RP1723 GOVERNMENT OF UTTAR PRADESH Public Works Department Uttar Pradesh Core Road Network Development Program Part – A: Project Preparation DETAILED PROJECT REPORT Volume - IX: Draft Resettlement Action Plan Hamirpur–Rath Road (SH-42) December 2014 India Consulting engineers pvt. ltd. Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Volume-IX : Draft Resettlement Action Plan Document Name (Draft Detailed Project Report) Document Number EIRH1UP020/DPR/009 Uttar Pradesh Core Road Network Development Program Project Name Part – A: Project Preparation including Detailed Engineering Design and Contract Documentation Project Number EIRH1UP020 Document Authentication Name Designation Prepared by Dr. Sudesh Kaul Social Development Specialist Reviewed by Rajeev Kumar Gupta Deputy Team Leader Approved by Rajeev Kumar Gupta Deputy Team Leader History of Revisions Version Date Description of Change(s) Rev. 0 14/10/2014 First Submission Rev. 1 12/11/2014 Compliances to PWD and WB Comments Rev. 2 08/12/2014 Compliances to WB Comments Page i| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) TABLE OF CONTENTS Chapter Description Page 0 EXECUTIVE SUMMERY ................................................................................................... 0-1 0.1 Introduction......................................................................................................................... 0-1 0.2 Objective of the study .......................................................................................................... 0-2 0.3 Scope of the Study ............................................................................................................... 0-2 0.4 Methodology ........................................................................................................................ 0-2 0.5 Right of Way and Corridor of Impact ..................................................................................... 0-3 0.6 Rehabilitation Issues ............................................................................................................ 0-4 0.7 Land Use along the Project Road .......................................................................................... 0-4 0.8 Social Impact Assessment .................................................................................................... 0-4 0.9 Corridor of Impact ............................................................................................................... 0-6 0.10 Cut off Date ......................................................................................................................... 0-7 0.11 Analysis of Census and Baseline Socio-economic Data ............................................................ 0-8 0.12 Resource Base of the Affected Families ............................................................................... 0-11 0.13 Usual Activity ..................................................................................................................... 0-11 0.14 Occupational Pattern .......................................................................................................... 0-12 0.17 Project specific Resettlement & Rehabilitation (R & R) Policy, 2014 ....................................... 0-13 0.19 Widening Options............................................................................................................... 0-17 0.20 Timing of Resettlement ...................................................................................................... 0-18 0.21 Institutional Arrangement ................................................................................................... 0-18 0.22 Integrated Grievance Redressal Mechanism ......................................................................... 0-19 0.23 Implementation Arrangements and Schedule ....................................................................... 0-19 0.24 Budget .............................................................................................................................. 0-19 1 INTRODUCTION ............................................................................................................. 1-1 1.1 Project Background .............................................................................................................. 1-1 1.2 Start and End Points ............................................................................................................ 1-3 1.3 Salient Features ................................................................................................................... 1-4 1.4 Social Impact Assessment .................................................................................................... 1-5 1.5 Structure of Report .............................................................................................................. 1-8 2 STUDY METHODOLOGY ................................................................................................. 2-1 2.1 Introduction......................................................................................................................... 2-1 2.2 Social Assessment Process .................................................................................................... 2-1 2.3 Consultations ....................................................................................................................... 2-3 2.4 Local Level Consultation ....................................................................................................... 2-3 2.5 Consultation with Government Officials ................................................................................. 2-3 2.6 Collection of Data from Secondary Sources ............................................................................ 2-4 Page ii| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 3 MINIMISING NEGATIVE SOCIAL IMPACT ..................................................................... 3-1 3.1 Minimizing the Social Impact ................................................................................................ 3-1 3.2 Right of Way and Corridor of Impact ..................................................................................... 3-1 3.3 Design and R&R Co-ordination .............................................................................................. 3-2 3.4 Widening Options................................................................................................................. 3-3 4 RESETTLEMENT POLICIES AND LEGAL FRAMEWORK ................................................... 4-1 4.1 Key Social Laws and Regulations ........................................................................................... 4-1 4.2 World Bank Safeguard Policies .............................................................................................. 4-2 4.3 Comparative Analysis of World Bank OP 4.12 on Involuntary Resettlement and RFCTLARR Act, 2013 ................................................................................................................................... 4-3 4.4 Process of Land Acquisition and Other Immovable Assets ....................................................... 4-7 4.5 Project Specific R&R Policy ................................................................................................... 4-8 5 PROFILE OF STATE AND PROJECT AFFECTED PERSONS ............................................... 5-1 5.1 Socio-Demographic Profile of the State .................................................................................. 5-1 5.2 Census and socio-economic Survey Analysis .......................................................................... 5-3 5.3 Objectives of the Census and Socio-economic Surveys ........................................................... 5-3 5.4 Categories of Properties Affected within COI .......................................................................... 5-4 5.5 Analysis of Census and Baseline Socio-economic Data ............................................................ 5-4 6 COMMUNITY PARTICIPATION ...................................................................................... 6-1 6.1 Introduction......................................................................................................................... 6-1 6.2 Consultation and Participation Mechanisms ............................................................................ 6-1 6.3 The Process ......................................................................................................................... 6-2 6.4 Local Level Consultations ...................................................................................................... 6-3 6.5 Continuation of Public Consultations ...................................................................................... 6-7 7 GENDER ANALYSIS ........................................................................................................ 7-1 7.1 Status of Women ................................................................................................................. 7-1 7.2 Gender Issues...................................................................................................................... 7-2 7.3 Decision Making Power among Women PAPs ......................................................................... 7-5 7.4 Gender Action Plan............................................................................................................... 7-6 8 INCOME RESTORATION ................................................................................................. 8-1 8.1 Background ......................................................................................................................... 8-1 8.2 Income Restoration Options Preferred by PAPs ...................................................................... 8-1 8.3 Resettlement ....................................................................................................................... 8-1 8.4 Inter-Agency Linkages for Income Restoration ....................................................................... 8-2 8.5 Steps in Income Restoration (IR) .......................................................................................... 8-3 8.6 Alternative Individual Income Restoration Scheme ................................................................. 8-6 8.7 Monitoring of IR Schemes ..................................................................................................... 8-6 9 INSTITUTIONAL ARRANGEMENTS ................................................................................ 9-1 9.1 Background ......................................................................................................................... 9-1 9.2 The Process ......................................................................................................................... 9-1 Page iii| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 9.3 Need for NGO/CBO .............................................................................................................. 9-4 9.4 Role of NGO ........................................................................................................................ 9-4 9.5 Training and Capacity Building .............................................................................................. 9-5 9.6 Areas of Capacity Building .................................................................................................... 9-6 10 GRIEVANCE REDRESS MECHANISM ............................................................................ 10-1 10.1 Need for Grievance Redress Mechanism .............................................................................. 10-1 10.2 Functions of the Committee ................................................................................................ 10-1 10.3 Integrated Grievance redress Mechanism ............................................................................ 10-2 11 MONITORING AND EVALUATION ................................................................................ 11-1 11.1 Introduction....................................................................................................................... 11-1 11.2 Process and Output Indicators ............................................................................................ 11-1 11.3 Monitoring Project Input and Output ................................................................................... 11-3 12 IMPLEMENTATION SCHEDULE .................................................................................... 12-1 12.1 Background ....................................................................................................................... 12-1 12.2 Implementation Procedure ................................................................................................. 12-1 12.3 Timing of resettlement ....................................................................................................... 12-1 12.4 Miscellaneous Activities ...................................................................................................... 12-2 12.5 Implementation Responsibility ............................................................................................ 12-2 12.6 Community Participation in the Implementation of RAP ........................................................ 12-5 12.7 Tasks for NGO in Implementation and Tentative Methodology .............................................. 12-5 13 COSTS AND BUDGET .................................................................................................... 13-1 13.1 Budget .............................................................................................................................. 13-1 Page iv| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) LIST OF TABLES Table 0.1: Availability of Existing RoW ............................................................................................... 0-3 Table 0.2: Impact of the Project ....................................................................................................... 0-6 Table 0.3: Distribution of Families by Type of Loss ............................................................................. 0-6 Table 0.4: Distribution of Project Affected Households by Type of Loss ............................................... 0-6 Table 0.5: Cut off Date ..................................................................................................................... 0-7 Table 0.6: Distributions of Project Affected Households by Type of Loss .............................................. 0-8 Table 0.7: Distributions of Community Properties by Category ............................................................ 0-8 Table 0.8: Distribution of Affected and Displaced Families .................................................................. 0-8 Table 0.9: Distributions of PAFs and PDFs by Type of Affect ............................................................... 0-8 Table 0.10: Demographic and Social Characteristics in Corridor of Impact ........................................... 0-9 Table 0.11: Distribution of PAPs by Literacy Level .............................................................................. 0-9 Table 0.12: Distribution of Families by Type of Loss ......................................................................... 0-10 Table 0.13: Vulnerability Status of the Household in Corridor of Impact ............................................ 0-10 Table 0.14: Resource Base ............................................................................................................. 0-11 Table 0.15: Construction Typology of Structures .............................................................................. 0-11 Table 0.16: Usual Activity ............................................................................................................... 0-12 Table 0.17: Distribution of HH by Income Level ............................................................................... 0-12 Table 0.18: Distribution of Households by Primary Source of Income ................................................ 0-12 Table 0.19: Typical Cross Section (TCS) .......................................................................................... 0-17 Table 0.20: Built-up Locations along the Project Road ...................................................................... 0-17 Table 0.21: Plan for Handing Over the Stretches to Contractor ......................................................... 0-18 Table 0.22: Estimated Cost of R&R Budget based on R &R policy ...................................................... 0-20 Table 1.1: Road Network in Uttar Pradesh ......................................................................................... 1-1 Table 1.2: Impact of the Project (Phase I Route SH-42) ..................................................................... 1-6 Table 1.3: Distribution of Project Affected Households by Type of Loss ............................................... 1-7 Table 3.1: Availability of Existing RoW ............................................................................................... 3-2 Table 3.2: Plan for Handing Over the Stretches to Contractor ............................................................. 3-3 Table 3.3: Typical Cross Section (TCS) .............................................................................................. 3-3 Table 3.4: Built-up Locations along the Project Road .......................................................................... 3-4 Table 4.1: Relevant Social Legislations .............................................................................................. 4-1 Table 4.2: Safeguard Policies of World Bank ...................................................................................... 4-2 Table 4.3: Time Lines for SIA, Land Acquisition and Compensation Payments ...................................... 4-8 Table 5.1: Land Classification in U.P .................................................................................................. 5-2 Table 5.2:Work Participation for Various Industries ............................................................................ 5-2 Table 5.3:Work Participation for Main andMarginal Workers (‘000) ...................................................... 5-3 Table 5.4: Distribution of Project Affected households by Type of Loss ................................................ 5-4 Table 5.5: Distribution of Community Properties by type .................................................................... 5-4 Table 5.6: Distribution of Affected and Displaced Families .................................................................... 5-5 Page v| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 5.7: Distributions of PAFs and PDFs by Type of Affect ............................................................... 5-5 Table 5.8: Demographic and Social Characteristics in Corridor of Impact ............................................. 5-5 Table 5.9: Distribution of PAPs by Literacy Level ................................................................................ 5-6 Table 5.10: Distribution of Families by Type of Loss ........................................................................... 5-6 Table 5.11: Vulnerability Status of the Households ............................................................................. 5-7 Table 5.12: Resource Base ................................................................................................................ 5-7 Table 5.13: Construction typology of structures ................................................................................. 5-7 Table 5.14: Usual Activity ................................................................................................................. 5-7 Table 5.15: Distribution of H H by Income Level ................................................................................ 5-8 Table 5.16: Distribution of Households by Primary Source of Income .................................................. 5-8 Table 5.17: Household Asset Structure (Average Unit holding per Family) ........................................... 5-9 Table 5.18: Core Rapid Appraisal Mechanism ................................................................................... 5-10 Table 6.1: Local Level Consultation Output ........................................................................................ 6-4 Table 6.2: Core Rapid Appraisal : Mechanism for Continued Participation ............................................ 6-8 Table 7.1: Number of Women Headed Households............................................................................. 7-1 Table 7.2: Female Work Participation Rate and Gender Gap in Work ................................................... 7-3 Table 7.3: Sex Ratio ......................................................................................................................... 7-3 Table 7.4: Child Sex Ratio ................................................................................................................ 7-3 Table 7.5: Female Literacy and Gender Gap in Literacy ...................................................................... 7-4 Table 7.6: Usual Activity of Affected Women...................................................................................... 7-4 Table 7.7: Women – Time Disposition ............................................................................................... 7-5 Table 7.8: Decision Making Power among Women ............................................................................. 7-5 Table 7.9: Gender Action under the Project ..................................................................................... 7-10 Table 8.1: Income Restoration Options as Preferred by PAPs .............................................................. 8-1 Table 9.1: ESDRC Staff Responsibilities ............................................................................................. 9-3 Table 12.1: Plan for Handing Over the Stretches to Contractor ......................................................... 12-2 Table 12.2: Roles and Responsibilities .............................................................................................. 12-3 Table 12.3: Summary of Role and Responsibilities of Other Project Partners in Various Stages of Project ..................................................................................................................................................... 12-4 Table 12.4: Tasks of NGO ............................................................................................................... 12-5 Table 13.1: Estimated Cost of R&R Budget based on R&R Policy ....................................................... 13-1 Page vi| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) LIST OF FIGURES Figure 1.1: Location Map .................................................................................................................. 1-3 Figure 1.2: Start and End Points ....................................................................................................... 1-4 Figure 1.3: Land Use Pattern ............................................................................................................ 1-4 Figure 1.4: Typical View of Carriageway ............................................................................................ 1-4 Figure 1.5: Built-up Area .................................................................................................................. 1-5 Page vii| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) LIST OF ANNEXURES Annexure – 1 : Census Survey Questionnaires Annexure – 2 : Resettlement & Rehabilitation (R & R) Policy Annexure – 3 : Details of Census and Socio-economic Survey Annexure – 4 : Consultation Annexure – 5 : The Terms of Reference for Hiring NGO for Implementation of RAP Annexure – 6 : The Terms of Reference for Hiring M&E Consultant and End Term Evaluation Annexure – 7 : List of Affected Community Property Resources (CPR) Annexure – 8 : List of Affected Hand Pump Annexure – 9 : Socio-economic Baseline Studies and Preparation of Resettlement & Rehabilitation (RAP) Page viii| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) ABBREVIATIONS BPL Below Poverty Line CBO Community Base Organisation COI Corridor of Impact CPCB Central Pollution Control Board CPR Common Property Resources DC District Collector EA Environmental Assessment ESDRC Environmental Social Development and Resettlement Committee EIA Environmental Impact Assessment EMP Environmental Management Plan EP Entitled/Eligible Person ESMF Environmental and Social Management Framework GSHAP Global Seismic Hazard Assessment Programme GoUP Government of Uttar Pradesh Govt. Government GOI Government of India GRC Grievance Redressal Cell HCA House Construction Allowance MoEF Ministry of Forests and Environment MORST Ministry of Road and Surface Transport NEIAA National Environmental Impact Assessment Authority NGO Non Governmental Organisation PAP Project Affected Person PAF Project Affected Family PDF Project Displaced Family PDP Project Displaced Person PIU Project Implementation Unit PMC Project Management Consultants PWD/UPPWD Public Works Department/ Uttar Pradesh Public Works Department R&R Resettlement and Rehabilitation RAP Rehabilitation Action Plan RFCTLAR&R Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement act, 2013 ROW/RoW Right of Way RRO Resettlement and Rehabilitation Officer RTI Right to Information Act SC/ST Schedule Caste and Schedule Tribes Page ix| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) SEIAA State Environmental Impact Assessment Authority SES Socio-Economic Survey SH State Highway SIA Social Impact Assessment SLAO Special Land Acquisition Officer SMF Social Management Framework SOR Schedule of Rates u/s Under Section UP/U.P. Uttar Pradesh UPPCB Uttar Pradesh Pollution Control Board Page x| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 0 EXECUTIVE SUMMERY 0.1 Introduction The state has a road network of 299,604 km, out of which 174,451 km is under Uttar Pradesh Public Works Department (PWD). The roads under PWD comprise 7,550 km of National Highways (NHs), 7,530 km of State Highways (SHs), 5,761 km of Major District Roads (MDRs), 3,254 km of Other District Roads (ODRs) and 138,702 km of Village Roads (VRs). Only about 60% of SHs are two-lane (7 m). In the entire state 62% of MDRs and 83% of ODRs have widths less than 7 m. With a view to improve the transport network system, UP PWD has identified 24,095 km of Core Road Network (CRN) for the development. The Core road development works will consist of raising the formation level, widening to a full two lanes from the existing single and intermediate lane widths, and/or pavement rehabilitation/strengthening. Road sections with high volumes of non-motorized traffic will be widened to 10m with 1.5m full paved shoulders. Road stretches crossing urban areas may also require upgrading to a four lane cross section, and/or provision for drains, sidewalks and parking where required. In some cases, new alignments (by-passes and/or re-alignments may also be required. In view of the above, UP core road network development project (UPCRNDP) has been designed. The UPCRNDP will have three Components: Upgrading/reconstruction/widening as well as rehabilitation of selected roads from the Core Road Network (CRN) including construction of a new Sharda Bridge at Pachpheri Ghat in Lakhimpur district. Road Safety Component: A comprehensive and coordinated package of road safety sub- components to be delivered by the Transport, Home, Public Works and Health Departments Road Sector and Institutional Reform Component: This component is likely to include a program to strengthen PWD asset management of SHs, MDRs and ODRs, to support the application of IT systems for human resource management and works budgeting and management across the PWD organization The Hamirpur- Rath road selected for inclusion in the project demonstrated high Internal Rates of Return in project feasibility studies. Although such benefits were not quantified, the project is also expected to help alleviate development constraints in agriculture, commerce, education, health, social welfare, and public safety and contribute to general expansion and diversification of development activities. The project road, Hamirpur - Rath Road (SH-42) is part and first section of Hamirpur – Chirgaon (Jhansi) road. The complete road is divided into three packages: Hamirpur – Rath Road, Existing length 75.7 km (KM 2+000 to KM 77+720) Rath – Garautha, 35.0 km. This is missing link and alternative alignment via ODR/MDR is taken forward. The road has to be taken up for bid in Phase II. Garautha – Chirgaon (Jhansi), 50.0 km The Uttar Pradesh Public Works Department over a 3-year period will implement the project. Though there is no land acquisition in this particular corridor, there are non-titleholders who will be adversely impacted due to the project and therefore Resettlement Action Plan (RAP) has been Page 0-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) prepared. The primary purpose for preparing Resettlement Action Plan (RAP) is to assess the socio-economic condition of the Project Affected Persons (PAPs) in order to minimize impact and provide mitigate measures. Since the displacement is indispensable, rehabilitation need to be done in such a manner so that the standard of living of PAPs is restored. Special attention will be paid to the vulnerable groups. RAP has provisions to ensure that PAPs are compensated at replacement value for the assets lost and to enable them to regain or improve their socio- economic status enjoyed prior to the project. The RAP is a live document and will be updated as and when necessary. Implementation of the final RAP will be done on data so modified. This document comprises the Resettlement and Rehabilitation Action Plan (RAP) of the Uttar Pradesh Public Works Department (UPPWD). The RAP meets all Government of India (GOI) and World Bank resettlement-related requirements and complies with applicable GOI and World Bank (OD 4.20 and 4.30) regulations, policies, and procedures including those on public participation, environmental assessment and indigenous people. It confirms to provisions of Resettlement and Rehabilitation Policy for Persons Displaced or affected by Projects in Uttar Pradesh. Government of Uttar Pradesh has approved the policy vide letter number 1195(1)/23-12-14 dated August19, 2014. Uttar Pradesh PWD will implement this RAP with assistance from other government agencies, and non-governmental- and community-based organizations. 0.2 Objective of the study The social screening is done first and the objective is to create:  a baseline database containing the features and populace in the immediate vicinity of proposed road;  structures likely to be affected by the widening/improvement proposal;  highlight the social problems and suggests general and typical mitigation measures to alleviate social problems that the project-affected people may face less loss of livelihood, displacement and loss of access to community facilities etc;  develop resettlement action plan to avoid, reduce or mitigate likely negative impacts of project and enhance positive impacts, sustainability and development benefits; 0.3 Scope of the Study The scope of the study includes: Carry out Structure Verification Survey of the structures likely to be affected and Socio- Economic Survey of the Project Affected Persons (PAPs) to get the base line information about the level of impact and to get the base line socio economic status of the PAPs. Preparation of Strip Plan showing existing structures likely to be affected along the project road Conducting Social Impact Assessment including Rehabilitation and Resettlement (R&R) studies Preparation of Social Impact Assessment (SIA) report and Resettlement Action Plan (RAP) 0.4 Methodology The resettlement action plan is based on the primary and secondary data sources. Secondary data source include Gazetteer of project districts and District Census Details, 2011.To assess the Page 0-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) socio-economic condition, a questionnaire has been developed and used to conduct census and socio-economic survey of the project affected persons within the identified corridor width. This Resettlement Action Plan (RAP) report has been prepared as per the Rehabilitation (R&R) policy formulated for the Core Road Network Development Programme by Uttar Pradesh Public Works Department (UP PWD) and is based on World Bank's Operational Directives (O.D.) 4.30 and 4.20 for resettlement of involuntarily displaced persons and indigenous people and UP State Rehabilitation Policy. The principle of the R&R policy is the guiding philosophy to provide a development approach to resettle and rehabilitate the people affected by the project. The preliminary social assessment was carried out, considering 10 m either side along the project road except at the proposed facilities such as Junctions, Bridges etc. Most of the land use categories along this section is agriculture (predominantly), residential and general activities carried out by the local residents. The project road, Hamirpur - Rath Road (SH-42) is part and first section of Hamirpur – Chirgaon (Jhansi) road. The complete road is divided into three sections as below: Hamirpur – Rath Road, Existing length 75.7 km (KM 2+064 to KM 76+500) Rath – Garautha, 35.0 km. This is missing link and alternative alignment via ODR/MDR is taken forward. This section of road has to be taken up for bid in Phase II and will bypass Rath town. Garautha – Chirgaon (Jhansi), 50.0 km 0.5 Right of Way and Corridor of Impact Right of way is the public land owned by the State Government and administered by the PWD, for the existing road. Right of way held by the PWD is the lawfully acquired corridor of land. The established width on an average is 30m. However, Right of way width varies from 19 m to 44 m. Moreover, the existing ROW is not free of encumbrances, as will be seen from the strip maps. Using available records with the PWD and the revenue department, R&R team have verified the boundaries of legal right of way as well as boundaries of private properties within and in the vicinity of the corridor of impact. The limit of displacement will be limited not to the legal right of way but only to the corridor of impact. The corridor of impact is the corridor required for the actual construction of the road, including carriageway, shoulders, embankments and longitudinal drainage. Within this corridor there should be no structures or hindrances. Table 0.1: Availability of Existing RoW S. Chainage RoW Corridor of Remarks No. From To (in Metres) Impact Road cross-section with 1 2+065 3+500 36 34 unlined drain Road cross-section with 2 3+500 9+900 32 25 unlined drain With covered drain 3 9+900 11+010 30 13 because of built-up area 4 11+010 25+ 350 30 24 With unlined drain With covered drain 5 25+ 350 26+500 30 13 because of built-up area 6 26+500 33+ 850 32 24 With unlined drain With covered drain 7 33+ 850 35+000 30 13 because of built-up area Page 0-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Chainage RoW Corridor of Remarks No. From To (in Metres) Impact 8 35+000 50+450 32 24 With unlined drain With covered drain 9 50+450 51+800 30 13 because of built-up area 10 51+800 64+000 32 25 With unlined drain 11 64+000 70 +000 35 24 With unlined drain 12 70 +000 74+760 36 24 With unlined drain Source: Primary Survey 0.6 Rehabilitation Issues Most of the infrastructure improvements planned for the Urban/Rural areas will take place within the existing Right of Way(ROW) except at some of the congested settlements and densely built- up areas and at locations where minor improvements are required for accommodating road safety measures. Social screening surveys conducted in the Detailed Project Report (DPR) stage and verify the Right of Way (ROW) with revenue records. It was obvious that in majority sections of the project roads, ROW may be enough to accommodate/fit the considered design standards. Further, it has been identified that ROW is not fully free from encumbrances and at many places it is encroached and squatted upon by the people for various purposes mainly, near habitations and in marketplaces. In order to face or overcome these consequences, a preliminary idea of Social and Rehabilitation issues need to be acquired . The key social issues considered are as below. Loss of structures used for residential, commercial and other purposes and associated loss of livelihood due to impacts on sources of earning; Loss of other properties and assets such as boundary walls, hand pumps, bore wells, dug wells, ponds etc.; Disruption of livelihood due to clearing of ROW particularly, petty shop owners like kiosk; Loss of common property resources such as religious places, water resources, village gates, passenger shelters etc; 0.7 Land Use along the Project Road The proposed project road passes through the settlements wherein some permanent, semi- permanent and temporary structures are found in large number. These comprise private, government and community assets. The major portion is predominantly agricultural land. In general, the inhabitants occupying lands for different activities along the proposed road have land titles. This information has been used in the design of the Entitlement Matrix and mitigation measures. Common Property Resources (CPR) along the sections of the project road include religious structures, community, water resources, etc. Majority of the temporary structures within the existing right of way are road side commercial establishments. These are either squatters or kiosk owners engaged in small time petty business such as eateries; tobacco selling; tea stalls; etc. The structure owners belong to below poverty line group. 