Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulations. Other Conditions: 1. Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other Model Procurement Documents agreed with the Bank) shall be used. 3. Request for Bids (Open-National), if allowed in the Procurement Plan, will be carried out under the Bank’s Procurement Regulations following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and The Public Procurement Rules 2008, as amended in August 2009) using standard/model bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. PROCUREMENT Bangladesh : Rural Electrification and Renewable Energy Development II (RERED II) Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-07-28 2019-08-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P131263 GPN Date: Project Name: Rural Electrification and Renewable Energy Development II (RERED II) Project Loan / Credit No: IDA / 51580, IDA / 55140, TF / 15034, IDA / 62020 Executing Agency(ies): Infrastructure Development Company Limited WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual W-01 UNDER REREDII- Pending AFII / Civil Work Single Stage - One IDA / 62020 Sector Technical Assistance Post Request for Bids Open - National 4,000,000.00 0.00 Implementati 2019-06-13 2019-06-16 2019-07-16 2019-08-15 2019-09-12 2021-03-05 Construction of the New Envelope on Office Building of IDCOL W-01 UNDER REREDP-II Pending AF / Shore Piling work of Single Stage - One IDA / 55140 Sector Technical Assistance Post Request for Bids Open - National 551,250.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-05-19 the New Office Building of Envelope on IDCOL GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-16 UNDER GPOBA-II FOR REREDPII / Procurement of 1,000 Pcs of Request for Single Stage - One Construction Manuals under IDA / 51580 Household Energy Post Limited 1,200.00 619.86 Completed 2017-10-18 2017-10-25 2017-11-06 Quotations Envelope IDCOL Biogas program (Package No.: G-16 under GPOBAII) G-08 UNDER REREDP-II AF / Procurement of 2 Pcs Request for Single Stage - One of Online Energy Meters IDA / 55140 Access to Electricity Post Limited 2,565.00 2,127.79 Completed 2017-10-31 2017-11-09 2017-11-16 Quotations Envelope under IDCOL Other RE program G-09-REREDII-AF AND G- 57-REREDII / Procurement Single Stage - One IDA / 51580 Access to Electricity Post Request for Bids Open - National 55,000.00 46,716.39 Completed 2017-11-28 2017-11-29 2017-12-20 2018-01-19 2018-02-04 2018-03-06 of 22 units of Motorcycles Envelope for IDCOL G-18 UNDER GPOBA-II FOR REREDPII / Pending Request for Single Stage - One Procurement of 6 units of IDA / 51580 Household Energy Post Limited 75.00 0.00 Implementati 2017-12-29 2018-01-08 2018-01-23 Quotations Envelope toolkit for IDCOL Bio-gas on Program G-56 UNDER REREDP-II / Printing and Supply of Single Stage - One IDA / 51580 Household Energy Post Request for Bids Open - National 25,000.00 22,809.43 Completed 2017-11-28 2017-11-29 2017-12-20 2018-01-19 2018-02-04 2018-03-06 100,000 Pcs Calendar for Envelope IDCOL ICS Program. Page 1 G-11 UNDER REREDP-II AF / Procurement of 10 Request for Single Stage - One units of CPU and 13 units IDA / 55140 Access to Electricity Post Limited 6,282.01 5,911.85 Completed 2018-01-10 2018-01-21 2018-01-28 Quotations Envelope of monitor for IDCOL HO and RE office G-19 UNDER GPOBA-II / Supply of Biogas stoves for Request for Single Stage - One IDA / 51580 Household Energy Post Limited 28,750.00 25,032.78 Completed 2018-05-24 2018-05-31 