Social Assessment Report of Sheola Land Port SFG2769 V2 Table of Contents Executive Summary ............................................................................................................................ 7 Chapter 1: Introduction...................................................................................................................... 11 1.1 Background .......................................................................................................................... 12 1.2 Project Introduction .............................................................................................................. 12 1.2.1 Objectives ............................................................................................................................ 13 1.3 Scope of the Project ............................................................................................................. 13 1.4 Need for Social Assessment ................................................................................................. 14 1.5 Scope of work and Key Task ................................................................................................ 14 1.6 Approach and Methodology .................................................................................................. 15 1.6.1 Sampling Rationale .............................................................................................................. 15 1.6.2 Research Tools .................................................................................................................... 15 1.6.3 Quality Control ..................................................................................................................... 16 1.7 Organization of the Report.................................................................................................... 16 Chapter 2: Legal and Policy Frame Work .......................................................................................... 17 2.1 National Legislation ............................................................................................................. 18 2.1.1 Constitutional Provisions ...................................................................................................... 18 2.1.2 The Acquisition and Requisition of Immovable Property Ordinance, 1982 ............................. 18 2.1.3 Constitution Right of the Small Ethnic Communities .............................................................. 19 2.1.4 Other Social Policies, Laws and Regulation of GoB .............................................................. 19 2.2 Applicable World Bank Safeguards ....................................................................................... 20 Chapter 3: Baseline Status................................................................................................................ 21 3.1 Socio Economic Profile of Project Area ................................................................................. 22 3.1.1 Location and Geographic Profile ........................................................................................... 22 3.1.2 Physiographic Profile ............................................................................................................ 24 3.1.4 Description of Typical Community in the Project Area ........................................................... 25 3.2 Demographic & Socio Economic variables of Project Area .................................................... 25 3.2.1 Population ............................................................................................................................ 25 3.2.2 Households .......................................................................................................................... 25 3.2.2 Literacy ................................................................................................................................ 25 3.2.3 Main Workers ....................................................................................................................... 25 3.2.4 Birth and Death Rates .......................................................................................................... 25 3.2.5 Health Status........................................................................................................................ 26 3.3.1 Sex Ratio, Family Type and Size .......................................................................................... 26 3.3.2 Population by social Status ................................................................................................... 26 3.3.2 Ration Cards ........................................................................................................................ 26 3.3.3 Literacy ................................................................................................................................ 26 3.3.4 Dwellings.............................................................................................................................. 27 Yooshin-Vitti JV Page 2 Social Assessment Report of Sheola Land Port 3.3.6 Income ................................................................................................................................. 27 3.3.7 Public Health: Water Supply and Sanitation .......................................................................... 28 3.3.7 Other Social Infrastructure .................................................................................................... 29 3.3.8 Occupations and Livelihoods ................................................................................................ 29 3.3.9 Land and Assets................................................................................................................... 30 3.3.10 Land Use.............................................................................................................................. 31 3.3.11 Agriculture ............................................................................................................................ 31 3.3.12 Fisheries .............................................................................................................................. 31 3.3.13 Informal Border Trade .......................................................................................................... 32 3.3.14 Medical Tourism ................................................................................................................... 32 3.3.15 Other Cross Border Activities................................................................................................ 32 3.3.16 Cultural Resource and Issues ............................................................................................... 34 3.4 Salient Issues for the Project ................................................................................................ 34 Chapter 4: Institutional and Implementation Structure........................................................................ 35 4.1 Introduction .......................................................................................................................... 36 4.2 Institution Related to Policy, Planning &ME of the Project .................................................... 36 4.3 Ministry of Shipping (MoS).................................................................................................... 36 4.2.2 BLPA ................................................................................................................................... 36 4.2.3 Other Institutions .................................................................................................................. 37 4.2.4 Implementations and Operation-BLPA .................................................................................. 37 4.3.1 Hierarchy.............................................................................................................................. 37 4.3.2 Manpower ............................................................................................................................ 39 4.3.3 Key strengths and Weakness of BLPA.................................................................................. 39 4.4 Issues for Considerations ..................................................................................................... 39 4.5 Capacity Building.................................................................................................................. 39 4.5.1 Capacity Building Requirements ........................................................................................... 39 4.5.2 Training Needs ..................................................................................................................... 39 4.5.3 Capacity Building and Training Proposed ............................................................................. 39 Chapter 5: Stakeholder Analysis ....................................................................................................... 40 5.1 Introduction .......................................................................................................................... 41 5.2 Stakeholders at Different Levels ........................................................................................... 41 5.3 Stakeholders Analysis .......................................................................................................... 41 5.4 Beneficiaries/ Stakeholders Expectations ............................................................................. 44 5.4.1 Overall Issues Emerged During Public Consultations ............................................................ 44 Chapter 6: Impact Assessment ......................................................................................................... 48 6.1 Introduction .......................................................................................................................... 49 6.2 Positive Impact ..................................................................................................................... 49 6.3 Adverse Impacts................................................................................................................... 51 6.3.1 Land Acquisition Temporary and Permanent ........................................................................ 55 Yooshin-Vitti JV Page 3 Social Assessment Report of Sheola Land Port 6.3.2 Loss of Livelihoods: Fishing and Agriculture ......................................................................... 55 6.3.3 Impacts on River Boat and Vessels ...................................................................................... 55 6.3.4 Impacts on Passengers ...................................................................................................... 55 6.3.5 Impacts on Women and Minorities and Vulnerable................................................................ 55 6.3.6 Impacts on Health and Safety ............................................................................................... 55 6.3.7 Other Impacts....................................................................................................................... 55 Chapter 7: Major Risks and Assumptions .......................................................................................... 56 7.1 Risks .................................................................................................................................... 57 7.2 Assumptions......................................................................................................................... 57 7.3 Significance of Risks Assumptions........................................................................................ 57 Chapter 8: Overall Issues of Significance and Management .............................................................. 58 8.1 Issues of Significance ........................................................................................................... 59 8.1.1 Issues to be addressed by the Project .................................................................................. 59 8.2.2 Issues which are project Scope ............................................................................................ 59 8.2 Social Management Plan ...................................................................................................... 59 8.2.1 Resettlement Action Plan ..................................................................................................... 61 82.2 Land Acquisition Related ...................................................................................................... 61 8.2.3 Livelihood Related ................................................................................................................ 61 8.2.4 Inclusion and Equity ............................................................................................................. 61 8.2.5 Gender Minorities / Vulnerable ............................................................................................. 61 8.2.6 Ethnic Groups ...................................................................................................................... 65 8.2.7 Stakeholders Engagement ................................................................................................... 65 8.2.1.7 Transparency and Accountability .......................................................................................... 66 8.2.1.8 Capacity Support and Capacity Building ............................................................................... 70 8.2.1.9 Capacity Support and Building Budget .................................................................................. 71 8.2.1.10 Convergence of Relevant GoB Schemes ............................................................................ 71 8.2.1.11 Reference to Other Institutions of Issues ............................................................................ 71 8.3 Grievance Redress Mechanism ............................................................................................ 72 Chapter 9: Monitoring and Evaluation................................................................................................ 75 9.1 Introduction .......................................................................................................................... 76 9.2 Monitoring and Evaluation Framework .................................................................................. 76 9.2.1 Measurable Indicators .......................................................................................................... 78 9.2.2 Monitoring Framework .......................................................................................................... 79 9.2.3 Impact Evaluation ................................................................................................................. 80 9.3 M & E Budget ....................................................................................................................... 85 Chapter 10: Budget ........................................................................................................................... 86 10.1 Budgetary Requirements for Social Management ................................................................. 87 10.2 Overall Social Management Budget ...................................................................................... 87 Annexure .......................................................................................................................................... 88 Yooshin-Vitti JV Page 4 Social Assessment Report of Sheola Land Port Tables Table: 1. Level of Education of the affected person 27 Table: 2. Housing Pattern of the PAPs in the Project in the Terms of Housing Material 27 Table: 3. Distribution of PAPs Households by Sanitation Facilities 28 Table: 4. Distribution of PAPs Householder by Sources of Water for Other Utilization of Water 29 Table: 5. Distributions of the people by Characters under the Entire project Area 29 Table: 6. Land Holding Pattern of Households of the Project Area 31 Table: 7. Land Tenure System of the Area 31 Table: 8. Stakeholders/ institutions to support planning and implementation 43 Table: 9. Comments and suggestion in the FGD meeting 45 Table: 10. Comments of Participant National Public Consultation Workshop 46 Table: 11. Positive Impact of the project 50 Table: 12. Type of Negative Impact and Mitigation Measures 52 Table: 13. Tentative SMP Implementation Schedule 60 Table: 14. Capacity Building Budget 71 Table: 15. Tab-Potential Monitoring Indicators 79 Table 16 Monitoring and Evaluation Budget 85 Table 17. Budget for social mitigation 87 Figures Figure 1 Map of Beanibazar Upazila showing project site 22 Figure 2: Bangladesh Land Custom Station 23 Figure 3: Road Network Sheola Land Port 24 Figure 4: Monthly Income Level of Households of Project Affected Peoples. 28 Figure 5: Organogram of BLPA 38 Figure 6: Stakeholder map for project implementation 41 Figure 7: GRC Organogram 72 Figure 8: Proposed CMIS model (source: Microsoft XP Network Support) 83 Annexure: Annexure - 01: Structure Questionnaire Survey Annexure - 02: Check list Annexure - 03: Photo of the Project site and FGD meeting Annexure - 04 : Free Prior Public Consultation Annexure - 05 : National Consultation Workshop Yooshin-Vitti JV Page 5 Social Assessment Report of Sheola Land Port Abbreviations and Acronyms ARIPO Acquisition and Requisition of Immovable Property Ordinance of 1982 DC Deputy Commissioner BBS Bangladesh Bureau of Statistics BPLA Bangladesh Land Port Authority CUL Compensation Under the Law CMP Current Market Price EMP Environmental Management Plan EMF Environmental Management Framework EIA Environmental Impact Assessment FGD Focus Group Discussion GTL Grant to cover temporary loss of income HH Household HCG House Construction Grant HDA Homestead Development Allowance IEE Initial Environmental Evaluation IGA Income Generating Activities IDA International Development Association IPDP Indigenous People‘s Development Plan NGO Non-Government Organization OPs Operational Policies PAPs Project Affected Persons PAHs Project Affected Households PD Project Director PRA Participatory Rural Appraisal PIU Project Implementation Unit PAVC Property Assessment and Valuation Committee PM Project Manager RAP Resettlement Action Plan RP Resettlement Plan RRA Rapid Rural Appraisal RU-BLPA Resettlement Unit- Bangladesh Land Port Authority RS Resettlement Site SIA Social Impact Assessment SMF Social Management Framework SMP Social Management Plan STD Sexually Transmitted Disease STG Structure Transfer Grant TOR Terms of Reference TL Team Leader VNR Vested and Non- Resident Property WB World Bank Yooshin-Vitti JV Page 6 Social Assessment Report of Sheola Land Port Executive Summary Yooshin-Vitti JV Page 7 Social Assessment Report of Sheola Land Port Executive Summery Geographical location of Bangladesh is between two major regions of Asia. South- Asia and South -East Asia provides a unique opportunity for the countries to benefit from greater cross border movement of goods and services, investment flows, and enhanced human contact. Trade activities of Bangladesh have significantly increased over the years. On the other hand, Bangladesh has large trade deficit with India. Bangladesh can reduce this trade deficit by well connectivity between India and Bangladesh. It is true that Bangladesh is important to India because it could greatly boost the economy of West Bengal. Bangladesh could also greatly benefit from transit fees and transport charges. Improving the connectivity social and economic development of both the counties can be achieved. Bangladesh Land Port Authority (BLPA) will implement the present Sheola land port improvement project funded by World Bank (WB). Social Assessment Report and Resettlement Action Plan of Sheola Land Port adequately addresses the land, assets, structures, community property resources, livelihood, occupation and associated issues of project affected people. It incorporates principles and procedures for catering to entitlements and provision of required resources to deliver the compensation and assistance to PAPs and PAHs. Entitlement matrix outlines the provision for the same. A major emphasis has been on reducing the potential direct negative impacts of the project affected people and adjacent areas. The social components were carefully addressed in the project design, along with technical, environmental, and economic considerations. The major concerns include not only minimizing negative impacts especially displacement but also extending and enhancing positive impacts on the affected communities and large population of the project area. The socio- economic data was collected using household survey questionnaire, village profiling guidelines, Focus Group Discussion, specific to issues and data of Enterprise level. Information was collected using on demographic profile, education, profession, health and sanitation etc. as indicators of level of poverty of the sample households project affected (PA) landscape. The collected data was compared with the national average as compiled from different studies specially BBS. The study encompasses lots of information on different issues, not in depth, just an overview that may help to have an idea about the project area landscape. Another weakness of the study due to an unavailable cause is to establish the context of the issues which is interrelated might have cause-effect relationship. Connectivity is a demand of time between Bangladesh and India improving the connectivity, social and economic development of both the counties can be achieved. Under this project Bangladesh Land Port Authority (BLPA) will implement the project. However, some temporary livelihood loss is identified in the construction site. Shifting Sheola land port to the present project site is beside the highway at Borogram village of Dobagh Union (Sheola is another Union, previous location of land port known as ‗Sheola Land Port‘) under Beanibazar Upazila. Present location will ensure easy communication, more secured facilities for both the traders and common people in both the countries. For shifting the Sheola Land Port at new location will need 22.10 acres of land, which is proposed to be acquired at the new site of Borogram popularly known as Sutarkandi (Locally known as ‗Sutarkandi‘, a village of Indian side).More land may be needed in future for the present project, which may be in the vacant place. Local people and public Yooshin-Vitti JV Page 8 Social Assessment Report of Sheola Land Port representatives urged not to acquire homestead area and graveyard in the locality for further requirement. Local community and affected people have positive support for the project but need proper compensation at the rate of full replacement cost and livelihood support. Total 48 affected persons are identified as project affected person but some have more than one entitlement. Of total Project Households Affected (PAHs), the proposed site will cause 36 land owners as affected of which 22 are identified only structures affected will suffer as temporary shifting of business for construction work. So, direct impact of the project is economic displacement and livelihood loss by the project. Among the structure losers 4 are non-titled structure owners. All structures are used for business purpose. Out of these structures 3 are building and 10 are semi pacca and tin shed and no katcha structures will be affected, there are 5 pacca latrines and 3 Tube well were found