0.8 Social Impact Assessment Social Impact Assessment of the project is an important component of project preparation. The Right to Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Page 0-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Resettlement Act, 2013; project specific R&R Policy as approved by GoUP and World Bank policy require social impact assessment during the design stage to avoid, reduce and mitigate potential negative impacts of project and enhance positive impacts, sustainability and development benefits. Assessment results are considered with technical and economic feasibility findings in the final selection of roads to be rehabilitated. The assessments also contribute to engineering design and result in the preparation of social action plans governing project implementation and the resettlement and rehabilitation of those who may be displaced by road improvements. The main objective of the study is to ensure that the project addresses the adverse impacts on the livelihood of the people and that nobody is left worse off after implementing RAP and those affected have access to project benefits, both during project construction as well as operation. In specific, the objectives of the study are: o To carry out a socio-economic, cultural and political/institutional analysis to identify the project stakeholders and social issues associated with the project; o To assess the extent of land acquisition/appropriation and other losses and undertake the census of potential project affected people; o To develop a Resettlement Action Plan (RAP) in consultation with the affected people and project authorities; o To identify gender related issues in road design and develop gender action plan o To identify likely occurrence of HIV/AIDS resulting from the influx of outside labourers and others and develop a strategy to reduce their incidence; and o To develop a consultation framework for participatory planning and implementation of proposed mitigation plan. The project’s social impacts and resettlement component i ncludes assessment of social impacts of the project and development of appropriate mitigation plans as required. These plans must comply with appropriate national and local laws and guidelines, and with World Bank policy directives. Social assessment is carried out in close co-ordination with environmental assessment team and design team and includes consultation and participation among project stakeholders, local communities and potentially affected groups. The social impact assessment and resettlement planning component has following elements: Social screening as part of Project Feasibility Report.(PFR); Social Impact Assessment; Census and baseline socio-economic survey of the potentially affected population as part of Detailed Project Report (DPR); Preparation of a time-bound Resettlement Action Plan (RAP); Consultations at project, district and state level; Follow-up consultations (to be carried out after finalisation of drawings); and Videography and still photography of all the routes. Social screening was undertaken in conjunction with project inception report and the selection of roads to be included in the project. It provided important inputs and guidance to engineering designs. A full census has been undertaken in 30 m corridor (August to October 2014) to register and document the status of the potentially affected population within the project impact area, their Page 0-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) assets, and sources of livelihood. The baseline data was collected in 20 m corridor to get information of a wider corridor as it gives more flexibility for deciding widening options. Census data provides the basis for establishing a cut-off date for non-title holders in order to determine who may be entitled to relocation assistance or other benefits from the project. Socio-economic survey was also carried out on census basis. This survey provides a baseline against which mitigation measures and support will be measured and includes comprehensive examination of people’s assets, incomes, important cultural or religious networks or sites, an d other sources of support such as common property resources. Analyses of survey results cover the needs and resources of different groups and individuals, including intra-household and gender analysis. The Table 0.2 given below provides a comparative analysis of impacts between 30 m census and corridor of impact. Table 0.2: Impact of the Project 30 M CoI (in M) No. of PAPs No. of PAHs No. of PAFs No. of PAPs No. of PAHs No. of PAFs 6950 1912 2954 2028 488 798 Source: Primary Survey For further analysis and reporting of impacts, only corridor of impact has been considered. Therefore all the tables given below correspond to corridor of impact. Table 0.3: Distribution of Families by Type of Loss Commercial Residential Residential cum Others B. Wall Total Structures Kiosk Commercial 150 328 207 51 26 36 798 Source: Primary Survey As the Table 0.3 above shows, impact is more on commercial establishments which are immediate property in most cases of built-up sections. 0.9 Corridor of Impact On an average COI is 25 m and it varies between 13 m to 35 m. From chainage 2+150 to 2+250, COI is 44m due to raised cross section. The available ROW though is 36 m. However, the land outside the ROW on the right is government land which is free of encroachment and other encumbrances. In order to avoid Land Acquisition (LA), toe wall has been provided. Similarly from chainage 3+350 to 3+400, COI varies from 30 to 34 m which is more than available ROW. At this location toe wall has been provided to avoid land acquisition. Toe wall also has been provided at chainage 3+550 to save LA and few residential structures. Table 0.4: Distribution of Project Affected Households by Type of Loss Commercial Residential Residential cum Others B. Wall Total Structures Kiosk Commercial 90 194 141 29 22 12 488 18% 40% 29% 6% 5% 2% 100 Source: Primary Survey Page 0-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) As the Table 0.4 above shows, impact is more on commercial establishments including temporary kiosks. Out of total project affected households, 69% are commercial; 6% are residential cum commercial, 18% are residential and others cum boundary wall come to 7% only. Preparation of the RAP has been undertaken within the project’s social assessment component. A key prerequisite of the RAP is a policy framework for resettlement containing categories of impacts and their corresponding entitlements. The project specific R&R policy was prepared and agreed upon with the government of Uttar Pradesh (GoUP) vide their order number 1195(1)/23- 12-14 dated 19th August, 2014. The RAP provides number of affected households and families by impact category and detailed guidance on how to implement provisions in the policy framework, including institutional arrangements and budgets based on enumeration of project-affected people with entitlements under the framework. Detailed studies undertaken to prepare this RAP show extensive occupancy of project roadside areas, including densely settled village and urban communities containing numerous residential and commercial structures, businesses, and public facilities. Road widening and the other improvements proposed will impact roadside residences, businesses, religious shrines and structures, agricultural lands, public buildings, and infrastructure. Resettlement will be required only where residential and residential/commercial buildings must either be fully demolished or taken to the extent that they are rendered uninhabitable or useless. Displaced residents of these buildings will be resettled. Similarly affected businesses and other public and religious buildings and structures will be relocated. Rehabilitation will be required where resettlement, relocation, or other project impacts result in lost livelihood or income. In these cases, it will be necessary to restore the economic status of affected persons to at least pre-project levels. In most cases, the project will not require either full demolishing or the taking of residential or commercial structures to the extent that either resettlement or relocation will be necessary. Generally, only a narrow frontage strip of several meters or less will be affected. Frequently, this means that only a compound wall or fences, yards, must be removed. In some cases, small portions of roadside dwellings and businesses will be taken. Only rarely, will it be necessary to take entire residential or commercial structures. However, kiosks will have to move out of COI though they may remain within the ROW. The right of way (ROW) for this corridor ranges from 19 m to 44 m. The design width of the road will not be more than 20 m and will be well within the available ROW. Therefore, no Land Acquisition in envisaged in Hamirpur–Rath project road. 0.10 Cut off Date The date of completion of census survey will be considered as cut-off date and therefore, people who are not surveyed during the census will not be considered as PAP. The cutoff date will be used to establish whether a person located in the corridor qualifies as a PAP during the implementation of the various phases of the project. However, a person not enumerated during the census, but able to prove their stay in the project corridor, during the census survey will be considered for entitlement. Period of Census Survey is given below: Table 0.5: Cut off Date Route No. Route Name Start Month End Month Hamirpur-Rath-Gursahayganj-Jhansi SH- 42 Road (Section Hamirpur-Rath km 2+065 1 August-2014 4 October-2014 to 76+500 km Page 0-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 0.6: Distributions of Project Affected Households by Type of Loss Commercial Residential cum Residential Others B. Wall Total Structures Kiosk Commercial 90 194 141 29 22 12 488 18% 40% 29% 6% 5% 2% 100 Source: Primary Survey Other Properties includes loss of trees, irrigation units, etc. As the table above clearly shows that impact is primarily on commercial structures, though majority of them are temporary. This is primarily because commercial structures are always established along the highways for better business prospects. Table 0.7: Distributions of Community Properties by Category Temple / Shrine Water Water Hand Mosque Well Bus Stop Others Total / Chabutra Tap Tank Pump 10 0 4 5 1 46 13 0 79 Source: Primary Survey As the table above shows a total of 79 community properties are within the corridor of impact of which 46 are hand pumps and 10 are cultural properties. The Community Properties is attached as Annexure – 7 & 8. 0.11 Analysis of Census and Baseline Socio-economic Data A detailed socio-economic survey was conducted in conjunction with the census of the project- affected persons (PAPs) to profile the impacted project area and provide a baseline against which mitigation measures and support will be measured. For this purpose, comprehensive information related to people’s assets, income, socio-cultural and demographic indicators, religious structures, and other sources of support such as common property resources were collected. The analysis has covered the needs and resources of different groups and individuals, including intra- household analysis and gender analysis. The analysis is based on the cutoff date for entitlement assigned in the project (the cutoff date for the non title holder is the start date of census. The questionnaire canvassed during the survey is attached as Annexure – 1 Table 0.8: Distribution of Affected and Displaced Families No. of PAPs No. of PAHs No. of PAFs No. of PDFs 2028 488 798 491 Source: Primary Survey As shown in the table above, a total of 488 households (798 families) will be affected due to proposed road up gradation, which in turn will affect 2028 persons. Table 0.9: Distributions of PAFs and PDFs by Type of Affect Type of Loss Affect Type Residential Commercial kiosk Resi.+ Comm Others B.wall Total Displaced 16 268 207 0 0 0 491 PAF 150 328 207 51 26 36 798 Source: Primary Survey Note: Partial: Loss less than 10%; Adverse: Loss between 10 to 25%; Displaced: Loss more than 25% Page 0-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Approximately 61 % of the total affected families will be displaced either because of loss of residential property or commercial property/Kiosk. It is only the squatter & Kiosk who will be displaced. Table 0.10: Demographic and Social Characteristics in Corridor of Impact Demographic/Social Distribution of Distribution of PAPs Distribution of Families Distribution of PAPs by Families by Religious by type of Sex by Family Type Social Stratification Groups Extended General Nuclear Female Muslim Others Hindu Total Total Total Total Joint Male OBC SC ST 1119 909 2028 284 166 38 488 450 38 0 488 86 0 266 136 488 Distribution of PAPs by Marital Status Distribution of PAPs by Age Group 0 to 6 years Unmarried Separated Divorced Married 7 to 15 Widow 59 and 36–58 16-18 19-21 22-35 above years Total Total 903 1074 3 6 42 2028 268 391 134 119 531 445 140 2028 Source: Primary Survey During the census survey, sex of every individual was recorded as it helps in identification of family and vulnerable category as per R&R policy. As the table above shows, approximately 55% PAPs are male and 45% are female. Majority of the families (58%) are nuclear in nature. Nearly 92% of the PAPs follow Hinduism. Caste configuration shows that 71% of the PAPs are from other backward castes and 29% belongs to general caste. The scheduled castes are 18% of the total affected families. To identify affected families as per the R&R policy of UP State Roads Project, marital status of PAPs has been recorded and more specifically of women PAPs. According to survey results, number of unmarried PAPs is higher than married ones. Data for divorced, separated, widow and deserted was specifically analysed as they all form separate family as per R&R policy and are eligible for R&R assistance. The marital status of the PAPs shows that 44% are married. Nearly 2% PAPs are widows and less than 1% are either separated or divorced. Age group classification: As per R&R policy, all males/women above the age of 18 years, irrespective of marital status will be considered as separate family Age group classification also helps in assessing dependent and economically independent population. As the table on age cohort shows, nearly three fifth of the population comes under economically independent group of 19 to 58 years of age. About 13% of the population comes under non- school going age and about 7% are above the 59 years. Table 0.11: Distribution of PAPs by Literacy Level Intermediate Secondary Graduate technical Illiterate Primary primary Others Upper Total 611 453 458 234 149 69 47 7 2028 Source: Primary Survey Page 0-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Literacy level is a quantifiable indicator to assess the development status of any area/region. Higher the literacy rate, more developed the area would be. Secondly, in displacement induced development project, data on literacy level of PAPs helps in formulating alternative income restoration schemes. Keeping this in mind, literacy level of PAPs was recorded during the Census Survey. For recording literacy level, completed years of education have been taken. e.g., respondent who failed to clear 10th standard has been considered as middle literate. Similarly respondent who failed to clear 12th standard has been considered as secondary literate. However, those who have attended school but failed to clear 5th standard still have been considered as primary. The literacy rate among the PAPs is quite high. Nearly 30% of the PAPs were found to be illiterate. Even among the literates, 22% PAPs are literate up to primary level. Graduates and above are only 3% of the total population. Around 3% have done some technical literacy. Table 0.12: Distribution of Families by Type of Loss Commercial Residential Residential cum Others B. Wall Total Structures Kiosk Commercial 150 328 207 51 26 36 798 Source: Primary Survey As the Table 0.12 above shows, impact is more on commercial establishments which are immediate property in most cases of built-up sections. Out of total 798 affected families, nearly 19% are residential & 41% are commercial, 26% are from Kiosk. Another 6% families are affected due to loss of residential cum commercial structures. Among the affected commercial structures, 207 are kiosks those who will be displaced. Table 0.13: Vulnerability Status of the Household in Corridor of Impact Vulnerability Status of the Household Caste BPL WHH Total 303 55 12 370 Status of Ownership Squatter Encroacher Kiosk Tenant Total 203 (42%) 144 (30%) 141 (28%) 0 488 Source: Primary Survey The survey results show that out of 798 families, 370 are vulnerable. Among the vulnerable families, 85 % are socially vulnerable and rest 15% is economically vulnerable. The ownership status shows that over 42% are squatter. Apart from squatters, 28% are kiosk owners and 30% are encroachers. As per the project’s R&R policy, vvulnerable encroachers will be provided cash assistance at replacement cost for loss of structures; one time grant of Rs. 36000 as subsistence allowance; shifting allowance of Rs. 50,000 per family as one time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure; and each affected person who is a rural artisan, small trader or self-employed person assistance' of Rs 25,000/- for construction of working shed or shop. In case of Kiosks, only Rs. 5000 will be paid as one time grant. Page 0-10| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 0.12 Resource Base of the Affected Families The information presented below has been collected through both censuses as well as sample socio-economic survey. The economic indicators considered during the survey were usual activity, occupational pattern, average household income and expenditure, number of families below poverty line, asset holdings, etc. Table 0.14: Resource Base Enlistment of Families Facilities owned by Families No. of families holding ration card 634 No. of families with electrification 356 No. of families holding voter card 718 No. of shops with electrification 178 No. of families with tap connection 45 Families with legal document 53 No. of shops with tap connection 0 Source: Primary Survey As the table above shows, out of 798 families, 634 holds ration card and five households also owns legal document of the property. Out of 1677 adults, less than half of the PAPs (718) holds voter’s card. Approximately half of the families have electricity connection whereas just 6% families have tap connection. Though nearly 25% shops have electricity connection, none of the shops have tap connection. Table 0.15: Construction Typology of Structures Permanent Semi-Permanent Temporary Total 12 69 407 488 Source: Primary Survey As the table above shows, construction typology of majority of the affected structures (approximately 84 %) is temporary as most of them are either kiosks or small eateries along the road side. 0.13 Usual Activity It is important to record usual activity so as to assess whether PAP is gainfully employed or not. The activity the PAP is engaged in helps in formulating alternative income generation schemes. Accordingly activity where a person spends 8 or more than 8 hours in a day has been considered as usual activity for the respondent. Such activities may be directly economically gainful or may not be. Accordingly, PAPs have been classified into 8 categories as defined in Census of India. As the Table 0.16 shows, over one fourth of the total PAPs are engaged in some or the other kind of economically gainful activity and hence are in the category of workers. In rural areas, generally some kind of economically gainful activities are always available either in cultivation or non- agriculture labour activities run under various government poverty alleviation schemes. Still a small percentage of PAPs are reportedly non-workers or unemployed. Hence, such section of PAPs will require special attention during implementation phase of RAP. Over one fifth of the total PAPs reportedly are engaged in household chores and such PAPs are primarily women. Details about the household activities carried out by women PAPs are presented in chapter eleven on vulnerable groups. Page 0-11| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 0.16: Usual Activity Occupation Non-school Non Main Migrated Home going age Worker Student Others Worker Worker Worker Worker Children (0to 5 years) 675 102 114 11 381 508 225 8 Source: Primary Survey 0.14 Occupational Pattern Occupational pattern of the PAPs are recorded to assess their skill so that they can be imparted training in the same trade for alternative income generating scheme. Secondly, occupational pattern helps in identifying dominating economic activity in the area. As the survey results shows, trade and business (primarily petty shops) is the most common occupation found among the PAPs settled along the road. Nearly 60 percent of the PAPs are engaged in Trade and Business followed by non agriculture labourers and agriculturists. 0.16 Average Annual HH Income and Expenditure Table 0.17: Distribution of HH by Income Level 5001 - 10001 - 15001 - 20001 - 30001 - 1000 - 5000 Total 10000 15000 20000 30000 60000 365 82 16 16 7 2 488 Source: Primary Survey Annual income helps in identifying families below poverty line. During the survey income of a household through all possible sources was recorded. Accordingly, the average monthly household income, as table above indicates is Rs. 4712. The various sources asked during the survey for calculating household income includes agriculture; allied agriculture activities; agriculture labour; non-agriculture labour; household industries; services; trade and business; profession; etc. Income from these sources was added up and weighted average was taken to arrive at average annual income figure. Table 0.18: Distribution of Households by Primary Source of Income Source Number of HHs % of total Agriculture 36 7 Petty trade and business 301 62 Agriculture labour 19 4 Non agriculture labour 110 22 Daily wage earner 18 4 Salaried 4 1 Total 488 100 Source: Primary Survey The average monthly expenditure is Rs. 4485 which is little less than the income and this is one reason why PAPs have some kind of saving. The various heads of expenditure asked during the survey included food; fuel; clothing; health; education; communication; social functions; etc. Like income, in calculating average expenditure per family, expenses made against each head was added up and weighted average was taken up to arrive at average annual expenditure. Page 0-12| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 0.17 Project specific Resettlement & Rehabilitation (R & R) Policy, 2014 This policy is based on the Right to Fair Compensation and transparency in land Acquisition, Rehabilitation and Resettlement Act, 2013 subject to subsequent supplements by GoUP orders and World Bank Operational Policy 4.12 on involuntary resettlement. Government of Uttar Pradesh has plans to improve the Core Road Network. The aim and the objective are to improve and strengthen the state's road transport network. Apart from the positive aspects of the road up-gradation, the project may cause loss of land, structures, other immobile properties and various sources of livelihood. This document describes the principles and approaches to be followed in minimizing and mitigating negative social and economic impacts caused by projects so that the affected are able to restore and improve their standard of living. The entitlement matrix as per different impact categories is given below. (For details- Refer to Annexure-2) S. Definition of Application Entitlement Details No. Entitled Unit A. Loss of Private Agricultural, Home-Stead & Commercial Land 1 Land within Titleholder Compensation at a) Land for land, if available. Or, Cash compensation the Corridor of family. and Market value, for the land at Market value, Impact (COI) families with Resettlement and which will be determined as provided under section 26 traditional land Rehabilitation of RFCTLARR Act 2013. Right b) The land if allotted will be in the name of both husband and wife. c) If post acquisition, residual land is economically unviable, the land owner will have the choice of either retaining or sell off rest of the land. d) Refund of stamp duty and registration charges incurred for replacement land to be paid by the project; replacement land must be bought within a year from the date of payment of compensation to project affected persons. e) Subsistence allowance of Rs. 36000 as one time grant f) One time grant of Rs. 500,000 or annuity g) Compensation at market value for loss of crops if any B. Loss of Private Structures (Residential/Commercial) 2 Structure Title Holder/ Compensation at a) Cash compensation for the structure at Market within the Owner Market value, value which would be determined as per as per Corridor of Resettlement & section 29 of the RFCTLARR Act 2013. Impact (Col) Rehabilitation House under Indira Awas Yojna in rural area Assistance or Rs 50000 in lieu off and house under RAY in urban area or Rs 100,000 in lieu off. The house if allotted will be in the name of both husband and wife. b) Right to salvage material from the demolished structures. c) Three months' notice to vacate structures. d) Refund of stamp duty and registration charges for purchase of new alternative houses/shops at prevailing rates on the market value as determined in (a) above. Alternative houses/shops must be bought within a year from the date of payment of compensation. e) In case of partially affected structures and the Page 0-13| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit remaining structure remains viable, additional 10% to restore the structure. In case of partially affected structures and the remaining structure becomes unviable additional 25% of compensation amount as severance allowance. f) Subsistence allowance equivalent to Rs. 36000 as one time grant. G) Each affected family getting displaced shall get a one-time financial assistance of Rs 50,000 as shifting allowance. h) Each affected family that is displaced and has cattle, shall get financial assistance of Rs 25,000/- for construction of cattle shed. i) One time grant of Rs. 50,000 as resettlement assistance j) Each affected person who is a rural artisan, small trader or self-employed person and who has been displaced (in this project owner of any residential-cum commercial structure) shall get a one-time financial assistance of Rs 25,000/-for construction of working shed or shop. j) One time grant of Rs. 500,000 3 Structure Tenants/ Resettlement & a) Registered lessees will be entitled to an within the Lease Holders Rehabilitation apportionment of the compensation payable to Corridor of Assistance structure owner as per applicable local laws. Impact (Col) b) In case of tenants, three months written notice will be provided along with Rs 50,000 towards shifting allowance. C. Loss of Trees and Crops 4 Standing Owners and Compensation at a) Three months advance notice to project affected Trees, beneficiaries market value persons to harvest fruits, standing crops and removal of Crops . within (Registered/ trees. the Corridor of Un-registered b) Compensation to be paid at the rate estimated Impact (Col) tenants, by: contract i) The Forest Department for timber trees cultivators, ii) The State Agriculture Extension Department for crops leaseholders & iii) The Horticulture Department for sharecroppers fruit/flower bearing trees. c) Registered tenants, contract cultivators & leaseholders & sharecroppers will be eligible for compensation for trees and crops as per the agreement document between the owner and the beneficiaries. d) Un-registered tenants, contract cultivators, leaseholders & sharecroppers will be eligible for compensation for trees and crops as per mutual understanding between the owner and the beneficiaries. D. Loss of Residential/ Commercial Structures to Non-Titled Holders 5 Structures Owners of Resettlement & a) Non vulnerable encroachers shall be given three within the Structures or Rehabilitation months' notice to vacate occupied land Corridor of Occupants of Assistance b) Vulnerable encroachers will be provided cash assistance Impact (Col) structures at replacement cost for loss of or identified as per structures as described in section 29 of the Government Project Census RFCTLARR Act 2013. . land Survey c) Any encroacher identified as non-vulnerable but losing more than 25% of structure used will be paid cash assistance at replacement cost for loss of structures. The amount will be determined as per section 29 of the RFCTLARR Act 2013. Page 0-14| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit d) All squatters to be paid cash assistance for their structures at replacement costs which will be determined as mentioned in section 29 of the RFCTLARR Act 2013. e) All squatters (other than kiosks) will be eligible for one time grant of Rs 36000 as subsistence allowance. f) All squatters other than Kiosks will be given shifting allowance of Rs 50,000 per family as one time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure. g) Each affected person who is a rural artisan, small trader or self-employed person assistance' of Rs 25,000/- for construction of working shed or shop. h) In case of Kiosks, only Rs. 5000 will be paid as one time grant. E. Loss of Livelihood 6 Families living Title Holders/ Resettlement & a) Subsistence allowance of Rs. 36,000 as one within the Non-Title Rehabilitation time grant. (PAPs covered under 1(f), 2 (f) Corridor of holders/ Assistance and 5 (e) above would not be eligible for this Impact (Col) sharecroppers, assistance). agricultural b) Training Assistance of Rs 10,000/- for labourers and income generation per family. employees c) Temporary employment in the project construction work to project affected persons with particular attention to vulnerable groups by the project contractor during construction, to the extent possible. F. Additional Support to Vulnerable Families 7 Families within SC, ST, BPL, Resettlement & One time additional financial assistance of Rs. 50,000. the Corridor of WHH families Rehabilitation Squatters and encroachers already covered under clause 5 Impact (Col) Assistance are not eligible for this assistance. G. Loss of Community Infrastructure/Common Property Resources 8 Structures & Affected Reconstruction Reconstruction of community structure and Common other communities of community property resources in consultation with the community. resources and groups structure and (e.g. land, • common water, property access to resources structures etc.) within the Corridor of Impact (Col) H Temporary Impact During Construction 9 Land & assets Owners of land Compensation for Compensation to be paid by the contractor for loss of temporarily & temporary impact assets, crops and any other damage as per prior impacted Assets during agreement between the 'Contractor' and the 'Affected during construction e.g. Party'. construction diversion of normal traffic, damage to adjacent parcel of land / assets due to movement of heavy machinery and plant site. Page 0-15| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit J. Resettlement Site 10 Loss of Displaced Provision of Resettlement sites will be developed as part of the project, residential titleholders and resettlement site/ if a minimum of 25 project displaced families opt for structures non-titleholders vendor market assisted resettlement. Vulnerable PAPs will be given preference in allotment of plots/flats at the resettlement site. Plot size will be equivalent to size lost subject to a maximum of provision given in RFCTLARR Act 2013. Basic facilities shall be provided by the project at resettlement site as per the provisions given in the Third Schedule of RFCTLARR Act 2013. Similarly, if at least 25 displaced commercial establishments (small business enterprises) opt for shopping units, the Project Authority will develop the vendor market at suitable location in the nearby area in consultation with displaced persons. Basic facilities such as approach road, electricity connection, water and sanitation facility, will be provided in the vendor market by the project. Vulnerable PAPs will be given preference in allotment of shops in vendor market. One displaced family will be eligible for only one land plot at resettlement site or shop in the vendor market. 