Appendix to Annex 3 Procurement Plan I. General 1. Project Information Country : India Borrower : Government of India Project Name : National Hydrology Project Loan Credit No. : 2. Bank’s Approval Date of the Procurement Plan : 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services Thresholds for Method of Procurement for procurement of goods, works and non-consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million Shopping Up to USD 100,000 (INR 6.5 m) Direct Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Procurement of Works: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million Comparison of three quotations / Shopping Up to USD 100,000 (INR 6.5 m) Force Account Must meet the requirements as per Para 3.9 of the Procurement Guidelines, and with prior agreement in PP with the Bank Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: (a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million (b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment. 1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract.. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only. 3. Reference to Procurement Manual The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements. 4. Any Other Special Procurement Arrangements The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions: (a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding. (b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. (d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures. (g) Two or three envelope system will not be used (except when using the e-procurement system assessed and agreed by the Bank). (h) No negotiations are conducted even with the lowest evaluated responsive bidders. 5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Procurement methods of procurement of Consultants' Services (Firms) Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS) Quality Based Selection (QBS) Must meet the requirements as per Para 3..2 to 3.4 of the Consultant Guidelines Selection based on a Fixed Budget (FBS) Must meet the requirements as per Para 3.5 of the Consultant Guidelines, Selection Based on Least Cost Basis (LCS) Must meet the requirements as per Para 3.6 of the Consultant Guidelines, Selection based on Consultant’s Qualification Estimated not to exceed USD 300,000, and (CQ) must meet the requirements as per Para 3.7 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank. Procurement methods for Selection of Individual Consultants (IC) Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V, Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V, Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Consultant Guidelines Prior Review Thresholds: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. 1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines 4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] I. Implementing Agency Capacity Building Activities with Time Schedule No Expected Outcome/Activity Description Estimated Date Duration ASCI training on Procurement Procedures arranged for 1. Executive, Assistant Engineers who are responsible for 2 weeks Continuous Procurement – multiple trainings 2. Contract management training – multiple trainings 2 weeks Continuous Customized training on Procurement Procedures arranged for 3. Executive, Assistant Engineers who are responsible for 1 week Continuous Procurement – multiple trainings PROCUREMENT India : National Hydrology Project PLAN General Information Country: India Banks Approval Date of the Original Procurement Plan: 2017-09-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-10 Project ID: P152698 GPN Date: Project Name: National Hydrology Project Loan / Credit No: IBRD / 87250 Executing Agency(ies): Ministry of Water Resources RD-GR, National Institute of Hydrology, Roorkee, Sikkim - NHP, West Bengal Ground Water, Andhra Pradesh Ground Water, Bhakra Beas Management Board, Himachal Pradesh - NHP, Damodar Valley Corporation, Kerala Surface Water, Kerala Ground Water, Telengana Surface Water, Odisha Ground Water, Meghalaya - NHP, Rajasthan - NHP, Jharkhand - NHP, Andhra Pradesh Surface Water, Survey of India, Gujarat Surface Water, Telengana Ground Water, Assam-NHP, Gujarat Ground Water, Nagaland - NHP, Karnataka Surface Water, Chhattisgarh Ground Water, Chhattisgarh Surface Water, Tamil Nadu - NHP, Bihar Surface Water, Central Water and Power Research Station, Mah WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-DVC-20023-CW-RFB / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 461,538.00 0.00 2017-11-30 2017-12-05 2018-01-16 2018-03-31 2018-05-05 2019-11-01 Construction of water Quality Lab System Envelope Implementation IN-HIMACHAL PRADESH-20159- Water Resources Monitoring Request for Single Stage - One Under CW-RFQ / Renovation and allied IBRD / 87250 Post Open - National 23,076.00 0.00 2017-08-10 2018-04-02 2017-11-28 2018-05-27 System Quotations Envelope Implementation works for SDC Mandi IN-HIMACHAL PRADESH-20392- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 26,923.00 0.00 2017-10-12 2018-01-17 2018-07-16 CW-RFQ / Site Store System Quotations Envelope Implementation IN-ANDHRA PRADESH SW- Water Resources Monitoring Single Stage - One Pending 22044-CW-RFB / Rennovation IBRD / 87250 Post Request for Bids Open - National 84,615.38 0.00 2017-10-31 2017-11-05 2017-12-17 2018-01-16 2018-02-20 2018-08-19 System Envelope Implementation and repairs of Data Centers IN-TELENGANA GW-23242-CW- RFB / (i)Protection works (126) for piezometers drilled under HP- II in Southern Telangana Region and Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 90,770.00 0.00 2017-10-02 2017-12-24 2017-11-26 2018-02-24 (ii)Rejuvenation of existing System Quotations Envelope Implementation piezometers (86) for effective water level measurements in piezometers constructed during HP I & II. IN-TELENGANA GW-23262-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Civil Works for Purpose IBRD / 87250 Post Limited 7,692.00 0.00 2018-02-05 2018-03-19 2018-05-18 System Quotations Envelope Implementation Driven Studies IN-GUJARAT SW-23692-CW- Water Resources Monitoring Single Stage - One Pending RFB / Civil Work for Sub divisio / IBRD / 87250 Post Request for Bids Limited 30,769.23 0.00 2017-10-01 2017-10-15 2017-10-30 2017-11-15 2017-12-30 2018-06-30 System Envelope Implementation Section Offices. IN-ODISHA (GW)-23843-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Renovation/Repair of IBRD / 87250 Post Limited 16,923.07 0.00 2017-10-05 2017-11-30 2018-03-31 System Quotations Envelope Implementation existing divisional data centre IN-TELENGANA GW-24093-CW- RFQ / (i) Protection works (98) for Peizometers drilled under HP- II covering Cluster of Eastern Telangana and Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 91,850.00 0.00 2017-09-30 2017-12-24 2017-11-25 2018-02-23 (ii) Rejuvenation of existing System Quotations Envelope Implementation piezometers (205) for effective water level measurements in piezometers constructed during HP I & II. IN-TELENGANA GW-24096-CW- RFQ / (i) Protection works (76) for Peizometers drilled under HP- II covering Cluster of Northern Telangana and Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 67,550.00 0.00 2017-09-30 2017-12-24 2017-11-25 2018-02-23 (ii) Rejuvenation of existing System Quotations Envelope Implementation piezometers (135) for effective water level measurements in piezometers constructed during HP I & II. IN-ASSAM -28007-CW-RFQ / Water Resources Monitoring Request for Single Stage - One Under Renovation and construction of IBRD / 87250 Post Open - National 49,231.00 0.00 2017-10-14 2017-12-09 2018-06-07 System Quotations Envelope Implementation Divisional Data Centre IN-MOWR RD-GR-28188-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Refurbishing NPMU Office, IBRD / 87250 Post Limited 15,384.00 0.00 2017-09-20 2017-11-01 2018-02-09 System Quotations Envelope Implementation Wood Work IN-CHHATTISGARH SW-29222- CW-RFQ / Renovation of Sub Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 32,307.69 0.00 2017-11-11 2018-01-06 2018-07-05 divisional Data Center & office System Quotations Envelope Implementation building 2 nos. IN-KERALA SW-29241-CW- RFQ / NHP- Discharge Water Resources Monitoring Request for Single Stage - One Pending Measurement Equipment - IBRD / 87250 Post Open - National 60,000.00 0.00 2017-11-25 2018-01-13 2018-03-14 System Quotations Envelope Implementation installation of Cableways in 7 river gauge locations IN-GUJARAT GW-25106-CW- Water Resources Monitoring Single Stage - One Pending RFB / Improvement of Existing IBRD / 87250 Post Request for Bids Open - National 80,769.23 0.00 2017-10-01 2017-10-06 2017-11-10 2017-11-27 2018-01-01 2018-06-30 System Envelope Implementation Piezometers- 526 Nos Institutional Capacity IN-MAHARASHTRA SW-33224- Enhancement CW-RFQ / Renovation & Water Resources Operations furnishing of existing Water and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 22,769.00 0.00 2018-01-05 2018-03-02 2018-08-29 Quality Labs at Nashik & Water Resources Monitoring Quotations Envelope Implementation Aurangabad in Godavari basin of System Marathwada region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33225- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending furnishing of existing Water IBRD / 87250 Post Open - National 9,230.77 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Quality Labs at Pune and System Kolhapur in Krishna basin. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33226- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending furnishing of existing Water IBRD / 87250 Post Open - National 12,307.69 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Quality Lab at Thane in West System flowing rivers in Konkan basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33227- Enhancement CW-RFQ / Renovation & Water Resources Operations furnishing of existing Water and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,815.38 0.00 2018-01-05 2018-03-02 2018-08-29 Quality Labs at Nagpur in Water Resources Monitoring Quotations Envelope Implementation Godavari basin of Vidharbha System region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33234- Water Resources Operations CW-RFQ / Establishment and and Planning System Request for Single Stage - One Pending Furnishing of New Water Quality IBRD / 87250 Post Open - National 53,846.00 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation Level II Lab For Tapi Basin at System Jalgaon. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33257- Water Resources Operations CW-RFQ / River Cross Section and Planning System Request for Single Stage - One Pending Survey for rivers on South of IBRD / 87250 Post Open - National 16,923.08 0.00 2018-03-31 2018-05-26 2018-11-22 Water Resources Monitoring Quotations Envelope Implementation Panchganga river of Krishna System Basin. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33259- Water Resources Operations CW-RFQ / Renovation & and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 6,923.08 0.00 2018-01-20 2018-03-17 2018-09-13 furnishing of Divisional Data Water Resources Monitoring Quotations Envelope Implementation Center of Amravati Division. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33262- Water Resources Operations CW-RFQ / Renovation of Sub and Planning System Request for Single Stage - One Pending Divisional Data Center of Akola IBRD / 87250 Post Open - National 5,384.62 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation Sub Division under H P Division, System Amaravati. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33264- Water Resources Operations CW-RFQ / Renovation of Sub and Planning System Request for Single Stage - One Pending Divisional Data Center of Jalgaon IBRD / 87250 Post Open - National 5,384.62 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation Sub Division under H P Division, System Amaravati. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33265- Water Resources Operations CW-RFQ / Renovation of Sub and Planning System Request for Single Stage - One Pending Divisional Data Center of Dhule IBRD / 87250 Post Open - National 5,384.62 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation Sub Division under H P Division, System Amaravati. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33267- Water Resources Operations CW-RFQ / Renovation & and Planning System Request for Single Stage - One Pending furnishing of Divisional & Sub- IBRD / 87250 Post Open - National 30,769.23 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation Divisional Data Centers of System Aurangabad Division. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33268- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending furnishing of divisional and sub- IBRD / 87250 Post Open - National 30,769.23 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation divisional data centres under System Nagpur Division Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33270- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 9,230.77 0.00 2018-01-20 2018-03-17 2018-09-13 furnishing of divisional data Water Resources Monitoring Quotations Envelope Implementation centre of Pune Division. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33273- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 21,538.46 0.00 2018-01-20 2018-03-17 2018-09-13 furnishing of sub-divisional data Water Resources Monitoring Quotations Envelope Implementation centres under Pune Division. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33277- Water Resources Operations CW-RFQ / Renovation and and Planning System Request for Single Stage - One Pending furnishing of Divisional and Sub- IBRD / 87250 Post Open - National 30,769.23 0.00 2018-01-20 2018-03-17 2018-09-13 Water Resources Monitoring Quotations Envelope Implementation divisional Data centre of Thane System Division. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33365- Water Resources Operations CW-RFB / Renovation of and Planning System Single Stage - One Pending Jalvidnyan Bhavan, Nashik for IBRD / 87250 Post Request for Bids Open - National 307,692.31 0.00 2017-12-26 2017-12-31 2018-02-11 2018-03-13 2018-04-17 2018-10-14 Water Resources Monitoring Envelope Implementation State Water Data Center & System Training Center. Water Resources Information Systems IN-WEST BENGAL GW-37311- CW-RFQ / DRILLING AND INSTALLATION OF 18 NEW NESTED (3 WELLS PER NEST) GW MONITORING WELLS IN THREE MULTI-LAYERED Water Resources Monitoring Request for Single Stage - One Pending AQUIFERS AND IBRD / 87250 Post Open - National 94,166.33 0.00 2017-11-27 2017-12-25 2018-01-09 System Quotations Envelope Implementation CONSTRUCTION OF 18 PROTECTION WORKS FOR DWLR IN NINE COASTAL BLOCKS OF PURBA MEDINIPUR DISTRICT, WEST BENGAL IN-WEST BENGAL GW-37344- CW-RFQ / Protection Works for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 11,551.88 0.00 2017-11-29 2017-12-27 2018-01-11 5 Automatic Weather Station System Quotations Envelope Implementation (AWS) IN-WEST BENGAL GW-37349- CW-RFQ / Protection Works for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 5,390.88 0.00 2017-11-28 2017-12-26 2018-01-10 5 Automatic Raingauge Station System Quotations Envelope Implementation (ARS) IN-WEST BENGAL GW-37354- CW-RFB / Protection Works for Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 6,161.00 0.00 2017-11-24 2017-11-29 2017-12-06 2017-12-27 2018-01-10 2018-01-25 5 Automatic Water Level recorder System Envelope Implementation (AWLR) & Velocity Sensor (VS) IN-TELENGANA SW-38228-CW- RFB / Civil Works for Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 115,384.61 0.00 2017-12-20 2017-12-25 2018-02-05 2018-03-07 2018-04-11 2018-10-08 Construction of Regional Data System Envelope Implementation Center IN-KERALA SW-29250-CW- RFQ / NHP - Rennovation of Institutional Capacity Request for Single Stage - One Pending Knowledge Centres- Upgradation IBRD / 87250 Post Open - National 84,615.39 0.00 2017-12-05 2018-02-20 2018-05-21 Enhancement Quotations Envelope Implementation of Training Centre, Thrissur 2017- 18 IN-WEST BENGAL SW-38559- Water Resources Monitoring Single Stage - Two Under CW-RFB / Construction of State IBRD / 87250 Post Request for Bids Open - National 328,358.00 0.00 2017-12-18 2018-03-08 2017-12-20 2018-03-10 2018-01-22 2018-04-13 2018-02-08 2018-06-20 2018-03-04 2019-03-04 System Envelope Implementation Data Center at Kolkata IN-KERALA SW-39093-CW- RFQ / NHP-Shifting of River gauge station at Cheruthuruthy to Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,538.46 0.00 2017-12-20 2018-02-14 2018-03-31 Vazhalikkavu Check dam under System Quotations Envelope Implementation Hydrology Section, Wadakkanchery IN-KERALA SW-39107-CW- RFQ / NHP- Construction of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 246.15 0.00 2017-12-22 2018-02-16 2018-03-18 steps for river gauge station at System Quotations Envelope Implementation Vettilappara - IN-KERALA SW-39108-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / NHP- Protection of IBRD / 87250 Post Open - National 6,400.00 0.00 2017-12-18 2018-02-12 2018-03-29 System Quotations Envelope Implementation Kurumali River Gauge station IN-KERALA SW-39111-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / NHP- Protection of Aloor IBRD / 87250 Post Open - National 4,892.31 0.00 2017-12-20 2018-02-14 2018-03-16 System Quotations Envelope Implementation River Gauge station IN-KERALA SW-39132-CW- RFQ / NHP- Protection work for Water Resources Monitoring Request for Single Stage - One Pending installation of Bank Operated IBRD / 87250 Post Open - National 7,535.63 0.00 2017-12-29 2018-02-09 2018-03-26 System Quotations Envelope Implementation Cable Way at Karikkadavu river gauge station IN-TELENGANA SW-39866-CW- RFB / Infrastructure _Works - Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 92,307.69 0.00 2017-12-20 2017-12-25 2018-02-05 2018-03-07 2018-04-11 2018-10-08 Interior Works for State & System Envelope Implementation Regional Data Centers Page 1 IN-WEST BENGAL GW-37305- CW-RFQ / CONSTRUCTION OF 25 NOS PROTECTION WORKS Water Resources Monitoring Request for Single Stage - One Pending FOR DWLR AT 25 NOS IBRD / 87250 Post Open - National 9,822.18 0.00 2017-12-17 2018-01-14 2018-02-28 System Quotations Envelope Implementation EXISTING GROUNDWATER MONITORING WELLS IN WEST BENGAL IN-WEST BENGAL GW-37300- CW-RFQ / DRILLING AND INSTALLATION OF 20 NOS GROUNDWATER MONITORING WELLS AND CONSTRUCTION Water Resources Monitoring Request for Single Stage - One Pending OF 20 NOS. PROTECTION IBRD / 87250 Post Open - National 18,376.73 0.00 2017-12-17 2018-01-10 2018-02-24 System Quotations Envelope Implementation WORKS FOR DWLR TELEMETRY SYSTEM IN WEATHERED ZONE OF HARD ROCK AREAS OF PURULIA DISTRICT, WEST BENGAL IN-WEST BENGAL SW-38561- CW-RFB / Construction of Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 89,552.00 0.00 2018-01-31 2018-07-18 2018-03-21 2018-09-17 Control Room for SCADA of System Quotations Envelope Implementation Tilpara Barrage IN-WEST BENGAL SW-38558- CW-RFB / Construction of Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 89,552.00 0.00 2018-01-17 2018-05-17 2018-03-09 2018-09-05 Control Room for SCADA of System Quotations Envelope Implementation Durgapur Barrage IN-MANIPUR -41468-CW-RFB / Construction of state hydrological Water Resources Monitoring Single Stage - Two Pending data centre at water resources IBRD / 87250 Post Request for Bids Open - National 1,011,978.20 0.00 2017-12-30 2018-01-04 2018-02-05 2018-02-13 2018-02-19 2019-08-21 System Envelope Implementation department campus, lamphel, Manipur IN-ASSAM -44713-CW-RFB / Water Resources Monitoring Single Stage - Two Under Construction of State Data IBRD / 87250 Post Request for Bids Open - National 307,692.00 0.00 2018-01-19 2018-01-24 2018-03-07 2018-05-20 2018-06-24 2018-12-21 System Envelope Implementation Centre IN-SOI-44988-CW-DIR / Establishment of production facility for 1:25k geodatabase processing. Work involves civil Water Resources Information Single Stage - One Pending and electrical renovation in IBRD / 87250 Post Request for Bids Open - National 186,153.85 0.00 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 2018-03-31 Systems Envelope Implementation existing building. Work being executed through CPWD as per WB guidelines at NGDC/ DMC, Dehradun. IN-SOI-44996-CW-DIR / Establishment of production facility for 1:25k geodatabase processing. Work involves civil Water Resources Information Single Stage - One Pending and electrical renovation in IBRD / 87250 Post Request for Bids Open - National 204,615.39 0.00 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 2018-03-31 Systems Envelope Implementation existing building. Work being executed through CPWD as per WB guideline at GISTC/ UK&WUP GDC, Dehradun. IN-SOI-45002-CW-DIR / Establishment of production facility for 0.5m DEM data processing. Work involves civil Water Resources Information Single Stage - One Pending and electrical renovation in IBRD / 87250 Post Request for Bids Open - National 307,692.31 0.00 2018-02-09 2018-02-14 2018-03-07 2018-03-12 2018-03-20 2018-03-31 Systems Envelope Implementation existing building. Work being executed through CPWD as per WB guidelines at G&RB office of Survey of India in Dehradun. IN-TAMIL NADU -46686-CW- RFQ / Improvements to Data Centre in Ground Water Division and Sub-Divisional Data Centre Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 9,231.00 0.00 2018-02-12 2018-04-02 2018-05-31 at Salem Ground Water sub Enhancement Quotations Envelope Implementation division, Ground water circle office & Division campus at Thanjavur District. IN-TAMIL NADU -46681-CW- RFQ / Repairs and Renovation works to Regional and Division Data Processing Centres at Institutional Capacity Request for Single Stage - One Pending Thallakulam in Madurai District & IBRD / 87250 Post Limited 7,692.00 0.00 2018-02-01 2018-03-15 2018-05-14 Enhancement Quotations Envelope Implementation Data Processing Centres at Paramakudi Ground Water Subdivision office in Ramanathapuram District. . IN-TAMIL NADU -46688-CW- RFQ / Improvements to Data Institutional Capacity Request for Single Stage - One Pending Processing Centre at Ground IBRD / 87250 Post Limited 7,692.00 0.00 2018-01-31 2018-03-15 2018-06-18 Enhancement Quotations Envelope Implementation Water Divisions at Tharamani, Cuddalore and Vellore. IN-KERALA SW-39133-CW- RFQ / NHP- Fencing of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,723.08 0.00 2018-01-29 2018-03-01 2018-03-22 Kunnamangalam rain gauge System Quotations Envelope Implementation station IN-KERALA SW-39109-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / NHP- Renovation of IBRD / 87250 Post Limited 707.70 0.00 2018-01-29 2018-03-01 2018-03-22 System Quotations Envelope Implementation Vanimel River Gauge station IN-KERALA SW-39110-CW- RFQ / NHP: Civil works at Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,015.38 0.00 2018-01-29 2018-03-01 2018-03-22 Kaithapram River gauge station System Quotations Envelope Implementation for upgrading to RTDAS IN-KERALA SW-39112-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Fencing work of Chooral IBRD / 87250 Post Limited 2,153.85 0.00 2018-02-05 2018-03-08 2018-03-23 System Quotations Envelope Implementation rain Gauge station IN-KERALA SW-39113-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / NHP - Fencing of IBRD / 87250 Post Limited 2,461.54 0.00 2018-02-05 2018-03-08 2018-03-23 System Quotations Envelope Implementation Thillenkeri rain gauge station IN-KERALA SW-39114-CW- Water Resources Monitoring Request for Single Stage - One Pending RFQ / NHP - Fencing work of IBRD / 87250 Post Limited 2,153.85 0.00 2018-02-07 2018-03-10 2018-03-25 System Quotations Envelope Implementation Payyavoor rain gauge station IN-TAMIL NADU -46834-CW- RFQ / Improvements to TAWS Water Resources Monitoring Request for Single Stage - One Pending station at Upper Anicut in Trichy, IBRD / 87250 Post Limited 954.00 0.00 2018-02-12 2018-04-02 2018-05-31 System Quotations Envelope Implementation Ooty and Valparai in Coimbatore District. IN-JHARKHAND -47260-CW- RFB / construction of Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 93,333.84 0.00 2018-03-14 2018-03-16 2018-04-13 2018-05-11 2018-05-23 2018-11-19 piezometers in different districts System Envelope Implementation of jharkhand IN-TAMIL NADU -46732-CW- RFQ / Improvements to the Standard Rainguage Stations at Water Resources Monitoring Request for Single Stage - One Pending Sivagangai taluk Office in IBRD / 87250 Post Limited 154.00 0.00 2018-01-31 2018-03-15 2018-05-14 System Quotations Envelope Implementation Sivagangai and at Karaikudi taluk Office in Sivagangai District. IN-TAMIL NADU -46744-CW- RFQ / Improvements to the Standard Rainguage Stations at Water Resources Monitoring Request for Single Stage - One Pending Poonimangadu and IBRD / 87250 Post Limited 385.00 0.00 2018-01-30 2018-03-13 2018-05-14 System Quotations Envelope Implementation Dharanivaraghapuram in Thiruvallur, Palur and Thirukoilur in Cuddalore and Villupuram IN-BIHAR GW-50060-CW-RFB / Institutional Capacity Request for Single Stage - One Pending renovation of office for NHP-III at IBRD / 87250 Post Open - National 13,125.00 0.00 2018-03-22 2018-06-29 2018-08-28 Enhancement Quotations Envelope Implementation chief engineer office, patna IN-SOI-23030-CW-RFB / Lidar Survey- Acquisition and Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Open - National 4,492,307.69 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 processing including setting up of Systems Envelope geospatial data production centre IN-UTTAR PRADESH SW-50743- CW-RFB / Supply, Installation, Testing, Commissioning, Training, Dissemination, Water Resources Operations Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 615,300.00 0.00 2018-02-23 2018-02-20 2018-02-23 2018-03-17 2018-04-04 2018-04-30 2018-05-25 2026-02-24 Operation and maintenance of and Planning System Envelope Implementation SCADA System at Okhla Barrage and Head Regulator of Agra Canal, New Delhi Institutional Capacity Enhancement IN-MAHARASHTRA SW-33475- Water Resources Operations CW-RFB / Establishment of and Planning System Single Stage - One Pending SPMU with furnishing of Building IBRD / 87250 Post Request for Bids Open - National 315,384.62 0.00 2018-08-01 2018-08-06 2018-09-17 2018-10-17 2018-11-21 2019-05-20 Water Resources Monitoring Envelope Implementation & Equipments at Jalvidnyan System Bhavan, Nashik. Water Resources Information Systems IN-UTTARAKHAND-53107-CW- RFB / Renovation Work of Water Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 34,430.00 0.00 2018-06-18 2018-06-19 2018-06-20 2018-06-23 2018-06-25 2018-06-26 Quality Lab. at IRI Roorkee under Systems Envelope Implementation national Hydrology Project IN-UTTARAKHAND-53112-CW- RFB / Renovation Work of Water Water Resources Information Single Stage - Two Pending Quality Lab. at Irrigation Office, IBRD / 87250 Post Request for Bids Open - National 75,369.00 0.00 2018-06-14 2018-06-15 2018-06-16 2018-06-19 2018-06-21 2018-06-22 Systems Envelope Implementation Haldwani under National Hydrology Project IN-UTTARAKHAND-53151-CW- RFB / Construction of State Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 1,523,076.00 0.00 2018-06-12 2018-06-13 2018-06-14 2018-06-17 2018-06-19 2019-04-20 Water Informatics Centre building Systems Envelope Implementation at Roorkee under NHP IN-PUNJAB -54238-CW-RFQ / RESTORATION OF 700 No. GROUND WATER OBSERVATION WELLS Water Resources Monitoring Request for Single Stage - One Pending ALREADY INSTALLED IN IBRD / 87250 Post Open - National 81,676.92 0.00 2018-03-25 2018-05-20 2018-11-16 System Quotations Envelope Implementation PUNJAB STATE UNDER WORLD BANK AIDED HYDROLOGY PROJECT PHASE - II. IN-HIMACHAL PRADESH-54274- CW-RFB / Deep piezometers Water Resources Monitoring Single Stage - One Under IBRD / 87250 Post Request for Bids Open - National 146,154.00 0.00 2018-03-19 2018-03-05 2018-03-19 2018-04-20 2018-04-20 2018-07-20 2018-08-18 2019-08-18 (civil work) with DWLR with System Envelope Implementation ODEX Method (44 nos.) IN-HIMACHAL PRADESH-54493- Water Resources Monitoring Single Stage - One Under CW-RFB / Supply of G&D Bank IBRD / 87250 Post Request for Bids Open - National 92,308.00 0.00 2018-03-22 2018-03-22 2018-03-27 2018-04-02 2018-05-08 2018-05-19 2018-08-07 2018-09-11 2019-09-11 System Envelope Implementation Operated Cable-way (BOC) IN-HIMACHAL PRADESH-54498- CW-RFB / Construction of 12 Water Resources Monitoring Single Stage - One Under nos. of deep/shallow wells IBRD / 87250 Post Request for Bids Open - National 92,308.00 0.00 2018-03-29 2018-06-21 2018-04-03 2018-06-25 2018-05-15 2018-08-14 2018-09-18 2019-03-17 System Envelope Implementation (Observation Wells ) by Rotary Drilling Method. IN-HIMACHAL PRADESH-20162- CW-RFQ / Providing and Fixing of Staff Gauge , Gauge Plate in Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 34,230.00 0.00 2018-04-12 2018-07-31 2019-01-27 various G&D Sites in System Quotations Envelope Implementation HP.