Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Bangladesh : BD Private Sector Development PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2016-08-11 2020-03-08 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P120843 GPN Date: Project Name: BD Private Sector Development Loan / Credit No: IDA / 48660, IDA / 57690 Executing Agency(ies): Bangladesh Economic Zones Authority WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEZA GD-04 / Office Pending Equipment (Fax-2, Telephone Public Investment Facility Request for Single Stage - One IDA / 48660 Post Limited 2,500.00 0.00 Implementati 2016-11-02 2016-12-07 2016-12-27 Set- 5, Spiral Binding (PIF) Quotations Envelope on Machine-1) BEZA WD-1201 / Site Development & consruction Public Investment Facility Open - Single Stage - One IDA / 57690 Prior Request for Bids 33,085,651.26 39,186,460.83 Signed 2017-01-24 2017-01-30 2017-01-29 2017-02-24 2017-03-15 2017-04-12 2017-07-08 2017-09-07 2017-08-12 2017-12-13 2019-02-03 of embankment for Mirsarai (PIF) International Envelope - 2A EZ BEZA WD-2201 / Supply & installation of utility network for Administrative building & Control room Under (33/11 KV Sub-station) in Technical Assistance and Single Stage - One IDA / 57690 Post Request for Bids Open - National 60,880.46 0.00 Implementati 2017-01-29 2017-02-07 2017-01-30 2017-02-15 2017-02-27 2017-03-05 2017-04-05 2017-04-01 2017-05-31 Mongla EZ Capacity Building Envelope on (Earth work, Soak-well, Septic tank, False ceiling, supply & installation of electrical motor pumps etc) BEZA WD-1203 -A / Supply & installation of 2nd Pending production tube-well and Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 103,737.50 0.00 Implementati 2017-02-20 2017-02-21 2017-03-09 2017-03-24 2017-05-05 2017-08-03 related accessories and pump (PIF) Envelope on house of Mirsarai Economic Zone. BEZA WD-2301 / Pending Topographical survey (for Public Investment Facility Request for Single Stage - One IDA / 57690 Post Limited 1,618.75 0.00 Implementati 2016-10-05 2016-11-12 2016-12-02 widenig of access road) in (PIF) Quotations Envelope on Mirsarai EZ BEZA WD-1203-B / Topographical survey including reduced level (RL), Pending Public Investment Facility Single Stage - One cross-section, and profiling IDA / 57690 Post Request for Bids Open - National 17,875.00 0.00 Implementati 2017-02-27 2017-02-28 2017-03-14 2017-03-29 2017-05-10 2017-06-09 (PIF) Envelope for Pipe line for water on supply purpose in Mirsarai EZ. BEZA WD 2202 / Construction of 11 kv distribution line from Sub- station to transformer for Pending Public Investment Facility Single Stage - One administrative building IDA / 57690 Post Request for Bids Open - National 54,293.11 0.00 Implementati 2017-02-27 2017-02-28 2017-03-14 2017-03-29 2017-05-10 2017-06-09 (PIF) Envelope electricity connection and on electricity connection in booster station for water supply in Mongla EZ. Page 1 BEZA WD-1208 / Widening of embankment and construction of access road Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 2,835,234.60 2,484,038.13 Signed 2017-07-21 2017-07-02 2017-07-21 2017-08-03 2017-08-03 2017-09-02 2017-10-03 2017-10-14 2017-11-09 2018-10-14 for Mirsarai-2A EZ. (PIF) Envelope (Chainage : 0+000 km to 2+250 km). BEZA WD-1210 / Widening of embankment and Under Public Investment