2018-06-30 IDCOL Biogas & Bio- Quotations Envelope fertilizer Program. G-20 UNDER GPOBA-II / Supply of equipment for the Request for Single Stage - One IDA / 51580 Household Energy Post Open - National 8,250.00 7,782.60 Completed 2018-06-05 2018-06-13 2018-06-25 Technical Monitoring Facility Quotations Envelope of IDCOL. G-21 UNDER GPOBA-II / Supply and fixation of Request for Single Stage - One furniture, fixture and IDA / 51580 Household Energy Post Limited 36,880.00 25,588.37 Terminated 2018-07-12 2018-07-19 2018-07-26 Quotations Envelope equipment for IDCOL (17th floor-North). G-22 UNDER GPOBA-II / Supply of refrigerator for the Request for Single Stage - One IDA / 51580 Household Energy Post Limited 1,880.00 990.77 Completed 2018-07-12 2018-07-20 2018-07-27 Technical Monitoring Facilty Quotations Envelope of IDCOL G-05 UNDER USAID / Procurement of 30 unit IP Phones, 10 unit network Request for Single Stage - One TF / 15034 Access to Electricity Post Limited 2,812.00 2,602.48 Completed 2018-09-24 2018-10-02 2018-10-09 switch and 1 box CAT6 Quotations Envelope UTP cable for new regional offices of IDCOL G-06 UNDER USAID / Procurement of 5 unit of Request for Single Stage - One TF / 15034 Access to Electricity Post Limited 4,687.00 3,006.91 Completed 2018-09-24 2018-10-03 2018-10-10 LASER printers for new Quotations Envelope regional offices of IDCOL G-13 UNDER REREDII-AF Request for Single Stage - One / Supply of 3 unit of laser IDA / 55140 Access to Electricity Post Limited 5,250.00 3,433.07 Completed 2018-07-12 2018-07-19 2018-07-26 Quotations Envelope printers for IDCOL G-14 UNDER REREDII-AF / Supply of Batteries for Request for Single Stage - One IDA / 55140 Access to Electricity Post Limited 5,750.00 4,985.58 Completed 2018-07-12 2018-07-19 2018-07-26 Online UPS and IPS of Quotations Envelope IDCOL G-09 UNDER REREDII- AFII / Supply of furniture, Pending Single Stage - One fixture and office equipment IDA / 55140 Sector Technical Assistance Post Request for Bids Open - National 1,262,500.00 0.00 Implementati 2020-08-24 2020-08-29 2020-09-26 2020-10-26 2020-11-23 2021-05-22 Envelope for the new office building on of IDCOL G-15 UNDER REREDII-AF Request for Single Stage - One / Supply and installation of IDA / 55140 Access to Electricity Post Limited 6,875.00 5,545.59 Completed 2018-11-01 2018-11-09 2018-11-16 Quotations Envelope DocuDex server for IDCOL G-24 UNDER GPOBA-II / Supply of furniture, fixture Request for Single Stage - One IDA / 51580 Access to Electricity Post Limited 6,125.00 5,736.87 Completed 2018-11-01 2018-11-11 2018-11-18 and office equipment in Quotations Envelope IDCOL Dhaka RO G-16 UNDER REREDP-II Pending AF / Supply of thirty (30) Single Stage - One IDA / 55140 Access to Electricity Post Request for Bids Open - National 18,750.00 0.00 Implementati 2018-12-09 2018-12-10 2019-01-09 2019-02-04 2019-03-07 2019-03-22 units Desktop Computer for Envelope on IDCOL employees Page 2 G-06 UNDER REREDP-II AFII / Supply of Equipment Pending Single Stage - One (Phase-02) for IDCOL IDA / 62020 Access to Electricity Post Request for Bids Open - National 220,000.00 0.00 Implementati 2018-12-09 2018-12-10 2019-01-09 2019-02-10 2019-03-17 2019-05-16 Envelope Technical Monitoring on Facilities G-17 UNDER REREDP-II AF / Supply of two (02) Pending Request for Single Stage - One units PoE Switch & two IDA / 55140 Access to Electricity Post Limited 2,375.00 0.00 Implementati 2018-12-10 2018-12-19 2018-12-26 Quotations Envelope (02) units Laser Printer for on IDCOL G-23 UNDER GPOBA-II / Request for Single Stage - One Supply of rechargeable table IDA / 51580 Household Energy Post Limited 875.00 643.70 Completed 2018-07-12 2018-07-19 2018-07-26 Quotations Envelope fans for IDCOL. G-10 UNDER REREDP-II AF II / Framework Pending Single Stage - One Agreement for Supply of IDA / 62020 Access to Electricity Post Request for Bids Open - National 71,822.63 0.00 Implementati 2018-12-26 2018-12-27 2019-01-17 2019-02-17 2019-03-19 2020-03-18 Envelope Toners and Maintenance Kit on for printers of IDCOL G-11 UNDER REREDP-II Pending AF II / Framework Single Stage - One IDA / 62020 Access to Electricity Post Request for Bids Open - National 14,908.25 0.00 Implementati 2018-12-26 2018-12-27 2019-01-17 2019-02-17 2019-03-19 2020-03-18 Agreement for Supply of Envelope on Stationary for IDCOL G-12 UNDER REREDII-AF- II / Supply of 190 units of Pending Microsoft Exchange Online Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 10,000.00 0.00 Implementati 2019-01-15 2019-01-21 2019-01-29 Plan-1 (EOP-1) & Office 365 Quotations Envelope on Enterprise E1 subscription license for IDCOL G-18 UNDER REREDP-II AF / Selection of Firm for Request for Single Stage - One Printing Leaflet & Manuals IDA / 55140 Household Energy Post Limited 1,062.50 0.00 Canceled 2019-04-04 2019-04-10 2019-04-30 Quotations Envelope for IDCOL Biogas & Bio- fertilizer program G-12 UNDER REREDP-II Pending AF-II / Printing and Supply Single Stage - One IDA / 62020 Household Energy Post Request for Bids Open - National 60,000.00 0.00 Implementati 2019-03-04 2019-03-09 2019-03-31 2019-04-09 2019-05-14 2019-06-13 of 240,000 pcs of Calender Envelope on for IDCOL ICS Program G-19 UNDER REREDP-II AF / Supply of Arsenic Kit Pending for testing the arsenic level Request for Single Stage - One IDA / 55140 Access to Electricity Post Limited 2,812.50 0.00 Implementati 2019-03-26 2019-04-21 2019-05-02 in potential Solar Irrigation Quotations Envelope on Pump Project sites by IDCOL inspectors G-13 UNDER REREDP-II AF-II / Supply of thirty paper license of MS Office Pending 2019 (standard), thirty paper Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 28,750.00 0.00 Implementati 2019-03-29 2019-04-18 2019-04-30 license of Windows 10 pro Quotations Envelope on and Security firewall with UTM for 300 users of IDCOL HO & RE office G-14 UNDER REREDP-II AF-II / Supply of 120 SFT Pending Request for Single Stage - One Roller Blinds Fabrics & 22 IDA / 62020 Access to Electricity Post Limited 6,125.00 0.00 Implementati 2019-04-02 2019-04-11 2019-04-18 Quotations Envelope pcs Executive Chair for on IDCOL HO 17 Floor Page 3 G-20 UNDER REREDP-II AF / Supply of 30 television and 30 refrigerators for Pending dissemination in different IDA / 55140 Access to Electricity Post Direct Selection Direct 18,750.00 0.00 Implementati 2019-04-01 2019-04-02 2019-04-07 2019-04-11 solar mini-grid project sites on for demonstration of energy efficient appliances G-15 UNDER REREDP-II Pending AF-II / Supply of Attendance Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 7,437.50 0.00 Implementati 2019-05-05 2019-05-13 2019-05-20 Device for IDCOL Regional Quotations Envelope on Offices G-21 UNDER REREDP-II Pending AF / Supply of 02 units IDA / 55140 Access to Electricity Post Direct Selection Direct 875.00 0.00 Implementati 2019-05-29 2019-05-30 2019-06-09 2019-06-11 Hard Disk for IBA system on X3650 M4 Server G-16 UNDER REREDP II Pending AF II / Supply