0.18 Analysis of Alternatives Analysis of alternatives is very important activities, which leads to minimize the negative impacts on population and properties and meet the technical requirement. The provision of widening and COI were weighed upon by the technical team, considering the outcome of public consultation as well as the suggestion of people along the project road. In most of the heavy built up locations, concentric widening within the available ROW has been proposed in the design to avoid land acquisition and to minimize displacement of non- titleholders. In approximately 6.15 km eccentric widening has been proposed to save residential and commercial structures. However, between chainage 76+500 to 78+400 where market for Rath is located, the available ROW is 8 m. Therefore alternatives were explored and assessment was made. Analysis of Alternatives was done considering 2 options as given in the table below. Alternative 1 was not considered as there will be major impact and typical cross section will not fit in the available ROW. 1. Alternative -1: Rehabilitation of existing road 2. Alternative 2: Widening of 13 m. 3. Alternative-3: Bypass at location starting chainage 76+500 Impact Category Alternative 2 Alternative 3 Loss of structure 141 0 Land acquisition 0 4 ha Affected households 288 50 Loss of religious structures 12 0 Affected government structures 6 0 Loss of water bodies 1 1 Page 0-16| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Considering the above options the alternative 3 was appraised for Rath Market. Though there will be land acquisition, the impacted households will be much lower than alternative 2. Since there will be acquisition of land, this section will be part of Phase II roads. Alternative 2 apart from impacting 288 households will also impact a mazar (graveyard), one mosque and 3 temples /shrines. 0.19 Widening Options Due importance has been given to social issues while road designing. The coordination between social and design team helped in minimizing the number of PAPs and affected PAHs. Concentric widening has been proposed in majority of total stretch to avoid involuntary land taking and minimize the social impact. Eccentric widening option (one side widening) has been proposed in 8.1% of total project stretch, for geometrical correction and improvement of existing road alignment. However, those within the right of way (ROW) but not within corridor of impact (COI) will not be displaced by the project. Typical cross sections applied are presented in table below. Table 0.19: Typical Cross Section (TCS) TCS Type Length Proposal (with the minimum Land width) (Km) % Concentric 1A/1B With unlined drain 59.28 77.6 Eccentric widening 1A/1B With unlined drain 6.16 8.1 Raising 1A/1B With unlined drain 2.9 3.8 Realignment - Urban 2A/2B With covered drain 8.06 10.5 Total 76.40 100% In view of safety requirements as well as segregation of the fast moving traffic from the local slow moving traffic, paved shoulder has been proposed in the entire project road. Improvement in Built-up Locations In context of present project improvement that consisted of 2 lane with paved shoulders, the Corridor of Impact is the most important parameter in determining the number of PAPs. The requirement of the project demands that the entire corridor of impact should be free from encroachments, human habitation and structure, causing hindrances to traffic. Removing the encroachers and the squatters from the RoW does not guarantee that they would not reoccupy the area. Therefore, all estimations were limited to the CoI only and the project will not displace any person outside the corridor of impact, even if within the RoW. In the present road there are 5 locations with heavy urban built up where 13metres CoI has been considered to avoid/ minimize adverse impacts. Improvement in these locations would require removal of few squatters and encroachers. The chainage-wise locations of built-up areas along the project road is charted in table below. Table 0.20: Built-up Locations along the Project Road Chainage S. No. Length (m) Town/Village Name From To 1 9+980 11+000 1.02 Pothiya 2 25+400 26+500 1.10 Chhani Page 0-17| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Chainage S. No. Length (m) Town/Village Name From To 3 33+900 34+950 1.05 Biwar 4 50+400 51+800 1.80 Muskara 5 74+800 77+720 3.06 Rath 0.20 Timing of Resettlement The resettlement process must be completed by the start of civil works on the particular route. Requisite procedure will be developed by the PWD to carry out resettlement of PAPs located within the COI, before the civil work starts on any section of the project road. These people will be given at least three months’ notice to vacate their property before civil works begins. During the field visit with UP PWD on 8 & 9th of November, 2014, the milestone has been finalized for handing over to the Contractor. The Mile stone is based with no hindrance at the project corridors. Stretches, which are free of encroachment and other encumbrances, will be handed over first to contractor. The timetable of stretches to be handed over to the contractor is given below. Table 0.21: Plan for Handing Over the Stretches to Contractor Route Mile Chainage Date of handing over Road Name Total km No. Stone Start End to contractor 11 16 5 21 25 4 Hamirpur Rath 1 35 41 6 1 42 46 4 at starting date 52 57 5 59 76 17 Sub Total of Mile Stone-1 41 2 9 5 16 21 4 Hamirpur Rath 2 27 33 6 2 41 42 4 6th Month 46 50 5 57 59 17 Sub Total of Mile Stone-2 25 9 11 2 Hamirpur Rath 1 25 27 2 3 33 35 2 12th Month 50 52 2 Sub Total of Mile Stone-3 8 0.21 Institutional Arrangement The action plan provides a detailed mechanism for the appropriate organisation and implementation of the plan. A social cell is created which will be responsible for the implementation of the action plan. There will be a Resettlement and Rehabilitation (R & R) Officer, who will be supported by R & R Manager (of Executive Engineer Rank) for each Road. In addition Non-government Organisations (NGOs) having relevant experience in implementation of Page 0-18| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) R & R projects may be contracted to provide assistance to Implementing Authority as well as affected persons. The district level committees will be set up to facilitate the finalization of replacement value and all grievances of the people. 0.22 Integrated Grievance Redressal Mechanism An Integrated Grievance Redressal Mechanism (IGRM) will be established at the head quarter level that will register user complaints using combination of various mediums (e.g. a dedicated toll free phone line, web based complaints, written complaints in feedback register and open public days) and address them in a time bound system. The project will appoint a grievance redressal or Public Relation officer solely responsible for handling phone and web based complaints. The person will be responsible for directing the aggrieved person to the concerned official through e-mail. On receiving any phone call or web based or email, a unique number will be generated which will be the reference number for the caller and he can trace the progress of his grievance / query through that number. Any complaint lodged will be addressed within 15 days of receiving the complaint. System will have escalation matrix i.e. if grievance / query remain untended or there is no response from the concern officer for specified period of time than system will escalate the grievance / query to next level through email. The toll free line will be monitored between 10 AM to 5.30 PM on all working days. Any call made before or after the stipulated time, will get recoded and from the voice mail an e- mail will be generated addressed to the grievance officer. The grievance officer will then direct that mail to the concerned official and follow-up. The recorded message will be responded back the next day. The project will also commit itself for proactive disclosure and sharing of information with the key stakeholders, including the communities/beneficiaries. The website of PWD will have the name and number of social development officer; the toll free number and also the website address. 0.23 Implementation Arrangements and Schedule It is envisaged that the R & R activities will be completed before initiating the civil works. The project will establish Environment; Social Development and Resettlement Cell at headquarters level. ESDRC will be headed by Chief Engineer and will have one Environment and one Social Development Specialist. These specialists will be hired from the market. Project will hire the services of one NGO for implementation of RAP. At the district level, project will establish project implementation unit. One Assistant Engineer will be designated as Environmental and Social Officer. ESO will be responsible for coordinating with line departments at the district level and will also facilitate land purchase wherever required. The resettlement action plan will be implemented in two years. 0.24 Budget The implementation of RAP entails expenditure, which is a part of the overall project cost. The R&R budget, gives an overview of the estimated costs of the RAP and provides a cost-wise, item- wise budget estimate for the entire package of resettlement implementation, including compensation, assistance, administrative expense, monitoring and evaluation and contingencies. Values for compensation amounts and other support mechanism will be adjusted, based on annual inflation factor. Around 5% of the total cost has been set aside for physical contingencies. Such type of contingencies may arise as a result of time overrun of the project or due to various other unforeseen circumstances. The costs estimated mainly include structure cost and R&R assistance costs. Page 0-19| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Cost of Civil Works: While preparing the budget, the R&R team laid special emphasis on arriving at an estimate of the market value of the assets. The R&R team verified price data from a section of the PAPs, revenue officials in the concerned district; local entrepreneurs engaged in these works and even non-PAPs in each kilometer stretch. The resettlement budget, particularly, the compensation has been computed on this basis. R&R assistance: The R&R assistance amounts such as shifting allowance; subsistence allowance and grant for working shed has been taken from approved R&R policy for the project. Cost towards implementation arrangement: The cost for hiring NGO; M&E agency and implementation of gender action plan has been estimated based on other projects; activities envisaged; and number of PAPs The budget for RAP implementation comes to Rs. 4.85 crores. The detailed budget is presented below: Table 0.22: Estimated Cost of R&R Budget based on R &R policy Total S. No Item Unit Rate (INR) Amount Replacement cost for Structure A In Sq. mtr. Non Title holders Replacement cost for Permanent 1 199.48 13,000 25,93,240 Structure Replacement cost for Semi Permanent 2 725.74 12,000 87,08,880 Structure Replacement cost for Temporary 3 2717.54 3,500 95,11,390 structure 4 Replacement cost for Boundary Wall 138.7 2,000 2,77,400 Total 3781.46 2,10,90,910 B Assistance Number Squatters One time grant of Rs 36000 as 1 203 36,000 73,08,000 subsistence allowance Shifting allowance of Rs 50,000 as one 2 0 0 0 time grant for a permanent structure Shifting allowance 30,000 as one time 3 0 0 0 grant for a semi - permanent structure Shifting allowance 10,000 as one time 4 203 10,000 20,30,000 grant for a temporary structure Kiosks only Rs. 5000 will be paid as one 5 141 5,000 7,05,000 time grant Grant for construction of working shed 6 203 25,000 50,75,000 or shop for self employed Training Assistance of Rs 10,000/- for 7 310 10,000 31,00,000 income generation Total 1,82,18,000 CPR-compensation for C In Sq. mtr. Community/Properties 1 Compensation for Religious St. 159.99 12000 19,19,880 Community Boundary Wall ( in Running 2 23 2000 46,000 mts.) 3 Well (in number) 4 50000 2,00,000 4 Hand Pump (in number) 46 20000 9,20,000 Total 30,85,880 Page 0-20| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Total S. No Item Unit Rate (INR) Amount D Implementation Arrangement Implementation of GAP Lump sum 10,00,000 Hiring of NGO Lump sum 12,00,000 Hiring of M&E agency Lump sum 15,00,000 Training of Project Staff on RAP issues Lump sum 1,00,000 Total 38,00,000 GRAND TOTAL ( A +B+C +D) 46,194,790 Contingency 5% 23,09,739.5 Grand Total 4,85,04,530 Page 0-21| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 1 INTRODUCTION 1.1 Project Background The state has a road network of 299,604 km, out of which 174,451 km is under Uttar Pradesh Public Works Department (PWD). The roads under PWD comprise 7,550 km of National Highways (NHs), 7,530 km of State Highways (SHs), 5,761 km of Major District Roads (MDRs), 3,254 km of Other District Roads (ODRs) and 138,702 km of Village Roads (VRs). Only about 60% of SHs are two-lane (7 m). In the entire state 62% of MDRs and 83% of ODRs have widths less than 7 m. With a view to improve the transport network system, UP PWD has identified 24,095 km of Core Road Network (CRN) for the development. This network comprise NH, SH, MDR, ODR and the details are presented in the table below. Table 1.1: Road Network in Uttar Pradesh Road Category Length (km) National Highway (NH) 7,550 State Highway (SH) 7,530 Major District Road (MDR) 5,761 Other District Road (ODR) 3,254 Total 24,095 Although National Highways are an integral and significant part of Core Roads Network of the State, but their widening/strengthening and maintenance activities are carried out through the resources of Government of India and their ownership also lies with central government. Therefore the entire length of National Highways within the state has not been included in the proposed World Bank Project. However the State Government has intended to include improvement of about 3650.0 Kms of roads out of entire core network of 22296.0 Km, which has to be implemented in three phases. The Core road development works will consist of raising the formation level, widening to a full two lanes from the existing single and intermediate lane widths, and/or pavement rehabilitation/strengthening. Road sections with high volumes of non-motorized traffic will be widened to 10m with 1.5m full paved shoulders. Road stretches crossing urban areas may also require upgrading to a four lane cross section, and/or provision for drains, sidewalks and parking where required. In some cases, new alignments (by-passes and/or re-alignments may also be required. The Government of Uttar Pradesh has a long-term program to improve the Core Road Network (CRN) and, as part of this program, has applied for a financial assistance from the World Bank for developing the Uttar Pradesh Core road Network Development Project (UPCRNDP). The UPCRNDP will have three Components: Upgrading/reconstruction/widening as well as rehabilitation of selected roads from the Core Road Network (CRN) including construction of a new Sharda Bridge at Pachpheri Ghat in Lakhimpur district. Page 1-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Road Safety Component: A comprehensive and coordinated package of road safety sub- components to be delivered by the Transport, Home, Public Works and Health Departments Road Sector and Institutional Reform Component: This component is likely to include a program to strengthen PWD asset management of SHs, MDRs and ODRs, to support the application of IT systems for human resource management and works budgeting and management across the PWD organization The GoUP through the PWD will be the executing agency for the project. The road development projects have certain impact on environmental and social components at different stages. Management of environmental and social impacts is a very important component of such developmental activities and, rightly therefore, it has been emphasized to take care of environmental and social issues relevant to the projects under UPCRNDP. The project is expected to bring quite a few benefits viz., result in lower transport costs for freight and passengers of motorized and non-motorized vehicles, improved road transport corridors road network connectivity, improved management of road sector institutions, enhanced maintenance of priority roads rural prosperity reduced risk of highway related diseases, and basic amenities to the villages along the proposed highways Project benefits identified in economic analysis include savings in vehicle operating costs; time savings for passengers and goods in transit; savings in road maintenance costs. The Hamirpur- Rath road selected for inclusion in the project demonstrated high Internal Rates of Return in project feasibility studies. Although such benefits were not quantified, the project is also expected to help alleviate development constraints in agriculture, commerce, education, health, social welfare, and public safety and contribute to general expansion and diversification of development activities. The Uttar Pradesh Public Works Department over a 3-year period will implement the project. This document comprises the Resettlement and Rehabilitation Action Plan (RAP) of the Uttar Pradesh Public Works Department (UPPWD). The RAP meets all Government of India (GOI) and World Bank resettlement-related requirements and complies with applicable GOI and World Bank (OD 4.20 and 4.30) regulations, policies, and procedures including those on public participation, environmental assessment and indigenous people. It confirms to provisions of Resettlement and Rehabilitation Policy for Persons Displaced or affected by Projects in Uttar Pradesh. Government of Uttar Pradesh has approved the policy vide letter number 1195(1)/23-12-14 dated August19, 2014. Copy of the letter is enclosed as Annexure-2. Page 1-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Uttar Pradesh PWD will implement this RAP with assistance from other government agencies, and non-governmental- and community-based organisations. The project road, Hamirpur - Rath Road (SH-42) is part and first section of Hamirpur – Chirgaon (Jhansi) road. The complete road is divided into three packages: Hamirpur – Rath Road, Existing length 75.7 km (KM 2+000 to KM 77+720) Rath – Garautha, 35.0 km. This is missing link and alternative alignment via ODR/MDR is taken forward. The road has to be taken up for bid in Phase II. Garautha – Chirgaon (Jhansi), 50.0 km 1.2 Start and End Points The project road is located on south side of UP state passing in Hamirpur district. The project road start near Hamirpur (Km 2+000 of SH-42) forming a Y intersection with NH-86 (Km 59+000) and ends at Rath town near Police Station. End point is a 4-legged intersection, with project road diverting almost perpendicularly from the direction of travel. At start, 2 km road length is overlap with NH-86 hence project starts from Km 2+000. The project road location is presented in Figure 1.1. Figure 1.1: Location Map The existing road length is 75.72 km per existing Kilometer Stone while the proposed road length/ design length is 76.46 km. The design length is after fitting the curves and carrying out the design. Page 1-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Start of Project Road at Km 2+000 End of Project road (Y Junction at Km 59+000 of NH-86) Figure 1.2: Start and End Points 1.3 Salient Features The entire project road passes through plain/ rolling terrain. The land use along the project road is predominantly agricultural comprising of variety of crops. Agricultural Land on Both Sides Barren Land on Both Sides Figure 1.3: Land Use Pattern The existing road has both intermediate and two lane carriageway, approximately 50% each. Earthen shoulder of average width of 0.5-2.5 m is present on both sides of the carriageway. Average Right of Way (ROW) measured from Sajra map is 30m (range varying from 20 to 42m) 7.0m Carriageway 5.5m Carriageway Figure 1.4: Typical View of Carriageway Page 1-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) The entire road has low embankment height which varies from 0.5-1.0m except at bridges location where it is high. The major settlements/ towns along the project road are Pothiya, Chani, Biwar, Muskara and Rath. Out of these Rath is the major town. Muskara Town at Km 51+000 Rath Town at Km 78+000 Figure 1.5: Built-up Area There are numerous intersections; out of these one at start point is the major one as originating from National Highway. The road geometry is generally good but pavement condition is poor, mainly in first 16 km it is very poor state. 1.4 Social Impact Assessment Social Impact Assessment of the project is an important component of project preparation. The Right to Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013; project specific R&R Policy as approved by GoUP and World Bank policy require social impact assessment during the design stage to avoid, reduce and mitigate potential negative impacts of project action and enhance positive impacts, sustainability and development benefits. Assessment results are considered with technical and economic feasibility findings in the final selection of roads to be rehabilitated. The assessments also contribute to engineering design and result in the preparation of social action plans governing project implementation and the resettlement and rehabilitation of those who may be displaced by road improvements. The main objective of the study is to ensure that the project addresses the adverse impacts on the livelihood of the people and that nobody is left worse off after implementing RAP and those affected have access to project benefits, both during project construction as well as operation. In specific, the objectives of the study are: To carry out a socio-economic, cultural and political/institutional analysis to identify the project stakeholders and social issues associated with the project; To assess the extent of land acquisition/appropriation and other losses and undertake the census of potential project affected people; To develop a Resettlement Action Plan (RAP) in consultation with the affected people and project authorities; Page 1-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) To identify gender related issues in road design and develop gender action plan To identify likely occurrence of HIV/AIDS resulting from the influx of outside labourers and others and develop a strategy to reduce their incidence; and To develop a consultation framework for participatory planning and implementation of proposed mitigation plan. The project’s social impacts and resettlement component includes assessment of social impacts of the project and development of appropriate mitigation plans as required. These plans must comply with appropriate national and local laws and guidelines, and with World Bank policy directives. Social assessment is carried out in close co-ordination with environmental assessment team and design team and includes consultation and participation among project stakeholders, local communities and potentially affected groups. The social impact assessment and resettlement planning component has following elements: Social screening as part of Project Feasibility Report.(PFR); Social Impact Assessment; Census and baseline socio-economic survey of the potentially affected population as part of Detailed Project Report (DPR); Preparation of a time-bound Resettlement Action Plan (RAP); Consultations at project, district and state level; Follow-up consultations (to be carried out after finalisation of drawings); and Videograpy and still photography of all the routes. Social screening was undertaken in conjunction with project inception report and the selection of roads to be included in the project. It provided important inputs and guidance to engineering designs. A full census has been undertaken in 30 m corridor (August to October 2014) to register and document the status of the potentially affected population within the project impact area, their assets, and sources of livelihood. The baseline data was collected in 30 m corridor to get information of a wider corridor as it gives more flexibility for deciding widening options. Census data provides the basis for establishing a cut-off date for non-title holders in order to determine who may be entitled to relocation assistance or other benefits from the project. Socio-economic survey was also carried out on census basis. This survey provides a baseline against which mitigation measures and support will be measured and includes comprehensive examination of people’s assets, incomes, important cultural or religious networks or sites, and other sources of support such as common property resources. Analyses of survey results cover the needs and resources of different groups and individuals, including intra-household and gender analysis. The Table 1.2 given below provides a comparative analysis of impacts between 30 m census and corridor of impact. Table 1.2: Impact of the Project (Phase I Route SH-42) 30 M CoI (in m) No. of PAPs No. of PAHs No. of PAFs No. of PAPs No. of PAHs No. of PAFs 6950 1912 2954 2028 488 798 For further analysis and reporting of impacts, only corridor of impact has been considered. Therefore all the tables given below correspond to corridor of impact. Page 1-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Corridor of Impact (CoI) On an average CoI is 25 m and it varies between 13 m to 36 m. From chainage 2+150 to 2+250, COI is 44m due to raised cross section. The available ROW though is 36 m. However, the land outside the ROW on the right is government land which is free of encroachment and other encumbrances. In order to avoid LA, toe wall has been provided. Similarly from chainage3+350 to 3+400, COI varies from 30 to 34 m which is more than available ROW. At this location toe wall has been provided to avoid land acquisition. Toe wall also has been provided at chainage 3+550 to save LA and few residential structures. Table 1.3: Distribution of Project Affected Households by Type of Loss Commercial Residential Boundary Residential cum Others Total Structures Kiosk Wall Commercial 90 194 141 29 22 12 488 18% 40% 29% 6% 5% 2% 100 As the Table 1.3 above shows, impact is more on commercial establishments including temporary kiosks. Out of total project affected households, 69% are commercial; 6% are residential cum commercial,18% are residential and others cum boundary wall come to 7% only. Preparation of the RAP has been undertaken within the project’s social assessment component. A key prerequisite of the RAP is a policy framework for resettlement containing categories of impacts and their corresponding entitlements. The project specific R&R policy was prepared and agreed upon with the government of Uttar Pradesh (GoUP) vide their order number 1195(1)/23- 12-14 dated 19th August, 2014 .The RAP provides number of affected households and families by impact category and detailed guidance on how to implement provisions in the policy framework, including institutional arrangements and budgets based on enumeration of project-affected people with entitlements under the framework. Detailed studies undertaken to prepare this RAP show extensive occupancy of project roadside areas, including densely settled village and urban communities containing numerous residential and commercial structures, businesses, and public facilities. Road widening and the other improvements proposed will impact roadside residences, businesses, religious shrines and structures, agricultural lands, public buildings, and infrastructure. Resettlement will be required only where residential and residential/commercial buildings must either be fully demolished or taken to the extent that they are rendered uninhabitable or useless. Displaced residents of these buildings will be resettled. Similarly affected businesses and other public and religious buildings and structures will be relocated. Rehabilitation will be required where resettlement, relocation, or other project impacts result in lost livelihood or income. In these cases, it will be necessary to restore the economic status of affected persons to at least pre-project levels. In most cases, the project will not require either full demolishing or the taking of residential or commercial structures to the extent that either resettlement or relocation will be necessary. Generally, only a narrow frontage strip of several meters or less will be affected. Frequently, this means that only a compound wall or fences, yards, must be removed. In some cases, small portions of roadside dwellings and businesses will be taken. Only rarely, will it be necessary to Page 1-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) take entire residential or commercial structures. However, kiosks will have to move out of COI though they may remain within the ROW. The right of way (ROW) for this corridor ranges from 19 m to 44 m. The design width of the road will not be more than 20 m and will be well within the available ROW. Therefore, no Land Acquisition in envisaged in Hamirpur–Rath project road. 1.5 Structure of Report This report has been organized with 13 chapters as detailed below: Executive Summery Chapter 1- Introduction: provides an overview of the proposed project and the project corridors, objectives of social impact assessment, approach to minimize impacts, and the methodology for SIA preparation Chapter 2- Study Methodology: Social Assessment Process, Reconnaissance Survey, Census and Socio-economic Survey, Identifying Social Hotspots, Identifying Actual PAPs, Social Input for Design, Preparation for Resettlement Action Plan, Consultations & Collection of Data from Secondary Sources Chapter 3- Resettlement Policies and Legal Framework: Key Social Laws And Regulations World Bank Safeguard Policies, Comparative Analysis Of World Bank safeguard policies & , Involuntary Resettlement And RFCTLARR Act, 2013, Process Of Land Acquisition,& Project Specific R&R Policy for UPCRNDP Chapter 4- Minimising Negative Social Impact: Right Of Way And Corridor Of Impact Design And R&R Co-Ordination Widening Options Improvement In Built-Up Locations Analysis Of Alternatives Chapter 5 -Profile of State and Project Affected Persons: Socio-Demographic Profile Of The State, Economic Profile, Employment Pattern, Census And Socio-Economic Survey Analysis, Categories Of Properties Affected Within Coi, Analysis Of Census And Baseline Data Resource Chapter 6- Community Participation: Consultation And Participation Mechanisms, Issues Raised During Consultation, Local Level Consultations, Key Outcomes Of Consultations Carried Out And The Ways In Which The Concerns And Suggestions Of The Community Were Integrated Into The Project Design Are Presented; Chapter 7- Gender Analysis: Status of Women, Gender Issues, Child Sex Ratio, Education, Women’s Role In Household Economy, Decision Making Power Among Women PAPs, Gender Based Violence, Gender Action Plan, Safety Of Women , Involvement In Development Process, Women Participation With Other Stakeholders Chapter 8- Income Restoration: Income Restoration Options Preferred By PAPs, Chapter 9 -Institutional Arrangements: Need For NGO/CBO, Role Of NGO, Training And Capacity Building Chapter 10 - Grievance Redress Mechanism: Need for Grievance Redress Mechanism, Functions of the Committee Page 1-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Chapter 11- Monitoring And Evaluation: Objectives Of The Internal Monitoring, Internal Monitoring ,Monitoring And Reporting Systems, External Monitoring ,The Objectives Of The External Monitoring ,Project Input And Output Chapter 12- Implementation Schedule: Implementation Procedure, Timing Of Resettlement, Community Participation, Tasks For NGO Chapter 13- Costs And Budget: Cost of Civil Works R & R assistance, Cost towards implementation arrangement Page 1-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 2 STUDY METHODOLOGY 2.1 Introduction This section deals with the approach and methodology followed for the collection and analysis of data. The project followed both quantitative and qualitative approach for data collection. Social impact assessment and resettlement planning component has three main elements: Early screening as part of project feasibility studies; Social Impact Assessment; Census and baseline socio-economic survey of potentially affected population, and; Preparation of the Resettlement Action Plan and Gender Action Plan These elements have been further elaborated in the following paragraphs. 2.2 Social Assessment Process The complete R&R process included integration of engineering, environment and social inputs. The R&R team included Social Scientist, Civil Engineers, Field Supervisors, Community Organizers and field investigators doing the census verification, socio-economic surveys and public consultations. PWD is also closely integrated into the loop. The different steps in the R&R process are as follows: Step 1: Reconnaissance Survey and Familiarization This step involves preliminary reconnaissance of the project road to take into account sections with potential environment and R&R issues. This is done with the Social Scientist in charge along with the field surveyor and investigators. At this stage the sections of roads having social impact and type of impacts are identified. Screening results were presented in the Project Feasibility Report Team also familiarized itself with the concerned and important stakeholders to identify and collect the available literature and to scope the activities. This involved two pronged approach (a) discussions with project authorities and community members along the sample corridors b) project specific R&R policy as approved by government of Uttar Pradesh (GoUP) and collection of other available relevant project literature; and details of right of way (ROW). Relevant national and state legislations and regulations pertinent to the land acquisition and resettlement were reviewed. Step 2: Census and Socio-economic Survey The right of way status of the road is ascertained. This was done through collection of land records from revenue department. The right of way information is important in knowing the land available for widening, and land acquisition requirements. Collection of the right of way information continued simultaneously with the census and the socio-economic surveys. The census survey covers 100 % of the potentially affected population within 30m corridor. Following the designs, those within the corridor of impact were considered eligible for support under the project. The existing centreline provides the benchmark line to survey 15 meters on either side (i.e. within the 30m corridor). Page 2-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) The census registered the owners’ name, address, legal document if any towards the claim of the property, all household members and individuals within the potential COI; their assets and incomes and sufficient demographic and social information to determine whether they are to be categorized as vulnerable groups with special entitlements under the project. Private land owners, tenants and squatters and encroaches within the ROW were covered in the census. Social Census team is preceded by a Civil Engineers responsible for measuring the potentially affected structure perpendicular and along the road to record the size and shape of the structure. Each structure was measured and location was recorded. The socio -economic survey, which was also carried out on census basis, provides the baseline against which mitigation measures and support will be measured. The analysis covers the needs and resources of different groups and individuals, including inter and intra-household analysis and gender analysis.The following information was collected during the survey: Socio economic conditions of the affected persons Family structure and number of family members Literacy levels Occupation type and income levels Inventory of household assets Loss of immovable assets due to the project by type and degree of loss Accessibility to the community resources Perceptions on the resettlement and rehabilitation measures Perceived income restoration measures Grievances of affected persons and its redress Awareness and knowledge levels on HIV/AIDS and gender issues Willingness to participate in the project The study made an attempt to identify people losing their livelihood directly or indirectly. Also through consultations the rehabilitation strategies for those losses by way of training requirements for income generation and other remedial and restoration measures were identified. For this the consultations were conducted among: People losing properties/resources Village community (where only government / van panchayat land is being taken) Knowledgeable persons / opinion leaders in the village Village heads Step 3: Identifying Social Hotspots This step involves deciding sections, which need realignments. This was executed by measuring the distance of structures from the existing centerline. If the width available fails minimum requirement, then the option of a demolition of structures is considered. The proximity of location of settlements along the roads is one of the deciding factors in addressing the degree of impact. This process is facilitated by local level consultations where the needs and opinion of the local people are taken into consideration, to find out the opinion of the local community about widening the road through the village, and its impacts. Page 2-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Step 4: Social Input to Design The inputs of field information are integrated with the engineering designs. Once it is concluded that there is no space for expansion of the road identified around the village. This is done by the Social Scientist with topographic surveyor in-charge. This exercise includes analysis of various alternatives. Step 5: Identifying Actual PAPs After the integration of the social and environmental inputs, the final engineering drawings were completed. Once this was done then the actual number of PAF’s were identified, especially in the built up area, where there is reduced COI. For identifying legal owners, encroachers and squatters, revenue records were used for verification of legal ROW and the boundaries of properties likely to be within the COI. With the completion of final drawings, only those within the actual COI were considered eligible for entitlement under the project and list of PAFs is generated. During the local level consultations and also during door to door survey, community was informed on the definition of impacts and corridor of impact. All those outside the COI but within the ROW is well informed that they will not be adversely impacted by the project. Step 6: Preparing Resettlement Action Plan The last step in the process involves the preparation of Resettlement Action Plan. The RAP includes number of PAPs and families by impact category; their entitlements, grievance mechanism; institutional arrangement for implementation; implementation schedule and budgetary requirements. 