PROCUREMENT PLAN (Textual Part) Project information: Social Safety Net Project (P167416) Project Implementation agency: Ministry of Social Inclusion and Equity (MIES) Unidad del Registro Social Date of the Procurement Plan: September 9, 2019 Period covered by this Procurement Plan: 2019 - 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. For the implementation of Component 1, the MIES may use the Country’s own procurement procedures for “Menor Cuantía,” “Infima Cuantía,” “Ferias Inclusivas” and “Catalogo Electronic o Inclusivo” to procure the goods and services identified, those procedures will be complemented by specific processes and procedures established in the Operational Manual. PROCUREMENT Ecuador : Social Safety Net Project PLAN General Information Country: Ecuador Bank’s Approval Date of the Original Procurement Plan: 2020-01-06 2020-03-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167416 GPN Date: 2020-02-03 Project Name: Social Safety Net Project Loan / Credit No: IBRD / 89460 Executing Agency(ies): Ministry of Economic and Social Inclusion WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-MIES-7 / Adquisición de tablets para educadoras Component 2: Technical CNH y repotenciación de la Assistance for Capacity Solicitud de Open - Single Stage - One Ejecución IBRD / 89460 Previa 3,251,166.98 0.00 2020-02-24 2020-04-09 2020-05-29 2020-06-28 2020-07-21 2020-09-19 infraestructura tecnológica y Building & Monitoring and ofertas International Envelope pendiente los sistemas de información Evaluation del MIES. C2-MIES-42 / Adquisición Component 2: Technical de impresora multifunción Assistance for Capacity Solicitud de Single Stage - One Ejecución IBRD / 89460 Posterior Open - National 3,000.00 0.00 2020-02-27 2020-04-14 2020-04-29 para la gestión del Equipo Building & Monitoring and cotizaciones Envelope pendiente Ejecutor del Proyecto (MIES) Evaluation NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-MIES-16 / Campaña de comunicación que mitigue los efectos de la Refocalizacion de los Nucleos Familiares en Component 2: Technical los Programas Sociales por Assistance for Capacity Solicitud de Single Stage - One Ejecución IBRD / 89460 Previa Open - National 900,000.00 0.00 2020-01-30 2020-02-04 2020-03-18 2020-04-17 2020-05-12 2020-12-08 la aplicación del nuevo Building & Monitoring and ofertas Envelope pendiente Formulario e indice del Evaluation Registro Social- posibles tensiones provenientes del cambio de legibilidad de los CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 C2-MIES-2 / Diseño e Component 2: Technical Implementación de la Assistance for Capacity Selección basada Ejecución plataforma para el registro IBRD / 89460 Posterior Open - National 412,500.00 0.00 2020-02-10 2020-02-12 2020-02-25 2020-03-15 2020-03-16 2020-04-15 2020-06-08 2021-03-05 Building & Monitoring and en calidad y costo pendiente de los servicios de Inclusión Evaluation Económica Component 2: Technical C2-MIES-3 / Diseño de la Assistance for Capacity Selección basada Ejecución Estrategia de Tecnología IBRD / 89460 Posterior Open - National 58,000.00 0.00 2020-01-17 2020-01-20 2020-02-14 2020-03-09 2020-03-10 2020-03-29 2020-05-03 2020-08-01 Building & Monitoring and en calidad y costo pendiente Social Evaluation C2-MIES-5 / Diseño e Component 2: Technical implementación de un piloto Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 71,500.00 0.00 2020-01-17 2020-01-20 2020-02-14 2020-02-28 2020-03-02 2020-03-27 2020-05-09 2020-10-06 de microredes de Building & Monitoring and en calidad y costo pendiente emprendimientos populares Evaluation C2-MIES-6 / Diseño de los Servicios de Fortalecimiento de Capacidades y