Republic of Iraq Ministry of Labor and Social Affairs (MOLSA) Resettlement Policy Framework (RPF) For The Iraqi “Emergency Social Stabilization and Resilience Project”-(ESSRP) World Bank Group RPF Report – 21 December 2018 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Table of Contents LIST OF TABLES...........................................................................................................................................2 LIST OF FIGURES ........................................................................................................................................2 LIST OF ACRONYMS AND ABBREVIATIONS ............................................................................................2 CHAPTER 1: INTRODUCTION ..................................................................................................................4 1.1. THE PROJECT BACKGROUND ................................................................................................................4 1.2. RATIONALE FOR PREPARATION OF RPF ................................................................................................5 CHAPTER 2: PROJECT DESCRIPTION ....................................................................................................6 2.1. PROJECT DEVELOPMENT OBJECTIVES...................................................................................................6 2.2. PROJECT COMPONENTS ........................................................................................................................7 2.3. BUDGET AND TIMETABLE .................................................................................................................. 16 CHAPTER 3: RPF KEY OBJECTIVES AND PRINCIPLES .................................................................... 17 3.1. OBJECTIVES ...................................................................................................................................... 17 3.2. PRINCIPLES ....................................................................................................................................... 18 CHAPTER 4: LEGAL FRAMEWORK ...................................................................................................... 19 4.1. IRAQI LEGAL FRAMEWORK ................................................................................................................ 19 4.2. WORLD BANK POLICY ....................................................................................................................... 22 4.3. GAPS BETWEEN IRAQI LAW AND THE BANK POLICY ............................................................................ 25 CHAPTER 5: INITIAL ESTIMATION AND ELIGIBILITY CRITERIA ................................................ 29 5.1. PROJECT AFFECTED PERSONS AND STRUCTURES ................................................................................ 29 5.2. ELIGIBILITY CRITERIA ....................................................................................................................... 30 5.3. ESTIMATED POTENTIAL RESETTLEMENT IMPACTS .............................................................................. 30 CHAPTER 6: METHODS OF VALUATION AND COMPENSATION.................................................... 32 6.1. ASSET VALUATION ............................................................................................................................ 32 6.2. COMPENSATION ................................................................................................................................ 32 CHAPTER 7: INSTITUTIONAL ARRANGEMENTS FOR RESETTLEMENT PLANNING AND IMPLEMENTATION .................................................................................................................................. 34 7.1. GENERAL ARRANGEMENTS ................................................................................................................ 34 7.2. PROJECT SCREENING ......................................................................................................................... 34 7.3. PREPARATION OF SOCIO-ECONOMIC AND INVENTORY SURVEY ........................................................... 34 7.4. PREPARING AND APPROVING RESETTLEMENT ACTION PLANS ............................................................. 35 CHAPTER 8: STAKEHOLDERS’ CONSULTATION .............................................................................. 38 8.1. INFORMING THE PUBLIC/ PROJECT LAUNCH ........................................................................................ 38 8.2. THE CONSULTATION AND RESULTS COLLECTED ................................................................................. 38 8.3. PUBLIC CONSULTATION IN RESETTLEMENT PLANNING AND IMPLEMENTATION CONTEXT ..................... 44 CHAPTER 9: GRIEVANCE REDRESS MECHANISM (GRM) ............................................................... 46 9.1. RAISING PUBLIC AWARENESS ............................................................................................................. 46 9.2. PROPOSED GRM SYSTEM ................................................................................................................... 46 9.3. WORLD BANK GRIEVANCE REDRESS .................................................................................................. 50 CHAPTER 10: RESETTLEMENT BUDGETING ..................................................................................... 51 10.1. BUDGETING AND FUNDING ................................................................................................................ 51 CHAPTER 11: MONITORING AND EVALUATION ............................................................................... 52 11.1. INTERNAL MONITORING .................................................................................................................... 52 11.2. EXTERNAL MONITORING ................................................................................................................... 52 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 1 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 11.3. MONITORING AND E VALUATION INDICATORS ..................................................................................... 52 REFERENCES ............................................................................................................................................. 53 ANNEXES ..................................................................................................................................................... 54 ANNEX I: PUBLIC CONSULTATION QUESTIONNAIRE & PARTICIPANTS’ LIST ....................................................... 54 ANNEX II: SAMPLE GRIEVANCE REGISTRATION FORM ...................................................................................... 62 List of Tables Table 1: Budget allocation ............................................................................................................... 16 Table 2: Proposed time schedule for implementing ESSRP .............................................................. 16 Table 3: Comparison of Iraq Law and the Bank Policy..................................................................... 26 Table 4: key possible impacts and losses in the Project .................................................................... 29 Table 5: Eligibility categories and their relevant entitlement ............................................................ 30 Table 6: Replacement Cost of Assets ............................................................................................... 32 Table 7: Participants of the consultation interviews .......................................................................... 38 Table 8: E&S impact rating by interviewees .................................................................................... 39 Table 9: Notes and views collected during public consultations ....................................................... 41 Table 10: Pictures taken during public consultations ........................................................................ 42 Table 11: Available communication channels for the GRM.............................................................. 49 Table 12: The proposed GRM roles and responsibilities ................................................................... 50 Table 13: Monitoring and Evaluation Indicators .............................................................................. 52 List of Figures Figure 1: Project boundaries (colored) ............................................................................................ 6 Figure 2: IASC Guidelines Intervention Pyramid ........................................................................... 9 List of Acronyms and Abbreviations ARAP Abbreviated Resettlement Action Plan MHPSS Mental Health and Psychosocial Support Services CCTs Conditional Cash Transfers MOA Ministry of Agriculture CE Citizen Engagement MOE Ministry of Education CfW Cash for Work MoEnv Ministry of Environment DNA Damage Needs Assessment MOH Ministry of Health DOEL Department of Employment and Loans MOLSA Ministry of Labor and Social Affairs EA Environmental Assessment NGO Non-Governmental Organization EODP Emergency Operation for Development OP/BP Operational Procedure/ Bank Policy Project ESSRP Emergency Social Stabilization and PAPs Project Affected Persons Resilience Project GBV Gender‐based Violence PDOs Project Development Objectives GOI Government of Iraq PHC Primary Health Care GPS Global Positioning System PMO Project Management Office GR Grievance Redress PMT Proxy Means-Testing GRM Grievance Redress Mechanisms POM Project Operation Manual ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 2 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- GRS Grievance Redress Service PSS Psychosocial Support Services IASC Inter‐Agency Standing Committee RAP Resettlement Action Plan IBRD International Bank for Reconstruction and RPF Resettlement Policy Framework Development ID Identification Document SPC Social Protection Commission IDP Internally Displaced People SSN Social Safety Net IQD Iraqi Dinar UN United Nations ISIS Islamic State in Iraq and Syria US$ United States Dollars IT Information Technology USD United States Dollar LCC Local Coordination Committee UXOs Unexploded Ordnances LSADs Labor and Social Assistance Department WB World Bank M&E Monitoring and Evaluation WBG World Bank Group ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 3 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 1: Introduction 1.1. The Project Background Iraq has liberated remaining areas from Islamic State in Iraq and Syria (ISIS) control, including Mosul. And it is imperative for the government to quickly move back into these areas and provide support on the human aspects of the stabilization efforts, with a view towards individual and community recovery. As such, emphasis is needed on support to returnees including the provision of cash, short-term employment, and other means of social support to the most vulnerable of these returnees. The reinstatement of trust between the state and its citizens is highly dependent on the Government of Iraq’s (GOI) ability to demonstrate its capacity to deliver security, jobs and economic growth to all Iraqis, with a focus on the poor, the vulnerable and the millions of Internally Displaced People (IDPs) impacted by the war. Providing them with livelihood opportunities and rapid employment will be critical and can potentially make a significant contribution to Iraq’s national recovery and in rebuilding social cohesion. The GOI has received financial support from the World Bank in the form of a US$200 million loan for the Iraq Emergency Social Stabilization and Resilience Project (ESSRP) (“Project”), which will be implemented by the Ministry of Labor and Social Affairs (MOLSA) and will span 3 years. The Project will provide Cash for Work (CfW) and livelihood opportunities to returning and existing populations in the liberated areas, as well as other support to address the impact of conflict on the population. The aim is to encourage stabilization and recovery efforts for those communities, and to help kick-start economic activity, employment opportunities, and livelihoods. The Project will also provide services to mitigate psychosocial impacts of the conflict, particularly for men, women, and children. Furthermore, it will support the establishment of a resilient Social Safety Net (SSN) system, including development of a robust social registry, strengthening social workers’ infrastructure, and scaling up the existing Conditional Cash Transfers (CCTs) as mitigation measures. A Project Management Office (PMO) will be established in MOLSA to execute the Project and will report directly to the Office of the Minister of Labor and Social Affairs and draw upon resources from MOLSA and the Social Protection Commission (SPC), as well as hire consultants as needed. The PMO will work closely with the MOLSA Labor and Social Assistance Departments (LSADs) in each of the target governorates. These LSADs report to the central MOLSA and coordinate closely with local government. A Local Coordination Committee (LCC) will be established in each target governorate, headed by the governor and members from sectorial ministries. The LCC will assist in the selection of locations, type of projects, facilitating access to sites, monitoring, avoiding duplication, and coordinating CfW activities at the governorate level. LSADs will also recruit consultant staff to support implementation, particularly as it relates to communications, fiduciary aspects, safeguards, and monitoring and evaluation. The LSADs will be responsible for facilitating the monitoring of the number of days each worker has worked on projects and identify constraints to program implementation and take immediate corrective steps. The ESSRP and all associated interventions are financed by the International Bank for Reconstruction and Development (IBRD). Therefore, the Bank’s environmental and social safeguards policies apply. The Project was classified at environmental Category B. Specifically; the following Bank’s safeguards are triggered for the ESSRP: ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 4 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - Environmental Assessment (OP/BP 4.01) - Involuntary Resettlement (OP/BP 4.12) 1.2. Rationale for Preparation of RPF The Project is classified as Environmental Category "B” according to the provisions of The World Bank’s OP/BP 4.01 (Environmental Assessment). The safeguards instruments for this project are prepared in line with the emergency procedures defined by Paragraph 12, Section III, of the Bank Policy: Investment Project Financing (Projects in Situations of Urgent Need of Assistance or Capacity Constraints), and the Project has elected to defer preparation of the RPF to the implementation stage. The Project will support CfW to increase access to short‐term employment. Activities to be financed under these sub‐projects are small scale, including amongst others: street sweeping and cleaning, drainage clearance, painting of public buildings, rehabilitation of recreational spaces, rehabilitation of schools, and other community buildings in urban areas. In rural areas, the Project will support brushing of bushes along access roads, clearing non‐private agricultural land, breaking of rocks for road rehabilitation, cleaning and replacement of culverts, and drainage clearance along roads. Potential social/socio-economic impacts of the interventions and activities are expected to be minor, site‐specific, limited, reversible, and can be mitigated. These mainly include impacts brought about by lacking enough capacity to daily run the various activities, the insufficient selection of beneficiaries and missing some of the poor and marginalized people in rural communities. As well as insufficient insecurity conditions to implement and transact wages. In particular, components 1.1 and 1.3, may involve some negative impacts on daily socio-economic life while carrying out small civil works and revival of existing businesses. The surrounding communities and businesses among those who might feel some interruption to their daily life and access to markets and resources. Although, land acquisition is not part of the design and implementation of this ESSRP, some spaces might be dedicated for material storage, work preparation/ dispatching, and/or as buffering zones along culvert and drainage maintenance works, amongst others. Therefore, temporary land acquisition, relocation of encroachers or IDPs, and interruption or loss of livelihood would be possible, though unlikely. Up to date, numbers of people subject to these expected impacts in target governorates are not identified. And work packages are not determined. As well as worksites are not known but will be agreed on by authorities and contractors/ implementing agencies before commencement of activities. To account for expect socio-economic impacts, including possibility of resettlement and temporary land use, a Resettlement Policy Framework (RPF) has been prepared, as a guide, based on the requirements of the World Bank Policy on Involuntary Resettlement OP 4.12 and relevant provisions of the Iraqi laws including Land Acquisition Law No. 12 of the year 1981. Upon identifying work packages and conducting an E&S assessment per each site, a more specific safeguards instruments have to be prepares, which include Resettlement Action Plans (RAPs), or Abbreviated Resettlement Action Plans (ARAPs) based on numbers of affected people. This RPF report, provides information on the Project; objectives and principles; initial estimation and eligibility criteria; legal frameworks, both Iraqi’s and those of the WB; methods for valuation and compensation; institutional arrangements, resettlement planning and implementation; stakeholders’ consultation; grievance redress mechanism; and budgeting and funding; as well as monitoring and evaluation. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 5 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 2: Project Description The Iraqi ESSRP is a 3-year project funded by the IBRD and implemented by the GOI through the Iraqi Ministry of Labor Social Affairs (MOLSA). The Project will cover the governorates of Ninawa, Anbar, Salahideen, Diyala, Kirkuk, Baghdad and Babel. The following figure shows boundaries of the Project. Figure 1: Project boundaries (colored) 2.1. Project Development Objectives The Project Development Objectives (PDOs) are to: 1. Increase livelihood opportunities in liberated areas; 2. Increase access to psychosocial services in liberated areas; and 3. Strengthen the systems to expand the provision of social safety nets. The Project will provide CfW and livelihood opportunities to returning and existing populations in the liberated areas. The project will also provide services to mitigate psychosocial impacts of the conflict, particularly for men, women, and children. Furthermore, it will support the establishment of a resilient social safety net system, including development of a robust social registry, strengthening social workers’ infrastructure, and scaling up the existing Conditional Cash Transfers (CCTs) as mitigation measures. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 6 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2.2. Project Components The ESSRP will comprise of the following components and interventions: Component 1 – Cash for Work, Livelihoods, and Social Support; Component 2 – Resilient Social Safety Nets; and Component 3 – Project Management. Component 1 – Cash for Work, Social Support, and Livelihood Opportunities Sub‐Component 1.1 – Cash for Work This sub-component aims to provide targeted cash-for-work support to increase access to short-term employment in areas affected by the succession of cities. The CfW program will cover the 7 target governorates as mentioned above. Sub-Projects of the CfW program will be simple and cannot be imposed on individuals/communities. Worksite teams would include up to 150 workers and an appropriate number of supervisors per project. Workers would split into workgroups varying from 20‐50 people, with one leader per workgroup. In urban communities, the provision of essential service activities would include: Street sweeping and cleaning, drainage clearance, painting of public buildings and street walls, painting of crosswalks, rehabilitation of recreational spaces, rehabilitation of schools, health posts and other community buildings, and other similar activities. While in rural communities, activities would include brushing of bushes along access roads, clearing non‐private agricultural land (or for any other purpose that would serve a community or public need), breaking of rocks for road rehabilitation, cleaning and replacement of culverts, and drainage clearance along roads, and other similar activities. Where applicable, the public works and livelihood activities will be designed to promote climate change resiliency and adaptation measures and will support risk management and promote opportunities for individuals, while promoting a more climate resilient household and society. At least 30% of beneficiaries would be women. Needs (geographic, sectoral, etc.) will be determined based on the Damage Needs Assessment (DNA) currently underway. This arrangement is intended to increase social cohesion and development of a sense of community participation and ownership. Work would only proceed once an area is certified to be clear of unexploded ordnances (UXOs). The main design features of the CfW sub‐component will be based on the following principles: - A wage rate that is at a level that enables self‐selection, while ensuring take‐up into the program (i.e. above social safety net cash amount, but not high enough that it creates distortions in the labor market); - Restrictions on eligibility are to be avoided; a person’s desire to work at the offered wage rate should be the only requirement for eligibility. If rationing is required (because demand for work exceeds the budget available at the wage set) then the program should be targeted to poor areas/districts with high poverty; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 7 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - The labor intensity (share of wage bill in total cost) should be as high as possible, consistent with the quality of assets created. Projects selected for CfW should be such that the share of labor (including managerial and supervision labor) in total cost is at least 80% or more; - Wages should be paid within the stipulated time with no payment lags to ensure timely compensation for work completed; - To encourage female participation, the appropriate form of wages is important—for example, women can benefit from task‐based wages. Transaction costs to the poor should be kept low—for example, through locating project sites close to villages; and - Third party oversight is important ‐ social and technical audits are highly recommended. A credible M&E plan is critical in order to ascertain where the program is faltering and how to improve its efficiency. The allocation of cash resources by governorate will be based on a formula that provides different weighting to a combination of four factors: population, number of people below the poverty line, number of IDPs (from the governorate), and number of returnees (to the governorate). However, under different scenarios, Ninawa will receive the greatest amount of financial resources, given the high level of conflict, number of IDPs, and high poverty rate. The CfW program aims to engage with other ministries to address a broad range of sectoral needs. It will consider activities with the Ministry of Agriculture (MOA) given that agriculture is one of the priorities of the forthcoming Iraq Country Partnership Framework and has been included in the recently approved Emergency Operation for Development (EODP) Project Additional Financing. Projects involving unskilled labor‐intensive works will be identified in rural agricultural communities within the liberated zones. Both men and women will be offered employment schemes under the CfW. These short‐term interventions will allow farmers to resume their day-to-day activities as quickly as possible and reinstate their production as soon as possible. The CfW scheme will also be coordinated with the Ministry of Education (MOE) in their effort to rehabilitate schools and make them functional to accommodate students at the beginning of the academic year. It is also in line with EODP that CfW under ESSRP will assist in providing employment to community members in cleaning up community schools. Sub-Component 1.2 – Psychosocial Support Services This sub‐component aims to augment the impact of the immediate cash and CfW program towards resilience building with Psychosocial Support Services (PSS) to better empower communities to cope with post-crisis. The ultimate objective of the program is to create an enabling platform for the vulnerable minority returning IDPs to assist them in their coping mechanisms and to improve their own self‐care and advocacy skills using available recourses within their communities. Additionally, this sub‐component will increase access to Mental Health and Psychosocial Support Services (MHPSS) for returnees affected by the conflict in the governorates of Salahideen, Anbar, Diyala, and Ninawa, and strengthen the operational capacity of the system and providers to deliver quality services. This sub‐component will adopt the MHPSS framework developed by Inter‐Agency Standing Committee (IASC) on MHPSS in emergency settings. The framework consists of an intervention pyramid (Figure x) with a multi‐layered support system encompassing several support levels to meet ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 8 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- the needs of various population groups. This approach supports integration across services and quality improvement in service provision. While there are four basic levels of activities with referral in between, interventions in this project will focus on levels two and three of the pyramid focusing on community and family support (Level 2) as well as focused non‐specialized services (Level 3). Examples Mental health care by mental health specialists (Psychiatric nurse, psychologist, psychiatrist, etc.) Specialized Services Basic mental health care by PHC Focused doctors. Basic emotional and (person-to-person) practical support by community non-specialized workers. supports Activating social networks Strengthening community Communal traditional supports Supportive child-friendly spaces and family supports Social consideration in Advocacy for basic services that are safe, socially appropriate and basic services and protect dignity security Figure 2: IASC Guidelines Intervention Pyramid To ensure synergy and integration of services, this sub‐component will adopt a multi‐sectoral approach where interventions are implemented in coordination with relevant ministries namely, MOLSA, MOH, and MOE. Moreover, to bridge the supply gap and ensure rapid interventions, implementation of the PSS sub‐component activities will be contracted to UN agencies, NGOs, or other implementing agencies currently operating on the ground. The World Bank in collaboration with the Government of Iraq will set the criteria for selection of these implementing agencies based on technical and managerial expertise and the capacity to mobilize resources in a timely manner. To adequately address the above, the program adopts a three‐key pronged approach; (i) Rapid PSS interventions to increase service provision to people in immediate need for help; (ii) Focused capacity building in MHPSS through hands‐on training tailored to the different providers; and (iii) Policy dialogue with the GOI to develop a medium to long‐term strategy on violence. To this end, the program will be implemented through three main interventions as follows: Intervention 1: Scaling up the provision of MHPSS services This intervention builds and scales up ongoing MHPSS provided by the public sector, UN agencies and NGOs working on the ground to reach a larger number of beneficiaries and meet the growing needs of returnees. The project is expected to reach at least: (a) 400,000 women, men, boys and girls with direct MHPSS; (b) 15,000 indirect women, girls, men and boys targeted for MHPSS education messages; and (c) 500 health and social workers through capacity building and training. Intervention 2: Build capacities for non‐socialized MHPSS at health institutions (US$1 million) ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 9 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- The provision of MPHSS services will be accompanied with a capacity building plan. Training activities will be targeted to meet the needs of trainees at different levels. The training will target health providers (General Practitioners, nurses, health workers), social workers, and community volunteers. Competencies acquired in the training program include: age‐appropriate communication for behavior change, identification and case management, screening GBV cases and referrals. Intervention 3: Policy Dialogue This intervention will focus on engaging with the GOI in policy dialogue to develop a long‐term response to post‐conflict mental health needs. This includes strengthening mental health and protection policies to ensure the well‐being of vulnerable populations through community and family support and access to appropriate care. The project will contribute to maintaining the commitment of MOH and MOLSA to deliver MHPSS services to the vulnerable population and build a central ‐level strategy to implement a MHPSS program. Sub‐component 1.3 Livelihoods Opportunities This sub‐component will support opportunities for improving livelihoods through the existing income‐generating fund at MOLSA, governed under Law 10 of 2012 “Economic Empowerment through Income Generating Projects”. The sub-component will include two parts: - Provision of technical assistance to MOLSA to support enhancements to the existing microfinance program, in terms of sustainable products, back office systems, and loan portfolio monitoring, while minimizing distortions to the private microfinance sector; and - Provision of microfinance to beneficiaries to carry out income generating activities, which would only be capitalized through a potential project restructuring to reallocate funds from sub‐component 1.1, contingent upon MOLSA meeting guidelines indicated in Section III, Paragraph 15 of the Bank Policy: Investment Project Financing (Projects Involving Financial Intermediaries), and subject to World Bank approval. No funds are allocated to this part of Sub‐component 1.3. Once this Sub‐component is capitalized (subject to the preceding points), microfinance will be provided to beneficiaries in accordance with the agreed Project Operational Manual (POM). The Project embraces a comprehensive approach, complementing existing poverty-targeted cash transfers administered by MOLSA, and scaling a productive CfW program, and then transitioning to provision of livelihood opportunities through the income‐generating facility administered by DOEL at MOLSA. The technical assistance which will be provided under this sub-component will entail the following: (1) Undertaking a rapid market assessment; (2) Enhancing management information systems; and (3) Developing business support services at DOEL. The sub-component will support MOLSA in managing the microfinance fund based on sound practices that would ensure adequate outreach, sustainability, and impact. The implementation of this program will leverage existing legal framework, which would be also consistent with paragraph 15, Section III, of the Bank Policy: Investment Project Financing (Projects Involving Financial Intermediaries). Therefore, the program will take into account the context of the liberated areas, and not crowding out private sources of microfinance. According to the Economic Empowerment Law 10 of 2012, the range of the loan is IQD 3‐20 million (US$2,500‐16,500), and the average is IQD 8 million (US$6,500). Microfinance internal reviews ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 10 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- ensures loans do not exceed the values set in the Law. The DOEL, as required by legal regulations, follows specific loan issuance procedures: 1. The applicant submits the application electronically by entering their information using a web-based application system and uploads any required official documents by selecting the relevant governorate and the nearest loan branch unit (25 branch units in governorates, excluding KRG, and nine in Baghdad); 2. Verification of applicant information on the social protection network and women’s department databases to ensure no other loans or cash transfers are provided to the applicants; 3. The branch unit at the governorate reviews the request and provides provisional approval. All requests are submitted to MOLSA central offices in hard copy for final approval (online material is also available to be verified by officials in Baghdad); 4. Once all requests are received by DOEL, they are centrally checked and audited before final approval is granted; 5. Loan file is forwarded to fund management – loan issuance is affected after documentation is approved by the Vice President of the Microfinance Fund; and 6. Loan file is audited by internal audit, and loan is issued by check from accounting. Component 2 – Resilient Social Safety Nets This component is designed to strengthen the resilience of social safety net programs to allow the GOI to assist poor/vulnerable groups and build resilience to shocks effectively and efficiently. International experience has shown an increased recognition of the role of adaptive social safety net in recent years which places an enhanced focus on household resilience building and responsiveness of SSN programs. More specifically, this component aims to: - Set‐up design parameters of an effective national safety net system which in the medium‐and long‐term would protect households in the absence of shocks, but which could also be scaled up in times of crisis. The design will build on the MOLSA database generated using the Proxy Means‐Testing (PMT) methodology; - Contribute to the establishment of the unique registry of vulnerable individuals and households that will allow all social programs to identify and target their beneficiaries more efficiently. MOLSA will ensure coordination and interaction with other governmental bodies providing any schemes of social assistance; and - Scale up CCT program linked to households’ compliance with co‐responsibilities in education and health, incentivizing a greater use of education and health services, and therefore, develop the human capital of these households. This component will promote the resilience of SSN programs by supporting the move towards more dynamic and adaptive systems while ensuring the following considerations: - Setting up a strong institutional framework for social protection policy in line with the comprehensive reform the GOI is undertaking through the implementation of the Iraq Social Protection Strategic Roadmap. This will be key for setting up a safety net system; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 11 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - Continuous access for inclusion and coverage through dynamic targeting system; - Tools for on‐demand entry with active outreach and communication strategy; - Protocols and tools for active updating, regular recertification and self‐reporting; and - Strengthened tools for oversight, controls and monitoring. The component will follow eight stages along the “life of the case” delivery chain including: 1. Identification and Outreach. Further develop the current information system within MOLSA to record and process information on safety nets, to provide a foundation for policy design, and finding and informing the “potential beneficiaries” about social assistance benefits and services; 2. Intake & Registration. Consolidate and expand the information base for the SSN program to develop effective targeting strategies; collecting information to register potential beneficiaries into the system. Such information can include: personal and household identifying information (including unique IDs), socio‐economic information, and other information on needs and conditions. Introduce innovative approaches using information systems and targeting in the form of a conflict/post conflict‐sensitive monitoring arrangement that includes the use of GPS technology, real‐time data flows and third‐party monitoring. Strengthening the current poverty-based targeting to one that captures conflict‐related vulnerabilities (returnees, IDP, female headed households, youth, and the chronic poor); 3. Assessment (or “screening”). Support the design and implementation of M&E systems for the expanded SSN program, assessing the needs and conditions of clients of SA programs for the purposes of determining eligibility and enrollment in specific program(s); 4. Enrollment. Determining eligibility based on qualifying information gathered (via intake) and assessed according to needs and conditions – as compared to eligibility criteria for a specific program; 5. Determination of Benefits. Determining and informing benefit amounts (for cash programs), service needs (depending on specific service being delivered), or conditions of participation; 6. Supporting Payment Transactions. Supporting actual “transactions” of making cash payments, providing in‐kind benefits, or delivering specific services based on profiling of beneficiaries and demand; 7. Case Management. The process through which social workers plan, manage, monitor and report on benefits and services to eligible clients. Social workers in one or multiple programs (or agencies) can coordinate their efforts through teamwork or cross‐program referrals, thus expanding the range of services offered to any one client; and 8. Case Outcomes. Measuring, monitoring, and reporting on compliance with eligibility criteria and procedures, performance goals, and client outcomes. These eight stages will also be introduced into the training module of social workers. The scope of work of social workers would be expanded to include case management at both the CCT and the social assistance programs levels. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 12 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Grievance Redress Mechanism (GRM) The component will also build on further developing the GRM used by MOLSA. This GRM extends to the overall work of MOLSA particularly on cash transfers (CT) and will be extended further to cover the Conditional Cash Transfer (CCT) pilot project. The GRM comes in as an integral part of a Citizen Engagement (CE) modality that supports the communication strategy of MOLSA, the introduction of new behavioral insights (currently under testing within the pilot CCT) and the GRM. Engaging in this integrated approach with beneficiaries improves the efficiency of MOLSA services, thus increasing trust, and improves the interaction between beneficiaries, building towards social acceptance and reconciliation. Scaling up CCT This component will build on the progress achieved in the CCT pilot project being implemented in Baghdad‐Sadr 2. The monitoring mechanism will examine specific indicators involving the enrollment of beneficiaries, compliance with co‐responsibilities and case management. The level of timely coordination between the concerned ministries will be evaluated. Based on these elements, the plan for scaling up will be designed. This would require identification of areas characterized by the three main requirements: extreme poverty with households enrolled in the MOLSA database of beneficiaries, high rates of school dropouts, mainly among girls, and areas with prevalent high infant and maternal mortality rates. The scaling up will need to be based on a phased approach, to allow MOLSA, MOH and MOE to build their capacities. This will also require establishing adequate collaboration with regional authorities as part of the decentralization process. The launch of CCT programs in governorates will require a high political commitment centrally and locally. For this, one of the key requirements for scaling up would be the willingness of the local authorities to commit and support the program. Component 3 – Project Management This component will support project management and monitoring and evaluation (M&E) to ensure that the project is successfully and efficiently implemented in conformity with the Project Appraisal Document. The component will finance: a. PMO: The project will finance contracts for consultants to support the PMO at MOLSA, and specialized staff to be recruited at the Labor and Social Assistance Departments (LSADs) in the Governorates. In addition, the project will finance necessary equipment to support project management activities. b. Supervision, operating costs, external audits, and M&E: The project will finance costs associated with four supervision missions (during the project’s first year of implementation) that may take place in Baghdad or reverse missions outside of Baghdad, in a location to be determined jointly with the World Bank, in addition to regular operating costs for the PMO/LSADs. The project will also finance internal and external audits, as well as monitoring and evaluation activities. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 13 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Two key dimensions of the program are described as follows: 1. Communications This is targeting IDPs, from different religious and ethnic backgrounds, who have been returning to the liberated areas in Iraq. Rebuilding their homes and restoring their lives in devastated areas will not only require manual labor and financial resources, but also trust with the GOI. Eliminating communication barriers between the state and the people is key in the process of enhancing accountability and transparency, thus, establishing a new social contract. The ESSRP will ensure community participation throughout the different stages of the project, and will include the following: - Public meetings for target populations to raise awareness and the operating procedures as outlined in the POM; - Selection of public works through community‐based participatory planning processes to ensure that the works are valuable to the community in general and aim to balance competing needs among communities; - Posting of program budget, public works plan, salary levels, and list of beneficiaries in public locations to ensure that all community members are fully informed of program objectives and procedures; - Dissemination of clear guidance to follow to submit complaints and grievances redress mechanisms; and - Communicating with citizens on the importance of the ESSRP ‐ how it will impact their lives through the early stages of the reconstruction phase, and what benefits they will reap from this cash assistance program; that it is critical and reinstates confidence in such a way that does not succumb to the challenges of the old social contract. A two‐way communication stream is equally essential, particularly in view of the devastating effect of the conflict on the returning IDPs, and specifically children and youth groups. The project will support the development and implementation of a comprehensive communications campaign, and will finance communication instruments to be used to achieve the overall communications and awareness raising objectives, which will include: - Media Kit (brochures/flyers with key messages, press releases, contact info); - Convene a series of dedicated communal/group sessions to build and strengthen dialogue; - Establish information centers; - Schedule individual awareness raising and information sessions; - Identify and train diverse groups of “trusted” spokespersons to act as ambassadors for the project; - Dedicated web site with relevant contact details for information centers within ministries/ public offices, as well as social media outreach (Facebook, Twitter, etc.); - Publish articles and op‐eds in local newspapers to advocate the benefits of the project; and - Organize a series of TV/radio interviews for visual outreach. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 14 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2. Gender Focus The ESSRP aims to reinstate social stabilization from every possible angle to ensure a sound process of rebuilding lives and bolstering livelihoods. It seeks to contribute to the regeneration of hope and confidence among returnees who have shouldered the brunt of a damaging conflict. Statistics indicate that vulnerable groups face additional challenges beyond the devastation of conflict. Women are even more susceptible to experience further fragility, if not cushioned and empowered through social programs and safety net policies that take into consideration their specific conditions (religious, cultural, social, domestic, etc.). Gender equality and women’s empowerment are placed at the center of the development agenda. The CfW program is a first step towards restoring hope and reactivating manual effort for unskilled labor. Female participation in such labor schemes is one of the main issues to be addressed early on during the process of recovery and reconstruction. Since female headed households are prone to increase in number in times of conflict, providing women with the necessary opportunities for rebuilding their lives leads not only to comprehensive social and economic recovery, but also to sustainable development. A suggested list of specific labor programs tailored for women’s conditions and needs are suggested as follows: - Training of trainers in areas related to basic nursing and assisting groups with special needs (physically handicapped persons, persons with severe war injuries, caring for the elderly, etc.); - Handicrafts such as sewing and embroidery, particularly producing (basic) winter clothes for IDPs/returnees, including children who are in need; - Farming and agriculture, which contributes to rural development and food security; - Producing homemade food to be sold in local market, or which could be provided as meals to members of the cash‐for‐work program; and - Managing children’s daycare centers. Encouraging innovative initiatives must also be included in the program design, to incentivize youth groups to generate ideas that could eventually contribute to larger development schemes, and consequently, higher growth. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 15 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2.3. Budget and Timetable The following table summarizes budget allocation for the Project Table 1: Budget allocation Component/Sub-component Budget (million USD) Component 1 – Cash for Work, Social Support, and Livelihood Opportunities 169.95 Sub‐Component 1.1 ‐Cash for Work 164.5 Sub-Component 1.2 - Psychosocial Support Services 4.95 - Intervention 1: Scaling up the provision of MHPSS services 3.45 - Intervention 2: Build capacities for non‐socialized MHPSS at health institutions 1.0 - Intervention 3: Policy Dialogue 0.5 Sub‐component 1.3 Livelihoods Opportunities 0.5 Component 2‐ Resilient Social Safety Nets 18.10 Component 3 – Project Management 4.605 Contingency costs 7.345 Total 200 The Project will be implemented in three years. The following is a proposed schedule for carrying out key components: Table 2: Proposed time schedule for implementing ESSRP Component 1 – CfW, Social Support, and Livelihood Opportunities First twelve months Design of the CfW and Livelihood Support Program Initiation of the CfW program in the selected governorates MHPSS Initiatives 12‐24 months Implementation and Monitoring of the CfW and Livelihood support program Post‐conflict Strategy for Violence Component 2 – Resilient SSN First twelve months Poverty program implementation CCT pilot program (implementation and evaluation) 12‐24 months Poverty program scale-up CCT Pilot scale-up Component 3 – Project management: Throughout Project implementation (36 months) ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 16 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 3: RPF Key Objectives and Principles 3.1. Objectives The purpose of this RPF is to set down the principles for resettlement (economic displacement) impact mitigation, as well as to clarify the organizational arrangements that may be needed during sub-projects preparation and implementation. This includes compensating all Project Affected Persons (PAPs) for losing their property, and livelihood as a result of relocating/closing their businesses. Other kinds of assistance may include assisting these people in relocating and/or providing job opportunities. Generally, the RPF may be triggered whenever any of the project’s activities entail the acquisition of land and/or the displacement of people, causing the loss of land, property, assets, access (to land, property, and assets), income, or sources of livelihood. This Framework shall cover all the Project’s activities and shall apply to all displaced persons regardless of the total number affected, the severity of impact, and whether or not the affected persons have legal title to the land. Since resettlement (economic displacement) often affects the most vulnerable and marginalized groups (economically, politically, and socially), the RPF shall be particularly sensitive to the effects which displacement may have on these groups, including the poor, landless, elderly, women, children, ethnic minorities, or persons with specific mental or physical disabilities. Every effort will be made to avoid or minimize the need for land acquisition and resettlement for any of the sub-projects of Component 1. In the very unlikely and exceptional events, that any of the sub- projects under this Project require additional land, houses and other assets becomes unavoidable; the project management should refer to this RPF to further preparing a Resettlement Action Plan (RAP) or an Abbreviated Resettlement Action Plan (ARAP) as deemed necessary and in line with the requirements of PB/OP 4.12 and this RPF’s outline. In general, this RPF is intended to provide policies, guidelines and procedures to be integrated into the design and implementation of the proposed Project. The MOLSA is the responsible party for adopting, developing, and implementing this RPF. The overall objective is to assist the MOLSA to ensure that the following are fulfilled at the earliest implementation of the Project: - Addressing potential socio-economic issues associated with implementation; - Setting a course of mitigatory actions that would diminish threats and enhance opportunities; - Helping survey and valuate losses of space, assets, income, and livelihoods; - Setting out a compensation plan; - Setting out an entitlement matrix; - Finalizing a grievance redress mechanism and integrating it within existing systems; and - Strengthening institutional capacities needed to adequately address grievances related to the Project; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 17 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 3.2. Principles The principles outlined in the World Bank’s OP/BP 4.12 have been adopted in preparing this RPF. In this regard the following principles would apply: 1. Acquisition of land and other assets, and resettlement of people will be minimized as much as possible. Where land acquisition is unavoidable, the project will be designed to minimize adverse impacts on the PAPs, especially the vulnerable groups; 2. All PAPs will be compensated, relocated and rehabilitated, if required, so as to improve their standard of living, income earning capacity and production capacity, or at least to restore them to pre-Project levels; 3. All PAPs residing in, cultivating land, or having rights over resources within the projects areas are entitled to compensation for their losses and/or income rehabilitation. Lack of legal right to the assets lost will not bar the PAP from entitlement to such compensation, rehabilitation and relocation measures; 4. The rehabilitation measures to be provided include (i) compensation at full replacement cost for houses and other structures; (ii) compensation for land acquisition; (iii) dislocation allowance and transition subsides; (iv) full compensation for crops, trees and other similar agricultural products at market value; and (v) other assets, and appropriate rehabilitation measures to compensate for loss of livelihood; 5. Land-for-land is the preferred option (if applicable). Land-for-land may be substituted by cash provided that: (i) land is not available in the proximity of the project area; (ii) PAP willingly accept cash compensation for land and all assets on it; and receive full replacement value without any deductions for depreciation; and (iii) cash compensation is accompanied by appropriate rehabilitation measures which together with project benefits results in restoration of incomes to at least pre-project levels; 6. Resettlement plans will be implemented following consultations with the PAPs, and will have the endorsement of the PAPs; and 7. Any acquisition of, or restriction on access to resources owned or managed by PAPs as common property will be mitigated by arrangements that would ensure access of those PAPs to equivalent resources on a continuing basis. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 18 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 4: Legal Framework All Resettlement and Land Acquisition related issues under the proposed Project (although highly unlikely) will be addressed through relevant laws and regulations of the Government of Iraq and the World Bank’s Operational Policy, specifically the Land Acquisition Law No. 12 and the Involuntary Resettlement OP 4.12. This RPF will constitute the legal reference for whichever activities of resettlement/displacement foreseen important prior to commencing and implementation of ESSRP’s various working packages and services. MOLSA shall be committed to complying with the national laws and WB’s policies. The Bank Policy will prevail if there are gaps between the Bank Policy and the relevant policies of the government of Iraq. 4.1. Iraqi Legal Framework There are three main forms of land ownership in Iraq: - Public or government owned land; - Private land which can be bought from its owner or may be alienated/transferred freely by donation; and - Leased land. The land is owned by the government but leased to individuals, as the case with the agricultural lands managed by the Ministry of Agriculture. The Civil Code (Law No. 40 – year 1951) Usurpation Article 192: The property usurped must be restituted in-kind to its owner at the place wherein it was usurped if it is existing; if the owner of the property has casually met the usurped who had with him/her the usurped property at a different place he/she may if he/she so wishes to have the property restitute in that place. But if he/she demands restitution at the place of usurpation, the expenses of moving it and the cost of providing for its restitution will be borne by the usurper which thing will be without prejudice to reparation for the other losses. Article 195: If after the usurpation the value of the thing usurped has diminished (depreciated) the usurpee has no alternative but to accept it in its existing state without prejudice to his/her right to reparation for the other losses; the usurper shall however be liable if through his/her act or use, the thing usurped has depreciated. This law includes squatters as well. Land Acquisition Law No. 12 – year 1981 Land acquisition and all related issues are governed locally by the Land Acquisition Law No. 12 issued in 1981 and updated in 1998. Primarily, the Government of Iraq (GOI) has the right to remove encroachers of state-owned lands without compensation. Below are the relevant provisions (according to the latest amendments): Section II: Types of Acquisition & Procedures – Chapter I: Acquisition in Agreement Article 4: Directorates and social and joint sectors which have the right to acquire property can negotiate with the property/land owner to take the property by agreement either in kind or in cash ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 19 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- depending on the price estimated by the committee established according to this law. In case of a public property, all related partners shall approve this. Section II – Chapter II: Juridical Acquisition Article 9: Government departments and social and common sectors which have the right to legally possess a property can request to acquire any property, part of it, or its relevant original property rights for the purposes of implementing their projects and achieving their goals. Article 13: According to this Article, a Valuation Committee is formed to estimate the compensation value. This Committee is ideally assembled from the following members: 1. Head of the Land Registry Office or his/her deputy, 2. Head of the Property Tax Department or his/her deputy, 3. Representative of the holder, and 4. Representative of the property owner, if the property owner is a group of people and they do not agree to choose a representative, or if some of them were absent, the court assigns one of its experts. Section II – Chapter III: Administrative Acquisition Article 22: If the property or the real estate right requested for acquisition is owned by government departments or the social or public sectors, the property shall be possessed administratively, and the compensation is determined in consensus. Section III: Compensation – Chapter I: In-kind Compensation Article 29: First: If the property requested for acquisition is a land or an orchard, the holder can, in consultation with the Ministry of Finance or the Ministry of Agriculture, compensate the property owner for the land or orchard at the same value of the Administrative Unit of the land or orchard requested for acquisition. However, the holder can agree with the owner on land/orchard basis compensation, outside the Administrative Unit