PROCUREMENT PLAN Project information: Niger, Sahel Malaria and Neglected Tropical Diseases (P149526) Project Implementation agency: Fonds Commun d'appui à la mise en œuvre du PDS Date of the Procurement Plan: 3rd Octobre 2017 Period covered by this Procurement Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Décret No. 2016-641/PRN/PM du 1er décembre 2016, portant code des marchés publics et des délégations de service public, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. RAS PROCUREMENT Western Africa : Sahel Malaria and Neglected Tropical Diseases PLAN General Information Country: Western Africa Banks Approval Date of the Original Procurement Plan: 2018-01-08 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-03-08 Project ID: P149526 GPN Date: Project Name: Sahel Malaria and Neglected Tropical Diseases Loan / Credit No: IDA / 56690, IDA / 56670, IDA / D0710, IDA / 56680 Executing Agency(ies): Projet Maladies Tropicales Négligées (MTN) et le Paludisme saisonnier, Sahel Malaria and NTDs Project, West African Health Organization, Support Program for Health Development WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 24/2017/MSP/FC-PDS / acquérir Component 2: Support 150 Motos pour la supervision coordinated implementation of Single Stage - One Under IDA / 56690 Post Request for Bids Open - International 833,333.00 0.00 2017-07-31 2017-05-30 2017-08-05 2017-09-16 2017-07-20 2017-10-16 2017-08-01 2017-11-20 2018-05-19 des activités par les Chefs CSI technical strategies and Envelope Implementation MTN interventions Component 2: Support 17/2017/FOUR/MSP/FC-PDS / coordinated implementation of Single Stage - One Under Reproduire des supports de IDA / 56690 Post Request for Bids Open - National 204,000.00 0.00 2017-07-25 2017-06-08 2017-07-30 2017-09-10 2017-07-10 2017-10-10 2017-07-20 2017-11-14 2018-05-13 technical strategies and Envelope Implementation sensibilisation sur les MTN interventions 35/2017/MSP/PDS-FC / Doter Component 2: Support les programmes en outils coordinated implementation of Single Stage - One IDA / 56690 Post Request for Bids Open - National 171,111.00 142,658.21 Signed 2017-07-25 2017-07-26 2017-07-30 2017-09-10 2017-07-05 2017-10-10 2017-09-13 2017-11-14 2017-12-04 2018-05-13 informatique MTN , technical strategies and Envelope PNLP,DEP,FC interventions 99/2017/FOURN/MSP/FC-PDS / Component 2: Support Fourniture et pose des bruleurs coordinated implementation of Single Stage - One Pending avec accessoirs dans10 CSI des IDA / 56690 Post Request for Bids Open - National 80,000.00 0.00 2017-08-10 2017-08-15 2017-09-18 2017-10-18 2017-11-22 2018-05-21 technical strategies and Envelope Implementation district d'intervention du projet interventions MTN/ MALARIA 28/2017/FOUR/MSP/FC-PDS / Component 2: Support Doter 53175 DC nouveaux des coordinated implementation of Single Stage - One Pending IDA / 56690 Post Request for Bids Open - National 425,400.00 0.00 2017-07-28 2017-08-02 2017-09-04 2017-10-04 2017-11-08 2018-05-07 17 DS cible de la BM en sac et technical strategies and Envelope Implementation tee short comme identifiant interventions 51/2017/FOUR/MSP/FC-PDS / Component 2: Support Acquerir de matériels de coordinated implementation of Single Stage - One Under diagnostic correcte pour 10 CSI IDA / 56690 Post Request for Bids Open - National 300,000.00 0.00 2017-08-10 2017-10-10 2017-08-15 2017-09-15 2017-10-15 2017-11-19 2018-05-18 technical strategies and Envelope Implementation de 5 DS de la zone du projet interventions PNLBG 66/2017/FOUR/MSP/FC-PDS / Component 2: Support Acquerir 452 kitss pour la coordinated implementation of Single Stage - One Under IDA / 56690 Post Request for Bids Open - National 60,128.00 0.00 2017-08-01 2017-07-24 2017-08-06 2017-09-07 2017-10-07 2017-10-16 2017-11-11 2018-05-10 PECADOM pour les relais technical strategies and Envelope Implementation communautaires PNLP interventions 010/2017/FOURN/MSP/FC-PDS / Acquisition de matériels pour la Component 2: Support mise en oeuvre de la CPS coordinated implementation of Request for Single Stage - One Pending (bidons, nattes, sachets, IDA / 56690 Post Open - National 12,000.00 0.00 2017-07-18 2017-08-24 2017-09-03 technical strategies and Quotations Envelope Implementation seaux..) pour le Programme interventions National de Lutte contre le Paludisme 011/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition de sucre pour coordinated implementation of Request for Single Stage - One Under IDA / 56690 Post Open - National 30,720.00 0.00 2017-07-18 2017-08-24 2017-09-03 l'absorption de AQSP pour le technical strategies and Quotations Envelope Implementation PNLP interventions 012/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition de caisses pour les coordinated implementation of Request for Single Stage - One Under IDA / 56690 Post Open - National 3,564.00 0.00 2017-09-06 2017-10-13 2017-10-23 relais pour stocker les technical strategies and Quotations Envelope Implementation médicaments (PNLP) interventions 0013/2017/FOURN/MSP/FC- Component 2: Support PDS / Transports des outils et coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 17,200.00 0.00 2017-08-29 2017-10-05 2017-10-15 intrants pour la CPS vers les technical strategies and Quotations Envelope Implementation sites de distribution (PNLP) interventions 023/2017/FOURN/MSP/FC-PDS / Acquisition des outils de Component 2: Support