ZRWSS procurement plan 蓝色:已完成采购工作额合 同。黄色:存在调整的合同。 绿色:未调整且未完成采购合 同。 Contract Contract package cost implementation plan Contrac Price Procureme t Contract package Bank bidding No millio millio nt contrac packag contents million million review docume n n Method t PIU e name RMB US$ nt RMB US$ period issued Anji 204.31 32.85 121.73 19.52 prior review Anji wastewater house AJHC connection shopping for the first 2015/7 3 villager's committee contract wastewater house AJHC-1 connection for Jingcun 1.08 0.17 1.08 0.17 shopping prior 2015/10 3 Anji Guoyuan water affair compa village wastewater house AJHC-2 connection for Baishuiwan 2.76 0.45 2.76 0.45 shopping post 2015/10 3 Anji Guoyuan water affair compa village wastewater house AJHC-3 connection for Yinkeng 1.34 0.22 1.34 0.22 shopping post 2015/10 3 Anji Guoyuan water affair compa 1 village wastewater house AJHC-4 2.32 0.37 2.32 0.37 shopping post 2015/10 3 Majia Villager's committee connection for Majia village wastewater house AJHC-5 connection for Tangshe 1.47 0.24 1.47 0.24 shopping post 2015/10 3 Tangshe villager's committee village wastewater house AJHC-6 connection for Majialong 1.20 0.19 1.20 0.19 shopping post 2015/10 3 Majialong villager's committee village wastewater house AJHC-7 connection for 6 villages 14.14 2.28 NCB post 2016/7 12 Anji Guoyuan water affair compa suah as Maji village (1)works of 13.37.4km water distribution pipe (2)works of 13.27km wastewater pipes 2 AJMX1C (3)3.9km tail water pipeline 31.24 5.04 28.13 4.54 NCB post 2015/9 18 Anji Guoyuan water affair compa (4)Meixi Wastewater Treatment Plant 2nd Stage Construction Work (1) works of water distribution pipes in 3 AJCV1C 2villages; 3.50 0.56 1.71 0.28 NCB post 2015/8 15 Anji Guoyuan water affair compa (2)works of wastewater pipes in4 villages (1)works and SIC of a 13000m3/d boosting station and 23km water 4 AJTH1C distribution pipes; 51.82 8.36 38.58 6.22 NCB prior 2015/3 16 Anji Guoyuan water affair compa (2)works and SIC of 5500 m3/d liftstation and 47km wastewater pipes works of wastewater collection pipes in 6 5 AJCV2C villages of Tianhuangping 10.77 1.74 11.74 1.89 NCB prior 2014/12 9 Anji Guoyuan water affair compa area such as jingcun village works of wastewater collection pipes in 4villages 6 AJCV3C of Tianhuangping area 9.24 1.49 8.22 1.33 NCB prior 2014/12 9 Anji Guoyuan water affair compa such as Henglu village works of wastewater collection and treatment 7 AJDV1C system in 3 villages such 2.63 0.42 7.31 1.18 NCB prior 2014/11 9 Anji Guoyuan water affair compa as majianong village works of wastewater collection and treatment 8 AJDV2C system in 5 villages such 14.02 2.16 15.23 2.34 NCB post 2015/7 9 Anji Guoyuan water affair compa as Zhangwu village works of wastewater collection and treatment 9 AJDV3C system in 6 decentralized 28.83 4.65 NCB post 2016/8 9 Anji Guoyuan water affair compa villges such as Zhangcun villages works of wastewater collection and treatment 10 AJDV4C system in 6 decentralized 26.09 4.21 NCB post 2016/9 9 Anji Guoyuan water affair compa villges such as Baofu villages 11 AJ1G Pickup procurement 0.62 0.10 0.65 0.10 shopping prior 2016/4 1 Anji Guoyuan water affair compa office equipment 12 AJ2G procurement 0.62 0.10 shopping post 2016/8 1 Anji Guoyuan water affair compa 13 AJ3G offic furniture procurement 0.62 0.10 shopping post 2016/8 1 Anji Guoyuan water affair compa works of 3.6km water distribution pipe; works of 11km to be 14 AJXF1C wastewater collection determine NCB post 2016/10 12 Anji Guoyuan water affair compa d pipes in villages of Xiaofeng area Fuyang 413.92 67.08 292.22 41.03 prior review Fuyang wastewater house FYHC shopping for the first 2015/7 5 connection contract wastewater house 15 FYHC-2 connection for Gaoqiao 2.30 0.37 2.30 0.37 shopping prior 2015/7 5 Fuyang water affair company village wastewater house 16 FYHC-1 connection for 9 villages 13.00 2.10 13.05 2.10 NCB post 2016/2 15 Fuyang water affair company such as village (1)works of Fuyang WWTP upgrading from 80000m3/d1B to FYWW1 17 C 60000m3/d1A 92.02 14.94 70.11 11.31 NCB prior 2015/10 18 Fuyang water affair company (2)works of Fuyang WWTP expansion from 60000m3/d 1A to 140000m3/d1A (1)SIC of Fuyang WWTP modification from 80000m3/d1B to FYWW1 18 S 60000m3/d1A 137.83 22.38 79.76 12.86 NCB prior 2015/8 18 Fuyang water affair company (2)SIC of Fuyang WWTP expansion from 60000m3/d 1A to 140000m3/d1A works of 27.5km 19 FYXD1C wastewater pipes in 18.08 2.94 8.51 1.37 NCB post 2015/4 15 Fuyang water affair company Tashan and other villages works of 12.6km wastewater pipes and 1.6km stormwater 20 FYXD2C pipes in Songxi and other 10.37 1.67 6.23 1.00 NCB prior 2014/12 15 Fuyang water affair company villlages works of 12.2km wasetwater 21 FYXD3C pipes in Nanjin village 12.90 2.08 8.58 1.38 NCB post 2015/10 15 Fuyang water affair company works of water supply 22 FYXD4C pipes and water house 21.57 3.50 25.65 NBF connection in Xindeng area works of 32km wastewater 23 FYDY1C pipes in dayuan area 21.47 3.46 15.94 2.57 NCB post 2015/8 15 Fuyang water affair company works of water supply 24 FYDY2C pipes and water house 12.50 2.02 12.21 NBF connection in dayuan area works of 4 centralized and decentralized wastewater 25 FYCD1C collection and treatment 22.52 3.66 15.05 2.43 NCB prior 2015/1 15 Fuyang water affair company system in