Acceso a Component 2: Technical Mercados e Implementación Assistance for Capacity Selección basada Open - Ejecución IBRD / 89460 Previa 664,469.00 0.00 2020-01-17 2020-01-21 2020-02-24 2020-03-21 2020-03-28 2020-04-16 2020-05-04 2020-11-30 de un Piloto para Building & Monitoring and en calidad y costo International pendiente Fortalecimiento de Evaluation Capacidades Productivas en varios distritos C2-MIES-9 / Diseño e Implementación de aplicativos en Tablet para el registro de la información de Component 2: Technical las visitas domiciliarias Assistance for Capacity Selección basada Ejecución realizadas por las IBRD / 89460 Posterior Open - National 150,000.00 0.00 2020-03-02 2020-03-16 2020-05-20 2020-07-06 2020-07-20 2020-08-10 2020-09-14 2021-03-13 Building & Monitoring and en calidad y costo pendiente educadoras del CNH y los Evaluation técnicos de acompañamiento familiar del BDH; y, desarrollo de interfaces para sincronizar la infor C2-MIES-10 / Diseño e Component 2: Technical Implementación de Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 150,000.00 0.00 2020-01-27 2020-02-03 2020-02-27 2020-03-16 2020-03-17 2020-04-13 2020-05-22 2021-02-16 plataforma para registrar Building & Monitoring and en calidad y costo pendiente información de cooperantes Evaluation C2-MIES-13 / Diseño e Component 2: Technical implementación de un Assistance for Capacity Selección basada Open - Ejecución IBRD / 89460 Previa 646,000.00 0.00 2020-02-10 2020-02-24 2020-03-27 2020-05-18 2020-05-29 2020-06-23 2020-08-11 2021-08-11 sistema integrado de quejas Building & Monitoring and en calidad y costo International pendiente y reclamos Evaluation C2-MIES-14 / Consultoría para identificar, a través de mapas territoriales, la Component 2: Technical capacidad de oferta de Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 300,000.00 0.00 2020-01-17 2020-01-20 2020-02-12 2020-03-11 2020-03-13 2020-04-01 2020-04-18 2020-10-15 servicios de DIT y atención Building & Monitoring and en calidad y costo pendiente al adulto mayor Evaluation pertenecientes a hogares extremadamente pobres C2-MIES-15 / Estudio de Component 2: Technical sostenibilidad financiera del Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 80,000.00 0.00 2020-02-11 2020-02-25 2020-03-17 2020-04-03 2020-04-14 2020-05-01 2020-06-05 2020-12-02 programa Mis Mejores Años Building & Monitoring and en calidad y costo pendiente y PAM. Evaluation C2-MIES-17 / Diseño e implementación del modelo de gestión del seguimiento nominal de la población Component 2: Technical objetivo de misión ternura, Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 450,000.00 0.00 2020-01-24 2020-02-18 2020-03-20 2020-04-13 2020-04-16 2020-05-12 2020-06-24 2021-06-24 orientado a la prevención de Building & Monitoring and en calidad y costo pendiente la desnutrición infantil, Evaluation apalancado en instrumentos jurídicos, metodológicos, operativos y tecnológicos Page 2 C2-MIES-18 / Investigación Component 2: Technical y desarrollo de las encuestas Assistance for Capacity Selección basada Open - Ejecución para monitoreo de los IBRD / 89460 Previa 1,200,000.00 0.00 2020-01-17 2020-01-31 2020-03-02 2020-04-23 2020-05-11 2020-06-08 2020-07-20 2021-12-02 Building & Monitoring and en calidad y costo International pendiente resultados del proyecto Evaluation Multipropósito/ENEMDU C2-MIES-19 / Contratación de Verificación Técnica de Component 2: Technical Cumplimiento de DLIs para Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 100,000.00 0.00 2020-01-17 2020-01-31 2020-02-18 2020-03-11 2020-03-18 2020-04-03 2020-05-06 2020-12-22 el Proyecto Red de Building & Monitoring and en calidad y costo pendiente Protección