collecte de données et les coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 44,444.00 0.00 2017-07-18 2017-08-24 2017-09-03 supports supplémentaires pour le technical strategies and Quotations Envelope Implementation traitement de masse MTN pour le interventions PNDOEFL 027/2017/FOURN/MSP/FC-PDS Component 2: Support / Reproduire le module intégré coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 12,000.00 0.00 2017-07-18 2017-08-24 2017-09-03 MTN Paludisme pour les technical strategies and Quotations Envelope Implementation encadreurs MTN interventions 034/2017/FOURN/MSP/FC-PDS Component 2: Support / Reproduire le document de coordinated implementation of Request for Single Stage - One Pending politique national de lutte contre IDA / 56690 Post Open - National 20,000.00 0.00 2017-09-25 2017-11-01 2017-11-11 technical strategies and Quotations Envelope Implementation le paludisme en 1000 interventions exemplaires (PNLP) 059/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquérir 3 réfrigérateurs pour coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 5,000.00 0.00 2017-07-18 2017-08-24 2017-09-03 les sites sentinelles pour le technical strategies and Quotations Envelope Implementation PNLP interventions Page 1 087/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquérir 3 microscopes pour coordinated implementation of Request for Single Stage - One Under IDA / 56690 Post Open - National 9,000.00 8,292.50 2017-08-29 2017-10-05 2017-10-15 les sites sentinelles pour le technical strategies and Quotations Envelope Implementation PNLP interventions Component 2: Support 096/2017/FOURN/MSP/FC-PDS coordinated implementation of Request for Single Stage - One Pending / Achat mobiliers de bureau pour IDA / 56690 Post Open - National 20,000.00 0.00 2017-09-03 2017-10-10 2017-10-20 technical strategies and Quotations Envelope Implementation le Fonds Commun interventions 124/2017/FOURN/MSP/FC-PDS / Fourniture de matériels et Component 2: Support é uipements de protection q coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 40,000.00 0.00 2017-09-23 2017-10-30 2017-11-09 individuelle GDISS pour 10 CSI technical strategies and Quotations Envelope Implementation de Districts d'intervention du interventions Projet MTN/Malaria 03/2017/FOURN/MSP/FC-PDS / Component 2: Support Acquisition signes distinctifs de coordinated implementation of Request for Single Stage - One Under IDA / 56690 Post Open - National 18,000.00 10,951.18 2017-07-18 2017-08-24 2017-09-03 supports visuels pour la CPS technical strategies and Quotations Envelope Implementation (PNLP) interventions 04/2017/FOURN/MSP/FC-PDS / Component 2: Support Reproduction de supports de coordinated implementation of Request for Single Stage - One Under IDA / 56690 Post Open - National 36,000.00 33,249.20 2017-07-18 2017-08-24 2017-09-03 sensibilisation CPS sur le technical strategies and Quotations Envelope Implementation Paludisme (PNLP) interventions 07/2017/FOURN/MSP/FC-PDS / Reproduction des cartes de Component 2: Support distribution pour la nouvelle cible coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 30,000.00 0.00 2017-09-23 2017-10-30 2017-11-09 2017 dans le cadre de la CPS et technical strategies and Quotations Envelope Implementation les outils de collecte de données interventions PECADOM (PNLP) 08/2017/FOURN/MSP/FC-PDS / Component 2: Support Reproduction des outils de coordinated implementation of Request for Single Stage - One Pending collecte de données et les IDA / 56690 Post Open - National 48,000.00 0.00 2017-09-17 2017-10-24 2017-11-03 technical strategies and Quotations Envelope Implementation supports supplémentaires pour la interventions CPS (PNLP) 09/2017/FOURN/MSP/FC-PDS / Component 2: Support Acquérir des microscopes pour coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 32,111.00 0.00 2017-10-03 2017-11-09 2017-11-19 la surveillance massive de la technical strategies and Quotations Envelope Implementation LF/MTN interventions 014/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition des appareils coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 18,334.00 0.00 2017-10-15 2017-11-21 2017-12-01 Hemocue,Spectrophotomètre et technical strategies and Quotations Envelope Implementation video microscope interventions 015/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition de 150 boites de coordinated implementation of Request for Single Stage - One Pending IDA / 56690 Post Open - National 49,800.00 0.00 2017-10-21 2017-11-27 2017-12-07 chirurgie de trichiasis pour le technical strategies and Quotations Envelope Implementation PNSO interventions Component 2: Support 01/2017/FOURN/MSP/FC-PDS / coordinated implementation of Pending Acquisition de médicaments pour IDA / 56690 Prior Direct Selection Direct 708,695.00 0.00 2017-07-13 2017-07-18 2017-08-16 2017-09-15 technical strategies and Implementation la CPS (CAMEG) interventions 035/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition des médicaments coordinated implementation of Pending pour la prise en charge des effets IDA / 56690 Prior Direct Selection Direct 2,100,476.00 0.00 2017-09-27 2017-10-02 2017-10-31 2017-12-30 technical strategies and Implementation secondaires et du Praziquantel interventions (ONPPC) 043/2017/FOURN/MSP/FC-PDS Component 2: Support / Acquisition d'un logiciel de coordinated implementation of Pending IDA / 56690 Prior