74759 Procurement Plan PROJET SECTORIEL EAU EN MILIEU URBAIN (PSEU) I. General 1. Project information: Burkina Faso –Urban Water Sector Project (PSEU) Crédit IDA n°4820 H-BF Project Implementing Agency (PIA) : Office National de l’Eau et de l’Assainissement (ONEA) 2. Bank’s approval Date of the procurement Plan[Original : …. Janvier 2013 3. Date of General Procurement Notice: …22 juillet 2009…………….. 4. Period covered by this procurement plan: Année 2013 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement 2. Procurement Method Prior Review Threshold Comments US$ equivalent 1. ICB (Goods ) >= 500 000 ALL 3. ICB (Works) >= 3 000 000 ALL 5. direct contracting (works and Goods) Not threshold ALL 2. Prequalification. : Non applicable 3. Proposed Procedures for Community participation in procurement : this method would applied to component 2 – Acces including (i) the selection and training of artisans, masons and prefabricators, and (ii) the supply by prefabricators of goods for building household sanitation facilities. The use of Community participation would be done as per paragraph. 3.17 of the Guidelines 4. Reference to (if any) Project Operational Manual: some items to be financed under Urbain Sanitation Component would be procured in line with rules in the Project Implementation Manual 5. Any Other Special Procurement Arrangements: N/A 6. Procurement Packages with Methods and Time Schedule 07/01/2013 1 1 2 3 4 5 6 7 8 Procurement Ref. Contract Method Prequalification Domestic Review Expected Comments No. (Description) (yes/no) Preference by Bid- (yes/no) Bank Opening (Prior / Date Post) WORKS Urban Water (Component 1) 1 Réalisation d’un 3è forage à grand Février NCB NA NA POST débit à Bobo- 2013 Dioulasso 2 Construction d’un Suite résiliation contrat château d’eau de Février Fadoul 500 m3 à NCB NA NA POST 2013 Dédougou Urban Sanitation (Component 2) 3 Construction d’une station de traitement boues NCB NA NA POST Mai 2013 de vidange à Bobo-Dioulasso 4 Construction Remise en cause du site d’une station de Novembre initial traitement boues NCB NA NA POST 2013 Nouveau site en cours de vidange à d’identification Ouagadougou GOODS Institutional support and capacity building (Component 3) 5 Acquisition de terminaux portables ICB NA NA POST Mai 2013 et matériel de télé relève 6 Acquisition de compteurs à ICB NA NA POST Mai 2013 prépaiement Urban Sanitation (Component 2) 7 Production et diffusion des outils Septembre NCB NA NA POST de communication 2013 en assainissement 8 Fourniture de portes pour latrines à Ouagadougou et ICB NA NA POST Avril 2013 Bobo-Dioulasso phase 2 9 Fourniture de tôles pour latrines à Ouagadougou et ICB NA NA POST Avril 2013 Bobo-Dioulasso Phase 2 07/01/2013 2 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments (US$ equivalent) 1. QCBS (Firms) >= 200 000 ALL 2. Single Source (Firms) ALL ALL 3 Individual Consultants (IC) >50 000 ALL 4 Consultant Qualification (CQ) N/A TOR 5 Training ALL ALL 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: N/A 2. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Assignment Selection Review Expected Comments No. Method by Bank Proposals (Prior / Post) Submission Date 1 US$ = 500 FCFA QCBS: Quality and Cost based Selection CQ: Selection Based on the Consultants’ Qualifications SSS: Single Source Selection IC: Individual Consultants ICB : National competitive Bidding 07/01/2013 3