(Activities of similar nature have been clubbed) IN-MADHYA PRADESH-18230- Water Resources Monitoring Request for Single Stage - One Pending CW-RFQ / Benchmark and RL IBRD / 87250 Post Limited 3,230.77 0.00 2018-06-05 2018-07-31 2019-01-27 System Quotations Envelope Implementation surveys IN-MADHYA PRADESH-18234- Water Resources Monitoring Request for Single Stage - One Pending CW-RFQ / River Cross section of IBRD / 87250 Post Limited 10,615.38 0.00 2018-06-05 2018-07-31 2019-01-27 System Quotations Envelope Implementation River monitoring sites IN-MADHYA PRADESH-61561- Water Resources Monitoring Request for Single Stage - One Pending CW-RFQ / Rennovation works - IBRD / 87250 Post Open - National 15,384.62 0.00 2018-07-05 2018-08-30 2019-02-26 System Quotations Envelope Implementation State Data Centre IN-MADHYA PRADESH-61564- CW-RFQ / Rennovation works - Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-07-05 2018-08-30 2019-02-26 Bhopal Circle Data Centre of System Quotations Envelope Implementation Groundwater IN-BIHAR/WRD/FMISC/NHP- SW/W-NCB-01 / Construction of Water Resources Monitoring Single Stage - Two Pending Water Knowledge Center, Bihar IBRD / 87250 Post Request for Bids Open - National 1,115,384.61 0.00 2018-12-31 2019-01-05 2019-02-16 2019-05-01 2019-06-05 2021-06-04 System Envelope Implementation at Patna as Hydrology Project Center all complete. IN-SOI-61871-CW-RFQ / Water Resources Information Request for Single Stage - One Pending Establishment of production IBRD / 87250 Post Open - National 203,076.92 0.00 2018-07-21 2018-09-15 2019-03-14 Systems Quotations Envelope Implementation facility for 3-5m DEM IN-SOI-62132-CW-RFB / Setting Institutional Capacity Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 71,646.15 0.00 2018-07-16 2018-07-21 2018-09-01 2018-11-14 2018-12-19 2019-06-17 up Production Centre for PDO Enhancement Envelope Implementation IN-CGWB-32465-CW-RFB / Construction of 60 nos Water Resources Operations Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 649,254.00 0.00 2018-06-01 2018-06-29 2018-06-06 2018-07-18 2018-09-30 2018-11-04 2019-05-03 Piezometers- Tamilnadu and and Planning System Envelope Implementation Puducherry. IN-CGWB-39815-CW-RFB / Procurement of DWLR with Water quality probes and with Water Resources Operations Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 266,155.00 0.00 2018-10-15 2018-10-20 2018-12-01 2019-02-13 2019-03-20 2019-09-16 Telemetry (Supply, installation, and Planning System Envelope Implementation real-time data acquisition & maintenance) IN-DVC-19989-CW-RFB / Water Resources Monitoring Single Stage - Two Construction of hydrological data IBRD / 87250 Prior Request for Bids Open - National 347,753.00 0.00 Canceled 2017-07-10 2018-05-07 2017-07-15 2018-05-10 2017-08-26 2017-10-17 2017-11-08 2017-12-13 2019-06-11 System Envelope center of DVC IN-KARNATAKA SW-26473-CW- RFQ / Up gradation of State Water Resources Monitoring Request for Single Stage - One Data Center:- Repair & IBRD / 87250 Post Open - National 68,184.62 64,512.19 Signed 2017-08-29 2017-09-15 2017-10-17 2017-11-14 System Quotations Envelope Renovation of office and other allied works NHP-2018-2019-APGW-212910 Institutional Capacity Single Stage - Two Pending / Protection works for IBRD / 87250 Post Request for Bids Open - National 261,538.46 0.00 2018-09-17 2018-09-22 2018-11-03 2019-01-16 2019-02-20 2019-08-19 Enhancement Envelope Implementation Piezometers NHP-2018-2019-APGW-423400 Institutional Capacity Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 392,307.69 0.00 2018-09-24 2018-09-29 2018-11-10 2019-01-23 2019-02-27 2019-08-26 / Drilling of Piezometers Enhancement Envelope Implementation NHP-2018-2019-APGW-235012 Institutional Capacity Single Stage - Two Pending / Construction of State Data IBRD / 87250 Post Request for Bids Open - National 2,307,692.31 0.00 2018-09-24 2018-09-29 2018-11-10 2019-01-23 2019-02-27 2019-08-26 Enhancement Envelope Implementation Center for SW and GW NHP-2018-2019-ML-426354-CW- Water Resources Monitoring Single Stage - Two Pending NCB-SE / Construction of Data IBRD / 87250 Post Request for Bids Open - National 338,461.54 0.00 2018-08-06 2018-08-11 2018-09-22 2018-12-05 2019-01-09 2019-07-08 System Envelope Implementation Centre NHP-2018-2019-TSGW-339383 / Protection works to Piezometers Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 78,461.54 0.00 2018-09-15 2018-11-10 2019-01-09 of less than 50 m drilled under System Quotations Envelope Implementation HP-II in Southern Region NHP-2018-2019-TSGW-946553 / Protection works to Piezometers Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 53,846.15 0.00 2018-09-16 2018-11-11 2019-01-10 of less than 50 m drilled under System Quotations Envelope Implementation HP-II in Northern Region NHP-2018-2019-TSGW-834014 / Protection works to Piezometers Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 52,307.69 0.00 2018-09-17 2018-11-12 2019-01-11 less than 50m drilled under HP-II System Quotations Envelope Implementation in Eastern Telangana Region NHP-2018-2019-TSGW-564746 / Water Resources Monitoring Request for Single Stage - One Pending Rejuvenation of Existing PZ for IBRD / 87250 Post Open - National 84,615.38 0.00 2018-09-29 2018-11-24 2019-01-23 System Quotations Envelope Implementation effective water level monitoring NHP-2018-2019-TSGW-903276 / Water Resources Monitoring Single Stage - Two Pending Upgradation of State Data , IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2018-10-08 2018-10-13 2018-11-24 2019-02-06 2019-03-13 2019-09-09 System Envelope Implementation Training cum Information Centre Page 2 NHP-2018-2019-TSGW-721719 / Water Resources Monitoring Request for Single Stage - One Pending Civil works for Purpose Driven IBRD / 87250 Post Open - National 38,461.54 0.00 2018-10-15 2018-12-10 2019-06-08 System Quotations Envelope Implementation Studies (Yr1) NHP-2018-2019-KASW-842629- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rejuvenation of IBRD / 87250 Post Limited 61,538.46 0.00 2018-07-07 2018-09-01 2019-02-28 System Quotations Envelope Implementation existing peizometers-Package 1 NHP-2018-2019-KASW-470717- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rejuvenation of IBRD / 87250 Post Limited 61,538.46 0.00 2018-07-12 2018-09-06 2019-03-05 System Quotations Envelope Implementation existing peizometers-Package 2 NHP-2018-2019-KASW-955198- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rejuvenation of IBRD / 87250 Post Limited 61,538.46 0.00 2018-07-17 2018-09-11 2019-03-10 System Quotations Envelope Implementation existing peizometers-Package 3 NHP-2018-2019-KASW-724042- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rejuvenation of IBRD / 87250 Post Limited 61,538.46 0.00 2018-07-22 2018-09-16 2019-03-15 System Quotations Envelope Implementation existing peizometers-Package 4 NHP-2018-2019-KASW-316354- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rejuvenation of IBRD / 87250 Post Limited 61,538.46 0.00 2018-07-28 2018-09-22 2019-03-21 System Quotations Envelope Implementation existing peizometers-Package 5 NHP-2018-2019-KASW-809404- CW-SH-QU / Acoustics works,improvements works,civil Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 58,461.54 0.00 2018-08-01 2018-09-26 2019-03-25 & electrification etc.,, to class System Quotations Envelope Implementation rooms at ESTC,KERS& other works at WQ labs NHP-2018-2019-KASW-774493- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Improvements to IBRD / 87250 Post Limited 47,692.31 0.00 2018-08-25 2018-10-20 2019-04-18 System Quotations Envelope Implementation Main building , KERS NHP-2018-2019-KASW-624324- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Improvements to IBRD / 87250 Post Limited 47,692.31 0.00 2018-09-15 2018-11-10 2019-05-09 System Quotations Envelope Implementation Hostel building (Block-I) of KERS NHP-2018-2019-KASW-899118- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / GD IBRD / 87250 Post Limited 9,230.77 0.00 2018-08-25 2018-10-20 2019-04-18 System Quotations Envelope Implementation housing(reconstruction) NHP-2018-2019-KASW-688310- CW-SH-QU / Upgrading Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 30,769.23 0.00 2018-09-20 2018-11-15 2019-05-14 Divisional/Subdivisional data System Quotations Envelope Implementation processing centers-package1 NHP-2018-2019-KASW-352806- CW-SH-QU / Upgrading Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 30,769.23 0.00 2018-10-20 2018-12-15 2019-06-13 Divisional/Subdivisional data System Quotations Envelope Implementation processing centers-package 2 NHP-2018-2019-KASW-639841- CW-SH-QU / Upgrading Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 30,769.23 0.00 2018-11-04 2018-12-30 2019-06-28 Divisional/Subdivisional data System Quotations Envelope Implementation processing centers-package 3 NHP-2018-2019-KASW-462160- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rain gauge housing IBRD / 87250 Post Limited 12,307.69 0.00 2018-10-05 2018-11-30 2019-05-29 System Quotations Envelope Implementation -reconstruction-package 4 NHP-2018-2019-KASW-831126- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Rain gauge housing IBRD / 87250 Post Limited 12,307.69 0.00 2018-10-20 2018-12-15 2019-06-13 System Quotations Envelope Implementation -reconstruction-package 6 NHP-2018-2019-CGWB-450136 Water Resources Monitoring Single Stage - Two Pending / construction of piezometers in IBRD / 87250 Post Request for Bids Open - National 1,016,923.08 0.00 2018-06-25 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 System Envelope Implementation costal area NHP-2018-2019-DVC-210903- CW-NCB-DE / Construction of Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 269,230.77 0.00 2018-08-10 2018-08-15 2018-09-26 2018-12-09 2019-01-13 2020-07-11 Water Quality Lab and its System Envelope Implementation Furnishing. NHP-2018-2019-SK-979458-CW- Water Resources Monitoring Single Stage - Two Pending NCB-DE / Construction of State IBRD / 87250 Post Request for Bids Open - National 184,615.38 0.00 2018-07-18 2018-07-24 2018-08-24 2018-09-04 2018-10-23 2021-10-02 System Envelope Implementation Data center building NHP-2018-2019-RJ-106903-CW- Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 1,384,615.38 0.00 2018-08-16 2018-08-21 2018-10-02 2018-12-15 2019-01-19 2019-07-18 NCB-DE / State data center System Envelope Implementation NHP-2018-2019-RJ-354417-CW- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 38,461.54 0.00 2018-07-20 2018-09-14 2019-03-13 SH-QU / Regional data center System Quotations Envelope Implementation NHP-2018-2019-RJ-214021-CW- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 41,538.46 0.00 2018-07-20 2018-09-14 2019-03-13 SH-QU / District data center System Quotations Envelope Implementation NHP-2018-2019-RJ-968644 / Construction , Renovation & Institutional Capacity Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 523,076.92 0.00 2018-07-09 2018-07-14 2018-08-25 2018-11-07 2018-12-12 2019-06-10 modernisation of knowledge Enhancement Envelope Implementation center NHP-2018-2019-CPCB-469831 / Water Resources Monitoring Single Stage - Two Pending Renovation of Data Centre at IBRD / 87250 Post Request for Bids Open - National 30,769.23 0.00 2018-09-30 2018-10-05 2018-11-16 2019-01-29 2019-03-05 2019-09-01 System Envelope Implementation CPCB, Delhi IN-DVC-19989-CW-RFB-2 / Construction of Hydrology Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 347,753.00 0.00 2018-07-25 2018-07-30 2018-09-10 2018-11-23 2018-12-28 2020-06-25 Control Room at DVC Maithon System Envelope Implementation under NHP. NHP-2018-2019-ML-967673-CW- Water Resources Monitoring Request for Single Stage - One Pending SH-SCB / Construction of IBRD / 87250 Post Open - National 40,384.62 0.00 2018-09-08 2018-11-03 2019-05-02 System Quotations Envelope Implementation piezometers Institutional Capacity Enhancement NHP-2018-2019-UPGW-177029- Water Resources Operations CW-NCB-SE / INSTALLATION and Planning System Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 960,230.77 0.00 2018-06-24 2018-06-29 2018-08-16 2018-10-29 2018-12-03 2019-12-03 OF BLOCKWISE KEY Water Resources Monitoring Envelope Implementation PIEZOMETERS System Water Resources Information Systems NHP-2018-2019-JH-372935-CW- NCB-DE / Civil Works for Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 233,169.23 0.00 2018-12-27 2019-01-02 2019-01-30 2019-02-12 2019-02-27 2019-03-29 Construction of state data and System Envelope Implementation training centre,WQ LAB,HIS NHP-2018-2019-JH-395497-CW- Water Resources Monitoring Single Stage - Two Pending NCB-DE / Construction of IBRD / 87250 Post Request for Bids Open - National 363,076.92 0.00 2018-09-14 2018-09-19 2018-10-15 2018-10-29 2018-11-19 2019-03-19 System Envelope Implementation piezometers NHP-2018-2019-KLGW-429114 / Water Resources Monitoring Request for Single Stage - One Pending Platform construction and IBRD / 87250 Post Open - National 84,615.38 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation protective cover NHP-2018-2019-KLGW-170872 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 19,230.77 0.00 2018-09-06 2018-11-01 2019-04-30 Fencing for piezometers System Quotations Envelope Implementation GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-NIH ROORKEE-16148-GO- RFB / Desktop Computers (20), Institutional Capacity Request for Single Stage - One Under Workstation (1), Digital IBRD / 87250 Post Limited 77,000.00 0.00 2017-10-03 2017-11-28 2018-03-15 Enhancement Quotations Envelope Implementation Photocopier (1), Blade Server (2), Projector (1) IN-SIKKIM -16384-GO-RFQ / Procurement of 4 Computers, Printers and 2 Laptops (IT Equipment) to set up SPMU Water Resources Operations Request for Single Stage - One IBRD / 87250 Post Limited 7,200.00 7,248.69 Completed 2017-06-10 2017-06-10 2017-06-23 2017-06-22 2017-06-28 2017-06-27 Office as approved in the AWP and Planning System Quotations Envelope 2016-2017 and 2017-18. The WID are 728, 729, 2734, 2735 and 2736. 17335-GO-RFB / PROCUREMENT OF MANUAL Water Resources Monitoring Request for Single Stage - One Pending OBSERVATION INSTRUMENTS IBRD / 87250 Post Limited 13,538.46 0.00 2017-09-13 2017-10-16 2017-10-26 System Quotations Envelope Implementation (Portable Current Meter & Eco Sounder & GPS) IN-WEST BENGAL-GW-17345- GO-RFB / PROCUREMENT OF Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 16,230.77 0.00 2017-09-13 2017-10-16 2017-10-26 WATER QUALITY TESTING System Quotations Envelope Implementation INSTRUMENTS IN-WEST BENGAL GW-17346- GO-RFB / PROCUREMENT OF IT EQUIPMENTS (Computers & Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 22,384.62 0.00 2017-09-13 2017-10-16 2017-10-26 Laptop with Software & System Quotations Envelope Implementation Peripherals) FOR HYDRO INFORMATICS CENTRE IN-WEST BENGAL GW-17349- GO-RFB / PROCUREMENT OF IT EQUIPMENTS LCD (Projector Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 7,692.31 0.00 2017-09-13 2017-10-16 2017-10-26 and Screen/LED TV & System Quotations Envelope Implementation Photocopier) FOR HYDRO INFORMATICS CENTRE IN-SIKKIM -17740-GO-RFQ / Procurement of Office Furniture / Water Resources Information Request for Single Stage - One IBRD / 87250 Post Limited 5,000.00 2,350.56 Completed 2017-06-12 2017-06-12 2017-06-24 2017-06-29 2017-06-29 2017-06-30 Furnishing as per AWP 2016-17 Systems Quotations Envelope vide UID No 131. IN-ANDHRA PRADESH GW- 18140-GO-RFQ / Procurement of Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 9,231.00 0.00 2017-06-15 2017-06-15 2017-06-15 Air Conditioners for State and Enhancement Quotations Envelope Implementation District Data Centers IN-ANDHRA PRADESH GW- 18141-GO-RFQ / Procurement of Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 46,154.00 0.00 2017-06-15 2017-06-15 2017-06-15 Ground Water Monitoring Enhancement Quotations Envelope Implementation Equipment IN-ANDHRA PRADESH GW- Institutional Capacity Request for Single Stage - One Pending 18149-GO-RFQ / Procurement of IBRD / 87250 Post Open - National 46,154.00 0.00 2017-06-15 2017-06-28 2017-07-27 Enhancement Quotations Envelope Implementation DGPS IN-BBMB-18706-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending Procurement of Articulating IBRD / 87250 Post Limited 18,600.00 0.00 2017-08-11 2017-10-29 2018-01-27 Enhancement Quotations Envelope Implementation Pickup vehicle (Multi utility) Institutional Capacity IN-MOWR RD-GR-19666-GO- Enhancement Request for Single Stage - One Pending RFQ / IT Equipment for National IBRD / 87250 Post Limited 41,538.00 0.00 2017-07-09 2017-08-16 2017-11-04 Water Resources Information Quotations Envelope Implementation Project Management Unit Systems IN-HIMACHAL PRADESH-19979- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / supply of ground water IBRD / 87250 Post Open - National 23,077.00 0.00 2017-08-15 2017-12-18 2018-06-16 System Quotations Envelope Implementation sampling pump IN-DVC-19985-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Under Procurement of IT hardware & IBRD / 87250 Post Open - National 8,262.00 6,072.37 2017-07-15 2018-05-16 2017-09-09 2018-03-08 System Quotations Envelope Implementation software IN-HIMACHAL PRADESH-20070- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / supply of bore hole IBRD / 87250 Post Open - National 5,769.00 0.00 2017-08-15 2017-12-18 2018-06-16 System Quotations Envelope Implementation camera IN-HIMACHAL PRADESH-20073- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,385.00 0.00 2017-09-16 2017-12-20 2018-06-18 GO-RFQ / supply of total station System Quotations Envelope Implementation IN-KERALA SW-20846-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / Procurement of bridge outfit - 10 IBRD / 87250 Post Open - National 12,307.69 0.00 2017-11-17 2018-01-05 2018-02-04 System Quotations Envelope Implementation Nos (2016-17 and 2017-18) IN-KERALA GW-20103-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 23,000.00 0.00 2017-07-30 2017-09-24 2018-03-23 / Computer Purchase System Quotations Envelope Implementation IN-HIMACHAL PRADESH-20120- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 2,307.00 0.00 2017-09-16 2017-12-20 2018-06-18 GO-RFQ / Supply of Auto level System Quotations Envelope Implementation IN-TELENGANA SW-20126-GO- RFQ / Procurement of Survey Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 30,307.00 0.00 2017-09-06 2017-11-01 2018-04-30 Instruments like Total Station, System Quotations Envelope Implementation Auto Levels and GPS Hand sets IN-TELENGANA SW-20131-GO- RFQ / Procurement of office Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 3,077.00 0.00 2017-10-08 2017-12-03 2018-06-01 furniture for Central Data center System Quotations Envelope Implementation and Regional Data Center IN-HIMACHAL PRADESH-20136- GO-RFQ / Supply of Computers Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 4,923.00 0.00 2017-07-19 2017-09-13 2018-03-12 along with software and System Quotations Envelope Implementation accessories IN-KERALA SW-20141-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / Current Meter with accessories- IBRD / 87250 Post Open - National 27,692.00 0.00 2017-11-02 2018-01-11 2018-02-10 System Quotations Envelope Implementation Digital type - 9 Nos IN-KERALA SW-20143-GO-RFQ / NHP- Procurement of Staff Gauge and Auto graphic Water Level recorder. Staff Gauge in 44 Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 9,076.92 0.00 2017-11-02 2017-12-28 2018-01-27 River Gauge Stations. Each System Quotations Envelope Implementation station require Staff Gauge of different length of 1m, 1.5m and 2 m. AWLR - 1 No IN-HIMACHAL PRADESH-20157- GO-RFQ / Procurement of Water Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 7,692.00 0.00 2017-08-08 2018-03-15 2017-11-27 2018-05-26 Quality Equipment & System Quotations Envelope Implementation accessories for existing lab IN-ODISHA (GW)-21788-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Procurement of Desktop IBRD / 87250 Post Limited 16,153.84 0.00 2017-09-28 2017-11-23 2018-03-31 System Quotations Envelope Implementation Computer with OS IN-TELENGANA SW-20163-GO- Water Resources Monitoring Request for Single Stage - One RFQ / Purchase of Computers IBRD / 87250 Post Open - National 16,984.61 14,495.27 Signed 2017-09-20 2017-11-15 2017-11-22 2018-05-14 System Quotations Envelope with software IN-HIMACHAL PRADESH-20296- GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 18,462.00 0.00 2017-12-16 2018-03-06 2018-09-02 computer/laptop/printers etc. for System Quotations Envelope Implementation state (FY:2017-18) IN-HIMACHAL PRADESH-20297- GO-RFQ / Non ITC Equipments ( Water Resources Monitoring Request for Single Stage - One Pending UPS 5Kw 1 no. & 1Kw 10 nos. , IBRD / 87250 Post Open - National 13,462.00 0.00 2017-09-16 2017-12-20 2018-06-18 System Quotations Envelope Implementation colored photocopier 2nos. scanner 6 nos. etc.) FY:2017-18 IN-HIMACHAL PRADESH-20377- Water Resources Information Request for Single Stage - One Pending GO-RFQ / Information Brochure IBRD / 87250 Post Open - National 3,077.00 0.00 2018-03-20 2018-05-15 2018-11-11 Systems Quotations Envelope Implementation (FY:2017-18) IN-HIMACHAL PRADESH-20381- Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 76,923.00 0.00 2017-11-15 2017-11-20 2018-01-01 2018-01-31 2018-03-07 2018-09-03 GO-RFQ / ADCP above 25 meter System Envelope Implementation IN-HIMACHAL PRADESH-20382- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / ADCP Crane mounted IBRD / 87250 Post Open - National 26,154.00 0.00 2017-11-20 2018-02-23 2018-08-22 System Quotations Envelope Implementation vehicle IN-HIMACHAL PRADESH-20384- GO-RFQ / Procurement of Water Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 16,308.00 0.00 2018-01-20 2018-04-18 2018-10-15 Quality Equipment / Accessories System Quotations Envelope Implementation (FY:2017-18) IN-HIMACHAL PRADESH-20389- GO-RFQ / Supply of Discharge Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 23,077.00 0.00 2017-09-25 2018-01-12 2018-07-11 measurement equipment & System Quotations Envelope Implementation accessories (FY:2107-18) Page 3 IN-KERALA SW-20508-GO-RFQ / Procurement of Computers, printers and UPS (2016-17) and Water Resources Information Request for Single Stage - One Under IBRD / 87250 Post Open - National 35,230.77 0.00 2017-11-13 2018-01-22 2018-03-08 2017-18 Computers - 31 Nos Systems Quotations Envelope Implementation Work station -2 nos A4 printers- 25 nos and UPS IN-RAJASTHAN -21107-GO- RFQ / Manual Rain Gauge Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,077.00 67.11 Completed 2017-07-20 2017-11-14 2017-08-10 2017-11-22 2017-09-09 2017-12-03 equipment with measuring glass. System Quotations Envelope 45 Nos IN-JHARKHAND -21432-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Purchase of computers, IBRD / 87250 Post Open - National 13,276.92 0.00 2017-09-20 2017-11-08 2017-12-23 System Quotations Envelope Implementation printer,scanner,laptop with AMC. IN-APSW-21435-GO-RFQ / Purchase of ICT Equipments, Cloud Computing & Training Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 100,000.00 0.00 2017-10-21 2017-12-16 2018-06-14 equipments etc - Lumpsum System Quotations Envelope Implementation Provision under shopping for the FY 2017-18 IN-JHARKHAND -21445-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 24,615.38 0.00 2017-09-26 2017-11-14 2017-12-29 RFQ / Resistivitymeter System Quotations Envelope Implementation IN-SOI-21678-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 37,507.69 0.00 2017-09-05 2017-10-31 2018-04-29 Furniture for PDO Enhancement Quotations Envelope Implementation IN-ANDHRA PRADESH SW- 21930-GO-RFQ / Purchase of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 24,307.69 0.00 2017-11-20 2018-01-15 2018-07-14 Non ICT equipment for WQ labs System Quotations Envelope Implementation & Data Centers IN-ANDHRA PRADESH GW- 18144-GO-RFQ / Procurement of Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 100,000.00 0.00 2017-09-25 2017-11-18 2017-12-19 Geo-Physical survey equipment Enhancement Quotations Envelope Implementation for field surveys IN-ODISHA (GW)-21932-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 10,769.23 0.00 2017-09-02 2017-10-28 2018-03-31 RFQ / laptop with OS System Quotations Envelope Implementation IN-ANDHRA PRADESH SW- 21936-GO-RFQ / ADCP Carrying Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 107,692.31 0.00 2017-12-26 2018-02-20 2018-08-19 Vehicles and Other inspection System Quotations Envelope Implementation Vehicles IN-ODISHA (GW)-21937-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 4,615.38 0.00 2017-09-02 2017-10-28 2018-03-31 RFQ / printer System Quotations Envelope Implementation IN-ANDHRA PRADESH SW- Water Resources Monitoring Request for Single Stage - One Pending 21938-GO-RFQ / Current Meter IBRD / 87250 Post Limited 11,076.92 0.00 2017-12-16 2018-02-10 2018-08-09 System Quotations Envelope Implementation with accessories IN-ANDHRA PRADESH SW- Water Resources Monitoring Request for Single Stage - One Pending 21943-GO-RFQ / Procurement of IBRD / 87250 Post Limited 27,692.30 0.00 2017-12-05 2018-01-30 2018-07-29 System Quotations Envelope Implementation Total Stations IN-ANDHRA PRADESH SW- Institutional Capacity Request for Single Stage - One Pending 21946-GO-RFQ / Procurement of IBRD / 87250 Post Limited 15,384.61 0.00 2017-11-05 2017-12-31 2018-06-29 Enhancement Quotations Envelope Implementation Softwares IN-ODISHA (GW)-21941-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / power supply & on-line IBRD / 87250 Post Limited 9,230.76 0.00 2017-09-02 2017-10-28 2018-03-31 System Quotations Envelope Implementation UPS for data centre IN-ODISHA (GW)-21962-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / training equipment/LCD IBRD / 87250 Post Limited 3,076.92 0.00 2017-09-04 2017-10-30 2018-03-31 System Quotations Envelope Implementation projector & screen IN-ODISHA (GW)-21973-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / microsoft office(multi user IBRD / 87250 Post Limited 6,769.23 0.00 2017-09-05 2017-10-31 2018-03-31 System Quotations Envelope Implementation lic.) IN-ODISHA (GW)-21977-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,076.92 0.00 2017-09-05 2017-10-31 2018-03-31 RFQ / antivirus System Quotations Envelope Implementation IN-GUJARAT SW-22075-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Air conditioner-2 Nos. for IBRD / 87250 Post Limited 1,538.46 0.00 2017-09-06 2017-11-13 2018-01-11 System Quotations Envelope Implementation GERI IN-JHARKHAND -22182-GO- Institutional Capacity Request for Single Stage - One Pending RFQ / Establishment of SPMU IT IBRD / 87250 Post Open - National 15,384.62 0.00 2017-09-05 2017-10-17 2017-12-01 Enhancement Quotations Envelope Implementation infrastructure, furniture etc IN-ODISHA (GW)-22530-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 3,076.92 0.00 2017-08-25 2017-10-20 2018-03-31 RFQ / Handheld GPS units System Quotations Envelope Implementation IN-ODISHA (GW)-22548-GO- RFQ / GW Monitoring Equipment Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.69 0.00 2017-08-25 2017-10-20 2018-03-31 Kit ( WL indicator, measuring System Quotations Envelope Implementation tape, Stop watch) IN-GUJARAT SW-22865-GO- RFQ / PH Analyzer Micro Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,846.15 0.00 2017-09-11 2017-11-17 2018-01-15 Processor based -3 nos. for System Quotations Envelope Implementation GERI IN-GUJARAT SW-22875-GO- RFQ / EC-TDS Analyzer Micro Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,384.62 0.00 2017-09-11 2017-11-17 2018-01-15 Processor based - 3 nos for System Quotations Envelope Implementation GERI. IN-GUJARAT SW-22877-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Turbidimeter -3 nos for IBRD / 87250 Post Limited 1,615.38 0.00 2017-09-11 2017-11-17 2018-01-15 System Quotations Envelope Implementation GERI IN-GUJARAT SW-22878-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / U V Spectro Photometer-1 IBRD / 87250 Post Limited 7,153.85 0.00 2017-09-11 2017-11-17 2018-01-15 System Quotations Envelope Implementation no for GERI IN-SOI-23021-GO-RFB / Water Resources Information Single Stage - One Under Additional Hardware and IBRD / 87250 Post Request for Bids Open - National 278,461.54 0.00 2017-11-01 2018-07-02 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope Implementation Software for updation IN-TELENGANA GW-23217-GO- RFQ / Procurement of Borehole Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 76,923.07 0.00 2017-09-11 2017-12-23 2017-11-10 2018-01-09 Logging Equipment with AMC System Quotations Envelope Implementation Support IN-GUJARAT SW-23216-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Flame Photometer -1 no. IBRD / 87250 Post Limited 1,538.46 0.00 2017-12-05 2018-02-07 2018-03-05 System Quotations Envelope Implementation for W.Q. lab GERI. IN-GUJARAT SW-23218-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Ion meter -1 no. for W. Q. IBRD / 87250 Post Limited 1,538.46 0.00 2017-12-05 2018-02-07 2018-03-05 System Quotations Envelope Implementation lab GERI IN-GUJARAT SW-23219-GO- RFB / Procurement of office Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Limited 14,182.15 0.00 2017-08-16 2017-09-01 2017-09-22 2017-10-07 2017-11-07 2018-03-15 furniture for Water Quality lab System Envelope Implementation GERI IN-TELENGANA GW-23260-GO- RFQ / To create resource material (Annual Reports, Institutional Capacity pamphlets, Brochure, posters, Enhancement Request for Single Stage - One Pending audio visuals, documentaries IBRD / 87250 Post Limited 17,538.00 0.00 2018-02-03 2018-03-18 2018-04-17 Water Resources Operations Quotations Envelope Implementation etc.,)on water conservation & and Planning System management awareness creation to water users (IEC) & Resource material for PDS & DSS IN-TELENGANA GW-23278-GO- RFQ / Procurement and Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 12,308.00 0.00 2017-12-05 2018-01-10 2018-02-09 Installation of ACs (10) for SDC System Quotations Envelope Implementation and Conference Hall IN-SIKKIM -18127-GO-DIR / Procurement of 2 vehicles vide PID 82 of Procurement Plan 2017- Institutional Capacity 18. by direct contracting of IBRD / 87250 Post Direct Selection Direct 24,615.00 24,176.32 Completed 2017-08-03 2017-07-28 2017-08-04 2017-08-04 2017-08-19 2017-08-04 2017-10-03 2017-08-19 Enhancement Mahindra Bolero, a time tested and suitable for Hilly terrain condition of Sikkim. IN-GUJARAT SW-23676-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / GPS Hand held Type2 - 2 IBRD / 87250 Post Limited 1,538.46 0.00 2017-10-15 2017-12-10 2018-01-31 System Quotations Envelope Implementation nos. IN-ODISHA (GW)-23848-GO- Institutional Capacity Request for Single Stage - One Pending RFQ / cost of infrastructure and IBRD / 87250 Post Limited 7,692.30 0.00 2017-10-08 2017-12-03 2018-03-31 Enhancement Quotations Envelope Implementation furnishing of spmu IN-TELENGANA GW-24074-GO- RFQ / Basic Field equipment for field officers for Strengthening Manual Observations - 32units (Each unit Consists of WL Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 69,615.00 0.00 2017-09-21 2017-12-20 2017-11-16 2017-12-16 Indicators -2, Geological Survey System Quotations Envelope Implementation Kits-2, Infiltrometre-1, 100m Mesuring Tapes-5, 50m Measuring Tapes-5, Dumpy Level -1) IN-GUJARAT GW-24238-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Analytical Digital Balance- IBRD / 87250 Post Limited 6,923.08 0.00 2017-08-29 2017-10-25 2017-11-17 System Quotations Envelope Implementation 3 nos for WQ lab. IN-GUJARAT GW-24242-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Manual Ground Water IBRD / 87250 Post Limited 6,153.85 0.00 2017-08-28 2017-10-06 2017-11-02 System Quotations Envelope Implementation Level Indicator - 10 nos IN-GUJARAT GW-24245-GO- RFQ / Resistivity Meter Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 38,461.54 0.00 2017-11-03 2017-12-28 2018-01-28 (Terameter Multi Electrode) - 1 System Quotations Envelope Implementation No. IN-GUJARAT GW-24253-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Deep Resistivity Meter - 1 IBRD / 87250 Post Limited 6,153.85 0.00 2017-09-08 2017-10-26 2017-11-09 System Quotations Envelope Implementation no. IN-GUJARAT GW-24255-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 9,230.77 0.00 2017-09-22 2017-11-27 2017-12-27 RFQ / Borehole Camera - 1 no System Quotations Envelope Implementation IN-GUJARAT GW-24268-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Laptop - 3 nos.