Social - MIES Evaluation 2020 C2-MIES-21 / Contratación Component 2: Technical del Servicio de Auditoría Assistance for Capacity Selección basada Ejecución Financiera período 2019 para IBRD / 89460 Posterior Open - National 20,000.00 0.00 2020-01-17 2020-01-24 2020-02-17 2020-03-16 2020-03-25 2020-04-13 2020-05-18 2020-07-02 Building & Monitoring and en calidad y costo pendiente el Proyecto Red de Evaluation Protección Social - MIES C2-MIES-24 / Evaluación Component 2: Technical de impacto paquete Assistance for Capacity Selección basada Open - Ejecución integrado de inclusión IBRD / 89460 Previa 764,000.00 0.00 2020-03-31 2020-04-17 2020-05-08 2020-06-26 2020-07-06 2020-07-21 2020-08-25 2022-12-13 Building & Monitoring and en calidad y costo International pendiente Económica (CDH + Servicios Evaluation de Inclusión Económica) C2-MIES-20 / Contratación de Verificación Técnica de Component 2: Technical Cumplimiento de DLIs para Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 220,000.00 0.00 2020-11-20 2020-12-07 2020-12-26 2021-01-17 2021-01-24 2021-02-10 2021-03-13 2023-01-02 el Proyecto Red de Building & Monitoring and en calidad y costo pendiente Protección Social - MIES Evaluation 2020, 2021, 2022 C2-MIES-22 / Contratación Component 2: Technical del Servicio de Auditoría Assistance for Capacity Selección basada Ejecución Financiera para el Proyecto IBRD / 89460 Posterior Open - National 220,000.00 0.00 2020-11-23 2020-11-27 2020-12-18 2021-01-13 2021-01-22 2021-02-10 2021-03-17 2022-11-07 Building & Monitoring and en calidad y costo pendiente Red de Protección Social - Evaluation MIES 2020, 2021, 2022 C2-MIES-43 / Contratación Component 2: Technical de Consultores para la Assistance for Capacity Selección basada Ejecución IBRD / 89460 Posterior Open - National 52,684.32 0.00 2020-01-17 2020-01-20 2020-02-14 2020-03-06 2020-03-09 2020-04-12 2020-04-30 2021-02-24 Certificación de Calidad de Building & Monitoring and en calidad y costo pendiente Indicadores del MIES Evaluation C2-MIES-1 / Diseño e Component 2: Technical Implementación de un Piloto Assistance for Capacity Selección basada Open - Ejecución IBRD / 89460 Posterior 440,500.00 0.00 2020-01-13 2020-01-26 2020-02-24 2020-04-10 2020-04-13 2020-05-25 2020-07-06 2020-12-03 de Modalidades de CDH en Building & Monitoring and en calidad y costo International pendiente varios distritos Evaluation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-MIES-25 / Contratación Component 2: Technical de Consultor Individual Assistance for Capacity IBRD / 89460 Posterior Individual Open 25,189.56 0.00 Bajo Revision 2020-01-17 2020-03-09 2020-02-18 2020-02-25 2020-03-25 2020-12-20 Especialista en Protección Building & Monitoring and Social / UGP Evaluation Component 2: Technical C2-MIES-26 / Contratación Assistance for Capacity de Consultor Individual IBRD / 89460 Posterior Individual Direct 25,189.56 0.00 En ejecución 2020-01-03 2020-02-13 2020-01-20 2020-01-27 2020-01-31 2020-03-16 Building & Monitoring and Especialista en Comunicación Evaluation Component 2: Technical C2-MIES-27 / Contratación Assistance for Capacity Ejecución de Consultor Individual IBRD / 89460 Posterior Individual Open 30,487.71 0.00 2020-01-06 2020-02-03 2020-02-24 2020-03-02 2020-12-27 Building & Monitoring and pendiente Especialista Legal / UGP Evaluation Page 3 C2-MIES-28 / Contratación Component 2: Technical de Consultor Individual Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 30,487.71 0.00 2020-01-06 2020-01-29 2020-02-26 2020-03-02 2020-12-27 Especialista Financiero / Building & Monitoring and pendiente UGP Evaluation Component 2: Technical C2-MIES-29 / Contratación Assistance for Capacity