07-26 2020-07-31 2020-09-04 2021-03-03 Access Controller, Access and financial infrastructure on Switch,Ap, license fes and installation charges) (NPT and YGN) G-16 / Hardware Pending requirement for Currency Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 130,000.00 0.00 Implementati 2020-02-28 2020-04-24 2020-10-21 Management Application and financial infrastructure Quotations Envelope on Upgrade G-20 / Hardware Pending Requirement for MIS Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 300,000.00 0.00 Implementati 2020-02-28 2020-04-24 2020-10-21 Reporting System and financial infrastructure Quotations Envelope on Application. CBM/G-21 / Hardware Pending Requirement for QR Modernization of the CBM Single Stage - One IDA / 59300 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2020-02-23 2020-02-28 2020-04-10 2020-05-10 2020-06-14 2020-12-11 Generation and Central and financial infrastructure Envelope on Reporting Package CBM/G-22 / CBM Training Pending Center – Office Equipment Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 250,000.00 0.00 Implementati 2020-04-03 2020-05-29 2020-11-25 and Air-conditioner VRF and financial infrastructure Quotations Envelope on System , NPT Pending CBM/G-23 / CBM Training Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 80,000.00 0.00 Implementati 2020-04-03 2020-05-29 2020-11-25 Center – Furniture ,NPT and financial infrastructure Quotations Envelope on CBM/G-24 / Hardware Requirement for SWIFT Fin Scope (Backup) (2 servers + Pending Modernization of the CBM Request for Single Stage - One window license fee + IDA / 59300 Post Open - National 130,000.00 0.00 Implementati 2020-02-28 2020-04-24 2020-10-21 and financial infrastructure Quotations Envelope hardware + network devices on + online UPS and accessories) G-17 / Hardware Modernization of the CBM Open - Single Stage - One requirement for Accounting IDA / 59300 Prior Request for Bids 2,000,000.00 0.00 Canceled 2019-12-02 2019-12-07 2020-01-18 2020-02-17 2020-03-23 2020-09-19 and financial infrastructure International Envelope System NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NC-3 / MIS Reporting Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 350,000.00 197,694.00 Signed 2019-03-27 2019-05-22 2019-11-18 System Application and financial infrastructure Quotations Envelope NC-1A / 50 Mbps Fiber Pending Internet Line - Initial Cost, Modernization of the CBM IDA / 59300 Post Direct Selection Direct 33,000.00 0.00 Implementati 2018-05-23 2018-05-28 2018-07-02 2018-12-29 MPT – current internet and financial infrastructure on cable connection, CBM-NPT Page 3 NC-1B / 50 Mbps Fiber Pending Internet Line - Initial Cost, Modernization of the CBM IDA / 59300 Post Direct Selection Direct 68,000.00 0.00 Implementati 2018-12-21 2018-12-26 2019-01-30 2019-07-29 MPT – current internet and financial infrastructure on cable connection, CBM-YGN NC-6 / CBM Mail Service Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 60,000.00 5,234.62 Signed 2019-03-27 2019-05-22 2019-11-18 (Cloud Service) and financial infrastructure Quotations Envelope CBM/NC-7 / Customized Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 100,000.00 18,910.90 Signed 2019-07-06 2019-08-31 2020-02-27 HR Application and financial infrastructure Quotations Envelope Pending NC-4 / CBM ICT , English, Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 55,000.00 0.00 Implementati 2020-02-28 2020-04-24 2020-10-21 A/C & HR Training and financial infrastructure Quotations Envelope on CBM/G-17R / Hardware Pending Requirement for Accounting Modernization of the CBM Single Stage - One IDA / 59300 Post Request for Bids Open - National 