(Through IBRD / 87250 Post Limited 6,000.00 0.00 2017-09-18 2017-10-27 2017-11-27 System Quotations Envelope Implementation GEM) IN-GUJARAT SW-24269-GO- Water Resources Monitoring Single Stage - Two Pending RFB / Procurement of ADCP - 3 IBRD / 87250 Post Request for Bids Open - National 115,384.62 0.00 2017-09-01 2017-09-06 2017-10-18 2017-12-31 2018-02-04 2018-08-03 System Envelope Implementation nos IN-GUJARAT GW-24273-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Desktop Computers - 10 IBRD / 87250 Post Limited 11,846.15 0.00 2017-09-19 2017-11-07 2017-11-27 System Quotations Envelope Implementation nos. (Through GEM) IN-GUJARAT GW-24276-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Workstations - 2 nos IBRD / 87250 Post Limited 6,153.85 0.00 2017-09-28 2017-11-23 2017-12-23 System Quotations Envelope Implementation (Through GEM) IN-GUJARAT GW-24281-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Tablet - 14 nos.,Through IBRD / 87250 Post Limited 5,384.62 0.00 2017-10-03 2017-11-13 2017-11-28 System Quotations Envelope Implementation Government E Market(GEM) IN-GUJARAT GW-24283-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Portable External Hard IBRD / 87250 Post Limited 923.08 0.00 2017-09-18 2017-10-31 2017-11-27 System Quotations Envelope Implementation Disk - 6 nos. (Through GEM) IN-TELENGANASW-24378-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Current Meters with IBRD / 87250 Post Open - National 9,123.07 0.00 2017-10-15 2017-12-10 2018-06-08 System Quotations Envelope Implementation accessories IN-TELENGANASW-24379-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Boats with outboard IBRD / 87250 Post Open - National 38,461.53 0.00 2017-12-13 2018-02-07 2018-08-06 System Quotations Envelope Implementation engines IN-TELENGANA SW-24381-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,076.92 0.00 2018-02-17 2018-04-14 2018-10-11 RFQ / Bridge outfits System Quotations Envelope Implementation IN-TELENGANA SW-24387-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,076.92 0.00 2018-02-11 2018-04-08 2018-10-05 RFQ / Water Quality Field Kit System Quotations Envelope Implementation IN-TELENGANA SW-24389-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Surveying Instruments - IBRD / 87250 Post Open - National 3,076.92 0.00 2018-02-21 2018-04-18 2018-10-15 System Quotations Envelope Implementation Differential GPS IN-TELENGANA SW-24397-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Power supply & Online IBRD / 87250 Post Open - National 8,507.69 0.00 2017-10-28 2017-12-23 2018-06-21 System Quotations Envelope Implementation UPS IN-GUJARAT GW-24517-GO- RFQ / Procurement of B/W Water Resources Monitoring Request for Single Stage - One Pending Printers - 10 nos. And Colour IBRD / 87250 Post Limited 4,307.69 0.00 2017-09-19 2017-11-07 2017-11-27 System Quotations Envelope Implementation Printer A3 Size - 1 no. (Through GEM) IN-GUJARAT GW-24520-GO- RFQ / Multi function of Colour Water Resources Monitoring Request for Single Stage - One Pending Printer cum Scanner cum Copier IBRD / 87250 Post Limited 7,692.31 0.00 2017-10-03 2017-11-21 2017-12-12 System Quotations Envelope Implementation of A3 Size - 1 no. And Copier Machine - 1 no. IN-NAGALAND -26244-GO-RFQ Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 6,615.00 5,667.11 Signed 2017-08-26 2017-03-06 2017-08-30 2017-03-24 2017-09-04 / IT Equipment and Accesories System Quotations Envelope IN-KARNATAKA SW-26380-GO- RFQ / Procurement of Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 22,430.77 22,115.75 Completed 2017-08-29 2017-08-02 2017-08-29 2017-08-07 2017-08-29 2017-09-05 Computers(18 nos) through GEM System Quotations Envelope Portal IN-KARNATAKA SW-26472-GO- Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 9,230.77 8,846.30 Completed 2017-08-29 2017-08-02 2017-08-29 2017-08-05 2017-08-29 2017-09-05 RFQ / Procurement of Laptops System Quotations Envelope IN-NAGALAND -26982-GO-RFQ Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 24,615.00 23,424.44 Signed 2017-09-05 2017-03-06 2017-09-09 2017-03-23 2017-09-14 / Purchase of Vehicle Enhancement Quotations Envelope IN-MEGHALAYA -27690-GO- Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 2,769.00 1,164.61 Completed 2017-09-16 2017-09-12 2017-11-11 2017-12-14 2018-05-10 2018-02-01 RFQ / Procurement of 2 laptops System Quotations Envelope IN-CHHATTISGARH GW-28951- Water Resources Monitoring Pending GO-DIR / Procurement of colour IBRD / 87250 Post Direct Selection Direct 769.23 0.00 2017-09-18 2017-09-23 2017-10-28 2018-04-26 System Implementation printer. IN-CHHATTISGARH GW-28952- Water Resources Monitoring Pending GO-DIR / Procurement of A4 IBRD / 87250 Post Direct Selection Direct 1,692.30 0.00 2017-09-18 2017-09-23 2017-10-28 2018-04-26 System Implementation printer. IN-CHHATTISGARH GW-28954- Water Resources Monitoring Pending GO-DIR / Procurement of Digital IBRD / 87250 Post Direct Selection Direct 3,076.92 0.00 2017-09-18 2017-09-23 2017-10-28 2018-04-26 System Implementation Copier Multifunctional. IN-CHHATTISGARH GW-28960- Water Resources Monitoring Pending GO-DIR / Procurement of Tablet IBRD / 87250 Post Direct Selection Direct 384.61 0.00 2017-09-18 2017-09-23 2017-10-28 2018-04-26 System Implementation computer. IN-KERALA SW-29067-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / Procurement of Echo sounder - IBRD / 87250 Post Open - National 18,461.54 0.00 2017-11-03 2017-12-29 2018-01-28 System Quotations Envelope Implementation 1 No IN-KERALA SW-29071-GO-RFQ / NHP- Procurement of Water Quality Lab Equipment for Level II Water Resources Monitoring Request for Single Stage - One Under Lab 2017-18. Procurement of p H IBRD / 87250 Post Open - National 3,076.92 0.00 2017-11-20 2018-01-15 2018-02-14 System Quotations Envelope Implementation Analyser-1No, EC-TDS Analyser- 1No and Ion Analyser-1 No for Level II Lab. IN-KERALA SW-29073-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / NHP- Procurement of Total IBRD / 87250 Post Open - National 27,692.31 0.00 2017-10-30 2018-01-10 2018-02-09 System Quotations Envelope Implementation Station - 2 nos Page 4 IN-KERALA SW-29081-GO-RFQ / NHP- Procurement of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,246.15 0.00 2017-11-10 2017-12-29 2018-01-28 Automatic Level - 3 Nos (2016-17 System Quotations Envelope Implementation and 2017-18) IN-CHHATTISGARH SW-29146- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Procurement of IBRD / 87250 Post Limited 4,615.38 0.00 2017-11-04 2017-12-30 2018-06-28 System Quotations Envelope Implementation Standard Raingauge. IN-CHHATTISGARH SW-29149- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of IBRD / 87250 Post Limited 11,538.46 0.00 2017-11-04 2017-12-30 2018-06-28 System Quotations Envelope Implementation Airconditioners. IN-CHHATTISGARH SW-29152- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of Online IBRD / 87250 Post Limited 10,769.23 0.00 2017-11-04 2017-12-30 2018-06-28 System Quotations Envelope Implementation UPS 15 KVA. IN-CHHATTISGARH SW-29206- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Procurement 0f floor IBRD / 87250 Post Limited 3,846.15 0.00 2017-11-04 2017-12-30 2018-06-28 System Quotations Envelope Implementation scrubber machine. IN-KERALA SW-29209-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / NHP- Procurement of IBRD / 87250 Post Open - National 15,384.62 0.00 2017-10-30 2018-01-10 2018-02-09 System Quotations Envelope Implementation Differential GPS - 2 Nos IN-KERALA SW-29211-GO-RFQ / NHP - Procurement of Data Water Resources Monitoring Request for Single Stage - One Pending base server and accessories for IBRD / 87250 Post Open - National 23,076.00 0.00 2017-11-20 2018-01-22 2018-02-21 System Quotations Envelope Implementation WRIS and RTDAS and other IT equipment 2017-18 IN-KERALA SW-29213-GO-RFQ / NHP - Procurement of data from Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 769.23 0.00 2017-12-05 2018-01-30 2018-07-29 various offices for the Systems Quotations Envelope Implementation development of WRIS. 2017-18 IN-CHHATTISGARH SW-29216- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of LCD IBRD / 87250 Post Limited 1,538.46 0.00 2017-11-04 2017-12-30 2018-06-28 System Quotations Envelope Implementation Projetor. IN-CHHATTISGARH SW-29219- Institutional Capacity Request for Single Stage - One Pending GO-DIR / Procurement of 1 no IBRD / 87250 Post Limited 12,307.69 0.00 2017-10-11 2017-12-06 2018-06-04 Enhancement Quotations Envelope Implementation Vehicle. IN-KERALA SW-29223-GO-RFQ / NHP - Procurement of furniture for Training centre 2017-18. This Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-03-19 2018-05-14 2018-06-13 work will be started after Enhancement Quotations Envelope Implementation completing 80 percentage of renovation work IN-KERALA SW-29228-GO-RFQ Institutional Capacity Request for Single Stage - One Pending / NHP - Purchase of vehicle for IBRD / 87250 Post Open - National 12,307.69 0.00 2017-11-16 2018-01-11 2018-02-10 Enhancement Quotations Envelope Implementation SPMU - 1 No IN-KERALA SW-29244-GO-RFQ / NHP- Procurement of Water Quality Lab Equipment for level I Labs 2016-17 and 2017-18. Procurement of Analytical Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 12,615.40 0.00 2017-11-05 2018-01-14 2018-02-13 Balance-5 Nos, WQ Analyser- System Quotations Envelope Implementation 5Nos, p H Analyser-1 No, EC- TDS Analyser-1 No, Distillation Apparatus- 1No, DO measuring equipment- 1No for Level IN-KERALA SW-29249-GO-RFQ / NHP - Procurement of furniture Water Resources Monitoring Request for Single Stage - One Pending for regional data centre, divisional IBRD / 87250 Post Open - National 9,461.54 0.00 2017-11-27 2018-02-05 2018-03-07 System Quotations Envelope Implementation data centre, sub divisional data centres and field offices IN-TAMIL NADU -29283-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Package I Water Quality IBRD / 87250 Post Limited 60,000.00 0.00 2017-10-03 2017-11-28 2017-12-27 System Quotations Envelope Implementation Equipment IN-JHARKHAND -21804-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Purchase of DGPS (1 IBRD / 87250 Post Open - National 35,384.61 0.00 2017-10-11 2017-11-30 2018-01-14 System Quotations Envelope Implementation numbers). IN-TAMIL NADU -29575-GO- RFQ / Pacakge IV DWLR Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 55,385.00 0.00 2017-10-03 2017-11-28 2017-12-27 Telemetry, DWLR Telemetry with System Quotations Envelope Implementation water quality prob IN-NIH ROORKEE-30957-GO- RFB / Gas Chromatograph Mass Institutional Capacity Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 276,923.00 0.00 2017-10-27 2017-11-27 2017-11-01 2017-12-13 2018-02-25 2018-04-01 2018-09-28 Spectrometer 01, Dedicated Auto Enhancement Envelope Implementation Titrator 01, TOC Analyser 01 IN-NIH ROORKEE-30965-GO- RFB / Element Analyser (Dual Carbon C 13 Isotope analyser) Institutional Capacity Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 215,385.00 0.00 2017-10-27 2017-11-28 2017-11-01 2017-12-13 2018-02-25 2018-04-01 2018-09-28 01, Tritium Enrichment unit 01, Enhancement Envelope Implementation Normal Scintillation Counter 01, Liquid Nitrogen Plant 01. Institutional Capacity IN-CWPRS-31044-GO-RFQ / Enhancement Procurement of 16 nos. of Water Resources Operations Request for Single Stage - One LaserJet Multi-function Printers IBRD / 87250 Post Open - National 13,692.00 6,539.18 Completed 2017-11-04 2017-12-30 2018-02-12 2018-06-28 2018-03-26 and Planning System Quotations Envelope through Government e Market Water Resources Monitoring (GeM) System Institutional Capacity IN-CWPRS-31046-GO-RFQ / Enhancement Procurement of 26 nos. of Water Resources Operations Request for Single Stage - One Pending Personal Computers (i-7 & i-5) IBRD / 87250 Post Open - National 25,385.00 0.00 2017-11-11 2018-01-06 2018-07-05 and Planning System Quotations Envelope Implementation through Government e Market Water Resources Monitoring (GeM) System IN-CWPRS-31047-GO-RFQ / Procurement of Multi Media LED Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Open - National 1,308.00 841.27 Completed 2017-11-15 2018-01-10 2018-03-07 2018-07-09 2018-03-19 Projector- 1 No. through Enhancement Quotations Envelope Government e Market(GeM) IN-CWPRS-31049-GO-RFQ / Procurement of 14 nos. of Water Resources Monitoring Request for Single Stage - One Pending Inverter Split Air Conditioners (2T IBRD / 87250 Post Open - National 9,046.00 0.00 2017-11-11 2018-01-06 2018-07-05 System Quotations Envelope Implementation & 1.5T) through Government e Market(GeM) IN-CWPRS-31050-GO-RFQ / Procurement of Refrigerator ( 2 Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 462.00 0.00 2017-11-11 2018-01-06 2018-07-05 Door/300 Liters) -1 through System Quotations Envelope Implementation Government e Market(GeM) IN-CHHATTISGARH GW-31279- GO-RFQ / procurement of NON IT Equipment ( Airconditoner & Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.70 0.00 2017-11-20 2018-01-15 2018-07-14 Refrigerator ) for System Quotations Envelope Implementation Divisional data center under PP 2017-18 IN-CHHATTISGARH GW-31280- GO-RFQ / Procurement of online Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 5,384.60 0.00 2017-11-20 2018-01-15 2018-07-14 UPS 15 KVA UNDER PP 2017- System Quotations Envelope Implementation 18 IN-CHHATTISGARH GW-31282- Institutional Capacity Request for Single Stage - One Pending GO-RFQ / Procurement of IBRD / 87250 Post Limited 12,307.70 0.00 2017-11-20 2018-01-15 2018-07-14 Enhancement Quotations Envelope Implementation Vehicle under PP 2017-18 IN-CWPRS-31378-GO-RFQ / Institutional Capacity Procurement of Office Furniture( Enhancement Request for Single Stage - One Pending 10 various types of Items) IBRD / 87250 Post Open - National 10,000.00 0.00 2017-11-11 2018-01-06 2018-07-05 Water Resources Monitoring Quotations Envelope Implementation through Government e Market System (GeM) IN-GUJARAT GW-25110-GO- RFB / Procurement of Telemetry Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 930,615.38 0.00 2017-10-01 2017-10-06 2017-11-10 2017-11-27 2018-01-01 2018-06-30 Digital Water Level Recorder - System Envelope Implementation 526 Nos . IN-KERALA SW-31525-GO-RFQ Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 769.23 0.00 2017-10-25 2017-10-30 2017-12-04 2018-01-03 / Procurement of Journals Systems Implementation IN-WEST BENGAL GW-31748- GO-RFQ / PROCUREMENT OF REAL-TIME HYDRO- METEOROLOGICAL AND Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 15,993.36 0.00 2017-10-18 2017-11-07 2017-12-07 HYDROLOGICAL System Quotations Envelope Implementation INSTRUMENTS (Current Meter, Eco-Sounder and Resistivity Meter) IN-WEST BENGAL GW-31752- GO-RFQ / PROCUREMENT OF Water Resources Monitoring Request for Single Stage - One Pending WATER QUALITY TESTING IBRD / 87250 Post Limited 8,458.03 0.00 2017-10-18 2017-11-10 2017-12-10 System Quotations Envelope Implementation INSTRUMENTS (UV Spectrophotometer) Institutional Capacity Enhancement IN-MAHARASHTRA SW-33198- Water Resources Operations GO-RFQ / Up gradation & and Planning System Request for Single Stage - One Pending Renovation of Existing Real Time IBRD / 87250 Post Open - National 10,385.00 0.00 2017-12-05 2018-01-30 2018-07-29 Water Resources Monitoring Quotations Envelope Implementation Data Acquisition System System (RTDAS) for Tapi Basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33201- Enhancement GO-RFB / Upgradation & Water Resources Operations Renovation of Existing Real Time and Planning System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 267,769.23 0.00 2017-12-25 2017-12-30 2018-02-10 2018-03-12 2018-04-16 2018-10-13 Data Acquisition System Water Resources Monitoring Envelope Implementation (RTDAS) for Godavari Basin in System Marathwada Region. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33206- Enhancement GO-RFQ / Upgradation & Water Resources Operations Renovation of Existing Real Time and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 20,000.00 0.00 2018-02-27 2018-04-24 2018-10-21 Data Acquisition System Water Resources Monitoring Quotations Envelope Implementation (RTDAS) system for Godavari System River Basin In Vidharbha Region. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33205- Enhancement GO-RFB / Expansion of existing Water Resources Monitoring Real Time Data Acquisition System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 1,336,046.15 0.00 2018-02-22 2018-02-27 2018-04-10 2018-05-10 2018-06-14 2018-12-11 System (RTDAS) established in Water Resources Information Envelope Implementation HP II for remaining area of South Systems of Panchganga in Krishna basin. Water Resources Operations and Planning System Institutional Capacity Enhancement IN-MAHARASHTRA SW-33209- Water Resources Operations GO-RFB / SCADA system for and Planning System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 308,153.85 0.00 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-01-05 reservoir operation of Waghur Water Resources Monitoring Envelope Implementation Barrage in Tapi basin. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33212- Water Resources Operations GO-RFB / Procurement of 4 no. and Planning System Single Stage - One Pending of River Surveyor Instrument IBRD / 87250 Post Request for Bids Open - National 156,984.62 0.00 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 Water Resources Monitoring Envelope Implementation (Acoustic Doppler Current System Profiler) for 4 basins. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33220- Water Resources Operations GO-RFQ / Special 5 Vans to all and Planning System Request for Single Stage - One Pending Basins for lowering ADCP For IBRD / 87250 Post Open - National 136,154.00 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Discharge Measurements over System the Bridge. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33221- Water Resources Operations GO-RFQ / Procurement of and Planning System Request for Single Stage - One Pending Portable Water Quality Sondes IBRD / 87250 Post Open - National 73,846.15 0.00 2018-03-05 2018-04-30 2018-10-27 Water Resources Monitoring Quotations Envelope Implementation for Water Quality Labs in the System State. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33229- Water Resources Operations GO-RFQ / Providing & supplying and Planning System Request for Single Stage - One Pending consumables (Chemicals & IBRD / 87250 Post Open - National 4,615.00 0.00 2018-03-20 2018-05-15 2018-11-11 Water Resources Monitoring Quotations Envelope Implementation Glasswares) for Water Quality System Lab at Jalgaon in Tapi basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33230- Enhancement GO-RFQ / Providing & supplying Water Resources Operations consumables (Chemicals & and Planning System Request for Single Stage - One Pending Glasswares) for Water Quality IBRD / 87250 Post Open - National 18,461.54 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Labs at Nashik and Aurangabad System in Godavari basin of Marathwada Water Resources Information region. Systems Institutional Capacity IN-MAHARASHTRA SW-33231- Enhancement GO-RFQ / Providing and Water Resources Operations supplying consumables and Planning System Request for Single Stage - One Pending (Chemicals & Glasswares) for IBRD / 87250 Post Open - National 12,307.69 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Water Quality Lab at Nagpur in System Godawari basin of Vidharbh Water Resources Information region. Systems Institutional Capacity IN-MAHARASHTRA SW-33232- Enhancement GO-RFQ / Providing and Water Resources Operations supplying consumables and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,384.62 0.00 2018-01-05 2018-03-02 2018-08-29 (Chemicals & Glasswares) for Water Resources Monitoring Quotations Envelope Implementation Water Quality Labs at Pune and System Kolhapur in Krishna basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33233- Enhancement GO-RFQ / Providing and Water Resources Operations supplying consumables and Planning System Request for Single Stage - One Pending (Chemicals and Glasswares) for IBRD / 87250 Post Open - National 10,769.23 0.00 2018-01-05 2018-03-02 2018-08-29 Water Resources Monitoring Quotations Envelope Implementation Water Quality Lab at Thane in System West flowing rivers of Konkan Water Resources Information basin. Systems Institutional Capacity IN-MAHARASHTRA SW-33240- Enhancement GO-RFQ / Procurement of Water Resources Operations equipment for existing Water and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 66,153.85 0.00 2017-12-20 2018-02-14 2018-08-13 Quality Labs at Nashik and Water Resources Monitoring Quotations Envelope Implementation Aurangabad in Godavari basin of System Marathwada region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33241- Water Resources Operations GO-RFQ / Procurement of and Planning System Request for Single Stage - One Pending equipment for existing Water IBRD / 87250 Post Open - National 52,307.69 0.00 2017-12-20 2018-02-14 2018-08-13 Water Resources Monitoring Quotations Envelope Implementation Quality Lab at Nagpur in System Godawari basin Vidharbh region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33242- Water Resources Operations GO-RFQ / Procurement of and Planning System Request for Single Stage - One Pending equipment for existing Water IBRD / 87250 Post Open - National 41,538.46 0.00 2017-12-20 2018-02-14 2018-08-13 Water Resources Monitoring Quotations Envelope Implementation Quality Lab at Pune and System Kolhapur in Krishna basin. Water Resources Information Systems Page 5 Institutional Capacity Enhancement IN-MAHARASHTRA SW-33243- Water Resources Operations GO-RFQ / Procurement of and Planning System Request for Single Stage - One Pending equipment for existing Water IBRD / 87250 Post Open - National 40,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 Water Resources Monitoring Quotations Envelope Implementation Quality Lab at Thane in West System flowing rivers of Konkan basin. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33248- Water Resources Operations GO-RFQ / Procurement and and Planning System Request for Single Stage - One Pending fixing of existing manual IBRD / 87250 Post Open - National 29,230.77 0.00 2017-11-25 2018-01-20 2018-07-19 Water Resources Monitoring Quotations Envelope Implementation hydromet observation network System equipment in Tapi basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33250- Enhancement GO-RFQ / Procurement & fixing Water Resources Operations of existing manual hydromet and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 26,153.85 0.00 2017-11-25 2018-01-20 2018-07-19 observation network equipment in Water Resources Monitoring Quotations Envelope Implementation Godavari Basin of Marathwada System Region. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33251- Enhancement GO-RFQ / Procurement and Water Resources Operations fixing of existing manual hydro and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 147,692.31 0.00 2017-11-25 2018-01-20 2018-07-19 met observation network Water Resources Monitoring Quotations Envelope Implementation equipment in Godavari basin of System Vidharbha Region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33252- Water Resources Operations GO-RFQ / Procurement and and Planning System Request for Single Stage - One Pending fixing of existing manual IBRD / 87250 Post Open - National 7,692.31 0.00 2017-11-25 2018-01-20 2018-07-19 Water Resources Monitoring Quotations Envelope Implementation hydromet observation network System equipment in Krishna basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33253- Enhancement GO-RFQ / Procurement and Water Resources Operations fixing of existing manual and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 20,446.15 0.00 2017-11-25 2018-01-20 2018-07-19 hydromet observation network Water Resources Monitoring Quotations Envelope Implementation equipment for west flowing rivers System in Kokan basin. Water Resources Information Systems IN-HARYANA -33274-GO-RFQ / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2017-12-01 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02 Purchase of ADCP System Envelope Implementation IN-HARYANA -33278-GO-RFB / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2017-11-20 2017-11-25 2018-01-06 2018-03-21 2018-04-25 2018-10-22 SCADA system for Barrages System Envelope Implementation Institutional Capacity IN-MAHARASHTRA SW-33280- Enhancement GO-RFQ / Integration of Existing Water Resources Operations RTDAS system for Tapi basin in and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 9,230.77 0.00 2018-03-24 2018-05-19 2018-11-15 regional & State data centres Water Resources Monitoring Quotations Envelope Implementation including Divisional & Sub System Divisional Data Center. Water Resources Information Systems IN-HARYANA -33281-GO-RFQ / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 3,846.15 0.00 2018-02-20 2018-02-25 2018-04-08 2018-06-21 2018-07-26 2019-01-22 Procurement of ACs System Envelope Implementation Institutional Capacity Enhancement IN-MAHARASHTRA SW-33284- Water Resources Operations GO-RFQ / Integration of Existing and Planning System Request for Single Stage - One Pending RTDAS system for Godavari IBRD / 87250 Post Open - National 72,307.69 0.00 2018-03-24 2018-05-19 2018-11-15 Water Resources Monitoring Quotations Envelope Implementation basin in Marathwada region in System regional & state data centres. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33287- Water Resources Operations GO-RFQ / Integration of Existing and Planning System Request for Single Stage - One Pending RTDAS system for Godavari IBRD / 87250 Post Open - National 41,538.46 0.00 2018-03-24 2018-05-19 2018-11-15 Water Resources Monitoring Quotations Envelope Implementation basin in Vidharbha region in System regional & state data centres. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33341- Enhancement GO-RFB / Upgradation of Water Resources Operations existing hydrology project web and Planning System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 384,615.38 0.00 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01 site with State level portal for Water Resources Monitoring Envelope Implementation RTDAS and development of state System chapter of India-WRIS. Water Resources Information Systems IN-HARYANA -33337-GO-RFB / Water Resources Monitoring Single Stage - Two Pending Purchase of Vehicle Mounted IBRD / 87250 Post Request for Bids Open - National 23,076.92 0.00 2018-03-15 2018-03-20 2018-05-01 2018-07-14 2018-08-18 2019-02-14 System Envelope Implementation Crane Institutional Capacity IN-MAHARASHTRA SW-33345- Enhancement GO-RFQ / Providing Video Water Resources Operations Conferencing facility at and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 92,307.69 0.00 2017-12-23 2018-02-17 2018-08-16 Jalvidnyan Bhavan, Nashik, and Water Resources Monitoring Quotations Envelope Implementation field offices under Hydrology System Project. Water Resources Information Systems IN-HARYANA -33357-GO-RFQ / Water Resources Monitoring Single Stage - Two Pending Training equipment / LCD IBRD / 87250 Post Request for Bids Open - National 2,307.69 0.00 2018-02-20 2018-02-25 2018-04-08 2018-06-21 2018-07-26 2019-01-22 System Envelope Implementation projector and screen IN-HARYANA -33361-GO-RFB / Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 15,384.61 0.00 2017-12-18 2017-12-23 2018-02-03 2018-04-18 2018-05-23 2018-11-19 Servers Systems Envelope Implementation Institutional Capacity IN-MAHARASHTRA SW-33362- Enhancement GO-RFB / Development of Water Resources Operations Modern/Smart irrigation System and Planning System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 769,230.77 0.00 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-01-05 of reservoir & canal operation Water Resources Monitoring Envelope Implementation based on real time information for System Tillari project. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33458- Water Resources Operations GO-RFQ / Establishment of E and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 76,923.08 0.00 2018-05-24 2018-07-19 2019-01-15 class room with furnishing at Water Resources Monitoring Quotations Envelope Implementation Jalvidnyan Bhavan, Nashik. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33463- Water Resources Operations GO-RFQ / Institutional and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 230,769.00 0.00 2018-01-07 2018-03-04 2018-08-31 Modernization Support, including Water Resources Monitoring Quotations Envelope Implementation IT systems & software. System Water Resources Information Systems IN-MAHARASHTRA SW-23034- Institutional Capacity GO-DIR / Purchase of 2 vehicles Enhancement in final phase through EGems out Water Resources Operations of 6 as approval of 2 accorded by and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 73,846.15 0.00 2017-10-26 2017-10-26 2018-03-31 the Maharashtra state. 4 vehicles Water Resources Monitoring Quotations Envelope Implementation will be purchased through System EGems after approval from Water Resources Information Maharashtra state. Systems IN-SIKKIM -35707-GO-RFQ / Water Resources Monitoring Request for Single Stage - One RFQ for one Total Station(UID IBRD / 87250 Post Open - National 13,846.15 13,229.69 Completed 2017-12-15 2018-02-07 2018-03-21 2018-08-06 2018-03-29 System Quotations Envelope 108) IN-SIKKIM -35726-GO-DIR / Request for quotations for 4 Water Resources Monitoring Request for Single Stage - One numbers of acoustic Doppler IBRD / 87250 Post Open - National 30,769.23 14,316.34 Completed 2017-12-10 2018-03-07 2018-03-21 2018-09-03 2018-03-29 System Quotations Envelope velocity meter ( Hand Held Current Meter) against UID 111 IN-TELENGANA GW-24071-GO- RFQ / Basic Field equipment for field officers for Strengthening Water Resources Monitoring Request for Single Stage - One Pending Manual Observations (98 GPS - IBRD / 87250 Post Limited 37,700.00 0.00 2017-12-08 2018-01-20 2018-02-20 System Quotations Envelope Implementation 3 Units for Each District Offices(31Districts) and 5 units for Head Office) IN-TELENGANA GW-24088-GO- DIR / Procurement of IT Equipment for Data Centres Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 83,385.00 0.00 2017-12-09 2017-12-20 2018-01-27 2018-02-26 (Desktops, Printers, Laptops, System Quotations Envelope Implementation HDDs, A0 Plotter etc) through GEM IN-SIKKIM -36085-GO-DIR / Procurement of One vehicle vide UID 88 of Procurement Plan Institutional Capacity 2016-17. by direct contracting of IBRD / 87250 Post Direct Selection Direct 11,962.00 11,574.59 Completed 2017-11-09 2017-03-17 2017-11-14 2017-03-21 2017-12-19 2017-03-24 2018-06-17 2017-06-01 Enhancement Mahindra Bolero, a time tested and suitable for Hilly terrain condition of Sikkim IN-JHARKHAND -36309-GO- RFQ / Purchase of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,692.30 0.00 2018-01-14 2018-03-11 2018-04-08 computers,Laptop,Printer,Antiviru System Quotations Envelope Implementation s IN-WEST BENGAL SW-36326- GO-RFQ / Procurement and installation of Photocopier and Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 25,355.32 Signed 2017-11-14 2017-10-18 2017-12-08 2017-12-27 2018-01-07 Printers for the System Quotations Envelope State Project Management Unit of National Hydrology Project IN-WEST BENGAL SW-36330- GO-RFQ / Procurement and Installation of Desktop PC with Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 19,082.30 Signed 2017-11-14 2017-10-16 2017-12-09 2017-12-12 2018-01-08 peripherals for the System Quotations Envelope State Project Management Unit of National Hydrology Project IN-PUNJAB -33503-GO-RFQ / Purchase of Renault Duster RXL Request for Single Stage - One Pending MT 106Ps Petrol BS4 5 Seater IBRD / 87250 Front End Fee Post Open - National 12,598.53 0.00 2017-11-19 2017-11-21 2018-01-10 Quotations Envelope Implementation for water resourcews bhawan mohali IN-PUNJAB -32222-GO-RFB / Supply, Fixing and Placing of Office Furniture at State Data Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 179,296.91 0.00 2017-10-18 2017-10-25 2017-11-27 2017-12-26 2018-01-30 2018-07-27 Centre, Water Resources System Envelope Implementation Bhawan, Sector 68, S.A.S. Nagar (Mohali). IN-PUNJAB -32261-GO-RFB / Supply, Installation, Testing Commissioning and Maintenance of RTDAS for selected Rivers, Head Works and Dams for Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 372,307.69 0.00 2017-12-14 2017-12-21 2018-01-25 2018-02-23 2018-03-30 2018-09-26 Surface Water sector in Punjab System Envelope Implementation and Supply, Installation, Testing Commissioning and Maintenance of AWS under e-Procurement system. IN-PUNJAB -32269-GO-RFB / Design, Supply, Installation, Testing And Commissioning Including Warranty and Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 51,615.38 0.00 2017-11-27 2017-12-04 2018-01-08 2018-02-07 2018-03-14 2018-09-10 Maintenance of 50 Kw Grid Tied System Envelope Implementation Roof Top Solar PV Plant At State Data Centre, Water Resources Bhawan, Sector 68, Mohali Institutional Capacity Enhancement IN-UTTAR PRADESH GW- Water Resources Operations 36938-GO-RFQ / Water Level and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 41,538.00 0.00 2017-12-04 2018-01-11 2018-01-31 Sounder, Hand held GPS, or Water Resources Monitoring Quotations Envelope Implementation alike devices System Water Resources Information Systems Institutional Capacity Enhancement IN-UTTAR PRADESH GW- Water Resources Operations 36953-GO-RFQ / and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 46,154.00 0.00 2017-12-06 2018-01-20 2018-02-19 Development/strengthening of IT Water Resources Monitoring Quotations Envelope Implementation infrastructure at field division level System Water Resources Information Systems IN-CWPRS-31045-GO-RFQ / Institutional Capacity Procurement of 22 nos. of 1 Enhancement KVA/400VAH Line Interactive Water Resources Operations Request for Single Stage - One IBRD / 87250 Post Open - National 3,385.00 3,379.42 Completed 2017-11-21 2018-01-16 2018-03-09 2018-07-15 2018-03-26 Uninterruptible Power Supply and Planning System Quotations Envelope through Government e Water Resources Monitoring Market(GeM) System IN-TELENGANA GW-37063-GO- RFB / WQ Lab Equpiment Up Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 123,100.00 0.00 2017-11-27 2017-12-02 2017-12-23 2018-01-09 2018-02-02 2018-04-04 gradation at Hyderabad and System Envelope Implementation Karimnagar Institutional Capacity Enhancement Water Resources Operations IN-UTTAR PRADESH GW- and Planning System Request for Single Stage - One Pending 37066-GO-DIR / Procurement of IBRD / 87250 Post Open - National 30,769.00 0.00 2017-12-11 2018-02-01 2018-03-02 Water Resources Monitoring Quotations Envelope Implementation 4 no basic ArcGIS software System Water Resources Information Systems Institutional Capacity Enhancement IN-UTTAR PRADESH GW- Water Resources Operations 37068-GO-RFQ / Development of and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.00 0.00 2018-01-03 2018-02-24 2018-03-26 Ground Water Atlas of Uttar Water Resources Monitoring Quotations Envelope Implementation Pradesh ( Urban and Rural ) System Water Resources Information Systems Institutional Capacity Enhancement IN-UTTAR PRADESH GW- Water Resources Operations 37074-GO-RFQ / Development of and Planning System Request for Single Stage - One Pending mobile app for field/ Community IBRD / 87250 Post Open - National 15,385.00 0.00 2017-11-29 2018-01-24 2018-05-24 Water Resources Monitoring Quotations Envelope Implementation based monitoring and System dissemination Water Resources Information Systems Institutional Capacity Enhancement Water Resources Operations IN-UTTAR PRADESH GW- and Planning System Request for Single Stage - One Pending 37081-GO-RFQ / Development of IBRD / 87250 Post Open - National 1,538.00 0.00 2017-12-20 2018-02-08 2018-03-10 Water Resources Monitoring Quotations Envelope Implementation library and E-library System Water Resources Information Systems IN-UTTAR PRADESH GW- Institutional Capacity 37154-GO-RFQ / "To prepare Enhancement resource material ( Annual Water Resources Operations Reports,pamphlets,Brochure,pos and Planning System Request for Single Stage - One Pending ters, audio visuals,documentaries IBRD / 87250 Post Open - National 3,846.00 0.00 2017-12-29 2018-02-19 2018-03-06 Water Resources Monitoring Quotations Envelope Implementation etc.,) on water conservation & System management awareness creation Water Resources Information to water users (information Systems education & communication )" IN-WEST BENGAL GW-37289- GO-RFQ / PROCUREMENT OF 20 DWLR /ABSOLUTE PRESSURE TYPE WITH Water Resources Monitoring Request for Single Stage - One Under TELEMETRY FOR NEW IBRD / 87250 Post Open - National 32,514.70 0.00 2017-11-27 2017-12-25 2018-01-09 System Quotations Envelope Implementation GROUNDWATER MONITORING WELLS IN WEATHERED ZONE OF HARD ROCK AREA, PURULIA DIST, WEST BENGAL Page 6 IN-WEST BENGAL GW-37292- GO-RFQ / PROCUREMENT OF 25 NOS DWLR /ABSOLUTE PRESSURE TYPE WITH Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 40,643.37 0.00 2017-11-27 2017-12-25 2018-01-09 TELEMETRY FOR 25 NOS System Quotations Envelope Implementation EXISTING GROUNDWATER MONITORING WELLS IN WEST BENGAL IN-WEST BENGAL GW-37369- GO-RFQ / Purchase of IT Equipment (Computers, Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 48,902.97 0.00 2017-11-27 2017-12-19 2017-12-26 workstations & Laptop with System Quotations Envelope Implementation Software & Printer, Plotter & Photocopier) IN-WEST BENGAL GW-37373- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Procurement of two IBRD / 87250 Post Limited 1,078.18 0.00 2017-11-26 2017-12-22 2017-12-29 System Quotations Envelope Implementation nos. Hand-held GPS IN-PUNJAB -37524-GO-RFQ / Water Resources Information Request for Single Stage - One Pending procurement of A0 scanner for IBRD / 87250 Post Open - National 9,617.87 0.00 2017-11-26 2017-12-16 2018-01-30 Systems Quotations Envelope Implementation water resources bhawan mohali IN-SIKKIM -37684-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Procurement of 5 nos. of Rain IBRD / 87250 Post Open - National 769.23 745.27 Completed 2017-12-10 2018-02-15 2018-03-21 2018-08-14 2018-03-29 System Quotations Envelope Gauge manual as per UID 107 IN-HARYANA -33254-GO-RFB / Supply and installation of AWLR Water Resources Monitoring Single Stage - Two Pending and Digital Rain Gauges(DRG) IBRD / 87250 Post Request for Bids Open - National 975,384.61 0.00 2017-11-21 2017-11-26 2018-01-07 2018-03-23 2018-04-27 2018-10-24 System Envelope Implementation with Telemetry including civil works IN-DVC-38048-GO-RFQ / Procurement of 01 (one) no. Water Resources Monitoring Request for Single Stage - One Under Server for WaterWare Software IBRD / 87250 Post Open - National 13,247.00 12,005.28 2017-11-28 2018-05-16 2018-01-23 2018-07-22 System Quotations Envelope Implementation under National Hydrology Project (NHP). IN-KERALA SW-20115-GO-RFQ Water Resources Monitoring Request for Single Stage - One Under / Current Meter with accessories- IBRD / 87250 Post Open - National 26,461.54 0.00 2017-10-30 2018-01-10 2018-02-09 System Quotations Envelope Implementation Cup Type- 46 Nos IN-KERALA SW-28944-GO-RFB / The Supply, Installation, Testing, Training, Commissioning, Operation and Maintenance of Hydrological Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 1,347,105.35 0.00 2017-10-28 2017-11-18 2017-12-16 2018-01-13 2018-02-17 2019-02-17 Information System for Kerala System Envelope Implementation State 2017-18.( Telecommunication system changed to INSAT as per the direction of NPMU) IN-WEST BENGAL SW-38546- GO-RFB / Procurement of Water Resources Monitoring Single Stage - Two IBRD / 87250 Post Request for Bids Open - National 97,015.00 69,656.41 Signed 2017-12-06 2017-12-18 2017-12-06 2018-03-10 2017-12-27 2018-02-16 2018-01-07 2018-04-09 2018-01-30 2018-04-16 2018-05-30 Discharge measuring Equipment System Envelope (ADCP) IN-HARYANA -33286-GO-RFB / Purchase of Laptops, Computers Water Resources Monitoring Request for Single Stage - One Pending with Software, Printer with IBRD / 87250 Post Open - National 17,076.92 0.00 2017-12-17 2018-02-11 2018-08-10 System Quotations Envelope Implementation Scanner and external hard disk 2 TB IN-HARYANA -33355-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 12,307.69 0.00 2018-03-05 2018-04-30 2018-10-27 Work stations System Quotations Envelope Implementation IN-HIMACHAL PRADESH-20302- Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 30,769.00 0.00 2018-05-24 2018-05-29 2018-07-19 2018-10-11 GO-RFQ / Procurement of GIS . Systems Implementation IN-WEST BENGAL SW-39196- Water Resources Monitoring Request for Single Stage - One GO-RFQ / Procurement of ITC IBRD / 87250 Post Limited 11,940.00 6,494.50 Signed 2017-12-11 2018-03-15 2018-01-26 2018-06-07 2018-03-12 System Quotations Envelope equipment IN-WEST BENGAL GW-37356- Water Resources Monitoring Request for Single Stage - One Under GO-RFQ / Procurement of one IBRD / 87250 Post Open - National 38,506.28 0.00 2018-02-05 2018-03-05 2018-03-20 System Quotations Envelope Implementation ADCP IN-TELENGANA SW-39968-GO- RFQ / IT Equipment with Water Resources Information Software - IT Equipment with Systems Request for Single Stage - One Pending Software, Computer&Laptops, IBRD / 87250 Post Open - National 62,215.38 0.00 2018-01-01 2018-02-26 2018-08-25 Water Resources Monitoring Quotations Envelope Implementation Printers, Plotters & Scanners, System Antivirus, Servers for Hosting Website IN-TELENGANA SW-39969-GO- RFQ / Procurement of office Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 38,461.53 0.00 2017-12-23 2018-02-17 2018-08-16 furniture for Central Data Center System Quotations Envelope Implementation & Regional Data Center IN-TELENGANA SW-39972-GO- Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 100,000.00 0.00 2018-02-20 2018-02-25 2018-04-08 2018-05-08 2018-06-12 2018-12-09 RFB / Video Conference facility System Envelope Implementation IN-TELENGANA SW-39974-GO- RFB / Hydrological Instruments Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 883,446.15 0.00 2017-12-30 2018-01-04 2018-02-15 2018-03-17 2018-04-21 2018-10-18 (Sensors & Telemetry Systems) System Envelope Implementation including DAS software IN-CHHATTISGARH SW-28469- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of 8 nos IBRD / 87250 Post Limited 9,864.15 0.00 2017-12-25 2018-02-19 2018-08-18 System Quotations Envelope Implementation Desktop computer. IN-CHHATTISGARH SW-28850- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of 3 nos IBRD / 87250 Post Limited 2,769.23 0.00 2017-12-26 2018-02-20 2018-08-19 System Quotations Envelope Implementation Laptop. IN-CHHATTISGARH SW-28851- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of 10 nos IBRD / 87250 Post Limited 1,846.15 0.00 2017-12-26 2018-02-20 2018-08-19 System Quotations Envelope Implementation A4 printer. IN-CHHATTISGARH SW-28853- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / procurement of Digital IBRD / 87250 Post Limited 3,076.92 0.00 2017-12-26 2018-02-20 2018-08-19 System Quotations Envelope Implementation copier multifunctional 1 no. IN-CHHATTISGARH SW-28855- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of IBRD / 87250 Post Limited 553.84 0.00 2017-12-26 2018-02-20 2018-08-19 System Quotations Envelope Implementation scanner. IN-CHHATTISGARH SW-29221- Water Resources Monitoring Request for Single Stage - One Pending GO-DIR / Procurement of ArC IBRD / 87250 Post Limited 38,461.54 0.00 2018-02-03 2018-03-31 2018-09-27 System Quotations Envelope Implementation GIS software 1no. IN-CWC-NHP-10546-GO-DIR / Water Resources Information Extension/Up-gradation of IBRD / 87250 Prior Direct Selection Direct 452,941.00 0.00 Canceled 2017-12-21 2017-12-21 2018-01-25 2018-07-24 Systems eSWIS IN-DVC-38058-GO-RFB / Procurement of Automated Pipe Flow measurement sensors for Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 384,615.00 0.00 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2026-05-22 drinking/ industrial water supply System Envelope Implementation for 40 nos. of consumers with GSM telemetry. IN-DVC-38032-GO-RFB / Supply, installation, testing, commissioning and maintenance Water Resources Monitoring Single Stage - One Under of Real Time Data Acquisition IBRD / 87250 Post Request for Bids Open - National 1,093,155.00 0.00 2018-01-10 2018-04-12 2018-01-15 2018-05-16 2018-02-26 2018-03-28 2018-05-02 2026-04-30 System Envelope Implementation System (RTDAS) of DVC under National Hydrology Project (NHP). IN-KARNATAKA SW-26476-GO- RFQ / Procurement of Bridge Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 9,230.77 4,521.99 Completed 2017-08-29 2017-10-25 2017-09-25 2018-01-07 2018-02-05 outfits-06 numbers for carrying System Quotations Envelope out the current meter gauging . IN-KARNATAKA SW-26478-GO- RFQ / Procurement of Current Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 13,846.15 12,245.55 Completed 2017-08-29 2017-10-18 2017-06-08 2017-12-18 2017-11-08 Meter Gauging equipment with System Quotations Envelope accessories. IN-KARNATAKA SW-41966-GO- RFQ / Procurement of Water Resources Monitoring Request for Single Stage - One photocopiers for divisional and IBRD / 87250 Post Limited 13,170.92 12,622.34 Completed 2018-01-02 2017-11-04 2018-01-02 2017-11-08 2018-01-02 2017-12-15 System Quotations Envelope subdivisional data centes(A3.3.03.01) IN-KARNATAKA SW 1970-GO- RFQ / Procurement of IT Water Resources Monitoring Request for Single Stage - One equipments(computers-13,laptop- IBRD / 87250 Post Limited 15,269.10 14,633.13 Completed 2018-01-02 2017-11-24 2018-01-02 2017-11-25 2018-01-02 2017-12-12 System Quotations Envelope 03&printers-04) for KERS training center. IN-KARNATAKA SW 1978-GO- Institutional Capacity Request for Single Stage - One RFQ / Procurement of vehicles IBRD / 87250 Post Limited 18,246.95 16,604.46 Completed 2018-01-02 2017-10-06 2018-01-02 2017-10-07 2018-01-02 2017-12-05 Enhancement Quotations Envelope for circle officers-2 nos IN-SIKKIM -42253-GO-RFQ / Procurement of 4 numbers of Hand held GPS UID 120 by RFQ Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 1,846.15 1,792.18 Completed 2018-01-08 2018-03-05 2018-03-21 2018-09-01 2018-03-29 since registration under eGeM is System Quotations Envelope not possible due to Aadhar issues IN-NAGALAND -42428-GO-RFQ Water Resources Monitoring Request for Single Stage - One / purchase of two(2) nos of IBRD / 87250 Post Limited 1,666.00 1,494.91 Signed 2018-01-04 2017-12-18 2018-01-24 2018-03-24 2018-01-31 System Quotations Envelope handheld GPS IN-KARNATAKA SW-42645-GO- RFQ / Procurement of Bolero Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 18,510.58 17,647.23 Completed 2018-01-06 2018-01-05 2018-01-27 2018-01-30 2018-07-26 2018-02-24 Camper PS4WD (utility vehicle) System Quotations Envelope for the vehicle mounted crane. IN-KARNATAKA SW-42648-GO- RFQ / Procurement of UPS for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 16,153.85 15,481.02 Completed 2018-01-06 2018-01-03 2018-01-27 2018-01-05 2018-07-26 2018-01-25 divisional and subdivisional System Quotations Envelope offices. IN-CWPRS-43247-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Steel tape (100 m)for water level IBRD / 87250 Post Limited 615.00 0.00 2018-01-20 2018-03-17 2018-09-13 System Quotations Envelope Implementation measuring in borehole-1 No. IN-CWPRS-44373-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Glassware and Chemicals for IBRD / 87250 Post Limited 1,538.00 0.00 2018-04-02 2018-05-28 2018-11-24 System Quotations Envelope Implementation Water Quality Lab IN-ASSAM -27692-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 46,307.00 0.00 2017-10-08 2017-12-03 2018-06-01 Total Station System Quotations Envelope Implementation IN-ASSAM -26120-GO-RFB / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 11,923.00 0.00 2017-10-09 2017-12-04 2018-06-02 Silt Laboratory System Quotations Envelope Implementation IN-ASSAM -27985-GO-RFQ / Water Resources Information Request for Single Stage - One Under Procurement of GPS -Hand Held IBRD / 87250 Post Open - National 33,262.00 0.00 2017-10-09 2017-12-04 2018-06-02 Systems Quotations Envelope Implementation and Differential GPS IN-ASSAM -27990-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 24,615.00 0.00 2018-01-24 2018-03-21 2018-09-17 Procurement of Flow Tracker System Quotations Envelope Implementation IN-TELENGANA SW-44737-GO- Water Resources Monitoring Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 25,000.00 0.00 2018-03-05 2018-03-10 2018-04-21 2018-05-21 2018-06-25 2018-12-22 RFB / Procurement of ADCP System Envelope Implementation IN-MADHYA PRADESH-44740- GO-RFB / RTDAS for Madhya Pradesh-Ganga Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Prior Request for Bids Open - National Y 2,016,569.23 0.00 2018-05-31 2018-08-16 2018-08-16 2018-06-05 2018-10-25 2019-01-07 2019-02-11 2020-08-04 Basin(Chambal,Sindh System Envelope Implementation Betwa,Son,Tons,Dhasan and ken sub-basins) IN-MADHYA PRADESH-44742- Water Resources Monitoring Single Stage - Two Pending GO-RFB / DWLR Telemetry in IBRD / 87250 Prior Request for Bids Open - National Y 946,153.85 0.00 2018-05-14 2018-07-30 2018-07-30 2018-05-19 2018-10-08 2018-12-21 2019-01-25 2020-07-18 System Envelope Implementation Piezometers in Madhya Pradseh IN-KARNATAKA SW-26480-GO- RFQ / Procurement of hydro- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,384.00 0.00 2017-08-29 2017-11-09 2018-01-15 meteorological instruments for System Quotations Envelope Implementation FCS stations-manual IN-KARNATAKA SW-26479-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Procurement of Standard IBRD / 87250 Post Open - National 4,923.00 0.00 2017-08-29 2017-11-07 2018-01-15 System Quotations Envelope Implementation Rain Gauges -manual IN-KARNATAKA SW-45012-GO- RFQ / Providing and supplying additional Hard Disks, RAM, Water Resources Monitoring Request for Single Stage - One Pending Modems with the necessary IBRD / 87250 Post Limited 15,384.62 0.00 2018-01-22 2018-02-12 2018-03-21 System Quotations Envelope Implementation server interface to the existing server and up gradation of Rainfall receiving applications. IN-KERALA SW-20580-GO-RFQ Water Resources Monitoring Request for Single Stage - One Pending / Procurement of Water Quality IBRD / 87250 Post Open - National 15,384.62 0.00 2018-01-29 2018-03-26 2018-04-25 System Quotations Envelope Implementation Sondes for PDS - 4 Nos IN-KERALA SW-31524-GO-RFQ / Procurement of Meteorological Equipment - SRG-28 Nos , FRP bottle-30 Nos, Measuring Jar - 44 Nos, Plastic Container- 30 Nos, Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 14,030.77 0.00 2017-11-20 2018-01-29 2018-02-28 Overflow Jar- 14 Nos, Pan System Quotations Envelope Implementation Evaporimeter-1 No,Pan Evaporimeter measuring Jar-5 Nos, Stevenson Screen -Large-4 Nos& Small- 5 N IN-TAMIL NADU -46723-GO- RFQ / Providing furniture to Data processing centres in Ground Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 6,154.00 0.00 2018-02-01 2018-03-13 2018-05-12 Water Division office, Madurai , Enhancement Quotations Envelope Implementation Tirunelveli and Ground Water Circle office, Madurai. IN-TAMIL NADU -46726-GO- RFQ / Providing Furnitures to Data Processing Centres in Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 9,231.00 0.00 2018-02-12 2018-04-02 2018-05-31 Ground Water Division office at Enhancement Quotations Envelope Implementation Thanjavur, Salem and Ground Water Circle office,Thanjavur. IN-WEST BENGAL SW-38548- GO-RFB / Procurement of Survey Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 53,800.00 51,901.20 Signed 2018-02-12 2018-03-07 2018-03-15 2018-08-03 2018-05-14 Instruments (1 no. RTK-DGPS System Quotations Envelope and 4 nos. GPS-Hand held) IN-NAGALAND -26984-GO-DIR / Water Resources Monitoring IBRD / 87250 Post Direct Selection Direct 38,461.00 37,530.50 Signed 2017-09-04 2017-02-24 2017-09-05 2017-03-06 2017-09-08 2017-03-22 2017-09-13 purchase of GIS software System IN-WEST BENGAL SW-48181- GO-RFQ / Procurement of Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Limited 23,100.00 0.00 2018-02-12 2018-04-18 2018-03-15 2018-05-14 Survey Instruments (2 nos. Total System Quotations Envelope Implementation Station and 4 nos. Digital Level) IN-ASSAM -26226-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Under Procurement of Laptops with IBRD / 87250 Post Limited 6,000.00 0.00 2017-09-21 2017-10-04 2017-11-03 2018-05-02 System Quotations Envelope Implementation software and Printer IN-CWPRS-49185-GO-RFQ / Water Resources Monitoring Procurement of 3 Nos. of A3 size System Request for Single Stage - One Monochrome LaserJet Multi- IBRD / 87250 Post Open - National 3,692.00 1,982.93 Signed 2018-03-03 2018-04-28 2018-03-28 2018-10-25 Water Resources Operations Quotations Envelope Function Printers through and Planning System Government-E- Market IN-TAMIL NADU -49552-GO- RFQ / Providing Furnitures to Data Processing Centres in Institutional Capacity Request for Single Stage - One Pending Ground Water Division IBRD / 87250 Post Limited 12,308.00 0.00 2018-03-05 2018-04-30 2018-10-29 Enhancement Quotations Envelope Implementation office,Cuddalore, Vellore,Chennai and Gauging Division office, Chennai. IN-TAMIL NADU -42599-GO-DIR Water Resources Monitoring Request for Single Stage - One Pending / Procurement of field vehicles for IBRD / 87250 Post Limited 19,385.00 0.00 2018-01-16 2018-03-13 2018-05-14 System Quotations Envelope Implementation data collection Page 7 IN-KARNATAKA SW-51640-GO- RFQ / Procurement of All in one Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,046.00 2,919.28 Completed 2018-02-28 2018-01-30 2018-02-28 2018-01-30 2018-04-09 2018-02-23 Printers for Divisional and System Quotations Envelope Subdivisional offices. IN-CWPRS-51670-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Electronic Water Level Sounder-1 IBRD / 87250 Post Open - National 3,077.00 0.00 2018-03-20 2018-05-15 2018-11-11 System Quotations Envelope Implementation No. IN-CWPRS-51704-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Pen Type Coliform (Total and IBRD / 87250 Post Open - National 2,308.00 0.00 2019-01-02 2019-02-27 2019-08-26 System Quotations Envelope Implementation Fecal) Detection Unit IN-CWPRS-51699-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 6,154.00 0.00 2018-04-04 2018-05-30 2018-11-26 Fuming Chamber System Quotations Envelope Implementation IN-CWPRS-51689-GO-RFQ / Fabrication of Environmental Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 53,843.00 0.00 2018-04-04 2018-05-30 2018-11-26 Chamber with automation and System Quotations Envelope Implementation generator set. IN-CWPRS-51692-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Water Quality Sensors with data IBRD / 87250 Post Open - National 30,769.00 0.00 2018-04-04 2018-05-30 2018-11-26 System Quotations Envelope Implementation logger IN-CWPRS-51695-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Standard Solutions for Water IBRD / 87250 Post Open - National 3,077.00 0.00 2018-12-19 2019-02-13 2019-08-12 System Quotations Envelope Implementation Quality Lab IN-CWPRS-51697-GO-RFQ / Laboratory Equipments ( Hot Plate,Muffle Furnance, Water Water Resources Monitoring Request for Single Stage - One Pending Bath (20Litres),High Precession IBRD / 87250 Post Open - National 9,385.00 0.00 2018-04-04 2018-05-30 2018-11-26 System Quotations Envelope Implementation Balance, Water Demeneralizer/Distilled Water Production Systems ) IN-CWPRS-51705-GO-RFQ / Equipments for Audio Video studio(HD Camera with accessories-1 No.,Tripod -2 Institutional Capacity Request for Single Stage - One Pending Nos., 50" LED TV with Speaker IBRD / 87250 Post Open - National 18,858.00 0.00 2018-04-04 2018-05-30 2018-11-26 Enhancement Quotations Envelope Implementation with Stand- 1No. , Head Phone- 4 Nos., Mic Lavalier wireless 2 Nos.,Lights for field 3 Nos., Set of cables Audio/Video) IN-CWPRS-51683-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Ground water Level Sensor IBRD / 87250 Post Open - National 9,231.00 0.00 2018-04-04 2018-05-30 2018-11-26 System Quotations Envelope Implementation without Vent and With Vent tube IN-CWPRS-51707-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending S/I/T/C of Electromagnetic flow IBRD / 87250 Post Open - National 20,000.00 0.00 2018-05-05 2018-06-30 2018-12-27 Enhancement Quotations Envelope Implementation meters(4 Nos. of various sizes IN-CWPRS-51720-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending Procurement of Battery Operated IBRD / 87250 Post Open - National 23,076.00 0.00 2018-07-04 2018-08-29 2019-02-25 Enhancement Quotations Envelope Implementation Fork Lift IN-CWPRS-51848-GO-RFQ / Institutional Capacity Procurement of Personal Enhancement Request for Single Stage - One Pending IBRD / 87250 Post Open - National 9,231.00 0.00 2018-03-17 2018-05-12 2018-11-08 Computers (i-5 ) - 12 Nos. Water Resources Monitoring Quotations Envelope Implementation through Government E Market System Institutional Capacity Enhancement IN-MAHARASHTRA SW-33199- Water Resources Operations GO-RFB / Real Time Data and Planning System Single Stage - Two Acquisition System (RTDAS) IBRD / 87250 Prior Request for Bids Open - National 2,372,307.69 0.00 Under Review 2018-05-08 2018-05-16 2018-05-13 2018-06-24 2018-09-06 2018-10-11 2019-04-09 Water Resources Monitoring Envelope with Civil Work for Godavari System Basin in Marathwada Region. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33592- Enhancement GO-RFB / Operation and Water Resources Operations Maintenance of Real Time Data and Planning System Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 207,692.31 0.00 2018-05-08 2018-05-13 2018-06-24 2018-09-06 2018-10-11 2019-04-09 Acquisition System for Krishna Water Resources Monitoring Envelope Implementation and Bhima River Basins in System Maharashtra. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33197- Water Resources Operations GO-RFB / Real Time Data and Planning System Single Stage - Two Pending IBRD / 87250 Prior Request for Bids Open - National 2,273,846.00 0.00 2018-05-08 2018-05-13 2018-06-24 2018-09-06 2018-10-11 2019-04-09 Acquisition System (RTDAS) Water Resources Monitoring Envelope Implementation with Civil Work for Tapi Basin. System Water Resources Information Systems IN-UTTARAKHAND-53341-GO- RFB / Supply of water Quality Water Resources Monitoring Single Stage - Two Pending testing equipment for water IBRD / 87250 Post Request for Bids Open - National 123,015.00 0.00 2018-06-14 2018-06-15 2018-06-16 2018-06-19 2018-06-21 2018-06-22 System Envelope Implementation quality lab at Roorkee & Haldwani. IN-ANDHRA PRADESH GW- 53564-GO-RFQ / Procurement of Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 11,539.00 0.00 2018-04-04 2018-05-30 2018-11-26 Air Conditioners for District Data Enhancement Quotations Envelope Implementation Centers IN-KERALA SW-53800-GO-RFQ / Equipments for PDS study (Image Processing Study) CCD Camera - 1 No, RLS with Institutional Capacity Request for Single Stage - One Under IBRD / 87250 Post Open - National 22,230.77 0.00 2018-03-18 2018-05-02 2018-06-01 integrated RLS data logger- 1 No, Enhancement Quotations Envelope Implementation Procurement of laser distance measuring equipment,Echosounder - 1 No IN-KERALA SW-53802-GO-RFQ / Water Quality Lab Equipment - Assessment of Water Quality Institutional Capacity Request for Single Stage - One Pending status of Thrissur Corporation IBRD / 87250 Post Open - National 10,769.23 0.00 2018-03-19 2018-05-03 2018-06-02 Enhancement Quotations Envelope Implementation (PDS)- Pre programmed Spectrophometer- 1No, Dissolved oxygen meter - 1No IN-HIMACHAL PRADESH-20223- GO-RFQ / GPS Handheld (GPS Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 6,924.00 0.00 2018-04-02 2018-06-21 2018-07-30 of both the FY:2016-17 & FY System Quotations Envelope Implementation 2017-18 have been clubbed) IN-HIMACHAL PRADESH-30202- GO-RFB / Supply, Installation, Testing, Commissioning and Maintenance of RTDAS for selected Automatic Weather Water Resources Monitoring Single Stage - One Under Stations Automatic Rain IBRD / 87250 Post Request for Bids Open - National 667,385.00 0.00 2018-03-28 2018-03-27 2018-03-28 2018-05-07 2018-05-19 2018-06-14 2018-08-17 2018-09-24 2019-09-24 System Envelope Implementation Gauges, AWLR (Radar type above 30m) sites in HP and integrate with Data Center (VSAT) located at Mandi, in Himachal Pradesh IN-NAGALAND -54278-GO-RFQ Water Resources Monitoring Request for Single Stage - One / Purchase of Computer software IBRD / 87250 Post Limited 1,153.00 1,125.92 Signed 2018-03-15 2018-03-15 2018-03-23 2018-03-24 2018-03-28 System Quotations Envelope and accessories IN-PUNJAB -54284-GO-RFB / Supply & Installation of Audio Video Instrument at Ground Floor Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 69,230.00 0.00 2018-03-19 2018-03-26 2018-04-25 2018-06-01 2018-06-21 2018-08-06 Conference Hall and Video Systems Envelope Implementation Conferencing Instrument at First Floor Committee Room. IN-PUNJAB -30139-GO-RFQ / Supply and Installation of Audio- Video Instrument at Ground Floor Water Resources Information Request for Single Stage - One IBRD / 87250 Post Limited 69,230.00 0.00 Canceled 2017-12-05 2018-01-23 2018-03-09 Conference Hall and Video Systems Quotations Envelope Conferencing Instrument at First Floor Committee Room. IN-HIMACHAL PRADESH-20391- Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 92,308.00 0.00 Canceled 2017-09-25 2018-01-15 2018-07-14 GO-RFQ / G&D BOC System Quotations Envelope IN-HIMACHAL PRADESH-20217- GO-RFQ / Supply of AWLR Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 55,385.00 0.00 Canceled 2017-08-15 2017-11-20 2018-05-19 Radar Type above 30 meters System Quotations Envelope (FY:2017-18) IN-HIMACHAL PRADESH-20155- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Supply of Auto IBRD / 87250 Post Open - National 15,384.00 0.00 2017-08-27 2017-12-30 2018-06-28 System Quotations Envelope Implementation Current Meters IN-ANDHRA PRADESH GW- Institutional Capacity Request for Single Stage - One Pending 18146-GO-RFQ / Procurement of IBRD / 87250 Post Open - National 46,154.00 0.00 2017-06-15 2017-06-26 2017-07-24 Enhancement Quotations Envelope Implementation Handheld GPS IN-MEGHALAYA -20421-GO- Water Resources Monitoring DIR / Procurement of vehicles for IBRD / 87250 Post Direct Selection Direct 24,615.00 22,929.35 Completed 2018-05-01 2017-06-29 2018-05-06 2017-06-30 2018-06-10 2017-07-27 2018-12-07 2017-09-04 System SPMU IN-SOI-60735-GO-RFB / Water Resources Information Single Stage - Two Under Procurement of 02 nos. Relative IBRD / 87250 Post Request for Bids Open - National 246,153.85 0.00 2018-04-25 2018-04-23 2018-04-25 2018-05-28 2018-06-27 2018-07-28 2018-09-26 Systems Envelope Implementation gravimeters for geoid modeling. IN-SOI-60751-GO-RFB / Procurement of Absolute Water Resources Information Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 499,384.62 0.00 2018-04-25 2018-04-23 2018-04-25 2018-05-28 2018-06-27 2018-07-28 2018-09-26 gravimeter (01 no.) for geoid Systems Envelope Implementation modeling IN-SOI-21533-GO-RFB / Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Open - National 745,384.62 0.00 Canceled 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 2018-10-31 Gravimeters for Survey of India Systems Envelope IN-MIZORAM -61332-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 500.00 0.00 2018-05-01 2018-05-01 2018-05-01 Purchased of 16 No. mini UPS System Quotations Envelope Implementation IN-MIZORAM -61352-GO-RFQ / Water Resources Information Request for Single Stage - One Pending Purchase of inspection vehicle- 3 IBRD / 87250 Post Limited 37,000.00 0.00 2018-05-01 2018-05-01 2018-05-01 Systems Quotations Envelope Implementation Nos IN-MIZORAM -61338-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Supply and Installation of High IBRD / 87250 Post Limited 2,500.00 0.00 2018-05-01 2018-05-01 2018-05-01 System Quotations Envelope Implementation Speed internet facility IN-MIZORAM -61341-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Purchase of 7 Nos Printer by IBRD / 87250 Post Limited 1,400.00 0.00 2018-05-01 2018-05-01 2018-05-01 System Quotations Envelope Implementation shopping method IN-MIZORAM -61340-GO-RFQ / Purchase of 5 Desktop Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 5,200.00 0.00 2018-05-01 2018-05-01 2018-05-01 Computers by Shopping Method System Quotations Envelope Implementation using E5 document IN-MIZORAM -61333-GO-RFQ / Water Resources Monitoring Request for Single Stage - One Pending Purchase of 1 Copier + Printer + IBRD / 87250 Post Limited 1,100.00 0.00 2018-05-01 2018-05-01 2018-05-01 System Quotations Envelope Implementation Scanner IN-MIZORAM -61336-GO-RFQ / Purchase of 3 laptops by Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 4,650.00 0.00 2018-05-01 2018-05-01 2018-05-01 shopping method using E5 System Quotations Envelope Implementation document IN-MIZORAM -61350-GO-RFQ / Purchase of 3nos Projector & Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,300.00 0.00 2018-05-01 2018-05-01 2018-05-01 2nos Screen by Shopping System Quotations Envelope Implementation Method using E5 document IN-MIZORAM -61349-GO-RFQ / Purchase of 1no Still Camera, Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,000.00 0.00 2018-05-01 2018-05-01 2018-05-01 Lens & Flash by Shopping System Quotations Envelope Implementation Method using E5 document IN-MIZORAM -61345-GO-RFQ / Purchase of Television by Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 350.00 0.00 2018-05-01 2018-05-01 2018-05-01 Shopping Method using E5 System Quotations Envelope Implementation document IN-MIZORAM -61343-GO-RFQ / Purchase of Sound System by Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 7,700.00 0.00 2018-05-01 2018-05-01 2018-05-01 Shopping Method using E5 System Quotations Envelope Implementation document IN-MIZORAM -61339-GO-RFQ / Purchase of I.T Equipment like 4 Desktop Computers, 3 nos Water Resources Monitoring Request for Single Stage - One Pending Laptops, 15 nos Antivirus, 3 nos IBRD / 87250 Post Limited 8,400.00 0.00 2018-05-01 2018-05-01 2018-05-01 System Quotations Envelope Implementation Laser printers and 1 no Printer + Scanner by Shopping method using E5 document IN-MIZORAM -61351-GO-RFQ / Purchase of Intercom by Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 7,700.00 0.00 2018-05-01 2018-05-01 2018-05-01 shopping method using E5 System Quotations Envelope Implementation document IN-MIZORAM -61334-GO-RFQ / Purchase of Office Furniture by Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 41,000.00 0.00 2018-05-01 2018-05-01 2018-05-01 Shopping Method using E5 System Quotations Envelope Implementation document IN-MADHYA PRADESH-18280- GO-RFQ / Procurement of IT equipments work Water Resources Monitoring Request for Single Stage - One Pending stations(06),Desktop IBRD / 87250 Post Open - National 60,353.84 0.00 2018-09-05 2018-10-31 2019-04-29 System Quotations Envelope Implementation computer(14),Printers(14),UPS(1 4),Scanners(05)Laptop(05),Exter nal Hard Disks(03) IN-MADHYA PRADESH-18597- GO-RFQ / Procurement of Water Quality Lab Equipment-Flame Water Resources Monitoring Request for Single Stage - One Pending Photometer(1No.),UV IBRD / 87250 Post Limited 56,815.38 0.00 2018-05-26 2018-07-21 2019-01-17 System Quotations Envelope Implementation Spectrophotmeter(2No.),COD Digester(1No.),Hot Air Oven(1No.) & Deionizer(3No.) IN-MADHYA PRADESH-19071- GO-RFQ / Furnishing Divisional / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 6,153.84 0.00 2018-09-05 2018-10-31 2019-04-29 Sub Divisional with Non ITC System Quotations Envelope Implementation equipment-SW IN-MADHYA PRADESH-18239- GO-RFQ / Procurement of Total Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 13,923.07 0.00 2018-05-21 2018-07-16 2019-01-12 Station(01 No.),Auto Levels(03 System Quotations Envelope Implementation no.) IN-MADHYA PRADESH-18428- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Procurement of Bridge IBRD / 87250 Post Open - National 23,076.92 0.00 2018-06-20 2018-08-15 2019-02-11 System Quotations Envelope Implementation outfits for flow measurement IN-MADHYA PRADESH-18427- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Procurement of Digital IBRD / 87250 Post Open - National 16,153.85 0.00 2018-06-20 2018-08-15 2019-02-11 System Quotations Envelope Implementation Current Meters(30Nos.) IN-MADHYA PRADESH-61566- Institutional Capacity Request for Single Stage - One Pending GO-RFQ / Purchase of 1 Vehicle IBRD / 87250 Post Open - National 6,153.85 0.00 2018-12-05 2019-01-30 2019-07-29 Enhancement Quotations Envelope Implementation for State level SPMU IN-MADHYA PRADESH-61567- Water Resources Information Request for Single Stage - One Pending GO-RFQ / Digitisation of IBRD / 87250 Post Open - National 39,846.15 0.00 2018-06-04 2018-07-30 2019-01-26 Systems Quotations Envelope Implementation Reports/Documents-GW IN-MADHYA PRADESH-61661- GO-RFQ / Furnishing State Data Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 21,846.15 0.00 2018-09-05 2018-10-31 2019-04-29 Centre with Non ITC equipment & System Quotations Envelope Implementation procurement of ACs(4No.) IN-MADHYA PRADESH-61670- Water Resources Monitoring Request for Single Stage - One Pending GO-RFQ / Softwares for Data IBRD / 87250 Post Open - National 1,138.46 0.00 2018-08-05 2018-09-30 2019-03-29 System Quotations Envelope Implementation Centre- Antivirus IN-MADHYA PRADESH-61671- GO-RFB / Canal SCADA for Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Prior Request for Bids Open - National 846,153.85 0.00 2018-12-31 2019-01-05 2019-02-16 2019-05-01 2019-06-05 2019-12-02 Major Reservoir-Samrat Ashok System Envelope Implementation Sagar Page 8 IN-MADHYA PRADESH-18610- GO-RFQ / Procurement of Field Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Open - National 6,153.84 0.00 Canceled 2017-08-04 2017-09-29 2018-03-28 Survey Equipments Theodolite System Quotations Envelope (3No.) and Diffrential GPS(1 No.) IN-NIH ROORKEE-61685-GO- Institutional Capacity Single Stage - Two Pending RFB / TRIPLE QUADRUPOLE IBRD / 87250 Post Request for Bids Open - National 149,300.00 0.00 2018-05-31 2018-05-31 2018-07-12 2018-09-24 2018-10-29 2019-03-22 Enhancement Envelope Implementation GC-MS Institutional Capacity Enhancement IN-MAHARASHTRA SW-33514- Water Resources Operations GO-RFB / Real Time Data and Planning System Single Stage - One Acquisition System (RTDAS) IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 Canceled 2018-05-08 2018-05-13 2018-06-24 2018-07-24 2018-08-28 2019-02-24 Water Resources Monitoring Envelope with Civil Work for Godavari System Basin in Vidarbha Region. Water Resources Information Systems IN-SOI-29487-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending Procurement of mid level IBRD / 87250 Post Limited 59,261.54 0.00 2017-10-11 2017-12-07 2018-06-05 Enhancement Quotations Envelope Implementation workstations for PDO IN-SOI-21535-GO-RFB / Water Resources Information Single Stage - One Under Procurement of Survey IBRD / 87250 Post Request for Bids Open - National 123,076.92 0.00 2017-09-01 2018-07-02 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Systems Envelope Implementation Instruments for Geoid modelling IN-SOI-21608-GO-RFB / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.69 0.00 2017-09-05 2017-10-31 2018-04-29 Procurement of Laptops for PDO Enhancement Quotations Envelope Implementation IN-SOI-21601-GO-RFB / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 46,153.85 0.00 2017-09-05 2017-10-31 2018-04-29 Purchase of vehicles for PDO Enhancement Quotations Envelope Implementation IN-SOI-22187-GO-RFQ / Water Resources Information Request for Single Stage - One Pending Procurement of 01 flat bed IBRD / 87250 Post Limited 46,153.84 0.00 2017-09-05 2017-10-31 2018-04-29 Systems Quotations Envelope Implementation scanner IN-SOI-61763-GO-RFQ / Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Limited 53,846.15 0.00 2018-06-09 2018-08-04 2019-01-31 Procurement of 10 plotters Systems Quotations Envelope Implementation IN-SOI-61764-GO-RFQ / Water Resources Information Request for Single Stage - One Pending Procurement of 05 drum IBRD / 87250 Post Limited 24,615.39 0.00 2018-06-09 2018-08-04 2019-01-31 Systems Quotations Envelope Implementation scanners IN-SOI-22160-GO-RFQ / Printing Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Consumables Enhancement Quotations Envelope IN-SOI-23020-GO-DIR / Cost of Water Resources Information Satellite imagery for updation of IBRD / 87250 Post Direct Selection Direct 746,200.00 0.00 Canceled 2018-01-01 2018-01-03 2018-01-11 2018-02-15 2018-08-14 Systems geodatabase IN-SOI-22995-GO-RFQ / Setting up of Production facility- Water Resources Information Request for Single Stage - One Conference room, electrification, IBRD / 87250 Post Limited 15,384.62 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Systems Quotations Envelope partitioning, computer table, chairs etc IN-SOI-23002-GO-RFB / Setting up of Production facility at Water Resources Information Single Stage - One multiple locations- Conference IBRD / 87250 Post Request for Bids Open - National 186,153.85 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope room, office furniture and other petty items etc IN-SOI-22165-GO-RFB / Setting up of Geospatial Data Production Centres- all hardwares including servers, storage, workstations, Water Resources Information Single Stage - One firewall, ext HDD, related s/w, IBRD / 87250 Post Request for Bids Open - National 1,153,846.15 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope and Non-IT infrastructures including electrification, networking, partioning,DG sets, UPS etc at multiple locations IN-SOI-23693-GO-RFQ / Institutional Capacity Request for Single Stage - One Pending Procurement of scanners, IBRD / 87250 Post Limited 83,230.76 0.00 2018-06-16 2018-08-11 2019-02-07 Enhancement Quotations Envelope Implementation printers and plotters for PDO IN-SOI-23006-GO-RFB / Water Resources Information Single Stage - One Scanners and Plotters - three for IBRD / 87250 Post Request for Bids Open - National 158,461.54 0.00 Canceled 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Systems Envelope multiple locations IN-SOI-61868-GO-RFB / Setting Water Resources Information Single Stage - Two Under up of Continuously Operating IBRD / 87250 Prior Request for Bids Open - National 2,153,846.15 0.00 2018-07-10 2018-06-24 2018-07-15 2018-08-10 2018-08-26 2018-11-08 2018-12-13 2019-06-11 Systems Envelope Implementation Reference System (CORS) IN-SOI-61869-GO-RFB / Procurement of PCs, Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2018-06-25 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 workstations, laptops and office Systems Envelope Implementation software for 1:25k gdb IN-SOI-61870-GO-RFB / Establishment of H/W Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 437,846.15 0.00 2018-07-02 2018-07-07 2018-08-18 2018-10-31 2018-12-05 2019-06-03 infrastructure for Geospatial Data Systems Envelope Implementation Centre for 1:25k geodatabase IN-SOI-61872-GO-RFB / Procurement of PCs, workstations,laptops, scanners, Water Resources Information Single Stage - Two Under IBRD / 87250 Post Request for Bids Open - National 220,461.54 0.00 2018-06-25 2018-07-02 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 plotters, firewall, servers, storage Systems Envelope Implementation devices with related software for 3-5m DEM IN-KARNATAKA SW-57627-GO- RFQ / Procurement of 32 Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 16,000.00 0.00 2018-04-09 2018-04-09 2018-05-31 numbers of Autographic System Quotations Envelope Implementation Rainguages (with charts). IN-KARNATAKA SW-57628-GO- Water Resources Monitoring Request for Single Stage - One RFQ / Procurement of Current IBRD / 87250 Post Limited 13,095.00 12,385.60 Completed 2018-04-09 2018-04-09 2017-11-17 2018-05-15 2018-06-07 System Quotations Envelope meters. IN-KARNATAKA SW-57620-GO- Water Resources Monitoring Request for Single Stage - One Pending RFQ / Reconstruction of IBRD / 87250 Post Limited 15,385.00 0.00 2018-04-09 2018-04-09 2018-04-30 System Quotations Envelope Implementation Rainguage Stations (Civil Works) IN-CGWB-41317-GO-RFB / Water Resources Operations Request for Single Stage - One IBRD / 87250 Post Open - National 5,885.00 2,956.97 Completed 2018-05-11 2018-06-14 2018-05-14 2018-02-20 2018-05-14 2018-03-26 Procurement of Laptop-5 Nos and Planning System Quotations Envelope IN-CGWB-62234-GO-RFQ / Water Resources Operations Request for Single Stage - One Pending Procurement of 1 color IBRD / 87250 Post Open - National 6,150.00 0.00 2018-06-20 2018-08-15 2018-09-30 and Planning System Quotations Envelope Implementation photocopier IN-CGWB-39830-GO-RFQ / Water Resources Operations Request for Single Stage - One Procurement of IT equipment-02 IBRD / 87250 Post Limited 770.00 558.52 Completed 2018-05-15 2017-09-15 2018-05-19 2017-09-20 2018-05-20 2017-10-11 and Planning System Quotations Envelope printer Institutional Capacity Enhancement IN-MAHARASHTRA SW-33208- Water Resources Operations GO-RFB / Real Time Data and Planning System Single Stage - Two Pending Acquisition System (RTDAS) IBRD / 87250 Post Request for Bids Open - National 538,462.00 0.00 2018-06-18 2018-06-23 2018-08-04 2018-10-17 2018-11-21 2019-05-20 Water Resources Monitoring Envelope Implementation with Civil Work for West flowing System rivers in Kokan Basin. Water Resources Information Systems IN-BIHAR/WRD/FMISC/NHP- SW/G-NCB-01 / RTDAS for River Basins and Dams/Reservoirs including Civil Work. Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 1,692,307.70 0.00 2018-07-31 2018-08-10 2018-09-21 2018-12-04 2019-01-08 2025-01-08 (River Basins: Mahananda, System Envelope Implementation Gandak, Sone, Punpun and Kiul- Harohar and Eighteen Dam/Reservoir) IN-BIHAR/WRD/FMISC/NHP- Institutional Capacity Request for Single Stage - One Under SW/G-S-01 / Establishment Cost IBRD / 87250 Post Open - National 7,692.31 0.00 2018-05-11 2018-08-08 2018-09-22 Enhancement Quotations Envelope Implementation and Furnishing of SPMU IN-RAJASTHAN -40425-GO-RFB Water Resources Monitoring Single Stage - Two Under IBRD / 87250 Prior Request for Bids Open - National 2,353,846.15 0.00 2018-05-16 2018-06-04 2018-05-21 2018-06-12 2018-07-12 2018-09-09 2018-10-14 2019-07-11 / RTDAS for State of Rajasthan System Envelope Implementation IN-CGWB-62237-GO-RFQ / Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 5,384.00 0.00 2018-09-11 2018-10-27 2018-11-16 Procurement of 5 laptop and Planning System Quotations Envelope Implementation IN-DVC-63505-GO-DIR / Procurement of Cartosat 2.5m Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 7,692.00 0.00 2018-09-17 2018-09-22 2018-10-27 2019-04-25 steroids pair GIS/Satellite Systems Implementation Imageries Institutional Capacity Enhancement IN-MAHARASHTRA SW-64924- Water Resources Operations GO-RFB / Real Time Data and Planning System Single Stage - Two Under Acquisition System (RTDAS) IBRD / 87250 Prior Request for Bids Open - National 2,230,769.23 0.00 2018-06-25 2018-06-04 2018-06-30 2018-08-11 2018-10-24 2018-11-28 2019-05-27 Water Resources Monitoring Envelope Implementation with Civil Work for Godavari System Basin in Vidarbha Region. Water Resources Information Systems IN-NIH ROORKEE-65126-GO- Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,000.00 0.00 2018-06-16 2018-08-11 2019-02-07 RFQ / Laptop (6 nos.) Enhancement Quotations Envelope Implementation NHP-2018-2019-MOWR-213650- GO-DC-DC / Procurement of Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-06-05 2018-06-10 2018-07-15 2019-01-11 Image Processing software Systems Implementation (ERDAS) for India WRIS NHP-2018-2019-MOWR-568010- GO-DC-DC / Procurement of GIS Water Resources Monitoring Pending IBRD / 87250 Post Direct Selection Direct 138,461.54 0.00 2018-06-27 2018-07-02 2018-08-06 2019-02-02 software (Arc Server 1 & Desktop System Implementation 2) NHP-2018-2019-MOWR-984029- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 1,538.46 0.00 2018-06-11 2018-08-06 2019-02-02 System Quotations Envelope Implementation LED light for NPMU Office NHP-2018-2019-MOWR-671657- GO-SH-QU / Procurement of Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Limited 38,461.54 0.00 2018-04-20 2018-06-15 2018-12-12 Server for the development of e- Systems Quotations Envelope Implementation SWIS/IndiaWRIS/MIS NHP-2018-2019-MOWR-109303- GO-SH-QU / Purchase of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 9,230.77 0.00 2018-06-11 2018-08-06 2019-02-02 software for daily office running System Quotations Envelope Implementation like Antivirus, Office, Windows NHP-2018-2019-MOWR-268940- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of AC IBRD / 87250 Post Limited 5,384.62 0.00 2018-05-20 2018-07-15 2019-01-11 System Quotations Envelope Implementation for the NPMU Office IN-SOI-61767-GO-DIR / Procurement of stereo satellite Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 1,538,461.54 0.00 2018-05-21 2018-05-26 2018-06-30 2018-12-27 imagery for creation of 3-5m Systems Implementation DEM of gap areas. IN-SOI-61766-GO-DIR / Procurement of satellite imagery Water Resources Information Single Stage - One Pending IBRD / 87250 Post Direct Selection Direct - National 1,538,461.54 0.00 2018-07-10 2018-07-10 2018-07-20 2018-07-25 for updation of 1:25k Systems Envelope Implementation geodatabase. IN-WEST BENGAL SW-38540- GO-RFB / Supply Installation Testing Commissioning and Maintenance of Real Time Data Acquisition System (RTDAS) Water Resources Monitoring Single Stage - Two Under with telemetry of Irrigation and IBRD / 87250 Post Request for Bids Open - National 1,879,461.54 0.00 2018-07-25 2018-08-09 2018-07-25 2018-08-09 2018-08-27 2018-09-17 2018-10-08 2019-10-08 System Envelope Implementation Waterways Department West Bengal Under National Hydrology Project And Integrate with Data Center located at Kolkata IN-WEST BENGAL SW-38555- GO-RFB / Supply, installation, testing, commissioning, training Water Resources Monitoring Single Stage - Two Pending and maintenance of Automatic IBRD / 87250 Post Request for Bids Open - National 461,538.46 0.00 2018-09-04 2018-09-09 2018-10-12 2018-10-30 2018-11-27 2019-11-27 System Envelope Implementation Operation of Durgapur Barrage along with collection, storage and dissemination of data NHP-2018-2019-WBSW-351943- Water Resources Monitoring Request for Single Stage - One Under GO-SH-QU / Procurement of IBRD / 87250 Post Limited 7,538.46 0.00 2018-07-20 2018-03-15 2018-08-24 2018-09-24 System Quotations Envelope Implementation Laptops NHP-2018-2019-WBSW-998845- Institutional Capacity Pending GO-DC-DC / Procurement of IBRD / 87250 Post Direct Selection Direct 42,400.00 0.00 2018-07-25 2018-07-25 2018-08-13 2018-09-12 Enhancement Implementation PLAXIS-3D Software NHP-2018-2019-WBSW-354063- Institutional Capacity Pending GO-DC-DC / Procurement of IBRD / 87250 Post Direct Selection Direct 24,923.08 0.00 2018-07-25 2018-07-25 2018-08-13 2018-09-12 Enhancement Implementation HYPACK Software NHP-2018-2019-WBSW-317529- Institutional Capacity Under GO-DC-DC / Procurement of Geo- IBRD / 87250 Post Direct Selection Direct 30,861.54 0.00 2018-07-25 2018-07-12 2018-07-25 2018-08-13 2018-09-12 Enhancement Implementation Slope and Geo-Studio software NHP-2018-2019-WBSW-816546- Water Resources Information Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Open - National 15,384.62 0.00 2018-12-05 2019-01-12 2019-03-13 Systems Quotations Envelope Implementation Hardware for State-WRIS NHP-2018-2019-WBSW-714477- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of Non IBRD / 87250 Post Limited 15,384.62 0.00 2018-12-06 2019-01-14 2019-02-13 System Quotations Envelope Implementation ITC equipment for Data Center NHP-2018-2019-APGW-371695 Institutional Capacity Request for Single Stage - One Pending / Procurement of Air Conditioners IBRD / 87250 Post Open - National 46,153.85 0.00 2018-07-14 2018-09-08 2019-03-07 Enhancement Quotations Envelope Implementation and Furniture for 17 data centers NHP-2018-2019-APGW-195430 Institutional Capacity Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 232,307.69 0.00 2018-07-23 2018-07-28 2018-09-08 2018-11-21 2018-12-26 2019-06-24 / Procurement of IT Hardware Enhancement Envelope Implementation NHP-2018-2019-APGW-547481 Institutional Capacity Request for Single Stage - One Pending / Procurement of Water Quality IBRD / 87250 Post Open - National 84,615.38 0.00 2018-08-11 2018-10-06 2019-04-04 Enhancement Quotations Envelope Implementation Equipment NHP-2018-2019-GA-216692-GO- Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 954,615.38 0.00 2018-09-07 2018-09-12 2018-10-24 2019-01-06 2019-02-10 2019-08-09 NCB-DE / RT-DAS Goa System Envelope Implementation NHP-2018-2019-GA-131350-GO- SH-SCB / Computers,Printers Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 26,923.08 0.00 2018-08-27 2018-10-22 2019-04-20 with Scanner, Network-Attached- System Quotations Envelope Implementation Storage NHP-2018-2019-GA-716919-GO- NCB-SE / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 11,538.46 0.00 2019-02-16 2019-04-13 2019-10-10 Computers,Laptop,Printers with System Quotations Envelope Implementation Scanner NHP-2018-2019-GA-698560-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Water Quality IBRD / 87250 Post Open - National 15,384.62 0.00 2019-02-23 2019-04-20 2019-10-17 System Quotations Envelope