villages such as Gaoqiao village works of 4 centralized and decentralized wastewater 26 FYCD2C collection and treatment 30.87 4.98 25.69 4.14 NCB prior 2015/7 16 Fuyang water affair company system in villages such as Huanggongwang village works of 3 centralized decentralized wastewater 27 FYCD3C collection and treatment 12.49 2.01 9.14 1.47 NCB prior 2015/7 17 Fuyangwater affair company system in villages such as Hongzhuang village works of wasterwater 28 FYCK1C collection in Yesheng 6.00 0.97 NCB post 2016/11 12 Fuyangwater affair company village of Changkou area works of 3 centralized decentralized wastewater to be 29 FYCD4C collection and treatment determine NCB post 2016/12 18 Fuyangwater affair company system in villages such as d Jiangjia village works of 4 centralized decentralized wastewater to be 30 FYCD5C collection and treatment determine NCB post 2017/4 18 Fuyangwater affair company system in villages such as d Fangjiajin village works of 4 centralized decentralized wastewater to be 31 FYCD6C collection and treatment determine NCB post 2017/6 18 Fuyangwater affair company system in villages such as d Qinle village works of 6 centralized decentralized wastewater to be 32 FYCD7C collection and treatment determine NCB post 2016/12 18 Fuyangwater affair company system in villages such as d Xiejiaxi village works of wasterwater to be 33 FYLY1C collection and treatment determine NCB post 2017/10 18 Fuyangwater affair company system of Longyang area d Tiantai 157.68 25.65 64.20 10.46 Tiantai wastewater house 34 TTHC connection 4.48 0.73 5.36 0.87 NCB post 2015/11 12 Tiantai water supply company works of wastewater TTDV1 collection and treatment 35 4.60 0.75 3.84 0.62 NCB pior 2015/5 12 Tiantai water supply company C system in 2 villages such as Bixiazheng village works of wastewater TTCD1 collection and treatment 36 system in 5 villages such 10.70 1.74 8.28 1.35 NCB post 2015/9 12 Tiantai water supply company C as Baihedian village works of wastewater TTDV2 collection and treatment 37 system in 7 villages such 29.10 4.74 29.62 4.83 NCB post 2015/10 12 Tiantai water supply company C as Houcun village works of wastewater TTCD2 collection pipes in 7 38 villages such as 13.70 2.23 NCB post 2016/8 12 Tiantai water supply company C Hefangzhao village TTWW1 works of 4km wastwater 39 pipes in Baer 4.70 0.77 NCB post 2016/8 15 Tiantai water supply company C works of wastewater pipes TTCV1 40 in 6 villages such as 16.60 2.71 NCB post 2016/8 15 Tiantai water supply company C Kengbian villages works of 5.5km TTWW2 wastewater pipes and 41 4.7km stormwater pipes of 25.10 4.09 NCB post 2015/12 18 Tiantai water supply company C Tiantaishan road works of wastewater TTCD3 collection pipes in 5 42 villages such as Qianyang 22.90 3.59 NCB post 2016/8 18 Tiantai water supply company C village works of wastewater TTCD5 collection pipes in6 villages 43 such as Wanshanzhang 8.15 1.42 NCB post 2016/8 18 Tiantai water supply company C village (1)works of wastewater TTCD4 collection pipes in 7 44 villages such as Sanlisong 17.30 2.82 16.86 2.75 NCB post 2016/3 12 Tiantai water supply company C village 2 engineering management 45 TTXJ1 cars 0.35 0.06 0.24 0.04 shopping pior 2015/11 Tiantai water supply company Longqu 178.43 28.78 50.32 8.16 an 1 CPs for Longquan prior review 46 LQHC wastewater house 2.90 0.48 2.89 0.48 shopping for the first 2015/8 longquan rural water supply stati connection contract 47 LQWS1 (1) works and SIC of 38.00 6.13 38.80 6.26 NCB post 2015/7 18 longquan water and wastewater C Nandayang WSP modification from 30000m3/d to 25000m3/d and expansion from 25000m3/d to 50000m3/d; (1) works of 3.91km WS pipes,4.43km wastewater LQWS2 48 C pipes and 4.11km storm 14.40 2.32 NCB post 2016/12 18 longquan water and wastewater water pipes and drainage Channel 40 CPs for works of prior review LQWW1 C Longquan back alley 42.59 6.93 shopping for the first 2015/8 48 longquan water and wastewater impvovement in 124 sites contract works of wasterwater collection pipes of Lonquan LQWW1C 49 -1 Back Alley improvement works 1.85 0.30 shopping prior 2015/9 6 longquan water and wastewater in east downtown houses E group works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley 50 1.90 0.29 shopping post 2016/8 6 longquan water and wastewater 2 improvement works (phase 1) in Jinshi Alley works of wasterwater collection LQWW1C- pipes of 3 Lonquan Back Alley 51 0.43 0.07 0.40 0.06 shopping post 2016/3 3 longquan water and wastewater 3 improvement works such as Cangsong Road works of wasterwater collection LQWW1C- pipes of 5 Lonquan Back Alley 52 10.17 1.58 NCB post 2016/6 12 longquan water and wastewater 4 improvement works such as Dayang Residential area works of wasterwater collection LQWW1C- pipes of 3 Lonquan Back Alley 53 6.96 1.08 NCB post 2016/7 12 longquan water and wastewater 5 improvement works such as Dong Residential area works of wasterwater collection LQWW1C- pipes of 4 Lonquan Back Alley to be 54 determine NCB post 2016/9 6 longquan water and wastewater 6 improvement works in d downtown 55 LQWW1C- works of wasterwater collection to be NCB post 2017/2 12 longquan water and wastewater 7 pipes of Lonquan Back Alley determine d improvement works such as Residential area along two side of Cangsong North Road works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley to be 56 determine NCB post 2017/3 8 longquan water and wastewater 8 improvement works such as d Jiuchang alley and around area works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley to be 57 determine NCB post 2017/4 8 longquan water and wastewater 9 improvement works (phase d 1)such as Lishan area works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley to be 58 determine NCB post 2017/6 6 longquan water and wastewater 10 improvement works (phase d 2)such as Lishan area works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley to be 59 determine NCB post 2017/8 6 longquan water and wastewater 11 improvement works such as d Lvjia Residential area works of wasterwater collection LQWW1C- pipes of Lonquan Back Alley to be 60 determine NCB post 2017/11 6 longquan water and wastewater 12 improvement works such as d Nanqin area (1)works ad SIC of New 4000m3/d Anren WSP and works of 8.24km water distribution pipes 61 LQAR1C (2)works and SIC of new 26.50 4.31 NCB post 2015/12 18 longquan rural water supply stati Anren 1800m3/d WWTP and works of 5.87km wastewater pipes (1)works ad SIC of new 4000m3/d Badu WSP and works of 11.4km water distribution pipes 62 LQBD1C (2)works and SIC of new 22.84 3.71 NCB post 2016/8 18 longquan rural water supply stati Badu 1300m3/d WWTP and works of 7.61km wastewater pipes works of wastewater collection and treatment 63 LQDV1C system in 7 villages such 8.79 1.43 6.38 1.06 NCB prior 2015/2 9 longquan rural water supply stati as Hecun village works of wastewater collection and treatment 64 LQDV2C system in 5 villages such 12.50 1.94 NCB post 2016/8 18 longquan rural water supply stati as Luozhuan village works of wastewater collection and treatment 65 LQDV3C system in 5villages such as 9.30 1.44 NCB post 2016/8 18 longquan rural water supply stati Xixi village works of wastewater to be collection and treatment 66 LQDV4C system in 3 villages such determine NCB post 2016/9 18 longquan rural water supply stati d as Zhenbu village works of wastewater to be collection and treatment 67 LQDV5C system in 3 villages such determine NCB post 2016/9 18 longquan rural water supply stati d as Lingkun village works of wastewater to be collection and treatment 68 LQDV6C system in 4 villages such determine NCB post 2016/10 18 longquan rural water supply stati d as Nanxikou village office equipment 69 LQ1G procurement 0.08 0.01 shopping post 2016/9 longquan rural water supply stati 70 LQ2G Pickup procurement 0.28 0.04 shopping prior 2016/9 longquan rural water supply stati office equipment 71 LQ3G procurement 0.05 0.01 shopping post 2016/9 longquan water and wastewater 72 LQ4G Pickup procurement 0.20 0.03 shopping post 2016/9 longquan water and wastewater Phase 1 of ZRWSS 954.33 154.36 TA project management and ZRTA1 implementation assistance ZRTA1- Anji project management of Anji 1.89 0.29 CQS prior 12/8/2015 22 ZRTA1- Tiantai project management of Tiantai 1.89 0.29 CQS prior 12/8/2015 22 ZRTA1- project management of Longquan 1.89 0.29 CQS prior 12/8/2015 22 Longquan employing consultant of Anji 0.20 0.03 IC post employing consultant of Fuyang 0.20 0.03 IC post employing consultant of Tiantai 0.20 0.03 IC post employing consultant of 0.30 0.05 IC post ZJPPMO project management of ZRTA-4 1.95 0.30 CQS prior 3/11/2016 20 ZJPPMO institutional strengthening ZRTA2 of water affairs company institutional strengthening ZRTA2-2 of water affairs company of 0.70 0.11 CQS post 7/1/2016 5 Anji total(NBF included) 954.33 154.36 C=civil works S= supply,installation and commisionning TA=technical assistance CD=centralized and decentralized villages CV=centralized villages DV=decentralized villages PROCUREMENT China : Zhejiang Rural Water Supply and Sanitation Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-08-08 2019-04-09 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133018 GPN Date: Project Name: Zhejiang Rural Water Supply and Sanitation Project Loan / Credit No: IBRD / 84240 Executing Agency(ies): Zhejiang Province PMO WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AJDV1C / Works of Wastewater Collection and Single Stage - One Treatment System in Majia IBRD / 84240 Prior Request for Bids Open - National 1,176,626.65 Signed Envelope Village, Majianong Village and Tanghe Village FYHC-2 / First Batch Request for Open - Fuyang Wastewater House IBRD / 84240 Prior 359,723.45 Signed Quotations International Connection FYWW1C / Fuyang Waste Water Treatment Plant Single Stage - One IBRD / 84240 Prior Request for Bids Open - National 10,957,227.38 Signed Upgrading and Expansion Envelope Works AJHC-1 / Anuji Household Request for Open - IBRD / 84240 Prior 170,563.68 Signed Connection Works Quotations International AJXF1C / Xiaofeng Single Stage - One IBRD / 84240 Prior Request for Bids Open - National 15,812,171.10 Signed Network Construction Envelope AJCV2C and AJCV3C / Works of Wastewater Collection Pipes in 6 Villages of Tianhuangping Single Stage - One Area, Contract No.AJCV2C, IBRD / 84240 Prior Request for Bids Open - National 3,224,763.77 Signed Envelope and Works of Wastewater Collection Pipes in other 5 Villages of Tianhuangping Area, Contract No. AJCV3C FYCD1C and FYCD2C / Works for Centralized and Single Stage - One Decentralized Wastewater IBRD / 84240 Prior Request for Bids Open - National 