Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) West Africa Coastal Areas Resilience investment Project (P162337) AFRICA | Western Africa | Environment, Natural Resources & the Blue Economy Global Practice | IBRD/IDA | Investment Project Financing | FY 2018 | Seq No: 3 | ARCHIVED on 16-Oct-2019 | ISR36618 | Implementing Agencies: Sao Tome and Principe - Ministry of Infrastructures, Natural Resources and Environment, Mauritania - Ministry of Environment and Sustainable Development, Benin - Ministry of Environment and Sustainable Development, Sao Tome and Principe - Ministry of Economy, Commerce and Blue Economy, Togo - Ministry of Environment and Forest Resources (MEFR) (Directorate of Environment), Cote d'Ivoire - Ministry of Salubrity, Environment and Sustainable Development, Benin - Ministry of Economy and Finance, Togo - Ministry of Economy and Finance, Senegal - Ministry of Environment and Sustainable Development (Directorate of Environment (DECC)), Mauritania - Ministry of Economy and Finances, Senegal - Ministry of Finance, Cote d'Ivoire - Ministry of Economy and Finances, West Africa Economic and Monetary Union, International Union for Conservation of Nature Key Dates Key Project Dates Bank Approval Date: 09-Apr-2018 Effectiveness Date: 20-Jul-2018 Planned Mid Term Review Date: 15-Jan-2022 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2023 Revised Closing Date: 31-Dec-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) To strengthen the resilience of targeted communities and areas in coastal Western Africa. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Strengthening Regional Integration:(Cost $12.00 M) Component 2: Strengthening the Policy and Institutional Framework:(Cost $38.77 M) Component 3: Strengthening National Physical and Social Investments:(Cost $152.65 M) Component 4: National Coordination:(Cost $18.28 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating High High Implementation Status and Key Decisions 10/16/2019 Page 1 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) The overall implementation support arrangements have proven to be effective. The Bank team has had country-specific implementation support missions to each of the six countries and the regional units. The countries have come together to synthesize findings, update annual and 5- year plans, refine support needs from the Regional Implementation Support Unit, and have agreed to the regional integration performance tracking system. The Project Implementing Units (PIU’s) of all countries are about to complete their recruitment of key staff. In the meantime, short-term consultants will be employed to ensure timely implementation of activities. Regional Integration is working: The arrangement with IUCN managing a Regional Implementation Support Unit (RISU) and with WAEMU managing a Regional Management Unit (RMU) is working successfully. The arrangement is ensuring effective regional coordination across country activities. Regional integration indicator is working well (Project Development Objective Indicator 5). The indicator tracks regional integration through a “Regional Integration Score” that comprises four parameters: i) institutional collaboration, ii) coordinated investment planning, iii) tracking of key investments, and iv) state of the coast and regional observatory. The regional integration score is currently at 6 out of 16 points and deemed on track. As an example, WAEMU is now effectively supporting countries in ratifying the protocols of the UNEP-led Abidjan Convention, demonstrating an unprecedented collaboration that advances regional integration and harmonization of policies. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Sustainability Substantial Substantial Substantial Fiduciary Substantial Substantial Substantial Environment and Social High High High Stakeholders High High High Other -- -- -- Overall High High High Results PDO Indicators by Objectives / Outcomes To strengthen the resilience of targeted communities and areas in coastal Western Africa IN00689876 ►Households in targeted coastal areas with less exposure to erosion due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 16,998.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689877 10/16/2019 Page 2 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4,100.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689878 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,711.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689879 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4,879.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689880 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 210.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689881 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,500.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689882 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4,598.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689883 ►Households in targeted coastal areas with less exposure to flooding due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 53,378.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689884 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 10/16/2019 Page 3 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Value 0.00 0.00 0.00 1,600.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689885 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5,925.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689886 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 41,581.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689887 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 306.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689888 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 900.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689889 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3,066.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689890 ►Households in targeted coastal areas with less exposure to pollution due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12,277.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689891 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6,900.00 10/16/2019 Page 4 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689892 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689893 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689894 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 306.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689895 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689896 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5,071.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689897 ►Share of target beneficiaries with rating ‘Satisfied’ or above on project interventions (disaggregated by country, sex) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 72.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689898 Benin (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 65.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689899 Côte d’Ivoire (Percentage, Custom Breakdown) 10/16/2019 Page 5 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689900 Mauritania (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689901 São Tomé and Príncipe (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689902 Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689903 Togo (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 31-Dec-2023 IN00689904 ►Regional integration score (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 6.00 16.00 Date 14-Dec-2017 20-Jun-2018 20-Aug-2019 31-Dec-2023 Overall Comments PDO No activity has physically started on the ground, except in Mauritania (but where it would take some time for vegetation to rebuild the dunes to protect households) so no effect could be observed yet on reduction of exposure of households, which explain why values are still zero. Similar reasons explained why the population has not been yet able to express satisfaction on project intervention. As described in the previous ISR, all countries have submitted Annual Workplans and Budgets to the Bank. These plans include the activities whose impact will be measured by this results framework, including the development/implementation of legal and institutional reforms, coastal planning instruments, and feasibility studies for investments to support coastal resilience. The work plans also include studies that will be necessary to confirm the baselines of the indicators. In addition, all countries have started to prepare the community-driven development activities. A regional workshop with all monitoring and evaluation experts took place the third week of September, so that the result Framework 10/16/2019 Page 6 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) could be harmonized among countries and that countries could report on similar indicators. The baseline should be finalized before November 2019. Intermediate Results Indicators by Components Component 2: Strengthening the Policy and Institutional Framework IN00689905 ►Countries that timely submit datasets to the Regional Coastal Observatory (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689907 ►Countries with national Multi-Sector Investment Plans updated to integrate regional environmental considerations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689909 ►Score on policy instruments and legal framework (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689912 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689914 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689916 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 10/16/2019 Page 7 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689917 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689920 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689921 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689923 ►Inter-Ministerial Coastal Zone established and operational (disaggregated by country) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689925 Benin (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No Yes Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689927 Côte d’Ivoire (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No Yes Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689929 Mauritania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No Yes Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689931 São Tomé and Príncipe (Yes/No, Custom Breakdown) 10/16/2019 Page 8 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689933 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689935 Togo (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689937 ►National Early Warning System operational (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No No Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689940 Benin (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No No Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689941 Côte d’Ivoire (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689943 Mauritania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689945 São Tomé and Príncipe (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 10/16/2019 Page 9 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689947 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689950 Togo (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 Component 3: Strengthening National Physical and Social Investments IN00689906 ►Targeted coastal area with flooding control measures (disaggregated by country) (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 26,110.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689908 Benin (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 400.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689910 Côte d’Ivoire (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12,000.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689911 Mauritania (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12,590.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689913 São Tomé and Príncipe (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 10/16/2019 Page 10 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Value 0.00 0.00 0.00 25.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689915 Senegal (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689918 Togo (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,035.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689919 ►Shoreline with targeted coastal erosion control measures (disaggregated by country) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 110.80 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689922 Benin (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 23.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689924 Côte d’Ivoire (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 13.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689926 Mauritania (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 51.50 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689928 São Tomé and Príncipe (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.50 10/16/2019 Page 11 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689930 Senegal (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.80 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689932 Togo (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 18.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689934 ►Sites/zones with pollution control measures (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 16.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689936 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689938 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689939 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689942 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689944 Senegal (Number, Custom Breakdown) 10/16/2019 Page 12 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689946 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689948 ►Critical assets protected (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689949 ►Natural ecosystems conserved and/or restored (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 38.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689951 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689952 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 11.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689953 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689954 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 10/16/2019 Page 13 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Value 0.00 0.00 0.00 7.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689955 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689956 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689957 ►Coastal households with access to improved livelihood activities (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 53,860.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689958 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 300.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689959 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,200.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689960 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 44,000.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689961 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,860.00 10/16/2019 Page 14 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689962 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 500.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689963 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5,000.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 IN00689964 ►Local level planning committees in coastal resilience with female representation of 40% or more (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 Date 14-Dec-2017 20-Jun-2018 20-Jun-2018 06-Jul-2023 Overall Comments IR After one year of implementation, the activities have not yet delivered measureable results on the ground. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P162337 IDA-62120 Effective USD 30.00 30.00 0.00 2.38 24.43 8.9% P162337 IDA-62130 Effective USD 30.00 30.00 0.00 2.42 24.63 9% P162337 IDA-62140 Effective USD 30.00 30.00 0.00 2.89 23.79 11% P162337 IDA-62150 Effective USD 30.00 30.00 0.00 1.23 25.85 4.5% P162337 IDA-D2860 Effective USD 15.00 15.00 0.00 1.40 12.85 9.8% P162337 IDA-D2870 Effective USD 15.00 15.00 0.00 0.00 14.24 0% 10/16/2019 Page 15 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) P162337 IDA-D2880 Effective USD 20.00 20.00 0.00 3.17 15.77 17% P162337 IDA-D2890 Effective USD 8.00 8.00 0.00 1.27 6.28 17% P162337 IDA-D2900 Effective USD 12.00 12.00 0.00 1.02 10.41 8.9% P162337 TF-A7130 Effective USD 7.53 7.53 0.00 0.00 7.53 0% P162337 TF-A7131 Effective USD 11.57 11.57 0.00 0.00 11.57 0% P162337 TF-A7132 Effective USD 1.15 1.15 0.00 0.00 1.15 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P162337 IDA-62120 Effective 09-Apr-2018 21-Apr-2018 14-Sep-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62130 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62140 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62150 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2860 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2870 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2880 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2890 Effective 09-Apr-2018 21-Apr-2018 31-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2900 Effective 09-Apr-2018 21-Apr-2018 30-Nov-2018 31-Dec-2023 31-Dec-2023 P162337 TF-A7130 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 30-Apr-2023 30-Apr-2023 P162337 TF-A7131 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 TF-A7132 Effective 09-Apr-2018 21-Apr-2018 31-Jul-2018 31-Oct-2023 31-Oct-2023 Cumulative Disbursements 10/16/2019 Page 16 of 17 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coastal Areas Resilience investment Project (P162337) Restructuring History There has been no restructuring to date. Related Project(s) P162337-West Africa Coastal Areas Resilience investment Project ,P163945-Investments towards Resilient Management of GCLME ,P168908- West Africa Coastal Areas Resilience Investment Project ,P169292-WACA-GCF-AF 10/16/2019 Page 17 of 17