Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project sichuan Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018, 2nd Revision: November 27, 2018] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Estimated Packages Domestic Review Comments Preference Cost by Bank (yes/no) US$ million (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 2.2 23 No Post the Shopping (Works) Summary of 0.062 1 No Post the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under CQS Summary of number of contracts that will be let under IS PROCUREMENT China : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-05-13 2019-04-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies): Sichuan poverty WORKS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCZJGD07 / Zhaojue County Liuhe Township Pending four kg five villages and Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 other potato projects Quotations Envelope ion rectification Village Road (hardening) 1.5 km SCZJGD08 / Zhaojue County four Kam Pending Request for Single Stage - One Township, Yi Li Mu village IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope potato production road 2 ion kilometers SCZJGD14 / Zhaojue County, Liangshan County, Pending the village of slash fire Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 village, a semi fine wool Quotations Envelope ion sheep project, 1.2 kilometers of new village road. SCZJGD12 / Zhaojue County four open Township Pending Request for Single Stage - One good Valley Village potato IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope project rectification Village ion Road 1.08 kilometers SCJYG001 / Jinyang Yongsheng konjac farmers' Pending professional cooperatives Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementat 2018-05-20 2018-05-25 2018-06-25 2018-06-26 2018-07-06 2018-09-06 remediation village road Envelope ion hardening 3 km project contract SCBTG01 / Construction Pending of office building in Luocun Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 co-operatives in Bu Tuo Quotations Envelope ion County SCBTG10 / Building of co- Pending operative room of co- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 operatives in Japanese Quotations Envelope ion village in Bu Tuo County SCXYG140 / Xuyong Pending County regulation Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-05-26 2018-06-20 2018-08-20 Road (hardening) 2 km, Quotations Envelope ion New Village Road 0.27 km SCXYG143 / Xuyong Pending County regulation Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-05-26 2018-06-20 2018-08-20 Road (hardening) 0.73 km, Quotations Envelope ion New Village Road 0.73 km SCXYG145 / A new 1000 Pending mu sweet orange garden Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementat 2018-07-02 2018-07-04 2018-08-04 2018-08-04 2018-08-12 2018-12-30 drip irrigation system in Envelope ion Xuyong County SCXYG49 / Xuyong county has built 60 cubic meters Pending of water pool 3, 200 cubic Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-05-27 2018-06-20 2018-08-20 meters of pool 2, PE 1.8 Quotations Envelope ion 40 km 1.8 km, PE 90 90 km 4.2 km SCZJGD09 / Zhaojue County four open Township Pending good Valley Village potato Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 project rectification Village Quotations Envelope ion Road (hardening) 2.5 kilometers SCZJGD10 / haojue County Liuhe Township, Pending Request for Single Stage - One the village of potato in the IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Quotations Envelope village of Bo Luo regulation ion Village Road (hardening) 0.5 km SCZJGD11 / Pending ZhaojueCounty, Damo Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Township, Dagu Village, Quotations Envelope ion Potato Project Production Road, 2.42 km SCZJGD13 / Zhaojue County, Bowling Township, Pending United Township, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Liangshan Semi-finishing Quotations Envelope ion Sheep Project, Renovation, Village Road (hardened), 1 km SCZJGD16 / Zhaojue Pending County, Bowling Township, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 United Township, Quotations Envelope ion Liangshan Semi-fine Sheep Project 4km Page 1 SCZJGD17 / Zhaojue Pending County Shaolapo Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-02 2018-06-26 2018-09-26 Bolige Village Liangshan Quotations Envelope ion Semi-fine Sheep Project 3km SCBTG02 / Butuo County Pending Request for Single Stage - One Villages Cooperatives IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope Offices ion SCZJGD039 / Zhaojue County Liberation Township Pending Liangshan Semi-finishing Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Sheep Project Renovation Quotations Envelope ion Village Road (hardened) 1km SCBTG05 / Butuo County Pending Request for Single Stage - One Rijie Village Cooperative IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope Office ion SCBTG06 / Suzuo Village Pending Request for Single Stage - One Cooperative Office House in IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope Butuo County ion SCZJGD040 / Zhaojue County Sangang Township Pending Liangshan semi-fine wool Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 sheep rectification village Quotations Envelope ion inner road (hardened) 0.8 kilometers SCBTG11 / Yahe Village Pending Request for Single Stage - One Cooperative Office in Butuo IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCZJGD041 / Zhaojue County Shaolapo Township Pending Liangshan Semi-fine Haired Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Sheep Project Renovation Quotations Envelope ion Village Road Highway (hardened) 1km SCBTG14 / Buer Village Pending Request for Single Stage - One Cooperative Office in Butuo IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCZJGD042 / Zhaojue Pending County Liuhe Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 potato project remedies Quotations Envelope ion village road (hardened) 1km SCBTG17 / Zhuerku Pending Request for Single Stage - One Village Cooperative Office IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope in Butuo County ion SCZJGD043 / Zhaojue County Sangang Town Pending Request for Single Stage - One Liangshan Semi-finishing IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Quotations Envelope Sheep Project 1.2km of ion Newly Built Village Road SCBTG18 / Labozuo Pending Request for Single Stage - One Village Cooperative Office IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope in Buto County ion SCZJGD044 / Zhaoju Pending County Dimo Potato Project Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Newly built village road Quotations Envelope ion 1km SCZJGD045 / Zhaojue Pending County Sangang Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Liangshan