E2818 v2 ENGINEERING CONSULTANTS GROUP Arab Republic of Egypt Ministry of Electricity and Energy Egyptian Electricity Holding Company Cairo Electricity Production Company Giza North Power Plant GIZA NORTH 3x750 MWe GAS-FIRED COMBINED CYCLE POWER PROJECT Environmental and Social Impact Assessment (Revised Report) EXECUTIVE SUMMARY FINAL REPORT Volume – II(A) September 2011 Project No. 1583 Submitted by: Engineering Consultants Group (ECG) Bldg. 2, Block 10, El-Safarat District Nasr City 11765, Cairo, Egypt. P.O.Box: 1167. Cairo 11511, Egypt. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 1 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Arab Republic of Egypt Ministry of Electricity and Energy Egyptian Electricity Holding Company Cairo Electricity Production Company GIZA NORTH 3 x 750 MWe GAS-FIRED COMBINED CYCLE POWER PROJECT Environmental and Social Impact Assessment (Revised Report) EXECUTIVE SUMMARY FINAL REPORT Volume – II(A) September 2011 Project No. 1583 Submitted by: Engineering Consultants Group (ECG) Bldg. 2, Block 10, El-Safarat District Nasr City 11765, Cairo, Egypt. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 2 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP P.O.Box: 1167. Cairo 11511, Egypt. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 3 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP GIZA NORTH 3 x 750 MWe GAS-FIRED COMBINED CYCLE POWER PROJECT Environmental and Social Impact Assessment (Revised Report) EXECUTIVE SUMMARY 1. INTRODUCTION 1.1 Background 1.2 Project Overview 2. THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2.1 Contributors to the EIA Report 2.2 Scope of the EIA Report Legal and Administrative Framework 3. GENERAL SETTING OF THE SITE: DESCRIPTION OF THE ENVIRONMENT 4. PROJECT DESCRIPTION 4.1 Overview of the Power Plant 4.2 Process Description 4.3 Operational Releases from the Power Plant 5. ANALYSIS OF ALTERNATIVES 5.1 Current Situation (“No Actionâ€? Option) 5.2 Alternative Technologies and Fuels 5.3 Power Plant Design 5.4 Alternative Sites 6. KEY FINDINGS OF THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 6.1 Introduction 6.2 Air Quality 6.3 Aquatic Environment 6.4 Noise Impacts ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 4 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 6.5 Flora and Fauna 6.6 Land Use, Landscape and Visual Impacts 6.7 Soils, Geology and Hydrology 6.8 Traffic 6.9 Socio-economics and Socio-cultural effects 6.10 Archaeology, Historic and Cultural Heritage 6.11 Natural Disaster Risks 6.12 Major Accident Hazards 6.13 Solid and Hazardous Waste Management 6.14 Occupational Health and Safety 6.15 Associated Infrastructure 7. ENVIRONMENTAL MITIGATION AND MONITORING: THE ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) 7.1 Enhancement and Mitigation Plan 7.2 Monitoring Program 8. PUBLIC CONSULTATION AND DISCLOSURE 9. RESPONSIBILITIES AND INSTITUTIONAL 9.1 Environmental Management Organization 9.2 Environmental Training 9.3 Occupational Health and Safety 9.4 Emergency Procedure and Accident Response 10. IMPLEMENTATION SCHEDULE AND REPORTING 11. CONCLUSIONS 12. REFERENCES AND CONTACTS ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 5 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ABBREVIATIONS AND ACRONYMS BOD Biochemical Oxygen Demand BPIP Building Profile Input Program CAA Competent Administrative Authority CAPMAS Central Agency for Public Mobilization and Statistics CEPC Cairo Electricity Production Company COD Chemical Oxygen Demand CWDS Circulating Water Discharge Structure DCS Distributed Control System DO Dissolved Oxygen DS Dissolved Solids EAAQLs Egyptian Ambient Air Quality Limits EEA Egyptian Electricity Authority EEAA Egyptian Environmental Affairs Agency EEHC Egyptian Electricity Holding Company ED Environmental Department EGAS Egyptian Natural Gas Holding Company EGSMA Egyptian Geological Survey and Mining Authority EHS Environmental Health and Safety EIA Environmental Impact Assessment EMS Environmental Management Staff ENIT Egyptian National Institute of Transport ESIA Environmental and Social Impact Assessment ESMP Environmental and Social Management Plan EUPS Egyptian Unified Power System ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 6 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP FHWA Federal Highway Administration, (US) FM Finance Manager GARBLT General Authority for Roads, Bridges and Land Transport GASCO Egyptian Natural Gas Company GEP Good Engineering Practice GDP Gross Domestic Production GIS Gas-Insulated Switchgear GNPP Giza North Power Plant GT Gas Turbine HCM Highway Capacity Manual HFO Heavy Fuel Oil HGVs Heavy Goods Vehicles HSE Health, Safety and Environment LFO Light Fuel Oil LOS Level of Service MWRI Ministry of Water Resources & Irrigation MSDSs Material Safety Data Sheets MWe Mega-Watt electrical NFRA National Fire Protection Authority NRIAG National Research Institute for Astronomy and Geophysic OSHA Occupational Safety and Health Administration PCBs Polychlorinated Biphenyls PCDA Public Consultation and Disclosure Activities pcph passenger car per hour PMU Project Management Unit PRS Pressure Reducing Station ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 7 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP RIGW Research Institute for Ground Water SFD Social Fund for Development SS Suspended Solids STG Steam Turbine Generator TDS Total Dissolved Solids TOC Total Organic Carbon TSS Total Suspended Solids TWA Time-Weighted Average vph vehicle per hour ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 8 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP List of Tables Table 1 : Potential World Bank Environmental Safeguard Policies and Giza North Power Project Triggerability Table 2 : Key Findings of the Consideration of Alternative Sites Table 3 : Environmental, Health and Safety Issues Relating to Construction and Operation of Giza North Power Project Table 4 : Environmental Impacts and Environmental Guidelines Table 5 : Institutional Arrangements for Giza North Power Project Table 6 : Construction Impact Mitigation, Monitoring and Management Measures Table 7 : Operational Impact Mitigation, Monitoring and Management Table 8 : Transmission System Impact Mitigation, Monitoring and Management Table 9 : Summary of Implementation Cost of the ESMP Table 10 : Monitoring Program for Ambient Air Quality, Noise and Vibration Table 11 : Monitoring of the Aquatic Environment During Operation Table 12 : Key Environmental Issues Associated with the Development of the Proposed Power Plant Identified During Local ESIA and RPF Consultation Table 13 : Recommended Training Required for the PMU/EMS List of Figures Figure 1 : Location Map of the Proposed Site within the Egyptian Context Figure 2 : Location Map of the Proposed Site within the Giza Governorate Context (before sparation of the 6th of October ex-Governorate) Figure 3 : Landsat Image of the Wider Delta Area Showing the Proposed Site of the Giza North Power Plant Figure 4 : Landsat Image of the Wider El-Kata Area Showing the Proposed Site of the Giza North Power Plant Figure 5 : Locailzed Map of the Proposed Site Figure 6 : Markaz Imbaba Region Master Scheme, 2009 Figure 7 : General Layout of the Giza North Power Plant and its Easments Figure 8 : Giza North Air Quality Monitoring Locations Figure 9 : Environmental Department (ED) within the Organizational Structure of Giza North Power Plant Figure 10 : Environmental Management Staff (EMS) within the Project Management Unit (PMU) ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 9 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP GIZA NORTH 3 x 750 MWe GAS-FIRED COMBINED CYCLE POWER PROJECT Environmental and Social Impact Assessment EXECUTIVE SUMMARY 1. INTRODUCTION 1.1 Background 1. Engineering Consultants Group (ECG), a private consulting firm (Egypt) was commissioned by the Egyptian Electricity Holding Company (EEHC) / Cairo Electricity Production Company (CEPC) to prepare the technical documents and procedures required by the World Bank Group (WB) and other Development Banks concerning the Environmental and Social Assessment of the Giza North Power Project. 2. EEHC is seeking financial assistance from the WB for the construction and operation of this 3x750 MWe, dual fuel Combined Cycle power plant. The proposed plant is designated as a Category A project under WB rules and a Category C project under the Egyptian environmental regulations and therefore requires a full Environmental Impact Assessment. Financing from WB and other Development Banks is conditional upon obtaining the environmental clearance from both the Egyptian regulatory authorities and the International & Regional Banks, i.e. the WB & other Development Banks. 1.2 Project Overview 3. Cairo Electricity Production Company (CEPC), a company incorporated in Egypt and affiliated to the Egyptian Electricity Holding Company (EEHC) proposes to construct and operate a new combined cycle power plant at Giza North, which is along the El-Rayyah El-Beheiry and about 30km north west of the Cairo city on the eastern coast of the El-Rayyah El- Beheiry. The site is within an existing piece of land purchased on 7th June 2009 by CEPC from the land owner Mr. Mohamed Galal Mohamed Kandil, who was offering the land for sale. The overall proposed site area is approximately 295,000 m2. 4. The proposed power plant is a 2,250 MWe Combined Cycle Gas Turbines (CCGT) comprising three 750 MWe modules, each module will include three gas turbines, each with a nominal electricity generating capacity of 250 megawatts (MWe) and three heat recovery steam generators (HRSG) feeding one steam generator with a nominal electricity generating capacity of 250MWe, which will be known as Giza North Power Plant. The overall generating capacity of the power plant will be 2,250 MWe. The power plant is ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 10 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP intended to be operational by the year 2012/2013. The power output from the proposed plant will be sold to the Egyptian Electricity Transmission Company (EETC). 5. The power plant will utilize natural gas as its primary fuel, and also have the capability to operate using sollar (light fuel oil). The ability to "dual- fuel" the power plant (with natural gas or sollar) will provide security of electricity supply in the event that gas supplies are unavailable for any reason. In addition, a small emergency generator, for the plant safe shut down, operating on sollar oil (light fuel oil) will also be provided on-site to drive key items of equipment within the power plant in the event of a power supply failure. 6. The power plant will incorporate a direct (once through) cooling system using water abstracted from the El-Rayyah El-Beheiry. The abstracted water will also be used, following pre-treatment demineralization and desalination, to provide process water make-up in the boiler system. Potable water supplies will be drawn from the potable water network feeding near villages around the power plant site. 7. The main demand for water is due to the direct cooling system. The use of a direct cooling system maximizes the electrical efficiency of the power plant and, after use, virtually all of the water will be returned to the El-Rayyah El-Beheiry at a slightly elevated temperature compared to the abstraction. No evaporative cooling towers are required, hence there is no opportunity for water drift or the formation of visible plumes of water vapor or ground fogging. 8. Canal water will be used as non-contact cooling water and for process water following desalination. Canal water will be pumped through a piping system running underground for water intake whilst heated cooling water will be returned to the canal via a discharge piping system running underground, too and released approximately on the verge of the canal bank. 9. A wastewater treatment facility on the site will treat liquid wastes and produce an effluent suitable for discharge into the canal. All oil waste effluents will be collected into a separate network and sent to an oil separator, then disposed of by petroleum company. 10. The Giza North site is located on the eastern bank of the El-Rayyah El- Beheiry (El-Beheiry Canal), which is a part of the sub-branch of the Rosetta Branch of the Nile River. The site is located approximately 30 kilometers northwest of Cairo City and just along the Manshyyet El-Qanater / Etay El- Baroud Regional Road, which runs parallel to the El-Rayyah El-Beheiry. The site is bordered to the North by a fodder factory within a cultivated land and consists of flat agricultural land approximately 295,000 squared meters, out of which approximately 125,000m2 are allocated for the facilities of the project. The remaining 170,000m2 has been set aside for future uses as a lay down area during construction and plant landscaping during operation. 11. The site is bordered to the south by agricultural areas. Construction laydown, as mentioned, is planned to be accommodated within the Giza North ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 11 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP project land on, therefore, the proposed site. The site of the proposed power plant is shown on Figure 1. Also, Figure 2 depicts this location within the context of the 6 of October and Giza Governorates. Figure 3 illustrates a landsat image (general view) of the proposed site land. 12. Table 1 of this E.S. Report presents environmental, health and safety issues relating to construction and operation of Giza North power project. 13. The key Environmental Issues associated with the development of the proposed power plant, identified during local ESIA and RPF scoping and consultation, are summarized in Table 12, page 84 of this E.S. Report, under "Public Consultation and Disclosure", and these issues were subsequently taken into account in the preparation of ESIA documentation both for local permitting requirements and this ESIA report. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 12 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 1 Environmental, Health and Safety Issues Relating to Construction and Operation of Giza North Power Project Potential Impacts During Subject Area Potential Impacts During Operation Construction Air Quality Dust from construction activities. Impacts of emissions from stacks on Traffic-related air quality impacts. ambient air quality. Traffic-related air quality impacts. Global warming potential. Aquatic Environment Control and management of site Thermal water discharge. drainage. Water requirements for power plant Wastewater discharge. operation. Sewage disposal and foul Discharge of process and wastewater. drainage. Operation of drainage systems on site. Discharge of storm water, sewage and drainage. Noise and Vibration Noise from construction activities. Noise from power plant operations on surrounding land uses. Land Use, Land use on site. Land use on site. Landscape and Land use in the surrounding area. Land use in the surrounding area. Visual Issues Effects of construction activities on Effects on landscape character. landscape character. Visual impact of the power plant and Visual impact of construction operation activities. activities. Soils, Geology and Effects on soils and geological Soil contamination. Hydrogeology features. Effect on groundwater. Soil contamination. Effects on groundwater. Flora and Fauna Loss of habitat or species due to Disturbance or damage to adjacent landtake. habitat. Disturbance or damage to Effects of structures on bird migration adjacent habitat of species. routes. Traffic Traffic conditions/disruption to Traffic conditions/disruption to road road users. users. Traffic-related air quality. Traffic-related air quality impacts. Traffic-related noise. Traffic-related noise impacts. Major Accident Risk to third-party hazardous Risk to third-party hazardous industry. Hazards industry. Risk to power plant of third-party hazardous industry. Natural Disaster Seismic risk. Seismic risk. Risk Flood risk. Flood risk. Solid Waste Contamination of soils and water. Contamination of soils and water. Management Hazards to workers health. Hazards to workers health. Accident risks. Accident risks. Occupational Health Accidents. Accidents. and Safety Effects on health of workforce. Effects on health of workforce. Safety at work. Safety at work. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 13 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 1 Location Map of the Proposed Site within the Egyptian Context ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 14 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 2 Location Map of the Proposed Site within the Giza Governorate Context ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 15 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 3 Landsat Image of the Wider Delta Area Showing the Proposed Site of the Giza North Power Plant ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 16 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 2. THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2.1 Contributors to the EIA Report 14. The Environmental and Social Impact Assessment (ESIA) report is prepared by ECG, a private consulting firm (Egypt), based on many baseline studies undertaken by independent national and international consultants and on information provided by EEHC, CEPC and their sub-contractors. Public consultation activities are undertaken by ECG and EEHC in conjunction with CEPC. The ESIA report draws heavily on the environmental and social assessment documentation prepared by group of local and international multidisciplinary consultants and submitted to ECG, for preparing the ESIA report for local permitting purposes and financing requirements. All such documentations were reviewed by ECG and cleared for inclusion in this report. Most of the relevant local permits for the construction of the power plant have now been received (Further details of the relevant local permits are available in Section 2.3.1 of the main ESIA report). 2.2 Scope of the ESIA Report: Legal and Administrative Framework 2.2.1 Government of Egypt Requirements 15. Beginning in the 1950s, the Government of Egypt has promulgated several laws and regulations concerning protection of the environment. 16. The Egyptian standards have been drawn from the range of provisions in the following documents: ï‚· Law 4/1994 and the Prime Minister’s Decree No. 338 of 1995, which promulgates the Executive Regulations of Law 4. ï‚· Amendment to the Law 4/1994 promulgated by the Prime Minister's Decree No. 1741 of 2005 for modifying some executive regulations of the Decree No. 338 of 1995. ï‚· Law 9/2009, which modifies some provisions of the Law 4/1994. ï‚· Law No. 93 for 1962 regarding the drainage of liquid wastes, particularly sanitary drainage. ï‚· Law of Labor No. 12/2003. ï‚· Law No. 38/1967 amended by Law No. 31/1976 on public cleanliness and collection and disposal of solid waste. 17. Law 4/1994 and Law 9/2009 require that, for establishments requiring licenses, an environmental impact assessment must be prepared and submitted to the Egyptian Environmental Affairs Agency (EEAA) for review. The environmental impact assessment must be submitted to the EEAA by “the Competent Administrative Authority (CAA) or the licensing authorityâ€? for the project in question. For the Power Plant Project, the Competent Administrative Authority is the 6 of October ex-Governorate. 18. The 6 of October ex-Governorate will send the EIA to EEAA for review and provide its opinion within 60 days. Once EEAA has approved the project, ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 17 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP a license to proceed can be issued. No additional environmental or social clearances are required other than the EIA approval to proceed with the project activities. The law requires that any new project should comply with all the relevant articles pertinent to environmental attributes, which could be impacted from project activities. 19. Egyptian EEAA regulations specify the technical scope or contents of an environmental impact assessment. As a matter of practice, environmental impact assessments for power plant projects typically have a scope and organization similar to World Bank environmental assessments. 20. In addition to environmental impact assessment requirements, the Government of Egypt has established air pollution and water pollution limits applicable to the Power Plant project. These limits are discussed in Chapter 6, alongwith the actual air and water pollution levels expected from the Power Plant. 2.2.2 World Bank Guidelines and Safeguard Policies 21. The World Bank includes environmental impact assessment as an integral part of the evaluations it performs before financing a proposed project. The World Bank’s Operational Policy 4.01 (October 3, 1991 and its updates, 1999) provides guidance on the types of assessments that should be performed for different types of projects, and on the scope and content of those assessments. According to Operational Directive 4.01, thermal power plant projects require a full Environmental Assessment (EA). 22. World Bank Environmental Safeguard Policies provide 10 potential issues that may need to be considered in an EA, depending on the specific characteristics of each project. Table 2 summarizes the expected triggerability of the potential Safeguard Policies for the Giza North Power Plant Project. The Safeguard Policies identified as “triggerableâ€? are those which may be triggered and thus considered “Requiring Managementâ€?. When the detailed design of the Giza North Power Plant has been determined, the CEPC should prepare project-specific plans to manage these potential impacts. 23. No safeguard policies were triggered except for the Environmental Impact Assessment and the Involuntary Resettlement. Table 2 shows potential World Bank environmental Safeguard Policies and Giza North project triggerability. The table justifies the triggerability or lack thereof for WB Safeguard Policies. 24. Annex B to Operational Directive 4.01 provides an outline of the information that should be included in a full EA. This Environmental and Social Impact Assessment follows the scope of Annex B. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 18 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 2 Potential World Bank Environmental Safeguard Policies and Giza North Power Project Triggerability No. Safeguard Policy Triggered? Justification Policy 1. Environmental Yes ï‚· This policy applies to all projects requiring a Category A Assessment Environmental Assessment Under OP 4.01. ï‚· All environmental and Social aspects included in Giza North project are adequately examined. ï‚· Giza North project is not likely to have significant potential (reverse) environmental risks & impacts in its area of influence (impacts on the natural environment: air, water & land; human health & safety; physical cultural resources; and transboundary and global environment concerns). 2. Forest No ï‚· No forest areas exist. 3. Involuntary Yes ï‚· This policy applies to all projects triggering OP 4.12. Resettlement ï‚· The final location of all sections of the transmission lines, which will evacuate power generated by the Giza North power plant is not yet fully firm. These transmission lines will include the following: A. Connection to the 220 kV grid: ï‚· Construct four circuits 220 kV underground cables Abo- Ghaleb / Giza North with length 5 km. ï‚· Construct 220 kV double circuit O.H.T.L–Ashmoun/ Giza North 220 kV with length about 10 Km. B. Connection to the 500 kV grid: ï‚· Construct Giza North substation 500 /220 kV with 2x500 MVA transformers. ï‚· Release 500 kV (O.H.T.L) Samallout 500 / Cairo 500 from Cairo 500 S/S side and extending it with a length of 1x35 km to Giza North 500 S/S to become Giza North 500 / Samallout 500 with a length about 244 km. ï‚· Construct 500 kV single circuit (O.H.T.L) Cairo 500 / Giza North 500 with length about 35 km. Also, the final location of the gas connection is not determined yet. Land take or resettlement may be associated to the power interconnecting lines as well as gas pipeline connection. The ESMP will be revised after exact routes for both the transmission lines and gas connection are available. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 19 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 2 (Contd.) Potential World Bank Environmental Safeguard Policies and Giza North Power Project Triggerability No. Safeguard Policy Triggered? Justification Policy 4. Indigenous No ï‚· The project does not affect the indigenous peoples in the Peoples project area. 5. Safety of Dams No ï‚· The project does not involve construction of a large dam. ï‚· The project is not dependent upon an existing dam. 6. Pest management No ï‚· Procurement of pesticides or pesticide application equipment is not envisaged. ï‚· The project will not affect pest management in any way. 7. Physical Cultural No ï‚· Physical cultural resources are adequately examined. Resources ï‚· The Giza North project is not likely to have any significant impact on physical cultural resources. 8. Natural Habitats No ï‚· Natural Habitats are adequately addressed and examined (in Sections 5.5, 5.6 and 5.7). ï‚· The Giza North project is not likely to have any significant impacts on natural habitats. 9. Projects in No ï‚· The CEPC/EEHC is not involved in any disputes over an Disputed Areas area with any of its neighbors. ï‚· The project is not situated in a disputed area. ï‚· Any component likely to be financed as part of the project is not situated in a disputed area. 10. Projects on Yes The impact of the project on the Canal Water, which is a branch International of an international waterway, the Nile River as per the Bank’s Waterways policy on projects on international waterways (Operational Policy 7.50) is addressed in the following topics: ï‚· Type of cooling system. ï‚· Source of water abstraction (surface water and ground water). ï‚· Pre-treatment of abstracted water before use inside the plant. ï‚· Water requirement per day for - (i) industrial cooling; (ii) processing or cleaning; and (iii) for domestic consumption by facility staff. ï‚· Water discharge per day from - (i) cooling/heating system, blow downs; (ii) storm water; and (iii) from use in toilets; floor cleaning, colony etc. ï‚· Point of discharge of water from power plant - directly into the water body. ï‚· Amount of discharged water from power plant - (i) untreated directly into water body and (ii) treated directly into the Nile River. ï‚· Average seasonal flow of water in the river water cum/hr (seasonal variation - minimum and maximum). ï‚· Average characteristics of water in the river (pH, total dissolved solids; suspended solids; chloride; sulfate and metals). ï‚· Average anticipated characteristics of discharge from (i) cooling system and (ii) from colony and non- industrial/process facility. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 20 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 2 (Contd.) Potential World Bank Environmental Safeguard Policies and Giza North Power Project Triggerability No. Safeguard Policy Triggered? Justification Policy ï‚· Information on mixing zones at the point. ï‚· Information about presence of fishes and other aquatic species in the Canal including fish catch etc. ï‚· Distinguishment between the consumptive use of water (abstracted water that is not returned back to the source of abstraction) and non-consumptive use (abstracted water that is returned back to the source of abstraction. Main answers of the above topics are given in the ESIA Report per One Module as follows: 3 ï‚· Drinking water : 8.33m /hr (1) (totally consumed) (2) 3 ï‚· Service water : 31.25m /hr 3 (10.7% consumed = 3.34 m /hr and 89.3% (3) 3 recycled = 27.91 m /hr) 3 ï‚· HRSG make – up water : 18.75 m /hr (totally recycled) 3 ï‚· Cooling water : 46,800 m /hr 3 (0.34% consumed = 159.12 m /hr and 99.66% 3 recycled = 46,640.88 m /hr) 3 ï‚· Fire fighting water : 26.04 m /hr (totally consumed) 3 ï‚· Total water usage : 46,884.38 m /hr 3 3 (consumed = 196.84 m /hr, recycled = 46,687.54 m /hr ) 3 ï‚· Cooling water abstracted from the Canal (13m /sec. per 3 module, i.e. 46,800 m /hr) is returned totally back to it. Actual water consumption is less than 0.35% of the abstracted water. ï‚· No disturbance to the Canal flow is expected either upstream or downstream. ï‚· Hydrological/hydraulic study is carried out and the study revealed that no impact is expected and the mixing zone is o limited to 50-70m distance with 5 C above ambient, which is o diluted to 3 C at a distance between 100 and 150 m with full compliance with Egyptian Law 48/1982 and WB regulations. ï‚· All waste water is treated. Water treated directly into 3 waterbody: 120-220 m /hr. ï‚· MWRI is in full agreement with EEHC regarding its plan for water abstraction. Average seasonal flow of water in the Canal is as follows: 3 ï‚· Minimum flow (Winter time): 113.5 m /sec. at a MSL of 12.8m (11.25% of the Nile total). 3 ï‚· Dominant flow (Average time): 231.5 m /sec. at a MSL of 14.0m (5.63% of the Nile total). 3 ï‚· Maximum flow (Summer time): 312.5 m /sec. at a MSL of 14.8m (4.17% of the Nile total). ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 21 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 25. In addition to environmental impact assessment guidelines, the World Bank has established guidelines concerning air pollution and water pollution form thermal power plants (Pollution Prevention and Abatement Handbook- Part III (July 1998)). The guidelines were officially published in 1988; since then, several sets of revisions have been proposed, most recently on March 22, 1996. The 1988 and proposed 1996 guidelines are discussed in Chapter 6, along with the actual air and water pollution levels expected from the Power Plant. Also, the most recent updates of the World Bank Guidelines, issued in 2007 and in December 2008 have been considered. 26. World Bank’s Pollution Prevention and Abatement Handbook-Part III (July 1998) also, provides with principles of industrial pollution management, monitoring and air emission & effluent discharge requirements presented in the industry Guidelines including Guidelines for New Thermal Power Plants. 27. Public Consultation Process has been designed in accordance with World Bank Guidance for the Preparation of a Public Consultation and Disclosure Plan (January 1996); 28. The ESIA has assessed the impacts of the construction and operation of the New Giza North Power Plant and has also considered the cumulative air quality impacts of the plant and other existing sources in the project area, including the small and medium sized local manufactures. Consideration has also been given to the operation of the transmission line and other outside facilities, including natural gas pipeline, which will feed the power project with gas fuel. The ESMP will be revised after exact route of both transmission lines and gas connection are available. Permits will be required from the relevant Competent Administrative Authorities. 29. The ESIA report presents the full assessment of the environmental, social, health and safety impacts of the Giza North power plant. This Executive Summary presents a short resume of the findings of the ESIA report. For further details, reference should be made to the full ESIA report. 3. GENERAL SETTING OF THE SITE: DESCRIPTION OF THE ENVIRONMENT 30. The proposed power plant site is located on the eastern bank of the El- Rayyah (Canal) El-Beheiry, a main branch of the Rosetta Branch of the River Nile, approximately 40 km northwest of Cairo City, and at the kilometer 20 southeast El-Khatatba along the immediate side northeast the Mansheyyet El- Qanater/Itay El-Baroud Road, which runs parallel to the El-Rayyah El-Beheiry. The site is within the administrative boundary of the 6th of October ex- Governorate and its Markaz of Imbaba & Menshat El-Qanater. The site, also, is within the El-Kata agricultural complex, an area being developed for agricultural use. The area surrounding the site is locally known as the El-Kata area. The general site location is given in Figure 4. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 22 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 31. For the purpose of defining the study area for this ESIA, the assessment has focused on an area stretching 15km to the north, west and south of the site and across the El-Rayyah El-Beheiry, whilst also taking into consideration wider regional issues where relevant. 