Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by Coordination Nationale du PAPSA July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] NA 6. Summary of the Procurement Packages planned during 2017 [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / million Post) Summary of 0.00 0.00 No Prior the ICB (Works) Summary of 0.00 0.00 No Prior the ICB (Goods) Summary of 5.6 5 No Post the NCB (Works) Summary of 2.9 6 No Post the NCB (Goods) Summary of 0.00 0.00 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule July 9, 2010 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 1.300 1 Prior QCBS number of contracts that will be let under QCBS Summary of 12.95 17 Prior CDS number of contracts that will be let under other methods Summary of 0.178 10 Post INDIV number of contracts that will be let under other methods Summary of 0.609 5 Post CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Burkina Faso : Agricultural Productivity and Food Security Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2017-08-22 2019-06-13 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P114236 GPN Date: Project Name: Agricultural Productivity and Food Security Project Loan / Credit No: IDA / H9740, / Executing Agency(ies): Coordination Unit of the Project for Improvement of Agricultural Productivity and Food Security WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PAPSA-13089-CW-RFB / Travaux de réhabilitation des infrastructures de semences piscicoles du Single Stage - One En attente Bazèga, de construction de IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-05-22 2017-05-27 2017-07-08 2017-08-07 2017-09-11 2018-03-10 Envelope d'exécution centres de pesée de poisson et de construction d'infrastructures de stockage d'intrants de pêche BF-PAPSA-13406-CW-RFQ / Travaux d'aménagement Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-05-14 2017-07-09 2017-09-07 d'une vitrine PFNL à Bobo Envelope d'exécution Dioulasso BF-PAPSA-13409-CW-RFB / Single Stage - One En attente Réhabilitation de sept (07) IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-11-20 2017-11-25 2018-01-06 2018-02-05 2018-03-12 2018-07-10 Envelope d'exécution retenues d'eau BF-PAPSA-21516-CW-RFQ / Single Stage - One En attente Construction de 4 centres de IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-08-22 2017-10-10 2018-02-07 Envelope d'exécution collecte de lait BF-PAPSA-21520-CW-RFQ / Confection de bornes pour la Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-09-12 2017-10-31 2018-01-29 matérialisation des limites Envelope d'exécution des APF du sahel BF-PAPSA-13323-CW-RFQ / Construction de Centres de Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-09-30 2017-11-25 2018-03-25 collecte de miel (CCM) (6 Envelope d'exécution régions concernées) AON-2017-039-MAAH-SG- DMP / Travaux de Single Stage - One En attente construction de magasins IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-02-07 2017-02-12 2017-03-26 2017-04-25 2017-05-30 2017-11-26 Envelope d'exécution de stockage de 200 et 100 tonnes BF-PAPSA-28340-CW-RFB / Travaux de construction de Single Stage - One En attente IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-10-03 2017-10-08 2017-11-19 2017-12-19 2018-01-23 2018-05-23 07 centres de pesée de Envelope d'exécution poisson dans le sahel BF-PAPSA-13321-CW-RFQ / Réhabilitation de trois Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-05-27 2017-07-22 2017-10-20 retenues d'eau (APF/CL et Envelope d'exécution PNKT) 2016 Page 1 BF-PAPSA-58918-CW-DIR / Travaux de construction de la station piscicole de Passation de Yakouta dans la région du En attente IDA / H9740 A posteriori marché de gré à Direct 0.00 2018-04-16 2018-04-21 