3,407,309.08 Signed Envelope Collection and Treatment System in Villages LQDV1C / works of wastewater collection and Single Stage - One IBRD / 84240 Prior Request for Bids Open - National 1,030,156.05 Signed treatment system in 7 Envelope villages AJTH1C / Tianhuangping Single Stage - One IBRD / 84240 Prior Request for Bids Open - National 6,213,653.92 Signed Wastewater Pipeline Works Envelope LQHC-1 / First Batch Request for Open - Longquan Wastewater House IBRD / 84240 Prior 456,544.32 Signed Quotations International Connection Works Page 1 FYCD2C / Works of 4 Centralized and Single Stage - One Decentralized Wastewater IBRD / 84240 Prior Request for Bids Open - National 4,014,311.45 Signed Envelope Collection and Treatment System in Villages FYCD3C / Works of 3 Centralized and Single Stage - One Decentralized Wastewater IBRD / 84240 Prior Request for Bids Open - National 1,436,933.66 Signed Envelope Collection and Treatment System in Villages LQWW1C / Longquan Back Request for Open - Alley Improvement Works IBRD / 84240 Prior 291,974.17 Signed Quotations International through Shopping AJGS2C / Jishan town Pending Single Stage - One area Fushi water treatment IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-07 2018-03-12 2018-04-11 2018-05-11 2018-06-15 2019-12-07 Envelope plant civil work engineering on AJGS1C / Three villages Pending Single Stage - One sanitation engineering such IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-08 2018-03-13 2018-04-24 2018-05-24 2018-06-28 2018-12-25 Envelope as Luosifang on AJMX1C / Mixi rural area water supply and sanitation Single Stage - One upgrading engineering of IBRD / 84240 Post Request for Bids Open - National 4,087,343.59 Signed 2018-03-08 2018-03-13 2018-04-24 2018-05-24 2018-06-28 2018-12-25 Envelope Anji rural sanitation subproject AJHC-2 / Baishuiwan Pending village household connection Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 of Anji Rural sanitation Quotations Envelope on model engineering AJDV2C / Five villages Pending sanitation engineering such Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-08 2018-03-13 2018-04-24 2018-05-24 2018-06-28 2018-12-25 as Zhangwu of Anji county Envelope on rural sanitation subproject AJHC-3 / Yinkeng village Pending household connection of Anji Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Rural sanitation model Quotations Envelope on engineering AJHC-4 / Majia village Pending household connection of Anji Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Rural sanitation model Quotations Envelope on engineering AJHC-5 / Tangshe village Pending household connection of Anji Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Rural sanitation model Quotations Envelope on engineering AJHC-6 / Majialong village Pending household connection of Anji Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Rural sanitation model Quotations Envelope on engineering AJHC-7 / Six villages Pending household connection suah Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2018-12-26 as Gangkou of Anji Rural Envelope on sanitation model engineering Page 2 AJCV1C / Four villages water supply and sanitation Pending Single Stage - One engineering such as Banqiao IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2019-06-24 Envelope of Anji rural sanitation on subproject AJDV3C / Six villages Pending sanitation engineering such Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2019-06-24 as Zhangcun of Anji county Envelope on rural sanitation subproject AJDV4C / Four villages Pending sanitation engineering such Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2019-06-24 as Baofu of Anji county Envelope on rural sanitation subproject AJTZH1C / Xiaofeng town area water supply and Pending Single Stage - One sanitation upgrading IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2018-12-26 Envelope engineering of Anji county on rural sanitation subproject AJGS4C / Jishan town Pending area water distribution Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2019-10-22 network upgrading Envelope on engineering Pending FYHC-1 / wastewater house Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-09-23 connection for 9 villages Envelope on FYXD1C / works of 27.5km Pending Single Stage - One wastewater pipes in Tashan IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-09-23 Envelope and other villages on FYXD3C / works of 12.2km Pending Single Stage - One wasetwater pipes in Nanjin IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-09-23 Envelope village on FYDY1C / works of 32km Pending Single Stage - One wastewater pipes in dayuan IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-09-23 Envelope area on FYCK1C / works of Pending wasterwater collection in Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Yesheng village of Changkou Envelope on area FYCD4C / Three villages such as Jiangjia of f Fuyang Single Stage - One IBRD / 84240 Post Request for Bids Open - National 5,695,453.64 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 distract rural sanitation Envelope model engineering FYCD5C / Four villages such as Shiyang of Fuyang Single Stage - One IBRD / 84240 Post Request for Bids Open - National 5,138,632.26 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 distract rural sanitation Envelope model engineering TTHC / Tiantai wastewater Single Stage - One IBRD / 84240 Post Request for Bids Open - National 769,015.56 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2018-12-27 house connection Envelope TTCD1C / works of wastewater collection and Single Stage - One treatment system in 5 IBRD / 84240 Post Request for Bids Open - National 1,546,924.19 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Envelope villages such as Baihedian village Page 3 TTDV2C / works of wastewater collection and Single Stage - One treatment system in 7 IBRD / 84240 Post Request for Bids Open - National 4,249,821.42 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Envelope villages such as Houcun village TTCD2C / works of wastewater collection pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,615,610.11 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 in 7 villages such as Envelope Hefangzhao village TTWW1C / works of 4km Single Stage - One IBRD / 84240 Post Request for Bids Open - National 588,066.97 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 wastwater pipes in Baer Envelope TTCV1C / works of wastewater pipes in 6 Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,781,097.29 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 villages such as Kengbian Envelope villages TTWW2C / works of 5.5km wastewater pipes and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 3,036,465.38 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 4.7km stormwater pipes of Envelope Tiantaishan road TTCD3C / works of Pending wastewater collection pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 in 5 villages such as Envelope on Qianyang village TTCD5C / works of wastewater collection pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,128,777.40 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 in6 villages such as Envelope Wanshanzhang village TTCD4C / works of wastewater collection pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,418,312.79 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 in 7 villages such as Envelope Sanlisong village TTCV2C / 2nd batch 4 villages water supply upgrading and sanitation Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,015,496.40 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-09-15 engineering such as Jietouyi Envelope in west area of Tiantai county TTCV3C / 2nd batch 5 villages water supply upgrading and sanitation Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,507,904.29 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 engineering such as Envelope Daxitang in west area of Tiantai county TTCV4C / 2nd batch 3 villages water supply upgrading and sanitation Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,085,809.15 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-03-27 engineering such as Yandian Envelope in north-central and eest areas of Tiantai county TTCV5C / 2nd batch 3 villages water supply upgrading and sanitation Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,716,801.09 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-08-15 engineering such as Yandian Envelope in north-central and eest areas of Tiantai county Page 4 TTCV6C / 2nd batch 2 villages water supply upgrading and sanitation Single Stage - One IBRD / 84240 Post Request for Bids Open - National 535,660.65 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-02-16 engineering such as Xiuyuan Envelope in north-central and eest areas of Tiantai county TTDV3C / 2nd batch 3 deconcentration villages Single Stage - One water supply upgrading and IBRD / 84240 Post Request for Bids Open - National 1,558,449.29 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-08-15 Envelope sanitation engineering such as Zuoyi in Tiantai county TTXJ-2 / 2nd batch deconcentration villages water supply upgrading and Request for Single Stage - One IBRD / 84240 Post Open - National 96,186.33 Signed 2018-04-05 2018-05-31 2018-06-30 sanitation engineering such Quotations Envelope as Huguo and Xiaguoyang villages in Tiantai county TTDV6C / 2nd batch 6 deconcentration villages water supply upgrading and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 2,149,466.41 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-08-15 sanitation engineering such Envelope as Wudong in Tiantai county TTDV7C / 2nd batch 2 deconcentration villages Single Stage - One water supply upgrading and IBRD / 84240 Post Request for Bids Open - National 1,563,606.61 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-05-17 Envelope sanitation engineering such as Hexi in Tiantai county TTWW3C / Main sewer(Ta ntou sction) engineering of Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,329,654.47 Signed 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2020-01-11 Cangshan wastewater treatm Envelope ent plant of Tiantai county TTWW4C / Main sewer(Sanhe section) Single Stage - One engineering of Cangshan IBRD / 84240 Post Request for Bids Open - National 1,346,236.24 Signed 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2020-01-11 Envelope wastewater treatment plant of Tiantai county TTSL1C / Works of Shiliang town water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 706,096.65 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2019-06-16 treatment plant of Tiantai Envelope county TTXJ-3 / The first batch deconcentration villages