Facility Single Stage - One construction of access road IDA / 57690 Post Request for Bids Open - National 1,924,127.28 0.00 Implementati 2017-07-21 2017-07-03 2017-07-21 2017-08-07 2017-08-07 2017-09-06 2017-10-03 2017-10-18 2018-07-15 (PIF) Envelope for Mirsarai-2B EZ. (CDSP on embankment to 24m bridge). BEZA WD-1209 / Pending Construction of Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 762,567.38 0.00 Implementati 2017-04-01 2017-04-02 2017-04-17 2017-05-17 2017-06-28 2017-09-26 Accommodation Shed in (PIF) Envelope on Mirsarai EZ. BEZA WD-1301 / Mirsarai Economic Zone (2B)- Public Investment Facility Open - Single Stage - One IDA / 57690 Prior Request for Bids 19,660,500.00 0.00 Canceled 2016-09-22 2017-04-18 2016-10-06 2017-04-24 2016-11-20 2017-07-10 2017-01-04 2017-02-08 2018-05-04 Construction of Land (PIF) International Envelope Development & Embankment BEZA WD-1308 / Site Public Investment Facility Open - Single Stage - One development works for IDA / 57690 Prior Request for Bids 19,873,566.32 20,513,912.87 Signed 2017-12-22 2018-01-16 2017-12-26 2018-01-17 2018-02-12 2018-03-19 2018-03-14 2018-05-08 2018-05-26 2018-08-01 2019-11-17 (PIF) International Envelope Mirsarai-2B EZ BEZA WD-2101 / Jaliardip- Public Investment Facility Single Stage - One Construction of Land IDA / 57690 Post Request for Bids Open - National 6,300,000.00 0.00 Canceled 2016-09-25 2016-10-09 2016-11-09 2016-12-10 2017-01-14 2018-01-14 (PIF) Envelope Development & Embankment BEZA WD-2105 / Public Investment Facility Single Stage - One Construction of Bridge at IDA / 57690 Post Request for Bids Open - National 3,000,000.00 0.00 Canceled 2016-10-20 2016-11-03 2016-12-03 2017-01-02 2017-02-13 2018-02-02 (PIF) Envelope Jaliardip Economic Zone BEZA WD-1604 / Subrang Public Investment Facility Single Stage - One Tourism Park- Construction IDA / 57690 Post Request for Bids Open - National 7,500,000.00 0.00 Canceled 2016-10-25 2016-11-08 2016-12-08 2017-01-07 2017-02-11 2017-03-19 (PIF) Envelope of Embankment BEZA WD-1802 / Mirsorai Pending Public Investment Facility Single Stage - One Economic Zone- Construction IDA / 57690 Post Request for Bids Open - National 3,940,000.00 0.00 Implementati 2018-01-24 2018-01-29 2018-03-12 2018-04-11 2018-05-16 2018-11-12 (PIF) Envelope of Administrative Building on BEZA WD-1203 / Mirsorai Pending Public Investment Facility Single Stage - One Economic Zone (2A)- Water IDA / 57690 Post Request for Bids Open - National 1,530,000.00 0.00 Implementati 2018-01-24 2018-01-29 2018-03-12 2018-04-11 2018-05-16 2018-11-12 (PIF) Envelope Supply on BEZA WD -1204 / Mirsorai Pending Public Investment Facility Single Stage - One Economic Zone- Electric IDA / 57690 Post Request for Bids Open - National 1,914,000.00 0.00 Implementati 2018-01-24 2018-01-29 2018-03-12 2018-04-11 2018-05-16 2018-11-12 (PIF) Envelope Supply on BEZA WD -1302 / Mirsorai Pending Economic Zone- Construction Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 3,723,000.00 0.00 Implementati 2018-01-24 2018-01-29 2018-03-12 2018-04-11 2018-05-16 2018-11-12 of sluice gate at ichakhali (PIF) Envelope on canal BEZA WD-1207 / Construction (widening) of access road including 1(one) Under Public Investment Facility Single Stage - One no. 51m bridge & 1 (one) IDA / 57690 Post Request for Bids Open - National 