in project site. Four shopkeepers are running business as tenants. Other than these losses, 5 small sized trees of local variety trees are affected on private land. No squatters and non-titled land owners are residing in the project site. The resettlement issue and project affected person will be rehabilitated at the rate of full replacement cost as per guidelines of WB OP 4.12 and common norms of donor funded project of the country. During consultation in the FGD meeting, PAP and community people expressed their positive ideas for shifting of Sheola Land Port at Borogram (Sutarkandi) of Dubagh Union. As number of project affected persons (PAPs) is not more an abbreviated Resettlement Action Plan (RAP) is prepared separately. RAP will be implemented for resettlement issues and social issues are mainly included in the Social Management Plan (SMP). Both SMP and Resettlement Plan will be implemented under establishing a resettlement unit (RU) during construction period and it will be converted to Social Development Unit/CSR department during post project period. RP will be implemented by hiring an implementing NGO for 6 months‘ period. There will be a provision monitoring, social and livelihood specialist with RU for the project period.NGO will prepare a monthly and final report regarding the completion of RP and SMP. Tentative budget of the SMP is Tk. 42,175,000. RAP will deal only resettlement issues, so SMP will not include any resettlement issues. During public consultation, all concerned urged to ensure proper compensation on land and structure and suggested alternative livelihood program for project affected households (PAHs). The project area is socially and naturally very active. In case of SMP some issues have been given priority for the increasing efforts of improving living standard of command area people. For sustainable development, livelihood skill is to be generalized among the command area population. Some stakeholders claimed, there is no source of drinking water, health facilities, and good schooling for the poor and common people, near proposed land port. From Corporate Social Responsibility (CSR) department, port authority can do something for the betterment of poor and vulnerable and they should have some facilities. The facilities are to be developed and distributed among beneficiaries through participatory social awareness and planning for the community. In addition to that, as a border area there may increase some crime trend like human trafficking; illegal drug route and marketing. Some other social issues are prevalent in the area, viz: early marriage, gender issues, wage discrimination, dowry, child labor, child and women persecution, kidnapping, moral degradation, addiction, gender discrimination, unhealthy sanitation, unhealthy harmful food preservation and distribution in the hotel and restaurant, AIDS & Yooshin-Vitti JV Page 9 Social Assessment Report of Sheola Land Port STD diseases among migrants, construction workers and transport workers may spread in the area. Road accidents is a major social problem especially highways and connectivity may increase this social problem and this should have minimized through raising awareness and social rehabilitation. There may be a permanent fund 1% with the land port authority either from (toll/ tax/ tariff) their income or imposing a surcharge on the exported or imported items of the land port for rehabilitation fo r victims and victims‘ dependent. Both for social and economic sustainability, above social problem may be aggravated and to be solved through raising intensive awareness. Free prior informed public consultation meetings were held at Sheola during project preparation and to share the draft SIA report. A public consultation meeting was held on 7 th May 2016 with the local communities. Notices about the consultation meeting were circulated to the local communities through leaflets one week in advance of the meeting. Posters were also displayed at public places (at Union Parishad Bhavan, market).Additionally, meetings were also held with local government officials and customs officials. A national consultation on draft social and environmental assessment study was held on 10th August 16 at BLPA auditorium in Dhaka. Photographs of these consultations are given at the end of report for local and national consultations, respectively. During these consultations, leaflets on key social and environmental issues were distributed to the participants (these were prepared in local language in Bangla) and big size posters were also displayed at the venue. Power point presentations were made by the social and environmental experts. Participants were encouraged to ask questions on the social and environmental issues. Yooshin-Vitti JV Page 10 Social Assessment Report of Sheola Land Port Chapter 1: Introduction Yooshin-Vitti JV Page 11 Social Assessment Report of Sheola Land Port Chapter-1 Introduction 1.1 Background As per The Government of Bangladesh has received a grant from the World Bank toward the cost of the Bangladesh Trade and Transport Facilitation Studies NLTA Project, and intends to apply part of the proceeds for consulting services. In order to improve key multi-modal transport corridors and networks that would address current transport bottlenecks for trade and help boost national, regional and international trade for Bangladesh, the World Bank is providing a Recipient-Executed grant to the Government of Bangladesh (GoB) to finance economic, financial, technical, environmental and social safeguards studies and technical assistance for: (i) dredging of priority inland waterways; (ii) provision of vessels, navigational aids, and safety equipment and improvement of selected river ports along priority waterways; (iii) construction of a new container terminal and improving operational efficiency at Chittagong Port; (iv) investments in selected equipment and improving operational efficiency at Mongla Port; (v) addressing missing links for road and inland waterways to establish transport connectivity between Chittagong Port, Chittagong Hill Tracts Districts, and NE India; and (vi) improving selected key priority border posts. These interventions are expected to facilitate domestic trade, international trade with third countries, as well as regional trade with neighboring countries including India, Nepal and Myanmar. These studies and technical assistance are expected to inform decisions on potential investment opportunities. In this context, Bangladesh has the potential to become a transport and transshipment centre for the sub region. It borders India and Myanmar and is close to the landlocked countries of Bhutan and Nepal, and Kunming, the key transportation hub in southwest China. The SAARC Thimphu Summit in 2010 recognized the importance of developing transport infrastructure and transit facilities, especially for the landlocked countries to promote intra-SAARC trade. Agreements between Bangladesh and India in 2010 for regional connectivity were a critical stepping stone for opening connectivity, not only between Bangladesh and India, but also with Bhutan and Nepal, diversifying regional and international transport routes. 1.2 Project Introduction This is the social assessment report of Sheola land port located at Sutarkandi of Dobag union of Beanibazar Upazila in Sylhet at Sylhet- Karimganj Border. From the present location the land port will be shifted to Borogram village of Dobagh union under Beanibazar Upazila of Sylhet district funded by World Bank. The project aims to improve trade facilities and economic development through participatory planning and monitoring between Bangladesh and India. Through infrastructure development of different land port improved connectivity will be ensured. The project will be jointly implemented by the Bangladesh Land Port Authority (BLPA) under Ministry of Shipping and NBR under Ministry of Finance. For shifting of Sheola Land Port, 22.10 acres of land is proposed to be acquired at Borogram, Beanibazar of Sylhet division and assessment capacity was also agreed upon. Yooshin-Vitti JV Page 12 Social Assessment Report of Sheola Land Port 1.2.1 Objectives The project objective is to develop potential Land Ports Bhomra, Sheola between Bangladesh and Indian border as per present TOR under social impact assessment SIA. But detailed objectives are as follows. The consulting services ("the Services") are required for detailed feasibility and design studies to conduct detailed feasibility and design studies for four land ports in Bangladesh that border India including: Bhomra, Sheola, and Thegamukh. The studies shall include: (i) an evaluation of expected traffic (by traffic type) and evolution, for the initial operation of the border station, after one year, and with an extrapolation for the next five years; (ii) an evaluation of space requirements after drafting the staffing matrix showing the number of positions, hours of duty, accommodation needs in terms of office space, control positions, specialized facilities and housing and staff amenities; (iii) a flow chart for the handling of different categories of traffic, roles of Customs and other border agencies; (iv) a (block) diagram showing traffic flows and location of different functions and their position. Space requirements will be calculated according to traffic estimates, with a capacity for expansion should the need arise; (v) detailed design & estimation of different infrastructures and bid documents for the land ports; (vi) take into account the possibility of co-located, juxtaposed and other models of enhanced collaboration for bilateral border management; (vii)Drafting Initial Environmental Evaluations (IEEs), Environmental Impact Assessments (EIAs), and Environmental Management Plans (EMPs) for the proposed land ports; and (viii) Draft Social Impact Assessments (SIAs), Resettlement Action Plans (RAPs), and where necessary, Indigenous/Tribal People's Development Plans for the land ports. The Consultant will also conduct consultations with broad stakeholders on the proposed works and their environmental and social impacts and management measures, as well as validate the draft designs with key stakeholders, before finalizing the studies. 1.3 Scope of the Project As stated in TOR and inception report, following task is under scope of work.  Carryout socio-economic base line study in the influenced area of approximately 2 km on either side of the proposed land port. And for any additional infrastructure required to access the ports.  Land Use: Characterize the existing land use within the area of influence of each port including areas for cultivation, grazing areas, shelter, commercial activities hilly areas, forested areas, industrial areas, residential areas, common properties, etc.  Identify and describe the known Physical Cultural Resources (historical, religious, or architectural) as well as socially sensitive areas like schools, bazaars, temples, etc.  Potentially-Affected Persons/Households: Collect baseline data as listed in point iv below (Social Screening and Preliminary Social Impact)  Social Screening and Preliminary Social Impact: Collect demographic, population, and land holding information in order to estimate populations to be affected positively or negatively. Estimate land acquisition and resettlement needs and application of World Bank Operational Policy 4.12 and Government guidelines and legislation. Carry out consultation with local population to identify their needs to prepare the Draft R&R Policy. Prepare initial cost estimate for land acquisition and resettlement, and for major components to quantify the social cost to be included in the project cost. Yooshin-Vitti JV Page 13 Social Assessment Report of Sheola Land Port Summarized: scope of the project is to ● Conduct Environmental and Social Impact Assessment and Prepare Management Plan  Carry out environmental and social screening and assessment according to the Environmental Management Framework (EMF) and Social Management Framework (SMF);  Ensure appropriate consultation according to the EMF and SMF;  Prepare the environment and social management plan and prepare the cost estimation for implementation of the EMP & SMP 1.4 Need for Social Assessment Social screening and assessment processes for projects have now become standard practice in development cooperation and are usually required by national regulatory frameworks and multilateral and bilateral donors. The outcome of the environmental and social screening process is to determine if and what environmental and social review and management is required. The screening process aims to quickly identify those projects where no potential environmental and social issues exist, so that only those with potential environmental and social implications will undergo a more detailed screening process. Social assessment is a key issue of project planning. Any project has direct impact on existing social parameters, norms, values, on existing socio economic condition of any area resulting social change, progress of social dynamics. Social assessment is a benchmark analysis of social condition of any project command area. So, for evaluation of the achievement of a project in future benchmark social evaluation is indispensible. 1.4.1 Social Assessment Objectives Objectives Social Assessment is to  Know the key social condition of the society  Analyze the socio- economic condition of the project population 1.5 Scope of work and Key Task The main and key task of the present assignment is to A. Prepare Social Management Plan. The Consultants will develop a first stage management plan to mitigate the negative impacts and to enhance the positive impacts resulting from the proposed project. This will include the following aspects: Yooshin-Vitti JV Page 14 Social Assessment Report of Sheola Land Port  Identification and description of mitigation measures identified to alleviate negative social impact both during construction and operation on vulnerable families, groups (e.g. women), and communities;  Identification and description of enhancement measures associated with potential multipurpose developments, including estimate and profile of potential beneficiaries;  Comprehensive cost estimate of all identified measures;  Institutional and other requirements to implement and monitor the SMP  Social awareness and education of contractors and local communities B. Social Screening The two main objectives of environmental and social screening are to: Enhance the environmental and social sustainability of the proposed project. This aspect of screening focuses on the environmental and social benefits of a project. Identify and manage environmental and social risks that could be associated with a proposed project. This aspect of screening focuses on the possible environmental and social costs of an intervention and may point to the need for environmental and social review and management. C. Appropriate Consultation The Consultant shall ensure appropriate consultation according to Social Management Framework. 1.6 Approach and Methodology For Rapid Social Assessment (RSA) and constructing primary socio economic information of the project site, several FGD meetings were arranged among the beneficiaries and affected persons. There was a checklist for collecting existing socio economic condition of the project area .Data from both, secondary and primary sources has been used for socio economic analysis. However, Focus Group Discussion public consultation was held. A checklist and questionnaire were used for interviewing the project affected person and personal contacts were arranged with concerned stakeholders. In collecting the information, both quantitative and qualitative techniques were applied. A complete census has been carried out for physically and economically displaced person in the proposed Sheola land port site. 1.6.1 Sampling Rationale All affected persons were interviewed. Other than, affected person contact and FGD meetings were the main RSA applied. No of questionnaire filled are 55 for the affected persons. No Questionnaire filled for the non affected persons. 1.6.2 Research Tools The main tools were checklist. Questionnaire and FGD meeting. Yooshin-Vitti JV Page 15 Social Assessment Report of Sheola Land Port 1.6.3 Quality Control Field Supervision, data validation after data computerization and cross checking with national figure 1.7 Organization of the Report The remaining part of this report has been organized as follows: Chapter: 1. Provide The Introduction Of The Project. Chapter: 2. Summarizes the relevant rules and regulations including the legislative framework of the state Chapter: 3. Provides the Socio Economic Profile Of The Project Area Chapter: 4. Gives the institutional and implementation structure Chapter: 5. Provides Stakeholders Analysis Chapter: 6. Outlines Impact assessments Chapter: 7. Identifies Major Risks and Assumption Chapter: 8. Gives the overall issues of significance and management Chapter: 9. Provides monitoring and evaluation Chapter: 10 Provides the estimated budget Yooshin-Vitti JV Page 16 Social Assessment Report of Sheola Land Port Chapter 2: Legal and Policy Frame Work Yooshin-Vitti JV Page 17 Social Assessment Report of Sheola Land Port Chapter-2 Legal and Policy Framework 2.1 National Legislation National laws regarding acquisition, livelihood loss for development and other government necessities are given in the following paragraphs. 2.1.1 Constitutional Provisions The fundamental rights under the Constitution indicate the general guidelines for a policy on resettlement/rehabilitation of citizens adversely affected (whatever be the mechanism) due to any activity of the State. Article 40 of the constitution states categorically that every citizen has the right to practice any lawful occupation which implies that anything impeding such right (a) should not be done or (b) there should be supplementary measures to compensate the losses faced by the citizen. Resettlement and rehabilitation of adversely affected people due to infrastructure projects very clearly falls within this requirement for supplementary measures. However, as per Article 42, sub-clause 2, no law with provision of compensation for acquisition of land can be challenged in a court on the ground that such compensation has been inadequate. However, under World Bank OP 4.12 Involuntary Resettlement, every affected person will have access to a project specific Grievance Redress Mechanism for dispute resolution before the matter is moved to the courts. Complaints, the resolution process and the outcome will be reviewed by the project proponents as well as the Bank. Until the dispute is resolved the funds for the disputed asset must be held in an escrow account (top-up payments due from the project agency can be held until the project closes; the amount placed with the DC may be held for 10 years or more if necessary). 2.1.2 The Acquisition and Requisition of Immovable Property Ordinance, 1982 The policy framework and entitlements for the Project Affected Persons (PAPs) are based on national law, Acquisition and Requisition of Immovable Property Ordinance of 1982(ARIPO) and WB‘s (OP4.12) Safeguard Guideline‘s on resettlement. Deputy Commissioner (DC) is empowered to permanently acquire or temporarily acquire of property and eligible compensate to the Project Affected Person (PAP). DC assesses the level of compensation, taking into consideration factors such as: land transactions in the locality over the past 12 months. The amendments to the ARIPO in 1993 increased the amount of the premium for compulsory acquisition from 25 to 50% on the assessed value of the property. The 1994 amendment provides provision for payment of crop compensation to tenants. The ARIPO does not cover compensation for loss of wage income; it also does not cover losses of non-titled persons (Sharecropper, squatters, encroachers, etc.) aside from crop losses to tenants. However, due to various reasons, actually legal compensation doesn‘t cover the market price of acquired land. The Deputy Commissioner (DC) processes land acquisition under the Ordinance and pays compensation to the legal owners of the acquired land. The Ministry of Lands (MOL) is authorized to deal with land acquisition through the DCs. Khas (government owned land) lands should be acquired first when a project acquires both khas and private land. If a project acquires only khas, the land will be transferred through an inter- Yooshin-Vitti JV Page 18 Social Assessment Report of Sheola Land Port ministerial meeting following the preparation of acquisition proposal submitted to Deputy Commissioner (DC) or Ministry of Land (MOL). 2.1.3 Constitution Right of the Small Ethnic Communities There is no special commitment regarding small ethnic communities. But under Article-19 of constitution declares quality of opportunity of the all citizen of the country. Under the article-9,(1) the state shall endeavor to ensure equality of opportunity to all citizens,(2) The state shall adopt effective measures to remove social and economic inequality between man and man to ensure the equitable distribution of wealth among citizens, and of opportunities in order to attain a uniform level economic development throughout the republic. This section of is a safety ethnic communities. 2.1.4 Other Social Policies, Laws and Regulation of GoB The Government of Bangladesh under MOL has prepared a national policy on involuntary resettlement though formally not accepted, which sets out that the rights of those displaced by development projects shall be fully respected, and persons being displaced shall be treated with dignity and assisted in such a way that safeguards their welfare and livelihoods irrespective of title, non-title, gender, and ethnicity. The Policy on involuntary resettlement recognizes that: i. All those displaced involuntarily by projects impacts like eviction must be resettled and rehabilitated in a productive and sustainable manner. People who are resettled must be able, through their own efforts and/or with support as may be required, to restore or improve upon their level of living within a reasonable period, at least pre project condition. ii. Cash compensation shall be paid in development projects at replacement value to those displaced for land and other assets acquired based on established prior ownership and/or user rights. In addition to cash compensation and resettlement, a benefit sharing will be considered where feasible. iv. Cultural and customary rights of people displaced by projects are to be protected, particularly those belonging to adibasis (indigenous people) and ethnic minorities. iii Gender equality and equity in all stages and processes of resettlement and rehabilitation will be fully respected. iv. Displaced persons will be informed and consulted in a transparent manner, including formal disclosure of project impacts and mitigation measures. vii. Vulnerable groups, including landless, adibasis, poor women headed households, physically challenged people, elderly and those falling below the nationally defined poverty line (by the government) displaced by project impacts, are entitled to additional benefits and assistance in a manner that addresses their specific needs related to socio-economic vulnerability. vi Similarly, displaced persons and/or businesses on government leased land will be eligible for compensation for loss of access to land and sites. vii. The right to compensation, resettlement and livelihood restoration shall not lapse or end with the conclusion of implementation of a project and shall remain an obligation of the owner of the project until fulfilled even beyond project completion. Yooshin-Vitti JV Page 19 Social Assessment Report of Sheola Land Port The draft Policy was submitted to the Government in November 2007. It has been approved by the Ministry of Land on 01 January 2008 and is placed before the Cabinet later in February 2008. After cabinet approval, the Government will undertake further work towards legislative changes to safeguard resettlement rights by law. 2.2 Applicable World Bank Safeguards As per WB OP4.12 policy guidelines will have to be ensured for the interest of the project level and project authority/ requiring body will reinstate the socio economic condition of project affected person (PAPs)  Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs  Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs.  Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to the beginning of project implementation, whichever is higher. Yooshin-Vitti JV Page 20 Social Assessment Report of Sheola Land Port Chapter 3: Baseline Status Yooshin-Vitti JV Page 21 Social Assessment Report of Sheola Land Port Chapter-3 Baseline Status 3.1 Socio Economic Profile of Project Area Existing socio economic condition of the project is given in the following section 3.1.1 Location and Geographic Profile Sheola Land Customs Station started its function in 1948. From the starting of the LC Station, the export and import activities were conducted with the Kushiara river route. In 1996, this LC station was transferred to the Borogram, 2km away from that place and started its activities as a L.C station. But the name of this L.C station remains the previous name as Sheola (Sutarkandi)L.C Station. This L.C station is situated in Borogram in Beanibazar of Sylhet District. In fact, original land and river port site is abandoned. Figure 1 Map of Beanibazar Upazila showing project site Yooshin-Vitti JV Page 22 Social Assessment Report of Sheola Land Port The distance of Sheola Land Customs station from Beanibazar Upazila Parishad is 13km and 45km from Sylhet district Headquarter. The Indian part of it is called Sutarkandi, which is situated under Karimganj district of Assam State. A 16 km pavement road exists from Sheola to Karimganj district. The distance from Sheola (Sutarkandi) to Gouhati, capital of Assam is 359km known from the local people. The road from Sylhet to Sheola L.C Station is constructed by the LGED and Paved. But the road is not wide enough and is not suitable for heavy vehicle. The road is not constructed for heavy vehicles. Figure 2: Bangladesh Land Custom Station Yooshin-Vitti JV Page 23 Social Assessment Report of Sheola Land Port 3.1.2 Physiographic Profile There is an immigration check post on 1.3 acre land with a semi-permanent building situated near the Zero point. But the official activities of customs are conducted from a rented Semi- permanent building. The electricity connection is available in this LC station. Figure 3: Road Network Sheola Land Port 3.1.3 Rivers and Canal Dependence The strategic location of the port has great dependence on the river Kushiara. But at this time, this is not so much prominent. In dry season there are shoals in the river Kushiara in some points. So local people use the river route in short distance. In wet season, potentiality of river routes is increased. After construction of Sheola port people inclined to use road communication and due to lack of passengers, launch owners suspended their business. But in future if properly managed, cargo vessel plying has potential. Some, coal businessmen raises the issue in survey period and during the workshop. On the other hand, fishing in the Sheola area is not prominent. Mainly fisherman from Zakiganj, around 200 catch the fishes in the river. But fish availability decreasing in the river. No canal connection with the port currently exists. People use river water for irrigation purpose and daily households needs. Yooshin-Vitti JV Page 24 Social Assessment Report of Sheola Land Port 3.1.4 Description of Typical Community in the Project Area The typical characteristic of the population of Beanibazar is almost same as rest of the country. Population is predominantly Muslim and Hindus. A reasonable no of population live in Great Britain as permanent residents which is around 20% of the population. In Sylhet region Kashia and Manipuri community resides but no indigenous people live in the project site area. Mainly Based on Secondary Data 3.2 Demographic & Socio Economic variables of Project Area 3.2.1 Population Project location is at Dobagh Union of Beanibazar Upazila and previously it was at Sheola union. According to BBS, Area of Dobagh Union is 6312acres. Total Population- 22,203; Male population is 10,746, Female population is 11,457;; Family size of the project union is 6.1 (BBS, Census-2011). Religious background among the affected persons 88% persons are Muslim and 12% are Hnidus. And no indigenous people were found among the affected people 3.2.2 Households Directly impacted within the project site mainly consists of Dobagh Union Total Household of the union is 3, 619(BBS -2011) 3.2.2 Literacy Literacy of the project union is both male and female is - 53.9%, male-55.4% and female-52.6%, (BBS, Census-2011) 3.2.3 Main Workers According to Banglapedia information, main source of income of the working people are, Agriculture 26.39%, non-agricultural labourer 6.80%, industry 0.78%, commerce 12.20%, transport and communication 3.09%, service 4.16%, construction 3.74%, religious service 0.51%, rent and remittance 28.37% and others 13.96%. 3.2.4 Birth and Death Rates Crude birth rates of Bangladesh is 17.88, Rural 17.91 and rural17.74 (BBS-2011) and Total mortality rate (total death/1000) 4.4 in last 12 months, male-5.3 and female in Sylhet region.(BBS, census 2011) Yooshin-Vitti JV Page 25 Social Assessment Report of Sheola Land Port 3.2.5 Health Status No special characteristic has been noticed in the project area. Common diseases people suffer in the area are scabies, skin diseases and asthma, allergy, diarrhea, dysentery, fever etc. There is government hospital in the Upazila. Sanctioned graduate doctor‘s post is 14, but reality is that all doctors are not available in the hospital. In addition to that, there are 18 private clinics in the Upazila.(Source: Upazila Health Complex) Mainly Based On Primary Data 3.3.1 Sex Ratio, Family Type and Size Among the affected person, sex ratio is 1.07(national 99.68) as defined, the ratio of males to females as the number of males per100 females in the project area. The majority of families belong to the nuclear family. A few families are found as extended family (5%). Bangladesh belongs to the Patriarchal family except a few indigenous people. Most families, around 98% is male headed household. 2% household is found as women headed household. The average family size of the affected households was found 5.68. 3.3.2 Population by social Status In the project area, social status mainly depends on the permanent citizenship of the population of Britain (around 20% household live in Britain, popularly known as Londoni), they are the rich people having higher social status. Secondly, who are politician involved with both national and local politics (10%), thirdly highly educated and rich businessmen (10%), then lower middle class (30%), and rest 30% is poor and ultra poor. The Lower middle class and poor have no status irrespective of religion. In the area, social status doesn‘t depend on religion and religious hierarchy. No dominant social and religious hierarchies prevail in the area. 3.3.2 Ration Cards No ration cards practice in Bangladesh for the common people in the recent years 3.3.3 Literacy According to Table 1, twenty eight percent of men and thirty nine percent of women have attended the primary schooling while twenty seven percent of men and thirty two percent of women have attended their secondary schooling. On the other hand eighteen percent of male and fifteen percent female have never attended their school. The educational status of the people under the project area is represented in Table 1. Yooshin-Vitti JV Page 26 Social Assessment Report of Sheola Land Port Table: 1. Level of Education of the affected person Serial Level No. of Male Percent (%) No. of Female Percent (%) 1. No Schooling 23 18.85 17 15.04 2. Below Class 1 9 7.37 8 7.08 3. Class 1 to 5 35 28.68 45 39.82 4. Class 6 to 10 33 27.04 37 32.74 5. SSC 6 4.92 5 4.43 6. HSC 8 6.55 1 0.89 7. BA 6 4.91 8. MA 1 0.81 9. Hafez 1 0.81 Total 122 100 113 100 Source: Field Survey 3.3.4 Dwellings In the project area rich people live in pucca and semi pucca houses and common people live in tin shed houses. This is a common practice in the area also. The housing pattern of the PAPs and their families is presented in Table 2. Table: 2. Housing Pattern of the PAPs in the Project in the Terms of Housing Material Types of Structure Number Percentage Pucca 3 5 Semi-Pucca 17 31 Tin roofed and fenced 23 42 Katcha 5 9 Thatched 7 13 Total 55 100 Source: Field Survey 3.3.6 Income Around 25% populations are below poverty line. Project area population is poor and middle class people. 70% households earn only Tk. 5000 to 10,000 monthly. And they mainly depend on agriculture. Business is the major source of income. The monthly income distribution of the household of the project implemented is given in Figure 2. Yooshin-Vitti JV Page 27 Social Assessment Report of Sheola Land Port Figure 4: Monthly Income Level of Households of Project Affected Peoples. Monthly Income Level of Householder of Project Affected Peoples Above Tk 25001 2% Tk 10001 to TK 25000 10% 70% Tk 5001 to Tk 10000 Below TK 5000 18% Source: Field Survey 3.3.7 Public Health: Water Supply and Sanitation In Beanibazar Upazila, people mainly depend on government hospital. Some charity health clinics with limited facilities are available in the Upazila. Normal health facilities are available in the hospital with no specialized doctors and facilities. No major and critical treatment is available there. The local people urged the land port authority should support or build hospital with modern health facilities. Sources of drinking water are Tube-well 79.79%, tap 2.37%, pond 13.28% and others 3.70%. Sanitation 60.46% (urban 74.46% and rural 59.13%) of dwelling households of the Upazila use sanitary latrines and 36.08% (urban 24.41% and rural 37.19%) of dwelling houses use non-sanitary latrines; 3.45% of households do not have latrine facilities (Source: Banglapedia). According to field survey, water supply and sanitation facilities are given in the following table 3 and 4. Table: 3. Distribution of PAPs Households by Sanitation Facilities Use of Toilets Number Percentage Pucca 13 33 Slab 16 40 Katcha 3 7 Hang 6 15 Open Space 2 5 Total 40 100 Source: Field Survey Yooshin-Vitti JV Page 28 Social Assessment Report of Sheola Land Port Table: 4. Distribution of PAPs Householder by Sources of Water for Other Utilization of Water Source of water Number Percentage Shallow Tube well 3 6 Deep Tube well 0 0 Hand Tube well 37 71 River 0 0 Pond 12 23 Canal 0 0 Total 52 100 Source: Field Survey Sanitation facilities in the area are medium. At the project site 60% households are using sanitary latrines, 20% temporary latrine and 20% households have pucca latrine but not these always sanitary (Source: Public consultation and FGD meeting). 3.3.7 Other Social Infrastructure In the Upazila following social infrastructures are available. Religious institutions Mosque 388, temple 19, sacred place 1, tomb 7. Noted religious institutions: Patan Baghmara Jami Masjid, tomb of Golab Shah (Bashba known as 'Imam Bari'), Shree Shree Kali Mandir, Shree Shree Mahapravhu Bigraha Akhra (Jaldhup). The educational institutions are follows. College 4 secondary school 34, primary school 134, community school 6, kindergarten 4, madrasa 345. Noted educational institutions: Lauta High School (1871), Panchakandha Hargovinda High School (1917), Khasa Government Primary School (1895), Jaldhup Government Primary School (1909) (Source: Banglapedia). 3.3.8 Occupations and Livelihoods Occupational pattern of the affected Persons are as follows Table: 5. Distributions of the people by Characters under the Entire project Area Present Male Female Total Character of No. % No. % No. % the Population 1 Student 27 11.48936 33 14.0426 60 25.5319 2 Housewife 0 0 40 17.0213 40 17.0213 3 Small 17 0 17 Retailing Shop 7.23404 0 7.23404 Business Person 4 Child 14 5.95745 26 11.0638 40 17.0213 5 Day labor 0 0 0 0 0 0 6 Service 0 0 0 0 0 0 7 Unemployed 30 12.766 0 0 30 12.766 8 Old people 6 2.55319 9 3.82979 15 6.38298 9 Overseas 3 1.2766 0 0 3 1.2766 Yooshin-Vitti JV Page 29 Social Assessment Report of Sheola Land Port Service 10 Rickshaw/ 0 0 0 0 0 0 Van Polar 11 Mason 0 0 0 0 0 0 12 Driver 2 0.85106 0 0 2 0.85106 13 Disabled 0 0 0 0 0 0 14 Agriculture 13 5.53191 0 0 13 5.53191 15 Tailor 0 0 0 0 0 0 16 Doctor 0 0 0 0 0 0 17 Fisherman 0 0 0 0 0 0 18 Others 10 4.25532 5 2.12766 15 6.38298 Total 122 51.9149 113 48.0851 235 100 Source: Field Survey Most people of the project area depend on more than one source of income. Agriculture, horticulture and other farming activities form the predominant occupation of the locality. Other occupation comprising employment in the following sectors, a) Transport and communication, b) Trade and commerce c) Construction activities d) Animal husbandry e) Fishing Illegal cross border trade (mostly fruits and other agricultural products is also an untold source of income of this locality. A significant number of the respondents also work as daily labors for their livelihood. Some people are engaged in service (both in private as well as the public sector). Animal husbandry, rearing of livestock forms only a subsidiary among the rural people. Livestock consists of different local varieties of poultry, cattle, buffalos and goats. For a period of about five months, from November to March coal trade activities income is one of the source of income of the project area locality. A few of the affected families depend largely on their income from small provision of shops or commercial establishment selling tea and food items. Some small numbers of people are engaged in fishing activities, it is mostly a small scale activity, primarily for self consumption. Some surplus amount is also sold in the local market. 3.3.9 Land and Assets Land is the main assets for a family. Other assets include trees, livestock, ornaments and households commodities viz. furniture, electronic items. Savings are also treated as an asset. Rich people specially remittance earners hold costly electronic items, mobile, fridge, washing machine etc. In the following table, land holdings and tenure system has been presented. Maximum households are found landless. Around 30% are totally landless they have no homestead land also. They live in government land or private land as squatters.20% owns only homestead. At Dobagh union Land holding pattern shows that 50% households have only agriculture land and rest 50% have no land to cultivate except homestead land. Land ownership of the households is 0.40 acres on average, though many are landless. On the Yooshin-Vitti JV Page 30 Social Assessment Report of Sheola Land Port other hand, about 50% households have no agricultural land for cultivations. In the Upazila, land holding pattern is almost same like as project site. Land holding system is about 50% household have no land in the Upazila for agriculture and 30% have no homestead land at all. In the area only 20% farmers cultivates their own land and 50% farmers are pure tenant i.e they cultivates other‘s land. As a result, a large group of people are vulnerable in respect of income, land and social position. Land holding system area shows that about 50% household have no land for agriculture or they have no homestead land. Table: 6. Land Holding Pattern of Households of the Project Area Land holdings % 0 decimal 30 1 to 50 decimal 35 51 to100 decimal 15 101 to 150 decimal 10 151 to 250 decimal 7 251 to 500 3 100% Source: Field Survey In the area only 20% farmers cultivates their own land and 50% farmer are pure tenant i.e they cultivates other‘s land. Table: 7. Land Tenure System of the Area Type of farmer % Owner farmer 20 Absentee farmer 30 Owner cum Tenant 0 Pure tenant 50 100 Source: Field Survey 3.3.10 Land Use Land is use mainly for agriculture, open water fisheries and forest land. The Upazila consists of both hilly and plain area. There are 170 tiles (hillocks) in the Upazila,43 Jalmahal and Total forest area of 15.54 sq.km 3.3.11 Agriculture Main crops in the area are Paddy, wheat, betel leaf, arum, oil seed and ground nut. Main fruits are Mango, jackfruit, banana, litchi, lemon, pineapple. Aus and Aman are crop varieties. Average production 2.70/hectare, Aman 1.60 metric ton per hectare and boro 4 metric ton/hectare. 3.3.12 Fisheries Kushiara River is about 10km from Upazila headquarter at Sheola point. The Kushiara river flows to west of the Upazila. The Sonai River flows from east to south ward direction. Yooshin-Vitti JV Page 31 Social Assessment Report of Sheola Land Port In the area, there are both cultured and open water fisheries. But from the Upazila fishery officer of Beanibazar the problem is not so prominent. Fish varieties Rui, Katla, Mrigel, Pungus, Telapia and grass carp etc. 3.3.13 Informal Border Trade Informal and illegal cross border trade (mostly fruits and other agricultural products) is also an untold source of income of this locality. On the other side Indian people are involved with informal border trade. The question that often comes in mind is how the villagers got involved in the informal trade? Before we answer this, let‘s have a look on the socio -economic conditions of the bordering villages. The Sutarkandi LCS is surrounded on the Indian side by the village Sutarkandi, which is densely populatedi along with Zarapataand Latuii villages. These villages are inhabited both by the Hindus and Muslims, though Muslims are majorityiii. Bangladesh side‘s LCS is surrounded by the village Kunagr am, which lies on the left side of the NH-151 and on the right side of this road is the village Khalpar, in middle of these two villages is the Zero Point Bridgeiv. Like NER side villages, both these villages are highly populatedv and the village Kunagram is a Muslimvi dominating one. The socio-economic conditions of all these bordering villagers are execrable vii. Majority of the villagers had adopted farming as their main profession, rest are working either as a carpenter or a daily labourer. Due to traditional cultivation technique and inadequate irrigation facilities the yield rate is very low. Besides, as farming completely depends on monsoon, there are hardly any off-season jobs. Due to the lack of alternative opportunities, the local youths got involved in informal trade. They gainfully utilize ethnic, linguistic and religious affinities across the border. 3.3.14 Medical Tourism Medical tourism is a future prospect due to enhanced connectivity in Sylhet region. In Sylhet, this is an unused investment scope, especially for Londoni people. In normal practice, people go to India for treatment. But here it may be reversed. On the other hand, India may avail the scope by strengthening medical infrastructure in NER. Sylhet region is basically a remittance earning area. If congenial social relation prevails, then tourism, education, health service exchange may be increased resulting socio- economic development of the citizens of both the countries. And also road infrastructure will be developed due to the project. It is expected new investment will be available in the area in near future. 3.3.15 Other Cross Border Activities Both formal trade and informal activities are being carried out in the border area. Some of them may not be legal. These are human trafficking and drug business also. For details separate study may be needed. As has already been discussed, the commodity structure of exports to Bangladesh via Sutarkandi LCS mainly consists of raw mineral resources like coal and limestone. These minerals are extracted mainly from the hills of Meghalaya. As the NER is land-locked and the national market places are far away, the markets across the border in Bangladesh act Yooshin-Vitti JV Page 32 Social Assessment Report of Sheola Land Port as the vent for surplus for her products. A strong resource-trade linkage has already been established where mineral resources from the region are used for the development of industries in Bangladesh. It may be noted that had these resources not exported to Bangladesh, their extraction would have to wait till their demand grow sufficiently in the national economy justifying a higher transport cost and making their use economically viable. The demand for the mineral resources in Bangladesh has in fact accelerated the extraction in the hills of north east region(NER). The resource-trade linkage across the border has thus created a growth generating effects particularly in the hills of Meghalaya in terms of creation of direct and indirect employment and income. On the Bangladesh side, Meghalaya coal has great demand particularly in the Dhaka and Chittagong districts. Being a developing economy, Bangladesh requires large quantity of coal and limestone to meet up her rising industrial and housing requirements Bangladesh's cement industry largely depends on the imported raw materials, of which clinker is the main one. This clinker is imported in small quantity from the NER of India to utilise in the Bangladeshi cement industries. Besides domestic demand, Bangladesh also exports cement to NER and earns a good amount of foreign exchange (The Daily Star, March 21, 2009). The Shah Cement, Meghna Cement, Aramit, Crown, Premium and Holcim companies of Bangladesh export cement to the NER (The Daily Star, March 21, 2009). Therefore, we find that Bangladesh imports raw material from the cheapest possible market i.e., NER and also sells the finished products to her. Traders in NER and Bangladesh are increasingly discovering that it is most convenient to procure goods and services from each other, rather than from distant sources. It is noticed high demand for NER‘s ores and minerals has been noticed in Bangladesh, for satisfying their rising manufacturing as well as the industrial requirements. But the question is how long Bangladesh will be interested to import from NER? Previously, Bangladesh, as a low resource endowed country, was interested in importing ores and minerals from NER. But with the discovery of coalmineviii in Bangladesh‘s Barapukulia in Dinajpur district, the demand for Meghalaya coal in Bangladesh has slightly come down. Given its large pharmaceutical industrial base, India produces a large number of prescription drugs. Most of these pharmaceutical preparations containing dextro propoxyphene and codeine are illegally trafficked to the neighboring countries. Phensedyl, a codeine-based cough syrup in particular, has become the chief item for smuggling into Bangladesh. Truckloads of Phensedyl bottles from the factory are smuggled to the Northeast and West Bengal. In addition, empty Phensedyl bottles are refilled with higher narcotic content and repackaged as ‗phensedyl1plus‘ and smuggled back into Bangladesh. Bulk amount of Phensedyl bottles are smuggled into Bangladesh through the Kailashar (Tripura) and the Cachar-Karimganj (Assam) borders. Law enforcement authorities, in both countries, continue to seize large consignments of phensedyl. For instance in 2009, Bangladesh seized 58,875 bottles of phensedyl.68 In the same year, India‘s Border Security Force (BSF) seized 4,18,788 bottles along the Indo - Bangladesh border.69 In 2010, Indian law enforcement officials seized 39,000 bottles of phensedyl destined for Bangladesh in Karimganj district of Assam.70 Similarly in 2011, the BSF seized phensedyl bottles worth about Rs 10.50 lakh.712 1 „Das, Pushpita „DRUG TRAFFICKING IN INDIA: A CASE FOR BORDER SECURITY‟ Institute for Defence Studies and Analyses, New Delhi, May 2012 2 “Smuggling thriving as fencing of Indo-bangla border delayed,” The Indian Express, Shillong, December 5, 2011 at http://www.indianexpress.com/news/ smuggling-thrives-as-fencing-of-indobangla-border- delayed/884123/0 (Accessed on January 12, 2012) Yooshin-Vitti JV Page 33 Social Assessment Report of Sheola Land Port 3.3.16 Cultural Resource and Issues There are several cultural organizations Club- 75, library -2, community centre- 13, women's organisation, playground- 15. Noted installations and tourist spots are Beanibazar Gas Field, Baro Haler Dighi, and Tomb of Golab Shah. Other cultural and Archaeological heritage and relics are Sree Basu Deva Bari (house) and Basu Deva image (made of black basalt) at village Supatala, six out of seven pieces of copper plates of king Bhaskar Barma (7th century) and an imperial elephant embossed stamp, ruins of Rajbari at Tengra. There are also sports organizations and community organization and social organization in the Upazila. But no impact on the above mentioned cultural resources is identified. 