995,000.00 0.00 Implementati 2020-03-29 2020-04-03 2020-05-15 2020-06-14 2020-07-19 2021-01-15 System including Hardware and financial infrastructure Envelope on License CBM/NC-8 / QR Generation Pending Modernization of the CBM Open - Single Stage - One and Central Reporting IDA / 59300 Prior Request for Bids 1,400,000.00 0.00 Implementati 2020-03-29 2020-04-03 2020-05-15 2020-06-14 2020-07-19 2021-01-15 and financial infrastructure International Envelope Package on CBM/NC-9 / Cloud Server Pending License Fee for CMD Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 5,000.00 0.00 Implementati 2020-01-31 2020-03-27 2020-09-23 Application and UFA and financial infrastructure Quotations Envelope on Reporting System CBM/NC-11A / SWIFT Fin Pending Scope, installation fee+ Modernization of the CBM IDA / 59300 Post Direct Selection Direct 160,000.00 0.00 Implementati 2020-06-28 2020-07-03 2020-08-07 2021-02-03 annual fee + and financial infrastructure on oracle license fee CBM/NC-2A / Central Bank Accounting System (EBS) Pending Modernization of the CBM Request for Single Stage - One Budget AP,FA, IDA / 59300 Post Open - National 450,000.00 0.00 Implementati 2020-01-31 2020-03-27 2020-09-23 and financial infrastructure Quotations Envelope Implementation for on Application CBM/NC-17 / SWIFT Fin Pending Test, Installation & SWIFT Modernization of the CBM IDA / 59300 Post Direct Selection Direct 170,000.00 0.00 Implementati 2020-03-29 2020-04-03 2020-05-08 2020-11-04 License fee for SWIFT Scope and financial infrastructure on Reporting System CBM/NC-16 / CBM Pending Modernization of the CBM Request for Single Stage - One Training Center-Design & IDA / 59300 Post Open - National 20,000.00 0.00 Implementati 2020-01-31 2020-03-27 2020-09-23 and financial infrastructure Quotations Envelope Supervision of Renovation on NC-2 / Central bank Accounting System – Enterprise Business Suit Modernization of the CBM Open - Single Stage - One IDA / 59300 Prior Request for Bids 2,200,000.00 0.00 Canceled 2019-01-25 2019-01-30 2019-03-13 2019-04-12 2019-05-17 2019-11-13 upgrading and and financial infrastructure International Envelope implementation, including license fee for oracle NC-5 / Training for Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 5,000.00 0.00 Canceled 2019-06-26 2019-08-21 2020-02-17 Accounting and HR. and financial infrastructure Quotations Envelope Pending CBM/NC-2R / SWIFT Modernization of the CBM Request for Single Stage - One IDA / 59300 Post Open - National 120,000.00 0.00 Implementati 2019-08-24 2019-10-19 2020-04-16 Oracle License and financial infrastructure Quotations Envelope on CBM/NC-11 AA / SWIFT Pending Fin Scope, Installation fee + Modernization of the CBM IDA / 59300 Post Direct Selection Direct 160,000.00 0.00 Implementati 2019-06-21 2019-06-26 2019-07-31 2020-01-27 annual fee + oracle license and financial infrastructure on fee Page 4 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-2 / CBM Training Modernization of the CBM Quality And Cost- Open - Center—delivery of training IDA / 59300 Prior 1,500,000.00 0.00 Canceled 2018-12-26 2019-01-16 2019-03-01 2019-03-29 2019-04-28 2019-06-02 2019-07-07 2020-07-06 and financial infrastructure Based Selection International program #1 CS-1 / CBM Training Consultant Modernization of the CBM Open - Center - curriculum IDA / 59300 Post Qualification 100,000.00 0.00 Canceled 2018-12-24 2019-01-14 2019-02-27 2019-03-29 2019-05-03 2019-10-30 and financial infrastructure International development Selection CS-5 / CBM Training Consultant Modernization of the CBM Open - Center -- Design and IDA / 59300 Post Qualification 100,000.00 0.00 Canceled 2018-02-20 