2018-05-26 2018-08-24 Sahel au profit du Projet d'exécution gré d'Amélioration de la Productivité Agricole et de la Sécurité Alimentaire BF-PAPSA-21512-CW-RFQ / Travaux de construction de trois (03) blocs de trois (03) Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2018-12-08 2019-01-26 2019-05-26 bungalows chacun dans le Envelope d'exécution ranch de gibier de Nazinga à Nazinga BF-PAPSA-21518-CW-RFB / Travaux de réhabilitation de Single Stage - One 150 Km de pistes forestières IDA / H9740 A posteriori Appel d'offres Open - National 0.00 Annulé 2018-01-17 2018-01-22 2018-02-21 2018-03-07 2018-03-28 2018-07-26 Envelope (NAZINGA, PNKT, ARLY, MH BK CL) BF-PAPSA-90095-CW-RFQ / Réhabilitation des mares Single Stage - One En attente Banakélé Dalan et Ladji IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-01-15 2019-03-12 2019-07-10 Envelope d'exécution Sogomina Dalan dans la réserve de la Comoé-Léraba BF-PAPSA-88987-CW-RFQ / Travaux de construction Single Stage - One En attente d'unités de conservation de IDA / H9740 A posteriori Demande de prix Limited 0.00 2018-12-21 2019-02-15 2019-05-16 Envelope d'exécution l'oignon dans le Sahel au profit du PAPSA BF-PAPSA-90080-CW-RFQ / Travaux de réhabilitation et de complément du dispositif d'Alimentation en Eau Potable de la station Single Stage - One En attente aquacole de Bazèga et IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-01-16 2019-02-27 2019-06-27 Envelope d'exécution d'équipement de la station en énergie (panneaux photovoltaïques et groupe thermique) au profit du PAPSA BF-PAPSA-21519-CW-RFQ / Travaux de construction d'un Single Stage - One En attente (01) bloc de trois (03) IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-01-26 2019-03-09 2019-07-07 Envelope d'exécution bungalows à la Comoé - Léraba BF-PAPSA-90085-CW-RFB / Travaux d'aménagement hydro-agricole de 318 ha de périmètres irrigués dans les Open - Single Stage - One En cours IDA / H9740 A posteriori Appel d'offres 0.00 2018-12-27 2019-01-01 2019-02-15 2019-03-01 2019-03-15 2019-08-12 régions du Centre-Sud, du International Envelope d'exécution Centre-Est, du Centre-Ouest, du Plateau Central et du Sahel BF-PAPSA-90090-CW-RFB / Réalisation des travaux d'aménagement de 1 075 ha Open - Single Stage - One En cours de bas-fonds de type PAFR IDA / H9740 A posteriori Appel d'offres 0.00 2019-03-05 2019-03-10 2019-04-24 2019-05-01 2019-05-15 2019-08-13 International Envelope d'exécution dans les régions du Centre- Ouest, du Centre-Est et du Centre-Sud Page 2 2018-009T-MAAH-SG-DMP- DU 20-02-2018 / Single Stage - One En attente Construction d'unités de IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2019-01-10 2019-01-17 2019-02-16 2019-03-02 2019-04-06 2019-08-04 Envelope d'exécution conservation de l'oignon au profit du PAPSA 2019 -210/MAAH/CAB/ DU 11 MARS 2019 / Travaux de construction de la station Single Stage - One En attente IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2019-03-31 2019-04-05 2019-04-25 2019-04-30 2019-05-10 2019-10-07 piscicole de Yakouta dans la Envelope d'exécution région du Sahel au profit du PAPSA BF-PAPSA-111506-CW-RFQ / Travaux supplémentaires de la réhabilitation des Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-05-01 2019-06-15 2019-10-13 bâtiments de la station Envelope d'exécution aquacole de Bazèga au profit du PAPSA 2019-002-1C-2C-ET-3C- MAAH-SG-DMP / Travaux supplémentaires de la Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-03-13 2019-04-17 2019-08-15 réhabilitation des bâtiments Envelope d'exécution de la station aquacole de Bazèga au profit du PAPSA GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PAPSA-9779-GO-RFB / Acquisition de sacs triple fonds pour les