3.4 Salient Issues for the Project Major impact of the project is that the land especially the agriculture land will be reduced for the villagers by the project. On the other hand every year cropland are reducing due to new infrastructure development and new housing structure also. The loss of agriculture land is the major impact, and maximum land are being used as coal depot as rental arrangement. As in the project site coal depot, land owners rent the land at the rate of Tk. 8,000 per decimal (8 lacs per acre) per year. So, new initiative should be needed for livelihood restoration for the affected household. It is possible by initiating pragmatic and timely decision by the project authority. It will be helpful for port authority and affected community also. During construction of land port some resettlement issues are available. Loss of livelihood and land loss are the main resettlement impact. Land acquisition process has not started till today. Deputy Commissioner is legally responsible for land acquisition on behalf of requiring body (BLPA). But at present, land price has increased substantially and due to changed situation, PAPs are anxious about getting proper compensation in case of acquisition. In this context they suggested resettlement is must for acquisition of land. 45 affected households are identified, a resettlement action (RAP) has been prepared for mitigating resettlement issues and at the same time, for solving social issue a Social Management Plan (SMP) is prepared. PAPs will be compensated by recruiting an NGO, which would be responsible for resettling the affected persons and raising awareness. It is mentioned here, during the construction period recruited NGO will implement both SMP and RAP under guidance of resettlement unit (RU). After construction period RU will work in the name of CSR/ social development unit for pending resettlement and social issues and will mitigate post negative impacts of the project. However, they suggested the port authority should play active role in development of the area and to improve the socio economic condition of the community. In addition to that they want prospect of job for the local youth in the project construction work. In regaining income of the affected persons, port authority should outline program. For the greater interest of the country, project is implemented but owner of the land of the acquired land should also be rehabilitated. Though Bangladesh‘s laws have no mandatory provision of resettlement but due to donor involvement and present norms, affected land owners, livelihood losers, vulnerable, irrespective of titled and non titled land owners and income losers will get extra benefit from the project at the rate of full replacement cost for re-owning the lost land. Moreover, all sorts of support in regaining income restoration from the project should be taken. Yooshin-Vitti JV Page 34 Social Assessment Report of Sheola Land Port Chapter 4: Institutional and Implementation Structure Yooshin-Vitti JV Page 35 Social Assessment Report of Sheola Land Port Chapter-4 Institutional and Implementation Structure 4.1 Introduction In order to implement Social Management BLPA needs institutional arrangement. Moreover, Existing institutional arrangement of BLPA needs to be reviewed 4.2 Institution Related to Policy, Planning &ME of the Project The project authority will establish RU during construction period and it will be converted to a Corporate Social Responsibility (CSR)/ Social Development Cell during post construction period for mitigating future social and resettlement impact including any pending resettlement issues, headed by a Deputy Director as Project Manager (PM) under the guidance of Project Director (PD). The project authority will hire an NGO to implement the social management plan. RU will implement both RP and SMP and will have also Monitoring, Evaluation specialist and Livelihood specialist and will engage for 6 months‘ period. There will be monthly, quarterly progress report. After completion of the project there will be a final report. Detailed institutional arrangement is mentioned in the RAP. 4.3 Ministry of Shipping (MoS) Ministry of Shipping (MoS) consists of following organization. Chittagong Port Authority, Bangladesh Shipping Corporation, Bangladesh Inland Water Transport Authority, Bangladesh Inland Water Transport Corporation, Bangladesh Land Port Authority, Department of Shipping; Marine Academy , Chittagong. 4.2.2 BLPA Bangladesh government has established Bangladesh Sthala Bandar Kartripaksha (BSBK) in 2001 with a view to facilitate bilateral/trilateral trade with neighbouring countries namely India, Nepal, Myanmar & Bhutan. Initially 12 land custom stations were declared as land ports in 2002. Leter ten new land ports have been declared. Presently the number of land ports is 22 of which 5 ports (Sonamosjid, Hilli, Teknaf, Bibirbazar and Bangladesh Land Port) are in operation under BOT basis. On the other hand, Benapole, Burimari, Akhaura, Nakugaon and Bhomra land ports are being operated by the own management of Bangladesh land port Authority. Vision and mission and activities of BLPA is given below. Vision: Facilitating export-import through land route. Mission: Infrastructure development, efficient cargo handling, improvement of storage facilities, fostering public-private partnership for effective and better service delivery. Yooshin-Vitti JV Page 36 Social Assessment Report of Sheola Land Port Activities: (a) Formulating policy for development, management expansion, operation and maintenance of all land ports. (b) Engaging operators for receiving, maintaining and dispatching cargoes at land ports. (c) Preparing Schedule of tariffs, tolls, rates and fees chargeable to the port users having prior approval of the government. (d) Executing contracts with any person to fulfill the objectives of the Act. 4.2.3 Other Institutions Other ministry shipping is large organization and has conformity with BLPA . 4.2.4 Implementations and Operation-BLPA Here chairman is the administrative head and Chief Engineer is basically technical and engineering issues. 4.3.1 Hierarchy The chairman is the executive head of BLPA. He is assisted by member traffic, member development and member Finance and administration and some other part time members. The Organogram of administrative hierarchy is given below in the following table. Yooshin-Vitti JV Page 37 Social Assessment Report of Sheola Land Port Figure 5: Organogram of BLPA Yooshin-Vitti JV Page 38 Social Assessment Report of Sheola Land Port 4.3.2 Manpower The port has 46 1st class officials. Chairman is the head of the organization. Total employees are 310 nos with 4 th class employees. 4.3.3 Key strengths and Weakness of BLPA BLPA is an important organization of Ministry of Shipping (MoS). But in maximum land port, they have no manpower. In some port only Asst Director Traffic, Sub-Asst Engineer, Traffic Inspector is working. Sheola has no sanctioned official from BLPA. Only Benapole has sufficient officials and employees. Main weakness is earning sufficient revenue for the concerned ports. Other than Benapole port no other port is economically sustainable. For identifying key strengths further investigation is needed 4.4 Issues for Considerations Key issues the sustainability of the proposed port regarding income, revenue and facilities. 4.5 Capacity Building For capacity building the BLPA should efficient manpower who will know the Trans border trade augmentation, law and regulation. 4.5.1 Capacity Building Requirements For capacity building, institutional development is an urgent issue. The employees should have a thorough knowledge trade law, tarrif etc. 4.5.2 Training Needs Training needs Trans border trade scope, resettlement issues, social issues includes trafficking etc 4.5.3 Capacity Building and Training Proposed Capacity building training is proposed for BLPA officials, PAPs, transport workers and Project affected community. Yooshin-Vitti JV Page 39 Social Assessment Report of Sheola Land Port Chapter 5: Stakeholder Analysis Yooshin-Vitti JV Page 40 Social Assessment Report of Sheola Land Port Chapter-5 Stakeholder Analysis 1.1 Introduction For the development of present port, identification of different stakeholders other than BLPA identification is essential which will optimize the project benefit. 1.2 Stakeholders at Different Levels At the grass root level project affected persons are the main stakeholders. Among the roads development facilities LGED, RHD are the main partners. In cases of maintaining security, law enforcing agencies are the stakeholders. Road users, NMT associations, Bus truck association, business associations are also one of the major stakeholders. 1.3 Stakeholders Analysis Figure 6: Stakeholder map for project implementation Administration, Revenue, Political Organization Security, Law and Order _Awami League (AL) _Bangladesh Natioanlist Party _Ministry of Shipping (MoS) (BNP) _Deputy Commissioner (DC) _Regional Political Parties _Superintendent of police (SP) Including Leftist _National Board of revenue (NBR) _Upazilla Nirbahi Officer (UNO) _Border Guard Bangladesh (BGB) Deputy Commissioner (DC), Sylhet Development Peoples Issue & Human _Ministry of Shipping (MoS) _Ministry of Land (MoL) Rights _Bangladesh land Port Authority _Road Transport and Highways _Local NGOs Division (RHD) _Grassroots Communities _Local Government Engineering _Local Elites & Business Community Department (LGED) The figure-1 stated above illustrates the following detailed roles and responsibilities of different stakeholders in the target project area: Yooshin-Vitti JV Page 41 Social Assessment Report of Sheola Land Port Political Organization: Awami League (AL): The most established and biggest political party of Bangladesh, presently the ruling party of the state. Honorable prime minister of Bangladesh, Sheikh Hasina is the chief leader of the ruling party. However, as the ruling party and the highest decision making authority (government) of the state, Bangladesh Awami League can play a vital role in the project area. The local AL subdivision can watch after or facilitate good governance through detailed participation, visible precision, contestation, responsibility and innovation for the best implementation and outcome of the project. Moreover, monitoring the opposite political party should be another concern. Bangladesh Nationalist Party (BNP): Bangladesh Nationalist Party (BNP) is the present opposition party of Bangladesh. As the opposition, BNP should speak as an alternative government in the target project territory and should be in charge of challenging the strategies of the government's policies and creating different arrangements where suitable or relevant to offer. However, most importantly the opposition should not produce or support any sort of political unrest and make the peaceful community worsen in the project area. Regional Political Parties including Leftist: other political parties should be concerned about the big picture and what is happening for the greater development. Helping by providing with the best support and with the relevant recommendation for the project. Development: Ministry of Shipping (MoS) consists of following directorates: 1. Chittagong Port Authority 2. Bangladesh Land Port Authority 3. National Maritime Institute 4. Bangladesh Inland Water Transport Authority 5. Bangladesh Inland Water Transport Corporation 6. Bangladesh Marine Academy 7. Bangladesh Shipping Corporation 8. Mongla Port Authority 9. Directorate General of Shipping. The directorates stated above would do the relevant works to implement exact strategies of the project. Again, Ministry of Land would overview and examine the Land laws, policies and rules in the project area. Bangladesh Land Port Authority would monitor the customs and border protection in the port area, and also keep an eye on other inspection agencies responsible for the enforcement of state's laws pertaining to all relevant activities. Road Transport and Highways Division (RHD) would monitor and ensure development of socio-economic condition of the general people of the project area community through planning arrangements and policies regarding roads, transports through construction, development, extension and upkeep of environment-friendly and user-accommodating coordinated roads transportation. Local Government Engineering Department LGED would work intimately with the local stakeholders to guarantee individuals' cooperation and bottom –up planning in all phases of the target project implementation cycle. Again, LGED will enhance the socio-economic condition of the community through supply of infrastructures at local level and capacity building of the stakeholders. Yooshin-Vitti JV Page 42 Social Assessment Report of Sheola Land Port Administration, Revenue, Security, Law and Order The National Board of Revenue (NBR) would be in charge of formulation and continuous re-appraisal of tax-strategies and tax-laws. Moreover, toll management and toll collection with respect of the project area would be another prime concern of NBR. Deputy Commissioner (DC) of Sylhet would be the prime personnel to monitor the holistic law implementation and under his jurisdiction, Upazilla Nirbahi Officer (UNO) of Beanibazar Upazila, Superintendent of Police (SP) of Sylhet would monitor the holistic law implementation. Armed forces and Border Guard of Bangladesh (BGB) would be in the duty of keeping holistic peace and keep the area free from any kind of un-wanted disturbances and unrests. Peoples Issue & Human Rights Local NGO of Beanibazar would support innovation and demonstration of the Project plan through rapport building with people. Local elites and businessman would ensure no harm and recommend necessary proposals. On the other hand, grassroots communities can build understanding of the project plan and facilitate the project and complain relevantly the authority. Table: 8. Stakeholders/ institutions to support planning and implementation Stakeholders categories Roles/ contribution Expectation Ministry of shipping Overseeing RAP RAP is planned and Bangladesh government implementation including successfully implemented addressing grievances, through participatory process. technical, legal and policy issues, maintaining social issues. Project Developer, Facilitate the valuation exercise Resource for compensation are Provision for fund for executed in time as planned compensation Beanibazar Upazila Parishad Grievance redress committee PAPs vacate the project area (Local government) Follow up on cut-of date All PAPs are paid on time Provide solid waste management services Land fill material Facilitating implementation of the RAP Local government authority Facilitating implementation of PAPs vacate the project area the RAP All PAPs are paid on time Dubagh Union Parishad & Provide technical support in Ward land acquisition and resettlement including property valuation Follow up on cut-of date Grievance redress committee Project Affected Person Provision of land for project Compensation and livelihood PAPs implementation improvement Vacating affected land as per Alternative land agreed time Abiding to cut-off date Affected local communities Provide support in project Improved socio-economic Local affected communities implementation condition and livelihood of local within the project area communities Employment opportunity Utilities companies Provide support in project Improved socio-economic implementation condition of local communities Yooshin-Vitti JV Page 43 Social Assessment Report of Sheola Land Port 5.4 Beneficiaries/ Stakeholders Expectations Improve facilities in border trade is the main expectations from the stakeholders. On the other PAPs and livelihood losers claim alternative site for business and compensation at the affected land and structure. 5.4.1 Overall Issues Emerged During Public Consultations According to the participatory planning, a public consultation meeting was held in the area for public consultation. On that purpose, a FGD meeting was held at Sutarkandi (Mouza: Barafram, Village: Baragram) with the affected people. The meeting was attended by the beneficiaries, concerned stakeholders and local elites. They have supported construction, renovation and rehabilitation of proposed land port under BLPA. On the other hand, they urged more compensation and actual market price without any hassle. Other public consultations were carried out individually and in groups in different places among the key stakeholders. The participants suggested, BLPA should take necessary action to create alternative livelihood support program for the affected people of the concerned area through social and economic support. It will enable them to be self sufficient, reduce their vulnerability, and increase their income and living standard. It is mentioned here, as there is no major acquisition of land and also requisition of the project. A resettlement impact can be seen through this present project. They have support to construct Sheola land port from previous place at present location but they urge for proper market price of the affected land and also include income loss of the affected land. Because DC‘s payment doesn‘t cover the real market price due to various reasons. Summary of the meetings are given below: A free prior informed Public Consultation Meeting was held on 7 May, 2016 at the local Dubag Union Parishad auditorium at 3 p.m. The meeting was chaired by Dubag Union Parishad Chairman and most of the PAPs were attended in the meeting. Among others Beanibazar Upazila Chairman, local high school headmaster, coal importers and local Ward Commissioners were present in the meeting. The discussed issues are given below: 1. Compensation should be paid within six months after the valuation of PAPs properties. 2. Employment to the people hailing from the project site during the construction. The community may be involved in some activities as laborers during the project construction phase. 3. If the authority decides to take this area on that moment will we provide enough time to salvage our properties? 4. We would like if the authority will secure another area which is adjacent and relocate us because we don't want to lose our business network as well as customers &employees. Yooshin-Vitti JV Page 44 Social Assessment Report of Sheola Land Port 5. PAPs should be educated on the usages of compensation money otherwise people will squander them and fail to build other houses. 6. During the project construction there will be dust Problems and noise which may be a source of coughing, chest pain and other influenzas in general. 7. The project area has conflict over ownership. So the administration should be careful regarding land ownership. National Consultation Workshop was organized by Bangladesh Land Port Authority on 10 August, 2016. The main purpose of the workshop was based on Draft environment and social assessment studies for proposed Bangladesh Regional Connectivity Project. The list of the participants who attended the national consultation workshop is given below: Table: 9. Comments and suggestion in the FGD meeting Sl. Date Place of the Participants Comments and Suggestion No. Meeting 1. 26.4.2016 Borogram Participants 14- , Local 1 Alternative. livelihood support and project site elites, local government business rehabilitation site representatives 2. Economic support, IGA training and loan 3. Technical training needed 4. No negative impact of the project 5. Training for livelihood and staff training 6. Training for livelihood and staff 7. Employment opportunity for local people during construction and post construction period 8. Development of access road to the port 9. Development of river port also on the bank of Kushiara which reduce cost of coal import 10. Support of accidents management 11. Joint effort from LGED and RHD 2 7.5.2016 Dubagh Union UP Chairman 1.Compensation should be done in Parishad Among others time not more than six months auditorium at Beanibazar Upazila 2. Employment to the people 3 p.m Chairman, local high 3. Resettlement Site for business school headmaster, owner. coal importers and local Ward Commissioners Yooshin-Vitti JV Page 45 Social Assessment Report of Sheola Land Port Table: 10. Comments of Participant National Public Consultation Workshop Sl. Name Position Organization Address Email Mobile Question Reply/ Response No. The replacement is estimated based on the actual cost to buy Social development or re-build same thing that was 01715 201759 Akhtar Zaman lost due to resettlement, and this World bank How did you define Specialist has been estimated based on Replacement cost? And 1 market rates. The impact on What is the level of livelihood from development of impact on livelihood? Sheola Land Port is severe on 12 person who are in restaurant business (4 tenants and 8 employees) It has always been seen Bhomra Handling that facilities for workers Md. Rejaul Islam Station, Satkhira 01740 552359 Worker Union Bhomra Tax are neglected while President Workers waiting room with toilet designing facilities for 2 facilities are provided in the land land port. Is there any ports. resing space for workers in your proposed land port? Bhomra land port, We cannot see the Dilwour (Raju) Kazi Nawshad 01711351030 Detailed design of Sheola land C & F Agents Association, building design for President Bhomra. Satkhira port is in final stage, but the Bhomra land port right 3 design of Bhomra land port is now. How much time is expected to be completed by required to complete the next year design? 1) In 1996 in the present land port the development Bhomra land port C & F Agents which was supposed to be done has not yet been The proposed development of land delivered. Moreover, it is my Nasim Mostafizur port will consider the improvement of observation that government 01713919585 existing facilities including providing Association is putting too much Bhomra General drinking water supply and sanitation, emphasis building the new 4 drainage, and dust control measures. service and not providing The extension of Bhomra land port importance in the existing will be done in phases and will include facilities. How long it will take towards both northern and southern todevelop the existing areas of the existing port facilities. facilities? 