3,720,000.00 3,527,569.73 Implementati 2018-01-24 2017-01-01 2018-01-29 2018-03-12 2017-02-06 2018-04-11 2017-04-17 2018-05-16 2018-11-12 (PIF) Envelope no. 18m bridge for Mirsarai on EZ (Chainage : 3+500 km to 7+000 km). Page 2 BEZA WD-1202 / Construction (widening) of access road including 1(one) Under Public Investment Facility Single Stage - One no. 56m bridge & 1 (one) IDA / 57690 Post Request for Bids Open - National 3,364,674.58 0.00 Implementati 2018-01-24 2016-12-19 2018-01-29 2018-03-12 2017-01-23 2018-04-11 2017-04-06 2018-05-16 2018-11-12 (PIF) Envelope no. 6m culvert for Mirsarai on EZ (Chainage : 0+000 km to 3+500 km). BEZA WD-1211 / Public Investment Facility Single Stage - One Construction of road with a IDA / 57690 Post Request for Bids Open - National 3,687,500.00 3,206,313.80 Signed 2018-08-18 2018-09-17 2018-08-19 2018-09-17 2018-09-09 2018-10-29 2018-09-16 2018-11-29 2018-10-28 2018-12-20 2020-01-21 (PIF) Envelope bridge in Mirsarai EZ BEZA WD-1304 / Public Investment Facility Single Stage - One Construction of road for IDA / 57690 Post Request for Bids Open - National 3,737,500.00 3,409,874.83 Signed 2019-01-16 2019-01-30 2019-01-20 2019-01-31 2019-02-19 2019-03-06 2019-03-21 2019-05-20 2019-05-02 2019-06-10 2020-07-25 (PIF) Envelope Mirsarai-2B EZ BEZA WD-1305 / Supply Pending and installation of 33/11 KV Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 1,509,975.00 0.00 Implementati 2019-05-06 2019-05-11 2019-06-22 2019-07-22 2019-08-26 2020-08-25 (2X20/28 MVA) Sub-station (PIF) Envelope on in Mirsarai EZ. BEZA WD-1203 D / Earth Pending filling work of 2nd Public Investment Facility Single Stage - One IDA / 57690 Post Request for Bids Open - National 59,700.00 0.00 Implementati 2019-10-03 2019-10-08 2019-11-19 2019-12-19 2020-01-23 2020-07-21 Production Tube-Well in (PIF) Envelope on Mirsarai EZ. BEZA WD-1802 A / Outer curtain wall work of Pending Public Investment Facility Single Stage - One Administrative Building in IDA / 57690 Post Request for Bids Open - National 1,187,500.00 0.00 Implementati 2020-02-15 2020-02-20 2020-03-19 2020-04-03 2020-05-01 2020-08-29 (PIF) Envelope Bangabandhu Sheikh Mujib on Shilpanagar. BEZA-WD22 / BEZA-WD22: Formation of Embankment and Construction of Bridge Technical Assistance and with Wall Mounted Sluice IDA / 48660 Prior 3,000,000.00 2,926,786.66 Signed Capacity Building Gate at the Icchakhale Channel at Mirsarai EZ under Chittagong District. BEZA WD-04 / BEZA WD- 04: Site development work Technical Assistance and IDA / 48660 Prior 3,000,000.00 2,847,453.07 Signed for Mirsarai EZ, Dist. Capacity Building Chittagong. BEZA/NW-16 / BEZA/NW- 16: Construction of 33KV Overhead Transmission Line Technical Assistance and 33/11 KV Main receiving IDA / 48660 Prior 1,400,000.00 1,339,910.41 Signed Capacity Building Sub-Station (MRSS) for Mongla Economic Zoe, Bagerhat BEZA/WD-15 / BEZA/WD- 15: Pumping Main and Related Accessories, Technical Assistance and Construction of Underground IDA / 48660 Prior 2,600,000.00 2,593,565.02 Signed Capacity Building reservoir and Pump House for Mongla Economic Zone, Bagerhat GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Pending BEZA GD-02 / Camara & Public Investment Facility Request for Single Stage - One IDA / 48660 Post Limited 1,875.00 0.00 Implementati 2016-10-23 