Direct Selection Direct 10,800.00 0.00 2017-09-13 2017-09-18 2017-10-23 2018-04-21 gestion de l'importation SIAMED technical strategies and Implementation (OMS) interventions GO-REF-1 / Acquisition de Component 1: Improve regional Under médicaments (SP+AQ, CTA)- IDA / 56670 collaboration for stronger results Prior Direct Selection Direct 8,839,985.00 0.00 2016-08-25 2016-08-30 2016-10-25 2019-12-31 Implementation CAMEG across participating countries GO-REF-2 / Achat-gestion- Component 2: Support distribution TDR, médicaments, coordinated implementation of Under Kits pour prise en charge MTN IDA / 56670 Prior Direct Selection Direct 4,166,708.00 0.00 2016-08-25 2016-08-30 2016-09-27 2019-12-31 technical strategies and Implementation ép (trichiasis, lé hantiasis, interventions hydrocèle)-PPM GO-REF-3 / Acquisition de Component 2: Support médicaments et matériels coordinated implementation of Under IDA / 56670 Post Direct Selection Direct 256,250.00 0.00 2017-03-17 2017-04-07 2017-05-17 2017-07-31 médicaux supplémentaires technical strategies and Implementation (Praziquantel, kits, tests, etc.) interventions Component 3: Strengthen GO-REF-4 / Acquisition de 16 institutional capacity to Single Stage - One IDA / 56670 Post Request for Bids Open - National 1,480,000.00 857,240.44 Completed 2016-12-02 2016-12-02 2016-12-16 2017-01-15 2017-03-23 2017-01-30 2017-04-08 2017-03-30 2017-06-28 2017-06-22 2017-11-03 Véhicules coordinate and monitor Envelope implementation GO-REF-6 / Matériels Component 3: Strengthen informatiques et mobiliers bureau institutional capacity to Single Stage - One Under IDA / 56670 Post Request for Bids Open - National 121,360.00 0.00 2017-09-17 2017-09-22 2017-10-22 2017-11-06 2018-01-04 2018-03-05 pour programmes MTN & PNLP, coordinate and monitor Envelope Implementation 19 districts sanitaires et 7 DRS implementation Component 2: Support GO-REF-8 / Fourniture et pose coordinated implementation of Single Stage - One dincinérateurs avec accessoires IDA / 56670 Post Request for Bids Open - National 485,440.00 288,801.05 Signed 2017-06-12 2017-05-08 2017-06-17 2017-07-17 2017-07-12 2017-08-01 2017-08-03 2017-09-29 2017-09-25 2018-01-05 technical strategies and Envelope pour 19 CSRef et 57 CSCom interventions GO-REF-9 / Matériels Component 3: Strengthen informatiques et institutional capacity to Request for Single Stage - One Under IDA / 56670 Post Limited 35,866.80 0.00 2017-01-28 2017-03-13 2017-04-02 é uipements/mobiliers de bureau q coordinate and monitor Quotations Envelope Implementation pour lUCP implementation Component 3: Strengthen GO-REF-10 / Groupe institutional capacity to Request for Single Stage - One Pending IDA / 56670 Post Limited 16,400.00 0.00 2017-11-10 2017-12-15 2018-01-14 é ectrogène pour lUCP l coordinate and monitor Quotations Envelope Implementation implementation Page 2 GO-REF-11 / Acquisition/mise Component 3: Strengthen en service logiciel comptabilité institutional capacity to Request for Single Stage - One Pending IDA / 56670 Post Limited 24,600.00 0.00 2017-09-22 2017-10-27 2017-12-11 TOM2PRO pour lUCP et coordinate and monitor Quotations Envelope Implementation formation utilisateurs implementation GO-REF-12 / Equipements & Component 3: Strengthen matériels analyse et traitements institutional capacity to Request for Single Stage - One IDA / 56670 Post Limited 40,361.98 44,715.73 Completed 2017-08-01 2017-08-01 2017-09-05 2017-08-24 2017-09-25 2017-09-07 pour qé uipes recherches dans le coordinate and monitor Quotations Envelope cadre du Projet implementation GO-REF-14 / Fourniture et pose Component 2: Support de 20 incinérateurs avec coordinated implementation of Single Stage - One Under IDA / 56670 Post Request for Bids Open - National 131,200.00 0.00 2017-08-18 2017-08-21 2017-09-02 2017-10-02 2017-10-17 2017-12-16 2018-03-24 accessoires pour 5 CSRef et 15 technical strategies and Envelope Implementation CSCom_Relance interventions Component 3: Strengthen GO-REF-13 / institutional capacity to Request for Single Stage - One Under Equipements/mobiliers de bureau IDA / 56670 Post Limited 9,840.00 0.00 2017-04-01 2017-05-02 2017-05-22 coordinate and monitor Quotations Envelope Implementation pour l'UCP_Relance implementation BF-WAHO-BF-35325-GO-RFQ / Component 3: Strengthen Système de projection salle de institutional capacity to Request for Single Stage - One IDA / D0710 Post Limited 45,000.00 56,327.03 Signed 2017-09-04 2017-11-02 2017-11-06 2018-02-06 2017-12-06 réunion (Écran avec accessoires coordinate and monitor Quotations Envelope é onférence) pour télc implementation BF-WAHO-BF-34545-GO-RFQ / Component 3: Strengthen Acquisition de matériel institutional capacity to Request for Single Stage - One informatique complémentaire IDA / D0710 Post Limited 50,000.00 5,899.52 Signed 2017-08-30 2017-10-05 2017-10-25 2017-11-21 2017-11-24 coordinate and monitor Quotations Envelope pour les 6 nouveaux staffs de implementation lUGP Component 3: Strengthen BF-WAHO-BF-34550-GO-RFQ / institutional capacity to Request for Single Stage - One Acquisition du logiciel Microsoft IDA / D0710 Post Limited 40,000.00 34,806.19 Signed 2017-09-30 2017-11-03 2017-11-25 2018-01-31 2018-05-24 coordinate and monitor Quotations Envelope Project 2016 Server + 20 clients implementation GO-REF-7 / Matériels et Component 2: Support é uipements délimination q coordinated implementation of Single