Semi-fine Sheep Quotations Envelope ion Project 3km SCZJGD046 / Zhaojue Pending County Bowling Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Liangshan Semi-fine Sheep Quotations Envelope ion Production Project 2 km SCZJGD047 / Zhaojue Pending County Sikai Town Potato Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Project Production Road 2 Quotations Envelope ion km SCBTG22 / Poli Village Pending Request for Single Stage - One Cooperative Office in Buto IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCBTG23 / Moci Village Pending Request for Single Stage - One Cooperative Office in Butuo IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCBTG26 / Ashengrida Pending Request for Single Stage - One Village Cooperative Office IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope in Butuo County ion SCBTG27 / Laojiugui Pending Request for Single Stage - One Village Cooperative Office IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope in Butuo County ion SCZJGD048 / Zhaoju Pending Request for Single Stage - One County Dimo Potato IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Quotations Envelope Production Project 2 km ion SCZJGD049 / Zhaojue Pending County Sarawipo Township Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-04 2018-06-28 2018-09-28 Liangshan Semi-fine Sheep Quotations Envelope ion Project 1km Page 2 SCBTG28 / Shouzi Village Pending Request for Single Stage - One Cooperative Office in Butuo IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCBTG29 / Dianzi Village Pending Request for Single Stage - One Cooperative Office in Butuo IBRD / 85090 Post Limited 0.00 Implementat 2018-06-27 2018-07-25 2018-11-25 Quotations Envelope County ion SCBTG31 / The village of Pending Butuo County rectifies the Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-16 2018-07-12 2018-10-12 village road (hardened) 1.5 Quotations Envelope ion kilometers SCBTG34 / Zuluo Village, Butuo County, remedies the Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-16 2018-07-12 2018-10-12 village road (hardened) 1.5 Quotations Envelope kilometers SCBTG35 / Old Tuofeng Village, Butuo County, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-16 2018-07-12 2018-10-12 remedies village roads Quotations Envelope (hardened) 1.5 kilometers SCBTG37 / Road Pending Renovation (hardening) Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-16 2018-07-12 2018-10-12 1.5km in Niche Village, Quotations Envelope ion Butuo County SCBTG38 / Road in the village of Rida Village, Abu Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-16 2018-07-12 2018-10-12 Province, Butuo County Quotations Envelope (hardening) 0.15 km SCBTG39 / Butuo County Request for Single Stage - One Shou zi Village Reclamation IBRD / 85090 Post Limited 0.00 Canceled 2018-06-16 2018-07-12 2018-10-12 Quotations Envelope (hardening) 0.8 km SCBTG40 / Zhuercun Pending Village Road Regulation Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-16 2018-07-12 2018-10-12 (hardening) 0.8 km in Quotations Envelope ion Butuo County SCBTG41 / Dianzi Village Request for Single Stage - One Road Regulation (hardening) IBRD / 85090 Post Limited 0.00 Canceled 2018-06-16 2018-07-12 2018-10-12 Quotations Envelope 0.8 km in Butuo County SCBTG42 / Yahe Village Pending Request for Single Stage - One Road Regulation (hardening) IBRD / 85090 Post Limited 0.00 Implementat 2018-06-16 2018-07-12 2018-10-12 Quotations Envelope 0.8 km in Butuo County ion SCJYG002 / Jinyang Yongsheng konjac farmers Pending Request for Single Stage - One cooperatives set up 60 IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Quotations Envelope cubic meters of irrigation ion reservoirs 5 contracts SCJYG003 / Jinyang County Shida village white Pending konjac Planting Farmers' Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-04 2018-08-23 professional cooperatives Quotations Envelope ion new village road 3 km project contract SCJYG004 / Jinyang County, Shida village, white konjac Planting Pending Request for Single Stage - One Farmers' professional IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Quotations Envelope cooperatives to build ion irrigation reservoirs 60 cubic meters and 5 engineering contracts SCJYG005 / Jinyang County, the village of jiguru white konjac farmers Pending Request for Single Stage - One cooperatives professional IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Quotations Envelope irrigation pool 60 cubic ion meters 5 engineering contracts SCJYG006 / Jinyang County Desheng white Pending konjac green pepper pepper Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-04 2018-08-23 farmers' professional Quotations Envelope ion cooperative new 1.5 km village road project contract SCJYG007 / Jinyang County Desheng white konjac green pepper pepper Pending Request for Single Stage - One farmers cooperatives IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Quotations Envelope irrigation pool 60 cubic ion meters 10 engineering contracts SCJYG008 / Jinyang County Desheng white konjac green pepper pepper Pending Request for Single Stage - One farmers professional IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-04 2018-08-23 Quotations Envelope cooperatives irrigation pipe ion irrigation 4 km project contract SCJYG009 / Jinyang County Hongli white konjac Pending Planting Farmers Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Cooperatives irrigation pool Quotations Envelope ion 60 cubic meters 3 engineering contracts Page 3 SCJYG010 / Jinyang County Hongli white konjac Pending Planting Farmers' Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-04 2018-08-23 professional cooperatives to Quotations Envelope ion install irrigation pipe 16 km project contract SCJYG011 / 3 km project Pending contract of New Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-01 2018-06-27 2018-09-27 Road in Mu Ni Guer Quotations Envelope ion village, Jinyang SCJYG012 / Jinyang County Fu Tai semi wool Pending Request for Single Stage - One sheep professional IBRD / 85090 Post Limited 0.00 Implementat 2018-06-01 2018-06-27 2018-09-27 Quotations Envelope cooperative new village ion road 1.5 km project SCJYG013 / Jinyang County, Fujian Province, Pending semi fine wool sheep Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-01 2018-06-27 2018-09-27 professional cooperative Quotations Envelope ion production of 2 km bypass engineering contract SCJYG014 / Jinyang County, Fujian Province, Pending semi fine wool breeding Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-07-09 2018-08-04 2018-09-30 professional cooperatives Quotations Envelope ion irrigation pipe 5 KM project contract SCJYG017 / Jinyang County Desheng white Pending Request for Single