water supply upgrading and Request for Single Stage - One IBRD / 84240 Post Open - National 248,567.26 Signed 2018-03-15 2018-05-10 2018-07-09 sanitation engineering such Quotations Envelope as Huangwu and Tantou villages in Tiantai county LQWS1C / works and SIC of Nandayang WSP modification from 30000m3/d Single Stage - One IBRD / 84240 Post Request for Bids Open - National 5,675,718.81 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 to 25000m3/d and expansion Envelope from 25000m3/d to 50000m3/d LQWS2C / works of 3.91k m WS pipes,4.43km wastew Single Stage - One ater pipes and 4.11km storm IBRD / 84240 Post Request for Bids Open - National 1,820,413.30 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 Envelope water pipes and drainage Ch annel Page 5 LQWW1C-2 / works of wast erwater collection pipes of L Request for Single Stage - One onquan Back Alley improvem IBRD / 84240 Post Open - National 253,737.83 Signed 2018-03-15 2018-05-10 2018-11-06 Quotations Envelope ent works (phase 1) in Ji nshi Alley LQWW1C-3 / works of wasterwater collection pipes Request for Single Stage - One of 3 Lonquan Back Alley IBRD / 84240 Post Open - National 57,930.71 Signed 2018-03-15 2018-05-10 2018-08-08 Quotations Envelope improvement works such as Cangsong Road LQWW1C-4 / works of wasterwater collection pipes Single Stage - One of 5 Lonquan Back Alley IBRD / 84240 Post Request for Bids Open - National 1,243,360.39 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Envelope improvement works such as Dayang Residential area LQWW1C-5 / works of wasterwater collection pipes Single Stage - One of 3 Lonquan Back Alley IBRD / 84240 Post Request for Bids Open - National 5,996,199.83 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Envelope improvement works such as Dong Residential area LQWW1C-6 / works of wasterwater collection pipes Single Stage - One of 4 Lonquan Back Alley IBRD / 84240 Post Request for Bids Open - National 477,282.38 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2018-12-27 Envelope improvement works in downtown LQWW1C-7 / works of wasterwater collection pipes of Lonquan Back Alley Single Stage - One improvement works such as IBRD / 84240 Post Request for Bids Open - National 397,582.47 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-06-25 Envelope Residential area along two side of Cangsong North Road LQWW1C-8 / works of wasterwater collection pipes of Lonquan Back Alley Single Stage - One IBRD / 84240 Post Request for Bids Open - National 910,064.27 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-02-25 improvement works such as Envelope Jiuchang alley and around area LQAR1C / (1)works ad SIC of New 4000m3/d Anren WSP and works of 8.24km water distribution pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 3,359,652.98 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 (2)works and SIC of new Envelope Anren 1800m3/d WWTP and works of 5.87km wastewater pipes LQBD1C / (1)works ad SIC of new 4000m3/d Badu WSP and works of 11.4km water Pending distribution pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 (2)works and SIC of new Envelope on Badu 1300m3/d WWTP and works of 7.61km wastewater pipes LQDV2C / works of wastewater collection and Single Stage - One treatment system in 5 IBRD / 84240 Post Request for Bids Open - National 1,651,772.29 Signed 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 Envelope villages such as Luozhuan village Page 6 LQDV3C / works of Pending wastewater collection and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 treatment system in Envelope on 5villages such as Xixi village LQDV4C / works of wastewater collection and Pending Single Stage - One treatment system in 3 IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 Envelope villages such as Zhenbu on village LQDV5C / works of wastewater collection and Pending Single Stage - One treatment system in 3 IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-10 2018-03-15 2018-04-26 2018-05-26 2018-06-30 2019-12-22 Envelope villages such as Zhenbu on village LQDV6C / works of wastewater collection and Pending Single Stage - One treatment system in 4 IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-10-13 Envelope villages such as Nanxikou on village LQJX1C / Works of 400m3/ d wastewater treatment plan t , water distribution netw Pending Single Stage - One ork pipeline , wastewater c IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-31 2018-04-05 2018-05-17 2018-06-16 2018-07-21 2020-01-12 Envelope ollection pipeline and house on connection in 4 villages in J inxi town area FYCD6C / works of 2 centralized decentralized Single Stage - One wastewater collection and IBRD / 84240 Post Request for Bids Open - National 3,017,747.18 Signed 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2020-01-11 Envelope treatment system in villages such as Qinle village LQWW1C-13 / works of wastewater treatment, water supply and wasterwater Single Stage - One IBRD / 84240 Post Request for Bids Open - National 364,313.88 Signed 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-05-27 equipment improvement of Envelope Beihe street (Xinhua street - Fengqi road) area LQWW1C-9 / works of wast erwater collection pipes of Single Stage - One Lonquan Back Alley improve IBRD / 84240 Post Request for Bids Open - National 