The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) AFRICA | Ethiopia | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2014 | Seq No: 10 | ARCHIVED on 18-Jun-2019 | ISR35862 | Implementing Agencies: FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA, Ministry of Water and Energy, Ministry of Education, Ministry of Health Key Dates Key Project Dates Bank Approval Date: 20-Mar-2014 Effectiveness Date: 07-Jul-2014 Planned Mid Term Review Date: 12-Jun-2017 Actual Mid-Term Review Date: 22-May-2017 Original Closing Date: 30-Jun-2019 Revised Closing Date: 30-Jun-2019 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed development objective of the project is to “increase access to improved water supply and sanitation services for residents in participating woredas/towns and communities in Ethiopia.” Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Rural Water Supply and Sanitation:(Cost $275.40 M) Urban Water Supply and Sanitation:(Cost $110.60 M) Program Management:(Cost $31.60 M) Contingency:(Cost $18.60 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Overall Implementation Progress. Progress on activities in rural water supply are progressing well and expected to meet program targets on time. Rural sanitation progress has exceeded expected results but figures need to be validated to ensure that households have adequately constructed "improved" latrines. Institutional WaSH targets require attention to finalize the provision of full packages (e.g. water supply, sanitation, handwashing and incinerator/placenta pits for health posts). With concerted efforts targets for institutional WaSH can be achieved within the remaining program period. Progress for urban WaSH has been slower than anticipated and it is unlikely to meet all program targets by the closing date. However, there has been a concerted effort to expedite implementation. 34 out of the total 115 towns are completed (32 small and 2 medium). 51 out of 83 small towns and 9 of the 20 medium towns are currently under implementation. 6/18/2019 Page 1 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Rural Water Supply. 17, 189 schemes are operational out of which 15,049 new schemes, 212 expansions and 1,928 schemes were rehabilitated. On rural sanitation, 1,071,970 household (HH) improved latrines (190%) of the target beneficiaries have constructed improved latrines. Though the data for rural HH sanitation is subject to verification, the reported achievement thus far exceeds program targets. Though there is a concern that communities could slide back to old practices, since the start of the Program a total of 4,188 Kebeles in the CWA program Woredas (out of a total of 9,343) have been declared as “Open Defecation Free” (Amhara 1,424, Oromia 1,162, SNNP 1,103, Tigray 408, B/Gumuz 82, Gambella 7, Harrar 2). Institutional WaSH: The pace of implementation has picked up significantly. A total of: i) 1,102 (90.3%) water supply facilities and 1,846 (83%) improved latrines in health facilities, and ii) 1,074 water supply and 2,204 improved sanitation facilities for schools were constructed/rehabilitated. Urban WaSH component. Despite the delays in implementation of this component there has been an effort to speed up procurement process and increase progress of urban water supply development.  Small towns: 32 of the 124 small towns have been completed and 51 are under construction. The 21 remaining towns that were identified under this project will not be financed due to lack of resources and readiness.  Medium towns: Of the 20 towns 2 are completed, 9 are under construction, the remining 9 are still in engineering design phase and due to complexity of the works will not be will not be financed under this operation. Cost escalations have also contributed in the decision to not finance remaining medium towns under this project. Urban sanitation. 173 public latrines and 111 communal latrines were constructed in different towns that are benefitting 73,056 were constructed during this period. 55% of the planned 450 public and communal latrines have been completed. Given the concerns regarding operation and management mechanisms that require concerted attention to ensure sustainability of these facilities, a recommendation to halt construction of new facilities was made to address O&M and sustainability of installed infrastructure. The Ministry of Health and Ministry of Water, Irrigation and Energy are exploring mechanisms to improve the operation and maintenance of these facilities. Program management. All critical positions are filled at federal and regional WaSH sector PMUs including NWCO. About 323 staff (92.6% of the approved 349 staff) have been deployed. High staff turnover continues to be a challenge. Continuous training is needed to ensure newly recruited staff are provided with adequate orientation to support program implementation. During the past four and half years, a total of 147,250 people have been provided with various trainings and capacity building activities. Based on approved training package, thus far, about 13,724 WaSH experts from federal, regional, and woreda WaSH units have received different levels of technical trainings on Financial management, Procurement management, Safeguards, Water quality monitoring, O&M, Sanitation marketing, among others. Of these 271 staff are trained abroad. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Low Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Low Low Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- Low -- Overall -- Moderate Moderate Results PDO Indicators by Objectives / Outcomes 6/18/2019 Page 2 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Increased access to improved water supply and sanitation services IN00664944 ►Number of people in rural areas provided with access to Improved Water Sources under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,530,874.00 3,818,325.00 3,800,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 IN00664945 ►Number of people in urban areas provided with access to Improved Water Sources under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 338,490.00 502,721.00 2,160,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 program targets for urban water supply are significantly lagging due to a series of challenges that include: (i) price escalation driven by the devaluation of the Birr that contributed to need for revision of estimated project costs; (ii) changes of standards (increase in service levels) to meet GTP II required revision of study and design documents and contributed to cost escalations; (iii) increasing population growth; and (iv) variation between urban master plans (demand projections) and water supply design documents. These factors contributed to cost escalations between 156% - 1,113%. Additionally other factors that contributed to delays included capacity issues such as: (i) prolonged delays in engaging consultants for Comments: study and design; (ii) mobilizing drillers to complete source development and poor quality of work (e.g. high borehole failure rate); (iii) mobilizing civil works contractors (variable quality, numerous delays, construction quality) . Further, the insecurity in the country over the past two years exasperated delays. Contractors were unable or unwilling to mobilize and continue work in light of sporadic and violent outbreaks. End target was revised from 3,008,786 to 2,160,000 to ensure consistency with the 2015 restructuring. IN00664961 ►People provided with access to "improved sanitation facilities” under the proj. (Number, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,966,660.00 4,896,921.00 3,150,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 for rural sanitation beneficiaries are calculated based on the number of newly constructed HH latrine. Although, Ministry of Health officially reports this figure, there is a need for further verification particularly for Oromia, Amhara and SNNP to improve the quality of data. The verification activity was agreed upon during the NWSC meeting held in December 2018. For urban sanitation, beneficiary number is calculated from the 145 public and 84 communal latrines constructed under the program. Comments: The end target is revised from 3,000,000 (which reflected only the rural target) to 3,150,000 to reflect the total target for both rural and urban access. Achievement exceeded target. Although the figure is officially reported by MoH, the need for further verification is agreed with government. The National WaSH Inventory II result will be considered to verify the report. IN00664962 People provided with access to “improved sanitation facilities” - urban (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 42,126.00 73,056.00 150,000.00 6/18/2019 Page 3 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 IN00664963 People provided with access to “improved sanitation facilities”- rural (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,966,660.00 4,823,865.00 3,000,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 IN00684974 ►Direct project beneficiareis number of which female constitute 50% (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 4,321,046.00 5,960,000.00 Date 01-Jul-2014 -- 21-May-2019 30-Jun-2019 This indicator is added to ensure consistency as it was included as part of the restructuring in 2015. Comments: Intermediate Results Indicators by Components Rural Water Supply and Sanitation IN00664964 ►Improved community water points constructed or rehabilitated under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 16,400.00 17,189.00 24,200.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 14,538 are new water supply constructions, 198 are extension from existing sources and remaining 1,758 Comments: are rehabilitations IN00664967 ►Improved water supply schemes that are not functional in the program woredas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 25.00 25.00 10.50 10.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 The source of data is the recently conducted WaSH baseline assessment in 2018. Comments: IN00664970 ►Woredas with prepared and approved RWSS programs and established WWTs. (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 100.00 100.00 70.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 Comments: 6/18/2019 Page 4 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) IN00664972 ►People trained to improve hygiene behavior/sanitation practices under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,076,000.00 1,929,546.00 2,100,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 In the previous ISR, the actual achievement was incorrectly reported. The figure reported was the final target rather than the actual achievement to date. Comments: This ISR has corrected this figure. IN00664974 People trained to improve hygiene behavior/sanitation practices - female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 637,616.00 964,773.00 1,038,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 IN00664975 ►% of kebeles declared and verified ODF in the participating program woredas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 17.00 23.00 45.00 80.