Implementation Equipment for Labs NHP-2018-2019-GA-223965-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Furnishing Divisional / IBRD / 87250 Post Open - National 30,769.23 0.00 2019-02-24 2019-04-21 2019-10-18 System Quotations Envelope Implementation sub-divisional Centre & SPMU IN-GOA -39865-GO-RFB / Supply, Installation, testing and Water Resources Monitoring Single Stage - Two commissioning of Real Time IBRD / 87250 Post Request for Bids Open - National 1,080,000.00 0.00 Canceled 2018-01-19 2018-01-24 2018-03-07 2018-06-19 2018-07-24 2019-03-21 System Envelope Data Acquisition System for Tillari Irrigation Canal System NHP-2018-2019-ML-265245-GO- Water Resources Monitoring Pending IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-02 2018-07-07 2018-08-11 2019-02-07 SH-QU / ArcGIS System Implementation NHP-2018-2019-ML-127591-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-LM / Procurement of PCs IBRD / 87250 Post Limited 3,138.46 0.00 2018-08-11 2018-10-06 2019-04-04 System Quotations Envelope Implementation and printers for Data Centre NHP-2018-2019-ML-560924-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Procurement of ground IBRD / 87250 Post Open - National 15,384.62 0.00 2018-10-10 2018-12-05 2019-06-03 System Quotations Envelope Implementation water monitoring equipments NHP-2018-2019-ML-524253-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,538.46 0.00 2018-12-08 2019-02-02 2019-08-01 SH-LM / Bridge outfit System Quotations Envelope Implementation Page 9 NHP-2018-2019-TSGW-261629- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Basic field IBRD / 87250 Post Open - National 92,692.31 0.00 2018-07-28 2018-09-22 2018-11-21 System Quotations Envelope Implementation equipment for field officers NHP-2018-2019-TSGW-127898 / IT Equipment for Data Centres - Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 4,615.38 0.00 2018-07-16 2018-09-10 2018-11-09 Communication equipment System Quotations Envelope Implementation (Tabs) NHP-2018-2019-TSGW-619408 / Water Resources Monitoring Request for Single Stage - One Pending IT Equipment for Data Centres - IBRD / 87250 Post Open - National 62,153.85 0.00 2018-07-16 2018-09-10 2018-11-09 System Quotations Envelope Implementation computers & laptops NHP-2018-2019-TSGW-551441 / Water Resources Monitoring Request for Single Stage - One Pending IT Equipment for Data Centres - IBRD / 87250 Post Open - National 9,307.69 0.00 2018-07-16 2018-09-10 2018-11-09 System Quotations Envelope Implementation Printer NHP-2018-2019-TSGW-983848 / Water Resources Monitoring Request for Single Stage - One Pending IT Equipment for Data Centres - IBRD / 87250 Post Open - National 52,461.54 0.00 2018-07-16 2018-09-10 2018-11-09 System Quotations Envelope Implementation UPS System NHP-2018-2019-TSGW-664034 / Water Resources Monitoring Request for Single Stage - One Pending A/Cs 2T for Data Centres and IBRD / 87250 Post Open - National 16,000.00 0.00 2018-09-09 2018-11-04 2019-01-03 System Quotations Envelope Implementation Water Quality Labs NHP-2018-2019-TSGW-965817 / Updation of existing Water Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 94,584.62 0.00 2018-08-28 2018-10-23 2018-12-22 Quality Labs at Hyderabad & System Quotations Envelope Implementation Karimnagar NHP-2018-2019-TSGW-167277 / Water Resources Information Pending IBRD / 87250 Post Direct Selection Direct 1,538.46 0.00 2018-07-20 2018-07-25 2018-08-29 2019-02-25 Procurement of SOI Toposheets Systems Implementation NHP-2018-2019-TSGW-953596 / To create resource material (Annual Institutional Capacity Request for Single Stage - One Pending Reports,pamplets,Brochure,post IBRD / 87250 Post Open - National 7,692.31 0.00 2018-10-27 2018-12-22 2019-02-20 Enhancement Quotations Envelope Implementation ers,audiovisuals,documentaries etc) on water conservation & management awareness NHP-2018-2019-TSGW-218424 / Procurement of equipment for Tanks as Source for regional Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 46,153.85 0.00 2018-08-20 2018-10-15 2018-12-14 Groundwater Recharge using and Planning System Quotations Envelope Implementation Managed Aquifer Storage & Recovery (ASR) NHP-2018-2019-TSGW-553646 / Water Resources Monitoring Pending Software for Data Center - GIS IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-25 2018-07-30 2018-09-03 2019-03-02 System Implementation software NHP-2018-2019-TSGW-319070 / Water Resources Monitoring Request for Single Stage - One Pending Software for Data Center - Other IBRD / 87250 Post Open - National 69,230.77 0.00 2018-08-13 2018-10-08 2018-12-07 System Quotations Envelope Implementation software NHP-2018-2019-JH-923973-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Softwares for data IBRD / 87250 Post Open - National 39,230.77 0.00 2019-01-08 2019-02-19 2019-03-19 System Quotations Envelope Implementation centre NHP-2018-2019-JH-846701-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,538.46 0.00 2018-05-22 2018-07-10 2018-08-24 SH-QU / Printers with scanners System Quotations Envelope Implementation NHP-2018-2019-JH-919411-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Purchase of Computers, IBRD / 87250 Post Open - National 45,076.92 0.00 2018-08-16 2018-10-03 2018-11-26 System Quotations Envelope Implementation Laptops,External Hard disk etc. NHP-2018-2019-KASW-403993- GO-NCB-DE / RTDAS: Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 1,064,615.38 0.00 2018-08-06 2018-08-11 2018-09-22 2018-12-05 2019-01-09 2019-07-08 Procurement of TRG & AWS System Envelope Implementation through eportal NHP-2018-2019-KASW-963084- Water Resources Monitoring Single Stage - Two Pending GO-NCB-DE / DWLR for Ground IBRD / 87250 Post Request for Bids Open - National 1,846,153.85 0.00 2018-07-23 2018-07-28 2018-09-08 2018-11-21 2018-12-26 2019-06-24 System Envelope Implementation Water NHP-2018-2019-KASW-154455- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 14,769.23 0.00 2018-08-02 2018-09-27 2019-03-26 data centre-Computers: through System Quotations Envelope Implementation GEM portal NHP-2018-2019-KASW-130432- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 20,307.69 0.00 2018-08-03 2018-09-28 2019-03-27 data centre-Copier / photocopier: System Quotations Envelope Implementation through GEM portal NHP-2018-2019-KASW-535118- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 7,692.31 0.00 2018-09-20 2018-11-15 2019-05-14 data centre-Networking / Internet System Quotations Envelope Implementation facilities NHP-2018-2019-KASW-695345- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 14,615.38 0.00 2018-07-28 2018-09-22 2019-03-21 data centre-Plotter: through GEM System Quotations Envelope Implementation portal NHP-2018-2019-KASW-460794- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 9,230.77 0.00 2018-07-28 2018-09-22 2019-03-21 data centre-Scanners: through System Quotations Envelope Implementation GEM portal NHP-2018-2019-KASW-929749- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 7,692.31 0.00 2018-07-28 2018-09-22 2019-03-21 data centre-Server: through GEM System Quotations Envelope Implementation portal NHP-2018-2019-KASW-355280- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 269.23 0.00 2018-09-08 2018-11-03 2019-05-02 data centre-Storage and backup System Quotations Envelope Implementation devices: through GEM portal NHP-2018-2019-KASW-475013- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 25,846.15 0.00 2018-08-25 2018-10-20 2019-04-18 data centre-UPS system: System Quotations Envelope Implementation through GEM portal NHP-2018-2019-KASW-811349- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 6,153.85 0.00 2018-10-15 2018-12-10 2019-06-08 data centre-Video wall/LED System Quotations Envelope Implementation display: through GEM portal NHP-2018-2019-KASW-509421- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 22,307.69 0.00 2018-07-28 2018-09-22 2019-03-21 data centre-WorkStations: System Quotations Envelope Implementation through GEM portal NHP-2018-2019-KASW-704320- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 5,538.46 0.00 2018-07-30 2018-09-24 2019-03-23 data centre-Laptops: through System Quotations Envelope Implementation GEM portal NHP-2018-2019-KASW-735425- GO-SH-QU / IT equipment for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 4,038.46 0.00 2018-09-14 2018-11-09 2019-05-08 data centre-Printer: through GEM System Quotations Envelope Implementation portal NHP-2018-2019-KASW-599620- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / SCADA for IBRD / 87250 Post Limited 92,307.69 0.00 2018-08-25 2018-10-20 2019-04-18 System Quotations Envelope Implementation barrages & reserviors:package1 NHP-2018-2019-KASW-365600- GO-NCB-DE / SCADA for Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 523,076.92 0.00 2018-09-04 2018-09-09 2018-10-21 2019-01-03 2019-02-07 2019-08-06 barrages & reserviors: Package System Envelope Implementation 2: Malaprabha & Bhadra NHP-2018-2019-KASW-258058- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.69 0.00 2018-08-25 2018-10-20 2019-04-18 GO-SH-QU / Bridge Outfits System Quotations Envelope Implementation NHP-2018-2019-KASW-151156- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Lab equipments for IBRD / 87250 Post Limited 23,076.92 0.00 2018-09-30 2018-11-25 2019-05-24 System Quotations Envelope Implementation KERS WQ ,divisional WQ labs NHP-2018-2019-KASW-134605- GO-SH-QU / Lab equipments for Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 10,769.23 0.00 2018-10-15 2018-12-10 2019-06-08 munirabad WQ, subdisional WQ System Quotations Envelope Implementation labs NHP-2018-2019-KASW-929140- GO-SH-QU / Furnishing Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 53,846.15 0.00 2018-10-11 2018-12-06 2019-06-04 State/basin informatic centre System Quotations Envelope Implementation :Pakage I NHP-2018-2019-KASW-643814- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Furnishing of data IBRD / 87250 Post Limited 30,769.23 0.00 2018-09-20 2018-11-15 2019-05-14 System Quotations Envelope Implementation centre KERS:package 1 NHP-2018-2019-KASW-345314- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 2,769.23 0.00 2018-08-15 2018-10-10 2019-04-08 System Quotations Envelope Implementation Current meters NHP-2018-2019-KASW-873395- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 11,076.92 0.00 2018-08-25 2018-10-20 2019-04-18 System Quotations Envelope Implementation Standard Rain Gauges NHP-2018-2019-KASW-106288- GO-SH-QU / Furnishing Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 30,769.23 0.00 2018-09-12 2018-11-07 2019-05-06 divisional/subdivisional data System Quotations Envelope Implementation centre package1 NHP-2018-2019-KASW-290284- GO-SH-QU / Furnishing Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 61,538.46 0.00 2018-09-03 2018-10-29 2019-04-27 divisional/subdivisional data System Quotations Envelope Implementation centre package:2 NHP-2018-2019-KASW-648504- Water Resources Information Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 7,692.31 0.00 2018-11-14 2019-01-09 2019-07-08 Systems Quotations Envelope Implementation Remote sensing data NHP-2018-2019-TSGW-448681 / Water Resources Operations Request for Single Stage - One Pending Resource material for PDS & IBRD / 87250 Post Open - National 10,984.62 0.00 2018-11-17 2019-01-12 2019-03-28 and Planning System Quotations Envelope Implementation DSS NHP-2018-2019-CGWB-931501- Water Resources Monitoring Single Stage - Two Pending GO-NCB-DE / DWLR IBRD / 87250 Post Request for Bids Open - National 166,153.85 0.00 2018-10-30 2018-11-04 2018-12-16 2019-02-28 2019-04-04 2019-10-01 System Envelope Implementation Procurement NHP-2018-2019-CGWB-420194- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Centre of IBRD / 87250 Post Limited 13,076.92 0.00 2019-03-20 2019-05-15 2019-11-11 System Quotations Envelope Implementation excellence for GW modelling NHP-2018-2019-CGWB-951078- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 5,384.62 0.00 2018-09-21 2018-11-16 2019-05-15 System Quotations Envelope Implementation Laptops NHP-2018-2019-CGWB-470405- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of IBRD / 87250 Post Limited 5,769.23 0.00 2018-10-05 2018-11-30 2019-05-29 System Quotations Envelope Implementation Color Photocopier NHP-2018-2019-DVC-247675- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / Procurement of 01 IBRD / 87250 Post Open - National 3,076.92 0.00 2018-09-20 2018-11-15 2018-12-15 System Quotations Envelope Implementation no. Xerox machine NHP-2018-2019-DVC-218077- GO-NCB-DE / Procurement of Automated Pipe Flow Water Resources Monitoring Single Stage - Two Pending Measurement sensors for IBRD / 87250 Post Request for Bids Open - National 384,615.38 0.00 2018-07-15 2018-07-20 2018-08-31 2018-11-13 2018-12-18 2019-12-18 System Envelope Implementation drinking / industrial water supply for 40 nos of consumers with GSM telemetry NHP-2018-2019-DVC-370770 / Water Resources Monitoring Request for Single Stage - One Pending Procurement of Printer for the IBRD / 87250 Post Open - National 384.62 0.00 2018-08-30 2018-10-25 2018-11-24 System Quotations Envelope Implementation data centre. NHP-2018-2019-SK-583221-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Manual Standard Rain IBRD / 87250 Post Limited 769.23 0.00 2018-08-16 2018-09-15 2018-12-14 System Quotations Envelope Implementation Gauge NHP-2018-2019-SK-883565-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / GD stations(CM AND IBRD / 87250 Post Limited 30,769.23 0.00 2018-08-16 2018-09-15 2018-12-14 System Quotations Envelope Implementation ACCESSORIES) NHP-2018-2019-SK-333559-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Furnishing of divisional IBRD / 87250 Post Limited 13,846.15 0.00 2018-08-16 2018-09-15 2019-03-31 System Quotations Envelope Implementation and sub divisional offices NHP-2018-2019-SK-579431-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 10,769.23 0.00 2018-08-16 2018-09-15 2018-12-14 SH-QU / WQ Field Kit 1 System Quotations Envelope Implementation NHP-2018-2019-UK-533091 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,434.15 0.00 2018-05-28 2018-07-23 2019-01-19 Procurement of Handheld GPS System Quotations Envelope Implementation NHP-2018-2019-NIH-107727-GO- Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 3,076.92 0.00 2018-10-06 2018-12-01 2019-05-30 SH-QU / Copier / photocopier Enhancement Quotations Envelope Implementation NHP-2018-2019-NIH-888075-GO- Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 3,846.15 0.00 2018-10-06 2018-12-01 2019-05-30 SH-QU / Plotter/Printer Enhancement Quotations Envelope Implementation NHP-2018-2019-NIH-989202-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 10,769.23 0.00 2018-10-06 2018-12-01 2019-05-30 SH-QU / Server System Quotations Envelope Implementation NHP-2018-2019-NIH-204542-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 4,615.38 0.00 2018-10-06 2018-12-01 2019-05-30 SH-QU / WorkStations and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-108835-GO- Institutional Capacity Request for Single Stage - One Pending SH-QU / Travel Stationery and IBRD / 87250 Post Limited 38,461.54 0.00 2018-07-06 2018-08-31 2019-02-27 Enhancement Quotations Envelope Implementation Computer Consumables , Misc NHP-2018-2019-NIH-880926-GO- Water Resources Operations Request for Single Stage - One Pending SH-QU / Radiocarbon Dating IBRD / 87250 Post Limited 1,538.46 0.00 2018-08-20 2018-10-15 2019-04-13 and Planning System Quotations Envelope Implementation Line NHP-2018-2019-NIH-934679-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.69 0.00 2018-09-04 2018-10-30 2019-04-28 SH-QU / Syringe Pump and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-241231-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,076.92 0.00 2018-04-10 2018-06-05 2018-12-02 SH-QU / Laptop and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-190238-GO- Water Resources Operations Request for Single Stage - One Pending DC-DC / GeoChemist Work IBRD / 87250 Post Limited 10,769.23 0.00 2018-09-04 2018-10-30 2019-04-28 and Planning System Quotations Envelope Implementation Bench Software NHP-2018-2019-NIH-724684-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 4,615.38 0.00 2019-01-04 2019-03-01 2019-08-28 DC-DC / VMOD FLEX Software and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-731166-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 923.08 0.00 2018-07-20 2018-09-14 2019-03-13 SH-QU / Laptop and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-538584-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 461.54 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Camera and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-825174-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,230.77 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Handheld GPS and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-637041-GO- Water Resources Operations Pending IBRD / 87250 Post Direct Selection Direct 7,692.31 0.00 2018-08-30 2018-09-04 2018-10-09 2019-04-07 DC-DC / WQ Software and Planning System Implementation NHP-2018-2019-NIH-335053-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,538.46 0.00 2018-08-20 2018-10-15 2019-04-13 SH-QU / Portable pH & EC Meter and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-452255-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 5,769.23 0.00 2018-07-20 2018-09-14 2019-03-13 SH-QU / Laptop and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-197101-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 5,846.15 0.00 2018-07-20 2018-09-14 2019-03-13 SH-QU / Desktop and Planning System Quotations Envelope Implementation Page 10 NHP-2018-2019-NIH-853608-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 692.31 0.00 2018-08-20 2018-10-15 2019-04-13 SH-QU / Printers and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-371795-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 615.38 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Water Level Meter and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-538573-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 692.31 0.00 2018-08-20 2018-10-15 2019-04-13 SH-QU / Camera and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-803917-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-08-20 2018-10-15 2019-04-13 DC-DC / Softwares and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-934561-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,230.77 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Portable pH & EC Meter and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-172815-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 769.23 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Digital Burette and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-518596-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 3,076.92 0.00 2018-09-04 2018-10-30 2019-04-28 SH-QU / Flame Photometer and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-225835-GO- Water Resources Operations Request for Single Stage - One Pending SH-QU / Cut Throat Flume / V- IBRD / 87250 Post Limited 3,076.92 0.00 2018-09-20 2018-11-15 2019-05-14 and Planning System Quotations Envelope Implementation Notch NHP-2018-2019-NIH-335077-GO- SH-QU / Desktop Workstation, Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 10,000.00 0.00 2018-08-04 2018-09-29 2019-03-28 Laptop Workstation, Desktop- and Planning System Quotations Envelope Implementation 5nos. NHP-2018-2019-NIH-477025-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 769.23 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Handheld GPS and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-685156-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 538.46 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Camera and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-469053-GO- Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Limited 2,307.69 0.00 2018-08-04 2018-09-29 2019-03-28 SH-QU / Mini Disk Infiltrometer and Planning System Quotations Envelope Implementation NHP-2018-2019-NIH-108582-GO- Water Resources Operations Request for Single Stage - One Pending SH-QU / Portable Soil & Water IBRD / 87250 Post Limited 3,076.92 0.00 2018-08-20 2018-10-15 2019-04-13 and Planning System Quotations Envelope Implementation Testing Kit NHP-2018-2019-NIH-716566-GO- Water Resources Monitoring Single Stage - Two Pending ICB-DE / Triple Quadrupole GC- IBRD / 87250 Post Request for Bids Open - International 153,846.15 0.00 2018-07-30 2018-08-04 2018-09-15 2018-11-28 2019-01-02 2019-07-01 System Envelope Implementation MS NHP-2018-2019-NIH-170551-CS- Institutional Capacity Request for Single Stage - One Pending SSS-SSS / Development of IBRD / 87250 Post Limited 23,076.92 0.00 2018-08-04 2018-09-29 2019-03-28 Enhancement Quotations Envelope Implementation Advanced Courses NHP-2018-2019-WBSW-877397- Water Resources Monitoring Under GO-DC-DC / Procurement of IBRD / 87250 Post Direct Selection Direct 176,923.08 0.00 2018-07-19 2018-07-04 2018-07-25 2018-07-12 2018-08-16 2018-09-15 System Implementation ARC-GIS Software NHP-2018-2019-RJ-398027-GO- Water Resources Monitoring Single Stage - Two Under NCB-DE / Discharge IBRD / 87250 Post Request for Bids Open - National 319,230.77 0.00 2018-07-01 2018-07-31 2018-07-06 2018-08-06 2018-08-17 2018-10-30 2018-12-04 2019-06-02 System Envelope Implementation measurement equipment NHP-2018-2019-RJ-302457-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,076.92 0.00 2018-07-15 2018-09-09 2019-03-08 SH-QU / Manual SRG (2018-19) System Quotations Envelope Implementation NHP-2018-2019-RJ-573302-GO- Water Resources Monitoring Single Stage - Two Under NCB-DE / SCADA and gate IBRD / 87250 Post Request for Bids Open - National 461,538.46 0.00 2018-07-01 2018-08-08 2018-07-06 2018-08-09 2018-08-17 2018-10-30 2018-12-04 2019-06-02 System Envelope Implementation sensors for other dams NHP-2018-2019-RJ-854780-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Computer/ Laptop for IBRD / 87250 Post Open - National 41,846.15 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation data center( 2018-19) NHP-2018-2019-RJ-270099-GO- SH-QU / LCD screen for Water Resources Monitoring Request for Single Stage - One Pending conference /meetin room and IBRD / 87250 Post Open - National 46,153.85 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation procurement of video conference facility(2018-19) NHP-2018-2019-RJ-436351-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / Software for data IBRD / 87250 Post Open - National 56,923.08 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation center(2018-19) NHP-2018-2019-RJ-759763-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 38,461.54 0.00 2018-07-15 2018-09-09 2019-03-08 SH-QU / Software/models System Quotations Envelope Implementation NHP-2018-2019-RJ-596058 / Water Resources Monitoring Request for Single Stage - One Pending Communication equipment for IBRD / 87250 Post Open - National 1,538.46 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation data center(2018-19) NHP-2018-2019-RJ-551788 / Water Resources Monitoring Request for Single Stage - One Pending Plotter/ printers for data center IBRD / 87250 Post Open - National 13,846.15 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation (2018-19) NHP-2018-2019-RJ-416392 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,615.38 0.00 2018-08-06 2018-10-01 2019-03-30 Scanner for data center (2018-19) System Quotations Envelope Implementation NHP-2018-2019-RJ-293051 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 1,538.46 0.00 2018-12-06 2019-01-31 2019-07-30 Servers for data center (2018-19) System Quotations Envelope Implementation NHP-2018-2019-RJ-235140 / Water Resources Monitoring Request for Single Stage - One Pending Storage and back up devices for IBRD / 87250 Post Open - National 1,538.46 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation data center (2018-19) NHP-2018-2019-RJ-651934 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,846.15 0.00 2018-08-06 2018-10-01 2019-03-30 Handheld GPS ( 2018-19) System Quotations Envelope Implementation NHP-2018-2019-RJ-632856 / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 346,153.85 0.00 2018-09-15 2018-09-20 2018-11-01 2019-01-14 2019-02-18 2019-08-17 DWLR with telemetry GSM System Envelope Implementation NHP-2018-2019-RJ-581558 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,230.77 0.00 2018-08-06 2018-10-01 2019-03-30 Software for data center(2018-19) System Quotations Envelope Implementation NHP-2018-2019-RJ-801730 / Water Resources Information Request for Single Stage - One Pending Development of Information IBRD / 87250 Post Open - National 3,600.00 0.00 2018-08-21 2018-10-16 2019-04-14 Systems Quotations Envelope Implementation brochures(2018-19) NHP-2018-2019-RJ-330361 / Water Resources Information Request for Single Stage - One Pending Servers for hosting website and IBRD / 87250 Post Open - National 20,461.54 0.00 2018-09-06 2018-11-01 2019-04-30 Systems Quotations Envelope Implementation data services(2018-19) NHP-2018-2019-RJ-294757 / Water Resources Information Request for Single Stage - One Pending Internet charges for hosting(2018- IBRD / 87250 Post Open - National 5,384.62 0.00 2018-09-06 2018-11-01 2019-04-30 Systems Quotations Envelope Implementation 19) NHP-2018-2019-RJ-334890 / Water Resources Information Request for Single Stage - One Pending Communication system for data IBRD / 87250 Post Open - National 7,692.31 0.00 2018-09-06 2018-11-01 2019-04-30 Systems Quotations Envelope Implementation exchange among agencies NHP-2018-2019-RJ-909517 / Institutional Capacity Request for Single Stage - One Pending Establishment cost of SPMU ( IBRD / 87250 Post Open - National 38,461.54 0.00 2018-08-04 2018-09-29 2019-03-28 Enhancement Quotations Envelope Implementation Furnishing/ Furniture) NHP-2018-2019-RJ-997858 / Institutional Capacity Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2018-07-09 2018-07-14 2018-08-25 2018-11-07 2018-12-12 2019-06-10 Furnishing of center IMTI kota Enhancement Envelope Implementation NHP-2018-2019-RJ-537251 / Installation of network, cabling Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 5,384.62 0.00 2018-08-06 2018-10-01 2019-03-30 etc & Training equipment/ LCD System Quotations Envelope Implementation projector and screen NHP-2018-2019-MHGW-434875- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-QU / IT Equipement for IBRD / 87250 Post Open - National 76,923.08 0.00 2018-08-06 2018-10-01 2019-03-30 System Quotations Envelope Implementation data centre NHP-2018-2019-CPCB-828332 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Limited 15,384.62 0.00 2018-08-04 2018-09-29 2019-03-28 Water Quality Kit System Quotations Envelope Implementation NHP-2018-2019-CPCB-530430 / Institutional Capacity Request for Single Stage - One Pending Procurement of Computers and IBRD / 87250 Post Limited 2,769.23 0.00 2018-10-20 2018-12-15 2019-06-13 Enhancement Quotations Envelope Implementation Laptops NHP-2018-2019-CPCB-130439 / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 1,538.46 0.00 2018-10-20 2018-12-15 2019-06-13 Procurement of Photocopier Enhancement Quotations Envelope Implementation NHP-2018-2019-CPCB-254999 / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 461.54 0.00 2018-10-20 2018-12-15 2019-06-13 Procurement of Fax Machine Enhancement Quotations Envelope Implementation NHP-2018-2019-CPCB-785943 / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 307.69 0.00 2018-10-20 2018-12-15 2019-06-13 Procurement of Scanner Enhancement Quotations Envelope Implementation NHP-2018-2019-CPCB-147435 / Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Limited 461.54 0.00 2018-10-20 2018-12-15 2019-06-13 Procurement of Printer Enhancement Quotations Envelope Implementation NHP-2018-2019-CPCB-587141 / Institutional Capacity Request for Single Stage - One Pending Procurement of Network/Internet IBRD / 87250 Post Limited 307.69 0.00 2018-10-20 2018-12-15 2019-06-13 Enhancement Quotations Envelope Implementation Facility NHP-2018-2019-CPCB-900370 / Institutional Capacity Request for Single Stage - One Pending Procrement of Storage and IBRD / 87250 Post Limited 307.69 0.00 2018-10-20 2018-12-15 2019-06-13 Enhancement Quotations Envelope Implementation Backup Devices NHP-2018-2019-ML-390072-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-SCB / DGPS and Handheld IBRD / 87250 Post Open - National 29,230.77 0.00 2018-08-11 2018-10-06 2019-04-04 System Quotations Envelope Implementation GPS NHP-2018-2019-ML-879264-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-SCB / Current meters with IBRD / 87250 Post Open - National 23,965.38 0.00 2018-08-11 2018-10-06 2019-04-04 System Quotations Envelope Implementation accessories and ORGs NHP-2018-2019-ML-577403-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 92,307.69 0.00 2018-08-11 2018-10-06 2019-04-04 SH-SCB / Water Quality Sondes System Quotations Envelope Implementation NHP-2018-2019-ML-589832-GO- Water Resources Monitoring Request for Single Stage - One Pending NCB-SE / Supply & Installation IBRD / 87250 Post Open - National 61,538.46 0.00 2018-10-06 2018-12-01 2019-05-30 System Quotations Envelope Implementation of DWLR with telemetry NHP-2018-2019-DVC-851940- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-DE / Procurement of IBRD / 87250 Post Open - National 28,923.08 0.00 2018-10-03 2018-11-28 