RP1558 V11 PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY DASU HYDROPOWER PROJECT SOCIAL AND RESETTLEMENT MANAGEMENT PLAN VOLUME 10: COMMUNICATIONS PLAN General Manager (Hydro) Planning WAPDA, Sunny view, Lahore, Pakistan Final Version 08 March 2014 Social and Resettlement Management Plan Vol. 10 Communications Plan i Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan SOCIAL AND RESETTLEMENT MANAGEMENT PLAN INDEX OF VOLUMES Volume 1 Executive Summary Volume 2 Socioeconomic Baseline and Impact Assessments Volume 3 Public Consultation and Participation Plan Volume 4 Resettlement Framework Volume 5 Resettlement Action Plan Volume 6 Gender Action Plan Volume 7 Public Health Action Plan Volume 8 Management Plan for Construction-related Impacts Volume 9 Grievances Redress Plan Volume 10 Communications Plan Volume 11 Downstream Fishing Communities: Baseline and Impact Assessments Volume 12 Area Development and Community Support Programs Volume 13 Costs and Budgetary Plan Volume 14 Safeguards Implementation and Monitoring Plan ii Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan ABBREVIATIONS AAC Additional Assistant Commissioner BBC British Broadcasting Corporation BHU Basic Health Unit CBO Community Based Organization CDF Communications for Development Framework CNA Communications Need Assessment CSM Communications Strategic Matrix CSP Consultation and Social Preparation CWP Communications Work Plan DC Deputy Commissioner DHP Dasu Hydropower Project DHO District Health Officer DPO District Police Officer EA Environmental Assessment EIA Environmental Impact Assessment EMAP Environment Management Action Plan EPA Environment Protection Agency EPD Environment Protection Department FATA Federally Administered Tribal Areas FGDs Focus Group Discussions FM Frequency Modulation FY Financial Year GCISC Global Climate Change Impacts Study Center GB Gilgit-Baltistan GBHP Ghazi Barotha Hydropower Project GBTI Ghazi BarothaTaraqiatiIdara GCH Gender and Community Health GOP Government of Pakistan HPICU Hydropower Public Information and Communications Unit ICRC International Committee of the Red Cross ICTs Information and Communication Technologies IDP Internally Displaced Person IESCO Islamabad Electric Supply Company ILR Income and Livelihood Restoration IPC Interpersonal Communications IPP Independent Power Producer KESCO Karachi Electric Supply Company KKH Karakorum Highway KPK Khyber Pakhtunkhwa LA&R Land Acquisition and Resettlement LESCO Lahore Electric Supply Company MDRP Mangla Dam Raising Project M&E Monitoring and Evaluation MMT Migration Management Team MNA Member of National Assembly MPA Member of Provincial Assembly MPR Monthly Progress Report NEPRA National Electric Power Regulatory Authority NGO Non-Governmental Organization NTDC National Transmission and Dispatch Company NV Negotiated Value OGRA Oil and Gas Regulatory Authority OP Operational Policy PAPs Project Affected Persons PBC Pakistan Broadcasting Corporation PCPP Public Consultation and Participation Plan PD Project Director PEMRA Pakistan Electronic Media Regulatory Authority iii Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan PEPCO Pakistan Electric Power Company PICs Public Information Centers PKR Pakistan Rupees PMU Project Management Unit PNGO Project Non-Governmental Organization POE Panel of Experts PPIB Pakistan Power Investment Board PRO Project Resettlement Office PTV Pakistan Television Corporation PVAC Property Valuation Advisory Committee QPR Quarterly Progress Report RAP Resettlement Action Plan RHC Rural Healthcare Centre RMU Resettlement Monitoring Unit SADO Social Awareness and Development Organization SC Construction Supervision Consultants SRMP Social and Resettlement Management Plan SRSP Sarhad Rural Support Program TOR Terms of Reference TSD Training and Skill Development UNICEF United Nations Children Fund VOA Voice of America WAPDA Water and Power Development Authority WCAP Water Sector Capacity Building and Advisory Services Project WCD World Commission on Dams WB World Bank Units of Measurements Ha Hectares (Metric Unit of Area) MAF Million Acre Feet (Unit of Volume) MTOE Million Tons Oil Equivalent (Unit of Energy) MW Mega Watt (Measuring Unit of Power) iv Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan GLOSSARY OF TERMS Adequate Enough to satisfy a need or meet a requirement. Audience A group or assembly of listeners, viewers, or spectators Climate Friendly A process or group of activities, that do not have any negative impacts on natural climate Communication The act or an instance of communicating; the imparting or exchange of information, ideas, or feelings Communication Strategy Communicating Strategy is designed to help you communicate your strategy in a compelling and effective way, and dramatically improve implementation and the resulting outcomes Community A group of individuals broader than the household, who identify themselves as a common unit due to recognized social, religious, economic and traditional ties or a shared locality. Compensation Payment in cash or in kind for an asset or resource acquired or affected by the project Displacement The act of changing the location of something Implementation To put into practical effect; carry out Land Acquisition Means the process whereby a person is compelled under eminent domain by a public agency to alienate all or part of the land he owns or possesses, to the ownership and possession of that agency, for public purpose in return for compensation. Misconception A mistaken thought, idea, or notion; a misunderstanding Mobilization Approach To organize for a purpose Monitoring To keep close watch over; supervise Patriarchal Society A social system in which the father is the head of the family and men have authority over women and children Print Media The print media is responsible for gathering and publishing news in the form of newspapers or magazines Resource Something that can be used for support or help Resettlement The act or instance of settling or being settled in another place Risk The possibility of suffering harm or loss; danger Stakeholders Include affected persons and communities, proponents, private businesses, NGOs, host communities and EPA’s and other relevant local departments etc. Sustainable Capable of being continued with minimal long-term effect on the environment v Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan COMMUNICATIONS PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... vii 1 THE PROJECT CONTEXT ......................................................................................... 1-1 1.1 THE PROJECT ..................................................................................................... 1-1 1.2 ROLE AND RATIONALE OF COMMUNICATIONS STRATEGY ......................... 1-1 1.3 PROCESS TO COLLECT EVIDENCE FOR COMMUNICATIONS STRATEGY ... 1-2 1.4 METHODOLOGY ................................................................................................. 1-2 2 COMMUNICATIONS NEED ASSESSMENT AND KEYFINDINGS ............................ 2-1 2.1 SOCIAL AND CULTURAL STRUCTURE OF KOHISTAN ................................... 2-2 2.2 PERCEPTIONS, ATTITUDES, CONCERNS AND KNOWLEDGE ....................... 2-3 2.2.1 Overall Attitude towards Project .................................................................... 2-3 2.2.2 Key Concerns of Communities ...................................................................... 2-4 2.2.3 Charter of Demands Requested by Jirga ...................................................... 2-4 2.2.4 Concerns Regarding Relocation Sites .......................................................... 2-6 2.2.5 Mistrust and Misinformation .......................................................................... 2-6 2.2.6 High Expectations of Local Communities ...................................................... 2-6 2.2.7 Feedback from Four National Workshops ..................................................... 2-7 2.3 COMMUNICATIONS RELATED ISSUES ............................................................. 2-7 2.3.1 WAPDA’s Capacity to Communicate ............................................................ 2-7 2.3.2 Minimization of the Role of Strategic Communications .................................. 2-8 2.3.3 Limited Local Professional Capacity in Communications .............................. 2-8 2.3.4 Weak Media Environment in Project Area ..................................................... 2-8 2.3.5 Local NGOs .................................................................................................. 2-8 2.3.6 Communications Needs and Preferences ..................................................... 2-9 2.4 GUIDING PRINCIPLES FOR COMMUNICATIONS STRATEGY .......................... 2-9 2.4.1 Building on Existing Positive Levels of Understanding .................................. 2-9 2.4.2 Correcting Misperceptions and Closing Knowledge Gaps ............................. 2-9 2.4.3 Focusing on Key Stakeholder Concerns and Fears ...................................... 2-9 2.4.4 Tailoring Communications to Specific Needs of Each Group ...................... 2-10 2.4.5 Focus on Local Community Leaders and Media as Opinion Drivers ........... 2-10 2.4.6 Communications Strategy to Build on Stakeholder Suggestions ................. 2-11 2.4.7 Short versus Long-term Communications Requirements ............................ 2-11 2.4.8 Need to Strengthen Public Participation Mechanisms ................................. 2-11 2.4.9 Build Communications Capacity within the Sector ...................................... 2-12 3 MEDIA ENVIRONMENT IN PAKISTAN ..................................................................... 3-1 3.1 RADIO FACTS ..................................................................................................... 3-1 3.2 TELEVISION FACTS ............................................................................................ 3-1 3.3 PRINT MEDIA FACTS .......................................................................................... 3-1 3.4 INTERNET FACTS ............................................................................................... 3-2 3.5 PAKISTAN’S POWERFUL MEDIA GROUPS ...................................................... 3-2 3.6 STRATEGIC USE OF MEDIA IN COMMUNICATING DHP MESSAGES ............. 3-2 4 STRATEGIC COMMUNICATIONS DESIGN .............................................................. 4-1 4.1 OBJECTIVES OF THE COMMUNICATIONS STRATEGY ................................... 4-1 vi Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan 4.1.1 Overall Objectives ......................................................................................... 4-1 4.1.2 Specific Strategies ........................................................................................ 4-2 4.1.3 Communications Approach ........................................................................... 4-2 4.1.4 Strengthening Project Capacity for Communications .................................... 4-2 4.1.5 Communicating with Institutions Involved in Project ...................................... 4-3 4.1.6 Communicating with Communities in Project Area and EstablishingParticipation Channels .............................................................. 4-3 4.1.7 Communicating with General Public ............................................................. 4-4 4.1.8 Communicating with International Community .............................................. 4-5 4.1.9 Audience Segmentation ................................................................................ 4-5 4.1.10 Strategic Communications Matrix.................................................................. 4-6 4.1.11 Strategy 1 ..................................................................................................... 4-7 4.1.12 Strategy 2 ..................................................................................................... 4-8 4.1.13 Strategy 3 ..................................................................................................... 4-9 4.1.14 Strategy 4 ................................................................................................... 4-10 4.1.15 Strategy 5 ................................................................................................... 4-11 4.1.16 Strategy 6 ................................................................................................... 4-12 5 IMPLEMENTATION OF THE STRATEGY ................................................................. 5-1 5.1 IMPLEMENTATION PLAN ................................................................................... 5-1 5.1.1 Establishing Communications Unit to Manage Implementation of Strategy ... 5-1 5.1.2 Delivering Communications from Branded Platform ...................................... 5-2 5.1.3 Developing and Producing Communications Materials ................................. 5-2 5.1.4 Implementing a Branded and Phased Communications Program ................. 5-2 5.1.5 Using Media Placement ................................................................................ 5-2 5.1.6 Disseminating Information Materials ............................................................. 5-3 5.1.7 Introducing Media Award Scheme ................................................................ 5-3 5.1.8 Successful Implementation Conditions ......................................................... 5-3 5.2 Implementation Plan and Budget....................................................................... 5-3 6 FRAMEWORK FOR MONITORING AND EVALUATION ........................................... 6-1 6.1 MONITORING OF THE ACTION PLAN ................................................................ 6-1 6.2 ASSESSING THE OUTCOMES AND IMPACT OF ACTIVITIES .......................... 6-1 vii Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan LIST OF TABLES Table 2.1: Charter of Demands and Responses by WAPDA ................................................ 2-5 Table 4.1: Audience Segmentation ........................................................................................ 4-5 Table 5.1: Strategy Implementation Plan and Budget ........................................................... 5-4 LIST OF FIGURES Figure 1.1: Purpose of the Communications Need Assessment ............................................ 1-3 Figure 2.1: Villagers near the Project Area ............................................................................. 2-1 Figure 2.2: Visit to Communities in Project Area ..................................................................... 2-6 Figure 4.1: Communications Approach ................................................................................... 4-3 Figure 5.1: Organogram for Communications Unit at Head Office ......................................... 5-1 Figure 5.2: Communications Unit at Project Site .................................................................... 5-2 LIST OF APPENDICES Appendix A: Dasu Hydropower Project Layout Appendix B: Field Survey Questionnaire Appendix C: List of Participants for in-depth Interviews Appendix D: Stakeholder Consultation Workshops vi Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan EXECUTIVE SUMMARY INTRODUCTION AND RATIONALE Strategic communication has become integral part of the large infrastructure projects such as dams. Recentlythe world has witnessed major advancements in the delivery of environmentally responsible and socially acceptable infrastructure developments in different governance settings. The emergence and wider acceptance of dialogue and partnership approaches that incorporate multiple stakeholders are trends that characterise beneficial changes in dam planning and its implementation. Dams are now also being looked as social development initiatives rather than energy and water services. This change in outlook demands involvement of stakeholders and communities through sustained and strategic communications. Government of Pakistan and WAPDA are conscious of this fact and believe that the keys to success are clearly: timely and continuous communications between project implementers and those affected; adequate compensation, support and long term contact; and efforts to ensure that the disruption of relocation is balanced by some direct benefits from the project. WAPDA and DHP are keen on learning from past lessons and improving on their strategies to cope up with communications demands/challenges related to DHP and other similar projects in future. In cases of Tarbela Dam and Mangla Dam Raising projects, lack of communications with communities, weak consultation mechanism, lack of disclosure about the implementation processes specially related to compensation and resettlement, and lack of regular contact with communities and stakeholders resulted in misunderstandings and apprehensions on part of the affected communities. Communications are required to build understanding and support for the project because resistance to any project is expensive. Communications before, during, and after the completion period have to be strategic, intensive and consultative in nature to build understanding and minimize resistance or risks, as technical solutions alone cannot build the consensus that is required for projects to succeed and becoming sustainable. KEY CONCERNS As a major power generation project, the DHP will have several impacts of varying significance. Despite these perceived impacts, the communities to be affected do not have a hostile attitude towards the Project although there was some opposition, particularly arising out of lack of information regarding compensation assistance and resettlement, at the beginning of the detailed design phase. However, this slowly began to change following the grand jirgas (tribal assemblies to make decisions and resolve issues) where local elders presented a set of demands to deal with the potential project impacts. . These include (i) compensation for land other assets; (ii) resettlement sites and amenities; (iii) Following is a summary of key concerns outlined by the communities; (iii) employment in the Project; (iv) loss