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 Out of the total 9343 Kebles in the CWA Program Woredas, 4188 Kebles are declared "ODF" (Amhara Comments: 1424, Oromia 1162, SNNP 1103, Tigray 408, B/Gumuz 82, Gambella 7, Harrar 2) IN00664976 ►Improved latrines constructed under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 593,332.00 1,071,970.00 627,000.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 Although MoH officially reports this figure, further verification is needed particularly for Oromia, Amhara Comments: and SNNP to improve the quality of the data. IN00664977 ►Institutional WaSH facilities constructed/ rehabilitated in Schools and health facilities under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 8,975.00 9,390.00 10,380.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 Previous reported figure was 8975. However, Sanitation facilities in a Health facility were counted separately (incinerator, waste disposal pit, placenta pit and latrines) while they should have been counted Comments: as one. This has been corrected by MoH in the 1st quarter of Ethiopian Fiscal Year 2011 (corresponding to Q1 FY19 in World Bank calendar) report and the figure is revised. 6/18/2019 Page 5 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Urban Water Supply and Sanitation IN00664965 ►Number of water utilities that the project is supporting (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 86.00 86.00 144.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 86 utilities are formally established in 20 medium towns and 66 small towns. An additional 49 towns, based of the size of the town, have established Water Committees to operate their water supply services. 34 out of the144 towns completed their water supply systems and providing water to beneficiaries. The development of Water supply systems in 60 towns (51 small and 9 medium) are currently ongoing. The project is due to support 94 towns with development of water supply schemes. 30 towns that have been Comments: supported with TA to prepare for water investments will not receive financing for infrastructure investments through this project due to shortage of funds. The final target is 144, an error was detected in 2015 restructuring paper that noted the support to 115 utilities. This error will be revised in upcoming restructuring. IN00664968 ►Additional volume of water produced from improved source under the project ( in participating towns) (Cubic Meter(m3), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 16,861.00 19,565.00 49,500.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 From the completed 27 small towns and 2 medium towns 13,497 m3/d and 3,319 m3/d of water is produced and distributed respectively. A number of small and medium towns have completed their source Comments: development and will be captured once the water is injected in to the system and providing water to households. IN00664971 ►Number of participating towns that have established water boards and have business plans (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 28.50 84.00 144.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 Although, 84small towns and all participating medium towns have established water boards only 51 of the small towns have their business plans finalized and approved under the Program. All 20 medium towns Comments: have prepared and approved business plans. IN00664973 ►Public and Communal Latrines rehabilitated /constructed under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 217.00 284.00 450.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 145 public and 84 communal latrines Comments: 6/18/2019 Page 6 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Program Management IN00664966 ►Number of trained PMU staff at WaSH sector Ministries and their respective regions and program woredas (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13,535.00 13,724.00 480.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 IN00664969 ►Number of trained WWT, WaSHCO/ Water Board members (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 140,318.00 147,250.00 7,835.00 Date 30-Jun-2014 30-Jun-2018 21-May-2019 30-Jun-2019 In all constructed rural water supply schemes, WaSHCOMs are established and provided with training (16,494 x 7). In addition, the Ethiopian Fiscal Year 2011 1st quarter (first quarter of FY19) report also Comments: shows that planning and progress review workshops have been organized at woreda level for about 26,927 participants Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P133591 IDA-53860 Effective USD 205.00 205.00 0.00 158.84 28.98 85% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P133591 IDA-53860 Effective 20-Mar-2014 10-Apr-2014 07-Jul-2014 30-Jun-2019 30-Jun-2019 Cumulative Disbursements 6/18/2019 Page 7 of 8 The World Bank Implementation Status & Results Report Ethiopia Water Supply, Sanitation and Hygiene Project (P133591) Restructuring History Level 2 Approved on 12-May-2015 Related Project(s) There are no related projects. 6/18/2019 Page 8 of 8