2.3 Consultations Considering the importance of people’s participation in the project planning, public consultation and FGDs were also carried out at different levels at various stages of project preparation. The objectives of the consultation were to disseminate information about the project to the potentially affected population in order to incorporate their views and suggestion for preparing the RAP and the design and to assess the economic situation of the settlement. The consultation focuses on identification of issues raised by the PAPs and its integration in the Resettlement Action Plan. 2.4 Local Level Consultation For local level consultations, villages were selected. It was ensured that information regarding consultations is disseminated in the concerned village at least two days prior to consultations. The participants included village head and/or opinion leader of the village; community and potentially affected persons. The targeted segments included men and women affected by loss of residential structures; commercial structures; land; livelihood or sources of livelihood. A total of 22 mixed consultations and 5 women consultations were held. 2.5 Consultation with Government Officials The objective of these consultations was to (i) create awareness about the project among the district administration, and officials of line departments along the project road.(ii) to study implementation arrangements and its capacity in delivering the R&R services verification of these arrangements. . Consultations were held with concerned village revenue officials to update the ownership of land and its utilization pattern by referring to Records of Right (ROR). Page 2-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 2.6 Collection of Data from Secondary Sources Throughout the Study, various types of secondary data were used along with the primary data collected through surveys. Secondary data sources included Uttar Pradesh at a Glance, published by Jagaran Publications (Social, Cultural, Demographic and Economic profile of Uttar Pradesh), District Census Handbooks of districts through which road is passing through, Tehasil Offices; and Census of India, 2011. Page 2-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 3 MINIMISING NEGATIVE SOCIAL IMPACT 3.1 Minimizing the Social Impact The need for resettlement arises when a proposed infrastructure project displaces a number of people and households for a defined public purpose which, in this case, is the widening and upgrading of the existing project corridor. As per the Bank’s operational Directives the displacement should be avoided or minimized. The objectives of the social analysis is to be done in order to understand the ways and means to minimize the negative impact on the lives of the affected population, offering them opportunities to enhance their living standards. While the land acquisition on the account of widening the road and new alignment is unavoidable, the area with the high population density could be marginalized and displacement could be minimized. The project specific R&R policy, also, acknowledges the importance of avoiding adverse socio- economic impacts in road design and construction. The success of a project depends to a large extent on the improvement that it brings about in the living standards of the people, both in the short and the long term. While preparing the engineering design, the prime consideration has been to minimise the social negative impacts within the limitations of technical requirements and cost effectiveness and to enhance the benefits. Despite the best efforts to minimise the negative social impact, however, land take at few places and resettlement have been unavoidable. In general, the design considerations adopted by the project to minimize the land taking in the project are as below: The corridor of impact (CoI)/proposed cross-section would be restricted within the existing right of way. The corridor of impact (CoI) for the project would broadly range between 13 m to 44 m to fit the typical cross sections, space for drains, roadside furniture and utilities. However, in specific locations, CoI of less than 13m would also be considered to minimize the impact on properties. Decision on bypasses and realignments will be taken based on a comparison of options with or without the proposed change in design on a case-to-case basis. 3.2 Right of Way and Corridor of Impact Right of way is the public land owned by the State Government and administered by the PWD, for the existing road. Right of way held by the PWD is the lawfully acquired corridor of land. The established width on an average is 30m. However, Right of way width varies from 19 m to 44 m. Moreover, the existing ROW is not free of encumbrances, as will be seen from the strip maps. Using available records with the PWD and the revenue department, R&R team have verified the boundaries of legal right of way as well as boundaries of private properties within and in the vicinity of the corridor of impact. The limit of displacement will be limited not to the legal right of way but only to the corridor of impact. The corridor of impact is the corridor required for the actual construction of the road, including carriageway, shoulders, embankments and longitudinal drainage. Within this corridor there should be no structures or hindrances. Page 3-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 3.1: Availability of Existing RoW S. Chainage RoW (in Corridor of Remarks No. From To Metres) Impact 1 2+065 3+500 36 34 With unlined drain 2 3+500 9+900 32 25 With unlined drain With covered drain because of 3 9+900 11+010 30 13 built-up area 4 11+010 25+ 350 30 24 With unlined drain With covered drain because of 5 25+ 350 26+500 30 13 built-up area 6 26+500 33+ 850 32 24 With unlined drain With covered drain because of 7 33+ 850 35+000 30 13 built-up area 8 35+000 50+450 32 24 With unlined drain With covered drain because of 9 50+450 51+800 30 13 built-up area 10 51+800 64+000 32 25 With unlined drain 11 64+000 70 +000 35 24 With unlined drain 12 70 +000 74+760 36 24 With unlined drain With covered drain because of 13 74+760 76+500 26 13 built-up area Source: Primary Survey 3.3 Design and R&R Co-ordination The prime objective of the RAP is to minimize negative impact on the people/community because of the project execution. Therefore, during preparation of the project, due consideration was given to minimise the negative impacts within the limitations of technical requirements and cost effectiveness. The built up areas generally have dense developments on either side of the existing road including high level of encroachment and residential/commercial squatting. Though some of the structures on the encroached land are permanent in nature, most of the squatting is in temporary structures. The rural open stretches are characterized by agriculture encroachment or fallow land. As a result two distinct design approaches were adopted: one for built up areas and other for open rural areas. The broad parameters considered by the design team based on the inputs from the R&R surveys were: Minimize the impact on roadside settlements Minimize impact on agricultural land Minimize land acquisition Minimize impact on community assets Avoid the adverse impacts of the crowded areas along the project stretch The proposed road design would require 20 m wide strip of land, which includes 7m wide two- lane carriageway. The existing ROW except at certain location on Hamirpur – Rath road is wide enough to accommodate proposed developments; therefore there is no need to acquire land for improvement of existing roads. Minimum COI is considered in order to minimize displacement in Hamirpur rath road within the ROW. Provision has been made in the RAP to address the issues related to non-title holders affected persons. Page 3-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 3.2: Plan for Handing Over the Stretches to Contractor Route Mile Chainage Date of handing over Road Name Total km No. Stone Start End to contractor 11 16 5 21 25 4 Hamirpur Rath 1 35 41 6 1 42 46 4 at starting date 52 57 5 59 76 17 Sub Total of Mile Stone-1 41 2 9 5 16 21 4 Hamirpur Rath 2 27 33 6 2 41 42 4 6th Month 46 50 5 57 59 17 Sub Total of Mile Stone-2 25 9 11 2 Hamirpur Rath 1 25 27 2 3 33 35 2 12th Month 50 52 2 Sub Total of Mile Stone-3 8 Plan for Handing Over the Stretches to Contractor During the field visit with UP PWD on 8 & 9th of November, 2014, the above milestone has been finalized for handing over to the Contractor. The Mile stone is based with no hindrance at the project corridors. 3.4 Widening Options Due importance has been given to social issues while road designing. The coordination between social and design team helped in minimizing the number of PAPs and affected PAHs. Concentric widening has been proposed in majority of total stretch to avoid involuntary land taking and minimize the social impact. Eccentric widening option (one side widening) has been proposed in 8.1% of total project stretch, for geometrical correction and improvement of existing road alignment. Typical cross section applied in presented in table below. Table 3.3: Typical Cross Section (TCS) TCS Type Length Proposal (with the minimum Land width) (Km) % Concentric 1A/1B With unlined drain 59.28 77.6 Eccentric widening 1A/1B With unlined drain 6.16 8.1 Raising 1A/1B With unlined drain 2.9 3.8 Realignment - Urban 2A/2B With covered drain 8.06 10.5 Total 76.40 Page 3-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) In view of safety requirements as well as segregation of the fast moving traffic from the local slow moving traffic, paved shoulder has been proposed in the entire project road. Improvement in Built-up Locations In context of present project improvement that consisted of 2-lane/2 lane with paved shoulders, the Corridor of Impact was the most important parameter in determining the number of PAPs. The requirement of the project demands that the entire corridor of impact should be free from encroachments, human habitation and structure, causing hindrances to traffic. Removing the encroachers and the squatters from the RoW does not guarantee that they would not reoccupy the area. Therefore, all estimations were limited to the CoI only and the project will not displace any person outside the corridor of impact, even if within the RoW. In the present road there are 5 locations with heavy urban built up where 13metresCoI has been considered to avoid/ minimize adverse impacts. Improvement in these locations would require removal of few squatters and encroachers. The chainage-wise locations of built-up areas along the project road is charted in table below. Table 3.4: Built-up Locations along the Project Road Chainage S. No. Length (m) Town/village Name From To 1 9+980 11+000 1.02 Pothiya 2 25+400 26+500 1.10 Chhani 3 33+900 34+950 1.05 Biwar 4 50+400 51+800 1.80 Muskara 5 74+800 77+720 3.06 Rath Analysis of Alternatives Analysis of alternatives is very important activities, which leads to minimize the negative impacts on population and properties and meet the technical requirement. The provision of widening and COI were weighed upon by the technical team, considering the outcome of public consultation as well as the suggestion of people along the project road. In most of the heavy built up locations, concentric widening within the available ROW has been proposed in the design to avoid land acquisition and to minimize displacement of non- titleholders. In approximately 6.15 km eccentric widening has been proposed to save residential and commercial structures. However, between chainage 76+500 to 78+400 where market for Rath is located, the available ROW is 8 m. Therefore alternatives were explored and assessment was made. Analysis of Alternatives was done considering 2 options as given in the table below. Alternative 1 was not considered as there will be majour impact and typical cross section will not fit in the available ROW. 4. Alternative -1: Rehabilitation of existing road 5. Alternative 2: Widening of 13 m. 6. Alternative-3: Bypass at location starting chainage 76+500 to 78+400 at Rath. Impact Category Alternative 2 Alternative 3 Loss of structure 141 0 Land acquisition 0 4 ha Page 3-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Impact Category Alternative 2 Alternative 3 Affected households 288 50 Loss of religious structures 12 0 Affected government structures 6 0 Loss of water bodies 1 1 Considering the above options the alternative 3 was appraised for Rath Market. Though there will be land acquisition, the impacted households will be much lower than alternative 2. Since there will be acquisition of land, this section will be part of Phase II roads. Alternative 2 apart from impacting 288 households will also impact a mazar (graveyard) and one mosque apart from 10 temples /shrines. Page 3-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 4 RESETTLEMENT POLICIES AND LEGAL FRAMEWORK 4.1 Key Social Laws and Regulations This section presents the legal framework for the land acquisition process and the Resettlement and Rehabilitation Policy which also includes the entitlements for affected eligible families. Project has developed Resettlement and Rehabilitation Policy based on the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013; World Bank’s OP 4.12 and various government orders issued by state government for issues related to R&R. The policy recognizes the need to support restoration of livelihoods of adversely affected people and lays down norms for rehabilitating the affected people and broadly outlines an approach and institutional framework to achieve its objectives. The key Social regulations and legislations that will govern then preparation and implementation of the project is presented below. Table 4.1: Relevant Social Legislations Applicability to this Responsible Acts/Rule/Policy Year Objective project Agency Archaeological Dept. GOI, Indian Heritage Ancient Monuments and Conservation of cultural and Yes. For the project Society and Indian Archaeological Sites and 1958 historical remains found in located within 300 m National Trust for Art Remains Act India. from such features and Culture Heritage (INTACH). Fair compensation for Right to fair acquisition of immovable compensation and assets; Resettlement of Revenue Yes. In case of transparency in land 2013 displaced population due to LA Department. Govt. of acquisition of land acquisition, rehabilitation and economic rehabilitation of U.P. and Resettlement Act all those who are affected due to land acquisition. The Act enables participation of Panchayat level institutions in decision-making by broadening the village level functions, supporting implementation of development schemes. Seventy Third Department of Yes, especially for any Constitution Amendment The Act provides for Panchayati Raj, 1992 sub project located in Act, involvement of the PRIs Government of Uttar panchayat area especially, the Gram Sabha/ Pradesh Panchayat during project preparation and implementation. The Panchayats at the village level will be involved for preparation and implementation of the project. The Scheduled Tribes Grants legal recognition to the Yes, if project road Ministry of Tribal and other Traditional passes through rights of traditional forest Affaires, GOI and Forest Dwellers 2006 customary forest land Department of Tribal (Recognition of Forest dwelling communities, partially including reserved and Welfare, GoUP Rights) Act correcting the injustice caused protected forests; Page 4-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Applicability to this Responsible Acts/Rule/Policy Year Objective project Agency by the forest laws. protected areas and also community forest. Makes a beginning towards giving communities and the public a voice in forest and wildlife conservation 4.2 World Bank Safeguard Policies Projects financed with IDA resources need to comply with World Bank Operational Policies. The World Bank has Environmental and Social Safeguard Policies to reduce or eliminate the adverse effects of development projects. The safeguard policies of World Bank are provided in the table below. Table 4.2: Safeguard Policies of World Bank World Bank Safeguard Safe Guard Objective Applicability Requirements Policies OP/BP 4.12 Involuntary Resettlement-The There will be need for Resettlement Action objective of this policy is to avoid limited land acquisition for Plan in consultation or minimize involuntary certain project corridors with the community resettlement where feasible, resulting in: relocation or and project exploring all viable alternative loss of shelter; loss of assets authorities. The project designs. Furthermore, it or access to assets; loss of project will adversely intends to assist displaced person income sources or means of impact 2954 project in improving their former living livelihood. affected families standards; community (6950 project affected participation in planning and persons). implementing resettlement; and Resettlement Action to provide assistance to affected Plan has been people, regardless of the legality prepared). of title of land OP 4.10 Indigenous People -This policy This policy may be triggered Indigenous people aims to protect the dignity, right if there are indigenous development Plan in and cultural uniqueness of people in the project area; consultation with the indigenous people; to ensure that when potential adverse IPs. There is no they do not suffer due to impacts on indigenous presence of any development; that they receive people are anticipated; and indigenous person or social and economic benefits if indigenous people are group in the project among the intended corridor, hence IPDP beneficiaries. is not required. OP/BP 4.11 Cultural Property –This policy This policy may be triggered Application has to be aims at assisting in the by sub-projects under prepared and preservation of cultural UPCRNDP in those areas submitted to property, historical, religious and where cultural property, Archaeological unique natural value-this includes historical, religious and department remains left by previous human unique natural value-this inhabitants and unique includes remains left by environment features, as well as previous human inhabitants in the protection and and unique environment enhancement of cultural features may be affected properties encountered in Bank- during widening and financed project. strengthening work of the sub-projects. Page 4-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 4.3 Comparative Analysis of World Bank OP 4.12 on Involuntary Resettlement and RFCTLARR Act, 2013 S Topics/Issues/Areas World Bank OP4.12 RFCTLAR&R No. 1 Application of LA Direct economic and social Section 2 Applicable to projects where impacts that both result from government acquires land for its own use, Bank-assisted investment hold and control, including PSU and for projects. Applies to all public purpose; for PPP where ownership of components of the project that land continues to vest with govt; private result in involuntary companies where 80% of land owners1 resettlement, regardless of the have given consent or 70% in case of PPP. source of financing. Principle of avoidance Involuntary resettlement should Alternatives to be considered as Act in be avoided where feasible, or chapter II, point # 4 (d) says "extent of land minimized, exploring all viable propsoed for acquisition is the absolute bare alternative project design minimum needed for the project; and (e ) says land acquisition at an alternate palce has been considered and found not feasible. Linkages with other No such provision projects 2. Application of R&R Same as above In addition to the above, Section 2(3) land purchased by private company as prescribed by Govt. or when part acquired by govt 3. Affected area Involuntary take of land Section3(b): Area notified for ‘acquisition’ resulting in loss of shelter, loss of assets or access to assets, loss of income sources or means of livelihood 4. Family Section 3(m) includes person, his and her spouse, minor children, minor brothers and sisters dependent. Widows, divorcees, abandoned women will be considered as separate family. 5. Affected family for Section 3 (a): whose land and other eligibility immovable property acquired. All adversely affected people (b)&(e): Family residing in affected area whether have formal legal rights such as labourers, tenants, dependent on or do not have formal legal forest and water bodies, etc whose primary rights on land source of livelihood is affected due to acquisition (c)Scheduled tribes and other forest dwellers whose rights recognized under the Forest Dwellers Act 2006. (f) Family assigned land by state or central government under any schemes (g) Family residing on any land in urban area that will be acquired or primary source of livelihood affected by acquisition. 6. Cut-Off date Date established by the Section 3 c (ii), (iv) (vi): Families residing borrower and acceptable to the for preceding 3 yrs or more prior to Bank. In practice it is the date “acquisition of land”. of census. 7. Non-application of Chapter Stand-alone SIA for all Section 6(2): Irrigation projects where EIA II investments is required under other laws, provisions of 1 Land Owner – whose land and immovable property acquired and land assigned by state or central govt under any scheme (Section 3 c (i) and (v)) Page 4-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S Topics/Issues/Areas World Bank OP4.12 RFCTLAR&R No. SIA not applicable. 7. Consultation – Phase I Consultation a continuous Section 4(1) date issued for first during preparation process during planning and consultation with PRIs, Urban local bodies, implementation Municipalities, etc to carry out SIA. Section 5: Public hearing of SIA in affected area. Provide adequate publicity of date and time. 8. Time duration to prepare Draft Social Assessment, Section 4 (2): within six months from SIA and SIMP Resettlement Action Plan and or the date of its commencement. Social Management Framework prepared before appraisal. 9. Disclosure – Stage I To be disclosed before appraisal Section 6(1): Translated in local language and 120 days before board available in PRI institutions and local urban date. government bodies; district administrative offices and websites of concerned. government agency. 10. Formation of Expert Group Appraised by Bank staff Section 7(1): Constitute a multi-disciplinary to appraise SIA and SIMP Expert Group include members of decentralized govt Institutes (PRIs, ULBs). 11. Time stipulated for Group Before the decision meeting for Section 7(4): Submit its report within two to submit its report appraisal months from the date of its constitution 12. Scope of work of the Social Assessment, resettlement Section 7 (4) (a&b): assess whether it Expert group action Plan reviewed and serves any public purpose or not; if social appraised by Bank staff and costs outweigh potential benefits then should approved by Regional safeguard be abandoned; advisor Section 7 (5) (a&b): if serves public purpose, then it has considered minimum land acquisition, and alternate options to minimize displacement; potential benefits outweigh social costs 13. Consultation – Phase II In practice consultation Section 2 (2): Prior consent of 80% and during appraisal workshops are organized in 70% of land owners in PPP and where project affected areas at district private company has approached the govt to and state level. acquire balance land has been obtained, 14. Disclosure – Stage II Information dissemination Section 7 (6): recommendations of expert through the planning and group under 7(4&5)to be made public in implementation local language in district and block administrative office and PRIs 15. Minimize impact on multi- Select feasible design that has Section 10: In case multi-crop land is to be crop land minimal adverse impact. acquired under exceptional circumstances, the area to be acquired cannot exceed aggregate of land of all projects in district or state. The area to be acquired cannot exceed the total net sown area of the district or state. Wasteland equivalent to twice the area acquired will be developed. 16. Information dissemination Continuous part of the Section 11 (1), (2) & (3): Notice of preliminary notice preparation and participation published in local language and meetings called of gram sabahs, municipalities to provide full information about the purpose of the project, summary of SIA and particulars of administrator appointed for R&R’ summary of R&R scheme 17. Updating land records To be part of RAP Section 11 (5): Once established that the land is required for public purpose, Page 4-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S Topics/Issues/Areas World Bank OP4.12 RFCTLAR&R No. accordingly notice to be issued under section 19 following which land records to be updated within two months 18. Census and preparation of To be part of RAP Section 16 (1) (2): carry out census of R&R schemes affected people and their assets to be affected, livelihood loss and common property to be affected; R&R scheme including time line for implementation. 19. Information dissemination Section 16(4)&(5): mandatory to and Public hearing - Stage disseminate information on R&R scheme III including resettlement area and organize Consultation throughout the public hearing on the Draft R&R scheme in process is mandatory each Gram Sabha, Municipality and consultations in Scheduled area as required under PESA. 20. Approval of R&R Scheme Section 17 & 18: Draft R&R Scheme to be finalized after addressing objections raised during public hearing and approved. 21. Final declaration of R&R Approved RAP including Section 19 (2): Only after the requiring Scheme budgetary provisions to body has deposited the money will the govt implement it issue the notice along with 19(1). 22. Time period stipulated. Included in RAP - Time line Section 19 (2): the entire process to synchronized with Government’s update land records, disseminate procedures or adopts innovative information, preliminary survey, census, methods to reduce the time hearing of objections, preparation of R&R which is based operated on the schemes and approval, deposit of money principles of participation and must complete within 12 months from transparency. the date on which section 11, the preliminary notice issued. Section 19 (7): If the final declaration not made within 12 months of section 11 (1), the process will lapse, except under special circumstances. 23. Preparation of land Section 20: Land marked, measured for acquisition plans preparation of acquisition plans. 24. Hearing of claims Section 21(1) (2): Notices issued indicating govt’s intension to take possession of land, and claims on compensation and R&R can be made not less than one month and not more than six month from the date of issue of section 21(1). 25. Time period stipulated for Section 25: It is required to announce the declaring the award award within 12months of issue of Included in RAP. Section 19 (final declaration to acquire land, approved R&R scheme) after completing land acquisition plans, hearing of objection, settling individual claims for declaration of the award. If award not made within the stipulated time, the entire proceedings will lapse. 26. LA Act 1984 deem to lapse Section 24: where award is not declared and RFCTLAR&R is under section 11, or where made five years applicable ago but land not taken in possession or where award declared but money not deposited in the account of majority of beneficiary. Page 4-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S Topics/Issues/Areas World Bank OP4.12 RFCTLAR&R No. 27. Methodology for Full replacement Cost Section 26 and First Schedule: determining market value Recognizes 3 methods and whichever is for land higher will be considered which will be multiplied by a factor given in Schedule First; compensation given earlier will not be considered; if rates not available floor price can be set; steps to be taken to update the market value. 28. Valuation of structures Full Replacement cost Section 29 (1) without deducting the depreciated value. 29. Solatium and interest Section 30(1) 100% of the compensation amount Section 30(3): 12% per annum on the market rate from the date of notification of SIA to the date of ward or land taken over 30. R&R Award Total cost included in RAP to Section 31, Second Schedule: A family as resettle and rehabilitate the a unit will receive R&R grant over and above affected persons and assist in the compensation and those who are not their efforts to improve their entitled to compensation. livelihoods and standards of Second Schedule: Homeless entitled to living or at least to restore constructed house, land for land in irrigation them, in real terms, to pre- projects in lieu of compensation, in case of displacement levels or to levels acquisition for urbanization 20% of prevailing prior to the beginning developed land reserved for owners at a of project implementation, prices equal to compensation’ jobs or one whichever is higher time payment or annuity for 20 years’ subsistence grant, transportation, land and house registered on joint name husband and wife, etc 31 Transparency Section 37(1): Information of each individual family including loss, compensation awarded, etc will be available on the website. 38. Possession of land Taking of land and related Section 38(1): Land will be taken over by assets may take place only after the government within three months of compensation has been paid compensation and 6 months of R&R benefits and, where applicable, disbursed; infrastructure facilities at resettlement sites and moving resettlement sites will be completed within allowances have been provided 18 months from the date of award made to the displaced persons. under section 30 for compensation; in case of irrigation and hydle projects R&R completed six months prior to submergence. 39. Multiple displacement Section 39: Additional compensation equivalent to compensation determined will be paid to displaced 31. Acquisition for emergency Not permeable in bank funded Section 40 (5): 75% additional purpose projects compensation will be paid over and above the compensation amount 32. Prior consent before Mandatory to carry out Free, Section 41(3) Mandatory to get consent acquisition and alienation Prior, Informed Consultation from Gram sabah, Panchayat, Autonomous with Indigenous people. Councils in Scheduled areas. Page 4-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S Topics/Issues/Areas World Bank OP4.12 RFCTLAR&R No. 33. Development plans for SC Indigenous Peoples’ Section 41: Separate development plans to and ST Development plan required be prepared, settle land rights before along with RAP. acquisition; provision of for alternate fuel Land for land for is an option fodder, non-timber produce on forest land to across all sectors. be developed within 5 years; 1/3rd compensation amount to be paid as first instalment and rest at the time of taking possession; ST to be resettled within Scheduled area; land free of cost for community purpose; land alienation will be null and void and ST and SC considered for R&R benefits; fishing rights restored in irrigation and hydle projects; if wish to settle outside the district additional benefits to be provided in monetary terms; all rights enjoyed under other laws will continue. Second Schedule: additional provisions for SC&ST for land for land in irrigation projects, additional sum over and above the subsistence grant, 34. Institutional arrangement Institutional arrangement must Section 43-45: Appointment of be agreed upon and included in administrator, R&R Commissioner, when RAP, IPDP. more than 100 acres of land is to be acquired, R&R Committee will be formed at project level, social audit to be carried out by Gram Sabha and Municipalities. 35. Change of land use Section 46(4): Land will not be transferred to the requisitioning authority till R&R is not complied with in full 36 Monitoring and Evaluation Indicators and monitoring Section 48-50:Set up National and State system included in RAP and level Monitoring Committee to review and IPDP monitor progress 37. Authority to settle claims Section 51-74: the Authority will be set up settle any legal disputes that arise from acquisition and R&R, the aggrieved party can move to the high court thereafter. 