338,668.08 Signed 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-03-28 Envelope ment works (phase 1)such as Lishan area LQWW1C-10 / works of wa sterwater collection pipes of Single Stage - One Lonquan Back Alley improve IBRD / 84240 Post Request for Bids Open - National 280,305.39 Signed 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-01-27 Envelope ment works (phase 2)such as Lishan area LQDV8C / works of wastewater pipeline, Pending Single Stage - One treatment system and house IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-07-26 Envelope connection in 2 villages such on as Shuangduyang village TTWS1C / Wroks of water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,145,542.98 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 pipeline 26km Envelope TTWS3C / Wroks of water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,443,292.77 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 pipeline 33km Envelope Page 7 TTWS5C / Wrok of water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,581,516.67 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 pipeline 28km Envelope TTCV7C / works of Single Stage - One wastewater collection pipes IBRD / 84240 Post Request for Bids Open - National 736,706.49 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2020-03-13 Envelope in Tantou village TTCV8C / works of wastewater collection pipes Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,315,783.69 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2020-03-13 in 3 villages such as Envelope Yangtou village TTDV8C / works of Single Stage - One wastewater collection pipes IBRD / 84240 Post Request for Bids Open - National 644,498.95 Signed 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-10-15 Envelope in Qianyang village TTDV9C / works of Single Stage - One wastewater collection pipes IBRD / 84240 Post Request for Bids Open - National 374,098.69 Signed 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-10-15 Envelope in Minggong village FYCD7C / works of 4 centralized decentralized Single Stage - One wastewater collection and IBRD / 84240 Post Request for Bids Open - National 4,326,451.03 Signed 2018-05-25 2018-05-30 2018-07-11 2018-08-10 2018-09-14 2020-03-07 Envelope treatment system in villages such as Xinyi village AJMX2C / civil works of 50000m3/d Laoshikan water Pending Single Stage - One treatment plant and work of IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-05-31 2018-06-05 2018-07-05 2018-08-04 2018-09-08 2020-01-01 Envelope 1km raw water pipe in on Meixi town area Pending AJCQ1C / works of 27 km Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2020-01-13 wastewater pipeline Envelope on Pending AJDV5C / Upgrading of Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-04-18 sewage treatment terminal. Envelope on LQDV10C / Household Pending Single Stage - One connection engineering of IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2020-02-12 Envelope Badu town of Longquan city on LQBD2C / Badu town rural Pending area water supply and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2020-04-12 sanitation engineering of Envelope on Longquan city subproject FYCD9C / village such as Pengjia of Fuyang distract Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,250,879.59 Signed 2018-07-15 2018-07-20 2018-08-31 2018-09-30 2018-11-04 2020-04-27 rural sanitation model Envelope engineering LQWW1C-11 / works of wasterwater collection pipes Single Stage - One of Lonquan Back Alley IBRD / 84240 Post Request for Bids Open - National 1,410,150.64 Signed 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 Envelope improvement works such as Lvjiawu Residential area LQWW1C-12 / works of wasterwater collection pipes Single Stage - One of Lonquan Back Alley IBRD / 84240 Post Request for Bids Open - National 1,118,829.90 Signed 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 Envelope improvement works such as Nanqin area Page 8 LQDV7C / Three Villages Pending sanitation engineering as No. Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 7 of Longquan city Envelope on subproject LQDV9C / Household Pending connection engineering of Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 Anren town of Longquan Envelope on city FYCD8C / 2 villages such Pending as bashan of Fuyang Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2018-12-21 2020-06-13 distract rural sanitation Envelope on model engineering Pending TTWS2C / Wrok of water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 pipeline 20km Envelope on TTDV5C / 2nd batch 4 deconcentration villages water supply upgrading and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,959,877.68 Signed 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 sanitation engineering such Envelope as Zhuanghou in Tiantai county TTWS4C / Wroks of water Single Stage - One IBRD / 84240 Post Request for Bids Open - National 1,154,006.22 Signed 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 pipeline 11km Envelope LQYW1C / Longquan Pending Single Stage - One operation and maintenance IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2020-05-14 Envelope center on TTDV4C / 2nd batch 5 deconcentration villages Single Stage - One water supply upgrading and IBRD / 84240 Post Request for Bids Open - National 4,895,314.16 Signed 