2018-12-28 System Quotations Envelope Implementation Survey instruments. NHP-2018-2019-DVC-668297- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-DE / Procurement of IBRD / 87250 Post Open - National 9,230.77 0.00 2018-08-11 2018-10-06 2018-11-05 System Quotations Envelope Implementation Hand Held current meter. NHP-2018-2019-DVC-381001- Water Resources Monitoring Pending GO-DC-DC / Procurement of GIS IBRD / 87250 Post Direct Selection Direct 30,398.31 0.00 2018-06-18 2018-06-23 2018-07-28 2018-08-12 System Implementation software under NHP NHP-2018-2019-DVC-991380- GO-NCB-DE / Procurement of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 76,923.08 0.00 2018-11-25 2019-01-20 2019-07-19 Discharge Management System Quotations Envelope Implementation Equipment (ADCP). NHP-2018-2019-DVC-975293- Water Resources Monitoring Request for Single Stage - One Pending GO-SH-DE / Furnishing of Data IBRD / 87250 Post Open - National 76,923.08 0.00 2019-02-17 2019-04-14 2020-04-13 System Quotations Envelope Implementation Centre NHP-2018-2019-DVC-756876 / Procurement of Laptops and Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 4,888.26 0.00 2018-08-05 2018-09-30 2018-10-30 Desktops for Data Centre at System Quotations Envelope Implementation Maithon Institutional Capacity Enhancement NHP-2018-2019-UPGW-185362- Water Resources Operations GO-SH-QU / Procurement of and Planning System Single Stage - One Pending IBRD / 87250 Post Request for Bids Open - National 107,692.31 0.00 2018-08-16 2018-08-21 2018-09-20 2018-10-10 2018-11-14 2018-12-14 Digital Data Logger mounted on Water Resources Monitoring Envelope Implementation vehicle (Geophysical Equipment) System Water Resources Information Systems Institutional Capacity Enhancement Water Resources Operations NHP-2018-2019-UPGW-875446- and Planning System Request for Single Stage - One Pending CW-SH-QU / Development of IBRD / 87250 Post Open - National 15,384.62 0.00 2018-06-20 2018-09-10 2019-01-08 Water Resources Monitoring Quotations Envelope Implementation mobile app System Water Resources Information Systems Institutional Capacity Enhancement Water Resources Operations NHP-2018-2019-UPGW-342327- and Planning System Pending GO-DC-DC / Software for Data IBRD / 87250 Post Direct Selection Direct 32,307.69 0.00 2018-08-14 2018-08-14 2018-10-13 2018-11-12 Water Resources Monitoring Implementation Center System Water Resources Information Systems Institutional Capacity NHP-2018-2019-UPGW-414496- Enhancement GO-DC-DC / Upgradation of Water Resources Operations existing Remote Sensing Lab and Planning System Pending alongwith procurement of SOI IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-25 2018-07-25 2018-10-23 2018-12-22 Water Resources Monitoring Implementation Toposheets (Hard copy & digital System data) and sattellite data, Water Resources Information Geological Maps Systems NHP-2018-2019-JH-861607-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-DE / Procurement of Office IBRD / 87250 Post Open - National 15,384.62 0.00 2018-08-27 2018-10-15 2018-11-16 System Quotations Envelope Implementation Furniture NHP-2018-2019-JH-919830-GO- Water Resources Monitoring Single Stage - Two Pending NCB-DE / ADCP and other IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2018-09-11 2018-09-18 2018-10-23 2018-11-08 2018-11-30 2019-01-15 System Envelope Implementation accessories NHP-2018-2019-JH-684716-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-DE / Handheld current IBRD / 87250 Post Open - National 38,461.54 0.00 2018-10-15 2018-12-17 2019-01-31 System Quotations Envelope Implementation meters with accessories NHP-2018-2019-JH-928273-GO- Water Resources Monitoring Request for Single Stage - One Pending SH-SCB / Purchase of DGPS IBRD / 87250 Post Open - National 39,230.77 0.00 2018-08-16 2018-09-14 2018-10-15 System Quotations Envelope Implementation and GPS Handheld NHP-2018-2019-JH-595199-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 24,615.38 0.00 2018-08-16 2018-10-22 2018-12-06 SH-SCB / Resistivitymeter System Quotations Envelope Implementation IN-JHARKHAND -21443-GO- Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,846.15 0.00 2017-10-11 2017-11-30 2018-01-14 RFQ / Purchase of GPS (10 nos) System Quotations Envelope Implementation NHP-2018-2019-KLGW-891280 / Water Resources Monitoring Request for Single Stage - One Pending IT equipments-desktop IBRD / 87250 Post Open - National 16,923.08 0.00 2018-09-20 2018-11-15 2019-05-14 System Quotations Envelope Implementation computers NHP-2018-2019-KLGW-341034 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,461.54 0.00 2018-08-01 2018-09-26 2019-03-25 Handheld GPS System Quotations Envelope Implementation NHP-2018-2019-KLGW-462066 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 2,307.69 0.00 2018-09-04 2018-10-30 2019-04-28 IT equipments-Audio visual System Quotations Envelope Implementation NHP-2018-2019-KLGW-224157 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 46,153.85 0.00 2018-08-21 2018-10-16 2019-04-14 Lab equipments System Quotations Envelope Implementation NHP-2018-2019-KLGW-992950 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 23,076.92 0.00 2018-07-20 2018-09-14 2019-03-13 Lab equipments System Quotations Envelope Implementation NHP-2018-2019-KLGW-562650 / Water Resources Information Request for Single Stage - One Pending Pahlmlets/GW year IBRD / 87250 Post Open - National 1,538.46 0.00 2018-10-03 2018-11-28 2019-05-27 Systems Quotations Envelope Implementation books/awareness NHP-2018-2019-KLGW-912195 / Water Resources Monitoring Request for Single Stage - One Pending IT equipments-Communication IBRD / 87250 Post Open - National 1,538.46 0.00 2018-09-06 2018-11-01 2019-04-30 System Quotations Envelope Implementation equipment NHP-2018-2019-KLGW-679062 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 6,153.85 0.00 2018-09-06 2018-11-01 2019-04-30 IT equipments-Photocopier System Quotations Envelope Implementation Page 11 NHP-2018-2019-KLGW-420492 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 2,307.69 0.00 2018-09-06 2018-11-01 2019-04-30 IT equipments-printer/plotter System Quotations Envelope Implementation NHP-2018-2019-KLGW-891308 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 461.54 0.00 2018-09-06 2018-11-01 2019-04-30 IT equipments-scanner System Quotations Envelope Implementation NHP-2018-2019-KLGW-623599 / Water Resources Monitoring Request for Single Stage - One Pending IT equipments-storage and IBRD / 87250 Post Open - National 615.38 0.00 2018-09-06 2018-11-01 2019-04-30 System Quotations Envelope Implementation backup device NHP-2018-2019-KLGW-810820 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 24,615.38 0.00 2018-09-20 2018-11-15 2019-05-14 IT equipments-Laptop computers System Quotations Envelope Implementation NHP-2018-2019-KLGW-365669 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,846.15 0.00 2018-09-15 2018-11-10 2019-05-09 IT equipments-server System Quotations Envelope Implementation NHP-2018-2019-KLGW-339117 / Water Resources Monitoring Request for Single Stage - One Pending IT equipments-Workstation IBRD / 87250 Post Open - National 9,230.77 0.00 2018-10-20 2018-12-15 2019-06-13 System Quotations Envelope Implementation computers NHP-2018-2019-KLGW-805987 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 2,307.69 0.00 2018-10-20 2018-12-15 2019-06-13 IT equipments-UPS System Quotations Envelope Implementation NHP-2018-2019-KLGW-485006 / Water Resources Monitoring Request for Single Stage - One Pending IT equipments-videoconferencing IBRD / 87250 Post Open - National 4,615.38 0.00 2018-09-06 2018-11-01 2019-04-30 System Quotations Envelope Implementation unit NHP-2018-2019-KLGW-992750 / Supply and installation of Water Resources Monitoring Single Stage - Two Pending DWLR(telemetry) and Supply IBRD / 87250 Post Request for Bids Open - National 369,230.77 0.00 2018-10-01 2018-10-06 2018-11-17 2019-01-30 2019-03-06 2024-09-05 System Envelope Implementation and installation of DWLR(telemetry)with EC probe NHP-2018-2019-UK-541991 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 63,923.08 0.00 2018-08-18 2018-10-18 2019-01-16 Procurement of ADCP System Quotations Envelope Implementation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-BBMB-18692-NC-DIR / O&M Water Resources Operations Pending of RTDSS Developed under HP-II IBRD / 87250 Prior Direct Selection Direct 77,400.00 0.00 2017-06-30 2017-07-14 2017-08-17 2018-08-17 and Planning System Implementation by M/DHI on Mike Software IN-TELENGANA SW-20164-NC- Water Resources Information Request for Single Stage - One Pending RFQ / Digitization of Historical IBRD / 87250 Post Open - National 10,769.23 0.00 2017-09-17 2017-11-12 2018-05-11 Systems Quotations Envelope Implementation Data IN-HIMACHAL PRADESH-20303- Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,385.00 0.00 2018-03-20 2018-05-15 2018-11-11 NC-RFQ / Information Product Systems Quotations Envelope Implementation IN-ANDHRA PRADESH SW- Water Resources Information Request for Single Stage - One Pending 21933-NC-RFQ / Digitization / IBRD / 87250 Post Limited 14,230.76 0.00 2018-01-15 2018-03-12 2018-09-08 Systems Quotations Envelope Implementation Scanning of Reports, Documents IN-ANDHRA PRADESH SW- Water Resources Monitoring Request for Single Stage - One Pending 21951-NC-RFQ / AMC contact IBRD / 87250 Post Limited 103,846.15 0.00 2017-11-05 2017-12-31 2018-06-29 System Quotations Envelope Implementation for Existing Rain Gauge Stations IN-ANDHRA PRADESH SW- Water Resources Information Request for Single Stage - One Pending 21957-NC-RFQ / Printing & IBRD / 87250 Post Limited 4,615.38 0.00 2017-10-21 2017-12-16 2018-06-14 Systems Quotations Envelope Implementation Publications IN-GUJARAT SW-24284-NC- Water Resources Monitoring Single Stage - One Pending RFB / Bathymatric Survey of IBRD / 87250 Post Request for Bids Open - National 38,461.54 0.00 2017-08-15 2017-09-01 2017-09-30 2017-10-05 2017-11-15 2018-06-30 System Envelope Implementation Ukai Reservoir. IN-TELENGANA SW-24399-NC- Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 50,769.23 0.00 2017-12-17 2018-02-11 2018-08-10 RFQ / Digitisation of Data Systems Quotations Envelope Implementation Institutional Capacity Enhancement IN-MAHARASHTRA SW-32436- Water Resources Operations NC-RFQ / Digitize paper data, and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,384.62 0.00 2018-01-06 2018-03-03 2018-08-30 documents, design, drawing and Water Resources Monitoring Quotations Envelope Implementation scanned reports for Tapi basin. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-32444- Water Resources Operations NC-RFQ / Digitize paper data, and Planning System Request for Single Stage - One Pending documents, design, drawing & IBRD / 87250 Post Open - National 20,000.00 0.00 2018-01-06 2018-03-03 2018-08-30 Water Resources Monitoring Quotations Envelope Implementation scanned reports for Godawari System basin of Marathwada region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-32448- Water Resources Operations NC-RFQ / Digitize paper data, and Planning System Request for Single Stage - One Pending documents, design drawings and IBRD / 87250 Post Open - National 18,461.54 0.00 2018-01-06 2018-03-03 2018-08-30 Water Resources Monitoring Quotations Envelope Implementation scanned reports for Godawari System basin of Vidharbha region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-32450- Water Resources Operations NC-RFQ / Digitize paper data, and Planning System Request for Single Stage - One Pending documents, design, drawings IBRD / 87250 Post Open - National 23,076.92 0.00 2018-01-06 2018-03-03 2018-08-30 Water Resources Monitoring Quotations Envelope Implementation and scanned reports for Krishna System basin. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-32453- Water Resources Operations NC-RFQ / Digitize paper data, and Planning System Request for Single Stage - One Pending documents, design, drawing and IBRD / 87250 Post Open - National 15,384.62 0.00 2018-01-06 2018-03-03 2018-08-30 Water Resources Monitoring Quotations Envelope Implementation scanned reports for West System Flowing Rivers of Konkan region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33477- Water Resources Operations NC-RFQ / Hiring charges for and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 53,846.15 0.00 2017-12-09 2018-02-03 2018-08-02 vehicles during implementation of Water Resources Monitoring Quotations Envelope Implementation NHP for Amravati Division. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33479- Water Resources Operations NC-RFQ / Hiring charges for and Planning System Request for Single Stage - One Pending vehicles during Implementation of IBRD / 87250 Post Open - National 123,076.92 0.00 2017-12-09 2018-02-03 2018-08-02 Water Resources Monitoring Quotations Envelope Implementation NHP for Godavari basin of System Marathwada region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33482- Water Resources Operations NC-RFQ / Hiring charges for and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 76,923.08 0.00 2017-12-09 2018-02-03 2018-08-02 vehicles during implementation of Water Resources Monitoring Quotations Envelope Implementation NHP for Krishna Basin. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33483- Water Resources Operations NC-RFQ / Hiring charges for and Planning System Request for Single Stage - One Pending vehicles during Implementation of IBRD / 87250 Post Open - National 76,923.08 0.00 2017-12-09 2018-02-03 2018-08-02 Water Resources Monitoring Quotations Envelope Implementation NHP for Godavari basin for System Vidharbha region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33485- Water Resources Operations NC-RFQ / Hiring charges for and Planning System Request for Single Stage - One Pending vehicles during Implementation of IBRD / 87250 Post Open - National 53,846.15 0.00 2017-12-09 2018-02-03 2018-08-02 Water Resources Monitoring Quotations Envelope Implementation NHP for West flowing rivers of System Kokan basin. Water Resources Information Systems IN-JHARKHAND -36311-NC- Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 14,769.23 0.00 2017-12-24 2018-02-18 2018-03-11 RFQ / Hiring of vehicles Enhancement Quotations Envelope Implementation IN-DVC-38264-NC-RFQ / Pre Monsoon Survey of river cross- section to prepare Area-Elevation Water Resources Monitoring Request for Single Stage - One Under Chart for calculation of river IBRD / 87250 Post Open - National 2,685.00 2,444.66 2017-11-30 2018-05-16 2018-01-25 2018-07-24 System Quotations Envelope Implementation discharge and gauge fixing on River Damodar and Barakar under NHP. IN-DVC-38266-NC-RFQ / River cross section survey from D/S of Konar & Tenughat Dam upto U/S Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 12,769.00 12,814.59 2017-11-30 2018-05-16 2018-01-25 2018-04-25 of Panchet Dam and from D/S of System Quotations Envelope Implementation Panchet Dam to Damodar Bridge on river Damodar. IN-DVC-38267-NC-RFQ / Hiring Water Resources Information Request for Single Stage - One Under IBRD / 87250 Post Open - National 10,684.00 10,113.64 2017-12-06 2018-05-16 2018-01-31 2019-01-31 of 3 nos Data Entry Operators Systems Quotations Envelope Implementation IN-DVC-38272-NC-RFQ / Operation and maintenance of Water Resources Monitoring Request for Single Stage - One Under IBRD / 87250 Post Open - National 93,500.00 89,395.03 2017-11-30 2018-01-25 2020-01-25 Hydrological sites of DVC under System Quotations Envelope Implementation National Hydrology Project (NHP) IN-SOI-51084-NC-RFB / Providing Services for Generation Water Resources Information Single Stage - Two Under of GIS ready database for river IBRD / 87250 Prior Request for Bids Open - International 4,307,692.31 0.00 2018-03-12 2018-05-08 2018-04-06 2018-08-10 2018-05-21 2018-08-03 2018-09-07 2020-02-29 Systems Envelope Implementation basins/deltas covering area of approximately 803402 sq. kms. IN-SOI-51103-NC-RFB / Provision of services for Water Resources Information Single Stage - Two Under Acquisition, Processing and IBRD / 87250 Prior Request for Bids Open - International 12,807,692.30 0.00 2018-03-12 2018-05-09 2018-04-11 2018-08-08 2018-05-26 2018-09-08 2018-10-13 2019-08-09 Systems Envelope Implementation Delivery of DEM and Digital Ortho- Image Institutional Capacity Enhancement IN-MAHARASHTRA SW-33464- Water Resources Operations NC-DIR / Installation of Internet and Planning System Pending lease line and its recurrent IBRD / 87250 Post Direct Selection Direct 23,076.92 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 Water Resources Monitoring Implementation charges for Divisional data System center for Tapi basin. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33466- Water Resources Operations NC-DIR / Installation of Internet and Planning System Pending lease line & its recurrent charges IBRD / 87250 Post Direct Selection Direct 46,153.85 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 Water Resources Monitoring Implementation of Data Center for Godavari basin System in Marathwada region. Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33470- Water Resources Operations NC-DIR / Installation of Internet and Planning System Pending lease line and its recurrent IBRD / 87250 Post Direct Selection Direct 15,384.62 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 Water Resources Monitoring Implementation charges for Divisional data center System for Krishna basin. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33468- Enhancement NC-DIR / Installation of Internet Water Resources Operations lease line and its recurrent and Planning System Pending IBRD / 87250 Post Direct Selection Direct 23,076.92 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 charges for Divisional data center Water Resources Monitoring Implementation for Godavari basin in Vidharbha System region. Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33472- Enhancement NC-DIR / Installation of Internet Water Resources Operations lease line and its recurrent and Planning System Pending IBRD / 87250 Post Direct Selection Direct 23,076.92 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 charges for Divisional data center Water Resources Monitoring Implementation for West flowing rivers in Kokan System basin Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33474- Water Resources Operations NC-DIR / Installation of Internet and Planning System Pending lease line & its recurrent charges IBRD / 87250 Post Direct Selection Direct 23,076.92 0.00 2018-07-31 2018-08-05 2018-09-09 2019-03-08 Water Resources Monitoring Implementation for Basin Simulation Division data System center. Water Resources Information Systems IN-BIHAR/WRD/FMISC/NHP- SW/NC-RFB-01 / Conducting Water Resources Monitoring Single Stage - Two Pending River Cross-Section Survey of IBRD / 87250 Post Request for Bids Open - National 76,923.00 0.00 2018-12-31 2019-01-05 2019-02-16 2019-05-01 2019-06-05 2019-12-02 System Envelope Implementation Chandan River for Chandan Dam Break Analysis. IN-CGWB-62250-NC-RFQ / Water Resources Operations Request for Single Stage - One IBRD / 87250 Post Open - National 10,770.00 0.00 Canceled 2018-05-11 2018-05-16 2018-11-12 Hiring of 2 Nos vehicles and Planning System Quotations Envelope IN-WEST BENGAL SW-38551- Water Resources Monitoring Request for Single Stage - One Pending NC-RFB / Field Surveys related IBRD / 87250 Post Limited 30,769.23 0.00 2018-11-03 2018-12-01 2018-12-31 System Quotations Envelope Implementation with Benchmark and RL Surveys IN-WEST BENGAL SW-38552- Water Resources Monitoring Request for Single Stage - One Pending NC-RFB / Bathymetric Survey in IBRD / 87250 Post Limited 7,692.31 0.00 2018-07-27 2018-08-25 2018-09-24 System Quotations Envelope Implementation Sundarban Estuaries NHP-2018-2019-WBSW-330978- Water Resources Monitoring Request for Single Stage - One Pending NC-SH-QU / Geneartion of rating IBRD / 87250 Post Limited 9,230.77 0.00 2018-07-25 2018-08-28 2018-10-27 System Quotations Envelope Implementation curve at Jalpaiguri on river Teesta NHP-2018-2019-WBSW-747669- NC-SH-QU / Establishment of Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-08-31 2018-10-15 2019-02-12 State WRIS and integration with Systems Quotations Envelope Implementation National WRIS NHP-2018-2019-WBSW-758134- Water Resources Monitoring Request for Single Stage - One Pending NC-SH-QU / Bathymetric Survey IBRD / 87250 Post Limited 7,692.31 0.00 2018-11-01 2018-12-12 2019-02-10 System Quotations Envelope Implementation in Sundarban Estuaries NHP-2018-2019-WBSW-968183- Water Resources Monitoring Request for Single Stage - One Pending NC-SH-QU / Bathymetric Survey IBRD / 87250 Post Limited 7,692.31 0.00 2018-08-01 2018-09-17 2019-01-15 System Quotations Envelope Implementation of medium reservoirs in Purulia NHP-2018-2019-APGW-130792 Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 23,076.92 0.00 2018-09-08 2018-11-03 2019-05-02 / Printing of year book Systems Quotations Envelope Implementation NHP-2018-2019-APGW-691010 Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 30,769.23 0.00 2018-09-08 2018-11-03 2019-05-02 / Digitization of old reports Systems Quotations Envelope Implementation NHP-2018-2019-GA-798437-NC- Water Resources Monitoring Single Stage - Two Pending NCB-DE / AMC for 5 yrs for IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2018-09-10 2018-09-15 2018-10-27 2019-01-09 2019-02-13 2019-08-12 System Envelope Implementation instruments installed under HP-II NHP-2018-2019-ML-281079-NC- Water Resources Monitoring Request for Single Stage - One Pending SH-LM / Geo-referencing of IBRD / 87250 Post Limited 307.69 0.00 2018-10-10 2018-12-05 2019-06-03 System Quotations Envelope Implementation monitoring wells NHP-2018-2019-JH-628571-NC- SH-QU / Time to time survey of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-11-05 2018-12-24 2019-02-07 river cross sections where GDs System Quotations Envelope Implementation are established NHP-2018-2019-JH-522893-NC- Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 15,384.62 0.00 2018-08-24 2018-10-15 2018-11-16 SH-QU / Hiring of vehicles Enhancement Quotations Envelope Implementation Page 12 NHP-2018-2019-JH-772380-NC- SH-QU / Hiring of Non-Technical Staff such as Institutional Capacity Request for Single Stage - One Pending assistants,accountant, Data IBRD / 87250 Post Open - National 22,153.85 0.00 2018-10-03 2018-11-26 2018-12-26 Enhancement Quotations Envelope Implementation Entry Operator, Program assistant, Multi Tasking Staff, Field Staff etc NHP-2018-2019-JH-839564-NC- Water Resources Information Request for Single Stage - One Pending SH-QU / Digitization/Scanning of IBRD / 87250 Post Open - National 9,230.77 0.00 2018-10-01 2018-11-19 2019-02-18 Systems Quotations Envelope Implementation reports, documents NHP-2018-2019-JH-119283-NC- Water Resources Monitoring Request for Single Stage - One Pending SH-QU / River Cross section IBRD / 87250 Post Open - National 9,230.77 0.00 2018-11-03 2018-12-17 2019-01-30 System Quotations Envelope Implementation Surveys NHP-2018-2019-JH-307342-NC- SH-QU / Hiring of Technical Expert such as GIS, RS, IT, MIS, Institutional Capacity Request for Single Stage - One Pending IBRD / 87250 Post Open - National 29,538.46 0.00 2018-12-23 2019-02-18 2019-03-20 Procurement, Modeller, geo- Enhancement Quotations Envelope Implementation physist, chemist, GW modeller, Laboratory staff etc NHP-2018-2019-KASW-314165- Water Resources Monitoring Request for Single Stage - One Pending CW-SH-QU / Bathymetric survey IBRD / 87250 Post Limited 64,615.38 0.00 2018-09-13 2018-11-08 2019-05-07 System Quotations Envelope Implementation of reserviors NHP-2018-2019-DVC-578685 / Sedimentation survey of 4 nos Water Resources Operations Single Stage - Two Pending Reservoirs of DVC which are IBRD / 87250 Post Request for Bids Open - National 107,496.23 0.00 2018-07-15 2018-07-20 2018-08-31 2018-11-13 2018-12-18 2019-12-18 and Planning System Envelope Implementation Maithon, Panchet, Tilaiya & Konar. NHP-2018-2019-RJ-566978 / Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 307,692.31 0.00 2018-07-30 2018-08-04 2018-09-15 2018-11-28 2019-01-02 2019-07-01 River cross section surveys System Envelope Implementation NHP-2018-2019-RJ-474314 / Water Resources Information Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 223,076.92 0.00 2018-07-30 2018-08-04 2018-09-15 2018-11-28 2019-01-02 2019-07-01 Data digitization Systems Envelope Implementation IN-DVC-38268-NC-RFQ / Sedimentation Survey of 4 nos. Water Resources Operations Request for Single Stage - One Reservoirs of DVC which are at IBRD / 87250 Post Open - National 92,308.00 0.00 Canceled 2017-12-20 2018-02-14 2019-02-14 and Planning System Quotations Envelope Maithon, Panchet, Tilaiya & Konar NHP-2018-2019-DVC-779735- NC-SH-DE / Survey work related to development of Inflow Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 61,538.46 0.00 2018-09-20 2018-11-15 2019-03-15 Forecasting system from D/S of and Planning System Quotations Envelope Implementation Durgapur Barrage upto outfall of Damodar River. NHP-2018-2019-DVC-559899- Water Resources Information Request for Single Stage - One Pending NC-SH-DE / Hiring of 3 nos. data IBRD / 87250 Post Open - National 12,861.54 0.00 2018-11-20 2019-01-15 2020-01-15 Systems Quotations Envelope Implementation entry operator under NHP NHP-2018-2019-DVC-266749- NC-SH-DE / Pre monsoon River cross section survey work at Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 3,167.77 0.00 2018-08-05 2018-09-30 2018-10-30 different hydrological sites of System Quotations Envelope Implementation DVC on river damodar and barakar. NHP-2018-2019-DVC-308378- NC-SH-DE / Establishment of Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 18,461.54 0.00 2018-09-20 2018-11-15 2019-02-13 Bench mark and Gauge staff System Quotations Envelope Implementation near the Radar sites NHP-2018-2019-DVC-889370- Water Resources Monitoring Request for Single Stage - One Pending NC-SH-DE / River cross section IBRD / 87250 Post Open - National 16,923.08 0.00 2018-09-20 2018-11-15 2019-03-15 System Quotations Envelope Implementation survey of Lower Damodar NHP-2018-2019-DVC-574266- CS-QCBS-NAT / Development of Water Resources Information Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2019-02-06 2019-03-28 2019-04-27 Web application for Damodar Systems Quotations Envelope Implementation catchment including reservoirs. Institutional Capacity Enhancement NHP-2018-2019-UPGW-646305- Water Resources Operations NC-SH-QU / Development / and Planning System Request for Single Stage - One Pending IBRD / 87250 Post Open - National 7,692.31 0.00 2018-09-06 2018-11-01 2019-04-30 Procurement of Spatial Water Resources Monitoring Quotations Envelope Implementation Databases System Water Resources Information Systems Institutional Capacity Enhancement Water Resources Operations NHP-2018-2019-UPGW-300500- and Planning System Request for Single Stage - One Pending NC-SH-QU / UPDATION OF IBRD / 87250 Post Open - National 7,692.31 0.00 2018-10-06 2018-12-01 2019-05-30 Water Resources Monitoring Quotations Envelope Implementation WEBSITE System Water Resources Information Systems NHP-2018-2019-JH-843692-NC- Water Resources Monitoring Single Stage - Two Pending IBRD / 87250 Post Request for Bids Open - National 608,923.08 0.00 2018-08-31 2018-09-06 2018-10-23 2019-01-17 2019-02-26 2019-03-28 NCB-DE / RTDAS system System Envelope Implementation NHP-2018-2019-KLGW-180325 / Mapping of GW quality in the Water Resources Operations Request for Single Stage - One Pending IBRD / 87250 Post Open - National 13,076.92 0.00 2018-08-21 2018-10-16 2019-04-14 industrial belt of Ernakulam and Planning System Quotations Envelope Implementation district NHP-2018-2019-KLGW-423895 / Water Resources Information Request for Single Stage - One Pending Digitisation of Data IBRD / 87250 Post Open - National 23,076.92 0.00 2018-08-25 2018-10-20 2019-06-17 Systems Quotations Envelope Implementation /Reports/Maps etc NHP-2018-2019-KLGW-542034 / Water Resources Monitoring Request for Single Stage - One Pending IBRD / 87250 Post Open - National 11,538.46 0.00 2018-10-06 2018-12-01 2019-05-30 RL survey System Quotations Envelope Implementation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-MOWR RD-GR-9255-CS- QCBS / Consultancy for Water Resources Operations Quality And Cost- Under Technical Assistance and IBRD / 87250 Prior Open - International 15,384,600.00 0.00 2017-03-08 2017-03-08 2017-03-08 2017-03-08 2017-03-08 2017-04-12 2017-05-17 2018-05-17 and Planning System Based Selection Implementation Management Consultants (TAMC). IN-HIMACHAL PRADESH-20293- Consultant Water Resources Monitoring Pending CS-INDV / SCADA Automation of IBRD / 87250 Post Qualification Open - National 38,462.