Stage - One Under déchets biomédicaux pour CSRef IDA / 56670 Post Request for Bids Open - National 78,720.00 0.00 2017-08-31 2017-09-15 2017-10-15 2017-10-30 2017-12-28 2018-03-22 technical strategies and Envelope Implementation et CSCOM (brouettes, pelles, interventions gants, bottes, etc.) Component 3: Strengthen GO-REF-5 / Acquisition de 19 institutional capacity to Single Stage - One Under IDA / 56670 Post Request for Bids Open - National 68,552.00 0.00 2017-02-02 2017-02-07 2017-03-09 2017-03-24 2017-05-22 2017-08-14 motos tout terrain coordinate and monitor Envelope Implementation implementation Component 2: Support BF-PADS-37793-GO-RFB / coordinated implementation of Single Stage - One Matériel et consommables IDA / 56680 Post Request for Bids Open - International 1,300,000.00 424,715.32 Signed 2017-12-15 2017-01-30 2017-12-20 2018-02-03 2017-05-24 2018-03-05 2017-05-24 2018-04-18 2017-08-27 2018-08-16 technical strategies and Envelope médico-technique interventions Component 2: Support BF-PADS-37810-GO-RFB / coordinated implementation of Single Stage - One Pending Matériel et consommables pour IDA / 56680 Post Request for Bids Open - National 540,000.00 0.00 2017-01-30 2017-02-04 2017-03-18 2017-04-17 2017-05-22 2017-08-20 technical strategies and Envelope Implementation le Programme MTN interventions Component 2: Support BF-PADS-37798-GO-RFB / coordinated implementation of Single Stage - One Pending Réactifs et consommables de la IDA / 56680 Post Request for Bids Open - National 335,000.00 0.00 2017-09-13 2017-09-18 2017-10-30 2017-11-29 2018-01-12 2018-04-12 technical strategies and Envelope Implementation transfusion saguine interventions Component 2: Support BF-PADS-37808-GO-RFB / coordinated implementation of Single Stage - One Pending Matériel divers pour le IDA / 56680 Post Request for Bids Open - National 87,000.00 0.00 2017-12-15 2017-12-20 2018-01-19 2018-02-09 2018-03-25 2018-05-24 technical strategies and Envelope Implementation programme MTN interventions BF-PADS-37579-GO-RFQ / Component 2: Support Matéiel informatique pour le coordinated implementation of Request for Single Stage - One IDA / 56680 Post Open - National 67,000.00 38,104.38 Signed 2017-08-02 2017-10-29 2017-11-07 2017-12-13 programme MTN, le PNLP et technical strategies and Quotations Envelope L'UG-PADS interventions Component 2: Support BF-PADS-37573-GO-RFQ / coordinated implementation of Request for Single Stage - One Pending Mobilier de bureau pour le MTN IDA / 56680 Post Limited 17,000.00 0.00 2017-08-12 2017-10-07 2017-11-06 technical strategies and Quotations Envelope Implementation et le PNLP interventions Component 2: Support BF-PADS-37790-GO-RFQ / coordinated implementation of Request for Single Stage - One Pending IDA / 56680 Post Limited 20,000.00 0.00 2017-08-12 2017-10-01 2017-10-31 Fournitures de bureau technical strategies and Quotations Envelope Implementation interventions Component 2: Support BF-PADS-37786-GO-RFB / coordinated implementation of Single Stage - One Pending IDA / 56680 Post Request for Bids Open - National 42,000.00 0.00 2017-01-30 2017-02-20 2017-04-03 2017-05-03 2017-06-07 2017-10-05 ACHAT DE KITS KATO KATZ technical strategies and Envelope Implementation interventions Component 2: Support BF-PADS-48947-GO-DIR / coordinated implementation of Pending Achat de Praziquantel comprimé IDA / 56680 Prior Direct Selection Direct 1,458,000.00 0.00 2018-03-05 2018-03-20 2018-05-26 2019-03-22 technical strategies and Implementation de 600 mg interventions Component 2: Support BF-PADS-49033-GO-RFQ / 6 coordinated implementation of Request for Single Stage - One Pending 000 tests OV16 pour les IDA / 56680 Post Limited 16,500.00 0.00 2018-04-22 2018-06-02 2018-07-02 technical strategies and Quotations Envelope Implementation é aluations oncho v interventions BF-PADS-49060-GO-RFQ / Component 2: Support Acquérir des 50 Kits Kato-Katz coordinated implementation of Request for Single Stage - One Pending IDA / 56680 Post Open - National 22,000.00 0.00 2018-05-11 2018-07-07 2018-11-04 é aluations des sites pour les v technical strategies and Quotations Envelope Implementation sentinelles Schisto et STH interventions Component 2: Support BF-PADS-49075-GO-RFB / coordinated implementation of Single Stage - One Pending Réactifs et consommables de la IDA / 56680 Post Request for Bids Open - National 335,000.00 0.00 2017-09-13 2017-09-18 2017-10-30 2017-11-29 2018-01-12 2018-04-12 technical strategies and Envelope Implementation transfusion saguine interventions Page 3 Component 2: Support GO-REF-16 / Acquisition de coordinated implementation of Single Stage - One Pending TDR, de CTA, de praziquantel et IDA / 56670 Post Request for Bids Open - National 1,516,000.00 0.00 2018-03-29 2018-04-13 2018-05-18 2018-06-02 2018-07-20 2018-11-17 technical strategies and Envelope Implementation de tests OV 16 interventions GO-REF-17 / Acquisition de Component 3: Strengthen matériels informatiques pour le institutional capacity to Single Stage - One Pending IDA / 56670 Post Request for Bids Open - National 116,000.00 0.00 2018-03-20 2018-04-04 2018-05-04 2018-05-19 2018-06-30 2018-08-25 CNIECS, DNP et l'Unité DPLM coordinate and monitor Envelope Implementation de la DNS implementation 1/2018/FOURN/MTN/MSP/FC- PDS / Acquérir des Médicament Component 1: Improve regional Pending pour la CPS (AQ+SP) 3-11 MOIS IDA / 56690 collaboration