32. The site is situated in the heart of the cultivated lands. It forms the flat area which is a part from the Nile Delta plain. Many small villages (Ezzab / Kafr) are littered around the area. 33. The site is located a small distance to the immediate north of the existing poultry farm at km 22 El-Khatatba and 5 km north west Ezbet Sayyed Ibrahim, the nearest residential community to the site. The project site is owned by the Cairo Electrcity Production Company (CPEC), an affiliate company to the Egyptian Electricity Holding Company (EEHC), and consists of flat land measuring approximately 337m by 876m with a total allocated area of 275,000m2. This includes land required for building the power plant. A large land area (about 60 Feddans) on the site is covered with fruit trees (mangoes, tangerine), palm trees and cultivation of wheat and vegetables. The site is flanked on three sides (west, north and east) by agriculture lands with similar land use. The main road runs parallel to the west southern side of the site connecting to the city, Sixth of October, which is 25km west with a reported population of over a million people. The site has a small office building currently being used as a rest house. The site is surrounded by a barbed wire fence along the boundary and display boards announcing that the site is being proposed for construction of a power project. The site has a large ground water well, 50m deep, connected to a 75 HP pump, which reportedly runs 6 hrs every day to supplement water supply from the adjoining canal. 34. The entire land area reportedly belongs to one owner (Mr. Mohamed Galal Mohamed Kandil) from whom the CEPC purchased this land in February 2009 at a commercially negotiated value 37 Million Egyptian Pounds. To the north of the site, the nearset settlement is 5-6 km northwards at village El-Kata with a population of over 7000 people. The process of selecting the current site was based on consideration of 2 other alternative site options. The other site options were rejected for a variety of factors, including parcel size, price and proximity to road, water, transmission lines and gas. Figure 5 shows localized map of the proposed site area. 35. The proposed site and the land to the surroundings is flat. The topography of the site is described in more detail in Sections 5.2 and 5.8. 36. Across the main regional road from the site there is the El-Beheiry Canal which will serve as a source for the power plant’s condenser cooling water intake via a once-through cooling system and final discharge. 37. Potable water to the plant will be provided through the water supply network of the nearest village area reaching to the site, supplemented by new groundwater wells. Existing land uses surrounding the site are described in more detail in Section 5.8. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 23 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 38. The area is dissected by a system of irrigation and drainage. The main irrigation canal is the El-Rayyah El-Beheiry Canal. The width of this canal is about 50 m and its depth ranges from 4.5 m to 5 m. The canal contains aquatic habitat as same as the river Nile in this regions. 39. The surface water system comprises the River Nile Rosetta Branch. The irrigation network generally starts from the Rosetta Branch, and El- Rayyah El-Beheiry Canal. 40. The Rosetta Branch provides fresh water to El-Rayyah El-Beheiry Canal for domestic and irrigation demands. It also provides fresh water for various agricultural applications and discharges the rest of fresh water in the Mediterranean Sea for balancing pressures of erosion and salt water intrusion in the coastal region. 41. The water quality in Rosetta Branch is generally fair. It was estimated (by Awad and Yousef, 2002) that the Rosetta Branch receives more than 0.5 million m3/day of untreated or partially treated domestic and industrial wastes and huge amounts of agricultural drainage water. 42. The groundwater aquifer is highly productive. The aquifer is recharged by the infiltration from the irrigation systems and the excess irrigation water. 43. Land cover on the site consists primarily of green cultivation, with dense low and mid-rise growing vegetation. Scattered low-rise type housing residences, agricultural activities and other small-manufacturing and irrigation land uses are located on wider area around the site and in its immediate vicinity and the cultivable nature of the area provides great opportunity for agricultural production. 44. Agriculture activity found at and around the project site showed that only three types of land uses for agriculture purposes are present. The first type includeds areas designated for some trees (orange and mango) cultivation which concentrated at the eastern side of the bank of El-Rayyah El- Beheiry canal. This areas are mainly dependent on the intensive mango and orange plantation trees without introducing any other type of plant in the off season period. 45. Field survey indicated that there are no significant terrestrial or aquatic ecosystems on, or near, the proposed site or aquatic. The ecosystems present are typical of those throughout the western part of the Delta, west of the Rosetta Branch. Moreover, no Beduin settlements or any indigenous groups were observed in, or near to, the project location. A small number of scattered houses were observed in the lands of individual farmers or investors, approximately 3 km south east the project site, these homes are resided by few farmers. 46. Inside the cultivated lands around the site area some farm animals are present as donkey, cattle , sheep and cow. In the wider area around the site, there are some villages inhabited by several aggregations of fishermen and farmers. Most of the villages are concentrated on the eastern side of the El- Rayyah El-Beheiry canal. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 24 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 47. The annual average surface water temperature in the El-Rayyah El- Beheiry site area is 20.7oC, with a range of 12.5oC (recorded in February) to 29oC (recorded in August). The highest monthly average surface water temperatures are 27.5oC in July and 29oC in August. 48. The climate in the study region is one of the mildest climates in the Mediterranean Sea region. Winter temperatures are higher than in any other part of the Mediterranean coast. Generally, this climate, however, gradually changes as one moves south and at about 40 to 50 km inland, merges into Mediterranean Saharian climate. As far the area occupies a portion of the Mediterranean zone, it has a special climate which differs from the inland areas. It is characterized by a comparatively high humidity, frequent dew formation and small diurnal temperature variations. 49. The temperature data collected at Giza North for a 35 year period indicates a maximum monthly-average temperature of 35.3oC in July and a minimum monthly-average temperature of 6.9oC in January. Summertime high temperatures average 35.1oC while winter lows reach 8.1oC. The annual- average temperatures is 21.52oC with record highest and low temperatures of 48 and -1.1oC, respectively. 50. The average amounts of rainfall observed in Giza North site range between 0.0 mm and 4.9 mm. The annual rainfall precipitation is about 22.2 mm. The rainy season begins during the second half of October. December and January are the rainiest months with an average of 4.9 mm/month. Some showers are still observed in March, 2.9 mm/month. 51. Relative humidity does not vary greatly through the year, staying between 50% and 60% at noon and between 60% and 70% in the morning and in the evening. 52. Wind speeds are generally light to moderate with an annual-average speed of approximately 2.66 meters per second and rarely exceed 5.65 m/sec. 53. The Northwest winds prevail with a frequency of 30 – 40%. Winds in the Winter can be strong and stormy. A dry hot south west loaded with sands and dust (Khamasin wind) blows on occasions for three to four days during the Spring. During the Summer, the wind decreases steadily and in September there are many calm days. 54. No archaeological resources are known in this site. Local archaeological authorities have been consulted, where they confirmed that the near area around the site proved that no historic resources exist. 55. The main transport infrastructure linking the Giza North area to the country main ports facilities is principally based on road network. The site is accessible through a major Regional Road from Cairo to El-Khatatba via Delta Barrage. The Qanater / Khataba regional Road and the Cairo / Qanater Road are the main three roads linking the site with the national road network. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 25 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 56. The main national roads connecting sea ports to the Giza North site are: Cairo/ Alexandria Desert Highway and Cairo Alezandria Agricultural Highway from Alexandria port and both of Cairo / Suez desert Highway and Port Said / Suez highway from Suez, Port Said and Damietta ports. 57. The site, also, is accessible via railways network through El-Manashy railway, in the immediate west of the El-Rayyah El-Beheiry canal, parallel to it. 58. The 6th of October Region Master Scheme, 2009 is shown in Figure 6. The proposed land uses around the project site include new urbanized and residential development areas, which discussed in more detail in Section 5.8. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 26 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 4 Landsat Image of the Wider El-Kata Area Showing the Proposed Site of the Giza North Power Plant ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 27 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 5 Locailzed Map of the Proposed Site ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 28 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 6 Markaz Imbaba Region Master Scheme, 2009 [The 6th of October ex-Governorate is planned for developments, which enhance the need for electricity] ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 29 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 4. PROJECT DESCRIPTION 4.1 Overview of the Power Plant 59. The power plant site will occupy an area of approximately 125,000 m2, within a total allocated area of 275,000 m2 trapizoide-shaped piece of land and will include the following main elements for each 750 MWe module: ï‚· Three indoor combustion turbine generator (CTG) units. ï‚· Three outdoor heat recovery steam generators (HRSGs) without supplementary firing. ï‚· One indoor condensing steam turbine generator (STG) unit. ï‚· The project is rated for 750 MWe (nominal) net power generation at ISO conditions of 15 ï‚°C ambient air temperature, and 60 percent relative humidity. ï‚· Each CTG will feed exhaust gases to its respective HRSG. The steam produced from the three HRSGs will feed the STG. ï‚· The primary fuel for the combustion turbines will be natural gas supplied by Owner at 26.0 bar guaranteed at the interface. The secondary fuel for the combustion turbines will be sollar oil (Fuel oil No. 2). ï‚· Power will be generated at the manufacturer’s standard voltage and stepped up through main transformers to be connected to a 220 kV gas insulated switchgear (GIS). ï‚· The power plant is designed to operate as a base load unit with the STG operating in sliding pressure mode. ï‚· Cooling water supply will be provided by an extraction from, and discharge to, the El-Rayyah El-Beheiry Canal. 60. The power plant will include the following main components for each 750 MWe module: ï‚· Gas Turbine 1A. ï‚· Gas Turbine 1B. ï‚· HRSG Unit 2 A. ï‚· HRSG Unit 2 B. ï‚· Steam Turbine Unit 1 A. ï‚· Elec. Bldg. Unit 1 A. ï‚· Elec. Control Bldg. Unit 1 B. ï‚· Main Transformers Unit 1 A. ï‚· Main Transformers Unit 1 B. ï‚· Aux. Transformers Unit 1 A. ï‚· Aux. Transformers Unit 1 B. ï‚· Switchyard Area. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 30 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ï‚· Diesel Generator. ï‚· Switchgear Control Room. ï‚· Stacks Module 1. ï‚· Fuel Gas Receiving/Reducing Station. ï‚· Sollar Oil Unloading Pumps. ï‚· Sollar Oil Storage Tanks. ï‚· Water Treatment Area. ï‚· Circulating Water fire Water Pump House. ï‚· Circulating Water Electrical Equipment Bldg. ï‚· Chlorine Tank/Pump. ï‚· Condensate Water Tank. ï‚· Condensate Water Discharge Structure. ï‚· Condensate Water Seal Well. ï‚· Demineralized Water Storage Tank. ï‚· Waste Water Treatment Plant. ï‚· Administration Building. ï‚· Warehouse/Work Shops. ï‚· Security office. ï‚· Fire Station. ï‚· Hydrogen Generation Building. ï‚· Bottled Gas Storage/Gen. Area. ï‚· Foam Equipment. ï‚· Black Start Facility. 61. The layout and main components for the power plant is presented in Figure 7. 4.2 Process Description 62. The key steps of the generating process of the proposed combined cycle power plant are as follows: ï‚· The main inputs to the generating process consist of natural gas or sollar oil, which will be transported to the station via pipeline (gas) or by trucks (sollar oil). ï‚· Natural gas (or sollar oil as a backup) will be mixed with air at the gas turbine unit compressor outlet and combusted to produce hot high- pressure flue gas, which drives the gas turbine electrical generator. Gas turbine exhaust will be used to generate steam from demineralized water to drive one steam turbine generator. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 31 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ï‚· The steam is cycled from the Heat Recovery Steam Generators through the turbine to a condenser. A direct, once through cooling system, extracting water from, and discharging to the El-Rayyah El-Beheiry, cool the condenser. The condensate is then returned for recirculation within the Heat Recovery Steam Generators. ï‚· The final exhaust gases will be discharged to the atmosphere in accordance with emission standards set by the EEAA. The main by- products from combustion of natural gas are carbon dioxide (CO 2), water vapour (H2O), carbon monoxide (CO) and nitrogen oxides (NOx). Sulfur dioxide (SO2) and particulates, which are typically associated with coal and oil combustion, will not be produced other than in trace quantities during natural gas firing. When sollar oil is used instead of natural gas, SO2 and particulates will also be key emissions from the power plant. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 32 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 7 General Layout of the Giza North Power Plant and its Easments ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 33 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 4.3 Operational Releases from the Power Plant 63. During operation, the key releases into the environment from the power plant will comprise the following: ï‚· Exhaust gases, will be emitted into the atmosphere, normally from the Boilers’ stack as a result of fuel combustion. Emissions from the combustion of natural gas are carbon dioxide (CO2), water vapor, carbon monoxide (CO) and nitrogen oxides (NOx). Sulfur dioxide (SO2) and particulates, which are typically associated with coal and oil combustion, will only be produced in trace quantities during natural gas firing. In emergencies when light fuel oil (sollar) is used instead of gas, SO2 and particulates will however be key emissions from the power plant. ï‚· Heated cooling water will be discharged into the El-Rayyah El-Beheiry via the cooling water discharge structure at a temperature of no more than 8 o C at the point of discharge, which satisfies the requirement of both Egyptian and W.B. standards (see Chapter 2 in the Main Report). Process waste water will be treated and discharged into the discharge system, which includes three pathways: one to the circulating water discharge system (CWDS) and the other to the plantation irrigation network. Any oil and residual solids will be removed before discharge and the pH of discharged water maintained at between 6 and 9. ï‚· Chlorine will be added to the cooling water system to control bacterial and algal growth on various surfaces and in the cooling water intake. The cooling water discharge will contain residual quantities of chlorine at concentrations below the World Bank standard for free chlorine of 0.2 mg/l. ï‚· Small volumes of solid wastes will be segregated, collected and disposed of by licensed waste disposal contractors. 64. The power plant incorporates a range of measures to eliminate or reduce operational releases within its design and layout, such as low NOx combustors in the gas turbines, oil interceptors fitted to the site drainage system and effluent treatment facilities to treat wastewater prior to discharge. As a result, the power plant is designed to meet high environmental standards and comply with the emission limits of the Arab Republic of Egypt and the international / World Bank (Details are comprehensively described in the Main ESIA Report). 