This report presents the analysis and findings of the Inspection Panel on issues raised by the Request for Inspection relating to the Vishnugad Pipalkoti Hydro Electric Project for India received by the Panel on July 23, 2012. The Requesters state that they do not want the Alaknanda River to be diverted or controlled in any way. The Request includes a wide range of claims of harm and noncompliance. The Panel notes that the Request has two broad sets...