2016-11-27 2016-12-15 Accessiories (PIF) Quotations Envelope on BEZA GD-06 / Furniture Pending Public Investment Facility Request for Single Stage - One (Table-14 nos & Chair-14 IDA / 48660 Post Limited 5,000.00 0.00 Implementati 2016-12-11 2017-01-09 2017-01-29 (PIF) Quotations Envelope nos) on BEZA G -114 / Procurement of Interior Technical Assistance and Single Stage - One IDA / 48660 Post Request for Bids Open - National 90,000.00 0.00 Canceled 2016-12-20 2016-12-27 2017-01-17 2017-01-27 2017-02-17 2017-03-25 Decoration of New Office Capacity Building Envelope Space BEZA G -25 / Tally.ERP9 Release 5.1.3 or later Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 4,000.00 0.00 Canceled 2016-12-31 2017-01-22 2017-02-01 Software including providing Capacity Building Quotations Envelope users training BEZA G -057 / Procurement of Materials for Technical Assistance and Request for Single Stage - One Investment Promotion Road- IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-27 2017-01-11 2017-01-18 Capacity Building Quotations Envelope Show at Chittagong/Cox's Bazar BEZA G -054 / Technical Assistance and Request for Single Stage - One Procurement of Photocopier IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2017-01-01 2017-01-29 2017-02-08 Capacity Building Quotations Envelope toner and spares BEZA G -052 / Technical Assistance and Request for Single Stage - One Procurement of Computer IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-22 2017-01-11 2017-01-21 Capacity Building Quotations Envelope Consumable BEZA G -053 / Technical Assistance and Request for Single Stage - One Procurement of Cleaning IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-31 2017-01-24 2017-02-03 Capacity Building Quotations Envelope items BEZA G -051 / Technical Assistance and Request for Single Stage - One Procurement of Office IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-18 2017-01-12 2017-01-22 Capacity Building Quotations Envelope Stationery items BEZA G -055 / Procurement of Materials for Technical Assistance and Request for Single Stage - One IDA / 57690 Post Limited 6,250.00 0.00 Canceled 2016-12-25 2017-01-14 2017-01-21 Investment Promotion Road- Capacity Building Quotations Envelope Show at Khulna BEZA G -056 / Procurement of Materials for Technical Assistance and Request for Single Stage - One Investment Promotion Road- IDA / 57690 Post Limited 6,250.00 0.00 Canceled 2017-01-27 2017-02-20 2017-03-02 Capacity Building Quotations Envelope Show at Rajshahi/Bogra/Sirajgonj BEZA G-26 / Printing & Binding of BEZA Map, Calendar/Diary and a Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 5,000.00 0.00 Canceled 2016-09-30 2016-10-22 2016-11-01 Document on Project Capacity Building Quotations Envelope Progress and Future Plan (4827) BEZA G-29 / Procurement of Materials for Investment Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-29 2016-11-22 2016-12-02 Promotion Road-Show at Capacity Building Quotations Envelope Dhaka BEZA G-30 / Procurement of Materials for Investment Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-11-25 2016-12-21 2016-12-31 Promotion Road-Show at Capacity Building Quotations Envelope Sylhet Page 4 BEZA G -27 / Procurement Technical Assistance and Request for Single Stage - One of Computer Consumable IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-04 2016-10-30 2016-11-09 Capacity Building Quotations Envelope (non-stationery) BEZA G-28 / Procurement of Printing Materials (Investors guide, Annual Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-08 2016-10-30 2016-11-09 Report, Telephone guide, Capacity Building Quotations Envelope etc.) for Investment Promotion NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NS-101 / Investment Pending Technical Assistance and Promotion and Study Tour IDA / 57690 Post Direct Selection Direct 39,500.00 0.00 Implementati 2017-01-08 2017-01-18 2017-03-30 2017-04-29 Capacity Building to UAE and UK on BEZA NCS-1 / Procurement Technical Assistance and Single Stage - One of Security Service (7 IDA / 57690 Post Request for Bids Open - National 22,000.00 43,790.19 Signed 2017-12-03 2018-02-15 2017-12-08 2017-12-26 2018-03-20 2018-01-16 2018-03-29 2018-02-20 2018-05-06 2019-02-20 Capacity Building Envelope Security Guards) BEZA NCS-3 / Supply Technical Assistance and Subscription, Installation and IDA / 57690 Prior Direct Selection Direct 6,250.00 0.00 Canceled 2017-12-15 2017-12-20 2018-01-24 2018-03-10 Capacity Building Training on Microsoft Project BEZA NCS-4 / Procurement Technical Assistance and Single Stage - One of dedicated broadband IDA / 57690 Post Request for Bids Open - National 13,000.00 10,411.68 Signed 2017-12-15 2018-01-15 2017-12-20 2018-01-31 2018-02-08 2018-03-02 2018-03-29 2018-04-06 2018-05-03 2019-09-28 Capacity Building Envelope internet service BEZA NCS-2 / Supply Subscription, Installation , Necessary Customization and Technical Assistance and Request for Single Stage - One Training on Tally. ERP IDA / 57690 Post Limited 2,500.00 1,766.86 Signed 2018-01-20 2018-02-25 2018-02-20 2018-05-03 2018-04-21 Capacity Building Quotations Envelope Gold (Multi-user Edition) Software (Accounting Software) BEZA NCS-6 / Procurement Pending of printing service for Technical Assistance and Request for Single Stage - One IDA / 57690 Post Open - National 6,250.00 0.00 Implementati 2018-01-26 2018-02-02 2018-02-05 investment promotion Capacity Building Quotations Envelope on seminar at Cox's Bazar BEZA-NCS-7 / Training on Building Construction Rules Business Linkages and IDA / 57690 Post Direct Selection Direct 12,500.00 12,426.04 Signed 2018-03-15 2018-02-19 2018-03-20 2018-03-25 2018-04-06 2018-05-15 2018-06-05 (Housing and Building Product/Process Improvement Research Institute) BEZA-NCS-3 / Supply Technical Assistance and Subscription, Installation and IDA / 57690 Post Direct Selection Direct 6,250.00 6,473.37 Signed 2018-03-11 2018-03-12 2018-03-16 2018-03-15 2018-03-29 2018-04-30 2019-03-29 Capacity Building training of Microsoft Project BEZA NCS-8 / Skill Development Training at Pending Mirsarai by UCEP Business Linkages and IDA / 57690 Post Direct Selection Direct 72,000.00 0.00 Implementati 2018-04-22 2018-05-02 2018-06-02 2018-12-29 (Industrial Sewing Operation Product/Process Improvement on & Electrical Installation and Maintenance) Page 5 BEZA NCS 2251 / Sub-soil investigation for Pending Public Investment Facility Request for Single Stage - One infrastructures in IDA / 57690 Post Open - National 12,250.00 0.00 Implementati 2019-04-16 2019-06-11 2019-09-09 (PIF) Quotations Envelope Bangabandhu Sheikh Mujib on Shilpanagar. BEZA-NCS-18 / Procurement of Training Services from MIST on Business Linkages and Environment, Social IDA / 57690 Post Direct Selection Direct 20,625.00 17,716.55 Signed 2019-09-08 2019-07-16 2019-09-13 2019-09-30 2019-10-04 2019-10-30 2019-10-09 Product/Process Improvement Standard, Occupational Health and Safety Applicable for EZs BEZA NCS-2252 / Sub-soil Pending Public Investment Facility investigation of 24m bridge IDA / 57690 Post Direct Selection Direct 8,285.00 0.00 Implementati 2019-10-28 2019-11-02 2019-12-07 2020-01-06 (PIF) in Mirsari EZ on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PSDSP-BEZA-39-SBCC-CF- BEZA S-12 / Transaction Technical Assistance and Quality And Cost- Open - IDA / 48660 Prior 2,500,000.00 2,556,483.89 Signed 2014-05-28 2014-08-05 Advisory Services Firm Capacity Building Based Selection International (TASF) BEZA S-022 / Design and Business Linkages and Quality And Cost- Open - Pending Implementation of One Stop IDA / 57690 Prior 500,000.00 0.00 2017-01-24 2017-02-21 2017-03-28 2017-04-25 2017-05-09 2017-06-02 2017-06-30 2019-06-30 Product/Process Improvement Based Selection International Implementation Service (OSS) systems BEZA S-103 / Selection of Transaction Advisory Services Firm for Technical Assistance and Fixed Budget IDA / 57690 Prior Open - National 763,270.00 424,817.68 Completed 2016-11-28 2016-11-28 2016-12-19 2017-04-12 2017-01-16 2017-05-30 2017-01-30 2017-08-10 2017-02-13 2017-09-24 2017-03-13 2017-10-09 2019-06-30 2019-10-31 Engineering Design and Capacity Building Selection Supervision of Infrastructure Work BEZA S-101 / Pre- Technical Assistance and Quality And Cost- Open - IDA / 57690 Prior 750,000.00 236,000.00 Completed 2016-11-28 2016-11-28 2016-12-27 2017-04-12 2017-01-24 2017-06-08 2017-02-07 2017-10-26 2017-03-03 2018-01-02 2017-03-31 2017-12-13 2017-09-30 2019-03-31 Feasibility Study for 5 sites Capacity Building Based Selection International BEZA S-122 / Prepare a Technical Assistance and Quality And Cost- Open - Master Plan of Mirshorai IDA / 57690 Prior 500,000.00 405,356.85 Signed 2016-12-08 2017-01-23 2016-12-18 2017-01-31 2017-06-12 2017-03-02 2017-07-18 2017-03-16 2017-10-24 2017-04-05 2018-01-02 2017-04-26 2018-01-07 2018-01-21 Capacity Building Based Selection International Industrial City BEZA S-123 / Transaction Advisory Services Firm for Technical Assistance and Quality And Cost- Open - Centralized effluent IDA / 57690 Post 450,000.00 299,060.00 Signed 2017-06-01 2017-10-31 2017-07-13 2017-10-31 2017-08-11 2018-01-21 2017-09-15 2017-08-17 2017-09-30 2018-05-07 2017-10-28 2018-06-11 2017-11-25 2018-07-22 2018-11-25 Capacity Building Based Selection International treatment plant (CETP) at Mirsarai Industrial City BEZA S-106 / Under the package, procurement specialist will be appointed for a period of 02 (two) Technical Assistance and Quality And Cost- IDA / 57690 Prior Open - National 123,125.00 0.00 Canceled 2017-01-31 2017-02-15 2017-04-14 2017-06-19 2017-05-12 2017-05-27 2017-06-03 2017-06-25 2019-06-30 years. The estimated cost is Capacity Building Based Selection USD 123,125 including remuneration with IT, VAT and reimbursable. Page 6 BEZA S-102 / Pre-feasibility Study of Twelve (12) EZ/SEZ ( Lot-1: Khulna EZ-1, Patiya EZ, Bhola EZ, Dhaka EZ (Dohar) & Manikgonj EZ, Technical Assistance and Quality And