Ejecución de Consultor Individual IBRD / 89460 Posterior Individual Open 30,487.71 0.00 2020-01-06 2020-01-29 2020-02-26 2020-03-02 2020-12-27 Building & Monitoring and pendiente Especialista de Adquisiciones Evaluation C2-MIES-31 / Contratación Component 2: Technical de Consultor Individual Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 30,487.71 0.00 2020-01-06 2020-01-29 2020-02-24 2020-03-02 2020-12-27 Especialista en Planificación Building & Monitoring and pendiente y Monitoreo / UGP Evaluation C2-MIES-32 / Contratación de Consultor Individual Component 2: Technical Especialista en Evaluación Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-11 2020-03-09 2020-03-13 2020-12-08 de Impacto (Diseños de los Building & Monitoring and pendiente procesos de evaluación de Evaluation impacto) C2-MIES-33 / Contratación de Consultor Individual Component 2: Technical Especialista en Estadística y Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-10 2020-02-24 2020-03-13 2020-12-08 Procesamiento de Datos Building & Monitoring and pendiente (Cumplimiento de Evaluation Indicadores) C2-MIES-34 / Contratación de Consultor Individual Component 2: Technical Especialista en Sistemas de Assistance for Capacity Ejecución Información y Reportería de IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-10 2020-03-09 2020-03-16 2020-12-11 Building & Monitoring and pendiente Datos (Fortalecimiento del Evaluation InfoMies para permitir interoperabilidad) C2-MIES-35 / Contratación de Consultor Individual Component 2: Technical Especialista de enlace técnico Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-07 2020-02-21 2020-03-16 2020-12-11 con la Subsecretaría de Building & Monitoring and pendiente Aseguramiento No Evaluation Contributivo C2-MIES-36 / Contratación Component 2: Technical de Consultor Individual Assistance for Capacity Ejecución Especialista de enlace técnico IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-07 2020-02-23 2020-03-13 2020-12-08 Building & Monitoring and pendiente con la Subsecretaría de Evaluation Familia C2-MIES-37 / Contratación de Consultor Individual Component 2: Technical Especialista de enlace técnico Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 25,189.56 0.00 2020-01-17 2020-02-07 2020-03-09 2020-03-13 2020-12-08 con la Subsecretaría de Building & Monitoring and pendiente Inclusión Económica y Evaluation Movilidad Social Component 2: Technical C2-MIES-38 / Contratación Assistance for Capacity Ejecución de Consultor Individual IBRD / 89460 Posterior Individual Open 19,800.00 0.00 2020-07-16 2020-08-18 2020-09-02 2020-09-23 2021-07-20 Building & Monitoring and pendiente Analista de Adquisiciones Evaluation C2-MIES-41 / Contratación Component 2: Technical de Consultor Individual para Assistance for Capacity Ejecución Consultas Jurídicas IBRD / 89460 Posterior Individual Limited 29,124.26 0.00 2020-01-06 2020-01-08 2020-01-14 2020-02-07 2020-04-07 Building & Monitoring and pendiente Específicas para el Proyecto Evaluation Red de Protección Social Page 4 C2-MIES-45 / Consultoría Component 2: Technical para la Aplicación de una Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Limited 50,000.00 0.00 2020-01-13 2020-01-14 2020-02-04 2020-03-10 2020-06-08 Consulta para los Pueblos y Building & Monitoring and pendiente Nacionalidades Evaluation C2-MIES-39 / Contratación de Consultor Indovidual Component 2: Technical Especialista Social y de Assistance for Capacity Ejecución IBRD / 89460 Posterior Individual Open 22,500.00 0.00 2020-03-16 2020-04-06 2020-04-09 2020-04-20 2020-12-31 Comunicaciones para el Building & Monitoring and pendiente Proyecto Red de Protección Evaluation Social Page 5