38. Exempt from tax and fee Section 96: Compensation and agreements will not be liable to tax 39. No change in status of land Section 99: Once the land is acquired for a acquired particular purpose, its purpose cannot be changed 40. Return of unutilized land Section 101: If the acquired land remains unutilized for 5 years, then it will be returned to original owner, heir or included in land bank 41. Distribution of increased Section102: 40% of appreciated value of value of land transferred acquired land will be distributed to owners provided no development has taken place. 4.4 Process of Land Acquisition and Other Immovable Assets The project specific R&R policy provides two options for acquisition of land and other immovable assets. Option 1 on direct purchase and Option 2 is through RFCTLARR Act 2013. The details are given below: Option 1: Direct Purchase of land based on Clause 46 of RFCTLARR Act, 2013. Page 4-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Under this option following steps will be followed: Project to identify land parcels to be purchased and owners during SIA in consultation with the local revenue officials. List of such land owners along with intent to purchase and purpose of purchase will be forwarded to the District Magistrate. A committee will be set up as per the existing government order (GO) number 271/83 dated September 2, 2013 for direct purchase. The base price of land will be as per the process mentioned in RFCTLARR Act, 2013. The rate will be finalized by the land purchase committee. The rate agreed upon will be exclusive of R&R assistances as mentioned in project specific R&R policy. Option II: Acquisition of private land through Right to Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 As per option II, all private immovable assets will be acquired as per new RFCTLARR Act 2013. All eligible PAPs will be entitled to R&R assistance over and above the compensation. Those PAPs who are not entitled for compensation (encroachers and squatters) will get R&R benefits as per their entitlement given in project specific R&R policy. The entitlement of compensation and assistance will be extended to only those PAPs who are identified on or prior to the cut-off date. Claims regarding R&R regarding R&R assistance should be dealt by Grievance redress committee. However, acquisition through the Act may take 3.5 to 4 years of time as shown in table below. Table 4.3: Time Lines for SIA, Land Acquisition and Compensation Payments S. Key Activity TimeLine Remarks No. 1 SIA Notification (Sec.4) 0 date 2 SIA Report 6 months Appraisal of SIA by Expert 3 2 Months Committee ( Sec 7) Decision of Appropriate Government 3 No timeframe is suggested on SIA report Preliminary Notification for Land Within 1 year SIA Simultaneous update of 4 acquisition ( Sec.11) appraisal Land records ( 2 months) Final Declaration of Land acquisition Within a 1 year of 5 ( Sec. 19) Preliminary Notification Within 1 year of 6 Compensation Award ( sec. 30) declaration 7 Compensation Payment Within 3 months of award Lands can be taken over only after payment of 8 Payment of R&R monetary assistance Within 6 months of award compensation and R&R monetary assistance Development of R&R sites and Within 18 months from 9 infrastructure, if needed. the date of award Total Time Frame for taking over 10 About 3.5 to 4 years of acquired properties 4.5 Project Specific R&R Policy The Resettlement and Rehabilitation (R&R) policy for Core Road Network Development Programme Uttar Pradesh Public Works Department (UP PWD) is based on World Bank's Operational Policies (OP) 4.12 on involuntary Resettlement and 4.10 on Indigenous Peoples and Page 4-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) UP State Rehabilitation Policy. The action plan has been prepared based on the broad outlines laid down in the policy. The principle of the R&R policy is the guiding philosophy to provide a development approach to resettle and rehabilitate the people affected by project. The project specific R&R policy recognizes that involuntary resettlement results in dismantling of existing production system and way of life. Therefore, all rehabilitation programs will adopt a developmental approach rather than the welfare approach. The policy details out the assistance in re-establishing the homes and livelihoods of the Project Affected People (PAP) during the course of projects. The entitlement matrix as given in the approved policy is presented below. The detailed policy is attached as Annexure-2. S. Definition of Application Entitlement Details No. Entitled Unit A. Loss of Private Agricultural, Home-Stead & Commercial Land 1 Land within Titleholder Compensation at a) Land for land, if available. Or, Cash compensation the Corridor of family. and Market value, for the land at replacement value, Impact (COI) families with Resettlement and which will be determined as provided under section 26 traditional land Rehabilitation of RFCTLARR Act 2013. Right b) The land if allotted will be in the name of both husband and wife. c) If post acquisition, residual land is economically unviable, the land owner will have the choice of either retaining or sell off rest of the land. d) Refund of stamp duty and registration charges incurred for replacement land to be paid by the project; replacement land must be bought within a year from the date of payment of compensation to project affected persons. e) Subsistence allowance of Rs. 36000 as one time grant f) One time grant of Rs. 500,000 or annuity g) Compensation at market value for loss of crops if any B. Loss of Private Structures (Residential/Commercial) 2 Structure Title Holder/ Compensation at a) Cash compensation for the structure at replacement within the Owner Market value, value which would be determined as per as per Corridor of Resettlement & section 29 of the RFCTLARR Act 2013. Impact (Col) Rehabilitation House under Indira Awas Yojna in rural area Assistance or Rs 50000 in lieu off and house under RAY in urban area or Rs 100,000 in lieu off. The house if allotted will be in the name of both husband and wife. b) Right to salvage material from the demolished structures. c) Three months' notice to vacate structures. d) Refund of stamp duty and registration charges for purchase of new alternative houses/shops at prevailing rates on the market value as determined in (a) above. Alternative houses/shops must be bought within a year from the date of payment of compensation. e) In case of partially affected structures and the remaining structure remains viable, additional 10% to restore the structure. In case of partially affected structures and the remaining structure becomes unviable additional 25% of compensation amount as severance allowance. f) Subsistence allowance equivalent to Rs. 36000 as one Page 4-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit time grant. G) Each affected family getting displaced shall get a one-time financial assistance of Rs 50,000 as shifting allowance. h) Each affected family that is displaced and has cattle, shall get financial assistance of Rs 25,000/- for construction of cattle shed. i) One time grant of Rs. 50,000 as resettlement assistance j) Each affected person who is a rural artisan, small trader or self-employed person and who has been displaced (in this project owner of any residential-cum commercial structure) shall get a one-time financial assistance of Rs 25,000/-for construction of working shed or shop. j) One time grant of Rs. 500,000 3 Structure Tenants/ Resettlement & a) Registered lessees will be entitled to an within the Lease Holders Rehabilitation apportionment of the compensation payable to Corridor of Assistance structure owner as per applicable local laws. Impact (Col) b) In case of tenants, three months written notice will be provided along with Rs 50,000 towards shifting allowance. C. Loss of Trees and Crops 4 Standing Owners and Compensation at a) Three months advance notice to project affected Trees, beneficiaries market value persons to harvest fruits, standing crops and removal of Crops . within (Registered/ trees. the Corridor of Un-registered b) Compensation to be paid at the rate estimated Impact (Col) tenants, by: contract i) The Forest Department for timber trees cultivators, ii) The State Agriculture Extension Department for crops leaseholders & iii) The Horticulture Department for sharecroppers fruit/flower bearing trees. c) Registered tenants, contract cultivators & leaseholders & sharecroppers will be eligible for compensation for trees and crops as per the agreement document between the owner and the beneficiaries. d) Un-registered tenants, contract cultivators, leaseholders & sharecroppers will be eligible for compensation for trees and crops as per mutual understanding between the owner and the beneficiaries. D. Loss of Residential/ Commercial Structures to Non-Titled Holders 5 Structures Owners of Resettlement & a) Non vulnerable encroachers shall be given three within the Structures or Rehabilitation months' notice to vacate occupied land Corridor of Occupants of Assistance b) Vulnerable encroachers will be provided cash assistance Impact (Col) structures at replacement cost for loss of or identified as per structures as described in section 29 of the Government Project Census RFCTLARR Act 2013. . land Survey c) Any encroacher identified as non-vulnerable but losing more than 25% of structure used will be paid cash assistance at replacement cost for loss of structures. The amount will be determined as per section 29 of the RFCTLARR Act 2013. d) All squatters to be paid cash assistance for their structures at replacement costs which will be determined as mentioned in section 29 of the RFCTLARR Act 2013. e) All squatters (other than kiosks) will be eligible for one time grant of Rs 36000 as subsistence allowance. Page 4-10| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit f) All squatters other than Kiosks will be given shifting allowance of Rs 50,000 per family as one time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure. g) Each affected person who is a rural artisan, small trader or self-employed person assistance' of Rs 25,000/- for construction of working shed or shop. h) In case of Kiosks, only Rs. 5000 will be paid as one time grant. E.Loss of Livelihood 6 Families living Title Holders/ Resettlement & a) Subsistence allowance of Rs. 36,000 as one within the Non-Title Rehabilitation time grant. (PAPs covered under 1(f), 2 (f) Corridor of holders/ Assistance and 5 (e) above would not be eligible for this Impact (Col) sharecroppers, assistance). agricultural b) Training Assistance of Rs 10,000/- for labourers and income generation per family. employees c) Temporary employment in the project construction work to project affected persons with particular attention to vulnerable groups by the project contractor during construction, to the extent possible. F. Additional Support to Vulnerable Families 7 Families within SC, ST, BPL, Resettlement & One time additional financial assistance of Rs. 50,000. the Corridor of WHH families Rehabilitation Squatters and encroachers already covered under clause 5 Impact (Col) Assistance are not eligible for this assistance. G. Loss of Community Infrastructure/Common Property Resources 8 Structures & Affected Reconstruction Reconstruction of community structure and Common other communities of community property resources in consultation with the community. resources and groups structure and (e.g. land, • common water, property access to resources structures etc.) within the Corridor of Impact (Col) H Temporary Impact During Construction 9 Land & assets Owners of land Compensation for Compensation to be paid by the contractor for loss of temporarily & temporary impact assets, crops and any other damage as per prior impacted Assets during agreement between the 'Contractor' and the 'Affected during construction e.g. Party'. construction diversion of normal traffic, damage to adjacent parcel of land / assets due to movement of heavy machinery and plant site. J. Resettlement Site 10 Loss of Displaced Provision of Resettlement sites will be developed as part of the project, residential titleholders and resettlement site/ if a minimum of 25 project displaced families opt for structures non-titleholders vendor market assisted resettlement. Vulnerable PAPs will be given preference in allotment of plots/flats at the resettlement site. Plot size will be equivalent to size lost subject to a maximum of provision given in RFCTLARR Act 2013. Basic Page 4-11| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Definition of Application Entitlement Details No. Entitled Unit facilities shall be provided by the project at resettlement site as per the provisions given in the Third Schedule of RFCTLARR Act 2013. Similarly, if at least 25 displaced commercial establishments (small business enterprises) opt for shopping units, the Project Authority will develop the vendor market at suitable location in the nearby area in consultation with displaced persons. Basic facilities such as approach road, electricity connection, water and sanitation facility, will be provided in the vendor market by the project. Vulnerable PAPs will be given preference in allotment of shops in vendor market. One displaced family will be eligible for only one land plot at resettlement site or shop in the vendor market. Page 4-12| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 5 PROFILE OF STATE AND PROJECT AFFECTED PERSONS The project will be implemented in the state of Uttar Pradesh (UP) which is the fifth largest state in India. With an area of 2, 40,928 sq.km, UP covers 7.3% of India’s land area, and is the country’s most populous state with a population of nearly 200 million. One sixth of India’s population lives in the 70 districts of UP. Many roads in UP have locally important cultural properties located along the edge of pavement. UP forms the bulk of the Gangetic plain in India.The state has a road network of 299,604 km, out of which 174,451 km are under Uttar Pradesh Public Works Department (PWD). The roads under PWD comprise 7,550 km of National Highways (NHs), 7,530 km of State Highways (SHs), 5,761 km of Major District Roads (MDRs), 3,254 km of Other District Roads (ODRs) and 138,702 km of Village Roads (VRs). Only about 60% of SHs are two-lane (7 m). In the entire state 62% of MDRs and 83% of ODRs have widths less than 7 m. 5.1 Socio-Demographic Profile of the State 5.1.1 Demography The Government of Uttar Pradesh has requested the World Bank through Government of India to provide assistance for improvement of the Core Road Network of the state. Population: Uttar Pradesh as per Census Survey of 2011 has a total population of 200 million which is almost one sixth of India’s population. The population density is 828 persons per square kilometer. Approximately 77% of the total population lives in rural area. About 15% of the total population is below the age of 6 years. Gender classification: Over half the total population is male and sex ratio stands at 1000:912 which is much less than the national figure of 943. Social Stratification: Over one fifth of the population belongs to scheduled caste and less than 1% is tribal community. Hinduism is the dominant religion followed by 80% of the population. Muslims from the second largest community accounting for 18% of the total population. The other religions followed are Sikhism; Jainism and Bhudhism. Literacy rate: The literacy rate of the state is 68% which is much lower than the national figure. The male literacy is 77% whereas female literacy stands at just 57%. A brief socio-economic snapshot of the State is summarized below: Area 2,40,928 km2 Population (2011 census) 19.95 crore (16% All India Share of Population) Density of population (2011) 828 persons per km2 Decadal Growth (2001-11) 20.80 Percentage of Male population 52 Percentage of female population 48 sex ratio 912 Percentage of population between 0 to 6 years 15 Literacy rate (2011) 67.7 Male literacy rate 77 Page 5-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Area 2,40,928 km2 Female literacy rate 57 Percentage of scheduled caste population 21 Percentage of tribal population 0.6 Source: Statistical abstract of Uttar Pradesh, 2012 5.1.2 Economic Profile Under the economic profile, issues covered include working population; occupations; and use, and income. The details are in the paragraphs below. Land use Pattern in UP The land use pattern in UP is predominantly agriculture based. The breakup of the land use (2010-11) is given in Table 5.1. Table 5.1: Land Classification in U.P Area (Thousand S. No. Land Classification Percent (%) Hectares) 1. Forest 1658 7 2. Barren and Uncultivated land 486 2 3. Land under non agriculture uses 2835 12 4. Waste land unfit for Agriculture 426 2 5. Permanent pastures and grazing land 66 0 6. Area under trees and grooves 354 1 7. Current fallow land 1215 5 8. Other fallow land 538 2 9. Net area sown 16592 69 Total 24171 100 Source: Statistical abstract on Uttar Pradesh, 2012 5.1.3 Employment Pattern The work participation for various industries are summarizes for the districts and presented in Table 5.2. Table 5.2:Work Participation for Various Industries Industries 2001-02 2004-05 2007-08 2008-09 2009-10 2010-11 1. Agriculture & livestock 769 754 802 808 749 749 2. Mining & Quarrying 13 11 12 13 12 12 3. Manufacturing 2224 1994 2016 1974 1963 1951 4. Electricity, Gas 396 398 410 414 415 418 5. Construction 1054 988 1009 1017 1014 1014 6. Trade & Commerce 807 647 636 620 618 619 7. Transport 492 457 471 482 493 498 8. Financing. Insurance 5195 5263 5332 5390 5440 5528 & Real Estate etc. 9. Services 14689 14873 14944 14958 15040 15069 Total 25639 25385 25632 25676 25744 25858 Source: Statistical abstract on Uttar Pradesh, 2012 Page 5-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) The work participation rate for total workers is defined as the percentage of total workers to total population. In a similar way it is defined for main and the marginal workers. The main workers are distributed in nine industrial categories of economic activities as per 2011 census. Table 5.6illustrate the work participation in the project districts of the state of Uttar Pradesh for the main and marginal workers. The relative importance of the main spheres of economic activity may be gauged from the pattern of distribution of main workers in cultivation, agricultural labour, household industry and other economic activities Table 5.3:Work Participation for Main andMarginal Workers (‘000) District Main workers Marginal workers Total Rural Urban Total Rural Urban Uttar Pradesh 39,338 31,243 8,095 14,646 13,433 1,213 Jhansi 467 295 172 179 143 36 Hamirpur 271 231 40 138 128 10 Source: Census of India, 2011 State’s Income and per capita income Total State Income (2009-10) – current prices INR 4,53,020 crore Per capita Income (2009-10) current prices INR 23,132 Source: Statistical abstract on Uttar Pradesh, 2012 As the table above shows, the per capita income in the state is INR 23, 132 which is less than half of the national per capita income of 54,835. 5.2 Census and socio-economic Survey Analysis Successful implementation of Rehabilitation Action Plan (RAP) depends on appropriate and accurate census and socio-economic survey of Project Affected Persons (PAPs). Without these, there can be no measurement of precise impacts on the affected persons and therefore it becomes difficult to frame appropriate entitlement policies. Also, in the absence of surveys it is difficult to measure the achievement or non-achievement of the basic objective of the RAP. For details see Annexure-1-Survey questioner and Annexure-3-Details of Socio-economic analysis. Two kinds of surveys were taken up in course of the study: Census verification survey; Census socio-economic survey. 5.3 Objectives of the Census and Socio-economic Surveys The objectives of the census verification survey were: To collect information regarding likely project impacts in order to facilitate designs of various components of RAP To set up a cutoff date so as to monitor the influx of new people To desegregate the properties by type and identification of possible categories of entitlement. The objectives of the socio-economic survey were: Page 5-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) To attach actual values to key indicators of the PAPs social and economic status and their vulnerability to socio-economic change due to the project. To assess use/dependence on common property resource To provide a benchmark for any further information needed to monitor and evaluate EPs in the future; and To provide further inputs in preparation of RAP People who are not surveyed during the census will not be considered as PAP, as the date on which the census survey was carried out will act as a cutoff date. The cutoff date will be used to establish whether a person located in the corridor qualifies as a PAP during the implementation of the various phases of the project. However, a person not enumerated during the census, but able to prove their stay in the project corridor, during the census survey will be considered for entitlement. The survey for this project corridor was carried out between September 1 and October 4, 2014. 5.4 Categories of Properties Affected within COI The number of properties getting impacted within corridor of impact for SH-42 roads the various categories of impacted properties is as under: Table 5.4: Distribution of Project Affected households by Type of Loss Commercial Residential Residential cum Others B. Wall Total Structures Kiosk Commercial 90 194 141 29 22 12 488 18% 40% 29% 6% 5% 2% 100 Other Properties includes loss of trees, irrigation units, etc.As the table above clearly shows that impact is primarily on commercial structures, though majority of them are temporary. This is primarily because commercial structures are always established along the highways for better business prospects. Table 5.5: Distribution of Community Properties by type Temple / Shrine Water Water Hand Mosque Well Bus Stop Others Total / Chabutra Tap Tank pump 10 0 4 5 1 46 13 0 79 As the table above shows a total of 79community properties are within the corridor of impact of which 46are hand pumps and 10are cultural properties. 5.5 Analysis of Census and Baseline Socio-economic Data A detailed socio-economic survey was conducted in conjunction with the census of the project- affected persons (PAPs) to profile the impacted project area and provide a baseline against which mitigation measures and support will be measured. For this purpose, comprehensive information related to people’s assets, income, socio-cultural and demographic indicators, religious structures, and other sources of support such as common property resources were collected. The analysis has covered the needs and resources of different groups and individuals, including intra- household analysis and gender analysis. The analysis is based on the cutoff date for entitlement Page 5-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) assigned in the project (the cutoff date for the non title holder is the start date of census. The questionnaire canvassed during the survey is attached as Annexure-1. Table 5.6: Distribution of Affected and Displaced Families No. of PAPs No. of PAHs No. of PAFs No. of PDFs 2028 488 798 491 Source: Primary survey, 2014 As shown in the table above, a total of 488 households (798 families) will be affected due to proposed road up gradation, which in turn will affect 2028persons. Table 5.7: Distributions of PAFs and PDFs by Type of Affect Type of Loss Affect Type Residential Commercial kiosk Resi.+ Comm Others B.wall Total Displaced 16 268 207 0 0 0 491 PAF 150 328 207 51 26 36 798 Note: Partial: Loss less than 10%; Adverse: Loss between 10 to 25%; Displaced: Loss more than 25% Approximately 61 % of the total affected families will be displaced either because of loss of residential property or commercial property/Kiosk. It is only the squatter & Kiosk who will be displaced. Table 5.8: Demographic and Social Characteristics in Corridor of Impact Demographic/Social Distribution of Distribution of Distribution of PAPs Distribution of PAHs by social Families by Family Families by Religious by type of sex stratification Type Groups Extended General Nuclear Female Muslim Others Hindu Total Total Total Total Joint Male OBC SC ST 1119 909 2028 284 166 38 488 450 38 0 488 86 0 266 136 488 Distribution of PAPs by Marital Status Distribution of PAPs by age group 0 to 6 years Unmarried Separated Divorced Married 7 to 15 Widow 59 and 36–58 16-18 19-21 22-35 above years Total Total 903 1074 3 6 42 2028 268 391 134 119 531 445 140 2028 During the census survey, sex of every individual was recorded as it helps in identification of family and vulnerable category as per R&R policy. As the table above shows, approximately 55% PAPs are male and 44% are female. Majority of the families (58%) are nuclear in nature. Nearly 92% of the PAPs follow Hinduism. Caste configuration shows that 71% of the PAPs are from other backward castes and 29% belongs to general caste. The scheduled castes are 18% of the total affected families. Page 5-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) To identify affected families as per the R&R policy of UP State Roads Project, marital status of PAPs has been recorded and more specifically of women PAPs. According to survey results, number of unmarried PAPs is higher than married ones. Data for divorced, separated, widow and deserted was specifically analysed as they all form separate family as per R&R policy and are eligible for R&R assistance. The marital status of the PAPs shows that 44% are married. Nearly 2% PAPs are widows and less than 1% are either separated or divorced. Age group classification: As per R&R policy, all males/women above the age of 18 years, irrespective of marital status will be considered as separate family Age group classification also helps in assessing dependent and economically independent population. As the table on age cohort shows, nearly three fifth of the population comes under economically independent group of 19 to 58 years of age. About 13% of the population comes under non- school going age and about 7% are above the 59 years. Table 5.9: Distribution of PAPs by Literacy Level Intermediate Secondary Graduate technical Illiterate Primary primary Others Upper Total 611 453 458 234 149 69 47 7 2028 Literacy level is a quantifiable indicator to assess the development status of any area/region. Higher the literacy rate, more developed the area would be. Secondly, in displacement induced development project, data on literacy level of PAPs helps in formulating alternative income restoration schemes. Keeping this in mind, literacy level of PAPs was recorded during the Census Survey. For recording literacy level, completed years of education have been taken. E.g., respondent who failed to clear 10th standard has been considered as middle literate. Similarly respondent who failed to clear 12th standard has been considered as secondary literate. However, those who have attended school but failed to clear 5th standard still have been considered as primary. The literacy rate among the PAPs is quite high. Nearly 30% of the PAPs were found to be illiterate. Even among the literates, 22% PAPs are literate up to primary level. Graduates and above are only 3% of the total population. Around 3% have done some technical literacy. Table 5.10: Distribution of Families by Type of Loss Commercial Residential Residentia cum Others B. Wall Total l Structures Kiosk Commercial 150 328 207 51 26 36 798 As the Table 5.10 above shows, impact is more on commercial establishments which are immediate property in most cases of built-up sections. Out of total 798affected families, nearly 19% are residential & 41 % are commercial, 26% are from Kiosk . Another 6% families are affected due to loss of residential cum commercial structures. Among the affected commercial structures, 207 are kiosks those who will be displaced. Page 5-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 5.11: Vulnerability Status of the Households Vulnerability Status of the Household Caste BPL WHH Total 303 55 12 370 Status of Ownership Squatter Encroacher Kiosk Tenant Total 203 (42%) 144 (30%) 141 (28%) 0 488 The survey results show that out of 798 families, 370 are vulnerable. Among the vulnerable families, 85 % are socially vulnerable and rest 15% is economically vulnerable. The ownership status shows that over 40% are squatter. Apart from squatters, 28% are kiosk owners and 30% are encroachers. Resource Base of the Affected Families This section of the report deals with the economic status of the Project Affected Persons (PAPs). The information presented below has been collected through both censuses as well as sample socio-economic survey. The economic indicators considered during the survey were usual activity, occupational pattern, average household income and expenditure, number of families below poverty line, asset holdings, etc. Table 5.12: Resource Base Enlistment of Families Facilities owned by Families No. of families holding ration card 634 No. of families with electrification 356 No. of families holding voter card 718 No. of shops with electrification 178 No. of families with tap connection 45 Families with legal document 53 No. of shops with tap connection 0 As the table above shows, out of 798 families, 634 holds ration card and five households also owns legal document of the property. Out of 1677 adults, less than half of the PAPs (718) holds voter’s card. Approximately half of the families have electricity connection whereas just 6% families have tap connection. Though nearly 25% shops have electricity connection, none of the shops have tap connection. Table 5.13: Construction typology of structures Permanent Semi Permanent Temporary Total 12 69 407 488 As the table above shows, construction typology of majority of the affected structures (approximately 84 %) is temporary as most of them are either kiosks or small eateries along the road side. Table 5.14: Usual Activity Occupation Non school Non Main Migrated Home going age Worker Student Others Worker Worker Worker Worker children (0to 5 years) 675 102 114 11 381 508 225 8 Page 5-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Usual Activity It is important to record usual activity so as to assess whether PAP is gainfully employed or not. The activity the PAP is engaged in helps in formulating alternative income generation schemes. Accordingly activity where a person spends 8 or more than 8 hours in a day has been considered as usual activity for the respondent. Such activities may be directly economically gainful or may not be. Accordingly, PAPs have been classified into 8 categories as defined in Census of India. As the Table above shows, over one fourth of the total PAPs are engaged in some or the other kind of economically gainful activity and hence are in the category of workers. In rural areas, generally some kind of economically gainful activities are always available either in cultivation or non-agriculture labour activities run under various government poverty alleviation schemes. Still a small percentage of PAPs are reportedly non-workers or unemployed. Hence, such section of PAPs will require special attention during implementation phase of RAP. Over one fifth of the total PAPs reportedly are engaged in household chores and such PAPs are primarily women. Details about the household activities carried out by women PAPs are presented in chapter eleven on vulnerable groups. Occupational Pattern Occupational pattern of the PAPs are recorded to assess their skill so that they can be imparted training in the same trade for alternative income generating scheme. Secondly, occupational pattern helps in identifying dominating economic activity in the area. As the survey results shows, trade and business (primarily petty shops) is the most common occupation found among the PAPs settled along the road. Nearly 60 percent of the PAPs are engaged in Trade and Business followed by non agriculture labourersand agriculturists. Average Annual HH Income and Expenditure Table 5.15: Distribution of H H by Income Level 5001 - 10001 - 15001 - 20001 - 30001 - 1000 - 5000 Total 10000 15000 20000 30000 60000 365 82 16 16 7 2 488 Table 5.16: Distribution of Households by Primary Source of Income Source Number of HHs % to total Agriculture 36 7 Petty trade and business 301 62 Agriculture labour 19 4 Non agriculture labour 110 22 Daily wage earner 18 4 Salaried 4 1 Total 488 100 Annual income helps in identifying families below poverty line. During the survey income of a household through all possible sources was recorded. Accordingly, the average monthly household income, as table above indicates is Rs. 4712. The various sources asked during the Page 5-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) survey for calculating household income includes agriculture; allied agriculture activities; agriculture labour; non-agriculture labour; household industries; services; trade and business; profession; etc. Income from these sources was added up and weighted average was taken to arrive at average annual income figure. The average monthly expenditure is Rs. 4485 which is little less than the income and this is one reason why PAPs have some kind of saving. The various heads of expenditure asked during the survey included food; fuel; clothing; health; education; communication; social functions; etc. Like income, in calculating average expenditure per family, expenses made against each head was added up and weighted average was taken up to arrive at average annual expenditure. Household Asset Structure of PAPs Any development project brings about a change in the life style and the standard of living of the PAPs. Apart from movable properties such as land and house, it also has an impact on immovable properties. Any improvement in the economic conditions of the families is usually reflected in acquisition of these assets and similarly any adverse economic situation results in selling of these assets. The asset structure is an indicator of the economic strength of a particular family and its capacity to sustain the impact. The assets recorded during the sample socio-economic survey includes; livestock, household furniture, utensils, durables, etc. Table 5.17: Household Asset Structure (Average Unit holding per Family) Category wise HH assets Irrigation unit Average Average Average Land financial Average no. of Fuel Tube holding Fruit Fodder Timber Well Canal asset HH debt trees wood well (in (savings) per hh acres) 1.1 3688.83 1283.3 4.33 3.85 0 0.01 0.47 0.02 0.03 0.4 Durable Assets Poultry birds Bullock cart Motorcycle Hoe/Sickle Sheep/Pig Jewellery Furniture Tractor / Thresher TV/Tape Bicycle/ Utensils wooden /watch Goats/ plough /Radio Cattle Iron/ 0.21 1.53 41.98 17.88 16.65 0.05 0.03 1.18 0.01 0.42 0.01 0.11 Land Details The table above indicates that average land holding for a family varies from less than an acre to 1.1 acres. Most of the agriculture land in the project area is unirrigated. The average size of homestead land varies from 168 sq. m to 239 sq. m. Other Durable Assets Utensils and furniture are the most common household items used by every family in the project road. This is mainly because of two reasons viz., apart from being most important items, are also the cheapest of all other durable assets used by a family. Among the expensive assets, number of jewellery and watches were found more than motorcycles, televisions, tape recorder and radios. Page 5-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Agriculture Implements Small agriculture tools like hoe or sickle is possessed by all the families holding land followed by plough (either wooden or iron). Ownership of tractor and thrasher is also less found in the project road. Need for data update and mechanism to conduct update Since the census and socio-economic survey was conducted during Sep 2014 and RAP implementation usually starts at least one year after the RAP preparation, which implies that actual physical relocation of PAPs will be delayed by a year. Therefore, it is suggested that partnering NGOs entrusted with the responsibility of RAP implementation along with PWD, should conduct a Core Rapid Appraisal. R&R Coordinator from PWD will supervise the entire exercise and this document would serve as revised baseline information for the PAPs finally getting affected by the project (please see table number 9-1 in chapter 9 for detailed responsibility of R&R Coordinator). However non-title holders the day of census survey (conducted during the preparation stage of the project) will remain as cut-off date. The mechanism to conduct update is given below. Details are provided in table 6.2 of this report. Table 5.18: Core Rapid Appraisal Mechanism S. Technique Method Group Size Staff Required Time No. 1 Key Informant Interview selected local with 5-10 per group Interviewer Selection plus 3 interview special knowledge or observer & hours interview experience moderator per village 2 Focus group Specific topic discussed in 5-10 per group Interviewer 2 hours per open-ended group sessions observer & group per village moderator 3 Community Open public meeting with Large number At least 2 1 day per village Interview prepared questionnaire (more than 10) interviewer 4 Structured direct Observation of people and Large or small Team of 4 or 5 Several days observation things plus individual or numbers group interviews if desired 5 Informal surveys Non probability sampling Sample size of Team of 4 or 5 One day per with open ended 10-20 surveyors village questionnaires respondents Page 5-10| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 6 COMMUNITY PARTICIPATION 6.1 Introduction Public participation was undertaken to make explicit the social factors that will affect the development impacts of planned highway improvements and mediate project results. Through public participation, stakeholders and key social issues were identified and strategy was formulated. It included socio-cultural analysis and design of social strategy, institutional analysis and specifically addressed the issue of how poor and vulnerable groups may benefit from the project. Participation is a process, through which stakeholder influence and share control over development initiatives and the decisions and the resources, which affects them. The effectiveness of R&R program is directly related to the degree of continuing involvement of those affected by the project. Comprehensive planning is required to assure that local government, NGOs, host population and project staff interacts regularly, frequently and purposefully throughout all stages of the project. Participation of persons directly affected by projects is a primary requirement in development of R&R, if its programs are to be suited to the needs of the resettled population. Their involvement vastly increases the probability of their successful resettlement and rehabilitation. 