for stronger results Prior Direct Selection Direct 2,194,300.00 0.00 2018-04-01 2018-04-06 2018-05-29 2018-11-25 Implementation ET 12-59MOIS (CAMEG) 2018 et across participating countries 2019 2/2018/FOURN/MTN/MSP/FC- PDS / Acquérir des Médicaments pour la PEC des effets indésirables de l'AQ_SP Component 1: Improve regional des ACT pour la PECADOM, des Pending IDA / 56690 collaboration for stronger results Prior Direct Selection Direct 3,293,881.00 0.00 2018-04-06 2018-04-11 2018-06-06 2018-12-03 TDR, du paracétamol 100 mg et Implementation across participating countries de 51227 traitements de recto caps pour le traitement pré transfert pour le niveau communautaire PNLP, 5/2018/FOURN/MTN/MSP/FC- PDS / Acquerir de matériels de Component 1: Improve regional Single Stage - One Pending diagnostic correcte pour 10 CSI IDA / 56690 collaboration for stronger results Post Request for Bids Open - National 300,000.00 0.00 2018-04-17 2018-04-22 2018-05-23 2018-06-13 2018-07-18 2018-11-21 Envelope Implementation de 5 DS de la zone du projet across participating countries PNLBG 6/2018/FOURN/MTN/MSP/FC- PDS / Acquisition des supports pour la communication CPS Component 1: Improve regional 2018 (Affiches et banderoles pour Single Stage - One Pending IDA / 56690 collaboration for stronger results Post Request for Bids Open - National 78,000.00 0.00 2018-05-08 2018-05-13 2018-06-12 2018-07-01 2018-08-05 2018-11-07 les points fixes clés assurant la Envelope Implementation across participating countries visibilité des cycles, teeshirt, casquettes, hiijab et gilets d'identification) Component 3: Strengthen GO-REF-19 / Acquisition de 02 institutional capacity to Request for Single Stage - One Pending IDA / 56670 Post Limited 4,000.00 0.00 2018-03-10 2018-05-05 2018-06-04 coffres forts pour l'UCP coordinate and monitor Quotations Envelope Implementation implementation BF-WAHO-BF-52419-GO-RFQ / Component 1: Improve regional Editer un Guide d'orientation sur Request for Single Stage - One Pending IDA / D0710 collaboration for stronger results Post Limited 20,000.00 0.00 2018-04-09 2018-06-20 2018-07-20 le développement des stratégies Quotations Envelope Implementation across participating countries à base communautaire BF-WAHO-BF-52421-GO-RFQ / Produire les 'Compendium' des Component 1: Improve regional succès et leçons apprises de la Request for Single Stage - One Pending IDA / D0710 collaboration for stronger results Post Limited 50,000.00 0.00 2018-10-04 2018-12-15 2019-02-13 mise en Suvre du projet dans les Quotations Envelope Implementation across participating countries 3 pays et les résultats des travaux de recherche NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-WAHO-BF-35359-NC-RFQ / Recrutement d'une Agence de Communication pour la Component 3: Strengthen réalisation d'un film documentaire institutional capacity to Request for Single Stage - One Under IDA / D0710 Post Limited 30,000.00 0.00 2017-11-20 2018-01-08 2018-02-22 sur les activités du projet coordinate and monitor Quotations Envelope Implementation Paludisme et Maladies implementation Tropicales Négligées au Sahel (Burkina Faso, Mali, Niger) Component 2: Support BF-PADS-37590-NC-RFB / coordinated implementation of Single Stage - One Pending Réalisation et diffusion de IDA / 56680 Post Request for Bids Open - National 162,000.00 0.00 2017-05-08 2017-05-13 2017-06-24 2017-07-24 2017-09-06 2017-11-05 technical strategies and Envelope Implementation supports audio visuels interventions NE-PROJET MTN-48669-NC-DIR Component 1: Improve regional / Extension du logiciel Tompro Under IDA / 56690 collaboration for stronger results Post Direct Selection Direct 14,000.00 0.00 2018-02-23 2018-02-26 2018-02-28 2018-02-26 2018-04-04 2018-10-01 dans les régions sur financement Implementation across participating countries du projet MTN CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/2017/CONS/MSP/FC-PDS / Component 2: Support Recruter une agence de coordinated implementation of Quality And Cost- Under IDA / 56690 Post Open - International 170,000.00 0.00 2017-07-24 2017-08-15 2017-08-14 2017-09-27 2017-10-21 2017-10-02 2017-12-28 2017-10-18 2017-12-28 2017-11-22 2017-12-20 2018-07-18 paiement des relais technical strategies and Based Selection Implementation communautaires (OOAS) interventions 03/2017/CONS/MSP/FC-PDS / Component 2: Support Recrutement d'un Expert en coordinated implementation of Quality Based Under IDA / 56690 Post Open - International 48,000.00 0.00 2017-07-24 2017-06-14 2017-08-14 2017-09-15 2017-09-25 2017-10-13 2017-11-23 2017-10-18 2017-08-16 2017-11-17 2017-11-23 2017-12-22 2018-12-22 communication DAIP/PR technical strategies and Selection Implementation (OOAS) interventions 8/2017/CONS/MSP/FC-PDS / Component 2: Support Recrutement cabinet/firme coordinated implementation of Quality And Cost- Under IDA / 56690 Post Open - International 400,000.00 0.00 2017-08-11 2017-07-17 2017-09-01 2017-10-04 2018-02-16 2017-11-01 2018-02-16 2017-11-22 2018-02-16 2017-12-27 2018-01-24 2018-07-20 enquête selon approche LQAS technical strategies and Based Selection Implementation indicateurs MTN interventions Component 3: Strengthen CS-REF-1 / Elaboration du institutional capacity to Quality And Cost- Under IDA / 56670 Post Open - National 16,400.00 0.00 2017-02-07 2017-02-22 2017-03-23 2017-04-20 2017-05-05 2017-06-03 2017-06-24 2017-08-08 manuel du projet