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 Envelope sanitation engineering such as Huguo in Tiantai county FYLY1C / Longyang Pending Single Stage - One wasterwater collection and IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2020-07-13 Envelope treatment engineering on LQXC1C / Xiaomei and Chatian towns rural area Pending Single Stage - One water supply and sanitation IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2020-04-12 Envelope engineering of Longquan city on subproject FYWW2C / Fuyang Waste Pending Single Stage - One Water Treatment IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-09-30 2018-10-05 2018-11-16 2018-12-16 2019-01-20 2019-07-19 Envelope Plant renovation project on LQLJ1C / Lanju township Pending rural area water supply and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2018-12-21 2020-06-13 sanitation engineering of Envelope on Longquan city subproject TTDV10C / Water Pending Single Stage - One environment improvement IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2019-05-31 2019-06-05 2019-07-17 2019-08-16 2019-09-20 2020-05-17 Envelope of 12 villages on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Page 9 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Request for Open - AJ1G / vehicle procurement IBRD / 84240 Prior 100,656.99 Signed Quotations International Request for Open - TTXJ-1 / pickups IBRD / 84240 Prior 36,227.59 Signed Quotations International FYWW1S / Fuyang Waste Water Treatment Plant Single Stage - One Upgrading and Expansion IBRD / 84240 Prior Request for Bids Open - National 12,292,641.03 Signed Envelope Equipment Supply and Installation AJ2G / office equipment Pending Request for Single Stage - One shopping of Anji county IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Quotations Envelope rural sanitation subproject on AJ3G / Office furniture Pending Request for Single Stage - One shopping of Anji county IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-14 2018-05-09 2018-11-05 Quotations Envelope rural sanitation subproject on AJGS3C / Jishang town Pending area Fushi water treatment Single Stage - One IBRD / 84240 Prior Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2019-10-22 plant equipment installation Envelope on engineering AJGY2C / Smart water Pending platform construction Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2018-12-26 engineering of Anji Guoyuan Envelope on water affair company AJGY4C / Operation and Pending Single Stage - One maintenance center IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2018-12-26 Envelope equipment on Pending LQ1G / office equipment Request for Single Stage - One IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-15 2018-05-10 2018-11-06 procurement Quotations Envelope on Pending Request for Single Stage - One LQ4G / Pickup procurement IBRD / 84240 Post Open - National 0.00 Implementati 2018-03-15 2018-05-10 2018-11-06 Quotations Envelope on FYYW1S / equipment of O Single Stage - One IBRD / 84240 Post Request for Bids Open - National 726,240.30 Signed 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 2018-11-28 &M ;tool vehicle Envelope AJMX3C / works of 50000m3/d Laoshikan water Pending Single Stage - One treatment plant equipment IBRD / 84240 Prior Request for Bids Open - National 0.00 Implementati 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2020-01-13 Envelope installation in Meixi town on area TTXJ-4 / Operation and Pending Single Stage - One maintenance equipment IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-06-30 2018-07-05 2018-08-16 2018-09-15 2018-10-20 2019-04-18 Envelope procurements on TTXJ-5 / water quality Pending Request for Single Stage - One monitoring equipment IBRD / 84240 Post Open - National 0.00 Implementati 2018-07-05 2018-08-30 2019-02-26 Quotations Envelope procurement. on AJGS5C / cable Pending Single Stage - One procurement of Fushi water IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-08-30 2018-09-04 2018-10-16 2018-11-15 2018-12-20 2019-02-18 Envelope supply plant on Page 10 FYZHPS1D / Fuyang Pending smart drainage Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2018-12-31 2019-01-05 2019-02-16 2019-03-18 2019-04-22 2020-04-16 comprehensive management Envelope on platform TTXJ-6 / Tiantai rural Pending sewage treatment facilities Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2019-03-31 2019-04-05 2019-05-17 2019-06-16 2019-07-21 2020-01-17 information and monitoring Envelope on management system LQ5G / Wastewater Pending treatment operation and Single Stage - One IBRD / 84240 Post Request for Bids Open - National 0.00 Implementati 2019-04-30 2019-05-05 2019-06-16 2019-07-16 2019-08-20 2019-10-19 maintenance equipment Envelope on procurement NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant ZRTA-4 / project Open - IBRD / 84240 Prior Qualification 352,570.00 Signed managmenet for ZJPPMO International Selection Consultant ZRTA1-Tiantai / Project Open - IBRD / 84240 Prior Qualification 310,234.00 Signed Management International Selection Consultant ZRTA1-Longquan / Project Open - IBRD / 84240 Prior Qualification 615,933.74 Signed Management International Selection Consultant ZRTA1-Anji / Project Open - IBRD / 84240 Prior Qualification 320,329.00 Signed Management International Selection INDIVIDUAL CONSULTANTS Page 11