6.2 Consultation and Participation Mechanisms Experience indicates that involuntary Flow Chart 1 Levels of Consultation resettlement generally gives rise to severe STAKEHOLDER problems for the affected population. WORKSHOP: STATE LEVEL These problems may be reduced if, as part CONSULTATION of a resettlement program, people are properly informed and consulted about the project, their situation and preferences, PUBLIC INFORMATION and allowed to make meaningful choices. CAMPAIGN This serves to reduce the insecurity and opposition to the project which otherwise are likely to occur. INFORMATION DISSEMINATION: DISTRICT LEVEL The project will therefore ensure that the WORKSHOPS affected population and other stakeholders are informed, consulted, and allowed to participate actively in the development process. This will be done throughout the project, both during preparation, PEOPLE’S implementation, and monitoring of project PARTICIPATION: LOCAL LEVEL results and impacts. CONSULTATIONS During implementation and monitoring stage, information will be disseminated to project affected persons and other key stakeholders in appropriate ways. This information will be Page 6-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) prepared in Hindi and local languages as required, describing the main project features including the entitlement framework. Consultation will be carried out in ways appropriate for cultural, gender-based, and other differences among the stakeholders. Where groups or individuals have different views/opinions, particular emphasis will be laid on the views and needs of the vulnerable groups. The Resettlement Action Plan provides detailed information regarding the consultation process. It describes information disclosure at preparation stage. The consultation process established during preparation stage of the project uses different types of consultation such as in-depth interviews with key informants, focus group discussions, seminars and meetings. The consultation program included the following: Heads of households likely to be impacted; Household members; Clusters of PAPs; Villagers; Village panchayats Government Agencies and Departments; and As part of the consultation process, women are given the opportunity to voice their views without the presence of men. As part of the preparation for the project, state level workshop was conducted with participation from key stakeholders including local NGOs, academic institutions, government officials, and others. The purpose of the stakeholder workshop was to present and discuss the framework and approach to social impacts and resettlement, and to achieve agreement about implementation mechanisms and coordination among different groups and agencies. The main objectives of the consultation program were to minimize negative impact in the project corridors and to make people aware of the road rehabilitation project. During the process efforts were made to ascertain the views and preferences of the people. The aims of community consultation were: To understand views of the people affected w.r.t to the impacts of the road To identify and assess all major economic and sociological characteristics of the village to enable effective planning and implementation and, To resolve the issues relating to affect on community property. 6.3 The Process Consultation process was carried out at Village level and all the comments received have been incorporated in this version of RAP. Issues Raised During Consultation Participants were concerned about the safety of local population staying along the proposed roads. Suggestions made for such areas included railing or parapet walls along the route in urban areas. Concerns were shown on amount and mode of compensation. General consensus was on replacement value for any immovable property acquired. Participants also suggested that Page 6-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) compensation be paid in one single instalment so that the amount can be used in a fruitful manner. Participants also agreed that in case of displacement, Resettlement sites along with all basic amenities should be constructed before physical possession of properties of PAPs. On being informed that squatters will receive assistance under the project, apprehensions were expressed by participants. They feared that this step would lead to further encroachment and squatting along the roads. Revenue officials expressed their apprehensions regarding court cases unless PAPs are taken into confidence are told about the benefits and compensation package well in advance. 6.4 Local Level Consultations Consultant carried out local level consultations for Hamirpur –Rath Road. Efforts were made to select both small and big habitations in order to get representation of all the segments of affected population. More than one-group discussions were held in every village. The size of group was restricted to 10 to 15 so that everybody gets the chance to express their views on the project. Separate group meetings were held for women. The objectives of local level consultations were to inform the affected persons about the project, R&R policy, to incorporate their views on the policy in RAP and mitigation measures as suggested by them. 6.4.1 Methodology Consultation team included one socio-economic Analyst specialized in qualitative data collection, two women community organisers and one moderator. Data was collected through one to one meeting techniques. Key findings of the local level consultations The key findings of the local level consultations are as follows: Though participants were aware of the fact that road will be widened, but the people did not know details of the project. People were also concerned about the burial ground and trees getting affected. Temples however could be shifted in consultation with local place. People agreed to participate in the process of identifying alternate site for the road . PAPs were of the view that community should be consulted before the drawings of the roads are finalised. People are in favour of road widening and they even agreed for central widening. PAPs were also concerned about the compensation payment. Therefore, a strong demand for cash compensation at replacement value for the acquired property was made. PAPs demanded cash compensation. Safety issues were paramount in all discussions.At one village people also demanded for traffic police to monitor the flow of traffic at the intersection of their village. As regard to employment in the project or with the contractor was preferred over temporary job during the project implementation. However, quite a significant number of the PAPs declined to work as labourers with the contractors. The detail of local level consultations is given below. The minutes of the meetings and attendance sheet is attached as Annexure 4. Page 6-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 6.1: Local Level Consultation Output Suggestions of PAPs Mitigation Measures / Name of the Village Issues Raised (Response) Design Approach Hamirpur-Rath-Gursahayganj-Jhansi Road (Section Hamirpur-Rath km 000 to 78 km ) PAPs agreed that they are Assistance to vulnerable encroachers but they also said encroachers, squatters Encroachment that clear space of 14 to 18.50 and Kiosk as per R&R m is available. policy Should be widened according Widening option to the land availability on Concentric Widening either side of the road Would prefer permanent As per the policy, employment either with PWD contractor to give VILLAGE- HELAPUR BLOCK - Employment or contractor. Temporary preference to local SHUMERPUR DISTT- employment with contractor population HAMIRPUR (10/O9/.2014) was also agreed upon. VENUE- HOUSE OF RAKESH Provide drains on the both Drainage provided in all KUMAR Drainage side of the road and internal urban areas road of the village Shifting of Relocation should be carried Will be relocated in religions out in consultation with village consultation with the structure community village community As per the policy, Cash compensation at compensation will be Compensation replacement value provided at replacement value Various safety signages will be provided. Footpath In market place provide three and safety railing in every Safety breakers within a distance of urban area. Project has a 1 km along with the median separate component on and street light road safety. Sanitation, Drinking Water, Will be provided in Civic Amenities Internal road be provided Resettlement sites Encroachment PAPs agreed that they are Assistance to vulnerable encroachers. Clear space of encroachers, squatters 14 to 18.50 m is available. and Kiosk as per R&R policy Widening option Concentric Widening Concentric Widening As per the policy, contractor to give VILLAGE- PAUTHIYA BLOCK Training be provided for Self preference to local - SHUMERPUR DISTT- Employment employment. Employment population. NGO will HAMIRPUR (18 /O9/.2014) with contractor or PWD provide training for self VENUE- NEAR PRIMARY employment for eligible SCHOOL PAPs. Drainage Provide drain along with road Drainage provided in all to reduce water logging urban areas Compensation Cash compensation at As per the policy, replacement value compensation will be provided at replacement value Safety Speed breakers be provided at Various safety signage will the both end of the village be provided. Footpath and safety railing in every urban area. Project has a separate component on road safety. Civic Amenities School, Hospital, Sanitation, Will be provided in Page 6-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Suggestions of PAPs Mitigation Measures / Name of the Village Issues Raised (Response) Design Approach Drinking Water, internal roads Resettlement sites Widening Option Concentric Widening as per Concentric Widening the clear space available As per the policy, contractor to give Permanent employment either preference to local Employment with the government or population.NGO will private provide training for self employment for eligible PAPs VILLAGE- CHHANI BLOCK - Drainage Provide drains on both side of Drains provided in all SHUMERPUR DISTT- the road urban areas HAMIRPUR (22 /O9/.2014) Compensation Cash compensation at Compensation will be VENUE-MARKET OF CHHANI replacement value provided at replacement value as per the policy Safety Speed breakers should be Safety signage will be provided at both the ends of provided. Footpath and the village safety railing in every urban area. Project has a separate component on road safety Widening Option Clear space of 18 m is Concentric Widening available so road should be widened accordingly on either side Employment As per the policy, contractor to give preference to local population Drainage Provide drain Drainage provided in all urban areas Shifting of Village community should be Will be relocated in religions consulted. Relocation site and consultation with the VILLAGE- BIWAR BLOCK - structure process will be finalised by the village community MUSKARA DISTT- community. HAMIRPUR (24 /O9/.2014) Compensation Cash compensation at As per the policy, VENUE- NEAR PRIMARY replacement value compensation will be SCHOOL provided at replacement value Safety Speed breaker at entry and Footpath and safety railing exit of the village in every urban area. Various safety signage will be provided. Project has a separate component on road safety Removal of Villagers agreed that they are Assistance to vulnerable encroachment encroacher and agreed to encroacher and squatters move out as per the policy Widening Option Road should be widened on Concentric Widening both side as per the clear space available VILLAGE- MUSKARA BLOCK Drainage facility in every Drainage Drains should be provided - MUSKARA DISTT- urban area HAMIRPUR (28 /O9/.2014) Shifting of Relocation should be in Village community will be VENUE- MUSKARA MARKET religions consultation with village consulted during relocation structure community of religious structure Should be provided at Compensation at Compensation replacement value replacement value as per Page 6-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Suggestions of PAPs Mitigation Measures / Name of the Village Issues Raised (Response) Design Approach the policy Speed breaker and median Footpath and safety railing Safety should be provided, in every urban area Clear space of 18 m is available so road should be Encroachment widened accordingly on either side Widening Option Road should be widened on Concentric Widening either side Demolition of New structures be provided Commercial space will be commercial before demolition of existing provided as per the policy structures ones. Safety Breakers, Sinages Safety railings and signage will be provided. Project has a separate component on road safety Employment At least one member of the As per the policy, family should get permanent contractor to give employment preference to local population during construction Drainage Water logging is a major Drainage will be provided problem. Drainage should be in all urban areas as part provided of the project design Demolition of New structures be provided Commercial space will be VILLAGE- DHANAURI BLOCK commercial before demolition of existing provided as per the policy - GOHAN DISTT- HAMIRPUR structures ones. (30 /09 /.2014) VENUE- Compensation Cash compensation should be As per the policy, NEAR PRIMARY SCHOOL paid before relocation compensation will be paid at replacement value Safety Speed breakers and signage’s Safety railings will be will reduce number of provided in all urban accidents areas. NGO will hold awareness generation camps for safety issues during RAP implementation. Project has a separate component on road safety Encroachment PAPs agreed that they are Vulnerable encroacher and encroacher squatters to be assisted as per the policy Widening Option Road should be widened on Concentric Widening either side Drainage facility in every Drainage Drains should be provided urban area VILLAGE- RATH BLOCK - Shifting of Relocation should be in Village community will be RATH DISTT- HAMIRPUR religions consultation with village consulted during relocation (02 /10 /.2014) VENUE- structure community of religious structure RATH MARKET Compensation at Should be provided at Compensation replacement value as per replacement value the policy Footpath and safety railing Speed breaker and median in every urban area. Safety should be provided, Project has a separate component on road safety Clear space of 18 m is Encroachment available so road should be Page 6-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Suggestions of PAPs Mitigation Measures / Name of the Village Issues Raised (Response) Design Approach widened accordingly on either side Widening Option Road should be widened on Concentric Widening either side Demolition of New structures be provided Commercial space will be commercial before demolition of existing provided as per the policy structures ones. 6.5 Continuation of Public Consultations The effectiveness of the R&R program is directly related to the degree of continuing involvement of those affected by the project. Participation of PAPs has been emphasised in the development of RAP to assure that its components are suited to the needs of the impacted and resettled population. Their continued involvement and participation during RAP implementation will both increase the probability of their successful resettlement and rehabilitation and contribute to the overall project success. During the preparation stage, consultations were held at local level. Several additional rounds of consultations with PAPs have been planned in the action plan through partnering NGO during RAP implementation. Consultations during RAP implementation will involve agreements on compensation and assistance options and entitlements with PAPs and completion of a PAP identity card indicating the accepted entitlement package . The other round of consultations will occur when compensation and assistance are provided and actual resettlement begins. Plan for Continued Participation The following set of activities is required for effective implementation of RAP. This will also help in timely execution of RAP. Information Disclosure For the benefit of the community in general and PAPs in particular, RAP and R&R policy will be translated in Hindi and kept at Public Libraries of the districts Office of Chief Development Officer, and Libraries of various colleges in the district. PWD offices in project districts Schools of the villages affected, and Any other public place along the highway A copy of RAP and R&R policy will also be placed at the office of Chief Engineer,UP PWD, Lucknow and respective PWD circles and divisions. Public Information Dissemination PWD offices located along the Project Corridors will provide actual information and policies and other rehabilitation actionplan to the people in continous manner. For this, following are proposed Page 6-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) The NGOs involved in the implementation of RAP will organise Public meetings, and will appraise the communities about the progress in the implementation of limited works. The NGO will organise public meetings to inform the community about the payment and assistance paid to the community. Regular update of the program of resettlement component of the project will be placed for public display at the PWD office. Community Participation For effective implementation of RAP, it is essential to provide scope of involving communities and PAPs in the process. The mechanism of involving communities is suggested below : Table 6.2: Core Rapid Appraisal : Mechanism for Continued Participation Project & Local Project Stage PAPs NGOs Hosts Officials Planning Participate in Assist in impact Provide Provide public meetings assessment information or information on Identify Assist in census various aspects of PAP skills etc. alternatives to and SE survey host communities Suggest ways to avoid or minimise Participate in Assist in data minimise impacts displacement coordination collection and Indicate local staff Assist in committee design and budget developing and Participate in Provide inputs to capacity for chosing alterantive group meetings site selection relocation. options for Design and Identify possible Assist NGO in relocation and implement an conflict areas with information income generation information PAPs dissemination Help to choose campaign Identify social and Participate in resettlement sites. Support group cultural faclities consultations Participate in formation, needed at Examine the survey problem resettlement sites feasibility of IG Participate in identification and Assist in schemes and meeting with host planning forPAPs identification of IG discuss with PAPs. population and hosts, schemes Help document Provide inputs to Design and Provide inputs for and consultations. entitlement Participatory design of IG provisions process schemes Assist in Suggest Help develop a preparation of mechanism for process of action plan grievance consultation Suggest redressal of between hosts and mechanism for conflict resoultion. PAPs. grievance Assist in Suggst mechanism redressal conflict preparation of for grievance resoultion and action Plan redressal and participate in conflict resolution. grievance redressal Participate in coordination committees Implementation Participate in Provide ongoing Assist APO in Process IG implementation information for relocation proposals support activitives PAPs and hosts Manage common Participate in Participation in Provide support in property at site grievance local decision group Participate in local redressal making activities. management committees. Provide assistance Decide on Monitor Assist PAPs in under local management of entitlement integration with schemes. Page 6-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Project & Local Project Stage PAPs NGOs Hosts Officials common provision by Hosts. Participate as properties implementation of Assist PAPs in member of I Participate in IG schemes. useof new mplementation grieviance Assist production committee. redressal implementing live systerm. mechanism. deptts. Use established Monitor provision Provide support to mechanisms for of entitlements RAP implementtion grievance Labour and other . redressal. inputs of site Training to eligible Labour and other PAPs inputs at site Support to Credit and other vulnerable groups group scheme Evaluate management community O&M of sites and process and social project inputs preparation Members of Provide advice on implementation grievance committee redressal. Be an interface between PAPs and PWD for grievance redress, especially for vulnerable groups, and those will low levels of literacy. M&E Participate in Provide Provide inputs to Ongoing grievance tribunals information to M&E of R&R interaction with Report to project project staff on PAPs to identify on IG schemes vulnerable groups problems in IG Report on service Act as M&E agency programme. quality of sites for project Participants in Act as external correctional monitors for strategies. project (where not previously involved) ESMF Workshop The development of the ESMF is based on a consultative process that engaged key stakeholders at the state and local levels and sought their feedback. Key government agencies have been consulted at the various levels to obtain their consent on the ESMF in general and specially on the land acquisition process and resettlement framework. The state level consultation was carried out on November 7, 2014. The objective of consultation was to receive feedback from various stakeholders and wider dissemination. The consultation was carried out in Hindi and was attended by nearly 50 stakeholders representing academics, civil society, administration, project affected persons and technocrats. The executive summary of draft ESMF and project specific R&R policy in Hindi was circulated prior to the consultation. The issues discussed during the consultation included: Page 6-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Minimizing adverse environmental and social impacts such as minimize tree cuttings; provide safety measures near schools and health centres Safety of women and children during construction Safety measures for road users and public Project should provide bus stops at major habitations Drains in urban areas Land prices and prices of the properties affected to be finalized in consultation with the community Replacement of community properties Facilities for solid waste management in urban areas Project assured stakeholders that all measures suggested will be incorporated in design to the extent possible. Following the State level consultations, public consultations have been carried out in sample sub project areas to get feedback and suggestions from the community on the ESMF. The translated version of executive summary of draft ESMF was disclosed on the websites and placed with the offices of the nodal agencies prior to the consultation meetings. The minutes of the meeting was prepared highlighting the key discussions and issues raised by the stakeholders. The issues raised during the consultations were similar to those raised in state level consultation. Page 6-10| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 7 GENDER ANALYSIS 7.1 Status of Women The current situation of women across the Indian states based on a select set of indicators covering issues of work, education, health, survival, safety and women's participation in private and public decision-making is undertaken here to illustrate the relevance of adopting a simple methodology of individual indicators. The indicators used here include both attainment levels as well as gaps between men and women in selected spheres. This analysis reveals the utility of such a methodology in identifying the areas of gender backwardness and possible intervention mechanisms that can prove to be effective in improving the situation of Women. India ranks 103 out of 137 countries in the gender development index (GDI) that reveals the reality of insufficient level of development of women as compared to men in this country. The economic condition of women headed households varies considerably depending upon factors such as marital status, social context of female leadership and decision making, access to facilities and productive resources, income and composition of the household. These conditions form the basis for defining indicators to assess the vulnerability of such households. There are two important aspects of Uttar Pradesh Core Road Network Development Program under UP PWD where gender issues are required to be addressed. It is expected that in development projects women will experience socio-economic impacts differently than men. During the planning phase, gender impacts are primarily related to relocation; whereas during implementation, the impacts are related to loss of livelihood; access to common property resources; women workers who will be engaged in the road construction activities (these women workers are expected to come from outside being engaged by the construction contractors and will be staying in the construction camps during the construction); safety of local women members due to influx of outside labour force; etc. Impact on Women in Uttar Pradesh Core Road Network Development Program of UP PWD While women constitute almost half of the affected and displaced population in the project area they are neglected from the socio-economic development point of view. Socio economic parameters like literacy, work force participation rate, general health conditions etc. reveals that social status of women is very backward in the project area and thereby brought forward the scope of considering the households headed by women as vulnerable. Women Headed Households Women headed households are found to be less in number in the project area. The number of such families is 15 only. This constitutes only 2% of the total families affected. Table 7.1 below shows distribution of women headed families. Table 7.1: Number of Women Headed Households Particulars Nos. Number of Women Headed Households 12 Number of Women Headed Families 12 Number of Project Affected Women (including minors below 18 years) 909 Page 7-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) For the successful implementation of any project, it is important that both men and women are made equal partners in all stages of the project. This chapter examines the status of women using selected demographic, educational, socio-cultural, health-related and economic indicators. There are two demographic variables that include sex ratio and child sex ratio pertaining to the 0- 6 year age group. Effective female literacy and gender gap in literacy rates are the two educational indicators used in this chapter. Female work participation rates along with the gender gap in participation levels are the twin economic variables considered in this analysis. The indicators used here include both attainment levels as well as gaps between men and women in selected spheres. For any planned development to be effective and for replication of successful experiments, there is a need for more specific details that can be provided by gender related development indicators. However, the variables and indicators for women’s status need to be simple and disaggregated. The gender development indicators used generate specific sets of information that has been utilized for identification of and intervention for the amelioration of the status of women. 7.2 Gender Issues Discussion with women in the project area shows that women work both for the labour market and for the household. Some of this work is recognized and remunerated, while most of it is not enumerated and remains unpaid. Women’s contribution to the household, economy and society goes unrecognized since most of the activities females are involved in do not enter the sphere of the market and remain non-monetized. Most of the work undertaken by women is often interspersed with other household chores, making it difficult to separate the various tasks performed. The perpetuation of gender stereotypes and the social division of labour that typecasts women mainly as workers in the domestic sphere has been the chief barrier to the recognition of women’s economic work participation. Non -recognition of women’s participation in economic activities is not only an outcome of (a) their work being intertwined with household activities; and (b) being unpaid, making it difficult for enumerators to identify women as workers, but also stems from flawed definitions and the limited scope of economic activity. The role played by women in the care sector, predominantly their reproductive work (bearing, rearing, nurturing children and household maintenance), falls outside the accounting systems. Many of the tasks non-working women are involved in would be considered work if performed by a person hired for the purpose or unrelated to the household. Because women perform roles, which are not statistically counted as economic and hence not monetarily valued, women’s roles and their contribution are assigned a lower status. The role fulfilled by women in household maintenance and care activities is often trivialized. Assigning monetary value to all the tasks undertaken by them, however, is not very easy. 7.2.1 Female Work Participation Rate and the Gender Gap in Work The female work participation rate (FWPR) is measured by calculating the proportion of female main plus marginal workers among the female population. Standard definitions of economic activity indicate low rates of FWPR. At the all-India level, only 30 per cent of women are defined as workers, main or marginal. In Uttar Pradesh female work participation rate is lower than the national figure and the gender gap in work is higher. In female work participation rate, Uttar Pradesh is ranked 2 in the entire country with a participation rate of 20. The women work participation rate in project corridor was found to be 10 % with a gender gap of 43.3%. Page 7-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 7.2: Female Work Participation Rate and Gender Gap in Work Location Female Work Participation Rate Rank Gender Gap in Work Rank Project Road 9.8 43.3 Uttar Pradesh 20 2 37.8 4 India 30.3 31 Source: Rustagi Preet 2004) Notes: Work participation rates are calculated as the proportion of total workers (main + marginal) among respective populations above six years. AND Primary Survey results (Census and socio-economic survey). On the whole, FWPR is low, partly as a result of the poor coverage given to women’s work, especially in the unorganized sector and partly due to heavy domestic responsibilities that inhibit women’s economic activities. Nearly 50 per cent of women who are principally involved in home - making reported that there was no other household member to undertake these responsibilities. 7.2.2 Gender Disparity in Sex Table 7.3: Sex Ratio Sex Ratio Location 2011 2001 Project road 787 Uttar Pradesh 912 898 India 943 934 Source: Census of India, 2011 and 2001and Field Survey results. Uttar Pradesh has very low sex ratio reflecting the deteriorating situation of women in the state. In addition to the worsening mortality conditions, some of the reasons for this decline lie in increasing economic pressure for survival and sex selective migration. Uttar Pradesh has always recorded sex ratios below the all-India levels and one primary reason is male migration from these states. The situation is extremely poor in the project road where sex ratio is 787 as compared to 912 in the state and 943 in the country. 7.2.3 Child Sex Ratio Table 7.4: Child Sex Ratio Sex Ratio of Children in the Age Group of 0-6 Years Location 2011 2001 Project Road 751 Uttar Pradesh 899 916 India 914 927 Source: Census of India, 2011 and 2001and Primary Survey results The table above reflects a worsening gender balance among children. The situation in the project road is worse than the state. 