of livelihood and restoration issues; (v) environmental and social issues; (vi) health and safety issues; and (vii) impacts of in- migration and construction workers on the traditional tribal life. COMMUNICATIONS OBJECTIVES This Communications Strategy will provide a detailed and specific framework that guides communications on Dasu Hydropower Project and identifies the issues that need to be addressed to build understanding and generate support for this mega power project in Pakistan. These issues were identified through a situation analysis conducted at the initial stages of the process of developing this strategy. The communications objectives of DHP were defined on the basis of the desired outcomes, risk reduction, and the communications deficits that were identified through the communications need analysis. The objectives of the Communications Strategy are: vii Dasu Hydropower Project Social and Resettlement Management Plan Vol. 10 Communications Plan  To increase awareness, improve knowledge, and timely disseminate information among key stakeholders  To get public endorsement and acceptance of the Project  To enhance transparency of the Project  To promote and increase participation of key stakeholders in decision-making STRATEGIES AND ACTIONS These objectives will be achieved through the use of following specific strategies:  Internal Communications to increase knowledge, build support for the implementation of DHP and address new and existing concerns among staffs of the project, other related government departments, and various institutions involved  Provision of timely information on the project, its impacts, its timing, its progress, together with a mechanism to express their concerns and grievances and ensure that these are properly taken into account in the decision-making process  Public participation mechanisms to provide platform to engage with institutions opinion leaders, implementation partners, and the general public  A phased multi‐media communications programme to increase knowledge on the project and to increase public support for DHP and such projects in future  Media advocacy to promote accurate and analytical coverage of the project  Communications capacity strengthening of DHP team and/or partners to implement the Communications Strategy IMPLEMENTATION ARRANGEMENTS A phased‐in approach will be adopted when implementing this strategy over a period of three years. The first phase will be focusing on Project Communications. The Project office will be responsible for coordinating the implementation of this phase. The long‐term approach to seek support and share project benefits will be phased‐in towards the end of the first year. Activities will be implemented at three inter ‐linked levels: national, provincial and local. The overall implementation will be managed, coordinated, and supervised through establishing a communications unit at head-office level and another unit at the project-site level to leverage resources and to maintain coherence incommunications activities. MONITORING AND EVALUATION Monitoring and evaluation (M&E) will be essential to objectively establish progress towards the achievements of the objectives of this Communications Strategy and in tracking the performance of the action plan. The key aspects of the M&E framework for this strategy include: (a) monitoring of the communications activities as they happen and (b) assessing the outcomes and impacts of the actions at regular intervals. The overall outcome indicators will form the basis for assessing the interim and long‐term impact of the communications activities. This level of assessment would ideally be conducted by an independent research organization. The key methodology for assessing outcomes will be the stakeholder surveys such as annual surveys to assess changes in knowledge, attitudes and behaviors. viii Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 1 THE PROJECT CONTEXT 1.1 THE PROJECT The power availability situation in Pakistan is critical with the periods of load-shedding that is causing adverse economic and social impacts across the country. To meet the short-fall, generation from burning of fossil fuel is being expanded, which is environmentally damaging due to the emissions produced and is also unsustainable. Added to this is the fact that much of the fuel has to be imported. Compared to that, well managed hydropower is environmentally the least damaging and most sustainable power generation option for the country and also has by far the lowest operation cost. For development of the much needed mega hydropower schemes, the River Indus provides perennial flow and a large number of sites in the northern Pakistan. Dasu is one of such sites where a detailed feasibility study has been completed in early 2009. Pakistan Water and Power Development Authority (WAPDA) undertook the study through a consortium of indigenous and expatriate consultants. Construction of about 242m high dam at this site will provide a gross head of over 200 m for power generation with an installed capacity of 4320 MW. At a capital cost of US$ 7.8 billion and the average annual energy output of over 21000 GWh, the project’s economic internal rate of return (EIRR) is 18.6 % and the cost/benefit ratio is 1.89 indicating it to be an excellent 1 investment for Pakistan . 1.2 ROLE AND RATIONALE OF COMMUNICATIONS STRATEGY During the past few decades, the world has witnessed major advancements in the delivery of environmentally responsible and socially acceptable infrastructure developments in different governance settings. The emergence and wider acceptance of dialogue and partnership approaches that incorporate multiple stakeholders are trends 2 that characterise beneficial changes in dam planning and its implementation .There are several motivations which tend to drive these trends. The first is to involve affected people as partners in the development decisions. Second motivation is to inform and legitimise what are ultimately political decisions on proceeding with major dam developments, balancing the economic, social, and environmental performance aspects with the implementation phases of dams3. Third, the “social development” associated mainly with transformation of land-use in the project area, and displacement of people living in the reservoir area. Relocating people from the project area is the most challenging social aspect of hydropower projects, leading to significant concerns regarding preservation of local culture and religious beliefs.There are some other multifaceted concerns which also drive the need to embed strategic communications in dam planning and management. On top of these motivations, there is the concept that large dam constructions should be looked at holistically, as social development initiatives, rather than narrowly, as physical assets delivering water and energy services4. WAPDA and DHP are keen on learning from past lessons and improving on their strategies to cope up with communications demands/challenges related to DHP and other similar projects in future. In cases of Tarbela Dam and Mangla Dam Raising projects, lack of communications with communities, weak consultation mechanism, lack of disclosure about the implementation processes specially related to compensation and 1 See Appendix-A for Dasu Hydropower Project Layout Map 2 Mozammel, Masud, and Barbara Zatlokal 2002 “Strategic Communication in PRSP” The World Bank, Washington, D.C 3 Rice, Ronald E., and Charles K. Atkin 2001 Public Communication Campaigns California: Sage Publications. 4 Windahl, Suen, BennoSignitzer, and Jean T. Olson 1992 Using Communication Theory: An Introduction to Planner Communication California: Sage Publications 1-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan resettlement, and lack of regular contact with communities and stakeholders resulted in misunderstandings and apprehensions on part of the affected communities5. WAPDA believes6that mega infrastructure programmes such as DHP succeed when they are well understood and supported by stakeholders. Such programmes are however often placed at risk when the institution steering the changes does not put in place adequate mechanisms to secure political and social support amongst stakeholders. Such mechanisms include adopting a strategic approach to communicating with key stakeholder and other interest groups. Therefore, communications is required to build understanding and support for the project because resistance to any project is expensive. When there is resistance, reforms or projects take much longer to implement or they may not proceed as planned. 1.3 PROCESS TO COLLECT EVIDENCE FOR COMMUNICATIONS STRATEGY The communications situation analysis conducted indicates both a lack of awareness and misconceptions by various stakeholders regarding the project. Local communities are particularly sceptical about the land acquisition and compensations processes adopted by WAPDA in other projects. A Communications Need Assessment (CNA) was undertaken in August-September 2012. The triangulation method was used to conduct this research while combining communications-based field survey, in-depth interviews, national consultations, media analysis, and desk research. The communications strategy adopted in Dasu Project calls for increasing public understanding of the project impacts and social dimensions, including need for accountability to the local stakeholders. It addresses people’s concerns, perceptions and motivations. The communications strategy further suggests ways to communicate the project vision and agenda, and sustain this throughout the project implementation process, and afterwards. The assessment adopted communications techniques and tools to identify problems that must be addressed to ensure that: (a) DHP objectives are properly identified, understood and agreed to by the stakeholders and, (b) project implementation can proceed in a fair and efficient way, which ensures the achievement of project objectives. The objectives were to map various stakeholders and identify measures that can be taken to more effectively communicate with them; evaluate WAPDA’s communications capacity; and advice on the development of a Communications Plan for DHP. The communications need assessment also identified the political, social, and cultural environment of the project, and assessed the position of project stakeholders in terms of their respective knowledge, perceptions, attitudes, expectations, and practices that can tailor the design of the development initiative 1.4 METHODOLOGY Communications assessment was carried out through established research tools by utilising both qualitative and quantitative methods. The DHP consultant utilised quantitative research method in the field to carry out a field survey7in 34 villages to be affected around the project site. The field survey was based on a questionnaire (translated in Urdu also) submitted to a sample of 110 people in affected villages of Tehsil Dasu andKandia8. 5 Feedback from National Consultation Workshops and discussions with communities in the field 6 In-depth interview with Dasu Hydropower Project Team led by Project Director, Haji Mohammed Farooq 7 Copy of Survey Questionnaire is attached in Appendix-C 8 The primary data was collected by the supervisor with the help of the local Field Investigators. These local Field Investigators were given required training to complete the survey appropriately before moving into the project area. The names of those Field Investigators/Surveyors are Mr. Muhammad Yahya, Mr. Muhammad Iqbal, Mr.Sabir Khan, Mr. Hikmat Khan, Mr. Shabbir Khan 1-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan This study provided an insight into the local Understanding the history of the communications environment and the baseline project data which could be utilised for evaluation of the impact of communications activities implemented Evaluating the political, social and cultural environment around the by the DHP. project The communications team also carried out the Identifying stakeholders and assessing qualitative part of needs assessment by their level of information, perceptions, organizing over 30 in-depth interviews and interests and concerns. consultations with selected representatives of stakeholders, including WAPDA officials, local Identifying communication problems to government authorities, traditional tribal be addressed and related objectives authorities, religious groups, civil society Assessing the communication capacity associations local and national media, of Dasu HPP/WAPDA communications professionals as well as a direct Analyzing the available media and sampling of project affected people at the site, communication resources and residents of Dasu town. The consultant also visited Mangla Raising Project and conducted Designing a communication strategy interviews with the Mangla Raising Project team on the communications lessons learnt and best Figure 1.1: Purpose of the practices with reference to Mangla Dam Communications Need Assessment construction9. The consultant also undertook a desk research, which involved reviewing several key documents to identify pertinent issues in context of DHP and others areas affecting the water/energy sector and the key stakeholders. Major documents reviewed include: (i) Dasu Hydropower Project Design Report (ii) Interim Basic Design Report: Environment, Social, and Resettlement (iii) District Profile – Kohistan, Earthquake Reconstruction and Rehabilitation Authority (ERRA) (iv) Baseline Data Report, Palas Conservation and Development Project (v) A Study on Socio – economic Status of Migrated Kohistani Women, Barani Area Development Project (vi) Perceptions of conservation by children and women in the Palas Valley, Pakistan & implications for environmental education - Emily Woodhouse (vii) Are divergent preferences between benefactors and beneficiaries an obstacle to community-based conservation? A case study of the Palas Valley, Northern Pakistan - Alexander Hell Quist The consultant also benefited from the four national workshops (Peshawar, Lahore, Karachi and Islamabad), organized in September-October 2012, to disclose project impacts and to receive feedback from national experts and various related leading national and provincial agencies, including provincial Environmental Protection Agencies (EPAs). The formats of the consultations meeting were as follows: (i) a brief presentation on the technical/engineering design; (ii) a presentation on the project social and environmental impacts; and finally (iii) round table and/or Question and Answers (Q&A) on project impacts and mitigations. A total of 239 participants representing various stakeholders, including officials, NGOs/civil society members and relevant specialists attended the workshops. These four national workshops recommended due attention to good resettlement practices and long-term income and livelihood restoration in the project area. The workshops also stressed due attention to environmental management concerns on fauna /flora and biodiversity damage. Another important task during the communications need assessment was to assess the national and local media environment10.This included in-depth discussions with media 9 List of participants in FGD and in-depth interviews is attached as Appendix -F 10 See Media and Communications Environment in Pakistan in Appendix -H 1-3 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan professionals and identifying existing media outlets, assessing their capacity to reach the different audiences, and evaluating their ethics and the professional quality and skills of the journalists. The needs assessment was thus important to understand and anticipate: (a) potential roadblocks, (b) the audiences to be reached, and (c) effective channels of Communications. Finally, it explored the willingness and capacity of DHP/WAPDA to engage in two-way communications both through government’s own channels and through the agencies that will be responsible for DHP implementation. Underlying aims were to reduce or minimize the risk of controversy and threats to the project’s successful completion, and building public support for the project by taking into account different stakeholder interests. 1-4 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 2 COMMUNICATIONS NEED ASSESSMENT AND KEYFINDINGS11 In August 2012 when DHC Communications consultant started working on the ground and prepared for Communications Need Assessment research, a number of challenges emerged vis-à-vis communities of the project areas is concerned. The DHP with its value as a much-needed national project and one of the most important infrastructure projects in the recent times after Mangla and Tarbela dams has raised many hopes and caused some disappointments, as well. The communications assessment found that misinformation, rumours, and mistrust have been spreading among various groups of communities Figure 2.1: Villagers near the Project Area on the right and left banks. Moreover, it was observed that these project-area communities on both sides of the River Indus have a strong historical and cultural rivalry and sense of competition among themselves12 which sometimes turns into a conflict. “These differences could frustrate and jeopardize all attempts to effectively involve local communities in the project implementation”, 13 observed a community leader .There is also a risk that disagreements over project issues including resettlement, land acquisition, and compensation would aggravate local tensions. This is of particular importance as there are many social and financial tensions simmering below the surface within and among communities. The assessment thus demonstrated the urgent need to bridge information gaps, seek trustworthy dialogue with the stakeholders, restore confidence, and enhance support for the completion of DHP. To achieve these objectives, the project communications consultant designed and completed a comprehensive communications process. Following is the sequence of the key findings of the communications-based analysis: (i) Social and Cultural Structure of Kohistan – studies the social set up and role of traditional socio-cultural spheres in context of their possible role in designing communications initiatives. (ii) Perceptions, Attitudes, Concerns, and Knowledge – identify issues related to the perceptions, concerns and level of information and participation of the project stakeholders. (iii) Communications Related Issues - discusses those problems which are related to the institutional capacity to efficiently and effectively implement this Communications Strategy. 