coordinate and monitor Based Selection Implementation implementation Page 4 Component 3: Strengthen CS-REF-2 / Audit financier et institutional capacity to Quality And Cost- Under comptable des exercices 2016 à IDA / 56670 Post Open - National 49,200.00 0.00 2016-12-09 2016-12-24 2017-01-22 2017-02-21 2017-03-08 2017-04-07 2017-05-12 2019-06-30 coordinate and monitor Based Selection Implementation 2018 du projet implementation CS-REF-9 / Fourniture Component 3: Strengthen d'assistance technique aux institutional capacity to structures impliquées dans la IDA / 56670 Prior UN Agencies (Direct) Direct 2,000,000.00 0.00 Under Review 2017-09-09 2019-12-31 coordinate and monitor lutte contre le palu et les MTN- implementation OMS CS-REF-7 / Prestations Component 2: Support Consultant dagence(s) ou d'ONG pour le coordinated implementation of IDA / 56670 Post Qualification Open - International 260,514.00 0.00 Canceled 2017-09-03 2017-09-17 2017-10-12 2017-11-01 2017-12-06 2019-12-31 paiement des technical strategies and Selection ASC/relais/distributeurs interventions Component 2: Support BF-PADS-37791-CS-UN / coordinated implementation of Pending Assistance technique pour la IDA / 56680 Prior UN Agencies (Direct) Direct 1,000,000.00 0.00 2018-05-10 2019-10-02 technical strategies and Implementation mise en Suvre du Projet interventions CS-REF-21 / Prestations d'ONG pour la mise en Suvre d'activités à base communautaire et le Component 2: Support Consultant paiement des AS/Relais coordinated implementation of Pending IDA / 56670 Post Qualification Open - National 148,000.00 0.00 2018-03-08 2018-03-29 2018-05-02 2018-06-01 2018-07-13 2019-12-31 distributeurs des districts technical strategies and Implementation Selection sanitaires couverts par le Projet interventions dans les régions de Gao et Ménaka CS-REF-22 / Prestations d'ONG pour la mise en Suvre d'activités à base communautaire et le Component 2: Support Consultant paiement des ASC/Relais coordinated implementation of Pending IDA / 56670 Post Qualification Open - National 246,000.00 0.00 2018-03-08 2018-03-29 2018-05-22 2018-06-21 2018-08-02 2019-12-31 distributeurs des districts technical strategies and Implementation Selection sanitaires couverts par le projet interventions dans les régions de Tombouctou et Taoudénit CS-REF-23 / Prestations d'ONG pour la mise en Suvre d'activités à base communautaire et le Component 2: Support Consultant paiement des ASC/Relais coordinated implementation of Pending IDA / 56670 Post Qualification Open - National 99,000.00 0.00 2018-03-08 2018-03-29 2018-05-12 2018-06-11 2018-07-16 2019-12-31 distributeurs du district sanitaire technical strategies and Implementation Selection couvert par le Projet dans la interventions région de Kidal (D.S. de Tin- Essako) 3/2018/CONS/MTN/MSP/FC- Component 1: Improve regional Consultant PDS / appuyer l'organisation d' Pending IDA / 56690 collaboration for stronger results Post Qualification Open - International 30,000.00 0.00 2018-04-10 2018-05-01 2018-06-21 2018-07-21 2018-09-25 2018-12-28 un monitorage des activités du Implementation across participating countries Selection TDM dans les districts 5/2018/CONS/MTN/MSP/FC- Component 1: Improve regional PDS / Recrutement Consultant Quality And Cost- Pending IDA / 56690 collaboration for stronger results Post Open - International 160,000.00 0.00 2018-04-25 2018-05-16 2018-07-04 2018-08-01 2018-08-31 2018-10-05 2018-12-18 2019-12-18 Enquête de satisfaction auprès Based Selection Implementation across participating countries é iciaires des bénf 6/2018/CONS/MTN/MSP/FC- Component 1: Improve regional PDS / Recrutement Consultant Quality And Cost- Pending IDA / 56690 collaboration for stronger results Post Open - International 244,000.00 0.00 2018-04-25 2018-05-23 2018-07-12 2018-08-09 2018-09-08 2018-10-17 2018-12-12 2019-12-12 Enquête d'impact et surveillance Based Selection Implementation across participating countries MTN (trachome Fl Oncho 7/2018/CONS/MTN/MSP/FC- PDS / Recrutement Consultant Component 1: Improve regional Consultant Pending Enquête dans les sites IDA / 56690 collaboration for stronger results Post Qualification Open - International 40,000.00 0.00 2018-04-17 2018-05-15 2018-07-10 2018-08-09 2018-10-15 2019-04-13 Implementation sentinelles bilharziose et across participating countries Selection géohelminthes 8/2018/CONS/MTN/MSP/FC- Component 1: Improve regional Quality And Cost- Pending PDS / Recrutement Consultant IDA / 56690 collaboration for stronger results Post Open - International 150,000.00 0.00 2018-04-19 2018-05-17 2018-07-11 2018-08-08 2018-09-07 2018-10-19 2018-11-29 2019-11-29 Based Selection Implementation Enquête de couverture CPS across participating countries 9/2018/CONS/MTN/MSP/FC- Component 1: Improve regional Quality And Cost- Pending PDS / Recrutement Consultant IDA / 56690 collaboration for stronger results Post Open - International 152,000.00 0.00 2018-04-20 2018-05-18 2018-07-09 2018-08-06 2018-09-05 2018-10-17 2018-12-03 2019-12-03 Based Selection Implementation Enquête paludométrique across participating countries 10/2018/CONS/MTN/MSP/FC- Component 1: Improve regional PDS / Recrutement Consultant Quality And Cost- Pending IDA / 56690 collaboration for stronger results Post Open - International 140,000.00 0.00 2018-04-24 2018-05-22 2018-07-19 2018-08-16 2018-09-15 2018-11-20 2019-01-08 2019-12-25 Enquête de