2) in which side of the road land acquisition will occur for the present north side facilities? It has not been possible Bangladesh Land Port Authority TCB Bhaban 5th floor, Kawran to build the Benapole junnunbadeshi@gmail,com land port as well The project will strengthen the Public Relation Officer Equipped, modernized existing facilities in terms of Bazar, Dhaka. 01710741728 and environment friendly drainage improvement, dust Abu Saleh port after 35 years of control measures, water supply 5 liberation war. So, will it and sanitation. The land will be be possible to build the acquired both north and south sheola land port as side of the road, however the ecofriendly and north side is major part. organized land port as mentioned your speech? 1. The lands that are already Suter Kandi Dubogh Beanibazar developed in Sheola (filled areas of low land) should be given more compensation Compensation will be provided to all Suter Kandi / sh 01712647012 M.A.Hashem than the low lying lands. 2. the structures including shops that are For compensation of affected by the land acquisition. 6 buildings right amount Compensation for structures have should be calculated. 3. been estimated at a replacement Compensation should be cost. Compensation will also be given to shops that will be provided for the loss of businesses. affected by land acquisition 4. Right Amount of land price should be Given Yooshin-Vitti JV Page 46 Social Assessment Report of Sheola Land Port Sl. Name Position Organization Address Email Mobile Question Reply/ Response No. Additional Director of traffic Have you considered Authority of land port Mst. Foijunnahar the effect of Hazardous materials such radioactive and as fuels will be stored in the 7 hazardous chemicals warehouses. No radioactive to the surrounding materials will be transported areas which will be through the ports. imported to the port? 1) From Sheola port how much Revenue According to the feasibility 01744356217 Boishakhi TV will be earned by study of Sheola land port, Meher Moni Reporter 8 government the revenue o will be initially (forecasted) 1.4 million USD per year, 2) From Bhomra port and in 2049 it will 10.23 has much revenue million per year will come every year? Auditor Bangladesh land port We have shown that you are providing The BLPA staff will have Md. Ali Ashraf different facilities for office building, dormitories, Authority the stake holder but 9 guest house, restaurant, what you think about water supply and sanitation the facilities for the facilities. employer who will do the job. Md. Monir Hossain Mojumder First aid facilities will be Traffic Inspector provided at the land ports. There should be Hospital facilities are 10 hospital facilities in available within 13 km every land port. distance from the proposed Sheola and existing Bhomra land ports Is there Sulphur pollution from coal Only low grade coal having dust. DoE is now sulphur content. Coal wash Quazi Sarwar Imtiaz Hasmi Additioanl Director General revising the ECR, water wil be acidic and Agargaon, Dhaka Involve local DoE should be neutralize before 02 8181767 office for public filtration and discharge after DoE 11 consultation meting, meeting DoE compliance. Check the land issue Will be invited in the PC (RAP), air pollution Meeting. Land issue will be should be checked. Air pollution issue considered. CAM considered in the detail station at Shymnagar design. at Satkhira district. Yooshin-Vitti JV Page 47 Social Assessment Report of Sheola Land Port Chapter 6: Impact Assessment Yooshin-Vitti JV Page 48 Social Assessment Report of Sheola Land Port Chapter-6 Impact Assessment 6.1 Introduction The project has some negative impact identified as there is only a small amount of land acquisition, land owners, and structure losers have been identified in the project site. During survey and census some livelihood impact has been identified and these will be solved by WB‘s OP/BP 4.12 guidelines and legal framework of Bangladesh‘s law to regain at least the pre project condition at the full replacement cost. No indigenous community, squatters on vulnerable has been identified as affected. In the following paragraph, project‘s impacts and probable mitigation measures has been presented. 6.2 Positive Impact Future potential of the proposed project is very prospective. Urbanization and employment generation in the transport sector are expected to be increased in the project area. After development of the Sheola land port in new site with new facilities, cross border mutual cooperation will be intensified both socially and economically. Sylhet region basically is a remittance earning area. If congenial social relation prevails, then tourism, education, health service exchange will be increased resulting socio- economic development of the citizens of both the countries. And also road infrastructure will be developed due to the project. It is expected; new investment will be available in the area in near future. Project command area is not confined within the port area only. But it will make the whole Barak valley self-sufficient. As highly remittance earning area, Sylhet has huge surplus capital to invest in Sylhet and Assam. Assam and adjacent seven sister state make reciprocal benefit from the project. Assam has raw materials for industrialization and is rich in horticulture products. Sylhet division total Population -9,910,219(2011), 12,298.4 km2 (4,748.4 sq mi), Population density810/km2 (2,100/sq mi). On the other hand, Assam socio economic status is in some aspect comparatively in better position than Sylhet. In 2011, literacy rate in the state was 73.18%. Male literacy rate was 78.81% and female literacy rate was 67.27% In 2001, the census had recorded literacy in Assam at 63.3% with male literacy at 71.3% and female at 54.6%. Urbanization rate was recorded at 12.9%. Yooshin-Vitti JV Page 49 Social Assessment Report of Sheola Land Port According to the 2011 census, 61.5% were Hindus, 34.22% were Muslims. Christian minorities (3.7%) are found among Scheduled Tribe population. Scheduled Tribe population in Assam is around 13% in which Bodos account for 40%.[ Other religions followed include Jainism (0.1%), Buddhism (0.2%), Sikhism (0.1%) And animism (amongst Khamti, Phake, Aiton etc. communities) Out of 32 districts of Assam, 9 are Muslim majority according to the 2011 census of India. The districts are Dhubri, Goalpara, Barpeta, Morigaon, Nagaon, Karimganj, Hailakandi, Darrang and Bongaigaon Assam's economy is based on agriculture and oil. Assam produces more than half of India's tea. The Indian economy grew at 6% per annum over the period of 1981 to 2000; the growth rate of Assam was only 3.3%. (Source: Wikipedia) Since long time before both the areas were culturally integrated. Muslim population is mentionable in Karimganj and adjacent areas also. In education rate, Assam is more advanced (73.18%) and has more universities than Bangladesh; they can provide more scope for Bangladeshi students. On the other hand, tourism can be boost up and both the areas may be benefited. Assam is almost three times larger than Sylhet division in respect of area and population. Assam can import more industrial products from Sylhet and from whole Bangladesh and should abolish all non-tariff barrier from the Bangladeshi goods. Bangladesh in some cases, are rapidly growing and GDP growth is around 7%. On the other hand, Assam has only 3.3%. So, all future development depends on social relation, economic and political relation. Table: 11. Positive Impact of the project Sl, Type of Impact Positive Impact Comments No 1 Income opportunity for poor 1.Construction period work opportunity but exact number yet to be identified 1.1 Income opportunity for 1. Cross border trade will For assessing demand businessman increase. As Sylhet is further investigation is remittance earning area, essential rapid urbanization and construction industry is flourishing rapidly. So coal demand will be high. 2 Transport sector Transport worker, owners will get more income 3. Trade improvement Trans border Will increase For assessing demand further investigation is essential 3.1 Export Increased Export . For assessing demand further investigation is essential 3.2 Import Increased import For assessing demand further investigation is essential 3.3 Tourism May be increased depending For assessing demand on government initiative further investigation is essential 3.4 Education migration May be increased depending For assessing demand on more facilities and further investigation is institution building essential Yooshin-Vitti JV Page 50 Social Assessment Report of Sheola Land Port Sl, Type of Impact Positive Impact Comments No 3.5 Health migration May be increased subject to For assessing demand quality, affordable health further investigation is institution essential 3.6 Investment May be increased 6. Social impact Cross border social relation 6.1 Cross border social relation Positive impact on in Further investigation is migration and out migration needed for details analysis 6.3 Adverse Impacts There are many negative impacts can be seen because of the project but the reduction of the agriculture land is one of them. From 1976 to 2010, Bangladesh has been losing nearly 0.249 % of the agriculture land. It is a grave concern for Bangladesh because 60% of the land area of Bangladesh is used for the agricultural purposes. Every year the new development of the infrastructures and the housing structures are the main causes of the reduction of cropland. However, the maximum land of the proposed project area is fallow which used as coal depot and rental arrangement. The land owners of the coal depot rent the land at the rate of Tk. 8,000 per decimal (8lacsper acre) per year. It is a crying need to restore the livelihood of the affected households by pragmatic initiatives and well organized decision making by the project authority. It will be helpful not only for the port authority but also for the affected community. There are some resettlement issues, loss of livelihood and lands will be incurring because of the construction of the land port. Land acquisition process has not started till today. The Deputy Commissioner OF Sylhet is legally responsible for the land acquisition on the behalf of requiring body (BLPA). Because of the changed situation, the land price has increased substantially. This fact has created a great concern for the PAPs to get proper compensation in the case of acquisition. A Resettlement Action Plan (RAP) has been prepared for the identified 45 affected persons which will mitigate their settlement issues by following Resettlement Policy Framework of BLPA. At the same time, a Social Management Plan (SMP) is also prepared for solving the social issue. On the other hand, PAPs will be compensated by recruiting an NGO which will raise awareness and resettle the affected persons. During the construction period, it is also mentioned here that the recruited NGO will implement both SMP and RAP under the guidance of resettlement unit (RU). After the construction period, RU will start off working as the name of CSR and social development issues for pending resettlement and social issues. In this way, the post negative impacts of the project will mitigate properly. However, they suggested that the port authority should play an active role for the development of the area which will improve the socio economic condition of the community. In addition, they want to include the local youth in the project construction work which will also create job opportunities. The port authority should outline a program which will regain the income of the affected persons. The project needs to be implemented because of the greater demand and interest. On the other hand, the owners of the land should be rehabilitated as soon as possible. There is no mandatory provision of resettlement has been included in the existing laws of Bangladesh. Because of the donor involvement, the affected land owners will get additional benefit from the project at the rate of full replacement cost. It will help them for re-owning the lost land. It is assured that all kinds of support will be provided by the project for the restoration of income process. Yooshin-Vitti JV Page 51 Social Assessment Report of Sheola Land Port In present situation, 22.1 acres‘ agriculture land will be acquired under the land acquisition process. The construction work will be occurring on the existing site of the acquisition land. Five medium size wood trees and 26 structures will be affected due to this project implementation. Total 36 PAHs will be affected of which 36 have been identified as land owners and 26 PAHs as the structure losers. During construction time, some health problem may raise including water borne and air borne diseases. With sufficient precaution and awareness program, this problem may be minimized. A brief description of adverse impacts has been presented in the following table. Table: 12. Type of Negative Impact and Mitigation Measures Serial Type of Negative impact Mitigation measures Implementing Authority Impact 1 Land 22.1 acres‘ For agricultural land 1. District administration(DC). Acquisition agriculture land acquisition cash compensate will acquired be (market price) will be 2. Resettlement Unit(RU)/ Social under acquisition provided including 50 % Development unit/CSR Unit, Land process premium. Moreover, Port Authority(BLPA). compensate will be provided for standing crops. In that 3. NGO as implementation case one-month advanced agency. notice should be issued in time to harvest standing crops. 1. Primary Compensation by District Administration (DC). DC will carry out feasibility study of the land acquisition and submit the proposal with the feasibility report to the Ministry of Land. 2. Additional grant for purchasing land at the rate full of replacement cost synergic with local land purchasing rate. 3. Stamp duty refund for land purchase (20% on land Price) including other associated cost viz. income loss, inflation, preparation of documents etc. Land Dumping center 1. Contractor with 2. Requisition may be needed for supervision of the DC will 1. Contractor. the construction hire the land as market 2. BLPA will ensure proper materials but it price. If the land has crops compensation has not yet then the crop value will be finalized. provided and determined by DC. Demolition of 1.Demolition of 13 Replacement cost of 1. DC 3. Existing business structures and other 2.BLPA business structure. immovable builds items will 3.Non-Government structure 2. Demolition of 5 be provided at current Organization(NGO)as latrines. market price of the same implementation agency . 3. Demolition of 3 building materials plus the Yooshin-Vitti JV Page 52 Social Assessment Report of Sheola Land Port Tube wells. current cost of labor to build them. 1.Primary Compensation by DC 2. Salvage material will be taken by Owner as norms and common practice 3. Additional grant by Project. 4. Transfer Grant(TG) by Project (5% on market price) 5. Construction grant by project (10% on market price) 4. Impact on Five medium size Currently market prices of 1.DC Trees trees will be tree, which are 2.BLPA affected due to Irreplaceable will be 3.NGO this project determined considering the implementation. maturity and harvest price of fruits. 1.Primary compensation by DC. 2. There are many fallow lands in that project implemented areas so by considering the fact proper sapling must be needed according to the soil structure for sustainable tree plantation. Considering the fact, some money must be provided by the project through NGOs for the purpose of tree plantation. Each tree costs approximately 100 Tk. If 100 plants will be planted instead of 5 damaged plants, it will cost 10,000 Tk. 5. Employment Temporary Persons who are employed 1.Contractor opportunity Negative impact in the affected businesses 2.BLPA will ensure proper on income being operated on private or compensation sources will be public lands. 3.Skill training by NGO occurred due to relocation shops 1.Creating alternative and business . income facilities 2. Cash grant will be provided to the affected employees/wage earners equivalent to 90 days‘ wage specially for unskilled @ Tk. 400.00 and skilled Tk. 500.00 3. Preferential employment may be needed in the project construction work, if available. 3, Arrange training by NGOs on income generating activities (IGA) Yooshin-Vitti JV Page 53 Social Assessment Report of Sheola Land Port with new strategies. 4. PAPs and Local people should be given priority to the construction work of the port. It is also provided job facilities for the local people. 6. Road May be damaged Future support from the port 1. BLPA infrastructure due to movement authority will be 2.Construction Contractor of heavy vehicle. Given if any damage will occur in future during transportation. Authority should reinstate it timely and give support for the maintenance. 7. Health related Water borne 1. Authority should support 1. BLPA issues airborne, STD in building health 2. NGO diseases may infrastructure in the area increase due to 2. Raising awareness and coal transporting information campaign by business, NGOs can reduce the migration of negative impact of health workers, drivers. . hazards. In every year 4heathrelated campaigns can be done per 3 months. Each campaign costs approx. 50,000 Tk. and the total amount will be needed 240000 Tk.. 8. Drug Addiction Drug Addiction 1Authority should support in 1. BLPA and AIDS etc. may increase due building / health care 2. NGO to migration of facilities in the project workers, drivers implement area. 2. Raising awareness and information campaign is needed on time with the help of NGOs. In every year 2 campaigns for preventing drug addiction can be done per 6 months. Each campaign costs approx. 50,000 Tk. and the total amount will be needed100,000Tk . 9. Livelihood Temporary 1.Allocation of commercial 1. BLPA livelihood will be spaces for the existing shop 2. NGO affected for the keepers and business man. existing 2. Three-month income shopkeepers and restoration Grant according employees to the type of business and public consensus for the business owners if it is needed. 10. Loss of Income Temporary loss of 1.Providing job in the project 1. BLPA of the income in the who are eligible as per 2. NGO community community requirement. 2. Arranging Short technical trainings for PAPs and their families. Yooshin-Vitti JV Page 54 Social Assessment Report of Sheola Land Port 11. Human It may be 1. Authority should support 1. BLPA Trafficking increased. in maintaining law and order 2. NGO situation of the area. 2. Raising awareness and information campaign for reducing human trafficking by the help of NGOs and local government. In every year, 2 campaigns for preventing human trafficking can be done per 6 months. Each campaign costs approx. 55,000 Tk. and the total amount will be needed 125,000Tk. 12. Degradation of May increase 1. Raising awareness and 1. BLPA Social Values information Campaign to 2. NGO reduce the degradation of social values. In every year, 2 campaigns for improving social values can be done per 6 months. Each campaign costsapprox.65,000Tk. and the total amount will be needed 130,000Tk . 6.3.1 Land Acquisition Temporary and Permanent No temporary requisition of land and 22.10 acre land will be permanently acquired. 6.3.2 Loss of Livelihoods: Fishing and Agriculture Major livelihood loss is a business loss. No agriculture and fishing loss from the project 6.3.3 Impacts on River Boat and Vessels No Such type of impacts is identified as land port is beyond the river side. Sheola has bridge also. 6.3.4 Impacts on Passengers The port will have no negative impacts on passengers. However, they will be positively benefited due to improved facilities 6.3.5 Impacts on Women and Minorities and Vulnerable No women are directly identified as PAPs. 3 are from Hindu community. 6.3.6 Impacts on Health and Safety Increased traffic movements will cause more accidents. This is for both passengers and local community 6.3.7 Other Impacts No other impacts are identified. For the project Yooshin-Vitti JV Page 55 Social Assessment Report of Sheola Land Port Chapter 7: Major Risks and Assumptions Yooshin-Vitti JV Page 56 Social Assessment Report of Sheola Land Port Chapter-7 Major Risks and Assumptions 7.1 Risks Major risk of the present project is the land acquisition and livelihood loss of the project affected people and livelihood restoration of the project affected person. Other risk is reckless driving in the highway and increasing road accident. So, this issue should be handled carefully. 7.2 Assumptions In many cases people is unable to regain lost land due to the price hike of land and discontinuation livelihood in the project area. On the other hand, they have to spent illegal money for collecting compensation from DC office. Many PAPs, due to lack of up to date land document are failed to collect money. Due to inflation impact, harassment and lack of knowledge of land law, people suffer a lot. So this is very important. Normally government officials have no clear idea regarding resettlement. So, they offer very little amount regarding resettlement. 7.3 Significance of Risks Assumptions In recent years, due to several projects people were victimized and violently evicted against land acquisition and for proper compensation. Moreover, they laid their lives for the causes. So, this is very important to reinstate PAPs in previous socio economic condition. Yooshin-Vitti JV Page 57 Social Assessment Report of Sheola Land Port Chapter 8: Overall Issues of Significance and Management Yooshin-Vitti JV Page 58 Social Assessment Report of Sheola Land Port Chapter-8 Overall Issues of Significance and Management 8.1 Issues of Significance In the following sections significant social and project issues have been discussed regarding connectivity and land port development. Main issues of the significance are as follows.  Land Acquisition  Compensation at the rate of full replacement cost  Livelihood restoration of project affected persons  Mitigation of social Issues  Ensure connectivity social, economic and communications  Increase the trade volume and make land prt economically viable 8.1.1 Issues to be addressed by the Project  Land Acquisition  Compensation at the rate of full replacement cost  Livelihood restoration of project person  Mitigation of social Issues 8.2.2 Issues which are project Scope The main scope of work is to prepare a social management plan (SMP) and preparation RAP. 8.2 Social Management Plan A social management plan has been developed for mitigating social issues in the project area. A time bound implementation schedule has been proposed in the following table. The SMP has both resettlement and purely social issues. A separate RAP has also been prepared. Yooshin-Vitti JV Page 59 Social Assessment Report of Sheola Land Port Table: 13. Tentative SMP Implementation Schedule Months3 Up to July,2018 Serial Items 1 2 3 4 5 6 7 8 9 10 11 12 1 Socio Economic Survey 2 Preparation IEE,EIA,SMP 3 Joint Verification/ Video Filming by BLPA and DC office 4 Land Acquisition & Requisition 4.1 Serving Section-3,6,7 notice from DC office 4.2 Starting of Payment of Compensation 5 Set UP CSR Unit of BLPA 6 NGO/IA Recruitment 8 Information Campaign 9 Payment of Additional Grant 10 Raising Awareness 10.1 Health Awareness, drug addiction,STD, HIV/ AID etc 10.2 Awareness against social Degradation, human traffcking, gender discrimination, wage discrimination, child labour, begging, early marrige, dowry, smoking etc 11 Skill Training 12.0 Monthly Monitoring Report 12.1 Final SMP Progress Report 3 Tentative date of starting construction work is August,2016 and project completion is August,2018 Yooshin-Vitti JV Page 60 Social Assessment Report of Sheola Land Port 8.2.1 Resettlement Action Plan Total affected land is 22.10 acre. A resettlement action plan has been developed and total resettlement budget is Tk. 49,65,60,597 82.2 Land Acquisition Related Total land to be acquired is 22.10 acres. All land low lying lands are used as coal depot in dry season and during wet season it is submerged under flood water. 