11 For more detailed findings and data sets, see full Communications Need Assessment Report in Appendix- B 12 On the Swat side the tribes are divided into two groups, Manzar and Money. They were two brothers and sons of Nafria. Tribes of Kandia, Dubair, and Ranolia belong to Manzar group. Those of Banked, Jijal, Pattan, Keyal and Seo belong to Money group. The main tribes are Mula Khel, Koka, ManekKhel and DarramKhel. They are of cognate origin and do not convey clear territorial division. 13 Local Village Head (Malik), Village Kaigah 2-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 2.1 SOCIAL AND CULTURAL STRUCTURE OF KOHISTAN14 Dasu Hydropower Project (the Project) is located in the District of Kohistan in Khyber PakhtunKhwah (KP) Province. Kohistan – literally means “land of mountains” – is a predominantly mountainous area and forms part the Provincially Administered Tribal Area (PATA). The Indus River divides the district into two parts, referred to as Swat Kohistan (on the right bank) and HazaraKohistan (on the left bank). The affected villages on both banks consist of tribes and sub-tribes, who have lived in the Valley for generations, often fighting each other over land, women and political power and control in the Valley. The District of Kohistan comprises four Tehsils (sub divisions ofa district): Dasu, Palas, Pattan and Kandia. Dasu is the district headquarters. Following is an overview of socio-cultural environment in Kohistan district:  Kohistan, including the project area, is a tribal society. There are a handful of main tribes, and numerous sub-tribes. Tribal demarcation of territory is very clear, and people traditionally and culturally do not encourage others to cross into each other’s territory without due permission or understanding. Each tribe is headed by a malik (head). The maliks occupy the predominant position within Kohistan society. They hold ultimate authority within their own tribes, and are respected by wider society. The bigger the tribe, or the more financially strong the maliks, the stronger his position and standing. Whatever development work is undertaken in each village/local area, it is done through the malikand the local Jirga or assembly of elders. The Jirga is a collection of local leaders or, at higher level, maliks. These serve as a forum for collective decision-making.  Religious leaders enjoy great respect and wield influence on local opinion. Each village has its own mosque and paish imam (prayer leader) like other villages across Pakistan. Local people follow their respective pesh imams. But if there are any wider issues, there will be tehsil or district level meetings of religious leaders to decide on a common position. The foremost official religious leader in Kohistan is the Imam of the Jamia Masjid in Komila.  Kohistan has a traditional tribal governance system which is accepted by the provincial government and district administration as well as the society. The district administration involves the maliks and conducts Jirga system for local decision-making and resolution of disputes or for project administration. Jirga is a committee of elders representing all parties to a problem or issue which deliberate and decide on village or inter-village or inter-tribe problems and issues. Jirga’s are constituted at different levels and is convened to resolve a particular issue. In resolving issues which require legal interpretation, Tehsil level and District level Jirga’s are convened which include the District Commissioner or his representative(s). In the specific requirements of the present project, given the absence of land records, surveys to establish land tenure and acquisition will be completed with the help of the local communities, maliksand Jirga system. The assistance of the local traditional system will be obtained to resolve the conflicts related to land titling. Moreover, the traditional system can be helpful during the project implementation for establishing participatory planning and monitoring and grievance redress process/mechanism.  Kohistan is a patriarchal society where women’s involvement and engagement in social spheres is improving but very slowly. In rural areas, education and employment opportunities/ facilities like rest of the rural areas in Pakistan are fewer. Women culturally and historically observe purdah(a curtain or screen or veil, used in South Asia, Middle East, and North Africa to keep women separate from men or strangers). Traditionally and historically, women carry out household and agricultural chores as their contributions to the family. Satellite televisions have become more common in the district over the past couple of years with a 14 SRMP Vol.2 Socioeconomic Baseline and Vol.6 Gender Action Plan 2-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan positive influence on the society with special reference to women empowerment. One of the maliks, for instance, mentioned that he would provide all support to his own daughter and rest of the girls in his tribe for higher education in the fields of medicine and engineering.  Several international Non-Government Organizations (INGOs) and local Non-Government Organizations (NGOs) have been operating in Kohistan District since the devastating earthquake of 2005. The INGOs include Church World Services (CWS), Catholic Relief Services (CRS), the German Red Cross (GRC) and Welt HungerHilfe (WHH). Of these, GRC is the only one operating presently in the project area. Local NGOs working in the project area include Sarhad Rural Support Program (SRSP), Social Awareness and Development Organization (SADO) and the Pakistan Red Crescent Society (PRCS). SRSP works on water and sanitation as well as livelihood issues while the others work on these also, as well as health and nutrition and education.  Dasu Hydropower Project will open up new possibilities of development and progress in Kohistan that is an underdeveloped area and thus enjoys a tax-free status in Pakistan. The 1998 Census placed Kohistan bottom in the country in terms of socio-economic development indicators. The proportion of the population that was working and employed was 26.4 percent, equivalent to 70.53 percent of the total labor force. Of the total employed population, 71.60 percent were self-employed, 10.68 percent worked as employees and 17.32 percent were unpaid family helpers. The Karakoram Highway (KKH) has had a big impact in terms of opening up the region to the outside world. Large numbers of people are employed in NGOs, and increasingly are trying for jobs in government/police. 2.2 PERCEPTIONS, ATTITUDES, CONCERNS AND KNOWLEDGE 2.2.1 Overall Attitude towards Project The overall attitude towards the Project is that local people support the project and substantial assistance has been provided to the consultant team for carrying out various surveys and studies. However, at the beginning of the consultation, a considerable level of opposition and concerns about displacement and resettlement were raised. That situation substantially changed after the Project Director together with WAPDA attended the grand Jirga in March 2012.The affected communities and tribal elders now support the project and see a great opportunity for them to improve their quality of life and regional development15. As a major power generation project, Dasu Hydropower Project will have several impacts of varying significance. Despite the impacts, the affected communities did not have a hostile attitude towards the Project although there was some opposition, particularly arising out of lack of information regarding compensation assistance and resettlement, at the beginning of the detailed design phase. However, this slowly began to change following the grand Jirga’s when WAPDA responded positively to 15-point Charter of Demand submitted by the affected community. The interest of the Project Affected Persons (PAP’s) was noted during the consultation meetings and the Jirga’s held at Dasu site in April and June 2011. The meetings were attended by a large number of villagers, maliks, and local administrators including Additional Assistant Commissioner (AAC), DasuTehsil and DeputyCommissioner (DC), DHP Project Director (PD) and the consultants. The project officials encouraged the participants to express themselves and engagein detailed discussion on project impacts, community consultation, compensation, and awareness about the project and resettlement policies, and level and mode of community support for the project. Some concerns were raised by the participants, particularly with regard to replacement costs for land acquired by the project. There was active participation at the meetings and those 15 SRMP Vol. 3 Public Consultation and Participation Plan 2-3 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan who attended the four initial district level Jirga consultations expressed their willingness 16 to support the Project. The main concern was the adequacy and timely payment of compensation. These were cleared at the Jirga’s and the affected community was also made to see the positive impacts such as improved living environment at the resettlement sites with the availability of all civic amenities and social infrastructure. Further, all affected households who did not have secured tenure would for the first time be provided with titled land, economic stability and improved quality of life at the project-managed resettlement sites of their choice at the upper elevations as desired by the affected communities. In May 2012, a mission to the project site by the World Bank team found that the community in general had a positive attitude towards the Project and urged that the local community should be further engaged and involved in planning and implementation of the Project and to address issues of conflicts and security. 2.2.2 Key Concerns of Communities Consultation meetings with affected people in 34 hamlets (see Appendix-I) of the project affected area have been completed. The major findings of the consultation meetings are summarized as follows: Issues Description Compensation for The compensation issues and rates are of importance both to PAPs and land and other WAPDA. The local demands have been for the rate applied in the case of assets Bhasha Dam upstream. The affected communities want WAPDA to fix the rate prior to Section 4 notification. A recent Jirga formed a committee to discuss this with WAPDA Project Office. Resettlement Site Affected communities want to relocate to higher elevations to sites of their development own choices in mountains with basic amenities to be built at project costs. Job and The affected communities/sub-tribes demand maximum employment in the Employment project during construction and in post-construction periods. Accordingly, WAPDA has taken initiatives to conduct pilot training for candidates selected in batches from project affected households. In addition, through these initiatives, some outside employment or overseas employment opportunities are also expected by local PAP ’s. Livelihoods The traditional terrace cultivation and animal herding by the sub-tribes will be affected due to relocation and lack of terraced land in upper elevations. Thus, alternative livelihood after relocation must be explored since the vocational training mainly focused on the limited scope of PAPs, namely, youth with at least completed primary education. Environmental Despite community-based preferred relocation, it will bring some and Social Issues disruptions- for example schooling, access to market and health clinic. Three suggestions were made at meetings: (i) provision of education facilities for both male and female students and; (ii) provision of health facilities in the relocation sites and (iii) constructing access roads. Health and safety Local people are concerned about migrant workers for dam construction, issues noise and air quality issues, and heavy traffic on KKH during the construction period. In-migrants and The “outsiders” – for example, construction workers, construction material Outsiders suppliers and service providers (such as chefs, grocers, barbers, etc.) are required, in addition to local human resources. However, local villagers have “mixed” feeling about the outsiders moving in to work, including potential cultural and social conflict. 2.2.3 Charter of Demands Requested by Jirga On 28 July 2011, the elders attending a grand Jirga held in DC office submitted a 15- point Charter of Demands to the Project Director (PD) as their benchmark for supporting 16 For full documentation of the Jirga meetings, see SRMP Vol. 3 Public Consultation and Participation Plan. 2-4 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan the construction of the dam project. The main point in the Charter of Demands concern compensation rates for acquired assets (land and structure), employment, education, and healthcare facilities. WAPDA later prepared a response to the Charter of Demands (see Table 3.1). These demands are largely within the scope of project mitigation measures and have been considered within the social development framework under the Resettlement Action Plan. Table 2.1: Charter of Demands and Responses by WAPDA No. Charter of Demand Response from WAPDA 1. A modern vocational training Centre for Provision of vocational Training Institutes local should be established before start of for male and female have been kept in construction of DHP feasibility study 2. Provision of jobs for skilled and qualified Priority of jobs will be given to local local should be accepted as the right of inhabitants of District Kohistan on merit inhabitants of District Kohistan basis by following the codal procedures. 3. 20 percent Of the royalty of DHP should Matter relates to Federal and Provincial be fixed for the development of Kohistan Governments District 4. Establishment of new modern Hospital Provision of New Hospital for DHP have should be completed before construction been kept in feasibility study and would of DHP be the part of WAPDA (O&M) colony. 5. Establishment of new colleges and Provision of New college have been kept Universities in different areas of District in feasibility study and would be the part Kohistan should be completed before of WAPDA (O&M) colony construction of DHP 6. Establishment of new roads and tracks in Provision of New roads and tracks for different valleys of District Kohistan DHP have been kept in feasibility study should be completed before the and would be completed during project construction of DHP construction 7. Provision of supply of free electricity to all Matter relates to GOP and Provincial areas of District Kohistan Government 8. Twice of the existing market rates should Assessment and application of rates be considered for the acquisition of land relate to District Collector, Kohistan and ,property and trees etc. according to prevailing law 9. Provision of fixed quota for people of District Kohistan should be considered in Matter relates to education policy which is all educational Institution of WAPDA all a Provincial Government subject over the country 10. Revised survey for the acquisition of land, During Detail Engineering Design, the properties, houses etc. should be survey will be completed as proposed by conducted by involving the nominated the local committee committee by the affected owners of area 11. After construction of DHP, proprietary Fishing is a subject of Provincial rights of fishing should be given to local Government people of area. 12. Affectees of DHP should be resettled in Resettlement colonies with all modern modern residential colonies in different facilities in nearby Dasu town have been parts of the country proposed in feasibility study 13. Special overseas employment quota Matter relates to Federal and Provincial should be fixed for the local people of Governments Kohistan District 14. As District Kohistan is a non-settlement area therefore the prices of all properties Matter relates to Federal and Provincial should be considered doubled than the Governments existing local market values 15. Honorary certificate for their sacrifice should be given to all people of District Matter relates to Federal Government Kohistan 2-5 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan Since the grand Jirga, several rounds of Jirga meetings were held in Dasu to deal with various project issues, top among those are employment to locals in the ongoing planning work, equal distribution of jobs and other project resources between the Right bank and the Left bank people, and declaration of compensation rates prior to land acquisition and measurements survey. 2.2.4 Concerns Regarding Relocation Sites According to the census/inventory surveys, 767 households will require relocation due to the project constructions. Most of the affected households have houses in upper elevations in the valley. Naturally, they want to be relocated inthe hills in upper elevation within their own valleys. As per the survey responses, nearly half of the affected households prefer to resettle closer to their current settlement in the upper valley. While, the remaining affected households, however, have expressed desire to migrate outside the valley to downstream areas with cash compensation and project assistance. 