cartographie des Based Selection Implementation across participating countries infrastructures d'hygiène CS-REF-25 / Formation en Component 3: Strengthen passation des marchés et en Consultant institutional capacity to Pending gestion financière des agents IDA / 56670 Post Qualification Open - National 50,000.00 0.00 2018-05-14 2018-06-04 2018-07-18 2018-08-17 2018-09-28 2018-11-12 coordinate and monitor Implementation des structures impliquées dans Selection implementation la mise en Suvre du projet BF-WAHO-BF-52422-CS-CQS / Component 3: Strengthen Réalisation d'une mission Consultant institutional capacity to Pending d'évaluation externe à mi- IDA / D0710 Post Qualification Open - National 100,000.00 0.00 2018-03-30 2018-04-20 2018-06-03 2018-07-03 2018-08-07 2018-10-06 coordinate and monitor Implementation parcours du projet (Burkina, Mali, Selection implementation Niger et à l'OOAS) BF-WAHO-BF-52425-CS-CQS / Component 3: Strengthen Consultant Appuyer l'unité dans le soutien et institutional capacity to Pending IDA / D0710 Post Qualification Open - National 60,000.00 0.00 2018-08-15 2018-09-05 2018-10-19 2018-11-18 2018-12-23 2019-12-23 la coordination des comités coordinate and monitor Implementation Selection transfrontaliers implementation BF-WAHO-BF-52620-CS-QBS / Mission de recherche sur le thème « Quelle est la valeur Component 1: Improve regional Quality Based Pending ajoutée de la combinaison IDA / D0710 collaboration for stronger results Post Open - International 750,000.00 0.00 2018-04-30 2018-05-21 2018-07-04 2018-08-01 2018-08-31 2018-09-30 2018-11-04 2019-03-04 Selection Implementation praziquantel+ molluscicide sur across participating countries l'élimination des schistosomoses ?» INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Page 5 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 5/2017/CONS/MSP/FC-PDS / é ucatifs Diffuser des messages d Component 2: Support par les organes de coordinated implementation of Pending IDA / 56690 Post Direct Selection Direct 46,667.00 0.00 2017-08-14 2017-08-24 2017-10-17 2018-04-30 communications nationales technical strategies and Implementation ,régionales et communautaires interventions MTN 6/2017/CONS/MSP/FC-PDS / Component 2: Support Diffuser des messages d é ucatifs coordinated implementation of Pending IDA / 56690 Post Direct Selection Direct 4,578.00 0.00 2017-08-15 2017-08-25 2017-10-20 2018-04-30 sur les radios régionales et technical strategies and Implementation communautaires MTN interventions Component 2: Support 7/2017/CONS/MSP/FC-PDS / coordinated implementation of Pending Diffuser des messages radio IDA / 56690 Post Direct Selection Direct 48,000.00 0.00 2017-08-23 2017-09-02 2017-11-01 2018-05-30 technical strategies and Implementation é isés télv du Paludisme interventions Component 3: Strengthen CS-REF-4 / Formation de courte institutional capacity to Pending durée dun agent des IDA / 56670 Post Direct Selection Direct 4,100.00 0.00 2017-09-06 2017-09-16 2017-10-19 2017-11-18 coordinate and monitor Implementation programmes en entomologie implementation Component 3: Strengthen CS-REF-5 / Formation de courte institutional capacity to Under durée de deux agents des IDA / 56670 Post Direct Selection Direct 8,200.00 0.00 2017-09-13 2017-09-23 2017-11-27 2018-05-26 coordinate and monitor Implementation programmes en suivi programme implementation Component 3: Strengthen CS-REF-6 / Fourniture institutional capacity to Individual Consultant Under IDA / 56670 Post Direct 8,200.00 0.00 2017-01-17 2017-01-24 2017-01-31 2017-02-08 2017-02-18 d'assistance technique à l'UCP coordinate and monitor Selection Implementation implementation CS-REF-8 / Fourniture Component 3: Strengthen d'assistance technique à l'UCP institutional capacity to Individual Consultant Under IDA / 56670 Post Direct 13,120.00 0.00 2017-07-21 2017-08-18 2017-08-28 2017-09-10 2017-11-09 et aux structures impliquées coordinate and monitor Selection Implementation dans la mise en Suvre du Projet implementation Component 3: Strengthen CS-REF-10 / Spécialiste en institutional capacity to Individual Consultant Under IDA / 56670 Post Open 196,800.00 0.00 2016-04-01 2016-05-04 2016-05-25 2016-06-29 2019-12-31 gestion financière de l'UCP coordinate and monitor Selection Implementation implementation Component 3: Strengthen CS-REF-11 / Comptable de institutional capacity to Individual Consultant Under IDA / 56670 Post Open 98,400.00 0.00 2016-06-01 2016-07-05 2016-07-19 2016-08-16 2019-12-31 l'UCP coordinate and monitor Selection Implementation implementation Component 3: Strengthen CS-REF-12 / Coordinateur de institutional capacity to Individual Consultant Under IDA / 56670 Post Direct 236,160.00 0.00 2016-07-15 2016-07-25 2016-08-15 2016-09-19 2017-03-18 l'UCP coordinate and monitor Selection Implementation implementation Component 3: Strengthen CS-REF-13 / Spécialiste en suivi institutional capacity to Individual Consultant Under IDA / 56670 Post Open 196,800.00 0.00 2016-10-20 2016-11-18 2016-12-02 2016-12-26 2019-12-31 é aluation de l'UCP &v coordinate and monitor Selection Implementation implementation Component 3: Strengthen CS-REF-14 / Spécialiste en institutional capacity to Individual Consultant Under IDA / 56670 Post Direct 196,800.00 0.00 2016-08-26 2016-09-05 2016-09-26 2016-10-31 2017-04-29 passation de marchés de l'UCP coordinate and monitor Selection Implementation