5. ANALYSIS OF ALTERNATIVES 5.1 Current Situation (“No Actionâ€? Option) 65. The no action alternative will result in the demand for electricity exceeding supply, with an increasing deficit as demand increases in future years. A lack of a secure and reliable electricity generation and supply system has significant social and economic implications, since it will: ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 34 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ï‚· constrain existing and future economic development and investment through lack of energy resources to meet industrial and social demand; ï‚· restrict socio-economic development through lack of electricity supply, or poor reliability and shortages in electricity supply for domestic users, community and other public facilities and public services; ï‚· inhibit provision of social services, including public health and poverty eradication. 66. As a result, the "no action" option is not a viable or acceptable alternative to the proposed project. 5.2 Alternative Technologies and Fuels 5.2.1 Selection of the Proposed Technology 67. The EEHC has an objective to provide a secure, reliable electricity generation and distribution system for Egypt. A key element in meeting this objective is to establish a diverse range of technologies to avoid over-reliance on any particular fuel or technology, which may adversely affect the ability to provide electricity or meet the fluctuations in demand which occur on a day-to- day or seasonal basis. 68. The EEHC generation expansion plan includes provision of the following: ï‚· gas/oil-fired steam units; ï‚· gas/oil-fired combined cycle units; ï‚· gas/oil-fired simple cycle combustion turbine units; ï‚· pumped storage; ï‚· wind farms; and ï‚· integrated solar-combined cycle generating units. 69. Other possible options include “importing electricityâ€?, “rehabilitation of existing power plantsâ€?, “transmission and distribution investmentâ€? and “IPPsâ€?. These technological alternatives constrained by the following: ï‚· Importing electricity: Egypt is interconnected to Libya and Jordan and is exporting electricity to both countries. Interconnection to Libya has a capacity of 300 MWe, and that of Jordan has a capacity of 350 MWe, which was increased to 450 MWe in 2006. Libya and Jordan are currently paying 4 US¢/kWh for the Egyptian power supply. As they are net importers, there is currently not much scope for electricity imports to Egypt from the interconnected networks. In addition, the cost of electricity in both countries is much higher than that of Egypt, making it an uncompetitive alternative. There is currently no south border connection to Sudan, although there is an ongoing activities in the context of the Nile Basin Initiative (NBI), whereby Egypt could potentially import hydroelectric power starting approximately in 2012, if the price is competitive. However, ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 35 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP considering the abundance of natural gas and thus the low cost electricity provision in Egypt, it will be difficult for imported electricity to be competitive. The same situation stands as for completion of the Syrian interconnection, which entered into operation since Jordanian-Syrian interconnection on 8 March 2000. ï‚· Renewable energy: Current world market cost of wind based electricity is 5.9-7.38 US¢/kWh, whilst is 3.75 US¢/kWh with current grant financing for wind projects, which is higher than the cost from natural gas combined cycle plants (as estimated for the Giza North power project for only 2.249 US¢/kWh). Therefore, renewable energy is not competitive unless further subsidies are provided. ï‚· Rehabilitation of existing power plants: EEHC has concluded that the rehabilitation option is cost effective in seven of its existing power plants, and these sites have already been or will be rehabilitated. However, these efforts are not enough to cope with the growing demand for electricity. ï‚· Transmission and distribution investments: EEHC has developed a transmission and distribution (T&D) development plan and the T&D system is optimized for the current load requirements and generation capacity. To meet the demand growth for the fast track period and medium term expansion, a T&D investment plan has been developed. New electricity generation capacity is required in the network; therefore, strengthening of T&D capacity alone will not replace the need for the generation capacity. Furthermore, T&D losses are at a relatively low level, around 10% on average, and reducing the losses further would not free up the amount of electricity supply required. ï‚· BOOTs/IPPs: Three BOOT projects (650 MWe each) have been built in Egypt in late 1990's and early 2000's. The government is encouraging private sector participation in order to attract private investment. However, given the worldwide reduction in investor’s interest in the power sector, private financing for power generation in the near term is still unlikely. 70. Consistent with the generation expansion plan, the EEHC has stipulated that the Giza North should be gas/oil-fired combined cycle units of a net 3x750 MWe generating capacity. The reasons for the selection of this technology are as follows: 71. The steam cycle (SC) technology, which fires natural gas as a main fuel and mazout as a back-up fuel, has been used for decades in Egypt. The plant efficiency is around 42% with 600 MWe size. The investment cost of Steam Cycle Plant, based on recent worldwide market experience, is around $ 1100-1300/kWe (EPC basis with multiple packages). The application of large scale (750MWe) gas turbine combined cycle (CC) technology, which fires natural gas as a main fuel and diesel fuel as a back-up fuel, has been operational since 2004. Plant efficiency exceeds 55% and the investment cost, based on recent worldwide market experience, is around $760-810/kWe (EPC basis with multiple packages). Given that CC plants show lower investment cost and higher plant efficiency, this is considered a distinguished rationale to justify why the CC technology has been selected for the proposed project. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 36 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 72. Given this rationale, existing and planned generating capacity using gas/oil-fired steam cycle units is already considered sufficient by the EEHC and further reliance on this particular technology is not preferred –for the time being- for reasons of security of supply, response to demand and economics. As shown in Table 3-1, almost 26% of installed capacity in 2007/2008 was provided by combined cycle technology and considered able to accommodate more CC capacities. Also, declared combined cycle additions of Nuweiba on the Gulf of Aqaba has been delayed for unforeseen period of time, which means that the power generation system actually needs to increase the combined cycle capacity by another 750 MWe within the same period. 73. Hence, with the current policy to increase CC to 30-35% in the generation mix (as identified by EGEAS), and with urgent need of supply capacity with load following capability, CC technology has been identified as the most viable option for the Giza North project. This will ensure operational flexibility, network stability, fuel flexibility and local job creation. 5.2.2 Alternative Fuels 74. Natural gas has been selected as the main fuel for the power plant. Compared to other fossil fuel generating technologies, gas-fired combustion turbine generators have a relatively low emissions of carbon dioxide (CO2), moderate emission levels of nitrogen oxides (NOx) and the lowest emission levels (almost traces) of sulfur dioxide (SO2) and particulates. 5.3 Power Plant Design 75. There are a wide variety of potential designs for the proposed power plant. On the basis of the key design features selected for the power plant, together with the adoption of general good practices within its overall design and layout, fuel and chemical storage facilities and pollution monitoring equipment, the power plant minimizes its potential impacts on the environment whilst ensuring safe, secure and efficient operation. Key aspects of the design, which have been compared with alternatives, are as follows: ï‚· the stack has been designed to maximize buoyancy and dispersion of emissions and its height (82 m) exceeds good engineering practice; ï‚· the Gas Turbines will be equipped with low NOx combustors, minimizing emissions of NOx which is the key pollutant associated with combustion of natural gas; ï‚· direct cooling water will be used to maximize generating efficiency, minimizing visual impact, noise emissions and the potential for visible vapor plumes or ground fogging. Alternatives such as cooling towers and air cooled condensers (open, whilst using less water, result in lower generating efficiencies and also result in impacts such as vapor plumes, visual and noise impacts). The availability of water is not considered an issue for this project given the project location on the bank of the El- Rayyah El-Beheiry and the plentiful water source it represents. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 37 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ï‚· cooling water will be supplied from a sustainable water supply, namely the El-Rayyah El-Beheiry, and the intake and outfall structures can be constructed and operated without significant impacts. 5.4 Alternative Sites 5.4.1 Identification of Candidate Sites 76. Three sites were considered for the proposed project, namely Nubaryyah, Kom Hamada and Giza North. Relatively, the Giza North was preferred to Nubaryyah and Kom Hamada sites mainly because of the higher cost for connection to cooling water, make-up water and the gas network, in addition to difficulty of connecting the power plant to the electricity grid due to the distance densely covered with green cultivations to the load centers. 77. The key criteria used in the evaluation of the alternative sites by the EEHC/CEPC were as follows: ï‚· Economic factors: - capital costs; - operation and maintenance costs; - requirement for natural gas; - requirement for cooling water; - demand loads for electricity; and - requirement for electricity transmission lines/sub-stations. ï‚· non-economic factors: - potential environmental impacts; and - site development. 78. Potential environmental impacts have been examined for all sites. Screening level assessment during feasibility study indicated that the level of environmental impacts will be relatively constant for all the three sites. 79. According to the Land-use Map of 6 of October ex-Governorate, the site area of the El-Kata has been designated in early 2009 for some urbanizational developments. Part of the land around has already been assigned to the developed of El-Kata village. As a result, the Giza North on the El-Kata area has been identified eligible as an appropriate location for current and future electricity production facility. 80. Compared to other alternative sites, the Giza North on the El-Rayyah El-Beheiry site was found to be the most effective site for the following reasons: ï‚· Minimal additional infrastructure requirements are needed. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 38 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP ï‚· A workers colony is not required during construction as the power plant will use the local workforce from 6 of October and Giza Governorates and the surrounding towns and villages. ï‚· Desirable benefits for development of the site area. 81. In addition, the power plant will be constructed and operated on a land originally intended to be sold for an activity other than agriculture activity, thus it will not include any land take. Also, the power plant site will bring socio- economic benefits to the wider 6 of October and Giza Region, through employment opportunities, supply contracts and the effects of project expenditure within the local economy. 82. The key findings of the consideration of alternative sites are summarized in Table 3. The consideration of alternative sites by the EEHC/CEPC indicated that Giza North has no significant disadvantages and has several beneficial aspects for other developments in the 6 of October, Giza and Greater Cairo area, and desirable site development characteristics. Therefore, Giza North was selected as the preferred site for the power plant. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 39 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 3 Key Findings of the Consideration of Alternative Sites Site Key Findings Nubaryyah "Greenfield" site, hence a new colony for workers would be required with potential socio-economic conflicts. Extensive infrastructure requirements needed, resulting in higher costs and potential environmental impacts. High Difficulty for interconnection to the national electrical grid due to dense cultivated land all along the proposed routings. High difficulty with connection to the gas network. High purchase cost for the land to be bought for the project site area. Kom Hamada Relative to Giza North site, significant infrastructure requirements needed, resulting in higher costs and potential environmental impacts. Relative to the other three sites, the area available is considerably small and the price is considerably high. High difficulty with connection to the gas network. Giza North Minimal additional infrastructure would be required. Cost-effective site for development (first lowest of the three alternative sites). A workers colony is NOT required as the project will use the local workforce from wider Suez area. No problem at all with gas connection and electrical interconnection. 6. KEY FINDINGS OF THE ENVIRONMENTAL IMPACT ASSESSMENT 6.1 Introduction 83. A thorough assessment of the impacts of the proposed plant has been carried out based on information provided by EEHC, CEPC and their sub- consultants. A combination of quantitative and qualitative assessment techniques, ranging from computer and/or physical modeling for air, water, noise and traffic impacts to ecological and aquatic surveys and visual evaluation, have been undertaken. The results of the assessment work have been coÙ?mpared with the environmental standards set by the Government of the Arab Republic of Egypt and the World Bank, whichever is the more stringent. 84. The following items are examined in the corresponding sub-sections of the ESIA Study Report:  Air Quality;  Aquatic Environment;  Noise and Vibration; ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 40 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP  Flora and Fauna;  Land use, Landscape and Visual Impacts;  Soils, Geology and Hydrology;  Traffic;  Socio-economics and Socio-cultural Effects;  Archaeology, Historical and Cultural Heritage;  Natural Disaster Risks;  Major Accident Hazards;  Solid Waste Management;  Public Health Effects;  Occupational Health and Safety; and  Associated Infrastructure. 85. For each of these items, a concise description and evaluation of the significance of potential impacts of the project is presented in the ESIA study report. Where modeling has been undertaken, a description of the model as well as corresponding maps summarizing the results of the assessment are provided. 86. Where potentially significant adverse impacts are identified, possible mitigation measures are suggested wherever possible, to ameliorate the impact to an acceptable level. Where identified, beneficial or positive impacts/effects of the project are also highlighted. 87. The conclusions of the assessment (see Table 4) are that (with suitable mitigation measures described in Tables 5, 6, 7, 8 and 9) the project is in compliance with the environmental requirements of both the Government of Egypt and the World Bank with respect to stack emissions of the new power plant, ambient air quality, discharge quality and noise. Table 1 provides with a summary of anticipated impacts in relation to the Egyptian and World Bank environmental guidelines for stack emissions, ambient air quality, liquid effluent and noise. The following discussion highlights some of the key considerations and results of the assessment. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 41 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 6.2 Air Quality Construction Dust 88. Construction activities will result in locally high levels of dust. This may affect nearest receptors or sensitive environments which lie in the immediate boundaries of the power plant. Existing concentrations of airborne dust are already high in this rural area. Potential impacts from dust emissions on site will be significantly reduced by careful management and the implementation of mitigation measures to reduce dust generation. Stack Emissions and Background Air Quality 89. The power plant will burn natural gas as its primary fuel. As a result, the principle pollutant during normal operation will be NOx. During emergency operation (and for not more than 2% of operating time), the burning of light fuel oil will result in emissions of particulate matter and SO2 along with trace amounts of other pollutants. Emissions from the plant will meet Egyptian and World Bank Guidelines. 90. In order to analyze the potential impacts of the plant’s emissions during normal operation (firing gas) on ambient air quality in the project area, dispersion modeling has been undertaken. 91. The assessment indicates that with a stack height of 82m the highest concentrations for each of the averaging periods under consideration (hourly, daily, annual) are found to the north-north-east, north-north-east, and south- south-east of the site, respectively. This is because the winds are exposed to the atmospheric prevailing conditions, although they are overwhelmingly from the north and northwest for most of the time. The maximum hourly average value is 327.3 ï?­g/m3 at 377.0 meters (101.9 m, 363 m), the maximum 24- Hours average is125.6 ï?­g/m3 at 464.3 meters (101.9 m, 453 m) and the maximum annual average is 37.4 ï?­g/m3 at 370.3 meters (101.9 m, -377.1 m). The ambient existing levels of pollutants are dominating the wider area of the Giza North site. Combined effects from the proposed Giza North power project and the surrounding sources for nitrogen oxides (NOx) have been obtained using the background NOx measurements recorded for the Giza North area via the NRC. The maximum total combined 24-hour impact level (136.58ï?­g/m3, including the background level) is under the Egyptian 24-hour limit of 150 ï?­g/m3. The maximum 24-hour impact level of the Giza North power project is 125.6 ï?­g/m3 (excluding the background level). The maximum combined 1-hour impact level, including the highest value during 2006, is 354.75 ï?­g/m3. The Giza North plant contributed 327.3 ï?­g/m3 at this location. (see Figure 8). It is recommended that an air quality monitoring system composed of 2 or 3 monitoring stations will be utilized. The monitoring station equipped with meteorological monitoring system will be located near to, or within, the power plant site, the other one or three stations will be located one down wind within the designated area of maximum predicted pollutant concentration and the other (if any) upwind. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 42 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Figure 8 Giza North Air Quality Monitoring Locations Annual max 464.3 m 370.3 m 24-hrs max. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 43 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 4 Environmental Impacts and Environmental Guidelines Predicted Max. Concentration from Existing Ambient Air Quality Cumulative Air Quality Impact of both the World Bank Impact Area (Effect of All Surrounding Giza North Power Plant and Surrounding Egyptian Standard Giza North Power Plant Facilities) (2) Facilities Cuideline Stack emissions (70% load) (when firing Natural Gas) NOx(1)  50 mg m -3 `` 300 mg m-3 (1) 51 mg m-3 SO2 negligible not specified not specified -3 -3 -3 TSP – General (all sizes)  5 mg m 200 mg m 50 mg m Stack emissions (70% load) when firing Light Fuel Oil (<2% of total annual operating time)) NOx – oil firing  70 mg m -3 300 mg m-3(1) 152 mg m-3 SO2 – oil firing  700 mg m -3 3,600 mg m-3 N/A -3 -3 -3 TSP – General (all sizes)  5 mg m 200 mg m 50 mg m Ground Level Concentration (when firing National Gas) -3 -3 -3 -3 NOx – 1 hour 327.3 ï?­gm 354.75 ï?­gm 354.75 ï?­gm 400 ï?­gm - -3 -3 -3 -3 -3 NOx – 24 hours 125.6 ï?­gm 136.58 ï?­gm 136.58 ï?­gm 150 ï?­gm 150 ï?­gm -3 -3 -3 -3 NOx – 1 year 37.4 ï?­gm 39.59 ï?­gm 39.59 ï?­gm - 100 ï?­gm -3 -3 -3 SO2 – 1 hour Trace 4.25 ï?­gm 4.25 ï?­gm 350 ï?­gm - SO2 – 24 hours Trace 1.70 ï?­gm-3 1.70 ï?­gm-3 150 ï?­gm-3 150 ï?­gm-3 SO2 – 1 year Trace 0.34 ï?­gm-3 0.34 ï?­gm-3 60 ï?­gm-3 80 ï?­gm-3 PM10 – 24 hours(3) Trace 210 ï?­gm-3(3) 210 ï?­gm-3 150 ï?­gm-3 150 ï?­gm-3 PM10 – 1 year Trace 42 ï?­gm-3 42 ï?­gm-3 70ï?­gm-3 50 ï?­gm-3 Liquid Effluent pH 6-9 6-9 6-9 BOD <30 mg/l 30 mg/l - Chromium - 0.50 mg/l 0.5 mg/l Copper <0.5 mg/l 1 mg/l 0.5 mg/l Iron <1 mg/l 1 mg/l 1.0 mg/l Zinc <1 mg/l 1 mg/l 1.0 mg/l Oil and Grease <5 mg/l 5 mg/l 10 mg/l Total Suspended Solids (TSS) <30 mg/l 30 mg/l 50 mg/l Residual Chlorine (total)(4) <0.2 mg/l - 0.2 mg/l (4) Temperature Increase (oC) <8oC at the point of discharge and (max. absolute temp 35oC at the o o <3 C at edge(5)of <3 C within 100 m. point of discharge. Mixing zone up mixing zone to 5oC above ambient. Noise (6) Daytime (max.) Max. <54.6 dB(A) 65 dB(A) 55 dB(A) Night time (max.) Max. <54.6 dB(A) 55 dB(A) 45 dB(A) (1) Egyptian standards for NOx are expressed in terms of NO2. (2) Ambient air quality monitoring results measured by the NRC air quality monitoring equipment in Giza North area during September 2009. (3) The PM10 concentrations resulting from the power plant itself only is traces. (4) “Chlorine shockingâ€? may be preferable in certain circumstances, which involves using high chlorine levels for a few seconds rather than a continuous low level release. The maximum value is 2 mgl-1 for up to 2 hours, which must not be more frequent than once in 24 hours (and the 24 hour average should be 0.2 mg/l). (5) The effluent should result in a temperature increase of no more than 5oC at a distance less than 100m from the point of discharge where initial mixing and dilution take place. Where this zone is not defined 3oC at a distance, 100 m from the point of discharge is used when there are no sensitive aquatiÙ?c ecosystems within this distance. (6) There are no sensitive receptors for noise within 150m of the power plant. The area has been categorised as “Residential-Commercial areaâ€? with respect to Egyptian ambient noise standards and “commercialâ€? with respect to World Bank guidelines. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 44 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 6.3 Aquatic Environment 92. Cooling water and process water for power plant operation will be drawn from the El-Rayyah El-Beheiry via an intake structure. The quantity of the cooling water that will be returned back to the El-Rayyah El-Beheiry is about 46,800 m3/sec. per One Module. Process water that will be abstracted from the El-Rayyah El-Beheiry is about 0.34% of this quantity. Potable water will be supplied to the power plant via the El-Kata local potable water system. Cooling water will be returned to the El-Rayyah El-Beheiry via a discharge structure whilst waste process water will be disposed of the El-Kata local sewer system or after treatment via discharge system, which includes three pathways: plantation irrigation network and Circulating Water Discharge System (CWDS). Sanitary waste water will be disposed of through the El-Kata local sewer system or-after treatment- via plantation irrigation network. No ground water or other surface water will be used during power plant construction and operation. The Contractors will be responsible for relevant water/toilet facilities during construction and the need to provide appropriate services will be specified in their contracts. The key potential impacts of the power plant on the aquatic environment will therefore be impacts to the aquatic flora and fauna during power plant construction and operation. 93. The aquatic environment surrounding the project site is characterized by generally fair water quality. The aquatic flora is characterized by poor biodiversity and no sensitive ecosystems. This has been proved by baseline survey undertaken by specialized national experts for the purpose of this ESIA study (see details in Sections 5.5, 5.6 and 5.7 of the Main Report). No commercial fishing occurs in the vicinity of the project, but very limited fishing activity. 94. During construction of the power plant dredging and construction of the intake and discharge structures could lead to potential impacts on physical aquagraphy, water quality and removal of, or disturbance to, aquatic habitats, flora and fauna. Given that the area of impact is very localised, losses are in many cases temporary and field survey data available do not indicate significant or sensitive habitats, the impacts of power plant construction on the aquatic environment are not considered to be significant. In addition, good site management and engineering practices during construction will ensure that any residual impacts are reduced to a minimum. 95. Power plant operation will result in a heated plume of waste cooling water being discharged into the El-Rayyah El-Beheiry. Process water will be disposed of to the discharge system (identified above). All discharges of process water will be treated prior to discharge to ensure that the Egyptian and World Bank waste water quality guidelines are met. Treatment includes neutralization, oil separation, flocculation and filtration. 96. The returned cooling water will be released at a temperature of no more than 8oC at the point of discharge. Thermal modeling of the discharge plume shows that, at max. operational conditions, the point at which the ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 45 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP plume has decreased in temperature to 3oC above ambient at full load 2250 MW, lies at approximately within 100 m from the point of discharge. The mixing zone has been defined by the HRI/MWRI to be 150 m from the point of discharge. 97. The temperature of the returned cooling water at the point of discharge conforms to the Egyptian Standard, and the discharge as modeled satisfies the World Bank standard of a maximum increase of 3oC above ambient at the edge of the mixing zone (100 m from the point of discharge). In addition, the area affected by the highest temperature increases and therefore where aquatic ecology is likely to be most affected, is localized and the aquatic habitats in this area have been found to already be relatively impoverished. Outside this area, marginal increases in the El-Rayyah El-Beheiry water temperature are likely to create new or improved habitats for flora and fauna as has been experienced in all Egypt’s thermal power plants locations. 98. Physical aquagraphy, Giza North El-Rayyah El-Beheiry bankline access, fishing and navigation are not predicted to be significantly affected by the presence of the intake and discharge structures. 6.4 Noise Impacts 99. The construction of the Giza North power plant is expected to generate a maximum noise level of 59 dB(A) during the day at the fence of the power plant and 57 dB(A) at night. These worst-case construction noise levels are both within Egyptian and World Bank(1) guidelines, and for most of the construction periods, the noise levels will be lower than these values. There are no residential receptors within 1000 m of the plant. 100. Construction traffic on local roads will also generate additional noise, however noise levels on local roads predicted for peak construction activity (during 2011-2013) is expected to be only 0.3dB(A) above ambient levels. This magnitude of increase is generally not perceptible to the human ear, consequently no construction traffic impacts are predicted. 101. The potential noise emissions from the Giza North plant during operation have been modeled to provide noise contours in the area around the site. The predicted operational noise levels at the site boundary and at all receptors are below the Egyptian and World Bank guidelines during daytime and nigh-time. __________________________________ (1) There are no World Bank Guidelines for demolition and construction noise, therefore Operational noise guidelines are applied here. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 46 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 6.5 Flora and Fauna 102. No areas protected for their conservation value are located on, or in the vicinity of, the project area. The proposed site itself and the surrounding land is agricultural vegetated with much of the area having been dominated by common cultivars. Given that the potential impacts of construction and operation on power plant area likely to be localized and good site management practices will be implemented, no significant effects are predicted. 6.6 Land Use, Landscape and Visual Impacts 103. The land use at the project site is agricultural land. There is no loss of this land to the power plant development, as this land is offered for sale by its owner, either, for other purposes or for a power generation activity, therefore there is not significant land use impacts due to the Giza North power project. 104. The surrounding land use is generally agricultural. As the land is dominantly cultivated, all existing views will be insignificantly influenced by the power plant and given the surrounding context, the visual intrusion of the power plant could be accommodated. 105. Visual impacts of the power plant from the residential areas to the northwest and southeast are also not expected to be significant given the long distance of their locations from the site and orientation of the facilities. The potential landscape and visual impacts of the project are therefore expected to be properly accommodated. 6.7 Soils, Geology and Hydrology 106. Due to the characteristics of the soils and geology of the site, in particular the lack of any sensitive features, and the mitigation measures proposed as part of the construction and operation of the power plant, no significant impacts are predicted to occur. In addition, preliminary land surface investigations confirmed the site as being uncontaminated. 6.8 Traffic 107. The assessment of traffic and transport covers the changes in traffic conditions in terms of delay and congestion during construction and operation. 108. The greatest potential for traffic impacts to occur arises during a short period at peak construction. There is some potential for increased congestion on the main roads to the power plant, however the impacts will only occur during the peak construction phase and during peak hours. The overall impact is therefore predicted to be insignificant. Mitigation measures will be put in place to reduce the potential for impacts to arise. 109. During operation, a small number of workers and HGVs are associated with operating the power plant and no impacts are predicted to occur. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 47 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 6.9 Socio-economics and Socio-cultural effects 110. It is anticipated that the power plant will provide a net positive socio- economic impact through the provision of employment opportunities and attraction of economic investment into the area. In addition, the use of local labor (95% during construction), will maximize these positive impacts through the development of the local skill base and will also generate increased demand for local services, materials and products. 111. In addition to the area specifically designated for the plant, there are large empty spaces next to the power plant site. All activities related to the construction of the new plant will therefore take place within the area belonging to the CEPC, i.e. there will be no off-site activities or associated land acquisition during construction. 112. As indicated in the main document, scientific research has shown that certain species of the fish grow considerably faster in warmer water. 113. The effects on the fisheries of warmer water returned to the El-Rayyah El-Beheiry from similar power plants along the Nile banks are well known. Experience from more than 10 other power plants located on the banklines of both of the River Nile and its branches that have operated in Egypt for a number of years indicates that the overall impacts on fisheries of slightly warmer water actually are positive, and consultations with the fishermen indicate that the catches in these areas have increased rather than decreased. Since this is part-time, small-scale fisheries no statistics are available, but after many years the warmer water around the various points of discharge, is clearly perceived by the fishermen to have positive effects (More details are presented in "consultation with the fishermen" given in Volume III, Annex C). 