2.2.5 Mistrust and Misinformation Thoughoverwhelming majorities is supporting DHP and during all public meetings people in the project area have Figure 2.2: Visit to Communities in Project spoken in favor of the project but when it Area comes to individual level, it is somewhat different. People in the project are conscious about the terms of compensation and resettlement. The general public at national level, and especially the communities living in the project area, are confused about Dasu Hydropower Project whether it would reach the implementation stage again keeping in mind the example of delay in implementation of proposed Basha Dam which is located 74km upstream of Dasu project area. The lack of information was particularly obvious concerning resettlement processes, compensation issues, and employment of locals in the construction of dam. Only 18 % people from the communities have basic information (budget, ownership,) while only 37 % knew about the resettlement process. Local representatives from NGO’s and Local Government had a higher awareness than affected communities, but also displayed several misconceptions about project and expressed a number of concerns. The overall mixed perceptions include fears that the project will mean an increased cost of living because of high living standards, increased pollution, and increased cost of property/land. Based on their apprehensions and fears, the local communities have prepared and forwarded a “Charter of Demands”17 to the project consultants and WAPDA. 2.2.6 High Expectations of Local Communities The project design has anticipated monetary compensation or in-kind compensation only for those people directly affected18 by the project — those households that were going to suffer from loss or damage to structures and other properties, access to roads and other public services, access to natural resources (including forests and the river), crops and farmland, and all other losses associated with income-generating activities. Due to delay in preparing and sharing a well-structured compensation and resettlement plan, the local 17 See a copy of the Charter of Demands in Appendix-E 18 See Appendix-G for a complete list of affected villages and tribal structures in the project area 2-6 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan communities over the past couple of years have raised their expectations. The most recurrent one is free electricity for the affected villages. Public consultations have clearly shown that local communities expected significant benefits including free education, free health services, royalty, improved livelihood opportunities, employment for affected populations etc. from the huge investment project they were hosting. The consultations carried out during need assessment revealed that the communities are also expecting a community development program for the whole catchment area in the project design. 2.2.7 Feedback from Four National Workshops Dasu Hydropower Project is not a project only for Kohistan. It has basin wide significance and is an important national project. Therefore, four national workshops (Peshawar, Lahore, Karachi and Islamabad) were organized in September-October 2012 to disclose project impacts and to receive feedback from national experts and various related leading national agencies, including provincial EPAs. The formats of the consultations meeting were as follows: (i) a brief presentation on the technical/engineering design; (ii) a presentation on the project social and environmental impacts; and finally (iii) round table and/or Q&A on project impacts and mitigations. A total of 239 participants representing various stakeholders, including NGOs/civil society members attended the workshops. The outcomes and minutes of the workshops are in Appendix-J. The key points are summarized below: (i) The workshops added to WAPDA’s understanding of views of stakeholders. (ii) The workshop recommended due attention to good resettlement practices and long-term income and livelihood restoration (iii) Implementation and capacity building of WAPDA for social and resettlement management was underscored by many participants (iv) Due attention to environmental management – for example, concerns on fauna /flora and biodiversity damage, noise and the quality of air control, social, economic and safety issues were raised. (v) The workshop recommended careful examination of climate change impacts on the dam projects and Indus River water systems. 2.3 COMMUNICATIONS RELATED ISSUES 2.3.1 WAPDA’s Capacity to Communicate WAPDA has excellent capacity to communicate with stakeholders including media, general public, and partner international/local organisations. It has a fully operational Public Relations Division which deals with matters related to external communications, public information, internal communications, and news media. One of the areas of communications which requires further improvement is Programme Communications and Community Interaction. For instance, most of the information on DHP was perceived by communities and stakeholders as being incomplete and insufficient. This does not mean that WAPDA lacks in communications capacity. Rather this implies that there could be issues of methodology, approach, and mechanism. During the Communications Need Assessment, the communications capacity of DHP itself was found as “limited” in terms of information provision to communities and relevant stakeholders at local, provincial, and national level. Generally, large projects like DHP, do have dedicated communications professionals on board to deal with advocacy, community mobilisation, public information, or internal/external communications. Dasu Hydropower Project requires enhanced communications possibly through Programme Communications together with Public Information, Awareness Raising, and Community Engagement approaches. Ideally, there should be a communications section/unit within each project to closely coordinate matters of Programme Communications with the Public Relations Division. Improvement of communications and community engagement is an ever evolving process and WAPDA is making concerted efforts to keep up with the emerging 2-7 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan communications needs of all stakeholders. WAPDA’s recent initiative to establish Land Acquisition and Resettlement (LA&R) section is evidence of its commitment for improvement. At the moment WAPDA is the only organisation which is working on the social issues of Kohistan and Chillas as its social corporate responsibilities. 2.3.2 Minimization of the Role of Strategic Communications The minimisation of the role of Communications as a discipline is a common problem in development projects that involve large physical construction activities. The role of Communications is typically emphasised until it comes to allocating a budget. In particular, the national counterparts, which are usually bodies of the public administration, are unwilling to allocate significant funds to activities that are aimed at making their work more transparent and at enhancing the participation of a larger number of stakeholders. In a pure, top-down approach, the role of Communications is often seen as merely public relations and as a way to inform target groups about decisions made. 2.3.3 Limited Local Professional Capacity in Communications As in many other under-developed low-literacy19 districts in Pakistan, it is difficult to find local capacity in District Kohistan. Most of the skilled Kohistanis have left the area, and those remaining are distributed among private sector, development agencies, and NGOs. This is especially true regarding local communications professionals, which generally see their function confined to the role of public relations. 2.3.4 Weak Media Environment in Project Area Both the print and broadcast media in District Kohistan and surrounding areas are weak and in need of basic training for journalists, technical support and better infrastructure20. The assessment concluded that with some exceptions, local journalists lacked a sense of civic responsibility and consciousness regarding professional ethics. It suggests that journalism is not investigative, and local journalists do not play their essential role as members of the “fourth estate”. 2.3.5 Local NGOs21 The capacity and representation of national/local NGOs in District Kohistan is generally still fairly limited. Many among the national NGOs rely on assistance from foreign partner organisations. The assessment concluded that the overall perception of NGOs is negative and characterized by a broad lack of trust among pockets of the population. During the consultations, Dasu community clearly expressed their preference to interact directly with the project management and not through a third party, such as NGOs. Media Usage and Trust among Categories of Stakeholders The most reliable recent national research data on media access is Communications need assessment field survey, conducted by the Communications Consultant for DHC and WAPDA, which used quantitative methodology combined with in-depth interviews and group discussions. Various audiences have different patterns of information seeking and media consumptions habits. The data shows that Interpersonal Communications (IPC) through community leaders and Imam’s is by far the most used media in project 19 The literacy rate of the District Kohistan among the population aged 10 years and above is 11.1% – male 17.23% and female 2.95%. The proportion of working or employed population to population aged 10 years and above is 26.47% which is 70.53% of the total labor force. Out of the total employed population, 71.60% are self-employed, 10.68% work as employees, and 17.32% are unpaid family helper. 20 Local newspaper and radio stations 21 There are several international (INGO) and local NGOs operating in Kohistan district. INGOs include Church World Services (CWS), Catholic Relief Services (CRS), the German Red Cross (GRC) and Welt Hunger Hilfe (WHH). Of these GRC is the only one operating in the project area. Local NGOs working in the project area include the Sarhad Rural Support Programme (SRSP), Social Awareness and Development Organization (SADO) and the Pakistan Red Crescent Society. SRSP works on water and sanitation (Watsan) and livelihood issues while the others work on these, as well as health and nutrition and education. 2-8 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan area among the key affected populations, followed by television, and mobile phones. For external stakeholders like donor organisations, WAPDA, and general public, the research recommends usage of mix media including TV, Radio, mobile phones, and print media. 2.3.6 Communications Needs and Preferences When asked how would they like to receive information about the project and other related issues, communities’ order of preference was community leaders/maliks/imams, radio, district administration, television, and mobile phones. Local communities and district administration representatives expressed the need for regular updates on the status of the project. They also asked for more information on the settlement, compensation, community development, livelihood opportunities, local employment, benefits and effects of DHP. In addition, they expressed a willingness to support the establishment of information and communications centre in the project area as a vehicle for information sharing and education, public participation and cooperative management. Communities also showed strong interest in utilising Local Village Committees for Communications and dissemination of information. 2.4 GUIDING PRINCIPLES FOR COMMUNICATIONS STRATEGY 2.4.1 Building on Existing Positive Levels of Understanding The findings indicate some positive knowledge and attitudes that can provide a good platform on which DHP can further build on. The most important of these are that electricity is considered as a relatively high national priority. Local development, increased employment opportunities, better health and education facilities, better communications and transport facilities for the area, are other positives which could be further capitalised as positive outcomes of the project. WAPDA will utilise these perceptions and positive knowledge as ‘multipliers’ to enhance its credibility and ensure the local communities and public at national level that it cares for social responsibility. 2.4.2 Correcting Misperceptions and Closing Knowledge Gaps The findings point out some fundamental problem areas that need to be addressed. These include misperceptions, confusions, and low levels of knowledge (purpose, budget, implementing agency, funders etc.) about DHP. The role of the private sector, role of WAPDA, and the role of consultants such as Dasu Hydropower Consultants (DHC) are also not clear in the minds of concerned communities. WAPDA is putting in efforts to bridge this missing link of knowledge gap among the communities. This is for the first time in the history of hydropower projects in Pakistan that WAPDA has taken initiative to include Communications Strategy as one of the most important Social and Environmental Safeguards to establish two-way communications, and share information about the Project efficiently and effectively. 2.4.3 Focusing on Key Stakeholder Concerns and Fears WAPDA as an implementing agency for DHP realises that Communications should be strategic in the sense that it should address the major stakeholder concerns and fears that have been raised in the Communications Need Assessment findings and many rounds of field surveys and consultations. For communities, the big issues are compensation, resettlement, and loss of livelihood opportunities. For WAPDA, the concerns centre on lack of trust and confidence and misperceptions of the communities. When designing messages, the Communications Strategy would take into account reviving the trust and ownership of the communities in this project through evidence- based and culturally acceptable initiatives through full involvement of local communities and other national/local stakeholders. The greatest wish expressed by the majority of respondents was fair play, transparency, and accountability in dealing with issues of resettlement, compensation, livelihood, and environment. 2-9 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 2.4.4 Tailoring Communications to Specific Needs of Each Group The Communications Strategy has multiple audiences (see Appendix B) with various educational, cultural, economic, and social backgrounds. Their communications consumption habits and information seeking patterns are different than each other. An affected person (AP) from the project site is semi-literate and has access to Jirga meetings, histribal leader (malik), radio, and rarely a TV. At the same time a highly educated representative of the funding organization would have access to internet, newspapers, mobile phone, radio, TV, and social media. Comparatively speaking, both of these persons are audience of this Communications Strategy. A successful and more cognisant communications design would take into consideration their respective media and communications environments and socio-cultural preferences while implementing any initiatives. This Communications Strategy will not try “one-size-fits-all” approach. The findings indicate that although there are some common information needs, there are also significant differences in the concerns of the various stakeholder groups. They have different media usage and preference patterns, which need to be taken into account. Among other subjects, the Strategy would always cover:  The nature and implementation process (what’s happening?)  Why this project is needed and the benefits (why should I care?)  What will change for that particular audience (how does it affect me?) The communicationsdemand dueattention in selection of tools as well as handling various program issues. We discussed earlier that various audiences have different Communications preferences. In the same manner various audiences have different issues and concerns. The issues and apprehensions of a community member would be different than that of a WAPDA team member. A community member would like to know that how Dasu Dam is bringing change to his/her life while the Project staff would be more interested in issues related to implementation, among other things. 2.4.5 Focus on Local Community Leaders and Media as Opinion Drivers The media content analysis and discussions with media showed that coverage of the project was relatively ad hoc. There has been no sustained effort currently or in the recent past to share information about the project with key stakeholders. The only available information about/on the project is: project documents (Internal Communications which is not available to general public) and WAPDA website (with only a brief introduction about the project). There are some media reports also available on the web, related to the award of consultancy services as a result of tendering process. Communities do not have much information and knowledge either. Media at local as well as national level has not been able to cover the project because there is no data or information available to them. There has been a lack of contact with mass media in disseminating information about the project and whatever information is available to media, is event driven and weak in analysis. The strategy therefore will take proactive approach for increasing knowledge on the holistic nature of the DHP among media managers and leveraging the media as a partner in the coverage of the project and the longer‐term energy issues. WAPDA, through this Communications Strategy, will make concerted efforts to mobilise communities through religious leaders (Imams) and tribal leaders (maliks) to provide maximum information to the communities so that people living in the project area could become partners in the implementation of Dasu project and take greater ownership of this development initiative. WAPDA and the project team realises the important role of civil society organisations in the implementation of projects like DHP. Consultations and field survey have revealed that some NGOs tend to be most apprehensive about the effect of resettlements and compensation for lands, and other related issues, and they work with the media to vocalise their concerns. WAPDA will initiate a proactive outreach effort geared towards 2-10 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan establishing and maintaining dialogue with NGOs and media to bridge their information needs and working with them for the successful implementation of this project. 