implementation Component 3: Strengthen CS-REF-16 / Assistance institutional capacity to Individual Consultant Under technique dans le cadre de la IDA / 56670 Post Open 16,400.00 0.00 2017-10-19 2017-11-27 2017-12-18 2018-01-01 2018-04-01 coordinate and monitor Selection Implementation préparation du projet REDISSE implementation CS-REF-17 / Prestations Component 2: Support d'agence pour le paiement des coordinated implementation of Under ASC/Relais/Distributeurs dans IDA / 56670 Post Direct Selection Direct 604,105.48 0.00 2017-10-23 2017-11-02 2018-01-06 2019-01-06 technical strategies and Implementation les régions de Kayes, Koulikoro, interventions Sikasso et Ségou CS-REF-18 / Prestations d'agence pour le paiement des Component 2: Support ASC/Relais/Distributeurs dans coordinated implementation of Under IDA / 56670 Post Direct Selection Direct 387,616.46 0.00 2017-10-23 2017-11-02 2018-01-06 2019-01-06 les régions de Mopti, technical strategies and Implementation Tombouctou, Gao, Kidal et interventions Ménaka Component 3: Strengthen CS-REF-15 / Auditeur interne institutional capacity to Individual Consultant Under IDA / 56670 Post Open 102,500.00 0.00 2017-11-06 2017-12-15 2018-01-05 2018-01-29 2019-12-31 senior coordinate and monitor Selection Implementation implementation CS-REF-3 / Audit interne du Component 3: Strengthen projet (extension prestations institutional capacity to IDA / 56670 Post Direct Selection Direct 16,400.00 0.00 Canceled 2017-08-15 2017-08-25 2017-10-09 2019-12-31 auditeur interne de la coordinate and monitor DFM/MSHP) implementation Component 3: Strengthen CS-REF-19 / Appui à l'évaluation institutional capacity to interne/auto-évaluation à mi- IDA / 56670 Post Direct Selection Direct 16,400.00 18,509.78 Completed 2017-11-06 2017-11-02 2017-11-15 2017-11-09 2017-11-28 2017-11-24 2017-12-13 2017-12-20 coordinate and monitor parcours du Projet implementation Component 3: Strengthen CS-REF-20 / Chargé de institutional capacity to Individual Consultant Under IDA / 56670 Post Open 59,000.00 0.00 2018-01-11 2017-11-30 2018-03-01 2018-03-22 2018-04-26 2019-12-31 communication pour le Projet coordinate and monitor Selection Implementation implementation BF-WAHO-BF-35328-CS-CDS / Mission de recherche pour déterminer les canaux, les supports et les stratégies de Component 1: Improve regional communication qui induisent le Under IDA / D0710 collaboration for stronger results Post Direct Selection Direct 750,000.00 0.00 2017-08-30 2018-01-23 2017-12-28 2018-03-03 2019-03-03 plus de changement de Implementation across participating countries comportement dans la lutte contre les MTN dans les trois é iciaires du projet pays bénf P/MTN par le LASDEL - NIGER Page 6 BF-WAHO-BF-34548-CS-CDS / Mission de recherche pour déterminer la stratégiela plus Component 1: Improve regional Pending efficiente de chimio prévention du IDA / D0710 collaboration for stronger results Prior Direct Selection Direct 1,000,000.00 0.00 2017-08-30 2017-12-28 2018-03-03 2019-03-03 Implementation paludisme saisonner dans les across participating countries é iciaires du projet trois pays bénf P/MTN par le MRTC / MALI BF-WAHO-BF-34533-CS-CDS / Mission de recherche pour déterminer les facteurs qui Component 1: Improve regional influencent lobservance des IDA / D0710 collaboration for stronger results Prior Direct Selection Direct 1,000,000.00 0.00 Under Review 2017-08-30 2017-12-28 2018-03-03 2019-03-03 2èmes et 3èmes doses de la across participating countries CPS dans les trois pays bénfé iciaires du projet P/MTN par lIRSS Burkina Faso BF-WAHO-BF-35356-CS-CDS / Mission de recherche pour déterminer les meilleures stratégies d'incitation des Component 1: Improve regional Under distributeurs communautaires et IDA / D0710 collaboration for stronger results Post Direct Selection Direct 750,000.00 0.00 2017-11-10 2018-02-06 2017-11-20 2018-01-24 2019-01-24 Implementation d'appropriation de la lutte contre across participating countries les MTN par la communauté dans les trois pays bénfé iciaires du projet par l'ISSP - BURKINA . Component 2: Support 9/2017/CONS/MSP/FC-PDS / coordinated implementation of Recrutement OMS par ED pour IDA / 56690 Post Direct Selection Direct 2,000,000.00 0.00 Canceled 2017-08-30 2017-09-09 2017-11-08 2018-07-30 technical strategies and appui technique des pays interventions Component 2: Support 10/2017/MSP/FC-PDS / coordinated implementation of Individual Consultant Recrutement d'un Assistant au IDA / 56690 Post Open 20,000.00 0.00 Canceled 2017-07-17 2017-08-21 2017-09-11 2017-10-16 2018-10-16 technical strategies and Selection Contrôleur Financier du MSP interventions BF-PADS-37804-CS-INDV / Component 2: Support Etude sur l'analyse des parties coordinated implementation of Individual Consultant prenantes pour le renforcement IDA / 56680 Post Open 41,700.00 0.00 Canceled 2017-12-15 2018-02-02 2018-02-23 2018-04-08 2018-06-07 technical strategies and Selection de la communication en faveur de interventions la lutte contre les MTN BF-WAHO-BF-52426-CS-INDV / Component 3: Strengthen Documentation et le partage des institutional capacity to Individual Consultant Pending meilleures pratiques IDA / D0710 Post Limited 30,000.00 0.00 2018-04-23 2018-04-28 2018-05-19 2018-06-23 2018-08-22 coordinate and monitor Selection Implementation (Recrutement d'un consultant implementation individuel pour appuyer l'UGP) Page 7