7.2.4 Education 7.2.4.1 Female Literacy Rate Will improvement in female literacy ensure greater gender equality can be stated with a certain degree of certainty that improving the education of women will lead to gender development; it is difficult to affirm that improvements reflected through this variable of female literacy alone will be sufficient to bring about women’s equality. Page 7-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 7.5: Female Literacy and Gender Gap in Literacy Location Female Literacy in Rank Gap in Literacy in % Rank % Project road 68.2 13.23 Uttar Pradesh 42.98 4 27.25 3 India 54.16 21.69 Source: Census of India, 20011and Primary Survey As the table above shows, female literacy is extremely poor in Uttar Pradesh is ranked among the top 5 worst states in terms of women’s literacy. The state also has high gender gap in literacy. This could be because of low enrolment of girl child in primary schools coupled with high dropout rate. However in the project road, female literacy rate is much higher than the state and national average. Though there is gap in literacy rate, it is much less than state and national figure. 7.2.5 Women’s Health The NFHS III findings highlight that in U.P. 53 percent of the respondent women (between the age of 20-24) were married by the age of 18. While this figure was 30 percent in the urban area, it was a high 60.1 percent in the rural area. 14.3 percent women between the age of 14-19 were already mothers or pregnant at the time of the Survey. Marriage of girls before the legal minimum age of 18 is a widespread phenomenon in Uttar Pradesh. Nearly 49 percent girls are married below the age of 18 years in Uttar Pradesh. The position is alarming in Lalitpur and Maharajganj districts where over 80 percent of girls are married off before they reach the age of 18. Early age of marriage is both the symptom as well as a cause of women's subordination in the society. Girls are married off early for a complex array of causes. Socially and culturally perceived as "parayadhan", premium is put on virginity and therefore restrictive controls are imposed on her mobility and sexuality. Girls are thus seen to be protected from violence in society by an early marriage. The situation in project corridor is no difference as mean age of marriage for girls is 16 years. 7.2.6 Women and Work As per census 2011, employment opportunities seem to be much lower for women in U.P., which restricts their economic empowerment. The work participation rate (WPR) was very low for females at 16.5 percent as compared to 46.8 percent for males. The work participation rate for women in the project corridor is less than 10 percent. 7.2.7 Women’s Role in Household Economy As can be seen from table 7.6 below, women participation in economic activities is almost negligible. The survey result shows that 40% of the women PAPs spend their maximum time attending to household chores. Approximately 14% of the women PAPs reported that they are engaged in economically productive activities. Table 7.6: Usual Activity of Affected Women Usual Activity N=1296 % Worker 173 13.35 Non Worker 77 5.94 Main Worker 8 0.62 Page 7-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Usual Activity N=1296 % Marginal Worker 8 0.62 Student 360 27.77 Non School going age child (5 to 7 years) 148 11.42 Home Maker 509 39.27 other 13 1.00 7.2.8 Time Disposition This section highlights women’s involvement in various activities throughout the day. Although particulars like child rearing are difficult to record as women are of the opinion that there is no fixed time for rearing children. In joint family, (majority of families here are joint families) children are taken care of by any elder member of the family and not necessarily the mother. In nuclear families, even neighbours at time take care of children for some time. In this area among the respondents the maximum time was being spent by the females on household chores like cooking, washing, collection of drinking water, cleaning, cattle rearing etc. Those who are engaged in labour activities (including service in urban areas) on an average spend 6 to 9 hours every day. Women those who help family members in cultivation, on an average spent over 3 hours in a day. The recorded timings for relaxation and entertainment are pretty high because even sleeping time of 8 hours is also included in this. Table 7.7 below presents average time spent by responding women Table 7.7: Women – Time Disposition Number of Average Time S. Cumulative Time Activities Women Spent per No. Spent (hours) Respondents Women (Hours) 1 Cultivation 189 567 3 2 Allied activities- Dairy / Poultry 210 420 2 3 Collection of drinking water 698 698 1 4 Collection of Fuel 439 1317 3 5 Trade & Business 54 324 6 6 Agricultural Labor 72 576 8 7 Non Agricultural Labor 16 128 8 8 HH Industries 0 0 8 9 Service 9 72 8 10 Households Work 509 4581 9 11 Others 45 180 4 7.3 Decision Making Power among Women PAPs Table 7.8: Decision Making Power among Women Number of Women Percent of Women Percent of Women Activities Respondents Saying Yes Saying No Financial matter 45 22.22 77.78 Child’s education 210 18.6 81.4 Healthcare of child 234 12.4 87.6 Purchase of assets 42 22.3 77.7 Day-to-day activities 45 13.9 86.1 Social functions 103 24.6 75.4 Others 15 16.4 83.6 Page 7-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) During the group discussion, various issues related to household matter were raised viz., their importance in financial matter, child’s education, child’s health care, purchase of assets, marriages and other functions, etc. As the table above shows majority of women PAPs have said that they do not have any decision making power at household level. One fifth of the total sample respondents have say in important matters viz., child’s education, child’s health, etc. Little over one-tenth of the women respondents reportedly have say in financial matters of household. However, nearly one fourth reportedly have say in purchase of assets and social functions. 7.3.1 Gender Based Violence According to the NFHS III, 44.3 percent of married women in rural areas and 36 percent of women in urban areas have experienced some form or other of spousal violence. The Survey points out those women who have had education of ten years and more, experience least spousal violence. The survey result shows that 23 percent of ever married women faced some kind of spousal violence. 31 % of women respondent who have faced violence said that violence was physical. 7.4 Gender Action Plan 7.4.1 Awareness Generation Campaign The campaign will specifically address the issues related to gender based violence; women employment; HIV/AIDS; women health; women empowerment; and literacy among women. Apart from door to door approach; awareness campaigns will be through posters; wall paintings; street plays; village consultations; and various competitions among school children. Orientation workshop on gender issues for PWD officials and contractor’s staf f will also be carried out by NGO to sensitize staff members on gender related issues. 7.4.2 Safety of Women Women and children are the most affected section of the society when it comes to road accidents and other road related safety issues. Keeping this in mind, road safety has been taken up as a separate component of the project. In order to ensure safety of women and children while using village pond, project will enhance two ponds used by women and children. The enhancement will include constructing steps and ghat. Specific road safety engineering counter measures will be adequately integrated in the engineering designs to reduce the safety risks in hazardous locations and also to provide a safer road environment for all road users especially women and children. Project will improve safety of vulnerable road users through paved shoulders along entire stretches of project roads. Work zone safety standards would be fully integrated in the contract management framework to ensure safety of women workers. In addition to inclusion of adequate road safety provisions into the program of state highway rehabilitation and widening under the Civil Works Component, there will be programs of systematic, cost-effective safety engineering improvements focusing on: (a) high-risk corridors of the core network based on priorities identified by the International Road Assessment Program (iRAP) survey, and (b) junctions improvements and pedestrian safety. Awareness program will be carried out specifically for women; children and elderly people in the project corridor through partner NGO. Page 7-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Technical assistance will be provided to the Road Safety Division of PWD to assist the design of safety engineering improvements and to build its capacity, including the preparation of guidelines and manuals and related training programs for PWD staff, and support for specific safety design initiatives undertaken under project Component 1, Civil Works, to systematically address and improve road safety in the planning, design, construction and operation of the UP road network. Under the Road Safety Component implemented by Police and Transport Departments there will be a state wide road safety media campaign and targeted social marketing campaigns. 7.4.3 Women Involvement in Development Process through Employment The development experience of at least two decades shows that it is equally necessary to consult women and offer them options in enabling them to make informed choices and decide for their own development. Participation of women has been envisaged specifically in the following areas: In the pre-planning and planning stages participation from women could be sought through allowing them taking part in the consultation process. For this, the local level agencies of implementation, i.e. the NGOs have an important role to play. Each field team of the NGO shall include at least one women investigator/facilitator Compensation for land and assets lost being same for all the affected or displaced families, special care should be taken by the NGOs for women group while implementing the process of acquisition and compensation as well. The NGOs should make sure that women are actually taking part in issuance of identify cards, opening accounts in the bank, receiving compensation amounts through cheques in their name or not, etc. This will further widen the perspective of participation by the women in the project implementation. Under the entitlement framework there are number of provisions kept for compensation and assistances towards the losses incurred upon the impacted women headed households by the project. The implementing agencies should provide trainings for upgrading the skill in the alternative livelihoods and assist throughout till the beneficiaries start up with production and business. Women’s participation should be initiated through Self-Help Group formation in each of the villages affected by the project. These groups can then be linked to existing development schemes of the Government. For monitoring and evaluation, there should be scope for women’s participation. Monitoring of project inputs concerning benefit to women should involve their participation that will make the process more transparent to them. Women should be encouraged to evaluate the project outputs from their point of view and their useful suggestions should be noted for taking necessary actions for further modifications in the project creating better and congenial situation for increasing participation from women. All these done in a participatory way may bring fruit to this vulnerable group in an expected way. 7.4.4 Specific Provisions in the Construction Camp for Women The provisions mentioned under this section will specifically help all the women and children living in the construction camp. Page 7-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Temporary Housing During the construction the families of labourers/workers should be provided with residential accommodation suitable to nuclear families. Health Centre Health problems of the workers should be taken care of by providing basic health care facilities through health centres temporarily set up for the construction camp. The health centre should have at least a doctor, nurses, General Duty staff, medicines and minimum medical facilities to tackle first-aid requirements or minor accidental cases, linkage with nearest higher order hospital to refer patients of major illnesses or critical cases. The health centre should have MCW (Mother and Child Welfare) units for treating mothers and children in the camp. Apart from this, the health centre should provide with regular vaccinations required for children. Day Creche Facilities It is expected that among the women workers there will be mothers with infants and small children. Provision of a day crèche may solve the problems of such women who can leave behind their children in such a crèche and work for the day in the construction activities. If the construction work involves women in its day-night schedules, then the provision of such a crèche should be made available on a 24-hour basis. The crèche should be provided with at least a trained ICDS (Integrated Child Development Scheme) worker with ‘ayahs’ to look after the children. The ICDS worker, preferably women, may take care of the children in a better way and can manage to provide nutritional food (as prescribed in ICDS and provided free of cost by the government) to them. In cases of emergency she, being trained, can tackle the health problems of the children and can organise treatment linking the nearest health centre. Proper Scheduling Of Construction Works Owing to the demand of a fast construction work it is expected that a 24 hours-long work- schedule would be in operation. Women, especially the mothers with infants should to be exempted from night shifts as far as possible. If unavoidable, crèche facilities in the construction camps must be extended to them in the night shifts too. Education Facilities The construction workers are mainly mobile groups of people. They are found to move from one place to another taking along their families with them. Thus, there is a need for educating their children at the place of their work. For this at least primary schools are required to be planned in the construction camps. Wherever feasible, day crèche facilities could be extended with primary educational facilities. Control on Child Labour Minors i.e., persons below the age of 14 years should be restricted from getting involved in the constructional activities. It will be the responsibility of Environment and Social Cell of PWD and Page 7-8| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) NGO to ensure that no child labourer is engaged in the activities.The cell would require cooperation of Construction Supervision Consultants for effective monitoring for control on child labour. Exploitation of young unmarried women is very common in such camps. A strong vigilance mechanism will ensure ceasing of such exploitation. Project Director on receipt of complaint from R&R Coordinator or NGO and valid proof may take necessary action as per the Child Labour (Prohibition & Regulation) Act, 1986. Apart from that Project Director may take following actions: 1. Penalty 2. Black listing of the firm Special Measures for Controlling STD, AIDS Solitary adult males usually dominate the labour force of construction camps. They play a significant role in spreading sexually transmitted diseases. In the construction camps as well as in the neighbouring areas they are found to indulge in physical relations with different women. This unhealthy sexual behaviour gives rise to STDs and ADIS. While it is difficult to stop such activities, it is wiser to make provisions for means of controlling the spread of such diseases. Awareness campaigns for the target people, both in the construction camp and neighbouring villages as well, and supply of condoms at concession rate to the male workers may help to large extent in this respect. 7.4.5 Women Participation with Other Stakeholders It is imperative to bring the issue of women's development in the process of socio-economic uplift within the scope of the RAP for UP PWD. Encouraging women's participation in development projects is policy being followed by the GOI. Involving women meaningfully at all levels of the project therefore, you will show a greater commitment to the nation-wide goals. Women are involved in the project anyway. However, most of the times, they are on the negatively impacted side. Following is the account of the ways women are affected and/or involved in the project. Women constitute almost half of the PAPs. It is expected that women labourers will be engaged as contract labourers during the construction period. Experiences (elsewhere in India) show that women constitute 25- 40% of the semi-skilled and unskilled workforce in road construction contracts. However, women are seldom, if ever, involved in the road contraction industry at managerial levels. Women will be involved in the selection of location of community infrastructure facilities if needs to be relocated or newly constructed. Project through NGO will consult the community during project implementation and especially with the women groups to identify optimum locations to consider costs, maintenance, proximity to households and capacity of community to manage communal facilities. 7.4.6 Possible Areas of Women Involvement The entitlement Framework includes provisions for participation of, and consultation with women during implementation of the RAP. These provisions are already in place. Page 7-9| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Without doubt, women need to be involved in the implementation of the RAP. The other areas of concern to the women and more readily addressed by them will be in managing health and hygiene issues at the construction camps (where there are possibilities of exploitation of women workforce, or children), and in managing the spread of highway related diseases. 7.4.7 Summary of Gender Actions under the Project Table 7.9: Gender Action under the Project Steps to be taken during Key Indicators Steps Taken by Project implementation Representation and All meetings that take place so far, Process will remain the same during presence of women from has representation of women. The implementation as well. different socioeconomic meetings/consultations are organized groups in all meetings at a time when women find it convenient to attend, so that maximum participation can be ensured. Venue for meetings is The meeting venue was generally Process will remain the same during based on discussions with selected by the participants. The implementation as well. the women so they can meetings generally took place in the feel free and uninhibited in village or at the village entry point their discussions. which is accessible to all. Women facilitators or work Consultant’s team had one social The NGO and M&E consultant’s through women’s groups organizer who helped in facilitating terms of referencing specifically or networks—formal or the meetings. mentions hiring of women staff to informal. assist during consultations and other activities where women groups participate during implementation. Women’s involvement in The disclosure of RAP and preparation and review of entitlement matrix was carried out in resettlement plans. a mixed group as well as separately for men and women members. Women’s associations are In order to pre-empt situations vested with authority. where women are mere tokens in decision-making processes, women members will be encouraged to become office bearers of grievance mechanism at local level and other community level platforms through awareness campaigns. All women and mixed SHGs will be formed for livelihood enhancement. Such groups once established provides platform for women to take independent decision not only at household but also at community level. Ensure women’s . As said earlier, women members will involvement and be part of M&E consultants. Village participation in level monitoring groups will be implementation and formed with women members monitoring. Social and cultural factors It was ensured that consultants and may exclude women from NGOs do not operate via male elite, participating actively in who may not represent the planning, implementing, community in its entirety and and executing resettlement especially women Women’s activities participation was ensured so that male biases do not undermine Page 7-10| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Steps to be taken during Key Indicators Steps Taken by Project implementation women’s rights in customary institutions and disadvantage vulnerable women. Widows, the elderly, divorced women, and women-headed households those who suffer the most have been considered as vulnerable family in the project. As agreed during women consultations, project is enhancing two ponds which are used by women and children for collecting water; bathing and washing. Do women have any Women were involved in developing Process will remain the same during information about the the resettlement plan and their implementation as well. proposed project and inputs were solicited. Separate resettlement plan? meetings with women, using female facilitators were conducted to solicit women’s views, especially on sensitive issues as toilets, sanitation, water, and house plan. Women were also consulted in identifying affected persons and draft RAP was shared with the affected community. Inclusion of women in the Gender–disaggregated data for each socioeconomic survey? household was collected including ownership and use of resources; decision making regarding finance and resource use; women’s formal and informal income-earning activities; extent of women’s time spend on various day to day activities Legal rights to land and As part of the RAP, existing land and Since under RFCTLARR act 2013, property allocated as part property laws were examined to only legal titleholder can be given of the resettlement identify any provisions or compensation, R&R assistance will package for Women entitlements for women. be disbursed in the joint bank account operated by both. Income-restoration During social impact assessment The NGO to be hired for programs to address survey, existing levels of women’s implementation of RAP, will carry out gender issues skills were assessed. The SIA noted training need assessment. Special the complex role a woman performs orientation meetings will be arranged as a collector of food, fuel, fodder with the women members to help and water and also as a partner in form new self -help groups and to agricultural activities. revive the defunct groups if any. Training will be provided to the SHG groups along with the exposure visits. The NGO will also explore the opportunities for augmenting existing income. Page 7-11| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 8 INCOME RESTORATION 8.1 Background Development project may have an adverse impact on the income of project-affected persons. They also have a negative impact on the socio- cultural systems of affected communities. The basic postulates of all developmental activities should be that no one is worse of than before the project. Restoration of pre-project levels of income is an important part of rehabilitating socio- economic and cultural systems in affected communities. To achieve this goal, preparation of IR programs under Rehabilitation Action Plan should proceed exactly as it would have for any other economic development program. IR schemes should be designed in consultation with the affected persons and they should explicitly approve the program. As is clear that due to proposed roads project, out of a total of 1028 families, livelihood of 761families will be affected due to loss of commercial structures 8.2 Income Restoration Options Preferred by PAPs During the survey PAPs were specifically asked about their preference for rehabilitation in case they are affected / displaced by the proposed project. As table 8.1 below shows, over three fourth of the total affected PAPs opted for cash grant. Nearly 16% of the PAPs, primarily those running shops, opted for petty shops as they are already in the same avocation. Less than five percent of PAPs opted for employment with contractors during construction phase. However, educated PAPs demanded permanent employment either with PWD or contractors. Training for skill upgradation or activities allied to agriculture had very few takers. Income Restoration plan for eligible families have been given at the end of the chapter. Table 8.1: Income Restoration Options as Preferred by PAPs IR Options % of respondents to total N=820 Allied Agriculture Activity 0.44 Petty Shops 15.8 Cash Grant 76.6 Employment during construction 4.84 Training for skill upgradation 0.22 Others 2.10 8.3 Resettlement 8.3.1 Affected Families Resettlement and rehabilitation in UP PWD consists of the following broad entitlements of the “entitled person/family group”. Compensation for the loss of property at replacement value. Compensation relocation support of the displaced titleholder families; Page 8-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) R&R assistance to the non-titleholder affected/displaced families. Livelihood and income restoration support and assistance to the families/persons belonging to the vulnerable group. For details, refer the Entitlement Framework for the UP PWD, given in this report. 8.3.2 Non Titleholder Displaced Families No titleholder is getting affected in project road. However, 344 squatters and encroachers & kiosk will be displaced/ rehabilitated. The vulnerable encroachers will receive replacement cost of their (building) structures. This will have the right to salvage material from their structures, and will be notified in time of remove their assets. However, during the census of PAPs, no agricultural encroacher was recorded. The vulnerable group encroachers will be entitled to the additional support mechanisms and assistance, as per the entitlement framework. Squatters will be entitled to receive replacement cost of their (building) structures. They will have the right to salvage material from their structures, and will be notified in time (at least three weeks’ notice) of remove their assets. The tenants will receive Rs 5000 one time grant as per the policy. 8.3.3 Replacement of Amenities All amenities affected will be either conserved or replaced by the project. While replacing the amenities, particularly those used as a common resource with no restriction of access, development of the surrounding site will be given due consideration. (For example, while replacing hand pumps or tube wells, drainage and access path of the immediate surrounding will be improved, and sitting/washing facilities will be provided, irrespective of the fact that at present there is no proper access, or that the areas surrounding the extremely muddy, or there is no associated facility whatsoever. The location of common property resources and other community amenities will be finalized in consultation with the community. Separate consultations will be held with men and women. The preference of women will be given priority). Plans, designs, drawings have been prepared for replacement of all these amenities, along with technical specifications (including specifications for material and workmanship) and bill of quantities have been prepared in consultation with the community and project engineering staff. 8.4 Inter-Agency Linkages for Income Restoration Majority of the eligible families for income restoration earn their livelihood through petty businesses or cultivation (primarily small and marginal), and therefore, it is imperative to ensure that the PAPs are able to reconstruct their livelihood. The NGOs engaged in the implementation of the RAP will ensure that the PAPs are facilitated to obtain plots near their existing habitation to minimize disruption to their social network and normal work pattern. For Income restoration it is important that available skills with the PAPs is identified and further upgraded. During the survey, PAPs were specifically asked about the skill they posses other than the one related to their current occupation. However, none of the PAPs possessed any skill, which can be further upgraded through training. Hence, NGO contracted for implementation will have to conduct a survey among the PAPs with options of various skills related to the resource base of Page 8-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) the area and available market (with proper forward and backward linkages) and accordingly select trades for training. Based on the training, NGO will identify income-generating activities for sustainable economic opportunities. This would include establishing forward and backward linkages for marketing and credit facility. NGOs in consultation with the PAPs, R&R Coordinator of PWD, district administration and other stakeholders in institutional financing and marketing federations will prepare micro-plans for IR activities. In case of upgrading agriculture productivity, the training on technical know-how will be arranged as per the choices of the target group population. In case of creation of alternative livelihood schemes, felt needs of the target group population will be prioritized through people’s participation. Further, these options will be tested for their viability against availability of skills, resource base of the area and available appropriate technology. Suitable alternative livelihood schemes will be chosen finally, where training on skill up-gradation, capital assistance, and assistance in the form of backward-forward linkages can be provided for making these pursuits sustainable for the beneficiaries or the target groups. A comprehensive support system to the PAPs will ensure income security. The system will include establishing training need; identification of skills; hiring training staff; providing training to interested PAPs; ensuring that PAPs take up their new avocation; mid-term evaluation and corrective measures if required; and concurrent monitoring. The R&R coordinator of the project through the contracted NGO will ensure that these steps are followed. The results of concurrent monitoring and mid-term evaluation will be shared with the NGO to bring in corrective measures. The PAPs are required to participate in developing feasible long- term income generating schemes. The long- term options are expected to be developed during the implementation of the RAP and also supported by the government assistance. Government of India along with the state governments runs various poverty alleviation programs. One such scheme is Mahatma Gandhi National Rural Employment Guarantee Act. The objective is to generate additional gainful employment for the unemployed population in rural areas especially during lean agriculture season. The Act provides for 100 days of employment to husband and wife in a year. The person can demand job under MNREGA from village head and in case job is not available, panchayat will pay a day’s wage to the person. This scheme can be dovetailed especially for those who are losing source of income as temporary income restoration measure. Participation of PAPs in those schemes will be helpful for short- term IR gains. PWD and partnering NGO can tie up with such programs and help/facilitate PAPs to participate in poverty alleviation programs. The ensuing sections deals with the probable short and long-term IR schemes. 8.5 Steps in Income Restoration (IR) 8.5.1 Information on Economic Activities of PAPs Basic information on IR activities of PAPs will be available from the census and socio-economic surveys. Information from base line surveys will be available on features of economic activities of PAPs under two categories, viz. Land based economic activities Non-land economic activities Total income of PAPs from various sources Page 8-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Based on this information IR activities can be planned. IR activities are of two types: Short term; and Long term. The ensuing section describes both IR schemes. Short Term IR activities Short term IR activities mean restoring PAPs’ income during periods immediately before and after relocation. Such activities will focus on the following: Ensuring that adequate compensation is paid before relocation Relocation and transit allowances Providing short term, welfare based grants and allowances such as: One time relocation allowance Free transport to resettlement areas or assistance for transport Free or subsidised items Transitional allowances or grants until adequate income is generated, special allowances for vulnerable groups With consideration of PAPs skills and needs, promoting PAP access to project related employment opportunities such as: a) Work under the Main Investment Project b) Work on relocation teams (e.g., driver, food provision, etc.) c) Work on resettlement sites, if any (e.g. construction on, transport, maintenance, etc. Long Term IR Activities PAP should participate in developing a range of feasible long-term IR options. Long-term options are affected by the scale of resettlement which may affect the feasibility of various non-land based and land based IR options. The long-term options are government financed, therefore no separate budget is required. However, in R&R budget provision has been made for the expenses to be incurred towards the coordination between project and concerned departments for dove tailing of poverty alleviation schemes. The project officials will coordinate with government (district administration), including tribal development and social welfare departments, to assure PAPs access to all schemes for improving IR services. Project financed programmes should include a specific time frame for handing over the project to local administration at the end of a stipulated period. Availability and access to existing programmes should be sought for all PAPs. Long Term IR activities will be generated once the census surveys and consultation get over. IR activities will be generated in consultation with the community. Mechanism to dovetail existing government poverty alleviation programmes will be developed in consultation with the community and officials of district administration and District Rural Development Agency (DRDA). 