Stage - One konjac, green pepper, IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-06 2018-09-06 Quotations Envelope farmers' professional ion cooperative office space 100. SCJYG018 / Jinyang County Ben Kang konjac Pending Request for Single Stage - One planting professional IBRD / 85090 Post Limited 0.00 Implementat 2018-06-10 2018-07-06 2018-09-06 Quotations Envelope cooperative office space ion construction contract SCJYG019 / Construction Pending Request for Single Stage - One contract for building office IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 Quotations Envelope building of Jinyang County ion SCJYG020 / Jinyang County TengXiang white Pending konjac Planting Farmers Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 Professional Cooperatives Quotations Envelope ion office space 100 contract project SCJYG021 / Jinyang County Jia Fu white konjac Pending Planting Farmers' Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 professional cooperatives Quotations Envelope ion office space 100 contract project SCJYG022 / Jinyang County Lan Po semi fine Pending wool sheep breeding Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 farmers cooperatives Quotations Envelope ion professional office 100 square project contract SCJYG023 / Jinyang County NYDA IDA semi Pending fine wool sheep farmers Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 professional cooperative Quotations Envelope ion office space 100 contract project SCJYG024 / Jinyang County Jifu metropolitan Pending semi fine wool sheep Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 farmers professional Quotations Envelope ion cooperatives new office space project contract SCJYG025 / Jinyang County Joint farmers' Pending Request for Single Stage - One professional cooperatives IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-09-02 Quotations Envelope union office 100 square ion project contract SCJYG034 / Jinyang County, Fujian Province, semi fine wool sheep Pending Request for Single Stage - One farmers specialized IBRD / 85090 Post Limited 0.00 Implementat 2018-06-08 2018-07-02 2018-08-20 Quotations Envelope cooperatives irrigation ion reservoir 60 cubic meters 5 engineering contracts SCJYG032 / Contract for Pending construction of animal Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementat 2018-06-08 2018-06-10 2018-07-10 2018-07-11 2018-07-23 2018-10-31 husbandry trading market Envelope ion in Jinyang County SCMGG05 / Jiwei village Pending professional cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-08-01 2018-08-25 2018-10-25 building in Ba Pu town, Quotations Envelope ion Mei Gu County SCMGG11 / Mei Gu County, Xixiang, La Luo Request for Single Stage - One village, the construction of IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 Quotations Envelope 2 kilometers of convenient road Page 4 SCMGG18 / Mei Gu County, nine villages in the Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 village of Wu village Quotations Envelope regulation (hardening) 2 km SCMGG19 / Nine villages Request for Single Stage - One in Mei Gu County, New IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 Quotations Envelope Village Road 0.92 km SCMGG20 / 2 kilometers of New Village Road in Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-05 Longmen Township, Mei Gu Quotations Envelope County SCMGG21 / Mei Gu County, Rama Ai Village, Request for Single Stage - One new village regulation IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-25 2018-09-25 Quotations Envelope Village Road (hardening) 1.5 km SCMGG22 / Mei Gu County, La Ma Jiao Request for Single Stage - One Township rad village IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-25 2018-09-25 Quotations Envelope regulation Village Road (hardening) 1 km SCMGG23 / Mei Gu County, nine villages, nine Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 villages, new production of Quotations Envelope 2.5 kilometers SCMGG24 / The new rural area of Luo Yi Yi Request for Single Stage - One village in Mei Gu county IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-05 Quotations Envelope has 2.5 kilometers of new production. SCMGG25 / Mei Gu County, Luo Wo Yi village Request for Single Stage - One EBOHR Wo Village 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope cubic meters of new reservoir 1 Install PE 40 pipe 3 km SCMGG27 / Mei Gu County agricultural Request for Single Stage - One township Yi Cun new 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope cubic meters reservoir 1 Install PE 40 pipe 3 km SCMGG28 / Mei Gu County, farming village, Request for Single Stage - One WA Yi village, a new 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope cubic meter reservoir 1. Install PE 40 pipe 3 km SCMGG29 / Mei Gu County rural farming Request for Single Stage - One village of new 60 cubic IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope meters reservoir 1 Install PE 40 pipe 3 km SCMGG34 / A new 60 cubic meter reservoir in Longmen village, Mei Gu Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 County, has 1 cubic meters Quotations Envelope installed PE 3 40 kilometers. SCMGG35 / Mei Gu County, Longmen Township, Request for Single Stage - One new village 60 cubic meters IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-28 2018-09-20 Quotations Envelope of cistern reservoir 1, install PE 3 40 km pipeline SCMGG36 / Mei Gu County, Longmen Township tree Buyi Luo village, a Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-28 2018-09-20 new 60 cubic meters Quotations Envelope reservoir 1, install PE 3 40 km pipeline SCMGG40 / Ha Gu village, Longmen Township, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-28 2018-09-20 Mei Gu County, has built Quotations Envelope 200 cubic meters of reservoir 1. SCMGG41 / 1.92 kilometers of New Village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-28 2018-09-20 Road in Longmen village, Quotations Envelope Ma Ma Village, Mei Gu County SCMGG42 / Mei Gu Request for Single Stage - One County, Xixiang, 1 wells in IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 Quotations Envelope the New Village Road SCMGG43 / Village Road Request for Single Stage - One in Longmen village of Mei IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-28 2018-09-20 Quotations Envelope Gu County, 1.5 km SCMGG44 / Mei Gu Pending County, WA Xixiang, West Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-01 2018-07-02 2018-09-02 Village regulation Village Quotations Envelope ion Road (hardening) 1 km SCMGG45 / A new production road 5 Request for Single Stage - One kilometers in the village of IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-29 2018-11-15 Quotations Envelope Er Ma Village, Longmen Township, Mei Gu