114. In line with this recognition, discussions have already been initiated between the EEHC and the General Authority for Fishery Development with a view to jointly take advantage of this, e.g. establishing a fry collection station near the edge of the mixing zone. 115. Land expropriation is not likely for the sub-projects, including interconnecting transmission lines and gas pipeline. However, in order to handle any potential future changes, a Resettlement Policy Framework (RPF) is prepared by ECG separately in a stand alone document to be attached with this ESIA report. Fair compensation, if any, will be paid for the right of way according to the Law 63 of the Year 1974 and the recommendations set out in the RPF. The ESMP will be revised after exact routes for both of the gas connection an transmission lines are available. 6.10 Archaeology, Historic and Cultural Heritage 116. No available information was found which identified any archaeological, historic or cultural remains on the site or in the surrounding area. Consequently, no impact is predicted to occur on any known archaeological, historic or cultural resources. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 48 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 117. CEPC have incorporated mitigation measures into the construction program to ensure that any potential finds of significance are recorded and are accorded the required protection in consultation with Supreme Council for Antiquities. 6.11 Natural Disaster Risks 118. An assessment of the risks to the power plant from seismic activity has concluded that given the engineering measures incorporated into the design of the power plant, the potential environmental impacts of a seismic event during power plant operation are not anticipated to be significant. 119. Furthermore the power plant will be designed to conform to the Uniform Building Code Zone 2 seismic criteria, according to US regulations for earthquake. These design criteria are therefore considered sufficient to withstand the level of seismic activity experienced in the area. 120. The risks of flooding during power plant construction and operation were also examined. However, site drainage will be constructed to minimize any risks of contaminated water reaching the surroundings and to properly drain the site, no significant flood risk impacts are anticipated. 6.12 Major Accident Hazards 121. Given the wider land surrounding the Giza North power plant and the measures incorporated into the design of the plant to minimize the risk from fire and explosion, the plant is not anticipated to pose a potential risk of any significance to any third party facilities. 6.13 Solid and Hazardous Waste Management 122. The management of wastes during construction and operation of the power plant will include mitigation measures to collect and store waste on-site, record all consignments of solid or contaminated waste for disposal and periodically audit waste contractors and disposal sites to ensure that disposal is undertaken in a safe and environmentally acceptable manner according to the rules set by Law 4/1994 and the Governorate of the 6 of October. 123. Private sector contractor will be assigned via general bidding process and the contract will include detailed environmental procedures, according to Law 4/1994 and Governorate of the 6 of October regulations, for disposing debris materials. The contract covers all fees required. 124. During construction and operation, all wastes including debris waste, general waste, packaging waste, commercial wastes, raw-water pre- treatment sludge, tank sludge and interceptor sludge will be disposed of by licensed waste contractors according to the rules set by Law 4/1994 and the Governorate of the 6 of October. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 49 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 125. Solid and hazardous waste management is not predicted to cause any significant impacts. 6.14 Occupational Health and Safety 126. With the provision of a high standard of health and safety management on site, construction and operation of the power plant in accordance with good industry practice, the occupational health and safety risks associated with construction and operation of the power plant will be minimized and are not significant. 6.15 Associated Infrastructure 127. All construction related activities will take place within the area belonging to the East Delta Electricity Production Company. The total area is 297,250 square meters have, already, designated for the new plant. In addition to the area specifically designated for the plant, there is large empty space inside the purchased land next to the power plant designated area. All activities related to the construction of the new plant will therefore take place within the area belonging to the Cairo Electricity Production Company, i.e. there will be no off-site activities or associated land acquisition during construction. 128. Transmission lines which will evacuate power generated by the Giza North power plant will add connecting transmission lines to the Egyptian network. Some distance (around 10 km on 220kV and 70 km on 500 kV, too) transmission lines will connect the power plant to existing substations following new routes (Separate ESIA study report has analyzed the impacts and their mitigation measures). Very small pieces of land will be taken against compensation. 129. The power plant will be connected through the following: ï‚· Connection to the 220 kV grid: - Construct four circuits 220 kV underground cables Abo-Ghaleb/ Giza North with length 5 km. - Construct 220 kV double circuit O. H. T. L – Ashmoun / Giza North 220 kV with length about 10 Km. ï‚· Connection to the 500 kV grid: - Construct Giza North substation 500 /220 kV with 2x500 MVA transformers. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 50 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP - Release 500 kV (O.H.T.L) Samallout 500 / Cairo 500 from Cairo 500 S/S side and extending it with a length of 35 km to Giza North 500 S/S to become Giza North 500 / Samallout 500. - Construct 500 kV single circuit (O.H.T.L) Cairo 500 / Giza North 500 with length about 35 km. A shorter connection had also been discussed, but has not been found acceptable as it will likely go through a number of orchards as well as cultivated lands. The proposed option seems to be less intrusive, both in terms of adverse socio-economic impacts and land acquisition challenges. 130. A considerable portion of the proposed transmission routes of both groups of 220 kV and 500 kV TLs with their transmission towers would be footed on dry, unproductive land. The majority of affected land owners seem to have fairly large farms, with average land holdings estimated at 8-10 Feddans. The land required for each tower footing is expected to be maximum 20x20 meters. (this requirement will be almost half for angle towers compared to suspension towers). ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 51 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP The final information related to the location of the associated infrastructure (i.e., transmission lines and substations) is to be determined by EEHC/EETC/CEPC. 131. Also, a new gas pipeline route will have to be identified. Environmental impacts have been considered from the nearest point of supply within the gas network via a separate ESIA study undertaken by GASCo/EGAS. Gas connection will be implemented, where gas pipelines will be buried underground along the identified route. 132. However, since the transmission lines and gas pipelines are likely to require some land acquisition (and possibly resettlement), a Resettlement Policy Framework (RPF) is prepared separately, as part of this ESIA work. The ESMP will be revised after exact routes for both of the gas connection and transmission lines are available. 133. EETC and CEPC will submit Screening Form B to the EEAA concerning the electrical interconnection. No significant impacts are anticipated. 6.16 Global Impacts 134. Natural gas has been selected as the main fuel for the power plant. Compared to other fossil fuel generating technologies, gas fired steam generators have a relatively low emissions of carbon dioxide (CO2), moderate emission levels of nitrogen oxides (NOx) and the lowest emission levels (almost traces) of sulfur dioxide (SO2) and particulates. 135. The greenhouse effect is caused by the build-up of carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O) and chlorofluorocarbons (CFCs) in the atmosphere. Water vapor and ozone (O3) can also act as greenhouse gases. For power generation processes, CO2 is the key emission of concern, as methane and CFCs are not emitted by power plants and none of the other greenhouse gases are emitted in sufficient quantities from power generation to be considered important in terms of the greenhouse effect. 136. The efficiency of the proposed combined cycle power plant is 55-58% with natural gas, with associated CO2 emissions of about 360-420 g/kWh. This compares with the efficiency of a typical steam cycle power plant of 36-45% and CO2 emissions of about 500-520 g/kWh. 137. Emissions of carbon dioxide are estimated to be up to 6,200 kilotonnes per year (expressed as CO2). This assumes that the plant operates for the whole year and consumes around 9 millions m3 of gas per day. The emissions of CO2 from fuel burning in Egypt amounted to around 160,000 kilotonnes in ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 52 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 2008 (Ref: EEAA: Egypt's Second National Communication). Fuel combustion will account for most of Egypt’s CO2 emissions from all sources. Hence, the power plant as proposed will emit up to around 3.7% of the total Egyptian CO2 emissions in 2000. This is an upper estimate as the plant will not operate 100% of the year or at full load 100% of the time. 138. Natural gas, which is the main fuel to be used in the Giza North plant, contains very low concentrations of sulfur or particulate matter, therefore the potential for emissions of SO2 and particulates from the electricity generating process are also very low. Fuel oil however, leads to greater emissions of SO2 and particulates, due to the relatively high sulfur content of these fuels and the generation of ash during their combustion. 139. Natural gas fuel also has the significant benefit over fuel oil of being able to be delivered by an existing pipeline, whereas oil requires delivery to the power plant by road, rail and/or Nile river. The use of a pipeline avoids the potentially significant environmental impacts of road, rail or waterborne traffic and fuel unloading operations at a power plant. The very limited use of fuel oil at the proposed plant does not justify use of a pipeline for this fuel. 7. ENVIRONMENTAL MITIGATION AND MONITORING: THE ENVIRONMENTAL AND SOCIAL MNAGEMENT PLAN (ESMP) 7.1 Enhancement and Mitigation Plan 140. The Environmental and Social Management Plant (ESMP) includes mitigation measures, design of monitoring programs where appropriate, and specification of management measures (including institutional responsibility and training requirements). 141. The mitigation measures represent a synthesis of those measures which are part of the basic power plant design and those that have been recommended in Section 6 of the ESIA report for both the construction and operational phases of the power plant. The mitigation measures discussed in this section are summarized in the following Five Tables, together with respective environmental monitoring and management arrangements. It should be noted that many of the mitigation measures presented below for the construction phase, will be carried forward into plant Operation. 142. All the mitigation, monitoring and management measures proposed below and in Section 8 of the ESIA report (the Environmental and Social Management Plan (ESMP)), will be adopted by the Project Company and imposed as conditions of contract on the contractor and any sub-contractors employed to build or operate any part of the power plant. Since many of the mitigation measures presented are considered an essential, integrated component of the construction and operation works, it is not possible to separate the specific costs of their implementation from the overall construction and operation costs. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 53 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP 143. Mitigation measures introduced into the design and construction phase of the power plant will be carried forward into the operational phase by the CEPC Company. Many of the mitigation measures, as described in Sections 4 and 6 of the ESIA report, have already been integrated into the design of the power plant in order to minimize any operational impacts on the environment. Mitigation measures such as l ow NOx burners, noise silencers and water discharge controls are for example integral to the design of the power plant. 144. The key features of the ESMP relate to air quality, aquatic discharge and implementation of good site management practice. The ESMP is summarized in Tables 5, 6, 7 and 8 which relate to construction and operational phases respectively. Table 9 summarizes the cost of ESMP which will require to be included in the project financial plan. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 54 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 5 Institutional Arrangements for Giza North Power Project Implementation Type and Frequency of Responsibility Monitoring Budget in Issue/Impact Mitigation Measures Schedule Reporting / Monitoring Indicators US$ Implementation Supervision Construction Phase Institutional Establishment of the Project Management Prior to starting construction. Quarterly to EEHC PMU / EMS CEPC Project Manager in Training programs Environmental Quality capacity to address Unit (PMU), including the Environmental Environmental Management collaboration with the quarterly monitoring will start environmental and Management Staff (EMS) (will include 3-4 (EEM) and EEHC Chairman Consultant Site Manager Compliance with ESMP with the commencement of social issues staff members, B.Sc. and/or 5 years high Ongoing training construction phase. technical education), construction phase. Basic training of persons employed to Basic Training operate the monitoring activities. Basic Induction Training Basic induction training for all employees on good construction and site Air quality continuous management practice. monitoring will start 6 months ahead of commissioning. Training since that time is included in air quality monitoring package Training time and cost (included in construction cost) (around US$ 155 k) CEPC responsibility Operation Phase Institutional Establishment of the Project Management Prior to starting operation. Quarterly to EEHC & EEHC PMU / EMS CEPC Project Manager in Training programs Included in air quality capacity to address Unit (PMU), including the Environmental Environmental Management collaboration with the monitoring package environmental and Management Staff (EMS) (will include 3-4 (EEM) Consultant Site Manager Compliance with ESMP social issues staff members, B.Sc. and/or 5 years high Training time and cost technical education), operation phase. Ongoing training (included in operation cost) Basic training of persons employed to (around US$ 20 k) operate the monitoring activities. CEPC responsibility Induction, specific and refresher training for all employees on good operation management practice. Training methods, facilities & manuals Notes: (*) CEPC responsibility: means that training and capacity building activities are included in the company organizational structure and budget. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 55 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementati Monitoring Monitoring Frequency of Management Indicative Cost on Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Air Quality Dust emissions Implementation of good site Before Before Construction Implementation CEPC Project Dust levels Quarterly CEPC/PMU Mitigation caused by practices including: construction and during of Good Site Manager in (TSP, PM10) reporting of responsible for Measures, Construction until 6 construction ï‚· appropriate siting and and during Months ahead of Management collaboration summary results management of Management activities, maintenance of stockpiles of construction practices shall with the NO2, SO2, CO (or more if the air quality time and costs construction Commissioning: be the Consultant Site levels. requested) and monitoring (included in friable materials so as to Initiate baseline air vehicle minimize dust blow; responsibility of Manager submitted to the system. construction movements, and quality survey of main all contractors EEHC and any Submission of costs) transport of ï‚· minimizing drop heights for pollutants, particularly on site under other concerned annual summary friable material transfer activities NO2, SO2, CO, TSP supervision of authority. (e.g. reports to EEHC Baseline Air construction such as unloading of friable and PM10 using third the PMU / EMS EEAA, WB, and any other Quality materials. materials; party measurements on and the etc.). concerned Monitoring: ï‚· construction phase to begin a quarterly basis. Assistant Plant authority. with construction of access During Construction, 6 Manager. roads; Months ahead of Basic training of First construction ï‚· roads will be kept damp via a Commissioning: persons period; third water bowser; Initiate baseline air employed to party monitoring operate and (e.g. National ï‚· roads will be compacted and quality survey of NO2 , maintain the Research graveled if necessary; SO2 , CO, TSP and PM10 using air quality monitoring Center), four ï‚· site roads will be maintained monitors and continue system. times a year until in good order; during 6 months. using continuous ï‚· regulation of site access; CEPC/PMU to monitoring: Three analyzer stations ensure all USS$70K ï‚· sheeting of lorries will be electronically contractors and transporting friable connected to the EEAA subcontractors Second construction materials and ambient monitoring working on site construction spoil; system. are aware of period; 6 months ï‚· enforcement of vehicle speed ESMP and all ahead of limits on unmetalled roads to Measurements and employees are commissioning: <35 km/h. analysis of these given basic Permanent pollutants to be made induction training Continuous on a continuous basis on good Monitoring by a trained staff construction and System-approx. assigned by site US$ 1000- CEPC/GNPP and management 1500K plus submitted to EEHC for practice. management reporting to any time & reporting. concerned authority. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 56 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting / and Training Estimate (US$) monitoring Aquatic Environment Dredging and The following measures will be During Off bankline survey Implementation CEPC Project Actual Quarterly CEPC/PMU to Mitigation construction of taken: construction of undertaken September of Good Site Manager in parameters to reporting of ensure all Measures: the intake ï‚· Construction Method intake and 2009 along 5 profiles Management collaboration be measured. summary results contractors and Management structure and Statement to be produced discharge fronting the site. practices shall with the (or more if subcontractors time and costs water discharge by the Contractor; structures be the Consultant Site requested) and working on site (included in Report to be submitted to the structure. responsibility of Manager. are aware of construction ï‚· dredged areas limited to maintained for later all contractors EEHC and any ESMP and all cost). minimum area required; monitoring and other concerned Increased evaluation during on site under employees are suspended ï‚· disposal of dredged operation. supervision of authority. (e.g. given basic Water quality sediment and sediments to an agreed the PMU / EMS EEAA, WB, induction training measurement pollutant loads, site by Local Government Continuous visual and the etc.). on good costs (between permanent Authority; inspection Assistant Plant construction and US$ 30-45K) loss and ï‚· all works will be made Manager. site During dredging disturbance to clearly visible using flags, management sediment and surface aquatic flora and beacons and/or signals; practice. water will be monitored fauna. ï‚· bank area will be reinstated at four locations (three These mitigation following construction. downstream of the intake and three measures must upstream of the be a condition of discharge) twice a any construction month. contracts commissioned. During construction sampling will be conducted at three sites, unless preliminary monitoring campaign shows strong variations in water quality. Water samples will be tested for temp., PH, COD. BOD, TOC, DO, TSS, oil & grease, residual chlorine and light metals . Sediment will be tested for oil & grease and light metals. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 57 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting / and Training Estimate (US$) monitoring Contamination of Mitigation activities will include the During Continuous Implementation of CEPC Project Fluid effluents Quarterly CEPC/PMU to Management the aquatic following: construction visual inspection Good Site Manager in within the site. reporting of ensure all time and costs environment as ï‚· no discharge of effluents into the will be Management collaboration summary results contractors and (included in a result of El-Rayyah El-Beheiry - all conducted. practices shall be with the Soil erosion. (or more if subcontractors construction construction effluents shall be collected and the responsibility Consultant Site requested) and working on site cost). activities on land removed off site for treatment by of all contractors Manager. Surface water submitted to the are aware of e.g. spillages, approved firms; on site under run-off. EEHC and any ESMP and all disposal of liquid supervision of the other concerned employees are wastes; surface ï‚· development of a site drainage PMU/EMS and Sewage authority (e.g. given basic run-off, exposure plan which reduces flow velocity the Assistant effluents. EEAA, WB, induction training of contaminated and sediment load; Plant Manager. etc.), if required. on good soils (see also ï‚· protection of temporary Earth, mud and construction and under “Soils and stockpiles of soil from erosion by debris site Hydrologyâ€?). using a reduced slope angle depositions on management where practical, sheeting and by roads. practices. incorporating sediment traps in drainage ditches; ï‚· maintenance of well kept construction site. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 58 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) Construction Impact Mitigation, Monitoring and Management Measures(*) Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Noise Increased noise Implementation of good site practices During Monthly Implementation of CEPC Project Noise PMU/EMS will CEPC/PMU to Management in the project including: construction monitoring and Good Site Manager in complaints produce a ensure all time and costs area as a result ï‚· enforcement of vehicle speed supervision by Management collaboration register to Quarterly log of contractors and (included in of the use of limits; CEPC is practices shall be with the identify valid complaints subcontractors construction noisy machinery required to the responsibility Consultant Site concerns. and actions taken working on site cost). and increased ï‚· strict controls of vehicle routing; ensure the of all contractors Manager. to EEHC. are aware of vehicle ï‚· diesel engine construction plant implementation on site under Check validity ESMP and all Third party noise movements. equipment to be fitted with of good site supervision of the using noise Quarterly reporting employees are measurement silencers; management PMU/EMS and measuring of summary results given basic costs (about ï‚· limited noisy construction practices by all the Assistant devices. (or more if induction training US$ 23K) . activities at night; contractors Plant Manager. requested) and on good during submitted to the construction and ï‚· prohibition of light vehicle construction. Auditor (Noise EEHC and any site movements at night; Expert) other concerned management ï‚· use of protective hearing Third party audit, authority (e.g. practices. equipment for workers. conducted every EEAA, WB etc.), if 4 month. required. Flora and Fauna Site Clearance- ï‚· Good site management During Periodic Implementation of CEPC Project Good Quarterly reporting CEPC/PMU to Management Vegetation practices will be observed to construction. inspection and Good Site Manager in conservation No. of floral ensure all time and costs removal and ensure that disturbance of supervision by Management collaboration of floral species conserved contractors and (included in habitat habitats off-site are minimized. CEPC is practices shall be with the wealth. or planted, if any. subcontractors construction disturbance. required to the responsibility Consultant Site working on site cost) ï‚· Specific mitigation measures ensure the of all contractors Manager. are aware of include restricting personnel and implementation on site under ESMP and all vehicles to within construction of good site supervision of the employees are site boundaries, lay down areas management PMU/EMS and given basic and access roads. practices by all the Assistant induction training contractors Plant Manager. on good during construction and construction. site management practices. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 59 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Soils and Hydrology Site clearance, The potential for impacts are largely During Daily visual Implementation of CEPC Project ï‚· site drainage. Quarterly CEPC/PMU to Costs for excavation and dependent on management of the construction. inspection is Good Site Manager in ï‚· access only reporting of ensure all mitigation disposal of construction site and activities. The required to Management collaboration to summary results contractors and measures and material, following mitigation measures will be ensure the practices shall be with the construction (or more if subcontractors management exposure of implemented: implementation the responsibility Consultant Site site areas. requested) and working on site time included in potentially ï‚· development of effective site of good of all contractors Manager. ï‚· spoils. submitted to the are aware of construction contaminated drainage systems; management on site under ï‚· waste EEHC and any ESMP and all costs. soils, spillage or practices during supervision of the materials. other concerned employees are leakage of ï‚· restriction of access only to construction. PMU/EMS and authority (e.g. given basic Any additional construction site areas; ï‚· oily waters. substances on the Assistant ï‚· drainage EEAA, WB induction training features (e.g. land, movement ï‚· monitoring and control of spoil; Plant Manager. pathways. etc.), if required. on good bunding, of equipment ï‚· disposal of waste materials ï‚· potential construction and interceptors etc.) and vehicles on unsuitable for reuse on-site, spillage in site may incur site. (e.g. for landscaping) at operational management additional costs appropriately licensed sites; areas. practices. of between US$ 30-50K ï‚· provision of oil and suspended dependent on solid interceptors; the measure. ï‚· management of excavations during construction to avoid the generation of drainage pathways to underlying aquifers; ï‚· provision of impermeable bases in operational areas to prevent absorption of spillages. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 60 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Traffic and Transport Disruption, noise Standard good practice measures During Monitoring traffic Implementation of CEPC Project Increased Three times per CEPC/PMU to Management and increased will be implemented as follows: construction. entering the site Good Site Manager in congestion month ensure all time air pollution due ï‚· adherence of abnormal load during morning & Management collaboration Quarterly contractors and to increased movements to prescribed evening peaks to practices shall be with the Travel time subcontractors traffic, light loads ensure the the responsibility Consultant Site (compared to reporting of working on site routes, outside peak hours and summary results and abnormal advance publication of implementation of all contractors Manager. reasonable are aware of (or more if loads. movements if required; of good site on site under daily commute) requested) and ESMP and all management supervision of the employees are ï‚· construction shifts will be practices by all PMU / EMS and submitted to the given basic staggered; EEHC and any contractors the Assistant other concerned induction training ï‚· scheduling of traffic to avoid during Plant Manager. authority (e.g. on good peak hours on local roads; construction. EEAA, WB construction and ï‚· transportation of construction etc.), if required. site workers by contract bus. management practices. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 61 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Socio- Economic Environment Positive impacts All activities related to the construction of During Record local PMU/EMS and CEPC Project Workers Editing a special Responsibility of Responsibility of identified. the new plant will take place within the area construction. employment the Assistant Manager in satisfaction as report CEPC/PMU. CEPC. belonging to CEPC, i.e. there will be no off- provided by the Plant Manager collaboration measured by site activities or associated land acquisition during construction. project. with the staff interviews Consultant Site and complaints Transmission lines will connect the Manager. submitted. power plant to existing substations following new routes. Also, a new gas pipeline route will have to be identified from the nearest point of supply within the gas network. However, since the transmission lines and gas pipeline are likely to require some land acquisition (and possibly resettlement), a Resettlement Policy Framework (RPF) is prepared separately, as part of this ESIA work and RPF for Gas Pipeline project is already prepared by local independent Consultant Also, Separate ESIA have been prepared and submitted to the EEAA for both transmission interconnection project (by EETC) and gas pipeline project (by GASCo). The entire labor force will be daily commuters, thus no worker housing or associated facilities will be erected on site during construction. The contractors will be responsible for relevant temporary water / toilet facilities during construction and the need to provide appropriate services will be specified in their constracts. Public and Industry Relations will be maximized through open dialogue between CEPC (through the Assistant Plant Manager who has direct responsibility for EHS Liaison) and local authority, public and industry representatives. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 62 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Archaeology Potential chance The project site does not lie on, or in During Supervision of Construction CEPC Project Chance finds Daily inspection CEPC/PMU to finds of the immediate vicinity of any known construction contractors ensure that all Mitigation archaeological archaeological areas of interest. construction. activities. Manager in (see annex II) workers on site measures remains during collaboration Quarterly are aware of the require construction. If remains are found CEPC is with the reporting of importance of management committed to: Consultant Site summary results archaeological time. PMU/EMS and (or more if ï‚· cease activities and consult the Assistant Manager. requested) and remains and Antiquities authority; Plant Manager must report any Should chance submitted to the potential finds finds occur, ï‚· protection in situ if possible; will allocate EEHC and any responsibilities in immediately. protection & ï‚· excavation of areas where accordance with other concerned excavation could protection not feasible; authority (e.g. add significantly the Chance Finds EEAA, WB Immediate to the cost. ï‚· preparation of a Chance Finds Procedure. etc.), if required. liaison with Procedure and Method Statement. Competent Administrative Authority should a potential find be uncovered. Natural Disasters Flash flooding. Good engineering design will No monitoring Quarterly CEPC/PMU to Relevant costs incorporate the following mitigation During measures are PMU/EMS and CEPC Project ensure that all are included construction. the Assistant Manager in reporting of measures: envisaged. summary results workers on site within the Plant Manager collaboration ï‚· drainage system designed to with the (or more if receive training construction direct flood water from main in emergency costs requested) and preparedness plant areas into the sea and Consultant Site submitted to the direct potentially contaminated Manager. and response EEHC and any procedures. waters through the oil other concerned interceptor. authority (e.g. EEAA, WB etc.), if required. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 63 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Solid Waste Management Good practice measures such as the During Periodic Implementation of CEPC Project Management Quarterly CEPC/PMU to Management following: construction. inspection is Good Site Manager in contract in reports from ensure all time plus costs (1) all waste taken off-site will be required to Management collaboration place management contractors and (< US$ 20K) undertaken by a licensed ensure the practices shall be with the contractor to subcontractors contractor and CEPC will audit implementation the responsibility Consultant Site Functional CEPC and then working on site disposal procedure; of good of all contractors Manager. transfer station. to EEHC. are aware of (2) collection and segregation of management on site under ESMP and all wastes and safe storage; practices during supervision of the These reports employees are (3) recording of consignments for construction. PMU/EMS and are to be given basic disposal; the Assistant submitted to induction training (4) prior agreement of standards for Plant Manager. any other on good storage, management and concerned construction and disposal with relevant authority (e.g. site authorities. EEAA, WB, management etc.), if practices. It is of highest importance that required. final disposal of wastes shall be strictly adhered to environment friendly disposal Contract. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 64 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 6 (Contd.) (*) Construction Impact Mitigation, Monitoring and Management Measures Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting / and Training Estimate (US$) monitoring Occupational Health & Safety Good local and international During Daily inspection Implementation of CEPC Project Management Daily inspection CEPC/PMU to Mitigation construction practice in Environment, construction. is required to Good Site Manager in procedures in ensure all measures will Health and Safety (EHS) will be ensure the Management collaboration place. Quarterly contractors and require applied at all times and account will implementation practices and the with the reporting of sub-contractors management be taken of local customs, practices of EHS Policies, EHS policies shall Consultant Site Workers health summary results for workers on time plus costs and attitudes. Measures include: plans and be the Manager. and safety as (or more if site include of up to US$ 50K ï‚· implementation of EHS practices during responsibility of measured by requested) and reference to the for procedures as a condition of construction. all contractors on no. of incidents. submitted to the requirements of implementation contract all contractors and sub- site under EEHC and any the ESMP and of EHS Plans. contractors; supervision of the other concerned are aware of the ï‚· clear definition of the EHS roles PMU/EMS and authority (e.g. EHS policies and and responsibilities of all the Assistant EEAA, WB, plants. All construction companies and Plant Manager. etc.), if required. employees will staff; be given basic ï‚· management, supervision, induction training monitoring and record-keeping on EHS policies as set out in plant’s operational and practices. manual; ï‚· pre-construction and operation assessment of the EHS risks Contractors are and hazards; responsible for ï‚· completion and implementation ensuring that a of Fire Safety Plan prior to Fire Safety Plan, commissioning any part of the which conforms plant; to NFPA 850, is ï‚· provision of appropriate training prepared and on EHS issues for all workers; implemented ï‚· provision of health and safety prior to information; commissioning of any part of the ï‚· regular inspection, review and plant under recording of EHS performance; supervision of and PMU/EMS and ï‚· maintenance of a high standard the Assistant of housekeeping at all times. Plant Manager. (*) Environmental regulations are to be included in all construction contracts. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 65 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 7 Operational Impact Mitigation, Monitoring and Management Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Air Quality Emissions Mitigation measures have During first three Automatic monitoring The analyzer CEPC Top Stack Continuous Records must be Automatic stack from stack are already been included in the years of operation. of stack emissions for stations will be Management emissions (at Hourly data kept and monitors: not expected to design of the plant and, given NOx, SO2, particulate owned and least PM10, acquisition. summary data included in the exceed CEPC/GNPP’s strict matter and carbon operated by EEHC NOx, SOx and (including any project cost. standards. commitment to use sollar fuel oil monoxide (CO) via test CEPC/GNPP/ Environmental CO). Quarterly deviations from for <2% of operating time, no ports installed in the EMS. Management reporting to Egyptian and Management further mitigation measures are main stacks. & Studies EEHC. World bank time for proposed. Assistant Plant Sector. standards) will compilation of Manager Reports are to be submitted to reports and CEPC/GNPP will however Report be available to the Government performance demonstrate the validity of the introduced to any of the and WB on monitoring: conclusions drawn in the ESIA EEAA as concerning annual basis (or included in report. Install three requested. authorities more frequently operation cost. continuous NOx, SO2, Ambient air (EEAA, WB, if required). Ambient air CEPC/GNPP will demonstrate CO, PM10 & TSP Third party pollutants etc.). quality affected the validity of the conclusions monitoring stations to inspection. concentrations Annual reporting Purchase of by emissions drawn in the ESIA report. If monitor short-term (at least TSP, by CEPC/ Continuous from the power ground level concentrations are concentrations in the PM10, NOx, GNPP/EMS to Monitors (see plant. found to be above local and area predicted to have SOx and CO). Government and construction World Bank standards options the highest impacts on WB etc. (or more management for further mitigation will be humans (as there are frequently if table). discussed. no other sensitive required) environments). The highlighting key analyzer station near or features and within the site comparing Annual servicing, boundaries will include results with air calibration & a continuous monitor quality standards running costs: of meteorological and prediction in included in conditions ESIA report operation cost. (temperature, wind speed, wind direction and mixing heights). The analyzer stations will be electronically connected to the EEAA ambient monitoring system. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 66 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 7 (Contd.) Operational Impact Mitigation, Monitoring and Management Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Aquatic Environment The design of the intake and Lifetime of the Prepare regular water CEPC/GNPP/ CEPC Top Basic Monthly reports Records will be Management Discharge of cooling water structures have plant EMS Management parameters from kept and time for process and already incorporated measures quality monitoring program as per the CEPC/GNPP/ compared on implementation cooling water. to reduce impacts. In addition, including: Assistant Plant EEHC Law EMS to EEHC regular basis of site good site management 1) quality of all water prior Manager. Environmental 48/1982 against Egyptian management practices including the following to discharge Management and Law Continuous and World Bank practices. will be implemented: (continuous & Studies 93/1962 monitoring of standards and included in 1) neutralization, oil separation, monitoring of all Sector. water quality etc. impacts operation cost flocculation and filtration of discharged water for predicted in any contaminated water Monthly ESIA. All costs are temperature and pH, monitoring of included in before discharge to either daily monitoring of light metals and Summary operation cost. plantation irrigation network process water for COD, other pollutants. reports (with any or the El-Kata sewer network TSS, oil & grease and exceptions (if close to the site); residual chlorine and 3-monthly identified) will be 2) no disposal of solid wastes monthly monitoring of monitoring of the submitted to the or waste water into the light metals and other plume. Government discharge structure; and WB etc. on pollutants) Annual annual review 3) regular maintenance of site 2) ambient water quality in monitoring of basis (or more drainage system to ensure the area affected by the benthic frequently if efficient operation; discharge plume (3- environment required). 4) all discharges will comply monthly monitoring of (over a 3 year with local Egyptian and temperature, pH, COD, period). CEPC/GNPP/E World Bank guidelines. BOD, TOC, DO, TSS, oil MS to ensure Weekly that all & grease, residual monitoring of employees are In addition, CEPC/GNPP will chlorine, light metals and demonstrate the validity of the Fish Catches on given basic conclusions drawn in the ESIA other pollutants. intake screens induction training report. If pollutant Annual monitoring of (over a 1 year on the concentrations in the discharge benthic environment within period. requirements of or impacts to the surrounding a 2 km radius of the the ESMP, good aquatic environment are found Reports are to site discharge point (over a 3 be available to management to be above local and World year period) Bank standards or any of the practices and Weekly monitoring of fish concerning H&S procedures. unacceptable, options for further mitigation will be catches on intake screens authorities The Assistant discussed. inclu-ding species, num- (EEAA, WB, Plant Manager bers and size (over a 1 etc.). will ensure year period). implementation of procedures. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 67 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 7 (Contd.) Operational Impact Mitigation, Monitoring and Management Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management and Indicative Cost Schedule Implementation Supervision Indicators Reporting/ Training Estimate (US$) monitoring Noise Specific design mitigation measures During first year When the plant CEPC/GNPP/EMS CEPC Top Power plant Quarterly to Should any Minimal costs to minimize noise impacts include: of operation. is fully Management compliance CEPC and complaints be (up to US$ 10K operational, Third party audit with ESMP. EEHC. received regarding per annum) EEHC ï‚· gas turbines, steam turbine noise audit supervised by Environmental noise, these will required for generators; air compressors, measurements Assistant Plant Monthly be logged and the provision of Management & reporting of pumps and emergency diesel are to be carried Manager Assistant Plant protective wear Studies Sector. summary results engines are enclosed in out at noise Manager will (included in sources and at (or more if investigate operation cost). buildings; requested) and the fence of the problem. ï‚· air compressors are equipped power plant as submitted to the with silencers; EEHC and any well as at noise other concerned No further ï‚· noisy outdoor equipment are receptors around authority (e.g. CEPC/GNPP/EMS mitigation or designed to a noise limit of 90 the plant. EEAA, WB, to ensure that all monitoring costs dB (A) at 1 m. etc.), if required. employees are envisaged with given basic the exception of In addition, plant workers will be induction training management provided with protective wear in on the time. plant areas with high noise levels. requirements of the ESMP, good Noise audit US$ The plant will operate in site management 10-20K accordance with internationally practices and H&S (included in accepted health and safety procedures. The operation cost). measures. Assistant Plant Manager will ensure implementation of procedures. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 68 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 7 (Contd.) Operational Impact Mitigation, Monitoring and Management Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management and Indicative Cost Schedule Implementation Supervision Indicators Reporting/ Training Estimate (US$) monitoring Flora and Fauna Disturbance to The following mitigation measures Lifetime of the No monitoring is CEPC/GNPP/ CEPC Top Good Yearly CEPC/GNPP/EMS Management habitats as a will be implemented: plant. envisaged. EMS Management plantation to ensure that all time result of noise, ï‚· restrict personnel and vehicle EEHC employees are vehicle and movements to access roads Assistant Plant given basic personnel Manager Environmental induction training and within boundaries of site Management & movements. only; and on the Studies Sector. requirements of ï‚· control of noise during the ESMP, good operation. site management practices and H&S procedures. The Assistant Plant Manager will ensure implementation of procedures. Visual Impact Visual image of The visual effect of the power plant Lifetime of the No monitoring is CEPC/GNPP/EMS CEPC Top Improved Considered Approx. US$ 20- power plant from will be improved through: plant. envisaged. Management visual image management of 35K for surrounding ï‚· creation of landscaped Assistant Plant EEHC landscaped areas landscaping areas. boundary along the fence of the Manager to maximize visual measures Environmental image and habitat (included in power plant. Management & creation. operation cost) ï‚· Ficus elastica var decora and Studies Sector. Ficus nitida will be propagated CEPC/GNPP/EMS and the resulting plants will be to contract a used for decorating and suitable firm to landscaping the site when manage completing the new power landscaped areas. plant. One may obtain 200-300 individual plants from a single tree. ___________________________________________________________________________________________________________________________________________ ESIA for Giza North Combined Cycle Power Project E.S- Page 69 of 100 September 2011 - Project No. 1583 ENGINEERING CONSULTANTS GROUP Table 7 (Contd.) Operational Impact Mitigation, Monitoring and Management Responsibility Type and Issue/Impact Mitigation Measures Implementation Monitoring Monitoring Frequency of Management Indicative Cost Schedule Implementation Supervision Indicators Reporting/ and Training Estimate (US$) monitoring Soil and Hydrology Spillage of oils, Good site management measures as Lifetime of the The Assistant CEPC/GNPP CEPC Top Quality of 6-monthly CEPC/GNPP, Management chemicals or described under Aquatic plant Plant Manager Management bunds and reports from through the time fuels on site. Environment will minimize any will continuously Assistant Plant drainage management to Assistant Plant potential risks. As part of this, regular monitor Manager EEHC systems. EEHC. Manager, will checks of bunds and drainage application of Environmental Management & implement a systems will be undertaken to ensure ESMP and good Efficiency of Annual reporting Studies Sector. Spills Response containment and efficient operation. site operation. of summary management results (or more Plan and all practices and if requested) and employees will take corrective submitted to the receive action if EEHC and any corresponding required. other concerned training. authority (e.g. EEAA, WB, etc.), if required. Solid Waste Good practice measures undertaken Lifetime of the Continuous CEPC/GNPP CEPC Top Management 3-monthly CEPC/GNPP to Management during the construction phase will plant monitoring is Management contract in reports from ensure all time and costs be continued into the operation required to Implementation of place. management to (