2.4.6 Communications Strategy to Build on Stakeholder Suggestions Local representatives and other respondents of the research expressed the need for regular updates on the status of DHP. This suggests that the strategy should include mechanisms that enhance information sharing. This could include a regular communications and permanent public participation structures such as Local Village Committees suggested above. There was also consensus among respondents that effort to create long‐term positive attitudes and behaviour change among stakeholders for the support of DHP and other such hydropower projects. Responding to these types of demands for information and participation mechanisms is essential for the strategy, as is responding to stakeholder requests on preferred means of communications. For example, WAPDA and the DHP team prefer communications through official channels, while communities generally prefer to receive information via local leader, radio, TV, provincial administration, or newspapers. A further breakdown shows that urban consumers prefer mass media sources, and rural consumers prefer inter ‐personal sources. The most popular public meetings are those organized by the provincial administration together with Jirga (local tribal forum). 2.4.7 Short versus Long-term Communications Requirements Findings, consultations, and discussions with sector specialists suggest that the Communications Plan should be broken into two phases. Initially a short term phase of Project/Programme Communications should be used to build awareness, understanding, and trust related issues. A second longer term phase should focus on Behaviour‐Change Communications that promote positive attitudes and practices for community involvement and support. In view of these observations, the Communications Plan has been divided into two phases. The first phase spreads over one year and the second phase covers another two years. The first phase will employ tools and techniques to address short-term needs of the audience mainly focusing to enhance public information at local community as well as provincial and national levels. This phase will also build/win trust of the communities and remove apprehensions and confusions on issues already identified through public consultations. The second phase of the CommunicationsPlan will centre on behaviour change and advocacy for long-term support of the project. In longer term perspective, the Strategy would be paying special attention to increase public participation and community engagement for their greater and deeper involvement in the decision making process for the project implementation. Another important area for this long-term phase is media advocacy to promote accurate and analytical coverage of the project. Media plays a very important role as tool of communications. The strategy aims for greater involvement of local/national media as one of the partners in implementation of the project. This phase would also address communications capacity needs of various stakeholders identified during communications need assessment exercise. 2.4.8 Need to Strengthen Public Participation Mechanisms It is clear that information dissemination is important, but not sufficient for the project to succeed. The DHP Communications Team needs to build or strengthen two‐way consultation and participation structures such as stakeholder forums, networks and committees to enhance transparency, engage with communities, and take public feedback on board. WAPDA supports and realises that public participation and consultation is a relationship building exercise that is key to good governance, it needs to become a permanent modus operandi of the project management team. One of the possible solutions to strengthen public participation mechanism is setting up Communications and information platforms at national level and community level. The idea of Information Centres has been raised during public consultations. WAPDA is keen on taking up this suggestion. 2-11 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 2.4.9 Build Communications Capacity within the Sector Communications Need Assessment identified communications capacity building needs among various stakeholders. As the social development is inching more towards collaborative approach of work rather than individualistic approach, we have seen reasonable influencing of this paradigm shift in the field of communications. Organizations worldwide are considering capacity building of partners together with their own, for more sustainability. During the communications assessment, the DHP team identified definite communications capacity gaps among partners and within WAPDA itself. The project team will strengthen not only its own capacity but also partner NGO ’s, media, and local communities to communicate effectively and efficiently. There appears to be a definite need to build the communications capacity or bring trained communications professional(s) on board against the requirements for communications for the project implementation and post-implementation stage. Capacity must then be built to close the identified gaps, which include raising implementation support for the Communications Strategy and financial resources. 2-12 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 3 MEDIA ENVIRONMENT IN PAKISTAN Pakistan’s media is flourishing. Many of the privately owned media groups command big Mobile Mania radio, TV and newspaper audiences and are highly profitable. Television has become the Over the past decade, Pakistanis have main source of news and information for people become addicted to the mobile phones. More than half of all Pakistani adults in Pakistan’s towns, cities and large areas of the own a mobile handset. By January countryside. Generally speaking, where 2012, there were more than 114.6 television is available, Pakistanis prefer TV to million mobile phone lines in the radio as a source of information. However, much country, giving a mobile penetration of the rural population continues to rely heavily rate of 66.5%. However, this statistic on radio. So, too, do millions of Pakistanis who disguises the fact that many handset live in zones of conflict near the Afghan border. owners have SIM cards for two or more Young urbanites are increasingly tuning in to networks. Pakistanis use text Frequency Modulation (commonly known as FM) messaging intensively. In 2011 each radio stations for music and entertainment on handset owner sent on average more their mobile phones. than 140 text messages per month, even though only half the population 3.1 RADIO FACTS can read and write. That represented an increase of nearly 16% from 120 Pakistan Broadcasting Corporation (PBC), which messages per phone per month in runs the state radio network, retains an official 2010. Many young people also use monopoly on broadcasting national and their mobile handsets to listen to the international radio news. It covers the entire radio. country on FM, medium and short wave. Private radio stations are allowed to relay the news bulletins and programmes of PBC and, to a limited extent, the BBC Urdu service and Voice of America (VoA). Private FM stations are not allowed to produce and broadcast their own national and international news under the terms of their radio license, although this restriction is sometimes ignored. Some private stations are allowed to broadcast local news. The Pakistan Electronic Media Regulatory Authority (PEMRA) limits the transmitter strength of private FM stations. They are allowed a maximum broadcast coverage radius of 50 km. Private radio has almost no penetration in rural areas. 3.2 TELEVISION FACTS The government-run Pakistan Television Corporation (PTV) retains a monopoly of free- to-air terrestrial broadcasting. Private TV channels are only allowed to broadcast on cable, satellite and the internet. Marketing research company Gallup Pakistan estimated there were 86 million TV viewers in Pakistan in 2009. Of these, 48 million - more than half, were terrestrial viewers who could only receive PTV channels. 3.3 PRINT MEDIA FACTS Pakistan has around 300 privately owned daily newspapers. According to the Pakistan Bureau of Statistics (formerly the Federal Bureau of Statistics), they had a combined daily sale of 6.1 million copies in 2009. Most newspapers are published in Urdu or English and are regional rather than national in nature. Pakistan’s largest newspaper is the conservative Urdu language Daily Jang which claims nationwide daily sales of 850,000. Undated figures from the marketing research organization Gallup Pakistan say about 60 % of urban populations and 36 % of rural populations read newspapers. (These figures broadly track urban and rural literacy rates). About 10 % of the population read magazines. Gallup found that about 30 % of the population read a periodical at least once a day. 3-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 3.4 INTERNET FACTS Internet usage is growing rapidly from a low base, as witnessed by the phenomenal growth in popularity of the social networking site Facebook. Bandwidths remain low, but this could change rapidly, as large sums of money have been invested in web infrastructure projects. At least 30 cities now have WiMAX networks, which enable internet access by wireless anywhere within a wide area. By some measurements, Pakistan has deployed the largest WiMAX network in the world. This fourth generation technology offers metropolitan area networks a signal radius of about 50 km. The relatively low cost of WiMAX deployment makes last-mile broadband Internet economically viable, even in remote locations. The Pakistan Telecommunications Authority (PTA) said there were 29 million internet users at the end of 2011 – equivalent to about 16 % of the population. Among them were 6.4 million Facebook users (www.socialbakers.com, May 2012). According to the PTA, about 1.7 million people had access to broadband services in 2010. This was less than one per cent of the population. 3.5 PAKISTAN’S POWERFUL MEDIA GROUPS There is considerable cross-media ownership between newspapers and radio and television stations. Major large circulation daily newspapers exercise wide influence on public opinion from within large media groups that also include radio and TV stations. Many of Pakistan’s newspapers were founded by journalists with a political and nationalist agenda. However, the liberalisation of broadcasting in 2002 led to a wave of investment in the media by businessmen with a straightforward commercial interest. The new FM radio stations have proved particularly profitable. Their opening coincided with a period of rapid economic growth that brought with it a boom in advertising. The three largest private media groups are: Jang Group – The group owns Geo TV, Pakistan’s most popular private television network, along with a stable of newspapers and magazines. These include Daily Jang, Pakistan’s top-selling daily newspaper, Daily Awam, Daily Awaz, Daily Waqt, The News and The Pakistan Times. Dawn Media Group - This media group grew from the English-language Dawn Newspaper, founded in 1947 by Mohammad Ali Jinnah, the political leader responsible for Pakistan’s creation as an independent Muslim state. Dawn is one of the largest and most influential English language daily newspapers in Pakistan. It remains a cornerstone of the Dawn Media Group, which also Dawn News TV and the City FM 89 radio network, the latter broadcasts in four major cities. Other Dawn Media Group publications include the Herald, a monthly current affairs magazine. Lakson Group - This diversified business conglomerate owns the popular Express News and Express 24/7 TV news channels, along with the Daily Express, Express Tribune and Express Sunday newspapers. 3.6 STRATEGIC USE OF MEDIA IN COMMUNICATING DHP MESSAGES Some of the earlier methods used 10-15 years ago for communications have been visual and audio in the form of gestures, sounds and pictures/drawings. Technology today has transformed these sounds and gestures to produce speech, videos, films, posters and theatre. The evolution of different means including new media (web, internet, mobile) has opened up a vast potential for communications. With a plethora of tools and methods to use, the communicators today may find it difficult to choose an appropriate one. How is this choice to be made? Answer to this question depends on our understanding of the impact of information and communications technologies on our everyday life. Pakistan’s flourishing and booking media scene extends a plenty of options for projects like DHP. While it is difficult to decide as to what to choose and what to leave, there are some 3-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan factors which will provide us some guidance and direction. These decision-making factors could be on-ground research/consultations, audiences’ preference, cost, cultural preferences, general public’s communications requirements, and needs of our international audiences including project donors and other stakeholders. Let’s have a look at the following options, their pros and cons, utilities and downsides, in context of Pakistan’s own media environment. As for using media effectively and efficiently for communicating the project messages, there are two ways of doing this. First option is using media as a paid tool of communications through advertisements, print supplements, mobile messages, etc. The second way is entering into partnership with media houses and mobile companies to utilise and take advantage of vast outreach of TV, radio, internet, social media, mobile communications, and print media through unpaid coverage/messaging. WAPDA will capitalise on both of these options to utilise mass media and new media at national, local, and international level and take maximum advantage of these partnership opportunities. 3-3 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4 STRATEGIC COMMUNICATIONS DESIGN The design of the communications intervention had to respond to the need for an open, transparent, and inclusive decision-making process, one that reflected stakeholders’ concerns. It needed to help DHP/WAPDA design an environmentally sustainable, socially equitable, and economically viable project. To this end, a Communications Strategy was designed to establish a two-way communications mechanism and a continuous consultation process, allowing the DHP/WAPDA, Dasu Hydropower Consultants (DHC), andthe World Bank to actively and positively interact with all stakeholders. The Communications Strategy has been designed as a flexible tool, ready to be adapted according to the feedback received and the changing situation on the ground. In context of ever-evolving and ever-changing communications environment and patterns, the strategy adopts an approach in which the design of the Communications Strategy, instead of being entirely fixed at the outset, could be revised as communications activities progress and new knowledge and experience is gained. In such situations, the communications action plan of the strategy will take into account a long term strategy as well as immediate communications needs. In development, a Communications Strategy is defined as a comprehensive set of coherent communications activities aimed at achieving a project’s communications objectives. A communications objective is an objective that requires some changes in the;  level of information,  perceptions,  attitudes (intentions),  practices and/or behaviours,  level of participation, and/or  level of empowerment The previously covered findings suggest that there is need for a Communications Strategy that focuses on increasing knowledge of the communities and building public support for DHP. The strategy should also promote participation of stakeholders in decision making and address issues of fear and uncertainty on the effect of project. The findings also provide a clear indication on the appropriate messages and the audiences that this strategy needs to target. Based on this analysis, the objectives of the strategy are given below. 4.1 OBJECTIVES OF THE COMMUNICATIONS STRATEGY 4.1.1 Overall Objectives The communications objectives of DHP were defined on the basis of the desired outcomes, risk reduction, and the communications deficits that were identified through the communications need analysis. The objectives of the DHP Communications Strategy are:  To increase awareness, improve knowledge, and timely disseminate information among key stakeholders  To get public endorsement and acceptance of the project  To enhance transparency of the DHP project  To promote and increase participation of key stakeholders in decision-making The first two objectives are short‐term objectives focusing specifically on Project/Programme Communications and should be accomplished within the first year. The third and fourth objectives are longer‐term behaviour change communications objectives which will target sustainable changes in specific behaviours. These will be 4-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan started in the first year, but activities are likely to get fully underway during the second and third years. 