boundaries, Second: If the property requested for acquisition is not a land or an orchard, the holder can still agree with the property owner on offering another property or real estate as a means for compensation. Section III: Compensation – Chapter II: Monetary Compensation Article 31: Compensating for farmlands. First: The value of the land is estimated by Iraqi donum (equivalent to 2,500 sq metric meters) and according to the prices of 1973 by referring to the selling procedures of the Land Registry Office as a basis to fairly compensate as follows: a. If the land is an absolute property and has been transferred to the property owner in or before 1973, the compensation is determined according to the prices of 1973, adding 4% amount for ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 20 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- each year till the date of inspection and estimation. Taking into account that compensation should not exceed the prevailing price, and that a part of a year (if it is more than six months) is considered as a year, b. If the land is transferred to the property owner after 1973, the compensation is determined according to the price registered in the property record (adding to it the percentage mentioned in Item a. above) and the prevailing price during the inspection and valuation. Second: In order to define the prevailing price during inspection and valuation, other factors shall be referred to, such as: land production, location, distance from markets, fertility, irrigation and planting methods and other land qualifications identified locally. Third: a. The compensation for disposing of lands owned by the Government is estimated by considering the lands’ value as it is considered an absolute property according to the basis mentioned in Items First & Second of this article. The compensation received by the Government is deducted according to the percentages laid down in Article 5 of the Law of Unifying Government’s Lands Types No. 53 of 1976. b. The value of facilities built on the land owned by the Government and decided for disposition is estimated according to rules mentioned in this Law if these facilities have been established for planting purposes, including the house of the land owner and the house of the land workers or if these facilities have been established according to valid legislations. These facilities may be demolished if they are not built for planting purposes or they are proved to have been built contrary to valid legislations. Fourth: The land shall be covered by the provisions of this Law if it is used for cultivating or could be used for cultivating based on its status during acquisition request regardless of its area, location and type mentioned in the land registry. This rule applies for cultivated lands which do not match the orchards conditions mentioned in the Agrarian Reform Law of 1970. Article 32: Compensating for Orchards & Planted Species First: Trees planted on this land are considered orchards, thus, they are estimated as in Article 31. However, the utilities are valuated according to the rules mentioned in Article 33. Second: The value of the trees is valuated according to the prevailing prices in the area as of the date of inspection and valuation taking into consideration the tree species, age, and whether it is fruitful or not, as well as other known qualifications. Article 33: Compensation for Property This includes residential, industrial, and commercial properties, as well as land for constructing buildings. These properties are valuated according to their prevailing prices during inspection and valuation, regardless of their value after implementing the project. The following rules apply: First: when estimating compensation, the following factors are taken into consideration: location of the property, level of construction, area, assets, and type of construction materials, as well as revenues attained by the property. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 21 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Second: The following references could be accounted for when evaluating a property: the value of the property as estimated by the Land Registry Office, values of neighboring or equivalent properties, or their selling prices, or their annual lease value, either actual or estimated for tax purposes. Third: The value of land and the value of buildings and other utilities and property (if any) are estimated separately. Fourth: The estimation is made using the cubic meter or by using a standard measurement unit. The Valuation Committee can make an estimation in whole (according to a previous decision) or by any other normally accepted method, in order to have a fair compensation. Section V: Disadvantages due to Acquisition – Chapter I: Ownership Loss due to Acquisition Article 49: In the case of partial acquisition, the property owner could request repossession of the whole property if the part left did not benefit from government improvement. The court could decide to return the whole property to the owner if the Valuation Committee verifies the lack of benefit. Article 50: The property owner is entitled for compensation, if partial acquisition has caused damages to the remaining portion of the property. Section V: Disadvantages due to Acquisition – Chapter II: Others’ Losses due to Acquisition Article 51: If the acquisition has led to harm/damage to other property owners (whom were not subjected to acquisition), then this property owner is entitled for compensation, for the said harm/damage. It is worth mentioning here that the Law does not consider offering people who are encroaching a government-owned land any alternatives for relocation. 4.2. World Bank Policy The World Bank’s Policy applicable to this project is: The Operational Policy on Involuntary Resettlement OP 4.12. However, the Bank’s policy on Access to Information was identified useful to this framework and to the public and implementing agencies as well. Involuntary Resettlement OP/BP 4.12 The Bank’s Resettlement Policy OP/BP 4.12 provides the following definitions and terminology in relation to the involuntary resettlement: Abbreviated Resettlement Action Plan (ARAP): For projects in which the number of people to be displaced with a loss of assets or restriction of access to assets is small (less than 200 persons will experience resettlement effects), an abbreviated resettlement plan (ARAP) is prepared. Compensation: Payment in cash or in kind for an asset or a resource that is acquired or affected by a project at the time the asset needs to be replaced. Cut – off date: The date the enumeration begins. Persons occupying the project area after the cut- off date are not eligible for compensation and/or resettlement assistance. Similarly, fixed assets (such as built structures, crops and trees) established after the date of completion of the assets inventory or an alternative mutually agreed date will not be compensated. Displaced persons: Persons who are affected by the involuntary taking or clearing of land or resulting ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 22 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- in: − Relocation or loss of shelter − Loss of assets or access to assets; or − Loss of income sources or means of livelihood whether or not the affected persons must move to another location. Involuntary resettlement: Resettlement is involuntary when it occurs without the informed consent of the displaced persons or if they give their consent without having the power to refuse resettlement. Land expropriation: Process whereby a public authority, usually in return for compensation, requires a person, household, or community to relinquish rights to land that it occupies or otherwise uses. Project-affected person (PAP): Any person who, as a result of the implementation of a project, loses the right to own, use, or otherwise benefit from a built structure, land (residential, agricultural, or pasture), annual or perennial crops and trees, or any other fixed or moveable asset, either in full or in part, permanently or temporarily. Relocation Action Plan (RAP): The document in which a project sponsor or other responsible entity specifies the procedures that it will follow and the action that it will take to mitigate adverse effects to compensate losses and provide development benefits to persons and communities affected by an investment project. Resettlement Action Plan (RAP): The document in which a project sponsor or other responsible entity specifies the procedures that it will follow and the actions that it will take to mitigate adverse effects, compensate losses, and provide development benefits to persons and communities affected by an investment project. Resettlement assistance: Support provided to people who are physically displaced by a project. Assistance may include transportation, food, shelter, and social services that are provided to affected people during their relocation. Assistance may also include cash allowances that compensate affected people for the inconvenience associated with resettlement and defray the expenses of a transition to a new locale, such as moving expenses and lost work days. Stakeholders: Any and all individuals groups organizations and institutions interested in and potentially affected by a project or having the ability to influence a project. Structure owner PAPs: Project Affected Persons who own structures within the project area. Tenant PAPs: Project Affected persons who lease either residential or business premises within the project area. Vulnerable groups: People who by virtue of gender, ethnicity, age, physical or mental disability, economic disadvantage, or social status may be more adversely affected by resettlement than others and who may be limited in their ability to claim or take advantage of resettlement assistance and related development benefits. The ultimate objective of the Bank’s OP/BP 4.12 is to ensure that populations displaced by a Bank- financed project receive benefits from it. Furthermore, the Policy has the following key objectives: - Avoid involuntary resettlement where feasible, or minimize resettlement impacts where population displacement is unavoidable, exploring all viable project designs. Particular attention must be given to socio-cultural considerations, such as cultural or religious significance of land, the vulnerability of the affected population, or the availability of in-kind ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 23 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- replacement for assets, especially when they have important intangible implications. When a large number of people or a significant portion of the affected population would be subject to relocation or would suffer from impacts that are difficult to quantify and to compensate, the alternative of not going ahead with the project should be given a serious consideration; - Provide explicit guidance to Bank staff and to the borrowers on the conditions that need to be met regarding involuntary resettlement issues in Bank operations in order to mitigate the negative impacts of displacement and resettlement and establish sustainable economy and society; - Ensure that displaced people receive resettlement assistance, preferably under the project, so that their standards of living, income earning capacity, and production levels are improved; - Set up a mechanism for monitoring the performance of involuntary resettlement programs in Bank operations and remedying problems as they arise so as to safeguard against ill-prepared and poorly implemented resettlement plans; - Encourage community participation in planning and implementing resettlement. Appropriate patterns of social organization should be established, and existing social and cultural institutions of resettlers and their hosts should be supported and used to the greatest extent possible. Additionally, resettlers should be integrated socially and economically into host communities so that adverse impacts on host communities are minimized. The best way of achieving this is for resettlement to be planned in areas benefiting from the project and through consultation with the future hosts; - Provide assistance to affected/displaced people regardless of their legality status. Land, housing, infrastructure, and other compensation should be provided to the adversely affected population, indigenous groups, ethnic minorities, and pastoralists who may have usufruct or customary rights to the land or other resources taken for the project. The absence of legal title of land by such groups should not be a bar to compensation; The World Bank’s OP 4.12 has precedence in terms of identification of adversely affected PAPs and provision of mitigation and compensation measures. The Policy prescribes compensation and other resettlement measures to achieve its objectives and requires that borrowers prepare adequate resettlement planning instruments prior to Bank appraisal of proposed projects. In this regard, the World Bank’s Policy requires that a Resettlement Action Plan (RAP) be prepared whenever private property must be acquired, or its use modified, for a project, and the acquisition or modification of privately-owned lands results in the loss of income, residence or access to resources, either permanent or temporary and whether the occupation is legal or illegal. RAP should be prepared in full for a number of PAPs equals 200 or more, while a shortened RAP (Abbreviated Resettlement Action Plan ARAP) is to be prepared for PAPs less than 200. Any livelihood-related impacts or impacts on private lands (temporary and/or permanent acquisition) will be addressed through this RAP in accordance with the provisions of the World Bank’s Operational Policy (O.P 4.12). A mature RAP/ARAP should include the following measures, to ensure that PAPs – at a minimum, are: - Informed about their options and rights pertaining to resettlement; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 24 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - Consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; - Provided prompt and effective compensation at full replacement cost for losses; - Provided assistance (such as moving allowances) during relocation; and - Provided with residential housing, or housing sites, or as required agricultural sites for which a combination of productive potential, location advantages and other factors is at least equivalent to the advantages of old sites. Where it is necessary to achieve the objectives of the resettlement plan, it should also ensure that displaced persons are: - Offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standard of living; and - Provided with development assistance in addition to compensation measures, such as land preparation, credit facilities, training, or job opportunities. The World Bank Policy on Access to Information In addition to the safeguard policies, the Access to Information Policy also relates to safeguards. To promote transparency and facilitate accountability, Bank Access to Information Policy supports decision making by the Borrower and the Bank by allowing public access to information on environmental and social aspects of projects in an accessible location and understandable form and language to key stakeholders. The Bank ensures that relevant project- related environmental and social safeguard documents, including the procedures prepared for projects involving subprojects, are disclosed in a timely manner before project appraisal formally begins. The policy requires disclosure in both English and the local language (Arabic in this case) and must meet the standards of the World Bank. 4.3. Gaps between Iraqi Law and the Bank Policy The Project is financed by the World Bank Group, which requires the full compliance with the Bank’s environmental and social safeguards. Furthermore, implementing the Project will have to go through the Iraqi system, which is also governed by acts and decrees as described above. Both statutory bodies share the objective of pushing developments forward in a harmless (or at the least harmful) manner to the environment and people. Although, the Bank’s and Iraqi regulations support the undertaking of this Project, some negative socio-economic impacts of the Project were identified, and could be inevitable. Addressing and/or mitigating these effects would not be so easy or straight forward; due to some gaps in the requirements of the two governing systems. This may be the case with regard to the extent of stakeholder consultation/participation in the resettlement process, payment of compensation, grievance redress mechanisms, squatters and encroachers, information disclosure. Wherever there is insufficient information by the Iraqi laws, or where there is some disagreement/conflict with the Iraqi laws, the requirements of the World Bank Policy on Involuntary Resettlement OP 4.12, as outlined by this Framework, will take precedence. In essence, national laws do not provide alternatives for the displacement of PAPs located on a State- owned land, especially when it relates to having no legal title to the asset/property that PAPs are using. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 25 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Sub-Projects of Component 1 would not require land acquisition for carrying out activities, however, some spaces are most probably required for work preparation/stockpiling/ labor resting, etc. though cannot be identified at this stage. Additionally, worksites could involve the need for buffering zones, as in the case of culvert and drainage clearing works, which would entail clearing spaces from encroachers, squatters, or existing assets out of those areas and right of ways. The Iraqi Acquisition Law neither entitles any illegal holder of a property for any kind of compensation nor does it provide a fair compensation for those who have the legal tenure. The Project owner should take into consideration any possibilities of losses (assets/livelihoods/shelter, etc.) due to any action of economic displacement/ involuntary resettlement on people who occupy/utilize the Land at the time of the Project implementation. This kind of involuntary resettlement is fairly addressed in the WB's "Involuntary Resettlement OP/BP 4.12" in terms of applicability and means for compensation. The table below summarizes the gaps between the provisions of the World Bank Policy and those of the effective Iraqi Land Acquisition Law no. 12. Table 3: Comparison of Iraq Law and the Bank Policy Key Issue WB Iraqi Laws Policy of avoidance or Avoid or minimize by exploring Not specified (but common practice by the minimization of all viable alternatives; If Government has been to minimize this to the displacement of persons resettlement required – execute as extent possible) sustainable Program. Definitions of Adversely People impacted by: People impacted by involuntary taking of land Affected Persons resulting in loss of land, assets and livelihoods 1. Involuntary taking of land, 2. Loss of shelter, assets, income sources or livelihood, 3. Involuntary restriction of access to protected areas resulting in adverse impacts on livelihood. Requirement for Full RAP is required for 200 Law provides for identification through land Resettlement Action Plan adversely affected people or title registration, and a valuation/compensation (RAP)/ Resettlement more. committee is formed to verify adversely Policy Framework (RPF) affected persons. The law provides for Abbreviated RAP is for less than monetary compensation for one year of crops 200 adversely affected people lost for the entire packet of land leased/owned by the PAP. According to Decision No. 360/2008 of the Council of Ministers, compensation amounts have been identified for crops, trees, etc. 25% of agricultural land can be acquired without compensation. If the entire packet of ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 26 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Key Issue WB Iraqi Laws land is acquired the PAP is provided with 12% equivalent as “private” land. Consultations Affected persons, communities, The only consultation requirement is the local authorities, NGOs – on negotiation procedure set between affected eligibility criteria for parties with the compensation committee compensation and assistance; Displaced persons & their communities and host communities – participate in planning, implementing and monitoring of resettlement process; PAP’s will be meaningfully Consulted Impact on Informal Included, but only entitled to Law does not provide for resettlement Settlers resettlement assistance for assistance or mitigation for informal/illegal structure, other assets lost (other settlers. than land), and livelihood losses during resettlement Compensation for Replacement houses or full Cash compensation for these assets as per Housing/Structures established public valuation records replacement costs Compensation for Land Land in urban areas: market value Law provides for acquisition of 25% of land of land of equal size/use w/similar without compensation. Acquisition of the public infrastructure and services whole packets of leased state-land provides for in same vicinity, plus cost of any compensation of 25% of that land packet size, transfer taxes (BP 4.12) also either in agricultural areas or in urban areas. known as replacement cost; Agricultural land: market value of land of equal productive potential in vicinity plus the cost of preparing land to levels similar to affected land plus cost of transfer taxes & registration (BP 4.12); “Land” also includes anything growing or permanently affixed to land – including crops (OP 4.12). Livelihood Support/ Provides development assistance Not provided for. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 27 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Key Issue WB Iraqi Laws Transitional Assistance such as land preparation, credit facilities, training or job opportunities (also includes business premises); For impacts on agricultural land – PAPs that are actively cultivating affected land are given combination of training, money to invest to improve productivity, agricultural extension and income restoration allowance. Disclosure and access to Disclosure findings and proposed There is no explicit mentioning of the need to information management actions to the public disclose information to the public on in an accessible way and by using resettlement process outcome a language fairly understandable by the target community. The public can access information through the Bank’s website. Given the gap between GOI laws and regulations and OP 4.12, the Ministry of Labor and Social Affairs should need to get in compliance with the Bank’s OP 4.12. Thus, the principles of OP 4.12 will apply to all Subproject activities and guide the land acquisition and resettlement planning and implementation involved in the proposed Project. The Project (ESSRP) will follow the Bank’s disclosure guideline consistent with its safeguards operational policies to include proper in-country disclosure of documents in a form and manner appropriate to, and accessible to the local population. The intent is to make safeguard documents available to all project stakeholders in their local languages, but especially to the directly impacted populations. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 28 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 5: Initial Estimation and Eligibility Criteria 5.1. Project Affected Persons and Structures Project Affected Persons (PAPs) are defined in this policy framework as any individual(s) who may be subjected to adverse economic, social, or cultural impacts by the WB’s financed projects. These impacts may constitute anything ranging from the loss of physical assets such as land, farmlands, crops, commercial properties, homes, personal belongings, sources of income, and cultural/ historical/religious sites, to non-physical assets such as social capital and cultural networks and activities. Moreover, adverse impacts also include the loss of access to the physical and non-physical assets and the involuntary restriction of access to legally designated parks and protected areas. Sub-projects of small-scale working activities (under Cash-for-Work) will not require new lands, since these activities will be done on public properties. However, worksite/campsites are expected in some locations, which will be situated on state-lands as much as possible. Some interruption to daily business activities might be observed, but minor in magnitude. To the time of preparing this document, working sites are not identified. However, this RPF takes into consideration the broader effects and all possible losses resulted from this Bank-financed project. The following table encompasses all likely categories and impacts, which has to be furthered by a detailed survey. Table 4: key possible impacts and losses in the Project Category Inclusions Land - Agricultural land (rented or owned) - Access to land Structures - Houses or living quarters (rented or owned) - Other physical structures (rented or owned) - Income from crops - Income from wage earnings Income - Income from fishing areas - Income from affected business - Access to formal employment opportunities - Public Schools - Public Hospitals Communal - Markets - Community centers - Cemeteries - Social capital: networks, activities, relationships - Religious shrines Religious and Cultural - Worship areas (mosque, church, synagogue) - Cultural, historical, sites - Access to natural resources Environmental - Negative environmental impacts resulting from land acquisition or from the project itself In principle, projects are not permitted to be situated on public cemeteries or private graveyards or causing damage thereof. Additionally, no subproject be established on or cause any damage to cultural and religious physical assets. If extremely necessary, such cases shall be subject to the Laws of the Government of Iraq. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 29 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 5.2. Eligibility Criteria All PAPs who suffer a complete or partial loss of assets or access to assets shall be eligible for some kind of assistance, according to their legal rights to the land, if it can be proven that they occupied the land before the claim cut-off date. A Cut-Off date is to be established when surveying losses and PAPs, after which no claims to be accepted. The Bank OP4.12 specifically proposes three general categories for eligibility as shown in the table below. Table 5: Eligibility categories and their relevant entitlement Displacement Category Entitlement - Compensation for loss in land and assets at full replacement cost. First: - In case of physical relocation, provide Individuals who have formal legal rights assistance during relocation (i.e. moving to land (including customary and allowances) and residential housing and / or traditional rights recognized under the agricultural sites with productive and laws of Iraq) location advantages equivalent to the lost sites. Second: - Compensation for loss in land and assets at Individuals who do not have formal legal full replacement cost. rights to land, but have a claim to such - In case of physical relocation, provide land or assets (provided that such claims assistance during relocation (i.e. moving are recognized under Iraqi laws or allowances) and residential housing and/or become recognized through a process agricultural sites with productive and identified in the resettlement plan) location advantages equivalent to the lost sites. - Development assistance in addition to compensation measures (i.e. land preparation, credit facilities, training, job opportunities). Third: Resettlement assistance isn’t available Individuals/ encroachers who have no according to Iraqi laws. However, discrepancy recognizable legal right or claim to the land has been dealt with as in table 3 above. they are occupying (i.e. squatter settlements, disputed ownership). 5.3. Estimated Potential Resettlement Impacts As explained in the RPF Rationale, subprojects of ESSRP, especially those related to CfW and livelihoods opportunities will not involve land acquisition. Resettlement is not foreseen for any of the subprojects either. However, and given the stressed socio-economic context of the country in general, and the poor control over public areas and state lands, and insufficient enforcement of the law, some encroachers might be found in places where the rehabilitation works are to take place. Examples include occupation of public schools, settlement in state lands and public parks, occupying the right of way (where culverts and drainage channels are to be cleaned) for different reasons, for instance, for selling light goods to road travelers. These are some of the site features and disordered activities that might be hindering progression of civil works and/or obstructing daily livelihood means. There is no ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 30 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- enough information about the level of existing of those features and activities in the target seven governorates, or the degree of resettlement/evacuation required, which entails doing a full survey (census) to the sub-projects sites in advanced stages of the Project. Therefore, it would be hard to estimate losses and magnitude of socio-economic impacts at this stage. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 31 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 6: Methods of Valuation and Compensation 6.1. Asset Valuation The valuation of losses in physical assets will be carried out by assessing the market value of the assets, if known, and estimating the replacement cost. Replacement cost is simply calculated as the cost of replacing the lost assets plus any transaction costs associated with bringing the asset to pre- displacement value. However, if the land includes orchards/crops/livestock, then valuation will mainly rely upon the price lists developed by the Agriculture directorate/ Ministry of Agriculture and revisited annually. Replacement cost will vary depending on the type of asset, as shown in the following table. Table 6: Replacement Cost of Assets Asset Replacement Cost Agricultural Land Equals the pre-project or pre-displacement, whichever is higher, market (owned and leased) value of land of equal productive potential or use, located in the vicinity of the affected land, plus the cost of preparing the land to levels similar to those of the affected land, plus the cost of any registration and transfer taxes. For leased lands the Project proponent (MOLSA) will buy the land from the Ministry of Agriculture, and the Ministry of Agriculture in turn, will Equal the pre-project or pre-displacement, whichever is higher, market value of land of equal productive potential or use, located in the vicinity of the affected land, plus the cost of preparing the land to levels similar to those of the affected land Urban Land Equals the pre-displacement market value of land of equal size and use, with similar or improved public infrastructure facilities and services and located in the vicinity of the affected land, plus the cost of any registration and transfer taxes. Houses /Other Equals the market cost of the materials to build a replacement structure with Structures an area and quality similar to or better than those of the affected structure, or to repair a partially affected structure, plus the cost of transporting building materials to the construction site, plus the cost of any labor and contractors’ fees, plus the cost of any registration and transfer taxes. Crops and trees Trees and crops will be compensated based on the market value. The market value will be determined by a committee of experts. 6.2. Compensation Compensation will be provided to all individuals whose assets or access to assets is affected or damaged, as a consequence of land acquisition (although highly unlikely) or any other activities undertaken by the sub-projects. The compensation for the loss of physical and nonphysical assets will vary depending on the type of loss, and eligibility of the PAPs. Compensation may come in the form of cash compensation, in-kind compensation, and/or other kinds of assistance, like assistance for relocating and providing job opportunities. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 32 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- All PAPs will be entitled to monetary compensation at replacement cost, at market value (at the entitlement cut-off date) for affected tangible assets. Another option may be in-kind compensation where the affected assets would be replaced with an asset of similar size, value, and quality. The decision on which type of compensation is used should be jointly agreed upon between the project staff and the PAPs and shall be subject to the availability of replaceable assets. Moreover, development and resettlement transitional assistance needed to restore the livelihood and standard of living of PAPs under the project to pre-project levels shall also be part of the compensation component of any resettlement plan (i.e. short-term jobs, subsistence support, moving allowance, salary maintenance, food assistance, etc.). It should be noted here that compensation for losses in communal property shall only be in-kind for the community as a whole and shall take the form of reconstruction of the affected or damaged facility (i.e. public-school buildings, markets, etc.) to - at least - the same standard it was on prior to the Project’s implementation. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 33 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 7: Institutional Arrangements for Resettlement Planning and Implementation 7.1. General Arrangements Resettlement planning should be attached to MOLSA. The MOLSA has already established a Project Management Office (PMO), which will draw upon resources available at the ministry, and will have responsibilities that include; Information Management of the Project, and the allocation of needed resources to carry out an E&S Assessment, as well as manage a Project-related Grievance Redress Mechanism (GRM). However, with respect to resettlement planning, the following responsibilities could be attached to the Office: - Be responsible for the routine management of the consultant’s recruitment to prepare the RAPs/ARAPs; - Assign environmental, social and legal specialists to support this work; - Provide information required by the consultants; and - Set criteria for alternative locations and decide about area that needs to be acquired/utilized. Entitlements can be identified and delivered to PAPs by proceeding through the following: 7.2. Project Screening Once locations and exact areas are identified for the sub-projects, the PMO and the consultants will obtain all permits/approvals related to the working activities and use of worksites. Thereafter, the social development specialist of PMO will cooperate with relevant authorities to carry out social screening to determine whether or not the sub-project will result in any resettlement impact and expected numbers of PAPs. This assessment should necessarily include consultation with stakeholders (incl. target communities) in order to inform the public and jointly solidify mitigation measures. Accordingly, PMO will decide the need for the preparation of a Resettlement Action Plan (RAP) or an Abbreviated Resettlement Action Plan (ARAP) all in accordance with OP/BP 4.12. 7.3. Preparation of Socio-Economic and Inventory Survey Based on the findings and results of the sub-project screening, and stakeholder consultation, PMO and the consultants will carry out a socio-economic study and census survey, in which baseline data within the sub-projects’ sites are collected. This information shall include the PAPs and related household members and dependencies, total land holdings, and affected assets, amongst other things. This information will be put in writing and shall be used in determining the appropriate compensation and assistance for each affected individual / household. The objective of conducting this socio-economic survey is to: - Introduce the project to the PAPs, - Collect census data to identify PAPs on the individual and household levels, - Collect census data to identify vulnerable and severely affected PAPs, ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 34 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - Collect census data on the overall socio-economic environment of the affected communities, - Identify stakeholders, - Identify impacts of the sub-project on the livelihoods of the PAP (i.e. property, structures, income, etc.), - Identify any concerns or worries the PAPs may have, and - Identify the resettlement preferences of the PAPs. 7.4. Preparing and Approving Resettlement Action Plans The overall responsibility for preparing a RAP for each sub-project of the ESSRP will rest with the MOLSA. All finalized RAPs should be concluded according to the Bank's resettlement framework (OP/BP 4.12) and in line with Iraqi laws (where applicable). At the very beginning of the project(s), it is expected that MOLSA would hire a consultant to prepare a RAP/ARAP for each of the sub- projects, while environmental, social, and legal specialists (already working at MOLSA) should be assigned to work closely with the Project Team in order to oversee implementation and provide information to the consultant. Once prepared, all draft RAPs/ARAPs shall be submitted to the Bank for comment and approval. No work activities to commence until a RAP/ARAP has been prepared and approved by the Bank. Any project that shall entail the acquisition of land or may result in the involuntary resettlement of people (although very unlikely) or loss or restriction of access to private or communal resources will require the preparation of a Resettlement Action Plan (RAP) or abbreviated Resettlement Action Plan (ARAP) depending on the number of people affected or the significance of the resettlement/displacement impacts expected. Next steps for proceeding with RAP preparation include: - Compiling detailed data on land use from the land registration department as well as from available maps from the web (Google Earth® could be used in this case as one option). Other baseline data would include information on demography, socio-economic and socio-cultural aspects of the areas within which the new interventions will take place, in order to identify PAPs, get information on what assets will be affected and how this information will be collected, - Commissioning field surveys by the PMO, who should also have participation from official surveyors in their departments. Field visits should include participation from land registration department and other departments from concerned municipalities as well. This would confirm information on affected plots and assets and solidify information of livelihood losses and options for relocating, - Getting broader information on socio-economic characteristics of the affected populations, - Identifying stakeholders responsible for surveying, valuating assets, consulting the public and disseminating proposed mitigation measures, developing grievance redress mechanisms, and furthering monitoring systems, and - Confirming needed budgets for RAPs preparation, including for contingencies. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 35 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- The RAP should assess the number of PAPs, propose alternative locations for the sub-projects if possible, identify the eligibility criteria, include provisions for compensation and assistance, and address the means by which the sub-project monitoring and evaluation will take place to ensure that the PAPs receive their compensation and that their grievances are heard and addressed. The mitigation measures and compensation policies proposed in the RAP shall be disclosed to the PAPs for feedback and comments. More specifically, the full RAP (for 200 PAPs or more) should include as a minimum: - A description of the sub-project; - Identification of potential impacts; - Objectives of RAP; - Relevant findings of the socio-economic study; - Legal framework; - Institutional framework; - Eligibility criteria and eligible PAPs; - Valuation and compensation for losses; - Resettlement measures; - Site selection, site preparation, and relocation; - Housing, infrastructure, and social services; - Environmental protection and management; - Community participation; - Integration with host populations; - Grievance redress procedures; - Organizational responsibilities; - Implementation schedule; - Costs and budget; and - Monitoring and evaluation. If PAPs are less than 200 people, or if all the PAPs suffer only minor impacts (i.e., lose less than 10 percent of their income producing assets), and the sub-project does not involve any physical displacement, then an abbreviated plan (ARAP) should be prepared. An ARAP should include as a minimum: - A census survey of displaced persons and valuation of assets; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 36 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - A description of compensation and other resettlement/displacement assistance to be offered and the basis for compensation rates; - Consultations with displaced people about acceptable alternatives; - Institutional responsibility for implementation and procedures for grievance redress; - Arrangements for monitoring and implementation; and - A timetable and budget. RAP/ARAP Review and Approval The RAP/ARAP, including the proposed mitigation measures within the plan, will need to be reviewed by environmental and social teams of MOLSA and approved by PMO Head then will be sent to the WB for final review and approval. RAP/ARAP Implementation Once the RAP/ARAP is approved by the Bank, it will be translated into Arabic and disclosed locally as well as in website at the Bank. The PMO and relevant authorities are responsible for the implementation of the RAP/ARAP. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 37 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 8: Stakeholders’ Consultation 8.1. Informing the Public/ Project Launch As part of undertaking environmental and social impact assessments for the Project activities in the seven target governorates, the nominated focal points and teams at each governorate, in liaison with PMO/MOLSA, have conducted personal interviews/ small group meetings within the premises of Labor and Social Affairs Directorates (LSADs). The meetings aimed at introducing the Project components and activities, benefits brought by the Project, and concerns and views of possible effects (including socio-economic effects). Additionally, MOLSA is advertising the Project through its official website, and through social media (Facebook, and Twitter). 8.2. The Consultation and Results Collected The study team has used a pre-designed questionnaire to collect views from participants in all seven governorates (Baghdad, Salahideen, Diayal, Anbar, Kirkuk, Ninawa, and Babel). The questionnaire applied was intended to be simple, straightforward, and written in Arabic. The Questionnaire begins with providing basic information about the Project, and its various components. Questions have concentrated on social and environmental impacts, but with more emphasis on social/socio-economic impacts, as expected from carrying out activities of Components 1.1, 1.2, 1.3, and 2. While environmental impacts focused on workers and community heath, waste disposal, land contamination, as well as damage to cultural/historical objects. Questions included the option to rate severity/ significance of the impact, and allowing for more input about other possible impacts, as well as providing more space to express general views about the Project. Annex I provides a copy of the questionnaire as well as a participants’ register. The pre-designed questionnaire was chosen for carrying out consultations to avoid public gathering/ big meetings, as many areas were still living insecurity conditions; visitors to the MOLSA departments were targeted, including vulnerable groups (the elderly, and women), while they were pursuing living opportunities and services during their visits to MOLSA’s different departments. Additionally, the questionnaire saved a lot of time, money, and effort for setting up bigger public gathering places and using transport thereto. The following table provides primary information about participants: Table 7: Participants of the consultation interviews Parameter Baghdad Salahidee Diyala Anbar Kirkuk Ninawa Babel n Date(s) of 15, 16, 17, 18 16, 17, 18 Oct 4 & 5 Nov 28 Oct 2018 21 Oct 2018 15 & 16 Oct 17 & 18 Oct Oct 2018 2018 2018 2018 2018 interviews Number of 20 19 14 15 21 13 20 participants Gender 16 (M) 11 (M) 10 (M) 10 (M) 13 (M) 9 (M) 15 (M) 4 (F) 8 (F) 4 (F) 15 (F) 8 (F) 4 (F) 5 (F) Marital 9 (single) 3 (single) 1 (single) 6 (single) 10 (single) 5 (single) 2 (single) status 11 (married) 11 (married) 10 (married) 7 (married) 8 (married) 8 (married) 16 (married) ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 38 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Parameter Baghdad Salahidee Diyala Anbar Kirkuk Ninawa Babel n 2 (divorced) 3 (widowed) 2 (divorced) 3 (divorced) 2 (divorced) 3 (widowed) Educational 1 (illiterate) 3 (illiterate) 13 (primary 8 (primary 5 (primary 2 (primary 1 (illiterate) school) school) school) school) level 1 (primary 10 (primary 9 (primary school) school) 1 (diploma) 2 (diploma) 13 (diploma) 7 (diploma) school) 14 (diploma) 3 (diploma) 5 3 4 6 (diploma) undergraduate undergraduate undergraduate 1 3 4 undergraduate undergraduate undergraduate 2 (graduate) Interviewees were asked to read and rate the expected environmental and social impacts, as suggested in the Questionnaire. That has inherently included rating for expected involuntary resettlement impacts as well (item 10). The following table shows top selections (highest percent) per each governorate and the overall rating accordingly. Table 8: E&S impact rating by interviewees Level of participation & Significance Rating Overall Impacts Baghdad Salahideen Diyala Anbar Kirkuk Ninawa Babel Significance (20) (19) (14) (15) (23) (13) (20) Rate Component 1.1 – Cash-for-Work opportunities 1 Inflation and price Moderate High High Minor Moderate Moderate High Moderate distortion in local (40%) (68%) (71.4%) (53%) (39%) (77%) (50%) markets 2 Cash goes to illegal Minor Moderate High No No Moderate Moderate Moderate activities (45%) (42%) (71.4%) impact impact (39%) (45%) (60%) (48%) 3 No one wishes to Minor High High Moderate Minor Moderate Moderate Moderate volunteer for his/her (30%) (42%) (92.9%) (60%) (35%) (54%) (40%) community any more. No impact (35%) 4 Elderly, sick, and Minor High High No No High High High disabled community (50%) (68%) (78.6%) impact impact (62%) (40%) members can’t (53%) (61%) Moderate participate. (40%) 5 Child labor Minor High High Minor Minor High Moderate Minor (35%) (42%) (92.9%) (80%) (52%) (69%) (35%) 6 Beneficiaries think of Moderate High Moderate Moderate Moderate Moderate High Moderate CfW as long-term & (55%) (58%) (50%) (86%) (35%) (54%) (30%) primary source of Moderate income (30%) 7 Women at households Moderate High (Moderate) Minor No Moderate Moderate Moderate are unable to control (50%) (47%) (64.3%) (60%) impact (77%) (35%) over their own (61%) income 8 Discrepancy/ poor Moderate High (Moderate) Moderate High Moderate Moderate Moderate selection of people (65%) (42%) (64.3%) (60%) (61%) (39%) (30%) during field operations 9 Security issues (risks Minor Moderate (Moderate) No Moderate High High Moderate of attack, extortion, (55%) (42%) (64.3%) impact (39%) (54%) (30%) ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 39 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Level of participation & Significance Rating Overall Impacts Baghdad Salahideen Diyala Anbar Kirkuk Ninawa Babel Significance (20) (19) (14) (15) (23) (13) (20) Rate theft, tension) (67%) 10 Temporary land Minor High (Moderate) Minor Moderate Moderate Moderate Moderate acquisition, relocation (40%) (53%) (71.4%) (60%) (48%) (54%) (40%) of encroachers or IDPs, and interruption or loss of livelihood (adjacent businesses) 11 Occupational health Minor Minor (Moderate) Moderate Moderate Moderate Moderate Moderate and safety issues (40%) (42%) (85.7%) (67%) (57%) (54%) (35%) (over-exertion, slipping, falling from heights, stuck by objects, electrical shocks, respiratory problems) 12 Community health Minor High Moderate Minor Minor Moderate High Minor and safety issues (50%) (68%) (57.1%) (80%) (52%) (31%) (40%) (pests & diseases, excavation, dust & noise, heavy traffic) 13 Waste water disposal Moderate High High Moderate Moderate High High Moderate and solid waste (55%) (84%) (50%) (73%) (39%) (77%) (45%) accumulation 14 Land contamination Moderate High High Minor Minor High High High & sediments runoff (55%) (79%) (71.4%) (53%) (30%) (69%) (40%) 15 Endangering Moderate High High Minor No High High High biological life (40%) (47%) (57.1%) (40%) impact (54%) (40%) (57%) 16 Possible damage to Moderate High High High No Moderate High High objects of historical/ (35%) (68%) (57.1%) (60%) impact (46%) (45%) cultural value No (57%) impact (35%) Component 1.2 – psychosocial services 17 Discrimination Moderate High High No Moderate Moderate High Moderate among beneficiaries (35%) (58%) (42.9%) impact (35%) (54%) (35%) due to ethnicity, Minor (93%) religion, culture, or (35%) gender 18 Poor service due to Minor High No impact High No High High High insufficient capacity, (50%) (84%) (35.7%) (60%) impact (54%) (50%) cadre, and equipment (44%) Component 1.3 – livelihood opportunities 19 Poor supplies and Minor High High Moderate Moderate High High High poor demands for (60%) (53%) (64.3%) (60%) (48%) (62%) (40%) products and services Minor in businesses’ (40%) locations 20 Increasing debt Minor High High High Minor High High High burden, fail to (45%) (79%) (57.1%) (53%) (48%) (69%) (35%) generate sufficient Moderate income to support (30%) their families, and pay back loan 21 Beneficiaries change Minor High High Moderate No Moderate High Moderate their business (45%) (47%) (50%) (53%) impact (69%) (35%) (52%) Moderate (30%) Component 2 – Resilient Social Safety Nets 22 Excluding poorest Moderate High High High Moderate High High High and marginalized (50%) (47%) (71.4%) (67%) (30%) (85%) (60%) (they are unaware! or No ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 40 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Level of participation & Significance Rating Overall Impacts Baghdad Salahideen Diyala Anbar Kirkuk Ninawa Babel Significance (20) (19) (14) (15) (23) (13) (20) Rate can’t go and/or apply) impact (30%) 23 Excluding poorest Moderate High High Moderate Minor High High High and marginalized (50%) (47%) (64.3%) (67%) (39%) (62%) (70%) (misidentification, ineffective targeting) Moreover, the following provide notes and views about the Project, which mostly express interests and concerns, and few pictures taken during interviews. Table 9: Notes and views collected during public consultations Governorate Notes and views Baghdad - Shortage in working staff, especially the social welfare, and field staff in rural areas - Using state lands for agriculture is still restricted - Fluctuation in market prices (imported goods) - People are not fully aware about communication channels with MOLSA - Financial aid for the poor could include for building them suitable houses - Insufficient education for children in rural areas, - Insufficient psychosocial support opportunities in rural areas Salahideen - The Project should be a serious one, and should commence quickly - The Project should have enough monitoring, and reaches out poor families - Should include opportunities for housing the poor - Most people do not have adequate knowledge about the Project, as they perceive it as governmental job openings - More attention to be given to the unemployed, the elderly, and the orphans Anbar - There should be enough job opportunities for fresh graduates - Vocational training centers in Anbar lack enough equipment - Transportation expenses should be covered, especially those living in remote areas - The Project is important to enhance social stabilization and revive economy Kirkuk - The project in general is good and would service affected communities given it is within the right hands away from financial corruption or exploitation work position - The Project should avoid small wages, and should provide security to workers - There should have enough monitoring on the CfW program - Enough attention should be given to the poor in rural areas, as they do not know about the Project Ninawa - Additional activities are needed to cover more people - The project as such would be beneficial for increasing self-esteem, and provide social support - All vulnerable groups of women married, divorced, and widowed should be covered with the SSNs - The Project should diligently track those in need, especially those who are not covered by any of the support programs Babel - None ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 41 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Table 10: Pictures taken during public consultations ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 42 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 43 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 8.3. Public Consultation in Resettlement Planning and Implementation Context The public consultation is an important episode of resettlement planning process. It is an ongoing activity that applies participatory approaches throughout the entire project cycle. Specifically, public consultations shall take place during the following stages. - Project inception and planning, - Screening process, - Feasibility study, - Preparation of project final designs, - Resettlement and compensation planning, - Drafting and reading/signing of the compensation contracts, - Payment of compensations, - Resettlement activities, and - Post compensation monitoring and as relevant community support activities. The core value of holding public consultations and participatory meetings is that they need to be conducted openly and at the local scale. Such meetings can be called for via local media, including ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 44 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- TV, radio, and newspaper, as well as official posts in the governmental buildings. Meetings also should be supported by proper feedback documentation. For instance, preparation of questionnaires, asking for written proposals/ applications forms, and collecting notes. The public consultation must take into account low literacy levels prevalent in rural communities. Public consultations shall be carried out in more detail, for the RAP preparation, once PAPs are identified through a census. This would entail carrying out the RAP on the specifics of resettlement impacts; resettlement options; and on the development of a grievance redress mechanism suitable for the local context. The nature of consultations, and outreach methods, shall be more fine-tuned after the details on the census (who is affected); and on impacts (how are populations impacted) have been determined. Proper methodologies for consultation and outreach would include for instance, the tools that are best used to disseminate information about the project; elicit stakeholder participation and also provide data on the nature of consultations to be conducted and how (i.e., informal, small group settings, the use of proxies; specific outreach methods for more vulnerable populations; outreach methods for women, amongst other such issues). These will be developed once clarity on the detailed impacts is available. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 45 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 9: Grievance Redress Mechanism (GRM) During the Project implementation, and carrying out associated activities, negative effects on beneficiaries and issues in the field are very likely, but – as explained above – are different in magnitude. The most effective mitigation measure for the identified impacts will be ensuring that project beneficiaries and project-affected people are actively involved. In this regard, there are two main tools through which this can be achieved: (1) raising public awareness and carrying out mandatory public displays; and (2) establishment of a viable Grievance Redress Mechanism (GRM). 9.1. Raising public awareness Information about the grievance handling system described below will be distributed at an early stage of the Project to all Project Affected Persons through regular information channels used by the Project, including initiating meetings at the start of the Project where feasible, public meetings during project implementation, brochures/pamphlets in Arabic Language, posting on notice boards and online when necessary. The process of raising a complaint should be explained by reaching out the community in all targeted governorates, or by conducting a meeting with community representatives at the local level. It is important that community representatives include women at all times. MOLSA will have the overall responsibility of addressing concerns about resettlement issues brought to the attention of the focal points. As such, MOLSA will establish a unit in its head office to handle project activity‐related complaints with one to two dedicated focal points. Multiple access points (telephone, complaint box, website, email, text message, etc.) will be provided so that beneficiaries are provided with several modes to voice complaints/concerns. The contact information of the GRM focal point(s) will be posted in the local language at the local level. The Project Director in MOLSA will have the overall responsibility of addressing concerns brought to the attention of the focal points regarding any resettlement impacts resulting from project activities. Complaints received by MOLSA will be registered, tracked, investigated and promptly resolved. Copies of complaints will be recorded in the activity files and the progress reports, including the number, type and actions taken. 