2018-03-13 2018-04-26 2018-05-26 2018-06-30 2018-12-27 and financial infrastructure International Supervision of Renovation Selection CS-14 / CBM Training Consultant Center - Design and Modernization of the CBM IDA / 59300 Post Qualification Open - National 50,000.00 10,122.73 Signed 2018-03-23 2018-04-13 2018-05-27 2018-06-26 2018-07-31 2019-01-27 Supervision of Renovation and financial infrastructure Selection in YGN CS-13 / CBM Training Consultant Modernization of the CBM Open - Pending Center - delivery of training IDA / 59300 Prior Qualification 200,000.00 0.00 2019-12-20 2020-01-10 2020-02-23 2020-03-24 2020-04-28 2020-10-25 and financial infrastructure International Implementation program #1 Selection CS-15 / CBM Training Consultant Center - Design and Modernization of the CBM IDA / 59300 Post Qualification Open - National 50,000.00 0.00 Canceled 2019-12-27 2020-01-17 2020-03-01 2020-03-31 2020-05-05 2020-11-01 Supervision of Renovation and financial infrastructure Selection in NPT INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual CS-7 / CBM IT Project Project coordination and IDA / 59300 Prior Consultant Open 200,000.00 0.00 Canceled 2017-11-25 2018-01-13 2018-02-03 2018-03-10 2018-09-06 Adviser monitoring Selection Individual CS-9 / CBM General Modernization of the CBM Under IDA / 59300 Prior Consultant Open 200,000.00 0.00 2017-11-25 2018-01-13 2018-02-03 2018-03-10 2018-09-06 Ledger Specialist, (Oracle) and financial infrastructure Implementation Selection CS-11 / CBM & MOPF Individual Project coordination and International Financial IDA / 59300 Prior Consultant Open 200,000.00 159,800.00 Signed 2017-11-25 2018-01-13 2018-02-03 2018-03-10 2018-09-06 monitoring Management Specialist Selection Individual CS-7 B / CBM IT Project Project coordination and Under IDA / 59300 Post Consultant Open 100,000.00 0.00 2018-03-23 2018-05-11 2018-06-01 2018-07-06 2019-01-02 Adviser (Application) monitoring Implementation Selection Individual CS-7 A / CBM IT Project Project coordination and Under IDA / 59300 Post Consultant Open 100,000.00 0.00 2018-03-23 2018-05-11 2018-06-01 2018-07-06 2019-01-02 Adviser (Infra) monitoring Implementation Selection CS-3 / Legal and Individual Modernization of the CBM Pending Regulatory TA advisory IDA / 59300 Prior Consultant Open 300,000.00 0.00 2019-12-20 2020-02-07 2020-02-28 2020-04-03 2020-09-30 and financial infrastructure Implementation services (Estimated 1) Selection Page 5 CS-16 / CBM and MOPF Individual international Procurement Project coordination and IDA / 59300 Prior Consultant Open 200,000.00 151,880.00 Signed 2018-12-06 2019-01-24 2019-02-14 2019-03-21 2019-09-17 Specialist (Sharing monitoring Selection $100,000+$100,000). CS-6 / CBM & MOPF Individual Project coordination and International Procurement IDA / 59300 Prior Consultant Open 200,000.00 0.00 Canceled 2017-11-25 2018-01-13 2018-02-03 2018-03-10 2018-09-06 monitoring Specialist Selection CS-4 / Staff for Upgrading of the financial Individual Pending management of CBM IDA / 59300 sector legal, regulatory, and Prior Consultant Open 200,000.00 0.00 2019-12-02 2020-01-20 2020-02-10 2020-03-16 2020-09-12 Implementation Training Center supervisory framework Selection Individual CS-12 / CBM Local FM Project coordination and IDA / 59300 Post Consultant Open 30,000.00 0.00 Canceled 2019-03-29 2019-05-17 2019-06-07 2019-07-12 2020-01-08 Assistant (Tentatively) monitoring Selection CS-10 / CBM Local Individual Project coordination and Procurement Assistant( IDA / 59300 Post Consultant Open 30,000.00 0.00 Canceled 2019-03-22 2019-05-10 2019-05-31 2019-07-05 2020-01-01 monitoring Tentatively) Selection Page 6