producteurs Single Stage - One En attente de niébé et d'équipements IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-04-02 2017-04-07 2017-05-07 2017-05-27 2017-07-01 2017-10-01 Envelope d'exécution (palettes, bascules, sondes etc) pour les magasins de warrantage BF-PAPSA-13082-GO-RFB / Acquisition d'équipement pour production de fourrages, de production de lait, de Single Stage - One En attente matériel et des équipements IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-05-10 2017-05-15 2017-06-26 2017-07-10 2017-08-14 2017-10-13 Envelope d'exécution pour la mise en place de centres de pesée de poisson ainsi que des aliments pour bovins (vaches inséminées) BF-PAPSA-13086-GO-RFB / Acquisition de paillettes de semences bovines, d'hormones de Single Stage - One En cours synchronisation des chaleurs IDA / H9740 A posteriori Appel d'offres Open - National 515,903.90 2017-05-30 2017-06-04 2017-07-16 2017-07-30 2017-09-03 2017-11-02 Envelope d'exécution et de kits d'insémination artificielle et de vaccins volaille contre le New Castle et de déparasitant volaille Page 3 BF-PAPSA-13087-GO-RFB / Acquérir des combinaisons et autres matériels de protection dans le cadre de la lutte contre la grippe Single Stage - One En attente IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-05-23 2017-06-06 2017-07-18 2017-08-01 2017-08-29 2017-10-28 aviaire, de nappes de filets, Envelope d'exécution de perches, et de kits de pêche pour installation et exploitation d'enclos et de happas DC-N°2017- 001C/MAAH/SG/DMP / En attente Acquérir des licences / A posteriori Demande de prix 0.00 d'exécution utilisateurs du logiciel SPHINX BF-PAPSA-13293-GO-RFB / Acquisition d'équipements de transformation des PFNL Single Stage - One En attente (soumbala, beurre de karité IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-09-13 2017-09-18 2017-10-30 2017-11-29 2018-01-03 2018-03-04 Envelope d'exécution etc) et de ruches améliorées et d'équipement pour récolte de miel BF-PAPSA-13300-GO-RFQ / Acquisition d'un logiciel Single Stage - One En attente IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-10-04 2017-11-29 2017-12-29 SMART suivi de formation à Envelope d'exécution l'utilisation BF-PAPSA-12807-GO-RFB / Acquisition de matériel informatique (ordinateurs, onduleurs, imprimantes et photocopieurs) pour DR, 7 Single Stage - One En attente aires protégées, SP/CPSA, du IDA / H9740 A posteriori Appel d'offres Open - National 0.00 2017-04-28 2017-05-03 2017-06-14 2017-07-14 2017-08-18 2017-11-16 Envelope d'exécution matériel spécifique pour les SEP, GPS, de divers matériels (Ordinateurs portables, Smartphones) pour le SIMA BF-PAPSA-12808-GO-RFQ / Confection de panneau signalétique pour la Single Stage - One En cours IDA / H9740 A posteriori Demande de prix Limited 0.00 2017-09-25 2017-11-20 2017-12-20 localisation de bas-fonds qui Envelope d'exécution seront enrochés dans les régions BF-PAPSA-13543-GO-DIR / Acquisition de semences Passation de améliorées par la méthode En attente IDA / H9740 A posteriori marché de gré à Direct 0.00 2017-10-13 2017-10-18 2017-11-22 2018-01-21 d'entente directe avec d'exécution gré l'UNPSB pour le compte du PAPSA BF-PAPSA-21513-GO-RFQ / Acquisition de fournitures de Single Stage - One bureau et consommables IDA / H9740 A posteriori Demande de prix Limited 0.00 Annulé 2017-09-25 2017-11-13 2017-12-13 Envelope informatiques pour DR, aires protégées etc BF-PAPSA-13297-GO-RFQ / Acquisition d'équipements modernes pour la surveillance et le suivi- Single Stage - One En attente écologique des aires IDA / H9740 A posteriori Demande de prix Limited 0.00 2018-12-11 2019-02-05 2019-05-06 Envelope d'exécution protégées (drone) + formation des utilisateurs