9.2. Proposed GRM system The following section provides typical requirements for establishing a better system to serve for a Project’s GRM. The proposed GRM for the ESSRP aims to resolve issues that could come across implementation promptly, more efficiently, and accurately. The design of the GRM system should provide means for collecting supportive documents and evidences, investigating the problem, and supporting the final decision. More specifically, the proposed GRM should: - Reduce fraud and forgery; - Increase trust between citizens and the state; - Increase transparency in procedures; - Include complainer in the process as part of the solution; and - Circumvent issues before they escalate. Key design features may include: ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 46 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- - Diversifying complaining channels and access points; - Providing access points on the local level; - Setting clear procedures, including the use of simplified local language; - Swiftly responding to complaints; and - Allowing a two-way communication channel with the Complainant. Complainants would commonly approach this GRM for many reasons, including those related to incomplete or no service, vague procedures, inappropriate/ unfair treatment by the staff, and harm (environmental and/or social) to individuals or groups as a result of carrying out the Project’s interventions. Users of the system include all people working under this Project, and Project Affected Persons (PAPs), as well as vulnerable groups providing their grievances directly or indirectly through an intermediate. The complaint/ grievance, once received, should be promptly resolved or undergo further investigation. Complaints are sorted out according to complexity. Direct responses should be given to simple inquiries by concerned staff member in 3-6 working days as a maximum and should be documented and archived as per the relevant procedure. While, more comprehensive measures should be applied to complex issues, including field investigation and communicating with higher management for final decisions within a timeframe of 20 working days as a maximum. Procedure for Simple issues: The design of this procedure aims to resolve issues that do not require field investigation, swiftly, directly and at the point where the complainant lodges his/her application. In this case, the Complaints Receiving Officer (Registration Officer) will interact with the complainant directly and instantly, provide necessary explanations, and take actions accordingly. This would also include the Officer delegating part of or the whole case to his/her assistant(s), in order to ensure a quicker response, and not overloading higher management unnecessarily. More specifically, the Registration Officer shall take the following actions upon receiving the complaint: - Determine the suitability and validity of the complaint and whether it is related to the Project or any of its elements. If the complaint is not related to the Project, but is related to another government entity, the responsible Officer will refer the complainant to the appropriate authority to process his/her complaint; - If the complaint is validated, the Registration Officer shall use a pre-prepared application form to register the issue; and - The Registration Officer shall then determine whether the complaint is valid for the solution directly or need to be investigated and raised to a higher level. If the problem needs to be investigated more, the Registration Officer must submit it directly to the other responsible officer and not declare any action to the complainant before the investigation is completed. However, the Officer shall ensure the following points before processing the application: - Obtain a clear and complete picture of the complaint, this may require asking the complainant additional questions; and - Gain enough understanding of the outcome expected by the complainant, if the expectation was unrealistic or not related to the issue, the Officer shall explain this to the complainant; ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 47 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- This type of this complaint shall be resolved in no more than 3 – 6 days, which means that the Complainant must get the final answer within a maximum period of 6 days. The complainant shall also be notified in case of extension and be informed the reason thereabout. Nevertheless, the duration should not exceed a 10-day time limit including necessary proceedings. Procedure for Complex issues: This stage of grievance redress involves further investigation and should be considered for the following cases: - If Registration Officer has already tried to solve the problem directly, but no satisfactory result was obtained for the Complainant; - The Complainant directly requested an investigation; - The issue already requires careful research and investigation; and - The problem is serious or could result in broader effects. However, the following points should be fulfilled before advancing to a higher level: - The Officer is fully aware of the problem and adequately understands the outcome the Complainant is looking for; - The Complainant was contacted for additional information, as there was ambiguity, or missing supportive documents; - The Registration Officer provides all his/her observations and steps taken in the previous stages to the Officer responsible for the investigation. The duration of this type of complaints is 20 days as a maximum, meaning the complainant must be notified of the decision and the action taken within a total period of 20 days. In the case of logical and legitimate reasons for extending the duration, the Project Management should determine the time period. The Complainant should be informed of this extension. The reasons for the extension may include: - The persons involved in the investigation are travelling or on leave; - Some basic information for the investigation can be obtained only during a certain time such as the need to obtain administrative approvals; and - In case of external circumstances, such as the investigation was blocked for security reasons. There might be other reasons for an extension not listed above. It is the responsibility of the Project Management to assess circumstances and the validity of extending GR time periods. Closing the Complaint After the completion of the proceedings, the complaint is closed, and the complaint information is included in the system, including the action(s) taken and the result(s) required. The complainant shall be notified of the result and the action immediately and informed of the possibility of objecting to the procedure. Complainants will have the right to appeal their cases at a tribunal should the offered solution/ compensation deemed unsatisfactory. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 48 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Complaint Registration Mechanism The Officer responsible for receiving complaints will organize the complaint in the form pre-prepared for this purpose (see Annex II for a sample form). The registration form should contain the following fields as a minimum: - Name of the complainant - Complainant's address: Physical address and contact information (Telephone number, E-mail) - Content of the complaint - Referral information (for official use): The Officer responsible, and referral information - Actions taken Data Analysis and Reporting The data will be analyzed and matched with the fieldwork. These data will be used to identify the cause of the underlying problem and to take precautionary measures to avoid future occurrence of the problem. The procedure will also be recorded as a future reference for similar cases. The report will include total number of complaints, actions taken, number of complaints closed and number of ongoing complaints. Reporting should include statistical information on various receiving channels/ access points, and the most used ones. This information and alike will be studied for the sake of improving service in the future. Complaints lodging points and channels - The Project Management Office in the Ministry of Labor and Social Affairs – Baghdad; - Project Offices in governorates: Ninawa, Anbar, Salahideen, Diyala, Kirkuk and Babel, and subcommittees/ Labor and Social Affairs Directorates for each governorate; and - Sub-committees (Social workers) of the Project in each governorate The table below provides available communication channels for GRM of ESSRP Table 11: Available communication channels for the GRM Paper format (pre- - Responsible Officer at PMO/ MOLSA, prepared registration - Responsible Officer of the sub-committees (to be assigned) form) in governorates, then to be submitted via e-mail Telephone - Hotline 1018 from all national networks - Other landlines and mobile lines to be specified - Phone calls to be recorded MOLSA Official www.molsa.iq.gov Website Responsible Officers in collaboration with IT team Social Media Facebook page of MOLSA Twitter: @molsa_iraq Project’s email Molsa_projectmanagement@gmail.com GRM – Roles and responsibilities The following table shows key roles and responsibilities for running and sustaining a GRM within the ESSRP ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 49 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Table 12: The proposed GRM roles and responsibilities Project Manager - General supervision of the conduct of investigation and processing procedures - Referral of complaints to investigation - Approval of results of the investigation and the measures taken Head of Complaints - Submitting of Complaints to the PMO Team - Direct supervision of the investigation and registration teams - Review and approval of the results and procedures - Reporting to the higher management Investigation Officer - Managing the investigation of the complaint - Coordination with all parties to obtain all necessary information for a complete result - The conduction of an integrated investigation including recommendations for actions - Reporting to the head Registration Officer - Complaint registration by paper and electronic formats - Prompt actions to complaints if possible without referral - Communicating with the Complainant throughout the complaining process - Providing final decisions/ answers and collecting feedback after the Complaint has been addressed For resettlement and land/property related grievances, the Project has prepared a Resettlement Policy Framework (RPF) to address these issues more comprehensively. 9.3. World Bank Grievance Redress Communities and individuals who believe that they are adversely affected by a World Bank‐supported project may submit complaints to existing project‐level grievance redress mechanisms or the World Bank’s Grievance Redress Service (GRS). The GRS ensures that complaints received are promptly reviewed in order to address project‐related concerns. Project affected communities and individuals may submit their complaint to the World Bank’s independent Inspection Panel which determines whether harm occurred, or could occur, as a result of WB non‐compliance with its policies and procedures. Complaints may be submitted at any time after concerns have been brought directly to the World Bank's attention, and Bank Management has been given an opportunity to respond. For information on how to submit complaints to the World Bank’s corporate Grievance Redress Service (GRS), please visit http://www.worldbank.org/en/projects‐operations/products‐andservices/grievance‐ redress‐service. For information on how to submit complaints to the World Bank Inspection Panel, please visit www.inspectionpanel.org. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 50 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 10: Resettlement Budgeting 10.1. Budgeting and Funding At this stage, locations of the sub-projects have not been fully surveyed. Yet, no information is available as how many PAPs and how much losses could be encountered during implementation. Consequently, it is not possible at this stage to provide a budgetary estimate for the total costs of resettlement/relocation that may be associated with the implementation of the Project. It is envisaged that activities for resettlement action plans will be funded as part of financing the Project. Financing will be processed and disbursed through the Project’s financial processing arrangements. Nevertheless, Funds for implementing inventory assessments and resettlement plans are foreseen within the financial capacity of the implementing agency (MOLSA). In general, the cost of compensation will be included in the Project expenditures. The resettlement plan (RAP/ARAP) for a Bank-financed project should include an itemized, indicative budget and the implementing agency will finance this budget through the administrative and financial management rules and manuals like any other activity eligible for payment under the Bank-financed project. This budget will be subject to the approval by the implementing agency. The implementing agency will have to finance the resettlement compensation because they will be impacting on the people’s livelihoods. Disbursements based on budgetary requirements, established by the resettlement plan in consultation with PAPs, will be made through the relevant teams of PMO. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 51 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Chapter 11: Monitoring and Evaluation 11.1. Internal Monitoring It is envisaged that the Project Management Office (PMO) will be held responsible for monitoring implementation of the resettlement activities internally, all in line with the Bank’s requirements and applicable Iraqi laws and regulations. Monitoring can be carried out every three months. Results and findings will be included in a quarterly project progress report. The report will mainly cover resettlement policies and compensation standards, resettlement progress, delivery of resettlement compensation, provision of development and transitional assistance to PAPs (especially vulnerable groups), implementation schedule, fund disbursements, land or structure allocation, and grievances and redress. 11.2. External Monitoring External Monitoring might be required to ensure that the overall objective of the resettlement plan is achieved in an equitable and transparent manner and that effectiveness of the monitoring and evaluation activities carried out by staff of PMO are ensured. The RAP will spell out the monitoring arrangements; more specifically, it will set the performance indicators, which will later on, be used to monitor the land acquisition and resettlement activities and the procedures to be used. 11.3. Monitoring and Evaluation Indicators The RAP monitoring indicators will be simple but robust indicators or proxies that should be as far as possible visible and verifiable and that will, according to the nature of the impacts, measure the following key outcomes against the pre-resettlement baseline. Some key monitoring and evaluation indicators are shown in the following table. Table 13: Monitoring and Evaluation Indicators Monitoring Evaluation Percentage of individuals selecting cash or a combination of cash and in-kind Proposed use of payments compensation Payment of compensation to PAPs in Conformance to compensation policies described in various categories the RAP/ARAP Timeliness and quality of decisions made on Number of grievances grievances Delivery of technical assistance, Facilitation of access to technical and development relocation, payment of transitional assistance and transitional allowances subsistence and moving allowances Delivery of income restoration and Ability of individuals and households to restore development assistance livelihoods and sources of income Public information dissemination and Timeliness, quality, and effectiveness of consultation consultation procedures and information disclosure ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 52 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- References − Arabtech Jardaneh. “Resettlement Policy Framework for the Road Corridor Semel – Ibrahim Al- Khalil”. Prepared for the World Bank in August 2013. Retrieved from: http://www- wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2013/08/28/000442464_2013 0828115005/Rendered/PDF/RP14730v100ENG00PUBLIC00Box379816B.pdf − Republic of Iraq. “Emergency Operation for Development Project (P155732) – RPF”. Prepared for the World Bank in June 2015 − World Bank. "Project Appraisal Document – Emergency Social Stabilization and Resilience Project". March 2018. Ministry of Labor and Social Affairs – Iraq. − World Bank. “Operational Manual – OP 4.12 Involuntary Resettlement”. April 2013. https://policies.worldbank.org/sites/ppf3/PPFDocuments/090224b0822f89db.pdf − World Bank. “The Rehabilitation of Electricity Distribution Substations and Building Distribution Substations in Middle and South Iraq”. Iraqi Ministry of Electricity, 2015 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 53 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- ANNEXES Annex I: Public Consultation Questionnaire & Participants’ List a. English version Republic of Iraq – Ministry of Labor and Social Affairs Iraq Emergency Social Stabilization and Resilience Project Public Consultation Questionnaire I. Introduction: The Government of Iraq (GOI) has received financial support from the World Bank for the Iraq Social Stabilization and Resilience Project (ESSRP). This is a 3-year project and will be implemented by the Ministry of Labor and Social Affairs (MOLSA). Target areas will include 7 governorates: Ninawa, Anbar, Salah Aldin, Diyala, Kirkuk, Baghdad and Babel, of which four were recently liberated. The Project Development Objectives are: (i) increase livelihood opportunities in liberated areas; (ii) increase access to psychosocial services in liberated areas; and (iii) strengthen the systems to expand the provision of social safety nets. The Project consists of the following key components: Component 1: Cash for Work, Social Support, and Livelihood Opportunities Sub-Component 1.1: Cash for Work (CfW) This sub-component aims to provide targeted Cash-for-Work support to increase access to short-term employment. Beneficiaries will include returnees, internally displaced persons, and vulnerable groups. It also will improve disposable income, thus improve food consumption among vulnerable groups, including women. This component will provide public work restoration activities, such as: Street sweeping and cleaning, drainage clearance, culvert replacement, painting of public buildings and street walls, painting of crosswalks, rehabilitation of recreational spaces, rehabilitation of schools, health posts and other community buildings, brushing of bushes along access roads, clearing non‐private agricultural land, breaking of rocks for road rehabilitation. These activities, and alike, will have positive impacts on public health and environment, as well as reinforcing climate adaptive goals. Component 1.2: Psychosocial Support Services This sub‐component aims to augment the impact of the immediate cash and CfW program towards resilience building with Psychosocial Support Services to better empower communities to cope with post-crisis. The ultimate objective of the program is to create an enabling platform for the vulnerable minority