8.2.3 Livelihood Related Among all affected persons, the livelihood losers amounts to 45 of which 4 are below poverty line 8.2.4 Inclusion and Equity In preparing SMP and RAP, inclusion of all sorts of people, community, PAPs and stakeholders are given importance. Equity and justice has given priority. 8.2.5 Gender Minorities / Vulnerable Bangladesh is a highly patriarchal society. For this fact the men control over labor, choice of marriage partner, income, assets and affairs of livelihood. There is a strong cultural preference for males over females in the male dominated scenario of Bangladesh which exacerbates an imbalance society. From fathers to husbands to sons, women are dependent on men throughout their lives. Moreover gender studies focus on women. It happens because the position of women in the society is unfavorable in every aspect. Women are more vulnerable than men because of their lack of control over the means of production, restricted mobility, limited facilities for education and jobs. It is not only poverty that plays a hand in gender inequities but also the intricate connection of social and cultural influence the practices. Gender inequities not only effects on girls and women but also on boys and men. Present Women Status in the Project Area Project area of Sheola land port is not different from this situation. During census and field survey of the project area, no any female headed and handicapped people are identified from the affected people. In the project area women of both Muslim and Hindu community are living in a conservative society. A majority of women in the project area (not exactly acquired area) are housewives from poor community people. Their educational levels are comparatively low and access to technical skills education is constrained by poverty and other mobility related issues. Though a majority of women live in thatched and tin shed houses connected with no electricity and water services, hardly any of them could claim ownership to those houses. Almost 99 percent women live in their husbands‘ houses and are exclusively dependent on cash incomes generated by the family from employment. Land is owned by only a few families and supplementary incomes from agricultural activities are limited. Their knowledge and awareness on external issues such as HIV/AIDS is quite remote. Their vulnerabilities are reasonably high in physical and Yooshin-Vitti JV Page 61 Social Assessment Report of Sheola Land Port sexual abuse, domestic violence and other forms of insecurities. From the PAPs, three women are from Hindu community and they live below the poverty line. They should be given priority for social rehabilitation. One PAPs is Muslim who is living below the poverty line. Possible areas of Women Involvement The following proposals are made to involve Women at various levels of the Project. Women can work as managers during project implementation. The project can hire a local NGO to implement the RAP. It is proposed that NGO must fulfill the following conditions;  The NGO must propose at least one women as part of the key personnel, the proposed Women Key Person shall be available to work at site at least 50% of duration as the contract.  The NGO will depute a technical/ professional team to work at the site, which will consist at last 30% of Women members. Junior support Personnel and administrative staff will not have considered as technical/ Professional.  Income generating program will be designed to ensure women a reliable income by engaging in activities. Taking into account the availability of resources and the type of enterprises that they are already engaged in.  Capacity enhancing assistance will be provided for improving the access of women to skills training for off-farm employment such as tailoring, weaving, cutting, embroidery, handicaps‘, hair-cutting, beautification and processing of locally produced products.  Social awareness campaigns and training opportunities will be organized to increase Women‘s in regulation into social and economic mai nstream.  Project will strength Women‘s community based and non -governmental organizations by providing training and advisory supports once during construction period.  Prepare the skill development Plan for the women.  Develop monitoring and evaluation system for the gender development activities.  Provide support for getting loan from financial institutions.  Preparing a periodical report and activities undertaken for the welfare of Women. The Matter of Concern in the Project Area Prostitution, violence against women and human trafficking are the major factors which will be affecting the community around the port area. Especially the migrated workers and drivers will be participating in that kind of activities. This terrible attitude towards women accounts for the high incidence of violence. This antisocial macho persona is typically determined the violence against women .Due to the illegality of prostitution, the public tends to be indifferent and apathetic towards the welfare of prostitutes. If it occurs on that moment the port area can be determined as a bad part of town. The law should be enforced to protect prostitutes from violent crimes. Otherwise the law fails to prevent them from engaging in the risky behavior in the first place. These bad consequences will increase diseases like AIDS, STD and also create social degradation in future. That‘s why a gender action plan will be needed to modify the whole scenario. Yooshin-Vitti JV Page 62 Social Assessment Report of Sheola Land Port Gender Action Plan: The gender action plan will be mainstreaming some important issues from national to grass root level. This action plan will be eliminating gender inequities. In the context of present situation, the government as well as the civil society can play vital roles regarding women development. Some of the following measures are:  Offering high level education  Increasing women employment  Involving them in active politics and social activities  Arranging social protection programs  Generating awareness among parents  Giving scholarships to the girls  Spreading awareness against child abuse and violence  Stopping sex identification and abortions  Social welfare developments by politicians  Promoting campaign through NGOs to eradicate Gender Inequality  Increasing women's share of seats in National Parliament and local government bodies  Combat violence against children, adolescences and women  Guarantee women's and girls‘ property and inheritance rights  Guarantee reproductive health and rights The overall objective of Gender Action Plan (GAP) can improve the wellbeing of women who are living in the proposed project areas. The three specific objectives of GAP are given below: a) To avoid adverse impacts on women around the proposed land port. b) To facilitate economic benefits to women during project construction period. c) To support the processes of improving the socio-economic conditions of women. The first objectives call for exploring the strategies and mechanisms for avoiding or minimizing adverse effects and impacts of project constructions on the properties, livelihoods of women and their families. Furthermore, it focuses on adopting appropriate measures to avoid any harmful effects on women and girls during project construction period such as insecurities and harassments from construction workers, disturbances to routine life, and damages to their properties and livelihoods. The second objective endeavors to identify and provide economic benefits to women and their families during project construction period. Employment opportunities for women would be limited in project construction work as such work is largely male-centered in Bangladesh. Also, the social cultural norms in Bangladesh may not prescribe women engaging in construction work along with men in many cases. However, women of poor families may opt for such employment in the construction work as the work opportunities available. Employment opportunities for male members from the poor and vulnerable families could also be provide. It will help to generate incomes by those employees which will indirectly benefit the female members of their families. Opportunities for women to run small tea stalls or selling food parcels can also be promoted. The third objective focuses on networking with development agencies, other industrial and commercial establishments in the area. It will persuade them to implement suitable programs and activities that enhance the socio-economic conditions of women, girls and their families. In brief BLPA will ensure following action during construction period for women. Yooshin-Vitti JV Page 63 Social Assessment Report of Sheola Land Port  Engage affected and vulnerable women in construction work if they are interested.  Include 25% women as construction workers.  Separate sheds for women workers by ensuring their privacy and security.  Separate hygienic and safe toilet facilities inside the camp and construction sites.  Provide working dress with helmet, gumboot for workers,  Maintain same wage rate for man and woman.  Provide healthy food facilities near working site with subsidized rate.  Ensure crest for women worker with child near camp and working sites.  Ensure 1st Aid facilities and mobile hospitals near working site in emergency cases.  Provide transport between working sites and camps.  Not engage women labor at night  Ensure safe drinking water.  Build awareness about STD diseases, HIV/AIDS.  Build awareness against child and women trafficking and drug abuse.  Ensure payment through bank. Budget for Gender Action Plan Serial Description No Days for Man Monthly cost/Unit Total (Tk) training month Cost (Tk) 1 Campaign on Creating 3 1 100000 300000 Awareness about women‘s right 2 Campaign on Health 3 1 100000 300000 related issues like AIDS and STD 3 Campaign on WASH 3 1 150000 450000 4 1 1 100000 100000 Workshop on Property right 5 Workshop on Nutrition and 2 1 150000 300000 Food 6 Gender Specialist 1 12 100000 1200000 7 Environment and Health 1 12 100000 1200000 Specialist 8 Training Specialist 1 12 100000 1200000 9 Training for 200 women. Group-A (Cutting and 50 90 1000000 3000000 Tailoring) Group B (Embroidery and 50 90 1000000 3000000 Weaving) Group C (Handicrafts) 50 90 1000000 3000000 Group D (Hair cutting and 50 90 1000000 3000000 beautification) Yooshin-Vitti JV Page 64 Social Assessment Report of Sheola Land Port 10 Bill board 4 100000 400000 11 Leaflet & poster, booklet 1000 100 100000 Sub Total 17,550,000 5% Administrative cost 877500 5% Incidental cost 887500 20% Contingency 3510000 Total 22,815,000 8.2.6 Ethnic Groups No indigenous people identified as project affected person. So, no need for Indigenous people plans. 8.2.7 Stakeholders Engagement Stakeholder engagement is the process by which an organisation involves people who may be affected by the decisions it makes or can influence the implementation of its decisions. They may support or oppose the decisions, be influential in the organization or within the community in which it operates, hold relevant official positions or be affected in the long term. Stakeholder engagement is a key part of corporate social responsibility (CSR) companies engage their stakeholders in dialogue to find out what social and environmental issues matter most to them about their performance in order to improve decision-making and accountability. Engaging stakeholders is a requirement of the Global Reporting Initiative, a network-based organisation with sustainability reporting framework that is widely used around the world. Involving stakeholders in decision-making processes is not confined corporate social responsibility (CSR) processes. It's a tool used by mature private and public sector organizations, especially when they want to develop understanding and agree to solutions on complex issues or issues of concern. An underlying principle of stakeholder engagement is that stakeholders have the chance to influence the decision-making process. This differentiates stakeholder engagement from communications processes that seek to issue a message or influence groups to agree with a decision that is already made. "Stakeholder Engagement: A Road map to meaningful engagement" describes seven core values for the practices of gaining meaningful participation of which perhaps the three most critical are:  Stakeholders should have a say in decisions about actions that could affect their lives or essential environment for life.  Stakeholder participation includes the promise that stakeholders's contribution will influence the decision  Stakeholder participation seeks input from participants in designing how they participate The practitioners in stakeholder engagement are often businesses, non-governmental Organization (NGOs), labor organizations, trade and industry organizations, governments, and financial institutions. Yooshin-Vitti JV Page 65 Social Assessment Report of Sheola Land Port As a part of stakeholders engagement, SMP and RAP has a proposal of engagement NGO during implementing period and public consultation during feasibility stage and PAPs will have to engage in construction and lump sum budget for social development of community for future development and risk management of social issues. 8.2.1.7 Transparency and Accountability The success of our work depends on the ability of all affected parties to freely express their concerns. That is why WB has high standards of stakeholder engagement—to ensure that clients achieve the best possible development outcomes. Bank‘s country strategies and projects are based on dialogue with stakeholders, including civil society. World Bank Group President, Jim Yong Kim, has committed to incorporate beneficiary feedback in 100 percent of World Bank financed projects by 2018. So, the ability to help eliminate poverty and improve livelihoods would be severely compromised without space for civil society to help shape development in their countries. Environmental and social safeguard policies are designed to prevent and mitigate harm to people and the environment as a result of Bank Group-supported operations. Those who feel they have been negatively affected by WBG projects have access to robust and independent grievance mechanisms and to bodies, such as the World Bank Inspection Panel and the IFC Compliance Advisor/Ombudsman, able to hold WBG institutions to account. So, the ability to help eliminate poverty and improve livelihoods would be severely compromised without space for civil society to help shape development in their countries. Environmental and social safeguard policies are designed to prevent and mitigate harm to people and the environment as a result of Bank Group-supported operations. Those who feel they have been negatively affected by WBG projects have access to robust and independent grievance mechanisms and to bodies, such as the World Bank Inspection Panel and the IFC Compliance Advisor/Ombudsman, able to hold WBG institutions to account. When allegations of reprisal are brought to our attention, we work within the scope of our mandate with appropriate parties to try to address them. Where links between reprisals and WBG-financed projects can be established, Bank has taken action as documented by past cases and will continue to do so. Bank has strong policies and mechanisms that address many concerns raised by human rights advocacy groups and civil society, and Bank is open to dialogue on improvements and values the perspectives these groups bring. Bank will continue to work with them towards our shared goal of strengthening protections for people in the countries in where Bank work. Regarding the above context, SMP and RAP have proposal of raising participatory approach for project affected person and concerned stakeholders, As a WB Accountability Mechanism (AM), project transparency, an independent forum for people adversely affected by WB-assisted projects where they can: (i) Voice their concerns and seek solutions to their problems, and request a review of alleged noncompliance by WB with its operational policies and procedures (ii) 2 or more adversely affected people Yooshin-Vitti JV Page 66 Social Assessment Report of Sheola Land Port (iii) AP authorize representative (iv) NGO – Board members (v) Write a letter/ email/ fax in any official or national language to (vi) Complaint Receiving Officer at WB HQ and Resident Mission office Any time during project‘s life one can complain but no more than 2 years after project closing date Policies, Accountability Mechanisms and Stakeholder Participation at the World Bank Group The World Bank Group has several accountability mechanisms designed to enable civil society and people to voice their concerns regarding projects supported by the Bank.  A cornerstone of our work on investment projects is helping to ensure strong protections for the world’s poorest and most vulnerable people and for the environment. The World Bank‘s current policies – often called ―safeguards‖ – require borrowing governments to address certain environmental and social risks in order to receive Bank funding for development projects.  The World Bank is in the process of reviewing, updating and strengthening its environmental and social safeguards. The proposed framework emphasizes the Bank‘s commitment to core values, including respect for individual dignity, transparency, accountability, consultation, participation, and non-discrimination.  The World Bank has also just introduced a new Grievance Redress Service (GRS), to address complaints related to World Bank projects. Through this service, individuals and communities that may be directly and adversely affected by a World Bank-financed project can bring their concerns directly to the attention of World Bank management. The GRS ensures that complaints are being promptly reviewed and addressed by the responsible units in the World Bank. The objective is to make the World Bank more accessible for project affected communities and to help ensure faster and better resolution of project-related complaints.  The Inspection Panel (IPN) is the Bank‘s independent accountability mechanism for people and communities who believe that they have been, or are likely to be, adversely affected by a World Bank-funded project.  However, it is suggested for setting up an ‗independent monitoring panel‘ within the project. This proposed panel will make mission report every 4 months in the 1 st year and subsequently twice (1 in every 6 months) a year for the remaining period of the project‘s implementation headed by an independent monitoring consultant with support staff. Project authority will take necessary action regarding this.  Meaningful Public Consultation and Disclosure Requirements is also a part of accountability. The Bank reaffirms its recognition and endorsement of the fundamental importance of transparency and accountability to the development process. Accordingly, it is Bank‘s policy to be open about its activities and to welcome and seek out opportunities to explain its work to the widest possible audience.  The present project is categorized as Category B project. For all Category A and B projects the borrower should consult all the stakeholders including the project- Yooshin-Vitti JV Page 67 Social Assessment Report of Sheola Land Port affected groups and local non-governmental organizations (NGOs) about the project's environmental and social aspects and takes their views into account. The borrower should initiate such consultations as early as possible. For Category A projects, the borrower should consult these groups at least twice: (a) shortly after environmental and social screening and before the terms of reference for the ESIA are finalized; and (b) once a draft ESIA report is prepared. In addition, the borrower should consult with such groups throughout project implementation as necessary to address ESIA related issues that affect them.  For the overall project and all sub-projects, the borrower should provide relevant information on project interventions in a timely manner prior to consultation and in a form and language that are understandable and accessible to the groups being consulted. The borrower should provide a summary of the proposed project's objectives, description, and potential impacts for the initial consultation. For consultation after the draft ESIA report is prepared, the borrower should provide a summary of the ESIA's conclusions. In addition, the borrower makes the draft ESIA report available at a public place accessible to project-affected groups and local NGOs. The borrower also ensures that ESIA reports for all subprojects are made available in a public place accessible to affected groups and local NGOs. Apart from the present RPF, both the ESIA and RAP/ARAP for all sub-projects will be translated into Bangla. All these documents, both in Bangla and English, will be made available to interested public through BLPA website and in hard copies at all project offices. Public availability of the ESIA, RAP/ARAP report in the borrowing country and official receipt by the Bank are prerequisites to Bank appraisal of these subprojects.  doing ESIA, DPR preparation and RAPs. Several Community-level Consultations and Focus Group Discussions and meetings were also held at Shaula, Land ports. Public Consultation with Free Prior Informed Consultation be held when ESIAs are conducted for the planned sub-projects, to disclose and get feedback on ESIAs and RAPs, and these documents will be updated progressively based on feedback received.  