4.1.2 Specific Strategies The above mentioned overall objectives will be achieved through the use of following specific strategies:  Internal Communications to increase knowledge, build support for the implementation of the DHP and address new and existing concerns among staffs of the project, other related government departments, and various institutions involved  Provision of timely information on the project, its impacts, its timing, its progress, together with a mechanism to express their concerns and grievances and ensure that these are properly taken into account in the decision-making process  Public participation mechanisms to provide platform to engage with institutions opinion leaders, implementation partners, and the general public  A phased multi‐media communications programme to increase knowledge on the project and to increase public support for DHP and such projects in future  Media advocacy to promote accurate and analytical coverage of the project  Communications capacity strengthening of DHP team and/or partners to implement the Communications Strategy 4.1.3 Communications Approach Given that the subject of a communications objective is always one or more groups of people defined as primary stakeholders or primary audiences, the Communications Work Plan (CWP) has been subdivided into several components, each one directed to a specific audience/stakeholder group. In fact, several public, private, and international players are involved in the implementation of the project, each one playing a different role and having different tasks and responsibilities at different levels (political, economic, and technical); characterized by different communications needs, problems and objectives; and requiring different strategies and media to be reached. 22 The CNA showed that the main audiences that needed to be reached and the main stakeholders that needed to be engaged by the Communications Strategy were:  Institutions involved in the project implementation such as donors, WAPDA/government institutions, contractors, and so forth;  General public (mainly through mass media); and  People living in the project area, including the project-affected people  Given the concern of international NGOs about large infrastructure projects, and the related reputational risk for the World Bank and other financing partners, the international community was identified as a fourth audience 4.1.4 Strengthening Project Capacity for Communications Developing capacity of the project to design and implement a Communications Strategy requires significant efforts in terms of technical and human resources. For the sake of sustainability, it is important to think about how the created capacity can produce benefits during the implementation and after the project completion. In general, it is preferable to create the capacity inside the implementing agency. In case of DHP, the project office and infrastructure is already in place and therefore, it is recommended to establish a Hydropower Public Information and Communications Unit (HPICU) within the Project with the expectation of possible integration of HPICU within the future hydropower management structure in WAPDA. The Communications Unit will: (i). Design and carry out all communications activities related to Dasu Hydropower Project; (ii). Act as a focal point and source of information for all stakeholders; 22 CNA – Communications Need Assessment 4-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan (iii). Encourage exchange and collaboration between project staff members and stakeholders; 4.1.5 Communicating with Institutions Involved in Project There are various institutions involved in the design, and implementation of DHP including WAPDA, design consultants, implementing agencies, contractors, donor organisations like the World Bank and others. Figure 4.1: Communications Approach So, it is necessary to seek their support by increasing knowledge and providing regular updates so that all the institutions have shared understanding about the project. The lack of information sometimes during project design and implementation or during project negotiations with donors can trigger various rumours and speculation fuelled by short- term social, political, economic, interests. Sometimes misinformation, lack of information, incorrect, incoherent, and unverified information on the project can cause negative media coverage ultimately delaying any project implementation. It is therefore imperative to prepare communications activities to address situation(s) like this by ensuring that all institutions involved in the project implementation:  had a common understanding of the project objectives and strategy,  shared the same information and knowledge by being regularly informed about relevant facts and decisions, and  had the opportunity to express their views, opinions and proposals on the different issues concerning the project. This would allow each of these institutions and the project team experts working in the various sectors of the project, (social, environmental, economic, engineering) to feel part of the initiative and be motivated to provide valuable input to it. It also will allow them to disseminate objective and uniform information whenever they were in contact with other stakeholders or with the press. 4.1.6 Communicating with Communities in Project Area and Establishing Participation Channels In the backdrop of compensation issues, resettlement plans, and socio-environmental impact on communities related to other hydropower projects in the past, WAPDA, the 4-3 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan World Bank, and Dasu Hydropower Consultants (DHC) took special measure for DHP. In the past projects, local communities in the dam areas had not been adequately informed of the project impacts and the implications on their environment, and lives. They were only marginally consulted or involved in the project preparation and implementation. Moreover, households and communities whose lands were acquired never received the promised compensation. Now in case of DHP, the result is a widespread discontent and suspicion towards WAPDA and all other project staff/DHC staff visiting the project area. The first task of the Communications Strategy will be to build trust and credibility among project area residents. This task could only be achieved by establishing a direct relationship with the community and demonstrating responsiveness to their concerns. The people living in 34 affected villages around the project site on the Left Bank and Right Bank of the River Indus are considered major stakeholders of Dasu Hydropower Project. The communications objectives directed to the communities should be:  provide local communities with timely information on the project, its impacts, its timing, its progress, and so forth, and  Allow them to express their concerns and grievances and ensure that these are properly taken into account in the decision-making process. The communications analysis identified maliks (local community leaders/tribal heads) and Imams (religious leaders) as the most preferred channels of communications. This was confirmed through interviews and field survey. Opinion leaders, as influencers within the communities, can play a vital and cost‐effective role as an interpersonal way of reinforcing the messages sent out through mass media channels. To outreach communities in the affected areas, the 23 Communications Strategy recommends utilisation of Local Committees with the active involvement of maliks and imams. Public participation is described as an essential component within the Communications for Development (C4D) frameworkadopted by most of the international organisations including the World Bank. The Local Committees, as information‐sharing and consultation forums, will create the opportunity for opinion leaders to become informed partners that both disseminate information and receive feedback from stakeholder groups. 4.1.7 Communicating with General Public The general public of District Kohistan and areas around the project site including neighbouring districts should be focused: (i) to provide correct information about the progress of the DHP, its expected benefits, and the role of the different organizations involved (government, donors, contractors); (ii) to gather feedback and suggestions from the general public for consideration by decision makers; and (iii) to identify and address specific information gaps and misconceptions concerning the project. The media environment analysis has identified TV and secondly Radio as the most effective mass media channel to reach the general public. This was confirmed by the interviews and field survey. As gathered from the Communications Need Assessment, the people place the greatest trust in information provided by the TV and radio. It is important to stress that mass media activities and activities for the journalists should be 23 Local Committees are community-based bodies in 35 affected villages in the project area. A Local Committee comprises of Village Malik, Village Imam, and a senior community leader. Local Committees were established were established during the design phase with an objective to share information with and receive feedback from the communities. 4-4 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan aimed not only at informing and sensitising audiences, but also at developing mechanisms to gather feedback from the audiences. The role of media will be leveraged as a strategic partner through a proactive media relations program and a media award scheme. Under this strategy, the media will also be used as one of the channels for communicating the benefits of DHP to the public. 4.1.8 Communicating with International Community This aspect of the Communications Strategy focuses on making information concerning DHP available to international audiences (development agencies, international NGOs, academia, the Pakistani diaspora, and so forth). In the development and academic world, there is a widespread interest in new methodologies to develop large infrastructure projects and, in particular, in dealing with their environmental and social impacts. To address this communications requirement, this Strategy suggests designing and launching a website. This website should contain information on the project, on its context and on its expected impacts and benefits. It should also include a comprehensive “Question and Answer” section and allow downloading of project documents and reports. The website design should also include information to ensure transparency of the project financing and decision-making process. 4.1.9 Audience Segmentation Target audiences have been selected based on the overall objectives and specific strategies. Table 4.1: Audience Segmentation Audience Segment Sub Segments Rationale Internal Staff Staff members of the project and The project staffs are primary implementing contractor at implementers of the project and national and provincial level. This are frontline ambassadors in would also include other articulating the vision and need institutions including donor of DHP. They need to be fully organisations such as World informed and supportive of the Bank, WAPDA, related process to become effective government bodies/departments, advocates. Kohistan District Administration Local Communities Residents of 35 villages directly This group has many affected by the construction. misunderstandings and misperceptions. On top of that there is big communications gap due to non-availability of any regular communications with them. This lack of communications and interaction with these communities on issues related to settlement, compensation, and livelihood could cause great damage to the project implementation. General Public Urban, rural and informal Each of these groups have been (District Kohistan and settlement residents. chosen because they have adjacent districts Small scale service providers. particular perceptions and needs specially, and KP and Youths (for the second phase) that got to be addressed through at national level in Industrial, commercial and tailored messages and through general). institutional customers who feel the most appropriate channels. greater demand for electricity 4-5 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan Media Media gatekeepers (editors, Media analysis showed that the executives, and programme media is not fully informed about directors). Journalists. project as well as WAPDA’s overall strategy to address electricity crisis in the county. Media gatekeepers will be valuable partners in helping giving appropriate attention to energy issues in Pakistan and government’s efforts to address these issues. Media will also help increasing public knowledge, understanding and support for the project. Media bodies will also be important partners in disseminating information about the project and helping building a supportive environment among priority audiences. Opinion leaders MPs from Kohistan and other With a limited budget, (channels for two-way neighbouring areas. communications activities cannot information) Local Government Authorities. reach every adult person. The Civil society including CBOs, strategy relies on using opinion NGOs. leaders as channels to convey Professional, community, and information and to influence business associations groups of people. Opinion leaders are credible representatives to communicate messages to their respective communities. They are ideal to involve when seeking feedback information. Implementing  Implementing contractors The project will not be Partners  Other Ministries/Provincial successful without the help of Departments several other organisations who  Primary Ministries: Health; also play direct or indirect roles Environment; Agriculture; in the sector generally and as Social Welfare; communicators to key audiences  Secondary Ministries: in particular. Tourism, Information and Partnering with other Broadcasting; Education; organizations will help leverage Science & Technology outreach, particularly if their  Organisations NGOs and additional support is mobilized. training institutions working on water and power, environment, livelihood, and other related issues 4.1.10 Strategic Communications Matrix The Communications Strategy Matrixoutlines the key aspects of each specific strategy. It integrates all aspects of the strategy indicating the logical link between the audience, key message themes, methodology, channels and tools, expected outcome and implementing partners. Key message themes are based on the objective for communications to each audience and the findings from the Communications Need Assessment analysis. The channels recommended are based on the guidelines for media usage in Pakistan. The strategy matches audiences with specific channels depending on accessibility of channel to the specific audience. 4-6 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.11 Strategy 1 Internal Communications to increase knowledge, build support for the implementation of the DHP and address new and existing concerns among staffs of the project, related government departments, and other institutions involved; Key Tools and Outcome Audience Message Methodologies Partners Channels Indicators Themes Internal Benefits and Reach staff Staff briefing Reduced Dasu Staff opportunities members through kits e.g. fact staff Hydropower created by established and sheets on the concerns Project team, DHP. informal project and about WAPDA, World Implications communications reader institutional Bank, any other of the project systems within friendly changes donor(s), on job each organization. summary of and Implementing creations Utilize team the project enhanced Contractors and/or briefing methods achievement, shared losses. to communicate benefits, vision and Expectations with staff through social/environ clarity about of the Dasu the ment the DHP Hydropower institutional/project safeguards. implementat Project from hierarchy. Quarterly ion prospective Piggyback on information Increase in and present existing forums, bulletin on knowledge employees. e.g. the bi‐monthly progress of and support Roles and meetings the project on among mandates of Orientation and implementati staff donor training of on. organisation programme Internal (s), and communicators advertisemen implementing down to the district ts on new job contractor level. opportunities. (s). 