returning internally displaced persons to assist them in their coping mechanisms and to improve their own self‐care and advocacy skills using available recourses within their communities. Additionally, this sub‐component will increase access to Mental Health and Psychosocial Support Services for returnees affected by the conflict in the governorates of Salahideen, Anbar, Diyala, and Ninawa, and strengthen the operational capacity of the system and providers to deliver quality services. Sub‐component 1.3 Livelihoods Opportunities This sub‐component will support opportunities for improving livelihoods through the existing income‐ generating fund at MOLSA. The sub-component will include two parts: (a) Provision of technical assistance to MOLSA to support enhancements to the existing microfinance program, in terms of sustainable products, back office systems, and loan portfolio monitoring, while minimizing distortions to the private microfinance sector; and (b) Provision of microfinance to beneficiaries to carry out income generating activities, which would only be capitalized through a potential project restructuring to reallocate funds from CfW. The livelihoods focused financing activities are aimed at households without employment, and low levels of income. These activities are intended to help those with skills to generate immediate income through obtaining funds to acquire the assets and working capital needed to start or reactivate a small business. Component 2‐ Resilient Social Safety Nets This component is designed to strengthen the resilience of social safety net programs to allow the GOI to assist poor/vulnerable groups and build resilience to shocks effectively and efficiently. Positive impacts include reducing poverty and inequality through inclusion of the poorest and marginalized groups; extending coverage; increasing outreach capacity of MOLSA’s staff and system; Enhancing children grow up and longer staying in ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 54 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- schools. The Conditional Cash Transfer program will increase the human capital of children in poor and displaced families. Component 3 – Project Management This component will support project management and monitoring and evaluation (M&E) to ensure that the project is successfully and efficiently implemented. The component will finance: (a) project management office specialized staff (central and at governorates) and equipment; (b) supervision, operating costs, audits, and M&E; and (c) a communications and awareness campaign. Republic of Iraq – Ministry of Labor and Social Affairs Iraq Emergency Social Stabilization and Resilience Project Public Consultation Questionnaire Name: Gender: Age: Provision: Marital status: Education: Address: Date: II. Expected Negative Social and Environmental Impacts – Please rate the following impacts Rating Impacts No Significant Moderate Minor impact Component 1.1 – How do you rate impacts from Cash-for-Work opportunities? 1 Inflation and price distortion in local markets 2 Cash goes to illegal activities 3 No one wishes to volunteer for his/her community any more. 4 Elderly, sick, and disabled community members can’t participate. 5 Child labor 6 Beneficiaries think of CfW as long-term & primary source of income 7 Women at households are unable to control over their own income 8 Discrepancy/ poor selection of people during field operations 9 Security issues (risks of attack, extortion, theft, tension) 10 Temporary land acquisition, relocation of encroachers or IDPs, and interruption or loss of livelihood (adjacent businesses) 11 Occupational health and safety issues (over-exertion, slipping, falling from heights, stuck by objects, electrical shocks, respiratory problems) 12 Community health and safety issues (pests & diseases, excavation, dust & noise, heavy traffic) 13 Waste water disposal and solid waste accumulation 14 Land contamination & sediments runoff 15 Endangering biological life 16 Possible damage to objects of historical/ cultural value Component 1.2 – How do you rate impacts from psychosocial services? 17 Discrimination among beneficiaries due to ethnicity, religion, culture, or gender 18 Poor service due to insufficient capacity, cadre, and equipment Component 1.2 – How do you rate impacts from livelihood opportunities? 19 Poor supplies and poor demands for products and services in businesses’ locations 20 Increasing debt burden, fail to generate sufficient income to support their families, and pay back loan 21 Beneficiaries change their business ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 55 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Rating Impacts No Significant Moderate Minor impact Component 2 - How do you rate impacts from Resilient Social Safety Nets? 22 Excluding poorest and marginalized (they are unaware! or can’t go and/or apply) 23 Excluding poorest and marginalized (misidentification, ineffective targeting) III. Do you have any other expected Social and Environmental Impacts? Rating Impacts No Significant Moderate Minor impact Component 1 - Cash for Work, Social Support, and Livelihood Opportunities 1 2 3 Component 2 - Resilient Social Safety Nets 4 5 6 IV. General Comments on the Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 56 ‫‪RPF – Iraq Emergency Social Stabilization and Resilience Project‬‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪b. Arabic version‬‬ ‫ﺟﻤﮭﻮرﯾﺔ اﻟﻌﺮاق ‪ -‬وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ‬ ‫ﻣﺸﺮوع ﺗﻌﺰﯾﺰ اﻻﺳﺘﻘﺮار واﻟﺼﻤﻮد اﻻﺟﺘﻤﺎﻋﻲ اﻟﻄﺎرئ ﻓﻲ اﻟﻌﺮاق‬ ‫‪Emergency Social Stabilization and Resilience Project (ESSRP) in Iraq‬‬ ‫إﺳﺘﻤﺎرة اﻻﺳﺘﺸﺎرة اﻟﻤﺠﺘﻤﻌﯿﺔ وذوي اﻟﻌﻼﻗﺔ‬ ‫أوﻻً‪ :‬ﻣﻘﺪﻣﺔ‬ ‫ﺗﻠﻘﺖ اﻟﺤﻜﻮﻣﺔ اﻟﻌﺮاﻗﯿﺔ ﻣﺆﺧﺮا ً دﻋﻤﺎ ً ﻣﺎﻟﯿﺎ ً ﻣﻦ اﻟﺒﻨﻚ اﻟﺪوﻟﻲ‪ ،‬وذﻟﻚ ﺑﮭﺪف ﺗﻤﻮﯾﻞ ﻣﺸﺮوع ﺗﻌﺰﯾﺰ اﻻﺳﺘﻘﺮار واﻟﺼﻤﻮد اﻻﺟﺘﻤﺎﻋﻲ اﻟﻄﺎرئ‪ .‬ﺗﻤﺘﺪ ﻓﺘﺮة‬ ‫ﺗﻨﻔﯿﺬ ھﺬا اﻟﻤﺸﺮوع ﻋﻠﻰ ﻣﺪار ‪ 3‬ﺳﻨﻮات‪ ،‬ﺣﯿﺚ ﺳﺘﻘﻮم وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ ﺑﺘﻨﻔﯿﺬه وإدارﺗﮫ‪ .‬ﺳﺘﻤﺘﺪ أﻧﺸﻄﺔ اﻟﻤﺸﺮوع ﻟﺘﺸﻤﻞ ﺳﺒﻊ‬ ‫ﻣﺤﺎﻓﻈﺎت‪ ،‬وھﻲ‪ :‬ﺑﻐﺪاد‪ ،‬وﺻﻼح اﻟﺪﯾﻦ‪ ،‬وﻧﯿﻨﻮى‪ ،‬واﻷﻧﺒﺎر‪ ،‬ودﯾﺎﻟﻰ‪ ،‬وﻛﺮﻛﻮك‪ ،‬وﺑﺎﺑﻞ‪ .‬وﻣﻨﮭﺎ أرﺑﻊ ﻣﺤﺎﻓﻈﺎت ﺗﻢ ﺗﺤﺮﯾﺮھﺎ ﻣﺆﺧﺮاً‪ .‬ﺗﺘﻤﺜﻞ اﻷھﺪاف‬ ‫اﻟﺘﻨﻤﻮﯾﺔ اﻟﺮﺋﯿﺴﯿﺔ ﻟﻠﻤﺸﺮوع ﻓﻲ‪ .1 :‬زﯾﺎدة ﻓﺮص ﻛﺴﺐ اﻟﻌﯿﺶ ﻓﻲ اﻟﻤﻨﺎطﻖ اﻟﻤﺤﺮرة؛ ‪ .2‬زﯾﺎدة اﻟﻮﺻﻮل إﻟﻰ اﻟﺨﺪﻣﺎت اﻟﻨﻔﺴﯿﺔ واﻻﺟﺘﻤﺎﻋﯿﺔ ﻓﻲ‬ ‫اﻟﻤﻜﻮﻧﺎت اﻟﺮﺋﯿﺴﯿﺔ اﻟﺘﺎﻟﯿﺔ‪:‬‬ ‫ّ‬ ‫اﻟﻤﻨﺎطﻖ اﻟﻤﺤﺮرة؛ و ‪ .3‬ﺗﻘﻮﯾﺔ أﻧﻈﻤﺔ ﺷﺒﻜﺎت اﻟﺤﻤﺎﯾﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ اﻟﺤﺎﻟﯿﺔ‪ ،‬وﺗﻮﺳﯿﻊ ﻧﻄﺎق اﻟﺘﻐﻄﯿﺔ‪ .‬ﯾﺘﺄﻟﻒ اﻟﻤﺸﺮوع ﻣﻦ‬ ‫اﻟﻤﻜﻮن ‪ : 1‬اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ‪ ،‬اﻟﺪﻋﻢ اﻟﻨﻔﺴﻲ واﻻﺟﺘﻤﺎﻋﻲ‪ ،‬وﺗﺤﺴﯿﻦ اﻟﻔﺮص اﻟﻤﻌﯿﺸﯿﺔ‬ ‫ّ‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ ‪ :1.1‬ﺑﺮﻧﺎﻣﺞ اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ )‪(CfW‬‬ ‫ّ‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ إﻟﻰ ﺗﻮﻓﯿﺮ دﻋﻢ ﻧﻘﺪي ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ ﻋﻦ طﺮﯾﻖ ﺗﻮﻓﯿﺮ ﻓﺮص وظﯿﻔﯿﺔ ﻗﺼﯿﺮة اﻷﺟﻞ‪ .‬ﺳﯿﺴﺘﻔﯿﺪ ﻣﻦ ھﺬه اﻟﻔﺮص اﻟﻤﻮاطﻨﻮن‬ ‫ّ‬ ‫ﯾﮭﺪف ھﺬا‬ ‫ﻣﻞ ﻣﻦ ذﻟﻚ‪ ،‬ﺗﺤﺴﯿﻦ اﻟﺪﺧﻞ اﻟﻤﺘﺎح‪ ،‬وﺑﺎﻟﺘﺎﻟﻲ زﯾﺎدة ﺷﺮاء اﻟﻤﻮاد‬ ‫اﻟﻌﺎﺋﺪون إﻟﻰ دﯾﺎرھﻢ‪ ،‬واﻟﻤﺸﺮدون داﺧﻠﯿﺎً‪ ،‬واﻟﻤﺠﻤﻮﻋﺎت اﻟﻤﺠﺘﻤﻌﯿﺔ اﻟﻀﻌﯿﻔﺔ‪ .‬ﻛﻤﺎ ﯾﺆ ّ‬ ‫اﻟﺘﻤﻮﯾﻨﯿﺔ وﺗﺤﺴﯿﻦ اﻻﺳﺘﮭﻼك اﻟﻐﺬاﺋﻲ ﺑﯿﻦ اﻟﻔﺌﺎت اﻟﻀﻌﯿﻔﺔ‪ ،‬ﺑﻤﺎ ﻓﻲ ذﻟﻚ اﻟﻨﺴﺎء واﻻطﻔﺎل‪ .‬ﺳﯿﻮﻓﺮ ھﺬا اﻟﻤﺸﺮوع ﻓﺮص ﻋﻤﻞ ﻣﺠﺘﻤﻌﯿﺔ ﻗﺼﯿﺮة اﻷﺟﻞ‬ ‫ﻻﺳﺘﻌﺎدة اﻟﺤﯿﺎة اﻟﻌﺎﻣﺔ‪ ،‬ﻣﺜﻞ‪ :‬ﻛﻨﺲ اﻟﺸﻮارع وﺗﻨﻈﯿﻔﮭﺎ ‪ ،‬ﺗﻨﻈﯿﻒ ﻣﺠﺎري ﺗﺼﺮﯾﻒ اﻟﻤﯿﺎه‪ ،‬واﺳﺘﺒﺪال اﻟﻤﺘﻜﺴﺮ ﻣﻨﮭﺎ‪ ،‬أﻋﻤﺎل اﻟﺪھﺎن ﻟﻠﻤﺒﺎﻧﻲ اﻟﻌﺎﻣﺔ‬ ‫وﺟﺪران اﻟﺸﻮارع وﻣﻤﺮات اﻟﻤﺸﺎة‪ ،‬إﻋﺎدة ﺗﺄھﯿﻞ اﻟﺤﺪاﺋﻖ اﻟﻌﺎﻣﺔ وأﻣﺎﻛﻦ اﻟﺘﺮﻓﯿﮫ‪ ،‬وإﻋﺎدة ﺗﺄھﯿﻞ اﻟﻤﺪارس واﻟﻤﺮاﻛﺰ اﻟﺼﺤﯿﺔ واﻟﻤﺒﺎﻧﻲ اﻟﻤﺠﺘﻤﻌﯿﺔ‬ ‫اﻷﺧﺮى ﻓﻲ اﻟﻤﻨﺎطﻖ اﻟﺤﻀﺮﯾﺔ‪ .‬ھﺬا ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ ﺗﻘﻠﯿﻢ اﻻﺷﺠﺎر وإزاﻟﺔ اﻟﻤﺘﻜﺴﺮ ﻣﻨﮭﺎ ﻋﻠﻰ اﻣﺘﺪاد اﻟﺸﻮارع‪ ،‬ﺗﻨﻈﯿﻒ اﻻراﺿﻲ اﻟﺰراﻋﯿﺔ ﻏﯿﺮ‬ ‫اﻟﺨﺎﺻﺔ‪ ،‬وإزاﻟﺔ اﻟﺼﺨﻮر ﻹﻋﺎدة ﺗﺄھﯿﻞ وﻓﺘﺢ اﻟﻄﺮق‪ ،‬ﻓﻲ اﻟﻤﻨﺎطﻖ اﻟﺮﯾﻔﯿﺔ‪ .‬ﻣﻦ ﺷﺄن ھﺬه اﻷﻧﺸﻄﺔ‪ ،‬وﻏﯿﺮھﺎ‪ ،‬أن ﺗﻌﻮد ﺑﺎﻟﻨﻔﻊ ﻋﻠﻰ اﻟﻤﺠﺘﻤﻊ‪ ،‬واﻟﺼﺤﺔ‬ ‫اﻟﻌﺎﻣﺔ‪ ،‬واﻟﺒﯿﺌﺔ ‪ ،‬ﻓﻀﻼً ﻋﻦ ﺗﻌﺰﯾﺰ أھﺪاف اﻟﺘﻜﯿﻒ ﻣﻊ اﻟﺘﻐﯿﺮ اﻟﻤﻨﺎﺧﻲ‪.‬‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ ‪ :1.2‬ﺧﺪﻣﺎت اﻟﺪﻋﻢ اﻟﻨﻔﺴﻲ اﻻﺟﺘﻤﺎﻋﻲ‬ ‫ّ‬ ‫اﻟﻤﺮﺟﻮة ﻣﻦ ﺑﺮﻧﺎﻣﺞ "اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ" اﻟﻤﺬﻛﻮر أﻋﻼه‪ ،‬وذﻟﻚ ﺑﺰﯾﺎدة ﻗﺪرة اﻟﻤﺠﺘﻤﻌﺎت ﻋﻠﻰ‬ ‫ّ‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ إﻟﻰ إﺛﺮاء وﺗﻌﺰﯾﺰ اﻟﻔﻮاﺋﺪ‬ ‫ّ‬ ‫ﯾﮭﺪف ھﺬا‬ ‫اﻟﺼﻤﻮد‪ ،‬وإﻣﺪادھﺎ ﺑﺨﺪﻣﺎت اﻟﺪﻋﻢ اﻟﻨﻔﺴﻲ واﻻﺟﺘﻤﺎﻋﻲ‪ ،‬ﻟﺘﻤﻜﯿﻨﮭﺎ ﻣﻦ اﻟﺘﻌﺎﯾﺶ ﻣﻊ ظﺮوف ﻣﺎ ﺑﻌﺪ اﻷزﻣﺔ ﺑﺸﻜﻞ أﻓﻀﻞ‪ .‬ﺗﺸﺘﻤﻞ ھﺬه اﻷﻧﺸﻄﺔ ﻋﻠﻰ‬ ‫ﺗﻮﻓﯿﺮ ﻣﻨﺼﺎت ﻟﺘﻤﻜﯿﻦ ودﻋﻢ اﻟﻤﺠﻤﻮﻋﺎت اﻟﻀﻌﯿﻔﺔ‪ ،‬واﻟﻌﺎﺋﺪﯾﻦ إﻟﻰ دﯾﺎرھﻢ‪ ،‬واﻟﻤﺸﺮدﯾﻦ داﺧﻠﯿﺎً‪ ،‬ﻟﻤﺴﺎﻋﺪﺗﮭﻢ ﻋﻠﻰ ﺗﺨﻄﻲ اﻟﻈﺮوف اﻟﻨﻔﺴﯿﺔ واﻻﺟﺘﻤﺎﻋﯿﺔ‬ ‫ﻣﺮو ﺑﮭﺎ‪ ،‬وﺗﺤﺴﯿﻦ ﻣﮭﺎراﺗﮭﻢ اﻟﺬاﺗﯿﺔ ﻓﻲ اﻟﺘﻜﯿﻒ‪ ،‬وﺿﻤﻦ اﻟﻤﻮارد اﻟﻤﺘﺎﺣﺔ ﻟﮭﻢ ﻓﻲ ﻣﺠﺘﻤﻌﺎﺗﮭﻢ‪ .‬ﻛﻤﺎ ﺳﺘﺸﺘﻤﻞ ﻋﻠﻰ زﯾﺎدة ﺧدﻣﺎت اﻟﺮﻋﺎﯾﺔ اﻟﺻﺣﺔ‬ ‫اﻟﺘﻲ ّ‬ ‫واﻟﻌﻘﻟﯾﺔ واﻟﻨﻔﺴﯿﺔ‪ ،‬واﻻﺟﺘﻤﺎﻋﯿﺔ ﻓﻲ ﻛﻞ ﻣﻦ ﻣﺤﺎﻓﻈﺎت ﺻﻼح اﻟﺪﯾﻦ‪ ،‬واﻷﻧﺑﺎر‪ ،‬ودﯾﺎﻟﯽ‪ ،‬وﻧﯾﻧوى ﻋﻠﻰ وﺟﮫ اﻟﺨﺼﻮص‪ .‬ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ رﻓﻊ ﺳﻮﯾﺔ ھﺬه‬ ‫اﻟﻤﻨﺼﺎت‪ ،‬وﺑﻨﺎء ﻗﺪرات ﻣﻘﺪﻣﻲ اﻟﺨﺪﻣﺔ‪.‬‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ ‪ :1.3‬ﺗﺤﺴﯿﻦ اﻟﻔﺮص اﻟﻤﻌﯿﺸﯿﺔ‬ ‫ّ‬ ‫ﺳﻮف ﯾﺪﻋﻢ ھﺬا اﻟﻤﺸﺮوع اﻟﻔﺮﻋﻲ اﻟﻔﺮص اﻟﻤﺘﺎﺣﺔ ﻟﺘﺤﺴﯿﻦ ﺳﺒﻞ اﻟﻌﯿﺶ ﻣﻦ ﺧﻼل اﻟﺼﻨﺪوق اﻟﺤﺎﻟﻲ ﻟﺰﯾﺎدة اﻟﺪﺧﻞ ﻓﻲ وزارة اﻟﻌﻤﻞ واﻟﺸﺆون‬ ‫اﻟﻤﻜﻮن اﻟﻔﺮﻋﻲ ﻧﺸﺎطﯿﻦ إﺛﻨﯿﻦ‪:‬‬ ‫ّ‬ ‫اﻻﺟﺘﻤﺎﻋﯿﺔ‪ .‬ﺳﯿﺘﻀﻤﻦ‬ ‫أ‪ .‬ﺗﻘﺪﯾﻢ اﻟﻤﺴﺎﻋﺪة اﻟﻔﻨﯿﺔ إﻟﻰ وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ ﻟﺪﻋﻢ اﻟﺘﺤﺴﯿﻨﺎت ﻓﻲ ﺑﺮﻧﺎﻣﺞ اﻟﺘﻤﻮﯾﻞ اﻷﺻﻐﺮ اﻟﻘﺎﺋﻢ‪ ،‬ﻓﯿﻤﺎ ﯾﺘﻌﻠﻖ ﺑﺎﺳﺘﺪاﻣﺔ‬ ‫اﻟﻤﻨﺘﺠﺎت‪ ،‬واﻷﻧﻈﻤﺔ اﻹدارﯾﺔ‪ ،‬وﻣﺮاﻗﺒﺔ ﻣﺤﻔﻈﺔ اﻟﻘﺮوض‪ ،‬وﺗﻘﻠﯿﻞ اﻟﺘﺸﻮھﺎت اﻟﺤﺎﺻﻠﺔ ﻓﻲ ﻗﻄﺎع اﻟﺘﻤﻮﯾﻞ اﻷﺻﻐﺮ اﻟﺨﺎص؛ و‬ ‫اﻟﻤﺪرة ﻟﻠﺪﺧﻞ‪ ،‬واﻟﺘﻲ ﺳﯿﺘﻢ ﺗﻮﻓﯿﺮ رأس اﻟﻤﺎل ﻟﮭﺎ ﻣﻦ ﺧﻼل‬ ‫ّ‬ ‫ب‪ .‬ﺗﻮﻓﯿﺮ ﻓﺮص اﻟﺘﻤﻮﯾﻞ اﻷﺻﻐﺮ ﻟﻠﻤﺴﺘﻔﯿﺪﯾﻦ‪ ،‬ﻟﻤﺴﺎﻋﺪﺗﮭﻢ ﻋﻠﻰ ﺗﻨﻔﯿﺬ اﻷﻋﻤﺎل‬ ‫إﻋﺎدة ھﯿﻜﻠﺔ ھﺬه اﻟﻨﺎﻓﺬة‪ ،‬واﻻﺳﺘﻔﺎدة ﻣﻦ ﻣﺨﺼﺼﺎت ﺑﺮﻧﺎﻣﺞ "اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ" اﻟﻤﺬﻛﻮر أﻋﻼه‪.‬‬ ‫ﺗﺴﺘﮭﺪف ھﺬه اﻟﻨﺎﻓﺬة اﻟﺘﻤﻮﯾﻠﯿﺔ اﻷﺳﺮ اﻟﻤﻌﯿﻠﺔ اﻟﺘﻲ ﻓﻘﺪت ﺳﺒﻞ اﻟﻌﯿﺶ‪ ،‬ذات ﻣﺴﺘﻮﯾﺎت ﻣﺘﺪﻧﯿﺔ ﻣﻦ اﻟﺪﺧﻞ‪ ،‬إﻻ أﻧﮭﺎ ﺗﻤﺘﻠﻚ اﻟﻤﮭﺎرات اﻟﻔﻨﯿﺔ واﻻدارﯾﺔ‬ ‫اﻟﻼزﻣﺔ ﻹدارة ھﺬه اﻷﻋﻤﺎل وﻛﺴﺐ اﻟﺪﺧﻞ اﻟﺴﺮﯾﻊ‪ ،‬وذﻟﻚ ﻣﻦ ﺧﻼل ﺗﻮﻓﯿﺮ رأس اﻟﻤﺎل اﻟﻼزم ﻟﻠﺒﺪء ﺑﺎﻟﻨﺸﺎط اﻟﺘﺠﺎري اﻟﺼﻐﯿﺮ اﻟﻤﻨﺎﺳﺐ أو إﻋﺎدة ﺗﻨﺸﯿﻂ‬ ‫ﻣﺎھﻮ ﻗﺎﺋﻢ‪.‬‬ ‫اﻟﻤﻜﻮن ‪ : 2‬ﺷﺒﻜﺎت اﻟﺤﻤﺎﯾﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ‬ ‫ّ‬ ‫اﻟﻤﻜﻮن ﻟﺘﻌﺰﯾﺰ ﺑﺮاﻣﺞ ﺷﺒﻜﺎت اﻟﺤﻤﺎﯾﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ ﻣﻤﺎ ﯾﺴﻤﺢ ﻟﻠﺤﻜﻮﻣﺔ اﻟﻌﺮاﻗﯿﺔ ﺑﻤﺴﺎﻋﺪة اﻟﻔﺌﺎت اﻟﻔﻘﯿﺮة واﻟﻀﻌﯿﻔﺔ وﺑﻨﺎء اﻟﻘﺪرة ﻋﻠﻰ‬ ‫ّ‬ ‫ﺗﻢ ﺗﺼﻤﯿﻢ ھﺬا‬ ‫اﻟﺼﻤﻮد أﻣﺎم اﻟﺼﺪﻣﺎت ﺑﻔﻌﺎﻟﯿﺔ وﻛﻔﺎءة‪ .‬ﺗﺸﺘﻤﻞ اﻵﺛﺎر اﻻﯾﺠﺎﺑﯿﺔ ﻟﮭﺬا اﻟﻤﺸﺮوع ﻋﻠﻰ اﻟﺤﺪ ﻣﻦ اﻟﻔﻘﺮ وﻋﺪم اﻟﻤﺴﺎواة ﻣﻦ ﺧﻼل إﺷﺮاك اﻟﻔﺌﺎت اﻷﻛﺜﺮ ﻓﻘﺮا ً‬ ‫وﺗﮭﻤﯿﺸﺎ ً ﻓﻲ اﻟﻤﺠﺘﻤﻌﺎت اﻟﻤﺴﺘﮭﺪﻓﺔ؛ وﺗﻮﺳﯿﻊ ﻧﻄﺎق اﻟﺘﻐﻄﯿﺔ؛ وزﯾﺎدة ﻗﺪرات اﻟﻜﻮادر اﻟﻌﺎﻣﻠﺔ ﻓﻲ وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ ﻋﻠﻰ ﺑﺮاﻣﺞ‬ ‫اﻟﻮﺻﻮل واﻟﺘﻮاﺻﻞ؛ وﺗﻌﺰﯾﺰ ﻧﻤﻮ اﻷطﻔﺎل وإطﺎﻟﺔ ﺑﻘﺎﺋﮭﻢ ﻓﻲ اﻟﻤﺪارس‪ .‬ﺳﯿﺆدي ﺑﺮﻧﺎﻣﺞ اﻟﺤﻮاﻻت اﻟﻨﻘﺪﯾﺔ اﻟﻤﺸﺮوطﺔ‪ ،‬وھﻮ ﺟﺰء ﻣﻦ ھﺬا اﻟﺒﺮﻧﺎﻣﺞ‪،‬‬ ‫واﻟﻤﺸﺮدة‪.‬‬ ‫ّ‬ ‫إﻟﻰ زﯾﺎدة رأس اﻟﻤﺎل اﻟﺒﺸﺮي ﻟﻸطﻔﺎل ﻓﻲ اﻷﺳﺮ اﻟﻔﻘﯿﺮة‬ ‫اﻟﻤﻜﻮن ‪ : 3‬إدارة اﻟﻤﺸﺮوع‬ ‫ّ‬ ‫ﺳﯿﻤﻮل ھﺬا اﻟﺠﺰء ﻣﻦ اﻟﻤﺸﺮوع ﻛﻼً ﻣﻦ‪:‬‬ ‫ّ‬ ‫اﻟﻤﻜﻮن أﻧﺸﻄﺔ إدارة اﻟﻤﺸﺮوع وﻣﺮاﻗﺒﺘﮫ وﺗﻘﯿﯿﻤﮫ‪ ،‬ﺑﮭﺪف ﺿﻤﺎن ﺗﻨﻔﯿﺬ اﻟﻤﺸﺮوع ﺑﻨﺠﺎح وﻛﻔﺎءة‪.‬‬ ‫ّ‬ ‫ﺳﯿﺪﻋﻢ ھﺬا‬ ‫‪.1‬اﻟﻤﻮظﻔﯿﻦ اﻟﻤﺘﺨﺼﺼﯿﻦ اﻟﻘﺎﺋﻤﯿﻦ ﻋﻠﻰ إدارة اﻟﻤﺸﺮوع ﺿﻤﻦ داﺋﺮة إدارة اﻟﻤﺸﺎرﯾﻊ ﻓﻲ وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ )اﻟﻤﺮﻛﺰﯾﺔ ﻣﻨﮭﺎ وﻓﻲ‬ ‫اﻟﻤﺤﺎﻓﻈﺎت( واﻟﻤﻌﺪات اﻟﻼزﻣﺔ ﻟﺬﻟﻚ؛ ‪ .2‬ﺗﻜﺎﻟﯿﻒ اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﺸﺮوع‪ ،‬وﺗﺸﻐﯿﻠﮫ‪ ،‬واﻟﺘﺪﻗﯿﻖ ﻋﻠﯿﮫ‪ ،‬وأﻋﻤﺎل واﻟﺮﺻﺪ واﻟﺘﻘﯿﯿﻢ؛ و ‪ .3‬ﺣﻤﻼت‬ ‫اﻻﺗﺼﺎل واﻟﺘﻮﻋﯿﺔ اﻟﺨﺎﺻﺔ ﺑﺎﻟﻤﺸﺮوع‪.‬‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪Page 57‬‬ ‫‪RPF – Iraq Emergency Social Stabilization and Resilience Project‬‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫ﺟﻤﮭﻮرﯾﺔ اﻟﻌﺮاق ‪ -‬وزارة اﻟﻌﻤﻞ واﻟﺸﺆون اﻻﺟﺘﻤﺎﻋﯿﺔ‬ ‫ﻣﺸﺮوع ﺗﻌﺰﯾﺰ اﻻﺳﺘﻘﺮار واﻟﺼﻤﻮد اﻻﺟﺘﻤﺎﻋﻲ اﻟﻄﺎرئ ﻓﻲ اﻟﻌﺮاق‬ ‫‪Emergency Social Stabilization and Resilience Project (ESSRP) in Iraq‬‬ ‫إﺳﺘﻤﺎرة اﻻﺳﺘﺸﺎرة اﻟﻤﺠﺘﻤﻌﯿﺔ وذوي اﻟﻌﻼﻗﺔ‬ ‫اﻟﻌﻤﺮ‪:‬‬ ‫اﻟﺠﻨﺲ‪:‬‬ ‫اﻻﺳﻢ‪:‬‬ ‫اﻟﻤﺴﺘﻮى اﻟﺘﻌﻠﯿﻤﻲ‪:‬‬ ‫اﻟﺤﺎﻟﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ‪:‬‬ ‫اﻟﻤﮭﻨﺔ‪:‬‬ ‫اﻟﻌﻨﻮان‪:‬‬ ‫اﻟﺘﺎرﯾﺦ‪:‬‬ ‫ﺛﺎﻧﯿﺎً‪ :‬اﻵﺛﺎر اﻟﺴﻠﺒﯿﺔ اﻟﺒﯿﺌﯿﺔ واﻻﺟﺘﻤﺎﻋﯿﺔ اﻟﻤﺘﻮﻗﻌﺔ ﻣﻦ اﻟﻤﺸﺮوع – ﻟﻄﻔﺎ ً ﻗﻢ ﺑﺘﻘﯿﯿﻢ ﺷﺪة اﻷﺛﺮ‬ ‫اﻟﺘﻘﯿﯿﻢ‬ ‫ﻻ‬ ‫اﻵﺛﺎر‬ ‫ﯾﻮﺟﺪ‬ ‫ﺧﻔﯿﻒ‬ ‫ﻣﺘﻮﺳﻂ‬ ‫ﺷﺪﯾﺪ‬ ‫أﺛﺮ‬ ‫اﻟﻤﻜﻮن ‪ :1.1‬ﻛﯿﻒ ﺗﻘﯿّﻢ اﻵﺛﺎر اﻟﻨﺎﺟﻤﺔ ﻋﻦ أﻧﺸﻄﺔ "اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ "؟‬ ‫اﻟﺘﻀﺨﻢ واﺿﻄﺮاب اﻷﺳﻌﺎر ﻓﻲ اﻷﺳﻮاق اﻟﻤﺤﻠﯿﺔ‬ ‫‪1‬‬ ‫ﻗﺪ ﯾﺬھﺐ اﻟﻤﺎل إﻟﻰ اﻷﻧﺸﻄﺔ ﻏﯿﺮ اﻟﻘﺎﻧﻮﻧﯿﺔ‬ ‫‪2‬‬ ‫ﻋﺪم رﻏﺒﺔ أﻓﺮاد اﻟﻤﺠﺘﻤﻊ ﺑﺎﻟﻘﯿﺎم ﺑﺄﻋﻤﺎل ﺗﻄﻮﻋﯿﺔ )ﻏﯿﺮ ﻣﺪﻓﻮﻋﺔ اﻷﺟﺮ(‬ ‫‪3‬‬ ‫ﻋﺪم ﻣﻘﺪرة أﻓﺮاد اﻟﻤﺠﺘﻤﻊ اﻟﻤﺴﻨﯿﻦ واﻟﻤﺮﺿﻰ واﻟﻤﻌﻮﻗﯿﻦ ﻋﻠﻰ اﻟﻤﺸﺎرﻛﺔ‬ ‫‪4‬‬ ‫ﻋﻤﺎﻟﺔ اﻷطﻔﺎل‬ ‫‪5‬‬ ‫ﯾﻨﻈﺮ اﻟﻤﺴﺘﻔﯿﺪون ﻣﻦ ﺑﺮﻧﺎﻣﺞ "اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ"ﻋﻠﻰ أﻧﮫ ﻣﺼﺪر طﻮﯾﻞ اﻷﺟﻞ ﻟﻠﺪﺧﻞ‬ ‫‪6‬‬ ‫اﻟﻨﺴﺎء اﻟﻌﺎﻣﻼت ﻓﻲ اﻷﺳﺮ ﻏﯿﺮ ﻗﺎدرات ﻋﻠﻰ اﻟﺘﺼﺮف ﻓﻲ دﺧﻮﻟﮭﻦ‬ ‫‪7‬‬ ‫ظﮭﻮر ﺗﻨﺎﻗﻀﺎت ﻓﻲ اﻷﻋﻤﺎل اﻟﻤﯿﺪاﻧﯿﺔ ﻓﯿﻤﺎ ﯾﺘﻌﻠﻖ ﺑﻤﺴﻮﺣﺎت اﻟﻔﺌﺎت اﻟﻤﺴﺘﮭﺪﻓﺔ‪ ،‬وأﺣﯿﺎﻧﺎ ً ﺳﻮء اﻻﺧﺘﯿﺎر‬ ‫‪8‬‬ ‫اﻟﻘﻀﺎﯾﺎ اﻷﻣﻨﯿﺔ اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﺳﺘﻼم ﻣﺨﺼﺼﺎت وأدوات اﻟﻌﻤﻞ )ﻣﺨﺎطﺮ اﻟﮭﺠﻮم واﻻﺑﺘﺰاز واﻟﺴﺮﻗﺔ‬ ‫‪9‬‬ ‫واﻟﺘﻮﺗﺮ(‬ ‫اﻟﺤﯿﺎزة اﻟﻤﺆﻗﺘﺔ ﻟﻸراﺿﻲ ﻟﺘﻨﻔﯿﺬ ﺑﻌﺾ اﻷﻧﺸﻄﺔ‪ ،‬ﺗﺮﺣﯿﻞ اﻻﺷﺨﺎص اﻟﻨﺎزﺣﯿﻦ أو اﻟﻤﺘﻌﺪﯾﻦ ﻋﻠﻰ‬ ‫‪10‬‬ ‫اﻷرض ﻟﺘﻨﻔﯿﺬ ﺑﻌﺾ اﻷﻧﺸﻄﺔ‪ ،‬أو ارﺑﺎك اﻷﻋﻤﺎل اﻟﯿﻮﻣﯿﺔ وﺳﺒﻞ اﻟﻌﯿﺶ )وﺧﺼﻮﺻﺎ ً‬ ‫أﺻﺤﺎب اﻟﻤﺤﺎل اﻟﻤﺠﺎورة(‬ ‫ﻗﻀﺎﯾﺎ اﻟﺼﺤﺔ واﻟﺴﻼﻣﺔ اﻟﻤﮭﻨﯿﺔ )اﻻﺟﮭﺎد‪ ،‬اﻻﻧﺰﻻق‪ ،‬اﻟﺴﻘﻮط ﻣﻦ اﻟﻤﺮﺗﻔﻌﺎت‪ ،‬اﻟﺘﻌﻠﻖ ﺑﯿﻦ اﻷﺟﺴﺎم‪،‬‬ ‫‪11‬‬ ‫اﻟﺼﺪﻣﺎت اﻟﻜﮭﺮﺑﺎﺋﯿﺔ‪ ،‬ﻣﺸﺎﻛﻞ اﻟﺠﮭﺎز اﻟﺘﻨﻔﺴﻲ(‬ ‫ﻗﻀﺎﯾﺎ اﻟﺼﺤﺔ واﻟﺴﻼﻣﺔ اﻟﻤﺠﺘﻤﻌﯿﺔ )اﻵﻓﺎت واﻷﻣﺮاض اﻟﺴﺎرﯾﺔ‪ ،‬اﻟﺤﻔﺮﯾﺎت‪ ،‬اﻟﻐﺒﺎر واﻟﻀﻮﺿﺎء‪،‬‬ ‫‪12‬‬ ‫ﺣﺮﻛﺔ اﻟﻤﺮور اﻟﻜﺜﯿﻔﺔ(‬ ‫ﺗﺼﺮﯾﻒ اﻟﻤﯿﺎه اﻟﻤﺴﺘﻌﻤﻠﺔ ﺑﺸﻜﻞ ﻏﯿﺮ ﻗﺎﻧﻮﻧﻲ‪ ،‬وﺗﺮاﻛﻢ اﻟﻨﻔﺎﯾﺎت اﻟﺼﻠﺒﺔ‬ ‫‪13‬‬ ‫ﺗﻠﻮث اﻟﺘﺮﺑﺔ وﺟﺮﯾﺎن اﻟﺮواﺳﺐ‬ ‫‪14‬‬ ‫ﺗﻌﺮﯾﺾ اﻟﻜﺎﺋﻨﺎت اﻟﺤﯿﺔ ﻟﻠﺨﻄﺮ‬ ‫‪15‬‬ ‫إﻟﺤﺎق اﻟﻀﺮر ﺑﺎﻷﺷﯿﺎء ذات اﻟﻘﯿﻤﺔ اﻟﺘﺎرﯾﺨﯿﺔ‪ /‬اﻟﺜﻘﺎﻓﯿﺔ )اﻟﻤﻜﺘﺸﻔﺎت واﻷﻣﺎﻛﻦ اﻷﺛﺮﯾﺔ(‬ ‫‪16‬‬ ‫اﻟﻤﻜﻮن ‪ :1.2‬ﻛﯿﻒ ﺗﻘﯿّﻢ اﻵﺛﺎر اﻟﻨﺎﺟﻤﺔ ﻋﻦ ﻧﺸﺎطﺎت اﻟﺨﺪﻣﺎت اﻟﻨﻔﺴﯿﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ؟‬ ‫اﻟﺘﻤﯿﯿﺰ ﻓﻲ اﻟﺨﺪﻣﺔ ﺑﺤﺴﺐ اﻟﻌﺮق أو اﻟﺪﯾﻦ أو اﻟﺜﻘﺎﻓﺔ أو اﻟﺠﻨﺲ‬ ‫‪17‬‬ ‫ﺳﻮء اﻟﺨﺪﻣﺔ ﺑﺴﺒﺐ ﻋﺪم ﻛﻔﺎﯾﺔ اﻟﻤﻜﺎن‪ ،‬اﻟﻜﺎدر‪ ،‬واﻟﻤﻌﺪات‬ ‫‪18‬‬ ‫اﻟﻤﻜﻮن ‪ :1.3‬ﻛﯿﻒ ﺗﻘﯿّﻢ اﻵﺛﺎر اﻟﻨﺎﺟﻤﺔ ﻋﻦ أﻧﺸﻄﺔ اﻟﻔﺮص اﻟﻤﻌﯿﺸﯿﺔ؟‬ ‫ﺿﻌﻒ اﻹﻣﺪادات )اﻟﻤﻮاد اﻷوﻟﯿﺔ( وﺿﻌﻒ اﻟﻄﻠﺐ ﻋﻠﻰ اﻟﻤﻨﺘﺠﺎت واﻟﺨﺪﻣﺎت ﻣﺤﻠﯿﺎ ً )ﺣﯿﺜﻤﺎ وﺟﺪت‬ ‫‪19‬‬ ‫ﺗﻠﻚ اﻷﻧﺸﻄﺔ اﻟﺘﺠﺎرﯾﺔ(‬ ‫زﯾﺎدة ﻋﺐء اﻟﺪﯾﻮن‪ ،‬وﺿﻌﻒ اﻟﻤﺪﺧﻮﻻت ﻋﻠﻰ اﻷﺳﺮ اﻟﻤﺴﺘﻔﯿﺪة‪ ،‬واﻟﺼﻌﻮﺑﺔ ﻓﻲ ﺗﺴﺪﯾﺪ اﻟﻘﺮض‬ ‫‪20‬‬ ‫ﻗﯿﺎم اﻟﻤﺴﺘﻔﯿﺪﯾﻦ ﺑﺎﻟﺘﺤﻮل إﻟﻰ ﻣﮭﻦ ﺟﺪﯾﺪة ﻏﯿﺮ ﺗﻠﻚ اﻟﺘﻲ ﻣﺎرﺳﻮھﺎ ﻣﻦ ﻗﺒﻞ‬ ‫‪21‬‬ ‫اﻟﻤﻜﻮن ‪ :2‬ﻛﯿﻒ ﺗﻘﯿّﻢ اﻵﺛﺎر اﻟﻨﺎﺟﻤﺔ ﻋﻦ أﻧﺸﻄﺔ "ﺷﺒﻜﺎت اﻟﺤﻤﺎﯾﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ "؟‬ ‫ﺿﻌﻒ اﻟﻮﺻﻮل إﻟﻰ اﻟﻔﺌﺎت اﻷﻛﺜﺮ ﻓﻘﺮاً وﺗﮭﻤﯿﺸﺎ ً )ﻟﻜﻮﻧﮭﻢ ﻻ ﯾﻌﺮﻓﻮن ﻋﻦ اﻟﻤﺸﺮوع‪ ،‬أو ﻻ ﯾﺴﺘﻄﯿﻌﻮن‬ ‫‪22‬‬ ‫اﻟﻘﺪوم ﻟﺘﻘﺪﯾﻢ اﻟﻄﻠﺐ‪ ،‬أو ﻻ ﯾﺴﺘﻄﯿﻌﻮن ﺗﻌﺒﺌﺔ اﻟﻄﻠﺐ(‬ ‫ﺿﻌﻒ اﻟﻮﺻﻮل إﻟﻰ اﻟﻔﺌﺎت اﻷﻛﺜﺮ ﻓﻘﺮا ً وﺗﮭﻤﯿﺸﺎ ً )اﻟﺒﯿﺎﻧﺎت اﻟﺨﺎطﺌﺔ‪ ،‬اﻻﺳﺘﮭﺪاف و‪/‬أو اﻟﻮﺻﻮل ﻏﯿﺮ‬ ‫‪23‬‬ ‫اﻟﻔﻌﺎل(‬ ‫ﺛﺎﻟﺜﺎً‪ :‬ھﻞ ﯾﻮﺟﺪ أﯾﺔ آﺛﺎر ﺳﻠﺒﯿﺔ ﺑﯿﺌﯿﺔ أو اﺟﺘﻤﺎﻋﯿﺔ أﺧﺮى ﻟﻢ ﺗﺬﻛﺮ أﻋﻼه؟‬ ‫اﻟﺘﻘﯿﯿﻢ‬ ‫ﻻ‬ ‫اﻵﺛﺎر‬ ‫ﯾﻮﺟﺪ‬ ‫ﺧﻔﯿﻒ‬ ‫ﻣﺘﻮﺳﻂ‬ ‫ﺷﺪﯾﺪ‬ ‫أﺛﺮ‬ ‫اﻟﻤﻜﻮن ‪ :1‬اﻷﻧﺸﻄﺔ اﻟﻤﺘﻌﻠﻘﺔ ﺑـ "اﻟﻤﺎل ﻣﻘﺎﺑﻞ اﻟﻌﻤﻞ "‪" ،‬اﻟﺪﻋﻢ اﻟﻨﻔﺴﻲ اﻻﺟﺘﻤﺎﻋﻲ "‪ ،‬و "اﻟﻔﺮص اﻟﻤﻌﯿﺸﯿﺔ "‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪Page 58‬‬ ‫‪RPF – Iraq Emergency Social Stabilization and Resilience Project‬‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫اﻟﺘﻘﯿﯿﻢ‬ ‫ﻻ‬ ‫اﻵﺛﺎر‬ ‫ﯾﻮﺟﺪ‬ ‫ﺧﻔﯿﻒ‬ ‫ﻣﺘﻮﺳﻂ‬ ‫ﺷﺪﯾﺪ‬ ‫أﺛﺮ‬ ‫‪1‬‬ ‫‪2‬‬ ‫‪3‬‬ ‫اﻟﻤﻜﻮن ‪ :2‬اﻷﻧﺸﻄﺔ اﻟﻤﺘﻌﻠﻘﺔ ﺑـ "ﺷﺒﻜﺎت اﻟﺤﻤﺎﯾﺔ اﻻﺟﺘﻤﺎﻋﯿﺔ "‬ ‫‪4‬‬ ‫‪5‬‬ ‫‪6‬‬ ‫راﺑﻌﺎً‪ :‬ھﻞ ﺗﻮد ذﻛﺮ أﯾﺔ ﻣﻼﺣﻈﺎت ﻋﺎﻣﺔ أﺧﺮى ﻋﻠﻰ اﻟﻤﺸﺮوع؟‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪Page 59‬‬ RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- c. Participants’ List d. Baghdad 1 Hussein Rahim Khalaf 11 Ali Obaid Abdul Abbas 2 Mashkor Hamza Alwen 12 Hussein Mahdi Kazem 3 Mohammed Tayyar Muti 13 Abbas Karim Abdel Hassan 4 Heba Haider Tawfiq 14 Ali Ahmed Garmat 5 Fares Mohammed Khudair 15 Hussein Abbas Kazem 6 Nada Thamer 16 Amer Daoud Salman 7 Mehdi Kazem 17 Ali Tariq Sufian 8 Kadhim Mansour 18 Mohamed Abdel Abbas 9 Muntaha Khudair Abboud 19 Bassem Abdel Kadhim 10 Mariam Hashem Jayyan 20 Ahmed Raad Salahideen 1 Yasser Mohammed Amar 11 Ahmed Hassan 2 Yousef Hassan Yousef 12 Qusay Rasoul 3 Maali Ibrahim 13 Omiya Faraj 4 Maeda khalaf swadi 14 Hamid Hamid Abdul 5 Hadeel Basem Ahmed 15 Ammar Juma Hanal 6 Leqaa Mohammed Abdullah 16 Sajee Saud 7 Resalah Mohamed Sabah 17 Khalaf taleb 8 Essam Hamid Saleh 18 Othman Suleiman 9 Ahmed Shehab Mohamed 19 Haifa Abdel 10 Hamam Ghanim Hamid Anbar 1 Ahmed Haitham Jumaa 9 Mustafa Karim Khalaf 2 Ali Abdul Karim Saud 10 Aysar Mohammed dakheel 3 Omar Ahmed Ismail Maarouf 11 Abtahal Ahmed Ismail Maarouf 4 Mohamed Matar El Sewadawy 12 Samah Abdul Sager 5 Abdul Wahab Abdul Razzaq 13 Hajar Abdul Rahman Mohammed 6 Ahmed Mohamed Ajami 14 Rawa Mahmoud Aftan 7 Mostafa Riad Khader 15 Abeer Talib Saleh 8 Ahmed Khalil Yassin Diyala 1 Haidar Mahmoud Ibrahim 8 Adnan Hassan Salman 2 Basem Rashid Khalil 9 Abbas Jabbar 3 Bassem Mohammed Odeh 10 Safa Talal Malik 4 Mounir Kamel Taha 11 Amal Hindi Ali 5 Abdul Rahman Qassem Shehab 12 Raghda Khalil Omar 6 Fares Nasr Saleh 13 Intisar Ali Ishaq 7 Adnan Ghassan Ibrahim 14 Hanan Abdul Sattar Kirkuk 1 Hilal Said Nouri 12 Abdullah Abdul Karim 2 Hashim Sabah Qassem 13 Hassan Hamad Mahden 3 Enmar tamer 14 Asya Hussein Younis 4 Haytham Hamid Sultan 15 Deyaa Humaid 5 Muhannad Mohammed Mahmoud 16 Rabaa Ahmed Salim 6 Ibrahim Saleh Yassin 17 Reem Ibrahim Ahmed 7 Sufian Ahmed Suhail 18 Jouria Abdullah Ibrahim 8 Ali 19 Shaheed Aziz ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 60 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 9 Ahmed Mahdi 20 Intisar Taha Reda 10 Suhaib Sabah Nour Aldin 21 Mona Star 11 Mohammed Khaled Younes Ninawa 1 Adawiya Fathi 8 Boshra Taha Mohamed 2 Amar Ali Mohamed 9 Omar Ziad Hashem 3 Talal Mohammed Saeed 10 Hala Ahmed Ali 4 Nashwan Mohammed Younis 11 Mounir Samir 5 Louay Marwan Bashir 12 Samira Ali Mahmoud 6 Mohammed Muhannad Talal 13 Joury Salem Abdullah 7 Omar Riad Fadel Babel 1 Abdullah Mohammed Abdullah 11 Salam Abdul Amir Hassan 2 Hassan Mahdi 12 Ather Qhani Mohammed 3 Nasir Ali 13 Asaad Salem Mohammed 4 Alaa Kazem Abbas 14 Fadel Abbas Nasser 5 Mohammed Salman Ahmed 15 Jawad Kazem Aboud 6 Amer Kadhim Abboud 16 Basma Ahmed Ali 7 Haidar Yassin Mohsen 17 Iman Hanoun 8 Fadel Abbas Nasser 18 Arboub Razakia 9 Hatem the ruler of Issa 19 Halima Arheen 10 Ali Kazem Mousa 20 Elaph Akram Dino ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 61 RPF – Iraq Emergency Social Stabilization and Resilience Project ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Annex II: Sample Grievance Registration Form a. English version ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Page 62 ‫‪RPF – Iraq Emergency Social Stabilization and Resilience Project‬‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪b. Arabic version‬‬ ‫ﯾﺮﺣﺐ اﻟﻤﺸﺮوع ﺑﺄﯾﺔ اﺳﺘﻔﺴﺎرات‪ ،‬أو اﻗﺘﺮاﺣﺎت‪ ،‬أو ﻣﻼﺣﻈﺎت‪ ،‬أو ﺷﻜﺎوى ﺗﺘﻌﻠﻖ ﺑﺘﻨﻔﯿﺬ اﻟﻤﺸﺮوع‪ .‬ﻧﻨﺼﺢ اﻟﻤﺮاﺟﻌﯿﻦ ﺑﺬﻛﺮ اﻻﺳﻢ وﻣﻌﻠﻮﻣﺎت اﻻﺗﺼﺎل‬ ‫ﻟﯿﺘﺴﻨﻰ ﻟﻨﺎ اﻟﺘﻮاﺻﻞ ﻣﻌﮭﻢ ﺑﮭﺪف اﻻﯾﻀﺎح أو اﻟﺮد ﻋﻠﻰ اﻟﻘﻀﯿﺔ اﻟﻤﻄﺮوﺣﺔ‪ .‬أﻣﺎ ﻓﻲ ﺣﺎﻟﺔ اﺧﺘﺎر اﺑﻘﺎء اﻟﻤﻌﻠﻮﻣﺎت اﻟﺸﺨﺼﯿﺔ ﺳﺮﯾﺔ‪ ،‬ﻓﯿﺠﺐ ﻛﺘﺎﺑﺔ ﻋﺒﺎرة‬ ‫"ﺳﺮي" ﻓﻮق اﻻﺳﻢ ﻣﺒﺎﺷﺮة‪ ،‬ﻣﻊ ﺟﺰﯾﻞ اﻟﺸﻜﺮ‪.‬‬‫ّ‬ ‫ﻣﻜﺎن ﺗﺴﺠﯿﻞ اﻟﺸﻜﻮى‬ ‫اﻟﺘﺎرﯾﺦ‬ ‫ﻣﻌﻠﻮﻣﺎت ﻋﺎﻣﺔ‪ /‬اﻟﺘﻔﺎﺻﯿﻞ اﻟﺸﺨﺼﯿﺔ‬ ‫اﻟﺴﻦ‬ ‫ذﻛﺮ‬ ‫اﻟﺠﻨﺲ‬ ‫اﻻﺳﻢ‬ ‫اﻧﺜﻰ‬ ‫ﻋﻨﻮان اﻻﻗﺎﻣﺔ‬ ‫اﻟﻤﻜﺎن‬ ‫رﻗﻢ اﻟﮭﺎﺗﻒ‬ ‫اﻟﺒﺮﯾﺪ اﻻﻟﻜﺘﺮوﻧﻲ‬ ‫اﻟﺸﻜﻮى‪ /‬اﻻﻗﺘﺮاح‪ /‬اﻟﻤﻼﺣﻈﺔ‪ /‬اﻻﺳﺘﻔﺴﺎر‪ .‬ﯾﺮﺟﻰ ﺗﺰوﯾﺪﻧﺎ ﺑﺎﻟﻤﺰﯾﺪ ﻣﻦ اﻟﻤﻌﻠﻮﻣﺎت )ﻣﻦ‪ ،‬ﻣﺎذا‪ ،‬أﯾﻦ‪ ،‬وﻛﯿﻒ؟( اﻟﺨﺎﺻﺔ ﺑﺎﻟﺸﻜﻮى‪:‬‬ ‫ﺿﻊ اﺷﺎرة ھﻨﺎ‪ ،‬إن ﻛﺎﻧﺖ اﻟﺘﻔﺎﺻﯿﻞ ﻋﻠﻰ ﺷﻜﻞ رﺳﺎﻟﺔ أو ﻣﺮﻓﻖ □‬ ‫ﻛﯿﻒ ﺗﺮﻏﺐ ﺑﺎﻟﺤﺼﻮل ﻋﻠﻰ اﻟﺮد ﻋﻠﻰ ھﺬه اﻟﺸﻜﻮى‪ /‬اﻟﻤﻼﺣﻈﺔ أو اﻟﺘﻄﻮرات اﻟﻤﺘﻌﻠﻘﺔ ﺑﮭﺎ؟‬ ‫ﻟﻼﺳﺘﺨﺪام اﻟﺮﺳﻤﻲ ﻓﻘﻂ‬ ‫ﺳﺠﻠﺖ اﻟﺸﻜﻮى‪ /‬اﻟﻤﻼﺣﻈﺔ ﺑﻮاﺳﻄﺔ‪) :‬اﺳﻢ اﻟﻤﻮظﻒ اﻟﻤﺴﺆول ﻋﻦ ﺗﺴﺠﯿﻞ اﻟﺸﻜﻮى(‬ ‫طﺮﯾﻘﺔ اﻻﺗﺼﺎل‪:‬‬ ‫ﻣﻼﺣﻈﺔ‪ /‬رﺳﺎﻟﺔ‬ ‫ﺑﺮﯾﺪ اﻟﻜﺘﺮوﻧﻲ‬ ‫ﻣﺸﺎﻓﮭﺔ‪ /‬ھﺎﺗﻔﯿﺔ‬ ‫ﺗﻤﺖ اﻟﻤﺮاﺟﻌﺔ ﺑﻮاﺳﻄﺔ‪) :‬اﺳﻤﺎء اﻻﺷﺨﺎص‪ /‬وظﯿﻔﺘﮭﻢ اﻟﺬﯾﻦ ﻗﺎﻣﻮا ﺑﻤﺮاﺟﻌﺔ اﻟﺸﻜﻮى(‬ ‫اﻻﺟﺮاء اﻟﻤﺘﺨﺬ‪:‬‬ ‫ﻧﻌﻢ‬ ‫ھﻞ ﺗﻤﺖ ﻣﻜﺎﺷﻔﺔ اﻻﺟﺮاء اﻟﻤﺘﺨﺬ‪:‬‬ ‫ﻻ‬ ‫طﺮق اﻟﻤﻜﺎﺷﻔﺔ‬ ‫‪-------------------------------------------------------------------------------------------------------------------------------------------------------------------‬‬ ‫‪Page 63‬‬