County Page 5 SCMGG46 / Mei Gu County, farming village, Request for Single Stage - One new village 60 cubic IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope meters, 1 reservoirs Install PE 40 pipe 1.5 km SCMGG47 / Mei Gu County agricultural Request for Single Stage - One township Yi Cun new 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-05 2018-09-02 Quotations Envelope cubic meters reservoir 1 Install PE 40 pipe 1.5 km SCMGG49 / Mei Gu County, WA Xixiang, West Request for Single Stage - One Village installed PE 40 1.5 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 Quotations Envelope km pipeline, 60 cubic meters of new reservoir 1. SCMGG50 / Mei Gu County, Xixiang, La Luo Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 village, PE 1.5 40 km Quotations Envelope pipeline SCMGG51 / Mei Gu County, Xixiang, Dalla am Request for Single Stage - One village, PE 40 1.5 km IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 Quotations Envelope pipeline, 1 cubic meters of new 60 cubic meters. SCMGG52 / Mei Gu County, Xixiang, Nei Mu Request for Single Stage - One village installed PE 1.5 40 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-01 2018-07-02 2018-09-02 Quotations Envelope km pipeline, 60 cubic meters of new reservoir 1. SCMGG54 / Mei Gu County, BAP town ridge Request for Single Stage - One village new 60 cubic meters IBRD / 85090 Post Limited 0.00 Canceled 2018-06-04 2018-07-02 2018-09-05 Quotations Envelope reservoir 1 Install PE 40 pipe 3 km SCMGG55 / 60 new cubic meters of 1 new reservoirs Request for Single Stage - One in Sanhe Village, BAP IBRD / 85090 Post Limited 0.00 Canceled 2018-06-04 2018-07-02 2018-09-05 Quotations Envelope Town, Mei Gu County Install PE 40 pipe 1.5 km SCMGG56 / Mei Gu County, Longmen village, Request for Single Stage - One new village 60 cubic meters IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-29 2018-10-15 Quotations Envelope of water storage tank 1, install PE 3 40 km pipeline SCMGG57 / Mei Gu County, Longmen Township, Request for Single Stage - One hung Bi Village, a new 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-29 2018-10-15 Quotations Envelope cubic meter reservoir 1, PE 2 40 km pipeline SCMGG58 / Mei Gu County, according to Guo Gu township, ancient village 60 cubic meters of Request for Single Stage - One new reservoir 1 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-04 2018-07-02 2018-09-05 Quotations Envelope Installation of PE 1.5 40 km pipeline, regulation of Village Road (hardening) 1.5 km SCMGG60 / Mei Gu County, according to Guo Er Township, Erma village, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-04 2018-07-02 2018-09-05 a new 60 cubic meter Quotations Envelope reservoir 1. Install PE 40 pipe 1.5 km SCMGG61 / Mei Gu County, Longmen Township, the village has 200 cubic Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-29 2018-10-15 meters of new reservoir 1, Quotations Envelope PE 7 40, 7 kilometers, PE 3, 3 kilometers. SCMGG67 / Mei Gu County Jue Luo Russian Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-05 2018-06-30 2018-08-30 village regulation Village Quotations Envelope Road (hardening) 1.3 km SCMGG72 / Mei Gu County jilo Township jilo Request for Single Stage - One village new 60 cubic meters IBRD / 85090 Post Limited 0.00 Canceled 2018-06-05 2018-06-30 2018-08-30 Quotations Envelope reservoir 1 Install PE 40 pipe 3 km SCMGG73 / Mei Gu County, Jue Luo Township, Request for Single Stage - One Pago village, a new 60 IBRD / 85090 Post Limited 0.00 Canceled 2018-07-01 2018-07-25 2018-09-25 Quotations Envelope cubic meter reservoir 1. Install PE 40 pipe 3 km SCMGG80 / Mei Gu County, Xixiang, west of Request for Single Stage - One the village of PE PE 40 2 IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 Quotations Envelope km / 60 cubic meters reservoir 1, 90 km 4 km SCMGG82 / Mei Gu County well ye te Xixiang thousand village PE 40 2 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 km, 60 cubic meters, 1 Quotations Envelope reservoirs / PE 1 63 km 1 km Page 6 SCMGG83 / Mei Gu County, Xixiang fine leaf Request for Single Stage - One bamboo picking village PE IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 Quotations Envelope 40 1.5 km / 60 cubic meters reservoir 1. SCMGG84 / Mei Gu County, Xixiang, Tate Ye Village, PE village, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 installed with a diameter Quotations Envelope of 40 km, 1.5 km / 60 cubic meters, 1 reservoirs. SCMGG85 / Mei Gu County well ye te Xixiang Request for Single Stage - One West Village installed PE, IBRD / 85090 Post Limited 0.00 Canceled 2018-06-02 2018-06-30 2018-08-30 Quotations Envelope 40, 1.5 km, 60 cubic meters, 1 reservoirs. SCMGG88 / Mei Gu County, Jilao Township, the Request for Single Stage - One village of e 60 cubic meters IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-25 2018-10-25 Quotations Envelope of new reservoir 1. Install PE 40 pipe 3 km SCMGG89 / Mei Gu County jilo Township Code Request for Single Stage - One Arni village 60 cubic IBRD / 85090 Post Limited 0.00 Canceled 2018-08-01 2018-08-25 2018-10-25 Quotations Envelope meters of new reservoir 1 Install PE 40 pipe 3 km SCGLG40 / Gullin county Under shi bao white horse village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-01-01 2019-01-25 2019-08-15 regulation village road Quotations Envelope ion hardening 2 km SCGLG32 / There are 13 reservoirs of 60 cubic Under meters in shibao baima Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 village, gullin county, and Quotations Envelope ion 10.625 kilometers of PE40 irrigation pipes SCGLG63 / Gullin county Under shishibaokou village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-25 2019-08-15 renovation village road Quotations Envelope ion (hardening) 3 km SCGLG35 / There are 13 reservoirs of 60 cubic Under meters and PE40 irrigation Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 pipes of 7.625 kilometers in Quotations Envelope ion shibaokou village, gullin county SCGLG37 / Gullin county Under stone gem mouth village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-25 2019-08-15 regulation village road Quotations Envelope ion hardening 2 km SCGLG66 / Gullin county Under maxi tongxin village 60 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 cubic meters reservoir 10, Quotations Envelope ion PE40 irrigation pipe 3 km SCGLG64 / Gulin county Under Request for Single Stage - One maxi tongxin village office IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 Quotations Envelope room 100 square meters ion SCGLG73 / Gulin county Under ma xinhe village 60 cubic Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 meters reservoir 20, PE40 Quotations Envelope ion pipeline 