of 01 unit Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 4,375.00 0.00 Implementati 2019-06-09 2019-06-20 2019-06-30 6KVA online UPS for server Quotations Envelope on room of IDCOL Dhaka RO G-17 UNDER RERED-II-AF- Pending Request for Single Stage - One II / Printing and Supply of IDA / 62020 Household Energy Post Limited 6,875.00 0.00 Implementati 2019-06-24 2019-07-02 2019-07-09 Quotations Envelope Biogas Manuals for IDCOL on G-18 UNDER REREDP-II Pending AFII / Supply of 20 Single Stage - One IDA / 62020 Access to Electricity Post Request for Bids Open - National 45,000.00 0.00 Implementati 2019-08-29 2019-09-03 2019-09-24 2019-11-07 2019-11-28 2019-12-29 Motorcycles for new regional Envelope on managers G-19 UNDER REREDP-II Pending Request for Single Stage - One AFII / Supply of 35 units IDA / 62020 Access to Electricity Post Limited 2,406.25 0.00 Implementati 2019-08-22 2019-09-02 2019-09-09 Quotations Envelope IP Phones on G-20 UNDER REREDP-II Pending Request for Single Stage - One AFII / Supply of 41 units IDA / 62020 Access to Electricity Post Limited 9,225.00 0.00 Implementati 2019-08-04 2019-08-19 2019-08-26 Quotations Envelope IPS Battery on G-21 UNDER REREDP-II Pending AFII / Supply of 254 units Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 41,275.00 0.00 Implementati 2019-08-05 2019-08-27 2019-09-03 of mobile phones for field Quotations Envelope on staffs G-22 UNDER REREDP-II Pending AFII / Supply of 7 units Request for Single Stage - One IDA / 62020 Access to Electricity Post Limited 6,125.00 0.00 Implementati 2019-08-08 2019-08-24 2019-08-31 Laptops for IDCOL HO Quotations Envelope on employees G-23 UNDER REREDP-II Pending Request for Single Stage - One AFII / Supply of 25 units IDA / 62020 Access to Electricity Post Limited 1,875.00 0.00 Implementati 2019-08-19 2019-08-27 2019-09-03 Quotations Envelope IP Camera on G-24 UNDER REREDP-II Pending Request for Single Stage - One AFII / Supply of 10 pcs IDA / 62020 Access to Electricity Post Limited 312.50 0.00 Implementati 2019-08-26 2019-09-03 2019-09-10 Quotations Envelope Analog Hydrometer on G-25 UNDER REREDP-II Pending Request for Single Stage - One AFII / Supply of 2 pcs IDA / 62020 Access to Electricity Post Limited 6,250.00 0.00 Implementati 2019-09-09 2019-09-17 2019-09-24 Quotations Envelope Digital Battery Tester on G-22 UNDER REREDP-II / Pending Request for Single Stage - One Supply of 40 units Tablet IDA / 62020 Access to Electricity Post Limited 7,500.00 0.00 Implementati 2019-10-03 2019-10-14 2019-10-21 Quotations Envelope for technical inspectors on Page 4 G-23 UNDER REREDP-II Pending Request for Single Stage - One AF / Supply of 137 units IDA / 55140 Access to Electricity Post Limited 10,275.00 0.00 Implementati 2019-09-02 2019-09-10 2019-09-18 Quotations Envelope Multimeter on G-24 UNDER REREDP-II AF / Supply of 05 units Pending Request for Single Stage - One Printers, 1 unit Photocopier IDA / 55140 Access to Electricity Post Limited 16,500.00 0.00 Implementati 2019-08-04 2019-08-19 2019-08-29 Quotations Envelope Machine and 03 units on Projectors G-25 UNDER REREDP-II Pending AF / Supply of 01 unit Request for Single Stage - One IDA / 55140 Access to Electricity Post Limited 875.00 0.00 Implementati 2019-08-04 2019-08-08 2019-08-18 attendance device for IDCOL Quotations Envelope on office space NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NS-03 UNDER REREDPII- AF / Selection of Firm for Battery Testing under IDA / 55140 Access to