Cost- Open - IDA / 57690 Prior 980,000.00 980,000.00 Signed 2017-12-07 2018-03-05 2017-12-28 2018-03-20 2018-02-10 2018-09-18 2018-03-10 2018-11-04 2018-04-09 2019-02-06 2018-05-14 2019-06-19 2018-06-18 2019-06-26 2018-12-15 Jessore EZ, Lot-2: Natore Capacity Building Based Selection International EZ, Sylhet SEZ, Mymensingh EZ, Jamalpur EZ-2,Nilfamari EZ & Araihazar EZ-2) BEZA CS - 2211 / Selection of Transaction Public Investment Facility Quality And Cost- Advisory Services Firm for IDA / 57690 Prior Open - National 590,000.00 944,020.73 Signed 2018-12-08 2019-01-22 2018-12-29 2019-02-11 2019-01-24 2019-06-10 2019-02-21 2019-07-23 2019-03-14 2019-09-09 2019-04-18 2019-10-28 2019-05-23 2019-10-31 2021-01-31 (PIF) Based Selection Design and Supervision of Works BEZA S-130 / Selection of Consulting Firm for Study of Technical Assistance and Quality And Cost- Open - Under National Master Plan IDA / 57690 Prior 1,840,575.00 0.00 2019-11-11 2020-01-05 2019-12-02 2020-01-19 2020-03-31 2020-05-12 2020-06-26 2020-07-31 2020-09-04 2021-09-04 Capacity Building Based Selection International Implementation for Bangladesh Economic Zones Authority INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual BEZA S-104 / Marketing Technical Assistance and Under IDA / 57690 Post Consultant Open 200,000.00 0.00 2016-10-02 2018-08-06 2016-11-13 2016-11-27 2016-12-18 2018-08-10 Consultant (International) Capacity Building Implementation Selection Individual BEZA S-114 / Technical Assistance and IDA / 57690 Post Consultant Limited 45,000.00 32,576.20 Completed 2016-11-28 2016-07-20 2016-11-28 2016-08-29 2016-11-28 2016-08-22 2016-11-28 2016-10-04 2017-10-03 2019-06-30 Infrastructure Consultant Capacity Building Selection BEZA S-121 / Project Individual Technical Assistance and Under Management and Monitoring IDA / 57690 Post Consultant Open 90,000.00 0.00 2016-11-28 2016-07-10 2016-11-28 2016-11-28 2016-11-28 2018-11-21 Capacity Building Implementation Specialist Selection Individual BEZA S-115 / System Technical Assistance and IDA / 48660 Post Consultant Open 56,000.00 25,619.73 Signed 2017-01-10 2017-04-06 2017-02-05 2017-08-23 2017-02-12 2017-08-27 2017-02-26 2017-09-05 2019-06-30 Administrator Capacity Building Selection BEZA S-106 / Under this Individual package procurement Technical Assistance and IDA / 57690 Prior Consultant Open 120,121.00 90,865.23 Signed 2017-07-26 2017-08-04 2017-06-19 2017-08-06 2017-08-16 2017-08-17 2017-08-17 2019-04-08 specialist will be appointed Capacity Building Selection for a period of 02 years. BEZA S-124 / Selection of Individual Technical Assistance and Financial Management IDA / 57690 Post Consultant Open 78,750.00 65,494.01 Completed 2018-01-01 2018-01-04 2018-02-03 2018-03-04 2018-02-10 2018-03-06 2018-02-24 2018-04-12 2019-08-18 2019-04-04 Capacity Building Specialist Selection BEZA S-2 / Financial Individual Technical Assistance and Management Specialist IDA / 57690 Post Consultant Limited 50,000.00 0.00 Canceled 2017-05-28 2017-06-15 2017-06-02 2017-06-09 2017-06-23 2018-06-30 Capacity Building (FMS) Selection BEZA-S-105 / Selection of Individual Public Investment Facility Under Marketing Consultant IDA / 57690 Post Consultant Open 125,000.00 0.00 2018-08-01 2018-08-26 2018-09-19 2018-09-21 2018-10-12 2019-08-08 (PIF) Implementation (International) Selection