The RPF and EMF will be disclosed in country (on BLPA website and in hard copy in locally accessible locations in the project area UP, Pourashava and Upazila including BLPA offices at the existing terminals) and also sent to WB InfoShop. The IPN was created in 1993 by the World Bank Board of Executive Directors, as a three- member body, in an important step to increase the transparency and accountability in Bank operations. The IPN provides independent investigation, subject to Board approval, to determine whether harm has occurred from noncompliance with Bank Policy in connection with the implementation of a project financed by the World Bank. The IPN is the first body of its kind to give voice to private citizens in an international development context. But as required, an independent monitory panel was asked for the project. In this panel, there will be a chief consultant, two assistant of the consultant and one NGO worker. The team will be working as long as the work is going on. At first year, they will make report every four months. From second year, they will be making reports every six months. This will be continued till the end of the project. Yooshin-Vitti JV Page 68 Social Assessment Report of Sheola Land Port An approximate budget for the first two years is given below: Budget for the Head Consultant: 1st Year- (3 times Monitoring in a year): Description Unit Visit Unit Cost in Total Cost in Taka Taka Independent Remuneration for 1 3 200,000 600,000 Consultant one week (for one week) Transport 1 3 250,000 750,000 Conveyance and Logistic 1st Year total 1,350,000 2nd Year – Till the project ends (2 times monitoring per Year): Description Unit Visit Unit Cost in Total Cost in Taka Taka Independent Remuneration for 1 2 220,000 440,000 Consultant one week (for one week) Travel and Local 1 2 270,000 540,000 Hospitalities nd Per Year (From 2 Year) 980,000 Yooshin-Vitti JV Page 69 Social Assessment Report of Sheola Land Port Budget for the Assistant of Consultant: 1st Year (3 times Monitoring): Description Unit Visit Unit Cost in Total Cost in Taka Taka Assistant of the Remuneration for 2 3 75,000 450,000 consultant one week (for one week) Transport 2 3 25,000 150,000 Conveyance and Logistic 1st Year total 600,000 2nd Year – Till the project ends (2 times monitoring per Year): Description Unit Visit Unit Cost in Total Cost in Taka Taka Assistant of the Remuneration for 2 2 90,000 360,000 consultant one week (for one week) Transport 2 2 40,000 160,000 Conveyance and Logistic nd Per Year (From 2 Year) 520,000 Budget for the NGO worker: 1st Year (3 times Monitoring): Description Unit Visit Unit Cost in Total Cost in Taka Taka NGO worker Remuneration for 1 3 50,000 150,000 (for one week) one week Transport 1 3 20,000 60,000 Conveyance and Logistic 1st Year total 210,000 2nd Year – Till the project ends (2 times per Year): Description Unit Visit Unit Cost in Total Cost in Taka Taka NGO worker Remuneration for 1 2 60,000 120,000 (for one week) one week Transport 1 2 30,000 60,000 Conveyance and Logistic nd Per Year (From 2 Year) 180,000 Grand Total (For the First Two Years) Tk. 38, 40,000 In Words: Thirty Eight Lacks Forty Thousand Only 8.2.1.8 Capacity Support and Capacity Building Capacity support program will be for affected person and project community. Capacity building support for BLPA official for mitigating social resettlement issues, trans border trade law, trans border trade potential etc. The training of BLPA will be for strengthening and institution building. It is proposed here, 50 officials BLPA, 45 (one family member of project affected person) and 200 from project community below poverty line, 100 transport driver and workers will award capacity building training. PAPs and community training will be mainly for technical trade and social issues. BLPA will also arrange short training and workshop for trans border trade potential and investment potential. Capacity Building training will be for 340 which also include bus truck driver regarding accident management and safe road issue and STD diseases) Yooshin-Vitti JV Page 70 Social Assessment Report of Sheola Land Port 8.2.1.9 Capacity Support and Building Budget Table: 14. Capacity Building Budget Serial Description No Days for Man Monthly Total (Tk) training month cost/Unit Cost Capacity Building 1 Specialist 1 12 1lakh 1200000 2 Training Specialist 1 12 1200000 Capacity Building 350 15 10000 3400000 training(BLPA official 50+PAPs Family Member- 45, Affected Businessmen- 45 and 200 from community household member below poverty and 100 from bus truck driver regarding accident management and safe road issue and STD 3 diseases) Total 5800000 8.2.1.10 Convergence of Relevant GoB Schemes GoB has various capacity program in LGED for City corporation and Porashava officials 8.2.1.11 Reference to Other Institutions of Issues In case of social issue, no reference from other institution is found. No resettlement issues are found. Yooshin-Vitti JV Page 71 Social Assessment Report of Sheola Land Port 8.3 Grievance Redress Mechanism Figure 7: GRC Organogram NGO GRC BLPA Affected Concerned NGO Persons' UP Chairman/ Representative of Representative RU/ Concerned Representatives Member (1) (1) (2) Custom Officer (1) Male Female Representative Representative (1) (1) The redress committee will be formed with five members. The committee will solve the grievances which have been raised by the PAPs and Project community. The members of the committee are Concerned UP chairman / members (1), NGO representative (1), BLPA representative of RU/ concerned custom office (1), Affected persons‘ representatives (2). From the affected persons‘ representatives, one will be a male and the other one be female. The Grievance Redress committee (GRC) headed by an officer of Resettlement Unit (RU)/Social Development Unit of project area equivalent to Assistant Director in the BLPA. The committee will receive the application from the affected stakeholders about their grievances and they will solve the grievances every month other than disputes relating to ownership rights under the court of law. The GRC will review grievances involving all resettlement benefits, relocation, other assistance and social issues. Yooshin-Vitti JV Page 72 Social Assessment Report of Sheola Land Port The grievances will be redressed within 2-4 weeks from the date of lodging the complaints. The PAPs/community can appeal the decision of the GRC in the appropriate court of law which mainly depends on the nature of the grievance. All documents of grievances and judgment will be registered and filed both by GRC members of NGO and project office of BLPA in the field. Then the PAP will get a copy by judgment within 30 days of lodging complain. BLPA authority will arrange toll free phone available in the custom office to contact with the RU unit in the head quarter. The message will be properly communicated with affected person and field RU/ Social Development Unit of BLPA and NGO office. Phase One –GRM under Safeguard Issues  Receive compliant through the toll free number.  Register Case no. by issuing a complaint number to the complainant; Date and channel of receipt, name of complainant, nature of the complaint, gender, father or husband‘s name and complete address.  Nature of complaint should be clearly addressed (e.g., loss of land/property or entitlements)  Forward the complaint to the concerned person immediately via SMS.  Within five days complain will be examined, resolved and reported.  If not resolved within five days, SMS alert is sent out by the system to senior management.  Complaint will be investigated and resolved within seven days from the date of receiving the complaint.  Confirmation will be received from complainant on grievance redress and ticket number closed.  Monthly reports will be generated from the system that provides feedback to improve the process of implementation of RPE. Phase Two – Establishment of implementation Arrangements for setting up project level GRM.  Experience from the phase 1 of GRM implemented to support social and environment safeguards will be used to extend the protocol and inform the project wide GRM.  PIU needs to identify groups of users that are likely to use the GRM and assess the resources- human, financial and technological.  PIU needs to develop standard operating procedure and flowcharts to define how GRS involves within the project‘s operating structures.  The whole procedure should be monitored and reported on time.  The whole procedure will be overseen by BLPA chairman. The representatives of the affected areas will do face to face communication with the affected people of the community. It will also help the affected females to talk about their hurdles with the female representative from the community. The whole procedure should be kept confidential between the representatives from the community and the affected people. A resettlement action plan has been developed for maintaining 22.10 acre affected land. The total resettlement budget is Tk. 344,198,621 for the RPA. Yooshin-Vitti JV Page 73 Social Assessment Report of Sheola Land Port It is noted that the GRC will provide claimants with the assurance that grievances will be resolved satisfactorily without any cost. GRC will also assist the transfer of resettlement entitlements. Grievance procedure will not replace existing legal process available to the affected people and will not infringe on claimants' right to access existing legal procedures. It will seek to resolve issues promptly and fairly to expedite the receipt of entitlements and assistance will be provided without expensive restoration cost and time consuming legal actions. Some of the monitoring indicators for the GRC are given below: SL. Monitoring R & R Action Grievances redress No. indicators Indicators 1 Physical - No. of PAHs paid compensation for - No. of grievances progress acquisition of private properties; registered at GRC; - No. of PAHs provided R & R - No. of project level assistance; grievances meeting; - No. of Women PAPs received - Location of GRC livelihood training ; meetings; 2 Income - Reinvestment of compensation by the - No. of PAPs Restoration PAPs; expressing satisfaction - No. of PAPs with new employment at GRC resolution in opportunities after receiving training firms of judgments support; given, timeliness, - No. of Women groups formed for impartiality, etc. income generation; 3 Financial - Compensation paid for houses - No. of court cases Progress including assistance towards registration registered charges and taxes; - Compensation paid for acquiring other assets from private owner; - Expenditure on non-qualified impacts 4 Implementati - No. of Women PAPs got employment on of gender training‘ development - No. of Women developed; plan - No. of Women PAPs provided jobs in the project activities; - No. of Women PAPs received loan for sell employment - No. of Women PAPs participated in consultations by NGO. Yooshin-Vitti JV Page 74 Social Assessment Report of Sheola Land Port Chapter 9: Monitoring and Evaluation Yooshin-Vitti JV Page 75 Social Assessment Report of Sheola Land Port Chapter-9 Monitoring and Evaluation 9.1 Introduction Monitoring is a management tool for successful project implementation. Monitoring and follow up provides periodic checks to ascertain whether social and resettlement activities are working as planned. The project management will need this feedback to be able to ensure the planned activities to be on the right track. Monitoring provides both working system for the project management and channel for the resettles to make aware of their needs and reaction to the way the resettlement is being carried out. Evaluation on the other hand, is an exercise usually undertaken towards the end of the projects to assess whether the plan achieved its goals and objectives. 9.2 Monitoring and Evaluation Framework Sample Design and Monitoring Framework Social and Resettlement and Monitoring Framework Resettlement and Social Management Sheola Land Port Performance Data Sources Design Summary Targets/Indicators Reporting Assumptions and Risks Mechanisms 1.Impact By 2017:  1.For all indicators for Assumption: Land Acquisition 1.All payments of social and resettlement Government and Compensation Compensation issues: commitment to and other Social including additional Annual reports of improving the payment Issues grants is to be monthly, quarterly, and mechanism in DC office completed annual y reporting 2. Awareness system to be ensured for Risks: Program of Social NGO and Resettlement 1.Starting timely issues Unit of BLPA implementation RAP and payment of DC office. 2. Some PAPs will not get money due to malpractices from DC offices 3. Increase social crimes and increase STD disease and HIV/AIDs Yooshin-Vitti JV Page 76 Social Assessment Report of Sheola Land Port Outcome By end of project For all indicators: Assumption: Improved access to (2017) % increase Annual reports of Annual Capacity building efficient reports of monthly, activities for BLPA manpower of NGO Number of quarterly, and annual y 1.Risks: activities and RU of households will be reporting system to be Construction of ancillary BLPA compensated and ensured for NGO and facilities for BLPA rehabilitated (xx% of Resettlement Unit of 2. Land loss not new beneficiaries are BLPA regained from poor 3. Livelihood loss not households; xx% of reinstated female-headed households in service area benefitted, their income and social status will be uplifted) Activities with Milestones Inputs Output 1: Resettlement rehabilitation 1. WB: $xxx million 1. NGO recruitment by ___(Date) 2. Consulting services (xxx 2. Mobilize design and supervision consultant by ___ PMs): $xxx million 3. Award all contracts by ___ 3. Civil works: $xxx million 4. Complete construction, repair and rehabilitation by 4. Equipment: $xxx million __ Training: $xxx million 5. Complete all construction and commission all 5. Contingencies: $xxx facilities by ___ 6. million 6. Payment of Land in DC office by___ 7. Payment Additional grant of BLPA by_______ Government: $xxx 7. million Personnel (xxx PMs): 8. $xxx million Transport and logistics: 9. $xxx million Operating expenses: $xxx million Yooshin-Vitti JV Page 77 Social Assessment Report of Sheola Land Port 9.2.1 Measurable Indicators Some monitoring indicators are presented here. Ngo will use suitable monitoring indicators for reporting, monthly, quarterly, annually and post implementation evaluation report Monitoring Indicators  Payment of compensation and entitlements before replacement  Time taken for land acquisition  Number of grievances registered and resolved  Number of court cases  Land Purchase amount  Income patterns  Land holding status  Income from land  Changes in occupations  Housing status (area, floor, walls, roof, etc.)  Length of rural roads (connectivity to nearest land ports)  Journey time  No. of training programs conducted  No. of personnel trained  Trainees‘ understanding of the training content  Achievement of learning objectives  Adherence to contract conditions and standards (housing, sanitation, crèches, use of local labour, equal wages to men and women, avoidance of child labour, etc.)  Absence of inconvenience and nuisance during implementation  Adherence to SMP/RAP provisions/ guidelines during sub-project preparation and implementation  No Road Accidents  No Women trafficking Yooshin-Vitti JV Page 78 Social Assessment Report of Sheola Land Port 9.2.2 Monitoring Framework Table: 15. Tab-Potential Monitoring Indicators Monitoring Issues Monitoring Indicators 1. Budget and • Have all resettlement staff been appointed and mobilized for field Timeframe and office work on schedule? • Have capacity building and training activities been completed on schedule? • Are resettlement implementation activities being done as per agreed implementation plan? • Are funds for resettlement being allocated to resettlement agencies on time? • Have resettlement offices received the allocated funds? • Have funds been disbursed according to Entitlement Matrix of RP. • Has all the land made encumbrance free and handed over to the contractor in time for project implementation? 2. Delivery of DP • Have all APs received entitlements according to quantity and Entitlements categories of loss set out in the entitlement matrix? • How many affected households have land titles? • How many affected households are relocated and built their new structures at new location? • Are income and livelihood restoration program activities being implemented as planned? • Have affected businesses received entitled benefits? • Have the APs losing their eroded land received proper compensation? • Have the squatters, encroachers been displaced due to the project, been compensated? • Have the community structures been compensated and rebuilt at new site? 3. Consultation, • Have resettlement information brochures/leaflets been prepared Grievances and and distributed? Special • Have consultations taken place as scheduled including meetings, Issues groups, community activities? • Have any DP used the grievance redress procedures?  What grievances were raised  What were the outcomes? Monitoring Issues Monitoring Indicators • Have grievances and resolutions been documented? • Have any cases been taken to court? • Have conflicts been resolved? 4. Benefit Monitoring • What changes have occurred in patterns of occupation compared to the pre-project situation? • What changes have occurred in income and expenditure patterns compared to pre-project situation? • Have APs income kept pace with these changes? • What changes have occurred for vulnerable groups? Yooshin-Vitti JV Page 79 Social Assessment Report of Sheola Land Port 9.2.3 Impact Evaluation Monitoring & Evaluation is an important task for measuring the periodic progress of activities under resettlement program. Impact evaluation is also an important task. This helps to identify the constraints and bottlenecks in the progress as well as future impacts to determine remedial measures. Implementing Social management and resettlement being a complex nature of task, it needs development and establishment of Computerized Management Information System (CMIS). The main objective of the CMIS is to provide the management of the project with an efficient tool for better planning and control of different project tasks. So, BLPA will develop a computerized management information system in monitoring social and resettlement work. Software will be developed for CMIS. The authority will appoint experienced system analyst, programmer for this. All sorts of social issues and resettlement information, land acquisition, Entitlement Person (EP) file including all information and entitlements, pre and post-acquisition and requisition information of resettlement will be provided for CMIS. Socio economic background of the concerned affected persons and project community will be recorded for ready reference. The authority will arrange necessary step in this connection for proper and successful resettlement and social development. BLPA through project RU/Social Development unit will arrange yearly progress monitoring upto five years of which 3 years for implementation period and 2 years for post implementation period. Project authority will carry out at least two years post project intensive monitoring to follow any adverse impact and will do any needful necessary for the affected from the contingency fund. The major input in to the system will be: - Affected household data - Land acquisition data - Data on losses - Resettlement entitlement and delivery data - Resettlement monitoring and evaluation data - Other management related data - Monitoring and evaluation (M&E) are critical for ensuring effective implementation of the RAP and achievement of the set targets. Resettlement monitoring is a continuous process of data collection, dialogue with the various stakeholders, analysis & reporting and feedback to management to enable timely adjustment of implementation procedures and entitlements, if required. - The monitoring will commence with the commencement of the Project implementation and shall continue throughout the implementation of the Project. - At the implementation period, field officials will design a format for monthly resettlement/SMP monitoring and data collection. BLPA will prepare a post- resettlement/social evaluation report at the end of the Project activity. The report should provide evidence whether adverse effects of the project have been mitigated adequately or at least pre-project standard of living and income have been restored as a result of the RAP/SMP implementation. Yooshin-Vitti JV Page 80 Social Assessment Report of Sheola Land Port Some monitoring indicators are given below. This might help as proper guideline for implementation and monitoring of RAP/SMP. In addition to that BLPA will appoint Monitoring and Evaluation Specialist for further developing indicators and format for further needs or may reshuffle from the changed needs for efficient implementation of RAP. The GRC, implementing agency or NGO, BLPA RU/Social Development Unit and Accounts section will develop standard reporting formats and reports will be submitted on a monthly basis highlighting constraints and suggestion for implementation of SMP/RAP. RU/ Social Development Unit will arrange monthly review meeting with assistance of Implementing Agency NGO for identifying the problems and proper suggestions will be given to the implementing NGO and minutes will be sent to the concerned persons and higher authority. For smooth implementation of the affected person‘s problem, project community GRC will have a direct contact with the field. The NGO or implementing agency, executing the program will monitor PAPs participation in the vocational training and other economic rehabilitation program. Records will be maintained about their attendance and the payments. Post resettlement socio economic survey for evaluation will be carried out on the basis of a TOR to be developed by a resettlement/ social development expert engaged by BLPA .The survey document will be the final project document. The implementing NGO will develop Computerized Management Monitoring System and will supply to the BLPA and implementing NGO and BLPA will preserve the data. Implementation of the RAP/SMP will be monitored regularly. A Computerized Management Information System (CMIS) will be established to provide: Integrity of data records, better planning and decision making, improved resettlement services, problem detection on resettlement issues, and project expenses and implementation within limits and schedules. The CMIS will provide: household files for PAPs containing losses and entitlement, scheduled monitoring reports, progress reports, and financial reports. The Project Management Office (PMO) i.e RU will establish a quarterly monitoring system involving staff of the NGO staff. The PMO will prepare progress reports on all aspects of land acquisition and resettlement activities. The report contains progress made in RAP implementation with particular attention to compliance with the principles and matrix set out in the plan. (BLPA will hire Independent auditors acceptable to World Bank (WB) to carry out external monitoring of the resettlement operations within two months of loan effective date. The External monitor‘s report will be submitted simultaneously to the BLPA and WB regularly. The monitoring consultant will be selected within three months of loan approval. Monitoring will be carried out every year during project implementation. For efficient implementation and management of the RAP/SMP, some review work is needed. This will be internal and external. The authority will produce monthly and quarterly reports for monitoring the progress. BLPA will engage efficient consultant from outside for total review of the project after the implementation period. At the same time WB and other stakeholders may arrange separate study to monitor the implementation of RAP/SMP. BLPA will carry out a midterm internal evaluation for the affected person at the implementation period. Following formats are proposed to use the progress monitoring. In addition to following formats internal Monitoring Specialist, Resettlement Specialist may develop other formats or may change following formats if justified. Yooshin-Vitti JV Page 81 Social Assessment Report of Sheola Land Port Computerized Management Information System (CMIS) Monitoring and Evaluation is a huge task for measuring the intermittent advancement of activities under resettlement program. Impact evaluation is also an imperative task. This distinguishes the constraints and bottlenecks in the development and also future impacts to decide and modify remedial measures. Actualizing Social management and resettlement being a complex characteristics of the task, it needs improvement and foundation of Computerized Management Information System (CMIS). The prime concern of the CMIS is to give the administration a project with an effective tool for better arranging and controlling of different tasks assigned. In this way, BLPA will build up a computerized information system in checking social and resettlement work. Software will be developed for CMIS. The relevant authority will designate experienced system expert or analyst and a programmer for this. A wide range of social issues and resettlement data, acquisition of land, entitlement person (EP) document including all data and designations, pre and post-obtaining and