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-10-21 System Implementation Tube-wells (FY:2017-18) Selection IN-HIMACHAL PRADESH-20378- CS-INDV / DSS for Sub River Basin Giri River, Sal (Chamba) , Gaj and Banoor Khad Water Resources Operations Quality And Cost- Pending IBRD / 87250 Post Open - National 100,000.00 0.00 2017-12-11 2018-01-01 2018-02-14 2018-03-14 2018-04-13 2018-05-18 2018-06-22 2019-06-22 (Kangra)Seer Khad & Dehra and and Planning System Based Selection Implementation Developing Water Storage Capacity of Seasonal Stream in Himachal Pradesh IN-MEGHALAYA -20423-CS- Consultant Water Resources Monitoring CQS / Consultancy services for IBRD / 87250 Post Qualification Open - National 16,000.00 15,293.96 Completed 2017-07-13 2017-07-05 2017-08-03 2017-09-16 2017-08-23 2017-10-16 2017-10-12 2017-11-20 2017-10-23 2018-05-19 2018-03-22 System design of State Data Centre Selection IN-ANDHRA PRADESH SW- 21934-CS-LCS / Consultancy Water Resources Information Pending IBRD / 87250 Post Least Cost Selection Open - National 92,307.69 0.00 2017-11-15 2017-12-06 2018-01-19 2018-02-16 2018-03-18 2018-04-22 2018-05-27 2018-11-23 Services for Hosting Website & Systems Implementation Maintenance IN-ANDHRA PRADESH SW- 22030-CS-QCBS / Development Water Resources Operations Quality And Cost- Pending IBRD / 87250 Prior Open - National 615,384.61 0.00 2017-11-30 2017-12-21 2018-02-03 2018-03-03 2018-04-02 2018-05-07 2018-06-11 2019-06-11 of IWRM & Decision support and Planning System Based Selection Implementation systems IN-ANDHRA PRADESH SW- Consultant Water Resources Monitoring Pending 22040-CS-CQS / River cross IBRD / 87250 Post Qualification Open - National 107,076.92 0.00 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 System Implementation section surveys Selection IN-TELENGANA GW-23248-CS- QCBS / Consultancy Services for Study to delineate basin wise subsurface geometry in 3D using Water Resources Operations Quality And Cost- Pending existing data and evaluation of IBRD / 87250 Post Open - National 738,460.00 0.00 2018-01-18 2018-02-08 2018-03-24 2018-04-21 2018-05-21 2018-06-25 2018-07-30 2021-07-29 and Planning System Based Selection Implementation aquifer characteristics in Telangana region to develop comprehensive ground water Atlas IN-ASSAM -24094-CS-CQS / Consultant Consultancy service for State Water Resources Monitoring Pending IBRD / 87250 Post Qualification Open - National 23,076.00 0.00 2017-08-07 2017-08-21 2017-09-11 2017-09-14 2017-09-20 2019-03-14 Data Centre (3.5Lakh is approved System Implementation Selection in annual work plan for 2016-17) IN-TELENGANA SW-24402-CS- Consultant Water Resources Information Pending CQS / Website Development & IBRD / 87250 Post Qualification Open - National 21,753.84 0.00 2017-11-20 2017-12-11 2018-01-24 2018-02-23 2018-03-30 2018-09-26 Systems Implementation Hosting Selection IN-TELENGANA SW-24426-CS- QCBS / IWRM for Godavari & Krishna Basin by developing River basin modeling (including Water Resources Operations Quality And Cost- Pending supply of Hardware and IBRD / 87250 Post Open - National 100,000.00 0.00 2018-01-10 2018-01-31 2018-03-16 2018-04-13 2018-05-13 2018-06-17 2018-07-22 2019-07-22 and Planning System Based Selection Implementation Software), Development of Data Ware Housing and Data Mining of Hydrological data and Development IN-TELENGANA SW-25078-CS- CQS / Preparation of Master Consultant Water Resources Operations Pending Plan of river basins on GIS IBRD / 87250 Post Qualification Open - National 30,769.23 0.00 2017-11-16 2017-12-07 2018-01-20 2018-02-19 2018-03-26 2018-09-22 and Planning System Implementation Platform( including supply of Selection Hardware and software) Consultant IN-TELENGANA SW-25088-CS- Water Resources Information Pending IBRD / 87250 Post Qualification Open - National 4,569.23 0.00 2018-01-27 2018-02-17 2018-04-02 2018-05-02 2018-06-06 2018-12-03 CQS / Development of Videos Systems Implementation Selection IN-BIHAR/WRD/FMISC/NHP- SW/CS-CQS-01 / Planning, Consultant Water Resources Monitoring Under Designing and Architectural IBRD / 87250 Post Qualification Open - National 15,385.00 0.00 2017-11-30 2017-03-06 2017-11-30 2018-01-14 2018-01-13 2018-02-13 2018-07-12 2018-03-20 2018-05-19 System Implementation Layout of Water Knowledge Selection Center, Bihar at Patna. IN-MOWR RD-GR-31816-CS- QCBS / Consultancy services for Institutional Capacity Quality And Cost- IBRD / 87250 Prior Open - International 15,384,600.00 18,521,033.83 Signed 2017-10-12 2017-10-12 2017-10-13 2017-10-12 2017-10-13 2017-10-12 2017-10-13 2017-10-12 2017-10-15 2017-10-12 2017-10-24 2017-10-12 2017-10-09 2018-10-12 hiring Technical Assistance and Enhancement Based Selection management Consultancy IN-WEST BENGAL GW-32653- Water Resources Information Quality And Cost- Pending CS-QCBS / Web Hosting for IBRD / 87250 Post Open - National 7,599.27 0.00 2017-10-26 2017-11-02 2017-11-14 2017-11-21 2017-11-28 2017-12-12 2017-12-18 2018-01-17 Systems Based Selection Implementation NHP_WB(GW) Institutional Capacity Enhancement IN-MAHARASHTRA SW-33228- Water Resources Operations CS-QCBS / NABL Accreditation and Planning System Quality And Cost- Pending IBRD / 87250 Post Open - National 61,538.46 0.00 2018-01-31 2018-02-21 2018-04-06 2018-05-04 2018-06-03 2018-07-08 2018-08-12 2019-08-12 of Existing Water Quality Labs in Water Resources Monitoring Based Selection Implementation State. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33349- Water Resources Operations CS-QCBS / Development of and Planning System Quality And Cost- Pending IBRD / 87250 Post Open - National 30,769.23 0.00 2017-12-25 2018-01-15 2018-02-28 2018-03-28 2018-04-27 2018-06-01 2018-07-06 2019-07-06 Mobile Application for RTSF & Water Resources Monitoring Based Selection Implementation ROS of Krishna & Bhima Basin. System Water Resources Information Systems Institutional Capacity IN-MAHARASHTRA SW-33356- Enhancement CS-QCBS / Comprehensive River Water Resources Operations Basin Planning for Water and Planning System Quality And Cost- Pending Management of Entire Godavari IBRD / 87250 Post Open - National 407,692.31 0.00 2018-02-26 2018-03-19 2018-05-02 2018-05-30 2018-06-29 2018-08-03 2018-09-07 2019-09-07 Water Resources Monitoring Based Selection Implementation Basin in Marathwada Region with System compatibility to proposed IWRM Water Resources Information study up to Jayakwadi Dam. Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33358- Water Resources Operations CS-QCBS / River Basin planning and Planning System Quality And Cost- Pending for Water management for IBRD / 87250 Post Open - National 584,615.38 0.00 2018-02-26 2018-03-19 2018-05-02 2018-05-30 2018-06-29 2018-08-03 2018-09-07 2019-09-07 Water Resources Monitoring Based Selection Implementation Godavari Basin in Vidharbha System Region Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33360- Water Resources Operations CS-QCBS / River Basin planning and Planning System Quality And Cost- Pending IBRD / 87250 Post Open - National 230,769.23 0.00 2018-03-31 2018-04-21 2018-06-04 2018-07-02 2018-08-01 2018-09-05 2018-10-10 2019-10-10 for Water management for Water Resources Monitoring Based Selection Implementation Krishna Basin. System Water Resources Information Systems Institutional Capacity Enhancement IN-MAHARASHTRA SW-33488- Water Resources Operations CS-QCBS / Up gradation of and Planning System Quality And Cost- Pending IBRD / 87250 Post Open - National 38,461.54 0.00 2018-01-01 2018-01-22 2018-03-07 2018-04-04 2018-05-04 2018-06-08 2018-07-13 2019-07-13 existing Web Portal for RTDAS & Water Resources Monitoring Based Selection Implementation ROS. System Water Resources Information Systems IN-SIKKIM -18688-CS-CQS / Procurement of Architectural Consultant vide PID no:84 of PP Consultant Water Resources Monitoring Under 2016-17, is proposed in CQS IBRD / 87250 Post Qualification Open - National 30,769.00 0.00 2017-08-03 2017-07-28 2017-09-08 2017-09-22 2017-09-15 2017-09-26 2017-10-14 2017-10-12 2018-02-09 System Implementation method as advised by NPMU Selection and WB Officials at Guwahati Workshop on 5-9th June. IN-CWC-NHP-12586-CS-QCBS / To equip MoWR, RD&GR, CWC, CGWB and states with rational water-related assessment and Water Resources Operations Quality And Cost- planning at basin level, through IBRD / 87250 Prior Open - International 7,253,731.00 0.00 Canceled 2017-12-21 2017-12-21 2017-12-21 2017-12-21 2017-12-21 2018-01-18 2018-02-17 2018-03-24 2018-04-28 2019-04-28 and Planning System Based Selection the development and application for 3 basins in India (Godavari Basin, Krishna Basin and Mahanadi Basin). IN-CWC-NHP-40711-CS-QCBS / Cost Estimate of IWRM Study of Water Resources Operations Quality And Cost- Under Krishna & Godavari River Basin IBRD / 87250 Prior Open - International 6,000,000.00 0.00 2017-12-21 2017-12-21 2017-12-21 2017-12-21 2017-12-22 2018-01-13 2018-01-19 2018-04-05 2018-02-18 2018-07-12 2018-03-25 2018-04-29 2019-04-29 and Planning System Based Selection Implementation for Package-I(Krishna & Godawari Basin) IN-CWC-NHP-40721-CS-QCBS / Cost Estimate of IWRM Study of Water Resources Operations Quality And Cost- Under IBRD / 87250 Prior Open - International 4,000,000.00 0.00 2017-12-21 2017-12-21 2017-12-21 2017-12-21 2017-12-22 2018-01-13 2018-01-19 2018-04-05 2018-02-18 2018-07-12 2018-03-25 2018-04-29 2019-04-29 Krishna & Godavari River Basin and Planning System Based Selection Implementation for Package-II(Mahanadi Basin) IN-DVC-38274-CS-QCBS / Inflow Forecasting system and Stream Water Resources Operations Quality And Cost- Pending flow measurement for Damodar IBRD / 87250 Post Open - National 384,615.00 0.00 2018-01-15 2018-02-05 2018-03-21 2018-04-18 2018-05-18 2018-06-22 2018-07-27 2019-07-27 and Planning System Based Selection Implementation Basin upto outfall of Damodar River IN-UTTARAKHAND-53352-CS- CQS / Consultancy services for Planning, Designing and Consultant Water Resources Information Pending Architectural layout of State IBRD / 87250 Post Qualification Open - National 38,461.00 0.00 2018-06-11 2018-06-12 2018-06-14 2018-06-15 2018-06-17 2019-04-10 Systems Implementation Water Informatics Center (SWIC) Selection at Roorkee under National Hydrology Project. IN-KERALA SW-59043-CS-CQS / Hiring of Consultancy Services for preparation of bankable report for Rejuvenation of Meenachil, Consultant Water Resources Monitoring Pending Periyar, Bharathapuzha, Kallayi IBRD / 87250 Post Qualification Open - International 275,967.72 0.00 2018-04-13 2018-05-04 2018-06-17 2018-07-17 2018-08-21 2019-02-17 System Implementation & Valapattanam Rivers and Selection Sasthamkotta, Ashtamudi & Vembanad Lakes through cleaning and removal of wastes Page 13 IN-MIZORAM -59384-CS-CQS / Consultant Selection of Consultant for Water Resources Monitoring Pending IBRD / 87250 Post Qualification Open - National 15,400.00 0.00 2018-04-16 2018-04-16 2018-04-16 2018-04-16 2018-04-16 2018-10-13 Design & Supervision of Southern System Implementation Selection Divisional Centre. IN-ANDHRA PRADESH GW- 59608-CS-CQS / Consultancy services for Planning, Designing and Architectural Layout for Consultant Institutional Capacity Pending construction of State Data Center IBRD / 87250 Post Qualification Open - National 38,462.00 0.00 2018-04-17 2018-05-08 2018-06-21 2018-07-21 2018-08-25 2019-02-21 Enhancement Implementation for both Surface Water & Ground Selection Water and Water Audit Department under National Hydrology Project IN-ANDHRA PRADESH GW- 53541-CS-QCBS / Draft EoI for Consultancy services for Planning, Designing and Architectural Layout for Institutional Capacity Quality And Cost- IBRD / 87250 Post Open - National 15,385.00 0.00 Canceled 2018-03-26 2018-04-16 2018-05-30 2018-06-27 2018-07-27 2018-08-31 2018-10-05 2019-10-05 construction of State Data Centre Enhancement Based Selection for both Surface Water & Ground Water and Water Audit Department under National Hydrology Project IN-SOI-21568-CS-QCBS / Procurement, Contract Institutional Capacity Quality And Cost- IBRD / 87250 Post Open - National 83,076.92 0.00 Canceled 2017-11-01 2017-11-22 2018-01-05 2018-02-02 2018-03-04 2018-04-08 2018-05-13 2019-05-13 Management and Project Enhancement Based Selection Management Specialists IN-SOI-21539-CS-QCBS / Water Resources Information Consultant for setting up of H/w Systems Quality And Cost- IBRD / 87250 Post Open - National 46,153.84 0.00 Canceled 2017-07-24 2017-07-24 2017-09-06 2017-10-04 2017-11-03 2017-12-08 2018-01-12 2019-01-12 infrastructure for geospatial data Institutional Capacity Based Selection production centres Enhancement IN-SOI-23705-CS-QCBS / MIS Institutional Capacity Quality And Cost- IBRD / 87250 Post Open - National 38,461.54 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13 assistant at PDO Enhancement Based Selection IN-BIHAR/WRD/FMISC/NHP- SW/CS-QCBS-02 / Development of Sone Canal Asset Management System for Water Resources Operations Quality And Cost- Pending IBRD / 87250 Post Open - National 307,692.30 0.00 2018-12-31 2019-01-21 2019-03-06 2019-04-03 2019-05-03 2019-06-07 2019-07-12 2021-01-12 Irrigation Management (using and Planning System Based Selection Implementation Online Web based Monitoring system and GIS Techniques) and as a Decision Support Tool IN-SOI-23001-CS-QCBS / Hiring of technical resources for spatial Water Resources Information Quality And Cost- IBRD / 87250 Post Open - National 44,046.15 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13 data editing and processing and Systems Based Selection QA/QC -10m DTM IN-BIHAR/WRD/FMISC/NHP- SW/CS-QCBS-01 / Development of Embankment Asset Water Resources Operations Quality And Cost- Under IBRD / 87250 Post Open - National 415,385.00 0.00 2018-05-22 2018-04-06 2018-06-12 2018-05-18 2018-07-26 2018-08-23 2018-09-22 2018-10-27 2018-12-01 2020-03-01 Management System for Gandak and Planning System Based Selection Implementation River basin with structuring of a Master module. NHP-2018-2019-MOWR-547786- NC-NCB-DE / Engagement of Institutional Capacity Pending IBRD / 87250 Post Least Cost Selection Open - National 138,461.54 0.00 2018-07-25 2018-08-15 2018-09-28 2018-10-26 2018-11-25 2018-12-30 2019-02-03 2019-08-02 Audit firm for Internal Audit (for 3 Enhancement Implementation Years duration) NHP-2018-2019-APGW-307654 Consultant Institutional Capacity Pending / Design of District Data Centers IBRD / 87250 Post Qualification Open - National 6,153.85 0.00 2018-09-03 2018-09-24 2018-11-07 2018-12-07 2019-01-11 2019-07-10 Enhancement Implementation at Chittoor and Eluru Selection NHP-2018-2019-GA-682090-CS- QCBS-NAT / Study of Water Resources Operations Quality And Cost- Pending river/coastal zone interaction, IBRD / 87250 Prior Open - National 1,692,307.69 0.00 2018-12-07 2018-12-28 2019-02-10 2019-03-10 2019-04-09 2019-05-14 2019-06-18 2020-06-17 and Planning System Based Selection Implementation erosion problems due to changing river flows, etc NHP-2018-2019-TSGW-954549 / Development of website, Village GW estimation software, data Water Resources Information Quality And Cost- Pending IBRD / 87250 Post Open - National 338,461.54 0.00 2018-09-10 2018-10-01 2018-11-14 2018-12-12 2019-01-11 2019-02-15 2019-03-22 2020-03-21 entry & analysis software, mobile Systems Based Selection Implementation app design, creation & automation of central DB NHP-2018-2019-TSGW-995210 / Comprehensive Planing for Consultant Water Resources Monitoring Pending interiors and Architecture for IBRD / 87250 Post Qualification Open - National 31,538.46 0.00 2018-07-23 2018-08-13 2018-09-26 2018-10-26 2018-11-30 2019-01-14 System Implementation DDCs, SDC and Training cum Selection Information Centres NHP-2018-2019-JH-309381 / Consultancy Services for Consultant Designing, Drawing and Water Resources Monitoring Pending IBRD / 87250 Post Qualification Open - National 33,846.15 0.00 2018-07-30 2018-08-06 2018-08-27 2018-09-10 2018-10-08 2018-11-22 Architectural Layout for System Implementation Selection Construction of state data and training center NHP-2018-2019-SK-962040-CS- Water Resources Information Pending LCS-NAT / Consultancy services IBRD / 87250 Post Least Cost Selection Open - National 4,615.38 0.00 2018-10-24 2018-10-26 2018-11-12 2018-11-27 2018-11-29 2018-12-03 2018-12-24 2019-03-24 Systems Implementation for developing Website NHP-2018-2019-RJ-601794-CS- Consultant Water Resources Information Pending QCBS-NAT / Development of IBRD / 87250 Post Qualification Open - National 46,153.85 0.00 2018-07-30 2018-08-20 2018-10-03 2018-11-02 2018-12-07 2019-06-05 Systems Implementation mobile application Selection NHP-2018-2019-RJ-796152-CS- Consultant Water Resources Information Pending QCBS-NAT / Create on line e- IBRD / 87250 Post Qualification Open - National 23,076.92 0.00 2018-08-01 2018-08-22 2018-10-05 2018-11-04 2018-12-09 2019-06-07 Systems Implementation library Selection NHP-2018-2019-RJ-444765-CS- Water Resources Operations Quality And Cost- Pending QCBS-NAT / River basin IBRD / 87250 Prior Open - National 1,230,769.23 0.00 2018-07-30 2018-08-20 2018-10-03 2018-10-31 2018-11-30 2019-01-04 2019-02-08 2020-02-08 and Planning System Based Selection Implementation management NHP-2018-2019-RJ-316692 / Consultant Water Resources Information Pending Consultancy services for IBRD / 87250 Post Qualification Open - National 8,538.46 0.00 2018-09-01 2018-09-22 2018-11-05 2018-12-05 2019-01-09 2019-07-08 Systems Implementation developing website Selection NHP-2018-2019-RJ-289949 / Study of water availability, Water Resources Operations Quality And Cost- Pending Dynamic land use land cover IBRD / 87250 Post Open - National 76,923.08 0.00 2018-07-30 2018-08-20 2018-10-03 2018-10-31 2018-11-30 2019-01-04 2019-02-08 2020-02-08 and Planning System Based Selection Implementation pattern and water quality for Bisalpur project NHP-2018-2019-RJ-760744 / Consultant Water Resources Monitoring Pending Consultancy for design, IBRD / 87250 Post Qualification Open - National 15,384.62 0.00 2018-08-16 2018-09-06 2018-10-20 2018-11-19 2018-12-24 2019-06-22 System Implementation architecture etc. Selection NHP-2018-2019-MHGW-296042- CS-LCS-NAT / Development and Water Resources Information Pending IBRD / 87250 Post Least Cost Selection Open - National 23,076.92 0.00 2018-12-30 2019-01-20 2019-03-05 2019-04-02 2019-05-02 2019-06-06 2019-07-11 2020-01-07 maintenance of hydrology project Systems Implementation web site NHP-2018-2019-CPCB-397370 / Water Resources Information Quality And Cost- Pending Development of Web bases IBRD / 87250 Post Open - National 76,923.08 0.00 2018-08-16 2018-09-06 2018-10-20 2018-11-17 2018-12-17 2019-01-21 2019-02-25 2020-02-25 Systems Based Selection Implementation system for data entry NHP-2018-2019-CPCB-519933 / Water Resources Monitoring Quality And Cost- Pending Bench marking of Quality IBRD / 87250 Post Open - National 307,692.31 0.00 2018-12-30 2019-01-20 2019-03-05 2019-04-02 2019-05-02 2019-06-06 2019-07-11 2020-07-10 System Based Selection Implementation Assurance in Water Quality labs NHP-2018-2019-CPCB-748617 / Consultancy for survey, identification and preparation of Water Resources Monitoring Quality And Cost- Pending IBRD / 87250 Prior Open - National 2,384,615.38 0.00 2018-07-25 2018-08-15 2018-09-28 2018-10-26 2018-11-25 2018-12-30 2019-02-03 2020-02-03 Nationwide compendium based System Based Selection Implementation on Basin sub basin Inventory of water Pollution NHP-2018-2019-KLGW-185873- Consultant Water Resources Monitoring Pending CS-SSS-SSS / Development of IBRD / 87250 Post Qualification Open - National 7,692.31 0.00 2018-11-01 2018-11-22 2019-01-05 2019-02-04 2019-03-11 2019-09-07 System Implementation mobile APPS Selection NHP-2018-2019-KLGW-288382 / Management of GW pumping for Consultant Water Resources Operations Pending Irrigation with special reference to IBRD / 87250 Post Qualification Open - National 7,692.31 0.00 2018-09-24 2018-10-15 2018-11-28 2018-12-28 2019-02-01 2019-07-31 and Planning System Implementation calcified zones in Palakkad Selection district INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-MOWR RD-GR-10073-CS- CDS / Hiring of Consultancy Firm Institutional Capacity Under IBRD / 87250 Prior Direct Selection Direct 62,200.00 0.00 2017-03-14 2017-03-24 2017-05-26 2017-05-28 2017-11-24 for Developing and Managing MIS Enhancement Implementation modules of NHP for 1 Year. IN-TELENGANA SW-25075-CS- INDV / Impact Studies of watersheds on water availability Water Resources Operations Individual Consultant Pending IBRD / 87250 Post Open 30,769.23 0.00 2017-12-19 2018-02-06 2018-02-27 2018-04-03 2018-09-30 in basins(including supply of the and Planning System Selection Implementation instrumentation ,Hardware and software) IN-TELENGANA SW-25080-CS- INDV / Study of water resources Water Resources Operations Individual Consultant Pending in catchment of the cascade of IBRD / 87250 Post Open 46,153.84 0.00 2018-01-22 2018-03-12 2018-04-02 2018-05-07 2018-11-03 and Planning System Selection Implementation tanks and its impact on individual tanks IN-TELENGANA SW-25085-CS- INDV / Study on irrigation Planning of one major command Water Resources Operations Individual Consultant Pending IBRD / 87250 Post Open 7,692.30 0.00 2017-11-18 2018-01-06 2018-01-27 2018-03-03 2018-08-30 integrating tanks in the and Planning System Selection Implementation command, conjunctive use of ground water and surface water IN-BIHAR/WRD/FMISC/NHP- SW/CS-INDV-01 / Engagement Institutional Capacity Individual Consultant Pending IBRD / 87250 Post Open 22,708.00 0.00 2017-11-30 2018-01-24 2018-02-14 2018-03-21 2020-03-20 of Senior Water Resources Enhancement Selection Implementation Expert / Embankment Specialist IN-BIHAR/WRD/FMISC/NHP- Institutional Capacity Individual Consultant Pending SW/CS-INDV-02 / Engagement IBRD / 87250 Post Open 22,708.00 0.00 2017-11-30 2018-01-24 2018-02-14 2018-03-21 2020-03-20 Enhancement Selection Implementation of Hydrologist Institutional Capacity Enhancement IN-MAHARASHTRA SW-23066- Water Resources Operations CS-CDS / AMC has already and Planning System Individual Consultant Pending accorded to the vendor who has IBRD / 87250 Post Direct 30,769.23 0.00 2017-10-26 2017-10-26 2017-10-26 2017-10-26 2017-10-26 Water Resources Monitoring Selection Implementation executed RTSF & ROS for System Krishna & Bhima basin in HP-II. Water Resources Information Systems IN-TELENGANA GW-36922-CS- Institutional Capacity Individual Consultant Pending CDS / Hiring technical and IBRD / 87250 Post Limited 11,538.00 0.00 2017-12-15 2017-12-20 2017-12-27 2018-01-10 2018-05-10 Enhancement Selection Implementation financial experts IN-TELENGANA GW-36911-CS- CDS / Procurement of Services for Comprehensive Planing for Water Resources Monitoring Individual Consultant Pending IBRD / 87250 Post Limited 31,500.00 0.00 2018-01-25 2018-01-30 2018-02-06 2018-02-28 2018-06-28 interiors and Architecture for System Selection Implementation DDCs, SDC and Training cum Information Centres IN-KERALA SW-32875-CS-CDS Water Resources Information Pending / Consultancy service for IBRD / 87250 Post Direct Selection Direct 66,262.00 0.00 2017-10-28 2017-12-07 2018-02-10 2019-05-06 Systems Implementation developing state WRIS IN-KERALA SW-39264-CS-CD S / PDS- Assessment of Wate r Quality status (Surface wat er) and evolving mitigation IBRD / 87250 Water Resources Operations Post Direct Selection Direct 7,692.31 0.00 Under 2018-01-17 2018-01-17 2018-01-22 2018-01-22 2018-03-28 2020-03-17 and Planning System Implementation measures to improve the wat er quality in Thrissur Corpora tion IN-GOA -39872-CS-INDV / Hiring of 2 Nos Individual Consultants Institutional Capacity Individual Consultant Pending for operating Water Quality IBRD / 87250 Post Open 23,000.00 0.00 2018-01-05 2018-02-23 2018-03-16 2018-04-20 2019-04-15 Enhancement Selection Implementation Laboratory established under HP- II IN-ASSAM -44714-CS-INDV / Institutional Capacity Individual Consultant Pending System Administrator and other IBRD / 87250 Post Open 15,385.00 0.00 2018-01-19 2018-03-09 2018-03-30 2018-05-04 2018-10-31 Enhancement Selection Implementation support stuff. IN-SIKKIM -61926-CS-CDS / Recharge Study of PID 87 is Water Resources Operations Pending proposed to be taken up through IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-05-14 2018-05-24 2018-07-28 2019-01-24 and Planning System Implementation Direct Selection through IIT Indore. IN-GOA -59633-CS-CDS / Appointment of consultant for Water Resources Operations Pending IBRD / 87250 Prior Direct Selection Direct 46,350.00 0.00 2018-04-17 2018-04-18 2018-06-22 2018-10-20 Fact finding and planning study and Planning System Implementation on coastal issues in Goa IN-SOI-23210-CS-INDV / Water Resources Information Individual Consultant Consultant for Lidar Survey-Hiring IBRD / 87250 Post Limited 46,153.85 0.00 Canceled 2017-12-01 2017-12-06 2017-12-27 2018-01-31 2018-07-30 Systems Selection of IN-SOI-23212-CS-INDV / Water Resources Information Individual Consultant Consultant for Setting up of IBRD / 87250 Post Limited 46,153.85 0.00 Canceled 2017-09-01 2017-09-06 2017-09-27 2017-11-01 2018-04-30 Systems Selection CORS-Hiring of IN-NIH ROORKEE-64834-CS- CDS / Decision Support System (Planning & Management). It is continuation of the earlier DSS(P) Institutional Capacity Under developed under the HP-II. It is IBRD / 87250 Post Direct Selection Direct 690,000.00 0.00 2018-07-16 2018-07-26 2018-09-29 2019-03-28 Enhancement Implementation basically required to strengthen the earlier DSS(P) and provide simpler interface for increased and wider applicability by IAs. NHP-2018-2019-ML-411358-CS- Institutional Capacity Individual Consultant Under LCS-NAT / Hiring of Ground IBRD / 87250 Post Open 9,230.77 0.00 2018-07-02 2018-08-09 2018-08-20 2018-09-10 2018-10-15 2019-04-13 Enhancement Selection Implementation Water Expert NHP-2018-2019-ML-493065-CS- Water Resources Monitoring Individual Consultant Pending LCS-NAT / Hiring of GIS & RS IBRD / 87250 Post Open 9,230.77 0.00 2018-07-02 2018-08-20 2018-09-10 2018-10-15 2019-04-13 System Selection Implementation Expert NHP-2018-2019-ML-882946-CS- Institutional Capacity Individual Consultant Pending LCS-NAT / Hiring of Hydromet- IBRD / 87250 Post Open 9,230.77 0.00 2018-08-02 2018-09-20 2018-10-11 2018-11-15 2019-05-14 Enhancement Selection Implementation Instrumentation Expert NHP-2018-2019-ML-609629-CS- Institutional Capacity Individual Consultant Under LCS-NAT / Hiring of MIS & IBRD / 87250 Post Open 9,230.77 0.00 2018-08-02 2018-08-09 2018-09-20 2018-10-11 2018-11-15 2019-05-14 Enhancement Selection Implementation Database Management Expert NHP-2018-2019-TSGW-452849 / Institutional Capacity Individual Consultant Pending Hiring Technical & financial IBRD / 87250 Post Open 4,615.38 0.00 2018-08-23 2018-10-11 2018-11-01 2018-12-06 2019-06-04 Enhancement Selection Implementation Experts NHP-2018-2019-TSGW-190181 / Consultancy charges for PDS study on Impact of Urbanization Water Resources Operations Pending IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-16 2018-07-26 2018-09-29 2019-03-28 on Gw Quality & Quantity & its and Planning System Implementation Management in GHMC Area, Hyderabad NHP-2018-2019-TSGW-161599 / Consultancy charges for the PDS study on Tanks as Source for Water Resources Operations Pending IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-18 2018-07-28 2018-10-01 2019-03-30 regional Groundwater Recharge and Planning System Implementation using Managed Aquifer Storage & Recovery (ASR) NHP-2018-2019-TSGW-436795 / Institutional Capacity Individual Consultant Pending IBRD / 87250 Post Open 4,615.38 0.00 2018-08-23 2018-10-11 2018-11-01 2018-12-06 2019-06-04 Hiring financial Experts Enhancement Selection Implementation NHP-2018-2019-DVC-247732- Institutional Capacity Individual Consultant Pending CS-CQS-NAT / Hiring of GIS/RS IBRD / 87250 Post Open 9,230.77 0.00 2018-07-20 2018-09-07 2018-09-28 2018-11-02 2019-11-02 Enhancement Selection Implementation Expert Page 14 NHP-2018-2019-DVC-605538- Institutional Capacity Individual Consultant Pending CS-CQS-NAT / Hiring of IT IBRD / 87250 Post Open 9,230.77 0.00 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2020-05-30 Enhancement Selection Implementation Expert. NHP-2018-2019-RJ-374579 / Institutional Capacity Individual Consultant Pending IBRD / 87250 Post Open 15,384.62 0.00 2018-07-09 2018-08-27 2018-09-17 2018-10-22 2019-04-20 Architecture Consultancy for IMTI Enhancement Selection Implementation NHP-2018-2019-RJ-793638 / Institutional Capacity Individual Consultant Pending Hiring of technical expert( IBRD / 87250 Post Open 61,538.46 0.00 2018-08-07 2018-09-25 2018-10-16 2018-11-20 2019-05-19 Enhancement Selection Implementation RS&GIS) NHP-2018-2019-RJ-961781 / Institutional Capacity Individual Consultant Pending IBRD / 87250 Post Open 61,538.46 0.00 2018-08-07 2018-09-25 2018-10-16 2018-11-20 2019-05-19 Hiring of technical expert( IT) Enhancement Selection Implementation NHP-2018-2019-RJ-778831 / Institutional Capacity Individual Consultant Pending Hiring of technical expert( IBRD / 87250 Post Open 30,769.23 0.00 2018-08-07 2018-09-25 2018-10-16 2018-11-20 2019-05-19 Enhancement Selection Implementation Procurement) NHP-2018-2019-RJ-326985 / Institutional Capacity Individual Consultant Pending Hiring of technical expert( water IBRD / 87250 Post Open 61,538.46 0.00 2018-08-07 2018-09-25 2018-10-16 2018-11-20 2019-05-19 Enhancement Selection Implementation quality) NHP-2018-2019-MHGW-987147- Water Resources Operations Individual Consultant Pending IBRD / 87250 Post Limited 15,384.62 0.00 2018-11-30 2018-12-05 2018-12-26 2019-01-30 2019-07-29 CS-SSS-SSS / PDS for GW and Planning System Selection Implementation NHP-2018-2019-DVC-616980- CS-SSS-SSS / Inflow forecasting Water Resources Operations Pending system and stream flow IBRD / 87250 Post Direct Selection Direct 153,846.15 0.00 2018-09-20 2018-09-30 2018-12-04 2020-01-28 and Planning System Implementation measurement for Damodar Basin upto outfall of Damodar River. Page 15