4-7 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.12 Strategy 2 Provision of timely information on the project, its impacts, its timing, its progress, together with a mechanism to express their concerns and grievances and ensure that these are properly taken into account in the decision-making process; Key Message Tools and Outcome Audience Methodologies Partners Themes Channels Indicators People/resid The project is Information Village heads Local Local ents of those beneficial for dissemination to (maliks) and Communitie Communities 34 villages the local communities on religious s are more directly communities implementation, leaders informed District affected by and for the status, and (Imams) about the Administration the people of progress of the implementati construction Pakistan. It project Local on, maliks and of Dasu will bring Committees processes, Imams of 34 Dam development Seeking progress, Villages to the project communities’ Hydropower implementin Departments Local area while for feedback on the Information g agency, of Social communities people of implementation and timing etc. Welfare, around the Pakistan , it issues including Communicati Health, project site will generate resettlement, ons Unit The people Education, energy; compensation, in the and others General environmental, Mobile project area public of Implementatio and issues and phones are satisfied District n is solutions related with the Kohistan transparent to livelihood in District information and the the project area Administratio disseminatio project n Notice n and take implementers Boards ownership in want to share the project project implementati information on. with the communities They have better Project understandi implementers ng as to require your how project opinion on is beneficial solution of to the them issues as well the country They have more trust on the implementati on agency 4-8 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.13 Strategy 3 Public participation mechanisms to provide platform to engage with institutions opinion leaders, implementation partners, and the general public; Key Message Tools and Outcome Audience Methodologies Partners Themes Channels Indicators Opinion Contribution of Disseminate Briefing Discussions by NGOs active in leaders at Dasu information to materials. opinion leaders the water and the Hydropower opinion leaders Seminars are increasingly power sector. national, Project to through focal and based on correct regional efficient points within workshops. knowledge of Parliamentarians and local provision of their Energy the DHP, its at provincial and levels in electricity for organizations forums. benefits, impact, national levels influential sustainable on energy Organizatio and outcomes. and key organizatio national requirements of nal government n with wide development. the country in meetings. Increase in ministries. geographic next 20 years. Articles in knowledge of Development al reach. Invitation to sector DHP among partners. support Establish publications policy and Provincial/Local/ The implementation “energy forums” . decision District opinion of DHP and to engage Quarterly makers. administration. leaders will such initiative opinion leaders progress be in future as and promote newsletter. Functional engaged at progressive public public two levels: leaders. participation at participation a) Opinion the national, mechanisms leaders Need to initiate regional and established. who will activities that local level. serve as will ensure Consensus channels adequate Encourage building and such as electricity opinion leaders stakeholder MPs, production to mobilize their concerns provincial through communities. addressed administrati hydropower through public on, and projects such Facilitate participation civil as DHP opinion leaders mechanisms society. to reach out to Value of good their Increase in b) Opinion management of communities number of leaders hydropower with energy community and who will be resources for issues by civil society implementi the nation and providing initiatives in ng partners for each communications support of DHP such as business and support key household. through, for governmen example, talking t ministries. points on benefits of projects like DHP. 4-9 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.14 Strategy 4 A phased multi‐media communications programme to increase knowledge on the project and to increase public support for DHP and such projects in future; Key Message Tools and Outcome Audience Methodologies Partners Themes Channels Indicators General Benefits of Raise awareness Series of Increase Media Public DHP to nationally and in print levels of organizations. (District consumers/ge selected areas advertorials awareness Communications Kohistan neral public to through a in selected among organisations and get their six‐month newspapers. adult and agencies. adjacent support for branded Radio population NGOs. districts such projects. multi‐media infomercials within the Other related specially, Results of the campaign in KP and first six ministries. and KP and project such delivered utilizing throughout months. Local authorities. at national as increase in both paid‐for Pakistan. Increase in level in power advertisement quality of Provincial general). production. and non-paid Information knowledge administration. Roles of media initiatives. materials – on DHP. Urban, rural WAPDA and Reinforce posters, and DHP team to campaign brochures, informal address messages by bumper settlement energy crisis mobilizing NGOs, stickers. residents. in the country. CBOs, and government Radio and Small scale Improved departments to TV service delivery disseminate discussion providers. through better information programmes. governance materials to Youths (for and communities News and the second management. within their reach. feature phase) articles Industrial, Value of good generated commercial management through the and of water and media award institutional hydro scheme. customers resources for Community who feel the nation, meetings greater and for each through demand for business and Local electricity household. Committees and involvement of maliks and Imams. 4-10 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.15 Strategy 5 Media advocacy to promote accurate and analytical coverage of the project; Key Message Tools and Outcome Audience Methodologies Partners Themes Channels Indicators Senior Holistic nature Increase Media kit. Increased Media Management of and need for knowledge of Training knowledge houses. media hydropower editors and workshops, on water and organisations projects in reporters media award power issues WAPDA Pakistan and through training guidelines, in the country and other Editors of positive workshops and radio and TV among water, national and contributions of editorial discussion editors and power, and regional media DHP to efficient briefings. programs, and reporters. energy organizations. electricity. Facilitate editorial related Journalists in accurate briefings. Percentage institutions national and Progress made coverage of the News items, increase in . regional/provinc and challenges project by TV and radio coverage of ial media faced in developing and programs, water and Departmen organisations. implementing the disseminating a feature power issues t of Mass project. media kit. articles, call‐in by the media. Communic programs. Percentage ations Benefits of the Proactively Media awards increase of University project focusing manage the entry accurate and of the on success media by guidelines analytical Punjab stories and establishing a promoted articles on lessons learnt function within through media water and locally and project unit houses. power issues. internationally. (most probably through the Importance of proposed DHP at national Communication level. s Unit) to engage the Value of good media implementation in the coverage and of issues management of related to the DHP for the project nation and for Increase the each business breadth and and household. depth of coverage by leveraging the media as a program partner through a three month media award scheme designed to build a corps of knowledgeable reporters on water and power issues. 4-11 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 4.1.16 Strategy 6 Communications capacity strengthening of DHP team and/or partners to implement the Communications Strategy Tools and Outcome Audience Methodologies Partners Channels Indicators Dasu Orientate Workshops and The project has Selected Hydropower WAPDA Public seminars. established a agency/organisati Project and Relations Technical Hydropower on/company to other partner Division to the assistance. Information and implement the organisation(s) Communications “How To” Guides Communications Comm. Strategy. in Strategy. and Manuals. Unit to streamline, implementation Set up a Communications manage, Communications of the communications planning templates. coordinate, and training institution Communication function to Field visits and monitor s Strategy manage strategy study tours. An Communications WAPDA’s Public implementation. international Strategy Relations Division standard implementation. The DHP needs website on the to hire comm. project Number of or staff selected implementing Provide technical institution/organisat assistance to ion/company build and successfully knowledge of the implementing Communications components of the Strategy Communications implementers to Strategy. develop and implement Increased Communications communications Plan. capacity within sector institutions. Monitor and evaluate the specific plans developed and provide feedback. Create a national Hydropower Communications Unit to provide coherence and guidance on communications activities. 4-12 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 5 IMPLEMENTATION OF THE STRATEGY A phased‐in approach will be adopted when implementing this strategy over a period of three years. The first phase will be focusing on Project Communications and the DHP project office will be responsible for coordinating the implementation of this phase. The long‐term approach to seek support and share project benefits will be phased‐in towards the end of the first year. Activities will be implemented at three inter ‐linked levels: national, provincial and local. The overall implementation will be coordinated through the proposed Hydropower Communications Unit to leverage resources and to maintain coherence of communications activities. 5.1 IMPLEMENTATION PLAN Below are preparation and action priorities on key implementation areas: Preparation Priorities 5.1.1 Establishing Communications Unit to Manage Implementation of Strategy Implementation of this strategy will require focused, dedicated, and organized efforts from WAPDA and DHP team. It is recommended that the DHP should establish a Hydropower Information and Communications Unit and placing a full time senior communications professional as its manager/head to specifically manage the implementation of this strategy. The DHP could contract out through an independent/private communications company for the establishment, management, and output of this Communications Unit to avoid issues related to staff hiring, management, operations, logistics, post-completion, re-employment/re-location of staffs. WAPDA shall establish one Communications Unit at the Project Head Office and another Unit at the Site Office. The Communications Unit at Head Office will manage and coordinate Communications Strategy implementation at national and local level partly by itself and mainly through Communications firm(s). Since WAPDA does not have in-house communications expertise, this unit will ensure quality, efficiency, effectiveness, and monitoring of all activities including public information campaign, media advocacy, capacity building, and community mobilisation. The Communications Unit at Site Office will ensure and supervise local level implementation of Communications and community mobilisation activities as guided by the Communications Strategy. This Unit will also be responsible for providing feedback and information to the Communications Unit at Head Office. The project office together with its collaborating partners will work out the objectives, modalities, and TORs for both of these Units. Following are two separate compositions of Communications Unit at Head Office level and Communications Unit at Project Site level: PD Head of Communications Finance and Communication- Communication M&E Admin Coordinator- Coordinator (In charge of comm-unit) Coordinator Coordinator National Figure 5.1: Organogram for Communications Unit at Head Office 5-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan Communication Coordinator Sr. Communication Officer Admin and Communication Community Operation and Finance Officer Liason Officer Logistics Assistant Assistant Figure 5.2: Communications Unit at Project Site 5.1.2 Delivering Communications from Branded Platform A theme, logo and slogan will be developed at the beginning of the implementation of this strategy to provide a branded platform for all communications materials. This will enhance coherence of messages and create synergy across the different communications activities. 5.1.3 Developing and Producing Communications Materials All key materials produced will require pre‐testing among intended audiences prior to production. Development of materials will be competitively contracted out to an organisation/agency having experience in strategic communications which will be responsible for developing the theme and long‐term identity of DHP and the Communications Strategy. Operation Priorities 5.1.4 Implementing a Branded and Phased Communications Program The strategy will be implemented through phased but carefully linked streams over the period of three years. The first phase will be a national/local public information campaign delivered through mutually reinforcing mass media. Momentum for the campaign will be built through a high profile launch of the project implementation itself. The second phase will consist of thematic communications initiatives focused on increasing public support for projects such as DHP. This phase will also share benefits of the project. It is probable that communications during the second phase will primarily rely on community‐based media and mass media will only be used for strategic communications support during the launches. 5.1.5 Using Media Placement A detailed media plan shall be designed for the public service advertising which will be based on the most recent media usage data. The communications firm contracted to coordinate media placements and implement other communications initiatives would have the capacity to negotiate for bonus spots among media houses, as this is a social development programme (not a commercial project). 5-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 5.1.6 Disseminating Information Materials All materials will be designed and disseminated through a demand‐driven network to ensure that they are distributed efficiently and used effectively at community level. This demand driven network could be a well reputed NGO, a government organisation, or group of people, or local community heads. The project team will fine tune these modalities at the stage of implementation of Communications Strategy in consultation with relevant stakeholders. 5.1.7 Introducing Media Award Scheme As mentioned earlier, one way of utilising media is through paid placements. The other way is to partner and network with media to promote issues, awareness, and win public support for this project and other future projects. This Communications Strategy would use Media Award Scheme to encourage and acknowledge contributions of partner media organisations and professionals who will be supporting the Project and objectives of this Communications Strategy. The media award scheme activities will be linked to the public information campaign to generate the necessary and the right media content early in the implementation of the Communications Strategy. 5.1.8 Successful Implementation Conditions (i) For this strategy to succeed, all project partners have to buy in to the importance and value of communications, and of playing their part in the implementation of this strategy. Another rather obvious criterion for success is that adequate financial resources are required to be committed for the implementation of this strategy. (ii) The capacity to implement this strategy within DHP project structure has to be strengthened. There is need to set up Dasu Hydropower Communications Unit and dedicated communications staffs need to be hired. (iii) Making use of NGOs/CBOs who operate at ‘grassroots’ level as implementation allies would also be a strong recommendation. In terms of this messaging, the benefits of DHP are mostly going to be about energy improvements for the national development. The question of electricity cost will also have to be addressed. It will be very important however, not to overpromise on the improvement of electricity crisis in the country. For some people, it will take years before they personally benefit from DHP and this has to be made clear upfront. It has to be recognised that communications can only be as good as the efforts it supports on the ground. The ‘talk’ and the ‘action’ of successful hydropower projects improvements in supply of electricity have to be in harmony. It would be seriously counter ‐productive to overpromise as this would risk the credibility of this as well as future projects. 5.2 Implementation Plan and Budget Table 6.1 presents an implementation plan focusing on specific strategy and actions to be undertaken. There is an allocated budget of 0.54 million for the communication plan (see SRMP Vol. 10 Costs and Budgetary Plan). 5-3 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan Table 5.1: Strategy Implementation Plan and Budget ACTIVITIES TIME FRAME Year 1 Year 2 Year 3 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Strategy 1: Internal Communications Produce and disseminate briefing materials Plan and implement team briefing sessions Prepare and produce progress bulletins Provide orientation & training for program communicators Strategy 2: Information dissemination to communities, gen public, implementing partners Set-up Information &Communications Unit at Head Office and in Dasu Establish information dissemination and feedback mechanism Train and sensitize Maliks and Imams to communicate with communities Produce and disseminate information materials Strategy 3: Engaging with opinion leaders, stakeholders, and strengthening participation at national level Build partnerships with stakeholders for information dissemination Establish energy forums to engage opinion leaders and promote public participation Disseminate information to opinion leaders through focal points within their organizations on energy requirements of the country in next 20 years. Encourage opinion leaders to mobilize their communities Facilitate opinion leaders to reach out to their communities with energy issues Strategy 4: Phased and branded multi-media communications program Design & implement public information campaign utilizing mass & new media Reinforce campaign messages by mobilizing NGOs, CBOs, and government departments to disseminate information materials to communities within their reach Development information materials Mobilize NGOs, educational institutes, and private sector Strategy 5: Media advocacy Produce and disseminate media kits Organize national and provincial media workshops Implement a proactive media relations programme Plan and implement media award scheme Strategy 6: Communications Capacity Building Hold orientation workshops for top sector management within stakeholders Set up a national Communications Coordination Committee Arrange communications training for the project Communications Team Facilitate communications training within WAPDA for such projects in future 5-4 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan 6 FRAMEWORK FOR MONITORING AND EVALUATION Monitoring and evaluation (M&E) will be essential to objectively establish progress towards the achievements of the objectives of this Communications Strategy and in tracking the performance of the action plan. The key aspects of the M&E framework for this strategy include: a) Monitoring of the communications activities as they happen b) Assessing the outcomes and impact of the actions at regular intervals 6.1 MONITORING OF THE ACTION PLAN Monitoring of the performance of this Communications Strategy will involve tracking and assessing the specific outputs of the communications activities. A mechanism for collecting data and reporting on the specific output indicators for each activity would be developed and implemented. 