3 km SCGLG69 / Gullin county Under Request for Single Stage - One ma xinhe village office 100 IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 Quotations Envelope square meters ion SCGLG45 / Gullin county Under jiaoyuan longfeng village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-25 2019-08-15 regulation village road Quotations Envelope ion hardening 2 km SCGLG107 / Gullin county Under jiaoyuan yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-25 2019-08-15 regulation village road Quotations Envelope ion hardening 2 km SCGLG108 / Gullin county Under jiaoyuan yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 renovation of the village Quotations Envelope ion road (hardening) 3 km SCGLG03 / Gullin county Under jiaoyuan yulin village 60 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 cubic meters 20 reservoir, Quotations Envelope ion PE40 pipe 0.63 km SCGLG94 / Gullin county Under Request for Single Stage - One maoxi qinglong village IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 Quotations Envelope office 100 square meters ion SCGLG95 / Gullin county Under maoxi qinglong village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 renovation village road Quotations Envelope ion (hardening) 2 km SCGLG97 / Gullin county Under maoxi qinglong village 200 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 cubic meters reservoir 1, Quotations Envelope ion PE40 pipeline 3 km Page 7 SCGLG57 / Gullin county Under horse shoe town ring road Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-25 2019-08-15 village regulation village Quotations Envelope ion road hardening 2 km SCGLG87 / Gulin county ma shoe town ring road Under Request for Single Stage - One village 60 cubic meters IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 Quotations Envelope reservoir 10, PE40 pipeline ion 3 km SCGLG56 / Gullin county Under horseshoe town orchid Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 village renovation village Quotations Envelope ion road (hardening) 1 km SCGLG84 / Gullin county Under mahoozhen lanhua village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-02-02 2019-08-15 60 cubic meters reservoir Quotations Envelope ion 10, PE40 pipeline 5 km SCGLG16 / The office Under building of shunhe village, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-26 2019-01-27 2019-08-15 baini township, gullin Quotations Envelope ion county is 100 square meters SCBTG09 / Butuo county Pending Request for Single Stage - One rijiu village cooperative IBRD / 85090 Post Limited 0.00 Implementat 2018-12-08 2019-01-03 2019-02-03 Quotations Envelope office building construction ion SCBTG43 / butuo Pending countyLaobo village road Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-12-08 2019-01-03 2019-04-03 renovation (hardening) Quotations Envelope ion 1.913 km SCBTG36 / Moci Village Pending Request for Single Stage - One Road Regulation (hardening) IBRD / 85090 Post Limited 0.00 Implementat 2019-03-21 2019-04-16 2019-07-17 Quotations Envelope 1.393km in Butuo County ion SCMGG26 / There are 6 newly built 60 cubic meters Pending reservoir and 50 kilometers Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 of PE40 pipeline in Quotations Envelope ion azuowawu village, luoyigan township, meigu county. SCMGG30 / Wawu village, jiukou township, meigu Pending Request for Single Stage - One county, is 30km away from IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 Quotations Envelope the installation of PE40 ion pipeline. SCMGG31 / Three new reservoirs of 60 cubic Pending meters were built in waluo Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 village, jiukou township, Quotations Envelope ion meigu county. Install PE40 pipe for 20km. SCMGG32 / Mei Gu County, nine villages, Bo Pending Request for Single Stage - One Wo bitter New 60 cubic IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 Quotations Envelope meters reservoir 2 ion Install PE 40 pipe 20 km SCMGG33 / Meigu longme n township WaGu village 6 Pending Request for Single Stage - One 0 cubic meters of new rese IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 Quotations Envelope rvoir 3 mouth, PE Φ 40 pi ion pe installation, 30 km SCMGG37 / In jiwei village, bapu town, meigu Pending county, 6 new reservoirs of Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 60 cubic meters were built, Quotations Envelope ion and 15 kilometers of PE40 pipeline was installed. SCMGG38 / In dagge village, bapu town, meigu Pending county, 5 new reservoirs of Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 60 cubic meters were built, Quotations Envelope ion and 25 kilometers of PE40 pipeline was installed. SCMGG39 / There are 4 newly built 60 cubic meters Pending reservoir and 20 kilometers Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 of PE40 pipeline in sahler Quotations Envelope ion village, bapu town, migu county. SCMGG48 / Nongzuo village, nongzuo township, Pending meigu county, built 4 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 reservoirs of 60 cubic Quotations Envelope ion meters, and installed 25 kilometers of PE40 pipeline. SCMGG59 / According to t he fruit sleep township in Pending accordance with the DE am Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 or village 60 cubic meters Quotations Envelope ion of new reservoir 3 mouth, i nstall PE Φ 40, 50 km pip eline SCMGG81 / Guokhe village, jingyate west Pending township, meigu county, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-02 2019-05-26 2019-07-21 built 6 new reservoirs of Quotations Envelope ion 60 cubic meters, and installed 25 kilometers of PE40 pipeline. Page 8 SCBTG19 / Butuo county Pending hey door village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-06 2019-04-30 2019-06-30 office building 100 square Quotations Envelope ion meters SCBTG08 / Butuo county, Pending gaguang village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-06 2019-04-30 2019-06-30 office building of 100 Quotations Envelope ion square meters SCBTG20 / Butuo county Pending ah bao village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-06 2019-04-30 2019-06-30 office building of 100 Quotations Envelope ion square meters SCBTG24 / Butuo county Pending feige village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-08 2019-05-03 2019-07-03 office building 100 square Quotations Envelope ion meters SCBTG12 / Butuo county Pending shizui village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-08 2019-05-03 2019-07-03 office building of 100 Quotations Envelope ion square meters SCBTG15 / Butuo county Pending mo cooperative village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-05 2019-07-05 cooperative office building Quotations Envelope ion 100 square meters SCBTG16 / Butuo county Pending weizipo village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-05 2019-07-05 office building of 100 Quotations Envelope ion square meters SCBTG13 / Butuo county Pending filian wu village cooperative Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-05 2019-07-05 office building of 100 Quotations Envelope ion square meters SCBTG32 / Road Pending improvement (hardening) Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-05 2019-09-05 2.086 km in filian wucun Quotations Envelope ion village, butuo county SCBTG44 / Road Pending remediation (hardening) in Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-06 2019-04-30 2019-08-30 mohezuo village, butuo Quotations Envelope ion county, 1.492 km SCBTG45 / Road Pending improvement (hardening) Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-08 2019-05-03 2019-09-03 0.391 km in shizui village, Quotations Envelope ion butuo county SCBTG46 / Road Pending improvement (hardening) Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-06 2019-04-30 2019-08-30 0.119 km in yakaocun Quotations Envelope ion village, butuo county SCMGG10 / Construction Pending of office buildings for Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-05 2019-04-29 2019-07-21 yijiayuan cooperative in Quotations Envelope ion meigu county SCMGG106 / Meigu thous and ha village four 60 cubi Pending Request for Single Stage - One c meters of the construction IBRD / 85090 Post Limited 0.00 Implementat 2019-04-08 2019-05-04 2019-07-27 Quotations Envelope of reservoir, PE Φ 40 pipe ion 20 km SCMGG64 / Two reservoir s of 60 cubic meters will b Pending Request for Single Stage - One e built in guohe village of IBRD / 85090 Post Limited 0.00 Implementat 2019-04-08 2019-05-04 2019-07-27 Quotations Envelope meigu county,PE40 pipelin ion e 5 km SCMGG103 / Jiwei village, Pending Request for Single Stage - One meigu county, construction IBRD / 85090 Post Limited 0.00 Implementat 2019-05-02 2019-05-26 2019-07-20 Quotations Envelope of a drip irrigation project ion SCMGG105 / Meigu Pending Request for Single Stage - One county ji wei village slope IBRD / 85090 Post Limited 0.00 Implementat 2019-05-02 2019-05-26 2019-10-15 Quotations Envelope ladder construction 80 mu ion SCXYG1901 / Water conservancy facilities project Pending in haiya village, xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (200m 1 reservoir, Quotations Envelope ion PE40 water pipe, 1.2km, PE63 water pipe, 0.8km) SCXYG1902 / Water conservancy facilities project Pending Request for Single Stage - One of shuiliao village, xuyong IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (PE63 water pipe, ion 4km) SCXYG1903 / Tianba village water conservancy Pending facilities project in xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (200m 1 reservoir, Quotations Envelope ion 1.5km PE40 water pipe, 1km PE63 water pipe) SCXYG1904 / Water conservancy facilities project Pending in shuilaopu village, xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (200m 1 reservoir, Quotations Envelope ion 60m 3 reservoir, PE40 water pipe 1.5km) Page 9 SCXYG1905 / Water conservancy facilities project Pending of yantang village, xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (3 outlets of 60m Quotations Envelope ion reservoir, 1km of PE40 water pipe) SCXYG1906 / Water conservancy facilities project Pending Request for Single Stage - One of xiekou village, xuyong IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (3 60m reservoirs, ion PE40 water pipes, 1.5km) SCXYG1907 / Water conservancy facilities project Pending of sunjia village, xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (200m 2 reservoir, Quotations Envelope ion 60m 3 reservoir, PE40 water pipe 2km) SCXYG1908 / Shuangshan village water conservancy Pending facilities project in xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (200m 1 reservoir, Quotations Envelope ion 1km PE40 water pipe, 1km PE63 water pipe) SCXYG1909 / Water conservancy facilities project Pending of dawen village, xuyong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (4 200m reservoir, 1 Quotations Envelope ion 60m reservoir, 2km PE40 water pipe) SCXYG1910 / Water conservancy facilities project Pending Request for Single Stage - One in nanshan village, xuyong IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (200m 1 reservoir, ion PE40 water pipe, 1.5km) SCXYG1912 / In chahe Pending village of xuyong county, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 the low-voltage line is Quotations Envelope ion 0.4km SCXYG1913 / Xiongguang Pending village, xuyong county, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 implemented a low-voltage Quotations Envelope ion line of 0.2km SCXYG1915 / The Pending implementation of the low Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 voltage line in dama village Quotations Envelope ion of xuyong county is 0.4km SCXYG1916 / The Pending implementation of the low- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 voltage line in tianba Quotations Envelope ion village of xuyong county is 0.3km SCXYG1917 / The low- Pending Request for Single Stage - One voltage line in anle village IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope of xuyong county is 0.5km ion SCXYG1918 / The implementation of the low- Pending Request for Single Stage - One voltage line in shuilaopu IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope village of xuyong county is ion 0.3km SCXYG1921 / The Pending implementation of the low- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 voltage line in sunjia Quotations Envelope ion village of xuyong county is 0.3km SCXYG1928 / The Pending implementation of the low- Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 voltage line in daben Quotations Envelope ion village of xuyong county is 0.2km SCXYG1930 / Xuyong Pending county chahe village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation village road Quotations Envelope ion (hardening) 2.5 km SCXYG1931 / Baila Pending village, xuyong county, built Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 1.92 km of road within the Quotations Envelope ion village SCXYG1933 / Shuiliao village, xuyong county, Pending Request for Single Stage - One improved village road IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope (hardening) 0.2km, new ion village road 0.2km SCXYG1935 / Yan tang Pending village yan yong county Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 consolidation (hardening) Quotations Envelope ion village road 3 km SCXYG1937 / Sunjia Pending village, xuyong county, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 remediation of the village Quotations Envelope ion road (hardening) 3 km SCXYG1938 / Dawen Pending Village, Xuyong County, Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 renovates 3 kilometers of Quotations Envelope ion roads in the village Page 10 SCGLG109 / Water conservancy facilities project of shaba village, baini Pending township, gullin county (3 Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 reservoirs of 60 cubic Quotations Envelope ion meters, 11 kilometers of PE40 pipeline, 1 reservoir of 200 cubic meters) SCGLG110 / Improvement Pending of road (hardening) 3 km Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 in shaba village, bainai Quotations Envelope ion township, gullin county SCGLG111 / Gullin county white mud township sand Pending Request for Single Stage - One dam village regulation IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope village road road ion (hardening) 2 km SCGLG113 / Low voltage line project of shaba Pending Request for Single Stage - One village, baini township, IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope gullin county (1 km of low ion voltage line, 1 transformer) SCGLG114 / Water conservancy construction project of yulin village, Pending Request for Single Stage - One Erlang town, gulin county IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope (12 reservoirs of 60 cubic ion meters, PE40 pipeline of 5 km) SCGLG115 / Water conservancy construction project of yulin village, Pending Request for Single Stage - One Erlang town, gulin county IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope (1 mouth of 200 cubic ion meters reservoir, 5 km of PE63 pipeline) SCGLG116 / Gulin county Pending Erlang town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 production road construction Quotations Envelope ion 3 km SCGLG117 / Gulin county Pending Erlang town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation village road Quotations Envelope ion (hardening) 3 km SCGLG118 / Gullin county Pending Erlang town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation road (hardening) Quotations Envelope ion 2 km SCGLG120 / Construction of low-voltage line in yulin Pending Request for Single Stage - One village, Erlang town, gulin IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (1km of low-voltage ion power line, 1 transformer) SCGLG121 / Gullin county Pending jiaoyuan town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 production road construction Quotations Envelope ion 9 km SCGLG122 / Water conservancy construction project of yulin village, Pending Request for Single Stage - One jiaoyuan town, gullin IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (2 200 cubic meters ion reservoir, 12 km PE40 pipeline) SCGLG123 / Gullin county Pending jiaoyuan town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation village road km Quotations Envelope ion (hardening) 2 km SCGLG124 / Gullin county Pending jiaoyuan town yulin village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation village road Quotations Envelope ion (hardening) 3 km SCGLG125 / Construction of water conservancy facilities in biaozi village, Pending jiaoyuan town, gullin Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 county (1 200 cubic meter Quotations Envelope ion reservoir, 10 km PE40 pipe, 20 60 cubic meters reservoir) SCGLG126 / Water conservancy facilities Pending construction in qinglong Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 village, maoxi town, gulin Quotations Envelope ion county (2 reservoirs of 200 cubic meters) SCGLG128 / Gulin county Pending maoxi town qinglong village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 production road construction Quotations Envelope ion 9 km SCGLG127 / Construction of water conservancy facilities in qinglong village, Pending Request for Single Stage - One maoxi town, gulin county IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope (4 reservoirs of 60 cubic ion meters, PE40 pipeline of 15 kilometers) Page 11 SCGLG129 / Water conservancy project of chayuan village, mahisi Pending Request for Single Stage - One township, gullin county (20 IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope reservoirs of 60 cubic ion meters, 20 kilometers of PE40 pipeline) SCGLG130 / Construction of water conservancy project in chayuan village, Pending Request for Single Stage - One mahisi township, gullin IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope county (1 200 cubic meter ion reservoir, 10 km PE63 pipeline) SCGLG131 / Gullin county Pending masi township tea garden Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 village production road Quotations Envelope ion construction 8 km SCGLG132 / Gullin county Pending mahisi township tea garden Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 village regulation village Quotations Envelope ion road km (hardening) 2 km SCGLG133 / Gullin county Pending mahisi township tea garden Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 village regulation village Quotations Envelope ion road (hardening) 3 km SCGLG135 / Construction of low-voltage line in Pending chayuan village, mahisi Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 township, gullin county Quotations Envelope ion (1km of low-voltage power line, 1 transformer) SCGLG136 / Construction of water conservancy facilities in tuguan village, horseshoe town, gullin Pending Request for Single Stage - One county (20 reservoirs of 60 IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope cubic meters,20 kilometers ion of PE40 pipeline,2 reservoirs of 200 cubic meters) SCGLG137 / Gullin county Pending horseshoe town tuguan Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 village production road Quotations Envelope ion construction 10 km SCGLG138 / Improvement Pending of road (hardening) 3 km Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 in tuguan village, horseshoe Quotations Envelope ion town, gullin county SCGLG139 / Six groups of tuguan village, horseshoe Pending Request for Single Stage - One town, gullin county, will IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope renovate the village road ion (hardening) for 3 kilometers SCGLG140 / Four groups of tuguan village, horseshoe Pending Request for Single Stage - One town, gullin county, IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope regulate village roads and ion highways (hardening) for 2 kilometers SCGLG143 / Construction of low-voltage line in Pending tuguan village, horseshoe Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 town, gullin county (1km of Quotations Envelope ion low-voltage power line, 1 transformer) SCGLG144 / Gullin county, horseshoe town, Pending Request for Single Stage - One tuguan village small 2 - IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope type irrigation station ion construction SCGLG145 / Construction of water conservancy facilities in jiulong village, Pending taiping town, gulin county Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 (6 60m3 reservoir, 2 200m3 Quotations Envelope ion reservoir, 3 km PE63 pipeline, 5 km PE40 pipeline) SCGLG146 / Gulin county Pending taiping town jiulong village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 production road construction Quotations Envelope ion 5.97 km SCGLG147 / Groups 5 and 6, jiulong village, Pending Request for Single Stage - One taiping town, gulin county, IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope will regulate the village ion road (hardening) for 3 kilometers SCGLG148 / Groups 2 and 3 of jiulong village, Pending Request for Single Stage - One taiping town, gulin county, IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope regulate the roads within ion the village (hardening) for 3 kilometers SCGLG149 / Gulin county Pending taiping town jiulong village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 regulation village road road Quotations Envelope ion (hardening) 2 km Page 12 SCGLG151 / Construction of low-voltage line in Pending Request for Single Stage - One jiulong village, taiping IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 Quotations Envelope town, gulin county (1km of ion low-voltage power line, 1 transformer) SCGLG152 / Construction of water conservancy facilities in shuiluo village, Pending yongle town, gulin county Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 (6 reservoirs of 60 cubic Quotations Envelope ion meters, 1 reservoir of 200 cubic meters, 3 kilometers of PE40 pipeline) SCGLG153 / Gulin county Pending yongle town shuiluo village Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 production road construction Quotations Envelope ion 5 km SCGLG154 / Office Pending building construction in Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 shuiluo village, yongle Quotations Envelope ion town, gulin county (100 square meters) SCGLG155 / Construction of low-voltage line in Pending shuiluo village, yongle Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2019-04-11 2019-05-15 2019-08-15 town, gulin county (1km of Quotations Envelope ion low-voltage power line, 1 transformer) SCXYG1939 / Construction Pending of an agricultural products Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementat 2019-04-10 2019-04-15 2019-05-16 2019-05-17 2019-05-30 2019-07-30 trading market in xuyong Envelope ion county SCXYG1940 / Xuyong Pending county 5 small two - type Single Stage - One IBRD / 85090 Post Request for Bids Open - National 0.00 Implementat 2019-04-10 2019-04-15 2019-05-16 2019-05-17 2019-05-30 2019-07-30 irrigation station Envelope ion construction projects GOODS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCMGH01 / 10 cooperative Under Request for Single Stage - One office equipment purchase IBRD / 85090 Post Limited 0.00 Implementat 2018-05-28 2018-06-22 2018-07-20 Quotations Envelope in Mei Gu County ion SCJYH046 / Jinyang county poverty alleviation Pending Request for Single Stage - One project management center, IBRD / 85090 Post Limited 0.00 Implementat 2018-06-13 2018-07-07 2018-08-06 Quotations Envelope product market information ion release platform. SCBTH03 / The product Pending market information platform Request for Single Stage - One IBRD / 85090 Post Limited 0.00 Implementat 2018-06-22 2018-07-15 2018-07-30 of the project office of Bu Quotations Envelope ion Tuo County SCBTH02 / 11 cooperative Pending Request for Single Stage - One office equipment purchase IBRD / 85090 Post Limited 0.00 Implementat 2018-07-11 2018-08-06 2018-08-21 Quotations Envelope in Bu Tuo County ion SCJYH044 / Jinyang County 7.5 fine wool sheep Pending Request for Single Stage - One project area cooperative 7 IBRD / 85090 Post Limited 0.00 Implementat 2018-06-13 2018-07-09 2018-08-05 Quotations Envelope sets of office equipment ion procurement contract SCJYH045 / Jinyang County 7.5 fine wool sheep Pending Request for Single Stage - One project area cooperative 7 IBRD / 85090 Post Limited 0.00 Implementat 2018-06-13 2018-07-09 2018-08-05 Quotations Envelope sets of office furniture ion procurement contract SCBTH05 / Butuo county Pending Request for Single Stage - One 9 cooperative office IBRD / 85090 Post Limited 0.00 Implementat 2018-12-09 2019-01-03 2019-02-03 Quotations Envelope furniture procurement ion SCBTH07 / Butuo county Pending Request for Single Stage - One le 'an township office IBRD / 85090 Post Limited 0.00 Implementat 2019-04-16 2019-05-12 2019-05-27 Quotations Envelope equipment procurement ion NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCMGFZ02 / Walnut Pending Request for Single Stage - One trademark registration in IBRD / 85090 Post Limited 0.00 Implementat 2018-08-28 2018-09-22 2018-12-20 Quotations Envelope Mei Gu County ion SCMGFZ03 / Certification Pending Request for Single Stage - One of walnut green agricultural IBRD / 85090 Post Limited 0.00 Implementat 2018-08-28 2018-09-22 2019-10-01 Quotations Envelope products in Mei Gu County ion CONSULTING FIRMS Page 13 Activity Reference No. Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCMGZ12 / The design of Consultant Pending the walnut trademark in IBRD / 85090 Post Qualification Open - National 0.00 2018-08-20 2018-08-28 2018-09-13 2018-09-20 2018-09-23 2018-10-20 Implementation meigu county. Selection SCMGZ13 / Packaging Consultant Pending design of Walnut in Mei IBRD / 85090 Post Qualification Open - National 0.00 2018-08-20 2018-08-28 2018-09-13 2018-09-15 2018-09-24 2018-10-24 Implementation Gu County Selection SCXYZ19 / Investigation and design of drip Consultant Pending irrigation system for 1000 IBRD / 85090 Post Qualification Open - National 0.00 2018-05-22 2018-05-27 2018-06-27 2018-06-30 2018-07-09 2018-07-29 Implementation mu sweet orange garden in Selection Xuyong County SCXYZ18 / Sichuan World Bank six phase poverty Consultant Pending alleviation project IBRD / 85090 Post Qualification Open - National 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 Implementation "industrial poverty Selection alleviation risk prevention" project research SCGLZ011 / Research on the "poverty alleviation Consultant model of industry" in the Pending IBRD / 85090 Post Qualification Open - National 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 six phase of poverty Implementation Selection alleviation project of Sichuan World Bank SCXYZ17 / Research on cooperative operation Consultant Pending mechanism of Sichuan IBRD / 85090 Post Qualification Open - National 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 Implementation World Bank's six phase Selection poverty alleviation project INDIVIDUAL CONSULTANTS Page 14