requisition data of resettlement will be accommodated in CMIS. Financial background of the concerned victims and targeted project community will be recorded. And for the implementation of an automated Computerized Management Information System (CMIS) for the accomplishment of stated task and data record, a budget will be needed. The budget draft would require the following issues for implementing a Computerized Management Information System CMIS: 1. Purchasing equipment:  Computers  A central Server (Network Hub)  Printers  Furniture 2. Transportation to the office 3. Configuring the network 4. Software development 5. Appointing of experienced system analyst 6. Appointing of experienced programmer Yooshin-Vitti JV Page 82 Social Assessment Report of Sheola Land Port Figure 8: Proposed CMIS model (source: Microsoft XP Network Support) Yooshin-Vitti JV Page 83 Social Assessment Report of Sheola Land Port Budget Plan for CMIS No Description Unit Quantity Rate in Tk. Amount in Tk. 1 PC (Full set desktop computer); Model: each 4 43000 172000 ASUS AiO ET2013IUTI 20" Touch All-in- One PC, Intel Pentium Dual Core G2030, 3.0 GHz or equivalent 2 Computer Server; Model: Dell Power Edge each 1 525000 525000 R720 E5-2650 2.6GHz Enterprise or equivalent 3 Printer (Centrally shared); Model: Canon each 1 12490 12490 LBP 3300 Laser or equivalent 4 Furniture and decoration (including all each 4 tables, 8 150000 30000 necessary tables, chairs, shelves etc.) chairs, 2 shelves 5 Transportation Cost - - 20000 20000 6 Network configuration each 1 10000 10000 7 Software Development each 1 100000 100000 8 Appointment of experienced system 1 person 24 months 40000 40000 analyst 9 Data manager 4 person 24 months 25000 240000 10 Maintenance cost each 24 months 15000 360000 11 Internet Line each 24 months 2000 48000 Sub total 1557490 5% Administrative cost 77875 5% Incidental cost 77875 20% Contingency 311498 Total 467248 Yooshin-Vitti JV Page 84 Social Assessment Report of Sheola Land Port Resettlement Monitoring and Social Evaluation Forms: Monitoring Format-1: Monthly Progress Report Format for Social/Resettlement Monitoring Reporting Month: ………………… Sl. Component Progress No. Unit Completed Cumulative During Status & Completed Total % Achievement Reporting Remarks Month 1. Resettlement Preparation: 1.1 Identification of PAPs No. 1.2 Group Meeting with PAPs, No. 1.3 Distribution of Compensation for Tk. Structures 1.4 Compensation for crop/tree Tk. 2. Payment of Compensation 2.1 Land: (agriculture/homestead) Tk. 2.2 Compensation for Structures Tk. 2.3 Compensation for Crop/tree Tk. 3. Relocation and Income Restoration Activities 3.1 Relocation of Households No. 3.2 Payment of Transfer Grant Tk. 3.3 Income Restoration Grant Tk. Social Issues Road Accident Awareness meeting HIV/AIDS Capacity Building Training Awareness meeting child and women Trafficking Awareness meeting Gender Issue Awareness meeting Drug Addiction Public consultation is a very important aspect for monitoring purpose and it is a continuous process. Resettlement Unit (RU)/ Social Development Unit of BLPA will use this format for reporting public consultation in their monthly and quarterly progress report. NGO or implementing agency will submit it to the RU/Social Development Unit and to the WB. 9.3 M & E Budget Table 16 Monitoring and Evaluation Budget Serial Description No Man Monthly Total(Tk) month cost 1 M & E specialist 1 12 1lakh 1200000 2 Baseline Survey 15 lakh 1500000 3 Post Project Evaluation 15 lakh 1500000 Total 4200000 Yooshin-Vitti JV Page 85 Social Assessment Report of Sheola Land Port Chapter 10: Budget Yooshin-Vitti JV Page 86 Social Assessment Report of Sheola Land Port Chapter-10 Budget 10.1 Budgetary Requirements for Social Management Following budget has been proposed for the social action plan. Budget has been prepared on the basis of Census, socio economic survey and the basis of wide range of pubic consultation among the stakeholders. As there is separate resettlement plan (RP), these cost has been excluded from the social management plan. 10.2 Overall Social Management Budget Table 17. Budget for social mitigation Serial Item Qty Unit Cost(TK) Total(TK) 1 Awareness Building (arranging 10 10x1,00,000 10,00,000 workshop), social issues, road accidents etc 2 Bill Board 10 10x2,00,000 20,00,000 3 Poster, Booklet, Brochure for 5,000 5,000x50 lump 2,50,000 resettlement and social issues sum 4 NGO lump sum 15,00,000 5 CSR activities on the basis of 2,00,00,000 participatory planning with affected community, both affected and non-affected specially for poor and vulnerable and common people (lump sum) Subtotal 24750000 6 5% administrative cost of subtotal 1237500 7 5% Incidental cost of subtotal 1237500 8 Contingency 20% Subtotal 4950000 A. Sub-Total 32175000 B Sub Total Monitoring and 4200000 Evaluation Budget C Sub Total Capacity Building 5800000 Budget Grand Total 42175000 Yooshin-Vitti JV Page 87 Social Assessment Report of Sheola Land Port Annexure Annexure - 01: Structure Questionnaire Survey Annexure - 02: Check list Annexure - 03: Photo of the Project site and FGD meeting Annexure - 04 : Free Prior Public Consultation Annexure - 05 : National Consultation Workshop Yooshin-Vitti JV Page 88 Social Assessment Report of Sheola Land Port Annexure 01: Structure Questionnaire Survey Public Consultation Questionnaire Survey for Bangladesh Trade and Transport Studies RETF NLTA Project and Bangladesh Regional Connectivity Project at Sheola Land Port Sutarkandi, Beanibazar, Sylhet Date: 1. Name of Respondent : 2. Profession : 3. Address : 4. Do you feel if a Land Port is constructed at Sheola area will helpful be for you? What are the advantages ? Social life will improve? (Y/N) Income will increase ? (Y/N) Economic Benefit will occur ? (Y/N) Every day there will no loss of time for reaching distance place ? (Y/N) Communication with other place will easy ? (Y/N) Land value will increase ? (Y/N) Job facility will increase ? (Y/N) Business will increase due to land port delivery of goods to the cities. (Y/N) Cultural communication will improve ? (Y/N) 5. Is there any flood of water logging problem for proposed land port location? 6. What are the negative impacts (if any)? Increase of traffic volume ? Accident frequency will increase Increase of air and noise pollution 7. During construction is there any problem? Traffic congestion? Air pollution Noise pollution 8.Change of bio diversity? Lack of alternate or inadequate road for movement 9. If your land will acquire by Government what will you with the compensation money 10. If your house/shop needs to displace then how will you survive with your family. Name & Signature of Respondent Name & Signature of Surveyor Date Date Yooshin-Vitti JV Page 89 Social Assessment Report of Sheola Land Port Annexure 02: Check list Check list used in the FGD meeting 1.1 What is the View regarding land port by the local stakeholders? 1.2 Who will be the beneficiaries? 1.3 Approximate no of beneficiaries 1.4 Who will be affected by the project 1.5 Income and occupation pattern 1.6 No of affected people and compensation expectations 1.7 Is there any Indigenous people, women headed hhs and vulnerable hh be affected? Annexure 03: Photo of the Project site and FGD meeting FGD meeting at Baragram with Photo adjacent areas Chairman, Abdus Salam Project site Picture Project site Picture Yooshin-Vitti JV Page 90 Social Assessment Report of Sheola Land Port Indian Container truck with Cargo Coal Depot within Project Site Coal depot at project site Public consultation at site Affected Person Affected land owner Yooshin-Vitti JV Page 91 Social Assessment Report of Sheola Land Port Border area Indian portion of project site Photo of Indian side Border Post Establishment at Indian Side Graveyard for future proposed extension Proposed Future locality for acquisition Structure at acquisition site which people opposes Structure at acquisition site Structure at acquisition site Yooshin-Vitti JV Page 92 Social Assessment Report of Sheola Land Port Structure at acquisition site Structure at project site i Up to October, 2008, the total populations of the Sutarkandi village is 850, out of them total number of male and female villagers are 282 and 245 respectively and 332 children (Data collected on the basis of field survey). ii Latu village lies on the left side of the Sutarkandi LCS. iii A religion based classification shows that almost 75 percent are Muslims and only 25 percent are Hindus (Data collected on the basis of field survey). iv Actually, it is no men‘s land .The width of this bridge is about 11 meters and it spreads over 13.910 km. v Up to October, 2008, the total population of this villages are 700, among them no. of male villagers are 300 and no of female villagers are 400 (Data collected on the basis of field survey). vi If we make a religion based study we find that almost 100 percent villagers are Muslims and the percentage of Hindus are almost zero. vii More than 95 percent of these villagers are living below the poverty level. Yooshin-Vitti JV Page 93 Social Assessment Report of Sheola Land Port Annexure 04 : Free Prior Public Consultation Yooshin-Vitti JV Page 94 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 95 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 96 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 97 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 98 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 99 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 100 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 101 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 102 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 103 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 104 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 105 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 106 Social Assessment Report of Sheola Land Port Photo - 1: Photographs of Free Prior Public Consultation at Sheola Yooshin-Vitti JV Page 107 Social Assessment Report of Sheola Land Port Annexure – 05 : National Consultation Workshop 5.1 Participates List Bangladesh Land Port Authority National Public Consultation Workshop on Draft Environmental and Social Assessment Studies for Proposed Bangladesh Regional Connectivity project Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 1 Shakila Sultana Polly BLPA Assistant Director 2 Mosammat Faizunnahar BLPA Assistant Director 3 Bashir Ahmed ASL 01712289571 4 Kamal Chandra Shil BLPA 01772331388 5 Abul Kalam Azad Yooshin-Vitti - JV 01712820605 6 Md. Jamal Uddin Jibon BLPA 01748779178 7 Dr. J.C. Shaha Yooshin-Vitti - JV 01713117822 8 Md. Shahadat Hossain 01718946800 9 Maj. Said Hasan Tapash Yooshin-Vitti - JV 01727030727 10 Mohammed Mohsin Yooshin-Vitti - JV 01921396939 11 Md. Monir Hossain BLPA 01827625531 12 Md. Mahbubur Rahman BLPA 01718275173 13 Benjamin p. Retired M/O 01713061053 14 Dr. Probhat Sh. Sar Systra, India +919819461884 15 Md. Shahdatullah BLPA 01819782977 16 Rokanuddin BLPA 01756543968 17 Ashikul Alam RTV 01841091114 18 Meher Moni Boishakhi TV 01744356217 19 Faridur Reza Boishakhi TV 01683766642 20 Ranjit Babu M/O Shipping 21 Jahangir Alam M/O Shipping 01711425364 22 Emdad M/O Shipping 23 Jasim M/O Shipping 24 Ruhul Alam MOS 01630203849 25 Qazi Md. Ali Akbar BLPA 01715032513 26 Md. Ismail 01711972889 27 Abul Kalam Azad BLPA 01912416937 28 Masum Amen 01715454392 29 Ataur Rahman Khan Chairman Upazila 01715070779 Parisad Beanibazar 30 Amir Ali PAP, Sutarkandi 01715082666 31 Kirti Nishan Chakma World Bank 01755578273 32 Md. Shofiqul Islam Office, Branch 01712849939 33 Ajoy Kumar Sarkar PO 01819179530 Yooshin-Vitti JV Page 108 Social Assessment Report of Sheola Land Port Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 34 Kabir Khan PS 01913498615 35 Abdul Mayen EPOS Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 36 Mamun Ahmed 01914931498 37 Asaduzzaman BN 01915604161 38 Anwar 01818078789 39 Partho Gosh Bhomra Land Port 01716522007 Bangladesh Land Port Authority 40 Nazrul Islam Bhomra Land Port 01965249130 Bangladesh Land Port Authority 41 Md. Isom Hosen General Secretary Reg no. 1149 01713933875 42 Md. Rezaul Islam President Reg no. 1155 01740552359 43 Md. Nazrul Islam P.O to Minister 01712754851 44 Akash Kumar 01724499189 45 Md. Mazharul Islam Protocol ministry 01913022957 46 Md. Masud Rana 01770652900 47 Md. Shoel Rana 01715484190 48 Md. Mirazul Islam SI SB Dhaka 01775538313 49 Md. Rajjak 01916739830 50 Md. Nasim Bhomra C/F Agent Association 01713919585 General Secretary 51 Binu BTV 01534312812 52 Md. Shafiqul Islam Senior Staff Reporter 01709634515 24.com 53 Shohel mamun Dhaka Tribune 01817090813 54 Siyam Sarker BLPA 01773280971 55 Shorif BLPA 01729895926 56 Ratan Roy BLPA 01774158551 57 Md. Selim Vitti S.B 01718511342 58 Md. Sarwar Hosaain BLPA 01710299558 59 ADV. Durjoy Das MOS 60 Md. Sohel 01715484190 61 Zisah Walid Environ Consultant 01753449922 62 M.F Reza Sumon Bangladesh Institute of Planning 01711560355 (BIP) 63 Shamim Ahmed Tejgaon PS 01731842577 64 Kazy Abdul Kalam Tejgaon PS 01721460859 65 Habibur Tejgaon PS 01916584212 66 Kazi Rubel P.O to MOS 01722119946 Ministry of Shipping kazirubelict@gmail.com 67 Aftab Uddin BLPA 01731868852 68 Engr. Md. Rabiul Alam JGT DSL 01912249749 69 M.A Hossain BLPA 01712647012 70 Md. Shah Alam TCB 01727654255 71 Ruhul Amin BLPA 01818302521 72 Anwar Hossain TCB 01711035903 73 Zoaherlal TCB 74 Akhta Zaman World Bank 01718201739 75 Md. Monir Hossain T.I 01711380845 Yooshin-Vitti JV Page 109 Social Assessment Report of Sheola Land Port Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 76 Jahangir Alam 01741138858 77 Dr. B.K.D. Raja International social consultant 01919393333430 Ministry of shipping - Bangladesh bkduaja@hotmail.com 78 Venkata Nukclar Environment Consultant world bank + 17162352 ,Ministry of shipping - Bangladesh 79 Anis Ahmad Director ( Traffic) 01552304869 BLPA 80 Ar. Ishtiaque Zahir Deputy team leader. 01912888003 Yooshin -Vitti 81 Iqbal Hossain Project Engineer 01711010394 Yooshin -Vitti 82 Abu Salek Public Relation Officer 01710741728 BLPA 83 Rashadul Shajib BSBK 01720530665 84 Md. Sikuzzaman BSBK 01912205422 85 Shahana Akhtar BAPL 01767492035 86 Md. Aslam Kazi BLPA 01779196804 87 Mb. A L Mamun BLPA 01732496439 88 Md.Rafiqul Islam BLPA 01914216688 89 Md. Iqbal Kabir BSBK 01730846846 90 S.M Mehedi Hasan BSBK 01676200505 91 Masuda Akter BSBK 01746585251 92 Md.Magedur Rahman BSBK 01686654562 93 Ripan Chandra Som Accountant 01929238884 BSBK 94 Sonia Kamal Emmy Yooshin -Vitti 01922113314 95 Md.Suhel Rana Bets Consulting 01716830197 96 Lee Senng Woo Yooshin -Vitti 01052882553 97 Md. Kabir Hossain BLPA 01912916728 98 Md. Zahidul Islam BLPA 01921361642 99 Md. Jasim Uddin BLPA 01552384509 100 Abul Hasnat Mahmud BLPA 01911350448 101 Salah Uddin, Accountant BLPA 01815610628 102 Suman Datta BLPA 01711442259 103 Mohammad Ibrahim Computer Operator 01936089290 BLPA 104 Mohammad Ali BLPA 1712019118 105 Seong Yil Bae Yooshin -Vitti + 821062433791 106 Zahirul Dowlah SAI 1711042544 107 Morshed Hossain Channel 24 1730430888 108 Naser Baba 109 Fatema Akter BLPA 110 Monira Begum W.S BLPA 111 Shamim Shohana Deputy Director (Traffic) 1718330470 BLPA 112 Farjana BLPA Yooshin-Vitti JV Page 110 Social Assessment Report of Sheola Land Port Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 113 Ma. Imran Hassain Cashier 01911615258 BLPA 114 Md. Abul Hossain BLPA 01712015316 115 Ma. Aminul Islam BLPA 01727216848 116 Md. Jasim uuddin BLPA 01923485338 117 Md Shopan SOMOY TV 01923838057 118 Md. Abdul Hannan Po 01718946575 119 Md Jaman Hossian BLPA 01824185791 120 Md. Alamin 0175508967 121 A.Z.M Sakhawat Hossain Managing Director.SDF 01713017453 122 Iqbal Khair Reporter, Bctar 01916143307 123 Runa Akter BLPA 01796269106 124 Md. Kalm Miah BLPA 01710926485 125 Md. Shafiqul Tcr 01925528457 126 Md. Mahfuzul Islam BLPA 01711951833 127 Md. Abdus Salam Chairman Dubag 01718251527 128 Ruhal Ahmed Chowdury Sefl 01711912930 129 Md. Jasimuddin Ministry of shipping 0173201498 130 Kamrul Hasan SAI and BETS Consulting 01723251490 Jr Engineer CHT Service ltd Connectivity Project 131 Kamrul Islam OA 01814085376 Land Port 132 Ronjit Das BLPA 01677422375 133 Q. S. I Hashmi ADG 01711145239 DOE 134 Gozi Sarowar Press Information Dept 01717052670 135 Md. Mazharul Islam Talukder LGED 01712001564 136 Ahmede Ali World Bank 01819213182 137 Aminul Islam BLPA 01717424088 Asst. Engineer 138 Kazi Nawshed Dilwor Bhomra President of C&F 01711351030 Agent Association 139 S.A. Motin Visitor 017114581143 140 Md. Abid Hossian General Secretary 01748992007 Bhomra Handling labour Union Reg - 1722 141 Md. Shajahan Ali Office Assistant 01825052406 142 Md. Kibria Jolil Visitor of traffic 01716858230 President – Director 143 Md Ali Secretary 01917071503 144 Md. Shohel Police 01710702324 145 Md. Mosiul Islam Police 01728972041 146 Md. Rasel Mhamud Police 01863038267 147 Md.A. Salam BIWTC 01716359744 148 Kh. Shajahan 01716484698 149 Topn Dev Nath BLPA 01714703373 150 Md. Jhangir BIWTA 01955958165 151 C H Ali 01857771442 Yooshin-Vitti JV Page 111 Social Assessment Report of Sheola Land Port Sl. Name & Designation Name of Organization Contact No. No Mobile / e-mail 152 Mafaz TCB 01814376371 153 Younus MOS 01829371383 154 Kazi Mahfuzur Rahman TCB 01816448880 155 Md. Nur Hossain TCD 01914757046 156 Sumona Parvin BRAC 01923010090 157 Saif Reza 01914008070 158 Jhangir BANk 01716275140 159 Nur Hossain BANk 160 Bijon Dus My TV 01712697715 161 Sqbliz My TV 162 Md. Shohel Rana 01716654078 163 Md. Musta Uddin Custom 01928427706 164 Momin Mojibul 226 LGED 01711976061 165 Josim Uddin 01740628215 166 Rohman 01729604551 167 Billal Hossain 01745771529 168 Habib Rohman 71 TV 01685029404 169 Pias 71 TV 01841710400 170 Josim 71 TV 01841710406 171 Md. Shoyb Hossain Bangladesh Media Institute 01730890019 & somotol 172 Q Shahin DBC News 01719453483 Photo - 2 : Photographs of national consultation meeting at Dhaka Yooshin-Vitti JV Page 112 Social Assessment Report of Sheola Land Port 5.2 Comments of Participant National Public Consultation Workshop On Draft Environmental and Social Assessment Studies for Proposed Bangladesh Regional Connectivity Project TCB Auditorium, TCB Bhaban, Dhaka. 10 August 2016, 09:30 AM Comments of Participant Sl. Name Position Organization Address Email Mobile Question Reply/ Response No. The replacement is estimated based on the actual cost to buy Social development or re-build same thing that was Akhtar Zaman 01715201759 lost due to resettlement, and this World bank How did you define Specialist has been estimated based on Replacement cost? And 1 market rates. The impact on What is the level of livelihood from development of impact on livelihood? Sheola Land Port is severe on 12 person who are in restaurant business (4 tenants and 8 employees) It has always been seen Bhomra Handling that facilities for workers Md. Rejaul Islam Station, Satkhira 01740552359 Worker Union Bhomra Tax are neglected while President Workers waiting room with toilet designing facilities for 2 facilities are provided in the land land port. Is there any ports. resing space for workers in your proposed land port? Bhomra land port, We cannot see the Dilwour (Raju) Kazi Nawshad 01711351030 Detailed design of Sheola land C & F Agents Association, building design for President Bhomra. Satkhira port is in final stage, but the Bhomra land port right 3 design of Bhomra land port is now. How much time is expected to be completed by required to complete the next year design? 1) In 1996 in the present land port the development Bhomra land port C & F Agents which was supposed to be done has not yet been The proposed development of land delivered. Moreover, it is my Nasim Mostafizur port will consider the improvement of observation that government 01713919585 existing facilities including providing Association is putting too much Bhomra General drinking water supply and sanitation, emphasis building the new 4 drainage, and dust control measures. service and not providing The extension of Bhomra land port importance in the existing will be done in phases and will include facilities. How long it will take towards both northern and southern todevelop the existing areas of the existing port facilities. facilities? 2)in which side of the road land acquisition will occur for the present north side facilities? It has not been possible Bangladesh Land Port Authority TCB Bhaban 5th floor, Kawran to build the Benapole junnunbadeshi@gmail,com land port as well The project will strengthen the Public Relation Officer Equipped, modernized existing facilities in terms of Bazar, Dhaka. 01710741728 and environment friendly drainage improvement, dust Abu Saleh port after 35 years of control measures, water supply 5 liberation war. So, will it and sanitation. The land will be be possible to build the acquired both north and south sheola land port as side of the road, however the ecofriendly and north side is major part. organized land port as mentioned your speech? Yooshin-Vitti JV Page 113 Social Assessment Report of Sheola Land Port 1. The lands that are already Suter Kandi Dubogh Beanibazar developed in Sheola (filled areas of low land) should be given more compensation Compensation will be provided to all Suter Kandi / sh 01712647012 M.A.Hashem than the low lying lands. 2. the structures including shops that are For compensation of affected by the land acquisition. 6 buildings right amount Compensation for structures have should be calculated. 3. been estimated at a replacement Compensation should be cost. Compensation will also be given to shops that will be provided for the loss of businesses. affected by land acquisition 4. Right Amount of land price should be Given Additional Director of traffic Have you considered Authority of land port Mst. Foijunnahar the effect of Hazardous materials such radioactive and as fuels will be stored in the 7 hazardous chemicals warehouses. No radioactive to the surrounding materials will be transported areas which will be through the ports. imported to the port? 1) From Sheola port how much Revenue According to the feasibility 01744356217 Boishakhi TV will be earnedby study of Sheola land port, Meher Moni Reporter 8 government(forecast the revenue o will be initially ed) 1.4 million USD per year, 2) From Bhomra port and in 2049 it will 10.23 has much revenue million per year will come every year? Auditor Bangladesh land port We have shown that you are providing The BLPA staff will have Md. Ali Ashraf different facilities for office building, dormitories, Authority the stake holder but 9 guest house, restaurant, what you think about water supply and sanitation the facilities for the facilities. employer who will do the job. Md. Monir Hossain Mojumder First aid facilities will be Traffic Inspector provided at the land ports. There should be Hospital facilities are 10 hospital facilities in available within 13 km every land port. distance from the proposed Sheola and existing Bhomra land ports Is there Sulphur pollution from coal Only low grade coal having dust. DoE is now sulphur content. Coal wash Quazi Sarwar Imtiaz Hasmi Additioanl Director General revising the ECR, water wil be acidic and Agargaon, Dhaka Involve local DoE should be neutralize before 02 8181767 office for public filtration and discharge after DoE 11 consultation meting, meeting DoE compliance. Check the land issue Will be invited in the PC (RAP), air pollution Meeting. Land issue will be should be checked. Air pollution issue considered. CAM considered in the detail station at Shymnagar design. at Satkhira district. Yooshin-Vitti JV Page 114 Social Assessment Report of Sheola Land Port 5.3 Newspaper Cutting Yooshin-Vitti JV Page 115 Social Assessment Report of Sheola Land Port Yooshin-Vitti JV Page 116