au pilotage, exploitation et maintenance Page 4 BF-PAPSA-90081-GO-RFQ / Acquisition d'équipements Single Stage - One En attente de transformation des PFNL IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-01-22 2019-03-19 2019-06-17 Envelope d'exécution (soumbala, beurre de karité etc) BF-PAPSA-111532-GO-RFQ / Acquisition d'équipements modernes pour la surveillance et le suivi- Single Stage - One En attente écologique des aires IDA / H9740 A posteriori Demande de prix Limited 0.00 2019-05-29 2019-06-29 2019-08-28 Envelope d'exécution protégées (drone) + formation des utilisateurs au pilotage, exploitation et maintenance NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PAPSA-21509-CS-CQS / Sélection fondée Suivi - contrôle des travaux sur les En attente de construction de magasins IDA / H9740 A posteriori Open - National 0.00 2017-02-07 2017-02-28 2017-04-13 2017-05-13 2017-06-17 2017-12-14 qualifications des d'exécution de 200 tonnes et de consultants magasins de 100 tonnes BF-PAPSA-13091-CS-CQS / Sélection fondée Suivi - contrôle des travaux sur les En cours IDA / H9740 A posteriori Open - National 0.00 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2018-05-28 de construction de centres qualifications des d'exécution de pesée de poisson consultants BF-PAPSA-13407-CS-CQS / Sélection fondée Etude et suivi -contrôle des sur les En attente IDA / H9740 A posteriori Open - National 0.00 2017-09-25 2017-10-16 2017-11-29 2017-12-29 2018-02-02 2018-03-19 travaux de réhabilitation de qualifications des d'exécution sept retenues d'eau (boulis) consultants BF-PAPSA-28327-CS-CQS / Évaluation des performances Sélection fondée du personnel et recrutement sur les En cours IDA / H9740 A posteriori Open - National 0.00 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2018-01-23 2018-03-20 des ressources humaines qualifications des d'exécution additionnelles pour le compte consultants du PAPSA BF-PAPSA-28332-CS-CQS / Suivi - contrôle des travaux Sélection fondée de construction de quatre sur les En cours (04) centres de collecte de IDA / H9740 A posteriori Open - National 0.00 2017-09-26 2017-10-17 2017-11-30 2017-12-30 2018-02-03 2018-07-03 qualifications des d'exécution lait dans la Région de l'Est consultants et du Sahel au profit du PAPSA BF-PAPSA-23520-CS-QCBS / Etudes détaillées des Sélection fondée travaux sur les périmètres Open - En cours IDA / H9740 A priori sur la qualité et 0.00 2016-03-30 2016-04-18 2016-07-08 2016-10-01 2016-10-10 2017-02-16 2017-09-22 2018-01-08 irrigués (PI) (1750 ha) en International d'exécution le coût amont des barrages et (500 ha) en aval barrage Page 5 Sélection fondée BF-PAPSA-21517-CS-CQS / sur les En attente Etude et suivi contrôle de IDA / H9740 A posteriori Open - National 0.00 2017-09-26 2017-10-10 2017-11-07 2017-11-14 2017-12-12 2018-05-11 qualifications des d'exécution 150 km de pistes forestières consultants BF-PAPSA-59559-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-10 2017-03-09 2018-01-16 2018-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 1) BF-PAPSA-59562-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-10 2017-03-09 2018-01-16 2018-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 2) BF-PAPSA-59556-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-10 2017-03-09 2018-01-16 2019-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 3) BF-PAPSA-59560-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-10 2017-03-09 2018-01-16 2018-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 4) BF-PAPSA-59557-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-10 2017-03-09 2018-01-16 2018-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 5) BF-PAPSA-59353-CS-QCBS / Réalisation des études techniques d’aménagements hydro-agricoles de 2500 ha Sélection fondée de périmètres irrigués Open - En attente IDA / H9740 A posteriori sur la qualité et 0.00 2015-06-04 2016-03-30 2016-06-23 2016-09-30 2016-10-01 2017-03-09 2018-01-16 2018-05-24 (2000ha en aval et 500ha en International d'exécution le coût amont) dans les régions du Sahel, du Centre-Sud et du centre-Est (Lot 6) Page 6 BF-PAPSA-59356-CS-FBS / Etudes et suivi –contrôle des Sélection dans le travaux de réhabilitation de IDA / H9740 A posteriori cadre d'un budget Open - National 0.00 Annulé 2017-12-07 2017-12-28 2018-02-10 2018-03-10 2018-04-09 2018-05-14 2018-06-18 2018-11-15 150 km de pistes forestières déterminé (PNKT, MH et CL) BF-PAPSA-88976-CS-CQS / Développement d’une solution Sélection fondée informatique au compte du sur les En attente IDA / H9740 A posteriori Open - National 0.00 2018-10-07 2018-12-05 2018-12-26 2019-01-02 2019-01-16 2019-04-16 système information des qualifications des d'exécution marchés agro-sylvo-pastoraux consultants (SIMA) BF-PAPSA-90086-CS-CQS / Suivi-contrôle des travaux d'aménagement de 117 ha Sélection fondée de périmètres irrigués de sur les Open - En cours IDA / H9740 A posteriori 0.00 2018-12-20 2019-01-10 2019-01-31 2019-02-14 2019-03-14 2019-10-10 type gravitaire dans les qualifications des International d'exécution régions du Centre-Ouest, du consultants Plateau Central et du Centre-Est BF-PAPSA-90087-CS-CQS / Suivi-contrôle des travaux Sélection fondée d'aménagement de 201 ha sur les Open - En cours de périmètres irrigués de IDA / H9740 A posteriori 0.00 2018-12-20 2019-01-10 2019-01-31 2019-02-14 2019-02-24 2019-09-22 qualifications des International d'exécution type semi-californien dans consultants les régions du Centre-Sud, du Centre-Ouest et du Sahel BF-PAPSA-90089-CS-CQS / Suivi-contrôle des travaux Sélection fondée d'aménagement de 1 075 ha sur les Open - En cours de bas-fonds de type PAFR IDA / H9740 A posteriori 0.00 2018-12-20 2019-01-10 2019-01-31 2019-02-14 2019-02-28 2019-09-26 qualifications des International d'exécution dans les régions du Centre- consultants Ouest, du Centre-Est et du Centre-Sud 2017-019/MEEVCC/SG/DMP Sélection fondée DU 13/12/2017 / Suivi- sur les En attente contrôle des travaux de IDA / H9740 A posteriori Open - National 0.00 2017-11-30 2017-12-18 2018-01-24 2018-03-13 2018-11-14 2019-04-13 qualifications des d'exécution construction de dix consultants bungalows à Nazinga BF-PAPSA-88978-CS-CQS / Sélection fondée Suivi contrôle des travaux sur les En attente IDA / H9740 A posteriori Open - National 0.00 2017-12-15 2018-01-12 2018-05-17 2018-06-07 2018-09-27 2019-01-27 de construction d'unités de qualifications des d'exécution conservation de l'oignon consultants BF-PAPSA-93537-CS-QCBS / Sélection fondée Audit des comptes du En cours IDA / H9740 A posteriori sur la qualité et Open - National 0.00 2019-01-16 2019-01-30 2019-02-13 2019-03-13 2019-03-27 2019-04-17 2019-05-15 2019-06-29 PAPSA Exercices 2018, 2019 d'exécution le coût et audits de clôture BF-PAPSA-111509-CS-CQS / Déploiement du dispositif Sélection fondée électronique dans le cadre sur les En attente du mécanisme pilote de IDA / H9740 A posteriori Open - National 0.00 2019-04-25 2019-05-09 2019-05-23 2019-06-06 2019-06-27 2019-12-24 qualifications des d'exécution distribution électronique des consultants intrants pour la campagne humide 2019-2020 Sélection fondée BF-PAPSA-111512-CS-CQS / sur les En attente Réalisation de l'étude IDA / H9740 A posteriori Open - National 0.00 2019-05-10 2019-05-31 2019-06-28 2019-07-05 2019-07-26 2019-09-09 qualifications des d'exécution d'impact du PAPSA consultants INDIVIDUAL CONSULTANTS Page 7