6.2 ASSESSING THE OUTCOMES AND IMPACT OF ACTIVITIES The overall outcome indicators will form the basis for assessing the interim and long‐term impact of the communications activities. This level of assessment would ideally be conducted by an independent research organisation. The key methodology for assessing outcomes will be stakeholder surveys such as annual surveys to assess changes in knowledge, attitudes and behaviours. The expected outcomes for the first and second objectives are given below. Objective 1: Internal Communications to increase knowledge, build support for the implementation of the DHP and address new and existing concerns among staffs of the project, other related government departments, and various institutions involved (1 Year)  Reduced staff concerns about institutional changes and enhanced shared vision and clarity about the DHP implementation  Increased levels of awareness of the project and its implementation  Increased quality of knowledge about the project  Decreased misconceptions and/or any misperception on programmatic key issues  Increased accuracy and analytical nature of media coverage  Established and functional public participation mechanisms Objective 2: Provision of timely information on the project, its impacts, its timing, its progress, together with a mechanism to express their concerns and grievances and ensure that these are properly taken into account in the decision-making process (1-3 Years)  Increased public/community interest levels  Increased knowledge of communities about their rights and responsibilities  Increased communications capacity within the project as measured by increased resources and implementation of Communications Plan  Increased consensus building and addressing of stakeholder concerns through public participation mechanisms  Increased knowledge of the link between DHP and energy production in the country  Increased number of community and civil society initiatives including forums A monitoring and evaluation (M&E) specialist should be contracted to carry out this level of impact assessment. The scope of work for the M&E specialist would include:  Reviewing and finalising the outcome indicators  Designing a comprehensive M&E plan and methodology relevant to the outcome indicators 6-1 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan  Designing a comprehensive strategy for assessing the impact of the Communications Strategy  Conducting the outcome and impact assessment surveys at specified and agreed timeframes  Analysing the data, preparing reports and disseminating the survey findings to key stakeholders  The M&E Specialist will work closely with the project team and other stakeholders in implementing the above tasks 6-2 Dasu Hydropower Project Social and Resettlement Management Plan Vol.10 Communications Plan APPENDICES Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-A [1/2] Appendix A: Dasu Hydropower Project Layout Figure- Project Layout Figure-Dasu Dam Site Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-A [2/2] Figure- Hydropower Projects in Pakistan Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-B [1/4] Appendix B: Field Survey Questionnaire We are conducting a survey to assess the communications needs of the area. Your views and observations about the proposed hydropower project/dam are very important to us and can contribute to the policymaking at national and local level. Your identity will remain strictly confidential and your views will remain anonymous. Name of Respondent........................................................................................................... Address: ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………… Occupation: …………………………………………………………………………………………. Age (minimum 15 years) ……………………………………….............................................. Household Income..................................................... Number of Family Member.................... Education: .................... Religion: ...................................... Female Male Signature of Respondent (optional)……….............................. Signature of Interviewer........................... Date of Interview..................................................... Perception and attitude towards the proposed hydropower project Have you heard that Dasu dam is going to be built here? Yes No Do you know that the dam will produce electricity for you and rest of the country? What do you think? Yes No Don’t know People living in this area will benefit from the construction of this dam? What is your opinion? Agree Moderately Agree Disagree Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-B [2/4] Do you think the dam will have some impact on the following? Indicators Positive Negative Electricity production Industry Agriculture Employment Movement of people What type of damages/losses the community people will have to face due to construction of Dasu Dam? 1. 2. 3. 4. 5. 6. 7. Do you agree that the dam will play a crucial role in economic development of the country? Agree Moderately Agree Disagree Do you think the people would be happy if the dam is built? Yes No Don’t know Communications Needs Do you know how will the resettlement of the community people take place? Yes No Don’t know Do you know how the land acquisition and requisition is carried out? Yes No Don’t know Is this land acquisition process transparent in your understanding? Yes No Don’t know Do you know who acquires land and pays the land owners? Yes No Don’t know Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-B [3/4] Are the community people getting right value/price of their land already acquired by the authority? Yes No Don’t know Do you know where will the community people be resettled? Yes No Don’t know Do you know who are constructing the dam? Yes No Don’t know Do you have basic information on the Dasu Dam i.e. its budget, geographical coverage, constructors, implementing authority, donors/funders, significance etc.? Yes No Don’t know Information Seeking Behaviours and Preferences How do you get information about any local event (meeting, celebration of any day/occasion, sports/games event, theatre, distribution of relief materials etc.)? 1. Interpersonal channels like friends, relatives, peers etc. 2. Loud speaker announcement 3. Local newspapers 4. Leaflet/banner/poster 5. Mobile phone 6. Local opinion leaders: teacher/councilor/doctor/imam/barber/ etc. 7. Others How do you get information about any national/international event (national emergency, floods, disease outbreak, elections, protests, government activities, political activities etc.?) 1. Interpersonal channels like friends, relatives, peers etc. 2. TV 3. Radio 4. Internet 5. Newspapers 6. Opinion Leaders 7. Mobile Phone 8. Posters, Leaflets etc. Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-B [4/4] Who do you consider more authentic in getting any news/information about any event/affair? 1. Interpersonal channels like friends, relatives, peers etc. 2. TV 3. Radio 4. Internet 5. Folk Media 6. Newspapers 7. Opinion Leaders 8. Mobile Phone Which indigenous media (stage drama, mela, puppet show, discussion meet, etc.) are popular here? 1. 2. 3. 4. 5. 6. 7. 8. 9. What types of Mass Media are available in your locality? 1. Radio 2. TV 3. Newspapers 4. Posters/leaflets 5. Cinema 6. Theatre 7. Others What is the best medium of information here? 1. Radio 2. TV 3. Newspapers 4. Posters/leaflets 5. Folk media 6. Mobile phones Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-C [1/1] Appendix C: List of Participants for in-depth Interviews  Haji M. Farooq Ahmad, Project Director/CE, Dasu Hydro Power Project, WAPDA Office, D-Block Sunny View, Lahore  Abdul Rauf, Manager Field Operations, Dasu Hydropower Consultants (DHC), Shahrah-e-Resham, Dasu, District Kohistan  Dr.Haimin Wang, Associate Professor, China Agriculture University/Environmental Assessment Consultant, DHC, Gulberg -III, Lahore  ZafarIqbal Chaudhry, Environmental Expert, Dasu Hydropower Consultants (DHC), Gulberg-III, Lahore  Kazuo Iiyama, Environment Expert Nippon Koi Co. Ltd, Gulberg -III, Lahore  MotohikoIijima, Project Manager, Dasu Hydropower Consultants (DHC), Gulberg- III, Lahore  Dr IffatIdris, Development Consultant, E-11, Islamabad  Muhammad AbidRana, Director Public Relations, WAPDA House, Lahore  TabassumKhursheed, Deputy Director, Dasu Hydropower Project, WAPDA Office, D-Block Sunny View, Lahore  Meer Abdul Qayyum Babar, Deputy Director (Mechanical), Dasu Hydropower Project, WAPDA Office, D-Block Sunny View, Lahore  Abdul Qayyum, Deputy Director Environment, Dasu Hydro Power Project, WAPDA Office, D-Block Sunny View, Lahore  Noor-u-lHadi, Livelihood Specialist, Dasu Hydropower Consultants (DHC), Shahrah-e-Resham, Dasu, District Kohistan  Rana Mohammed Saleem, Resettlement Expert, Dasu Hydropower Consultants (DHC), Shahrah-e-Resham, Dasu, District Kohistan  ZulfiqarTanoli, DSP HQ, District Police Office, Dasu, District Kohistan  AaqilBadshahKhattak, Deputy Commissioner (DC), Dasu, District Kohistan  Fazal-e-Malik, Tehsildar, Dasu, District Kohistan  Dr.Gulber, DHO, Dasu, District Kohistan  Fazle Rabbi, Education Officer, Dasu, District Kohistan  KhawarMahmoodGhumman, Daily Dawn, Islamabad  Rasheed Ahmed, Social Welfare Officer, Dasu, District Kohistan  Malik Filqoos, Village Head (Malik), Village Kaigah, Dasu, District Kohistan  Mohammed Shah, Village Head (Malik), Village Se, Dasu, District Kohistan  ZakirAteeq, Sr. Engineer/WAPDA, Mangla Joint Venture (MJV), WAPDA office, Mangla  FidaHussainAashuri, Chief Town Planner, NESPAK, Mangla Joint Venture (MJV), WAPDA office, Mangla  GhulamSarwarMemon, Chief Engineer and Project Director, Mangla Dam Raising Project (MDRP), WAPDA Office, Mangla Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-D [1/4] Appendix D: Stakeholder Consultation Workshops Consultation Workshops Considering the significance of DHP in the national context and its potential impacts on Indus Basin, provincial-level stakeholder consultation workshops were conducted in Peshawar, Karachi, and Lahore in September 2012 followed by a national workshop in Islamabad in October, 2012. These workshops were attended by the respective provincial EPAs, Wildlife, Fisheries, Forest, Archeology, and Public Health Departments, universities, NGOs/CSOs, ADB, JICA, World Bank, Planning Commission, Ministry of Climate Change, Federal Flood Commission, and National Highway Authority. Table: Details of Stakeholder Consultations Sr. No. Date Location Participants 1. September 9, 2012 Peshawar 41 2. September 17, 2012 Lahore 88 3. September 24, 2012 Karachi 37 4. October 2, 2012 Islamabad 73 Total 239 Workshop at Peshawar Workshop at Lahore Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-D [2/4] Workshop at Karachi Workshop at Islamabad Key Outcomes A summary of comments and suggestions received in the workshops is given in following table. Table: Summary of Discussions in Consultation Workshops Comments and suggestions Action Point/Response Development of agricultural terraces to be Agricultural terraces will be developed in the considered for the affected households in their resettlement sites. new resettlement areas. Physical cultural resources in the area should A detailed report has been prepared on Cultural be properly documented. Resources. Details are Included in the PCR Plan. The people in Kohistan have unique social The social structure of the affected people will culture, which may be affected by resettlement. not be disturbed and will remain the same. Relocation of the affected people will be still within their annual migration range. Existing health facilities will not meet local and A Public Health Action Plan has been inward migrant workers’ needs. How the project developed. Public health issues such as safe will address these health needs? drinking water, safe disposal of sewage, safe collection and disposal of solid waste, protection against dust and community health are considered as part of EMP. Protection of aquatic flora and fauna should be Environmental flows will be designed for the considered in project design. Requirement of project as per established practices Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-D [3/4] environmental flows for the sustainability of andevidence based assessment. downstream habitat is to be assessed. KKH is one of the most important highways in A traffic management plan has been prepared to Pakistan which connects Northern Areas with address the traffic related issues along KKH reset of the country. Impact of construction together with other access roads to the project traffic on KKH should be assessed. sites. WAPDA shall have an Environmental An Environmental Unit is recommended for both Monitoring Unit at the project site for DHP (WAPDA) and supervision consultants. supervision of EMP implementation. Initial filling of reservoir may affect the The first water filling of reservoir will be carried downstream release of water to Rabi crops. out slowly at the rate of 1 m/day. The rest of the river water will be allowed to flow downstream of the dam through LLO. No impact on Rabi crop isexpected. Low-flow season operation of the dam and its The reservoir will be operated as full runoff river impact on aquatic life should be considered. (base load plant). Whatever water comes to the reservoir, the same will be released through the power house. Further, environmental flows will be released to maintain the downstream habitat. Project design shall consider geohazards The project is designed complying with (landslides and earth quakes) in the area. guidelines of International Commission on Large Dams (ICOLD) to deal with geological and geomorphological hazards. State of art engineering modeling was carried out for design of the dam. Floods from GLOFs will be a serious risk to the Design flood (Probable Maximum Flood) of the project. Early warning system for flood project considered extreme flood events from forecasting is necessary for the safe operation GLOFs and extreme rainfall events. A flood of the project. telemetry network will be established in the upstream of Dasu for early warning system and better management of floods. Security issues are to be considered during Security situation in the project area is assessed implementation of the project. and a plan is prepared to address these issues in Vol.3 Analysis of Poverty, Conflict and Development Nexus: The Case for DHPP. Historical and archeological sites are to be The PCR plan includes protection of protected. DHP should support the KPK ShatihalRock Carvings. Archeology Department for protection of ShatihalRock Carvings. Impact on the community and their livelihood A livelihood restoration program is proposed in due to relocation to higher elevation. RAP with both short-term and long-term goals to mitigate any impacts on livelihood. Community-based conservations should be The project identified a suitable site in the promoted. The conservancy at Kaigah where project area (Kandia Valley) for development of Markhor is protected by private arrangement similar community-based conservation. and selling one trophy annually for $100,000 is a good example. Indus valley is a flyway for migratory birds from Bird collision and electrocution are potential Siberia to Sub Continent. Impact of threats for migratory birds. These issues will transmission line on birds’ migration should be duly be addressed. assessed. Electromagnetic waves from transmission lines These issues will be assessed and properly and their impact on human health should be addressed. assessed. Cumulative impacts of hydropower The present assessment limits its scope of development on Upper Indus Basin and Lower Upper Indus Basin (Tarbela Catchment). A Indus Basin should be monitored. detailed study is in pipeline from WCAP on ‘Strategic/Sectoral Environmental and Social Social and Resettlement Management Plan Vol.10 Communications Plan APPENDIX-D [4/4] Assessment of Indus Basin’ Indus river ecology should be protected. Detailed studies on terrestrial and aquatic Feasibility of fish ladders should be studied. ecology were under taken as part of environmental assessment. Climate change impacts may trigger GLOFs, A climate change assessment study was under high erosion, and sedimentation which could taken as part of EA. affect the project. Lost community facilities in the affected villages All basic amenities like roads, water supply, should be rebuilt or restored at resettlement irrigation, sanitation, schools and any other site(s). facilities lost will be rebuilt in the new resettlement areas. Involvement of local community in planning and Consultation meeting were carried out in all the development process is very important. project villages through PRA techniques. Ensure timely & frequently stakeholders WAPDA has established a full time office at meetings for suggestion and feedback. Dasu which is constantly providing a forum to consult on all issues. An Executive Engineer of WAPDA heads the office. DC is also involved. Capacity of WAPDA in term of human Field-level Social and Environmental Units will resources needs to be increased to address be established. social and environmental issues. Potential livelihood and income generation Both short-term and long-term livelihood activities should be part of the planning. restoration plans have been recommended in RAP Involvement of women is very important. A Gender Action Plan is prepared. Mobilization of women for capacity building and income generation activities needs to be more focused. Invertebrate fauna / aquatic flora should be These are part of Aquatic Ecology Assessment addressed Establishment of fish hatchery is proposed. A fish hatchery will be established, initially for R&D, and then later, for full scale development if the farming of snow trout is feasible in the reservoir.