Electricity Post Direct Selection Direct 20,000.00 38,145.18 Signed 2018-02-22 2018-02-27 2018-03-22 2018-12-31 IDCOL Other RE Program (Package No.: NS-03 under REREDPII-AF) NS-05 UNDER REREDII- AFII / Selection of Firm for Collecting Power Quality IDA / 62020 Access to Electricity Post Direct Selection Direct 5,000.00 4,768.15 Signed 2018-11-05 2018-11-08 2018-11-16 2018-12-11 Data of Transmission Line of Two Power Plants of SEBL SMG Project-2 NS-06 UNDER REREDPII- AFII / Selection of Firm for Pending providing Billboard Display IDA / 62020 Access to Electricity Post Direct Selection Direct 57,500.00 0.00 Implementati 2018-11-08 2018-11-12 2018-11-27 2019-11-27 Service to promote IDCOL on Programs and Projects CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-16 UNDER RERED-II-AF- II / Selection of firm for developing the Consultant communication strategy for Under IDA / 62020 Household Energy Post Qualification Open - National 43,750.00 0.00 2018-06-24 2018-07-09 2018-07-20 2018-07-27 2018-08-06 2018-11-04 IDCOL ICS program Implementation Selection (procurement method: CQS with Limited Market approach) S-06 UNDER USAID / Audit services for solar Consultant Pending Irrigation Pump (SIP) and TF / 15034 Access to Electricity Post Qualification Open - National 50,000.00 0.00 2018-10-31 2018-11-14 2018-12-13 2018-12-18 2018-12-20 2019-04-30 Implementation solar Mini-Grid (SMG) Selection sponsors of IDCOL Page 5 S-21 UNDER REREDII- AFII / Consulting firm for Consultant the interior design and Pending IDA / 62020 Sector Technical Assistance Post Qualification Open - National 125,000.00 0.00 2020-04-05 2020-04-26 2020-06-14 2020-07-09 2020-07-29 2021-01-25 supervision of decoration of Implementation Selection new office building of IDCOL S-20 UNDER REREDII- AFII / A consulting firm for Consultant Architectural and Structural Pending IDA / 62020 Sector Technical Assistance Post Qualification Open - National 250,000.00 0.00 2018-11-20 2018-12-10 2018-12-17 2019-01-16 2019-02-16 2021-05-13 design and work supervision Implementation Selection of IDCOL's new office building S-24 UNDER REREDP-II AFII / Selection of a firm Quality And Cost- Pending IDA / 62020 Access to Electricity Post Open - National 25,000.00 0.00 2019-10-01 2019-10-22 2019-11-26 2019-12-24 2020-01-08 2020-01-26 2020-03-01 2020-05-31 for designing process flow Based Selection Implementation automation of IDCOL INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDCOL S-13 / Technical Consultant for Biogas Based IDA / 51580 Access to Electricity Prior Direct Selection Direct 0.00 155,946.05 Canceled Captive Plant - Draft Negotiated Contract S-11 UNDER GPOBA-II FOR REREDPII / Selection Individual of Individual Consultant for IDA / 51580 Household Energy Post Consultant Open 2,560.00 2,248.94 Completed 2017-12-10 2018-01-04 2018-01-11 2018-01-28 2018-02-27 development of PO Module Selection software under IDCOL Biogas program S-09 UNDER GPOBA-II FOR REREDPII / Selection of Individual Consultant for Individual Development and Publication IDA / 51580 Access to Electricity Post Consultant Open 24,400.00 23,840.74 Completed 2017-11-30 2017-12-18 2017-12-25 2018-01-17 2018-06-16 of Press News about IDCOL Selection Programs & Project (Package No.: S-09 under GPOBA-II) S-12 UNDER GPOBA-II / Selection of Individual Consultant for the Design of Individual Low-cost Brick-cement Based Under IDA / 51580 Household Energy Post Consultant Open 11,000.00 0.00 2018-02-20 2018-03-05 2018-03-12 