Individual BEZA-S-126 / Selection of Technical Assistance and IDA / 57690 Post Consultant Limited 116,458.00 110,261.45 Signed 2018-08-30 2018-09-10 2018-09-06 2018-09-13 2018-10-08 2018-10-18 2018-10-11 2020-12-06 Procurement Specialist Capacity Building Selection Page 7 BEZA S-126 / Project Individual Technical Assistance and Management and Monitoring IDA / 57690 Post Consultant Open 93,750.00 88,783.03 Signed 2018-11-19 2018-11-26 2019-01-10 2019-02-06 2019-01-17 2019-02-07 2019-02-14 2019-02-20 2020-12-31 Capacity Building Specialist Selection Individual BEZA S-127 / Technical Assistance and Pending IDA / 57690 Post Consultant Open 78,750.00 0.00 2018-11-19 2019-01-10 2019-01-17 2019-02-14 2020-12-31 Infrastructure Consultant Capacity Building Implementation Selection BEZA S-129 / Environment Technical Assistance and and Social Assessment of IDA / 57690 Post Direct Selection Direct 21,250.00 20,129.60 Signed 2018-12-17 2018-12-26 2018-12-31 2019-01-15 2019-03-13 2019-04-29 2019-08-10 Capacity Building Feni Economic Zone (EZ) BEZA S-131 / Individual Technical Assistance and Environmental Specialist IDA / 57690 Post Consultant Open 70,340.92 66,626.46 Signed 2019-03-03 2019-03-07 2019-04-24 2019-06-30 2019-05-01 2019-07-02 2019-05-29 2019-07-08 2021-02-28 Capacity Building (National) Selection Individual BEZA S-132 / Manager Technical Assistance and IDA / 57690 Post Consultant Open 61,994.32 58,696.32 Signed 2019-03-03 2019-03-07 2019-04-24 2019-06-30 2019-05-01 2019-07-02 2019-05-29 2019-07-03 2021-02-28 Administration (National) Capacity Building Selection BEZA CS 2221 / Analysis of infrastructures in Public Investment Facility Pending IDA / 57690 Post Direct Selection Direct 87,500.00 0.00 2019-03-12 2019-03-22 2019-05-26 2020-10-31 Bangabandhu Sheikh Mujib (PIF) Implementation Shilpanagar. Individual BEZA S-133 / Financial Technical Assistance and IDA / 57690 Post Consultant Open 101,250.00 78,786.26 Signed 2019-04-22 2019-04-25 2019-06-12 2019-08-26 2019-06-19 2019-08-28 2019-07-03 2019-09-02 2021-02-28 Management Specialist Capacity Building Selection BEZA S-134 / Preparation Individual Technical Assistance and Pending of Project Monitoring IDA / 57690 Post Consultant Direct 3,125.00 0.00 2019-10-20 2019-11-05 2019-12-05 2020-01-16 2020-02-15 Capacity Building Implementation Software (National) Selection BEZA S-135 / Selection of Consulting Firm for Environmental and Social Impact Assessment (ESIA), Regional Environmental and Technical Assistance and IDA / 57690 Post Direct Selection Direct 82,742.32 81,326.50 Signed 2019-10-14 2019-09-15 2019-10-19 2019-10-15 2019-11-16 2019-11-13 2020-08-12 Social Assessment (RESA) Capacity Building and Environmental and Social Management Framework (ESMF) for PRIDE Project Individual BEZA S-136 / Procurement Technical Assistance and Under IDA / 57690 Post Consultant Limited 59,267.14 0.00 2019-12-12 2019-12-11 2019-12-19 2019-12-17 2019-12-26 2020-01-09 2021-02-21 Specialist Capacity Building Implementation Selection BEZA CS-2212 / Consulting Services for Design and Supervision of Central Air- Public Investment Facility Pending IDA / 57690 Post Direct Selection Direct 8,125.00 0.00 2020-03-12 2020-03-22 2020-04-22 2020-10-19 Conditioning System for (PIF) Implementation Administrative Building of BEZA in BSMSN. Page 8