2018-04-03 2018-04-23 Biogas Plant under IDCOL Implementation Selection Biogas & Bio-fertilizer Program (Package No.: S-12 under GPOBA-II) S-24 UNDER REREDPII-AF / Selection of firm for conducting impact assessment of solar IDA / 55140 Access to Electricity Post Direct Selection Direct 108,000.00 126,621.50 Signed 2018-02-22 2018-02-25 2018-03-10 2018-12-31 irrigation, solar mini-grid and ICS Projects of IDCOL (Package No.: S-24 under REREDPII-AF) S-13 UNDER GPOBA-II / Selection of Individual Consultant for development Individual of 'Construction Manual' and IDA / 51580 Household Energy Post Consultant Open 3,500.00 3,046.31 Completed 2018-03-01 2018-03-09 2018-03-14 2018-03-22 2018-05-06 'User Manual' under IDCOL Selection Biogas & Bio-fertilizer Program. Page 6 S-14 UNDER GPOBA-II / Selection of Individual Consultant for the Individual development of online-based IDA / 51580 Household Energy Post Consultant Direct 1,400.00 1,218.52 Completed 2018-04-05 2018-04-10 2018-04-20 2018-05-08 2018-11-04 PO Data Entry Software for Selection larger plants under IDCOL Biogas & Bio-fertilizer program. S-17 UNDER RERED-II-AF- II / Selection of individual Individual consultant for development IDA / 62020 Household Energy Post Consultant Limited 4,380.00 3,814.52 Signed 2018-10-08 2018-10-23 2018-10-28 2018-11-05 2019-01-19 of a sociocultural program to Selection promote woodlot plantation under IDCOL ICS Program. S-18 UNDER RERED-II-AF- II / Selection of Individual Consultant for the Individual Development of Mobile IDA / 62020 Household Energy Post Consultant Limited 5,625.00 5,483.37 Signed 2018-10-15 2018-10-30 2018-11-04 2018-11-08 2019-02-06 Application Based Inspection Selection system under IDCOL ICS Program. S-22 UNDER REREDP-II AF / Selection of Technical Individual Pending Consultant under IDCOL IDA / 55140 Access to Electricity Post Consultant Limited 6,250.00 0.00 2018-01-15 2018-01-20 2018-02-10 2018-02-25 2018-05-26 Implementation Biomass program (under Selection Renewable Energy Project) S-19 UNDER REREDII- AFII / Firm for arranging a design competition to select Pending a firm for architectural and IDA / 62020 Sector Technical Assistance Post Direct Selection Direct 37,500.00 0.00 2018-10-31 2018-11-06 2018-11-20 2019-11-20 Implementation structural design work of new office building of IDCOL S-26 UNDER REREDP-II AF / Selection of Individual Individual Consultant for Designing Pending IDA / 55140 Household Energy Post Consultant Limited 937.50 0.00 2019-01-14 2019-01-16 2019-01-20 2019-01-23 2019-03-30 Leaflet & Manuals for Implementation Selection IDCOL Biogas & Bio- fertilizer program S-22 UNDER REREDP-II Individual AF-II / Individual Consultant Pending IDA / 62020 Household Energy Post Consultant Direct 56,250.00 0.00 2019-03-04 2019-03-11 2019-03-25 2019-03-31 2020-02-29 to develop domestic and Implementation Selection commercial stoves S-23 UNDER REREDP-II Pending AF-II / Design of Biogas IDA / 62020 Household Energy Post Direct Selection Direct 312.50 0.00 2019-03-05 2019-03-08 2019-03-21 2019-03-31 Implementation Manual S-27 UNDER REREDP-II AF / Selection of Individual Consultant for developing mobile application for Individual Pending inspection of Solar Irrigation IDA / 55140 Access to Electricity Post Consultant Limited 12,500.00 0.00 2019-09-01 2019-09-05 2019-09-08 2019-09-12 2019-10-13 Implementation & Solar-Minigrid with web Selection service and option for integrating other project- related inspection templates Page 7