8.5.2 Categories of Impacts Project induced displacement may lead to loss or diminished income for Project Affected Person (PAPs). The main categories of impacts are as follows: Loss of agriculture land in part or full Loss of commercial establishments (permanent) Page 8-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Loss of temporary commercial structure or mobile vendor (Squatters) Loss of livelihood (Commercial tenants or helping hands, agriculture labours) Projects like road development involve acquiring linear strips of land; as such the impacts are not expected to be significant. However, mitigation measures need to be planned and implemented however insignificant the impacts may be. Loss of Permanent Commercial Structure is a more complicated problem since the complementary issue of retaining the present customer base is to be simultaneously tackled. There is also the problem of tenants and owners with a majority of structures being occupied by tenants. The required mitigation would involve re-constructing the commercial structures in an adjacent area so that the present customer base is retained. The ways and means of achieving this together with the ownership of the new structure also needs to be defined. While the project authority can acquire the required land and construct the structures for allotment, a more practical way would be to let the PAPs handle their own replacement structures with the guidance and support of the PWD. Regarding ownership, the status quo can be maintained i.e. ownership remains with the owner while the tenant occupies it. As in the previous case, the compensation money can be deposited in blocked bank accounts to be released only for constructing or buying the replacement structure. Since the construction involves different activities, the money can be released in four instalments, coinciding with pre-determined stages in the construction activity. Loss of commercial space (for temporary structures and mobile vendors) should be given utmost importance since this involves vulnerable sections of the PAPs. They also need to be given alternative space in an adjacent area for carrying on their trade or vocation. The temporary structure can be shifted to the new location and the mobile vendor can get stationed there. Needless to mention, the PWD has to use its good offices with the local authorities (i.e. Municipality or Panchayat) for getting the alternative space. As per the project’s R&R policy, all squatters are entitled for cash assistance for their structures at replacement costs which will be determined as mentioned in section 29 of the RFCTLARR Act 2013. Squatters are also eligible for one time grant of Rs 36000 as subsistence allowance. In order to enable them to move out of COI, they will be given shifting allowance of Rs 50,000 per family as one time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure. Each affected person who is a rural artisan, small trader or self- employed person will be entitled for RS. 25000 as one time grant for construction of working shed or shop. The Kiosk owners who can easily move their structures out of COI are entitled for Rs. 5000 as disruption allowance as one time grant. During the census survey, 77% asked for cash grant so that they can self-relocate. While mitigation measures for specific impacts are discussed above, there is also the general impact of a disturbance upon displacement in the life and livelihood of PAPs. They need to be compensated through payment of a Maintenance Allowance. The income restoration cannot be fully achieved by using the compensation amount; there can be a provision of rehabilitation grant at least for the vulnerable sections of PAPs to enable them reach or improve upon their former standard of living. The Policy document also highlights this issue by acknowledging that the PAPs should be assisted in improving or at minimum regaining their former status of living at no cost to themselves. Page 8-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 8.6 Alternative Individual Income Restoration Scheme 8.6.1 Basis for Identification of Alternative IR Scheme Keeping in view the resource base of the entitled persons (Eps) and also the socio-economic characteristics and preferences, PWD and the NGO contracted for the implementation will have to chalk out individual IR schemes. This is an ongoing activity that needs to be completed by NGO. The terms of reference of NGO details out the activities to be carried out to complete the task. The important factors that need to be considered for identification of alternative IR schemes are: Education level of PAPs Skill possession Likely economic activities in the post displacement period Extent of land left Extent of land purchased Suitability of economic activity to supplement the income Market potential and marketing facilities “The best option is to allow the EP to continue its former occupation”. However, during any development program, occupations always change. 8.7 Monitoring of IR Schemes The monitoring of IR schemes will be carried out along with the monitoring of other components of RAP by an outside agency contracted for the purpose. The contract will specifically provide for regular (every six months) monitoring of income restoration of PAPs. The monitoring will be carried out based on economic indicators. The first monitoring visit should be after the first month then every 6 months. This will help to identify and possibly reduce PAPs who receive cash compensation from spending resources immediately. Vulnerable PAPs who lose their livelihood due to the project will be assisted in alternative economic rehabilitation schemes and vocational training for skill upgradation as per the requirement of suggested economic scheme. Special emphasis will be laid on both economic and socially vulnerable PAPs such as those who are below poverty line; belong to scheduled caste community; and women headed households. Page 8-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 9 INSTITUTIONAL ARRANGEMENTS 9.1 Background Institutions for planning and implementation of resettlement programs are numerous and vary substantially in terms of their respective roles and capacity to successfully carry out various components. Timely establishment and involvement of appropriate R and R institutions would significantly facilitate achievement of the objectives of the R&R Program. This document reflects an institutional assessment and provides a strategy for developing required implementation capacity and minimizing risks. Capacity building and training are coordinated with the project implementation schedule to ensure that skilled staff is available to implement the RAP without delay in civil works. The main R&R institutions would include: Official Agencies  PWD  World Bank  Local Administration Line Departments NGO/CBO Training Institutions Grievance Redress Cell Monitoring & Evaluation Agency 9.2 The Process PWD will focus effort in three critical areas to commence RAP implementation: (a) To initiate the process, orientation and awareness seminars will be organised for the PWD and other RAP implementers (b) To establish a Environment, Social Development and Resettlement Cell (Refer Organogram) (c) NGOs with experience in social development and a track record in resettlement and rehabilitation will be partners in RAP implementation. (d) To establish Coordination Committee with representatives from local self-government, PAPs and implementing NGO. The objective of this committee is to coordinate between various implementing agencies. In addition PMC will provide technical assistance in resettlement and rehabilitation planning during the transition to project and RAP implementation. The institutional context of resettlement in the project is reviewed below and major features of RAP implementation are described in sections that follow. Effective RAP implementation will require institutional relationships and responsibilities, rapid organizational development and collaborative efforts by PWD, State Government, partner NGO and affected population. The ESDRC should have representation of other line departments viz., revenue, forest, public health, rural engineering, etc. The responsibility of co-ordination lies with R&R Coordinator. The ESDRC will establish operational links within PWD and with other agencies Page 9-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) of government involved in project-induced resettlement. It will bridge the distance between the project and project affected persons and communities. It will provide the means and mechanisms for coordinating the delivery of the compensation and assistance entitled to those who will suffer loss. ESDRC will link the project with state government agencies, provide liaison with PWD field units and impacted communities, establish district level committees to co-ordinate social development and resettlement operations in the field and also to assist NGO partners It will also engage required training services, oversee a grievance redress process and actively monitor RAP implementation. On behalf of PWD, the ESDRC will assume the responsibility for representing the social impact and resettlement components of the project for environment clearance. The ESDRC will also be responsible for disseminating this information to the public and providing additional opportunities for public comment. Note: 1. The Assistant Engineer and Junior Engineer in the division incharge of the subsection of the corridor will also be the incharge of social (RAP) and Environment (EMP) issues. 2. The senior most assistant engineer in the division will be overall incharge of the internal monitoring of social and environmental issues in the division as a whole and will report to the Head office. Among government agencies, the revenue department will have the most important role. While the responsibility for land acquisition and payment of compensation for land acquired (including properties there on) lies with the Revenue Department, the ESDRC has to assume responsibility for coordinating various matters with the Revenue Department so that both physical possession of land acquired and payment of compensation is not unduly delayed. The responsibility for Page 9-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) income restoration and replacement of common property resources would fully be with the ESDRC along with the nodal NGO. The ESDRC will be consisting of Project Director, R&R and Environmental Coordinators of PWD (of the rank of Assistant Engineer) other officers of PWD responsible for implementation of RAP at district level. The ESDRC will have a flat organizational structure with the subject matter specialist working nearly independently under the supervision of a location specific coordinator. Since the Revenue Department has district – wise jurisdiction, the coordinators can also be appointed for each district. The structure of the staffing will be at two levels; (1) ESDRC with three people, PD, UPPWD as head, R&R and Environmental Coordinators of PWD and their district level counterparts. (2) In each contract, the R&R and Environmental coordinators of PWD will be assisted by their counterparts from districts. This district-wise separation can be maintained for all issues so that proper co-ordination can be done with the concerned authorities. Land acquisition details and rehabilitation action plans should also be segregated district-wise for all road stretches. The district ESDRC Coordinator can be given the necessary mandate for proper and adequate coordination with all authorities. It is necessary that the ESDRC be staffed in all concerned districts upon completion of the census and socio-economic survey so that the ESDRC can be involved in the consultation and counselling Phase Itself. Table 9.1: ESDRC Staff Responsibilities Position Responsibilities PD, UP PWD(WB) as Co-ordination of all activities of ESDRC with PWD and other Head of ESDRC government agencies. Will be holding review meeting every month. Assistant Engineers of Reports to Head, ESDRC; Will act as ears and eyes of Head, PWD. Will PWD (2-Environment, 2- collate reports form field, monitor progress, prepare monthly reports, Social, 1- LA) at Head catalyst between field staff and head office Office Field Staff of PWD at Oversee Construction; attend to social and environmental issues Circle/Division level including permission and Liaisoning with line departments, shifting of utilities in consultation with concerned departments, facilitating land acquisition Non- Government Will be grass root level worker actually dealing with PAP; develop Organisation rapport with the PAPs; conduct a sample survey among them, help in skill upgradation, facilitate purchase of land for PAPs, help in negotiation, help PAPs in obtaining benefits under entitlement framework and appropriate government schemes, help in creating awareness among truckers on highways and design methods / measures prevention of same. Supervision Consultant Oversee and certify for quality and quantity of construction, liase with NGO for shifting community assets, report on compliance with environment measures set out for contractors District Level Committee Announcement of awards; assistance; negotiation with respect to award, land, etc.; Co-ordinate with local government offices; field office of PWD, line departments and other government agencies; provide venue for dissemination of project information, public consultation and public hearings of Government of India. Page 9-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Position Responsibilities Grievance Redressal Cell Provide support to EP on problems arising out of LA/property , prioritise cases for which support is to be given, keep the EPS appraised about the development, inform PWD of serious cases within an appropriate time frame. Contractor Will carry out execution as required by the EMP; will monitor the pollution sources on site; will construct mitigation and enhancement measures 9.3 Need for NGO/CBO The relocation disturbs the present activities of PAPs and therefore there is a need to establish and stabilize their economic living. While all tasks relating to Land Acquisition is taken care by the Land Acquisition Officer and his staff, the implementation of RAP is the responsibility of the ESDRC under PWD. The NGO will help in implementing various components of the RAP, particularly the use of compensation and rehabilitation assistance for more productive purposes like purchase of land, self-employment, etc. Its involvement is all the more important since there are no social community organization among the PAPs which otherwise could have taken lead in this regard. Being new to the area of working with PAPs, the selected NGO will have to work directly under the ESDRC Coordinator who will be in charge for implementation of RAP. Thus implementation becomes joint responsibility of PWD and NGO. Developing rapport with the PAPs is one of the responsibilities of the NGO as specified in the TOR. In order to do so, NGO will hold regular community meetings and will also carry out door to door interaction with the PAPs. Whereas community meetings will include both PAPs as well as those who is not adversely affected, additional emphasis will be made for vulnerable community members in door to door interaction. 9.4 Role of NGO Resettlement relates to human aspects and economic rehabilitation requires human resources development consisting of education, training, awareness generation, etc. In absence of any sociologist / anthropologist, NGO will be involved to assist PWD in implementation of RAP. The NGO will help educating PAPs on the proper utilization of compensation and rehabilitation grant and help them in getting financial assistance, if required, under various subsidy related development programs. It will also organize training programs to impart required skill for such PAPs who would prefer to go for self-employment schemes. Specifically, the tasks of the NGO will be to: develop rapport with PAPs and between PAPs and PWD verification of PAPs post design consultations with the community assess the level of skills and efficiency in pursuing economic activities, identify needs for training and organise programmes either to improve the efficiency and/or to impart new skills. assist PAP in receiving rehabilitation entitlement due to them motivate and guide PAP for proper utilisation of benefits under R&R policy provisions; facilitate purchase of agriculture land in negotiating price and settling at a reasonable price or expedite the same through Land Purchase Committee. Page 9-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) assist PAPs in obtaining benefits from the appropriate development programmes. help PAPs in increasing their farm income through provision of irrigation facility or improving farm practices, and ensure marketing of produce particularly those under self-employment activities. Complete the consultation at the community level and provide support by describing the entitlements to the EPs and assisting them in their choices Accompany and represent the EPs at the Grievance Committee meeting. Assist the EPs to take advantage of the existing government housing schemes and employment and training schemes that are selected for use during the project, and Carry out other responsibilities as required and identified. In the context of implementing of RAP, it is important that NGO, which is genuine and committed to the task entrusted, is selected. An NGO with local presence is, however, more suitable hence would be preferred. The NGO may be contracted on specified terms and conditions with proper fixation of financial accountability. The payment to NGO will be linked to the performance of the task assigned and the time period. The payment will be arranged on quarterly basis to be released on certification of completing the previous task. The monitoring of R&R programme will also include the performance of NGO. The NGO services will be required for implementation period for which provisions have been provided in the plan. Simultaneously steps can be taken for promoting location specific Community Based Organisations (CBOs) of PAPs to handle resettlement planning, implementation and monitoring. These groups can be promoted for each adversely affected settlement/villages or a group of contagious villages. Until and unless sufficient institutional capacity is built amongst the PAPs, so that they can act and react as a group, participatory planning and implementation of good re- establishment solutions is nearly impossible. Resettlement negotiation, if carried out individually with all displaced families, is both uneven and time consuming. It favours the good bargainers over the bad bargainers and as bargaining capacity is directly related to income levels – favours the more affluent over the poorer and more vulnerable sections of the displaced population. This can be minimised by organising homogenous groups of displaced persons to handle resettlement negotiations together with participatory planning and implementation of re-establishment solutions. The terms of reference for hiring of NGO is attached as annex 5 9.5 Training and Capacity Building Establishing sufficient implementation capacity to launch and carry out those components of project resettlement that must be completed before civil works. Project in order to enhance the capabilities of ESDRC staff, will sent staff on exposure visits to other projects with good resettlement programs as well as sponsored for training courses in Resettlement and Rehabilitation (R&R). If required, selected NGO staff can also be send for exposure visits and training. This is the responsibility project to The training would also cover techniques in conducting participatory rural appraisal for micro planning, conducting census and socio-economic surveys, dissemination of information, community consultation and progress monitoring and evaluation. Page 9-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Training Modules Following training modules will be followed during initial and repeat training sessions of UPPWD staff (both at head office and at field level) and NGO staff. Overview of social issues in UPCRNDP: Social issues; methodology followed for SIA; entitlement framework and detailed R&R policy Land Acquisition: Legal and operational issues; RFCTLARR Act 2013; Resettlement: Issues pertaining to planning and preparation for relocation; implementation issues; factors necessary for identification and finalisation of resettlement area. Rehabilitation: Issues in economic rehabilitation; factors necessary for identification and finalisation of alternative economic rehabilitation schemes; training needs. Public Consultations: Issues to be discussed during various stages of project viz., preparation, implementation and post implementation; public consultation in project delivery; techniques of public consultations. Social Impact Assessment: Definition; steps; output; required surveys viz., screening, census, socio-economic, verification, etc.; issues to look at for preparation of entitlement framework; institutional capacity. 9.6 Areas of Capacity Building PWD needs to build their capacity in the following areas: Land Acquisition Though no land acquisition is required for HamirPur –Rath road, major land acquisition will take place in Phase II. LA generally is a long drawn and demanding process and therefore project R&R policy specifically talks about direct purchase of land. However, the existing strength of PWD for this purpose is too small. Land purchase or acquisition (in case negotiations fails) will also be Project Director’s responsibility. R&R Coordinator of PWD will assist him. The Project Director, apart from timely purchase or acquisition of land is also responsible for number of other important components of pre-construction work. Though revenue department of state government will do the purchase or acquisition, it will require constant follow up. Hence the responsibility will come on R&R Coordinator. Among other pressing assignments viz., identification and verification of PAFs, Issuing Identity cards, development of resettlement sites, etc, R&R Coordinator will also be responsible for regular follow up of land purchase or acquisition. In light of the above, it would be important to address the following: The procedural requirements have to be fulfilled. An official thoroughly conversant with the procedural requirements should be in position to co-ordinate the land purchase or acquisition process. For better co-ordination, the officer responsible has to spend sufficient time at the site. To enable better follow up the officer should be of sufficiently high rank. The procedural requirements have to be formalised and documented for the benefit of all projects concerned. Ensuring timely land acquisition is demanding requirement and requires full time involvement of an officer, at least during the first six months of the project. Page 9-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Women Participation It is imperative to bring the issue of women’s development in the process of socio -economic uplift within the scope of RAP. Encouraging women’s participation in development projects is a policy being followed by Government of India. Involving women meaningfully at all levels of the project will show greater commitment to the nationwide goals. Women constitute over two fifth of the total affected population, though number of women headed families are very few in Phase I roads. Possible areas of Women involvement include managing health and hygiene issues at the construction camps and in controlling the spread of highway diseases. Similarly, it may be specified in the Terms of Reference of NGO contracted for the implementation to have at least 33% of the total person months for women. A similar provision can be made in the TOR of external agency appointed for monitoring of RAP implementation. Page 9-7| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 10 GRIEVANCE REDRESS MECHANISM 10.1 Need for Grievance Redress Mechanism There is a provision for redress of grievances of PAPs in all aspects relating to Land Acquisition (LA) and payment of compensation in Rehabilitation Action Plan. Various provision under LA act enable aggrieved EPs at different stages of LA to represent their cases to Land Acquisition Officer or even refer to court for redress and seek higher compensation. It is suggested that LAO & RRO should hold a meeting at a fixed date every month to hear the grievances of EPs. Moreover, Lok Adalats can be held for quick disposals of cases. However, R&R policy of Government of Uttar Pradesh has a provision of Grievance Redress Committee to be headed by District Magistrate of respective districts. Members of the committee: Apart from District Magistrate as head of the committee at district level, the committee will comprise of representatives of two local NGOs, representative of people (viz., Member of Parliament, Member of Legislative Assembly, etc), representatives of blocks, districts, line departments & affected persons. At central level, Project Director of Project Implementation Unit will head the committee. Meetings and decision-making process of the committee: It is suggested that Grievance cell shall meet regularly (at least once a month) on a pre-fixed date (preferably on first 7th day of the month). The committee will fix responsibilities to implement the decisions of the committee. This will not only help proper assessment of the situation but also in suggesting corrective measures at the field level itself. The committee shall deliver its decision within a month of the case registration. The Divisional Commissioner of the area shall hear appeal against the decision of the grievance redress committee. 10.2 Functions of the Committee The functions of the grievance committee shall be To provide support for the EPs on problems arising out LA/property acquisition To record the grievances of the EPs, categories and prioritise and solve them within a month. To inform PWD of serious cases within an appropriate time frame To report to the aggrieved parties about the developments regarding their grievance & decision of PWD. To prioritise cases based on following criteria: (i) cases pertaining to the land and structures of displaced persons (ii) cases pertaining to the land and structures of adversely affected PAPs (iii) cases pertaining to the land and structures of partially affected PAPs As said earlier Divisional Commissioner of the area will have the final say and that decision will not be contested in any other forum except the regular arbitration forum or, if required, in the courts of law. In case court fails, NGO will have to motivate the agitated EPs to smoothen implementation of the R&R programme. The Grievance Redressal Committee for phase I roads will be in place by March 2015. Page 10-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 10.3 Integrated Grievance redress Mechanism An Integrated Grievance Redress Mechanism (IGRM) will be established at the head quarter level that will register user complaints using combination of various mediums (e.g. a dedicated toll free phone line, web based complaints, written complaints in feedback register and open public days) and address them in a time bound system. The project will appoint a grievance redressalor Public Relation officer solely responsible for handling phone and web based complaints. The person will be responsible for directing the aggrieved person to the concerned official through e-mail. On receiving any phone call or web based or email, a unique number will be generated which will be the reference number for the caller and he can trace the progress of his grievance / query through that number. Any complaint lodged will be addressed within 15 days of receiving the complaint. System will have escalation matrix i.e. if grievance / query remain untended or there is no response from the concern officer for specified period of time than system will escalate the grievance / query to next level through email. The toll free line will be monitored between 10 AM to 5.30 PM on all working days. Any call made before or after the stipulated time, will get recoded and from the voice mail an e- mail will be generated addressed to the grievance officer. The grievance officer will then direct that mail to the concerned official and follow-up. The recorded message will be responded back the next day. The project will also commit itself for proactive disclosure and sharing of information with the key stakeholders, including the communities/beneficiaries. The website of PWD will have the name and number of social development officer; the toll free number and also the website address. NGO staff will be responsible for assisting illiterate and other vulnerable PAPs in registering their grievances. Page 10-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 11 MONITORING AND EVALUATION 11.1 Introduction Monitoring and Evaluation (M&E) are critical activities in involuntary resettlement. Monitoring involves periodic checking to ascertain whether activities are going according to the plan. It provides the feedback necessary for project management to keep the programmes on schedule. By contrast, evaluation is essentially a summing up, the end of the project assessment of whether those activities actually achieved their intended aims. As per World Banks’ Operational Directive 4.30 "Monitoring provides both working system for project managers and a channel for the resettles to make known their needs and their reactions to resettlement execution". Monitoring exercise will be undertaken both internally and externally. While R&R Coordinator of PWD on monthly basis will carry out the project’s internal monitoring, an external agency will be appointed for third party monitoring. External agency will conduct quarterly monitoring and mid- term, annual and end term evaluation of the project. Indicators, which will be monitored during the project, consist of two broad categories: Process and output indicators or internal monitoring Outcome/impact indicators or external monitoring 11.2 Process and Output Indicators Monitoring of involuntary resettlement operations require in essence, an application of general project monitoring procedures and methods to the process accruing in resettlement but with particular attention to the specific high risks intrinsic in such operations. This means monitoring of R&R requires certain specialised skills. Therefore a specialised group reporting to the PWD must carry out M&E. The conventional monitoring through government machinery often misses focus on certain vital aspects, which may otherwise be very important. Therefore R&R Coordinator at Lucknow in close coordination with his counterparts at division level will carry out regular monitoring and will produce monthly reports. The internal monitoring is a conventional monitoring of government related to physical factors such as, number of families affected, resettled, assistance extended infrastructure facilities provided, etc. and other financial aspects, such as compensation paid, grant extended, etc. The internal M&E must be simultaneous with the implementation of the Rehabilitation Action Plan (RAP). 11.2.1 The Objectives of the Internal Monitoring The objectives of the internal monitoring are: Daily Operations Planning (DOP) Management and Implementation (M&I) Operational Trouble shooting and Feedback (OTSF) The periodicity of internal monitoring could be daily or weekly depending on the issues and level. Page 11-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 11.2.2 Information Required for Internal Monitoring For internal monitoring following information will be required: Individual files on each project affected person Village Proforma Action Plan and Progress reports 11.2.3 Monitoring and Reporting Systems Crisis and day to day management and monitoring management will require its own improved action plans, regular coordination and onsite training sessions and an Management Information System as internal system. It also requires trouble-shooters and informal networks of feedback from the communities, NGOs, M&E agencies and other government bodies. Physical monitoring of movement and progress reporting of input stocks, finance and service resource in the system to ensure management and financing functions in a timely and effective manager. Monitoring and verification of the qualifiable progress of the resettlement programme to indicate the timeliness of the financial disbursements already agreed to and deviations from the critical path for overall project completion and the required integrated arrangements to resettle PAPs. 11.2.4 External Monitoring An external monitoring and evaluation (M&E) agency will be appointed to meaningfully and realistically monitor and evaluate R&R programmes on periodical basis. The role of such an agency will not be fault finding but to act as a catalyst in smoothening the process of R&R and thus provide a helping hand in the proper implementation of rehabilitation programmes. It should also endeavour to bring the problem and difficulties faced by the PAPs to the notice of PWD so as to help in formulating corrective measures. Financial provisions have been made to appoint an external agency for M&E. As a feedback to the PWD and other concerned, the external agency should submit quarterly report on progress made relating to different aspect of R&R. 11.2.5 The Objectives of the External Monitoring The objectives of the external monitoring are: To track resettled and host population over time in order to document the restoration of incomes and standard of living. Determine remedial action if required. If income and standard of living of the PAPs has at least been restored and has not declined. In case of host population, whether income and standard of living of host population have not declined due to influence of resettlers Whether resettlers and host population have re-integrated with each other. 11.2.6 The Information’s Required for External Monitoring The information required for external monitoring is: Baseline survey data (conducted by PMC) Page 11-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Sample survey (to be conducted by M&E agency) Case studies/Thematic studies * Issue based research (to be conducted by M&E agency) Participatory research (to be carried out by M&E agency) Target group monitoring (to be carried out by M&E agency) 11.2.7 Monitoring and Reporting Systems Observing and appraising various specific parameters and processes as objectively as possible will carried out. Periodic evaluation of these would indicate where and when policy changes could occur or where deficiencies in implementation method or style are apparent. The boundaries of this assessment will need the agencies (M&E) to examine the multiplier effects and linkages outside of the project definition of affected people and areas. The impact evaluation will be carried out after the implementation of RAP is over. This is never an easy matter to determine. Financial considerations often require an impact evaluation shortly before or after the project concludes. However, project continuous to evolve overtime. Therefore it is suggested, that if required, second impact evaluation be carried out after three to five years of project conclusion as retrofit survey. Impact evaluation will look at all the affected populations; self-relocatee; assisted resettled population; host population. Further this larger population will be further broken down into vulnerable segments of each population. Impact evaluation will be carried out on randomly selected segment of population. The external agency will submit quarterly report to the PWD. 11.3 Monitoring Project Input and Output Project monitoring will be the responsibility of the R&R Coordinator who will prepare monthly progress reports. The reports will compare the progress of the project to targets set up at the commencement of the project. The list of impact performance indicators will be used to monitor project objectives. The socio-economic survey conducted will provide the benchmarks for comparison. Progress Assessment Methodology Expected Output Financial Amount disbursed for structure, Structured Schedule, informal and Adequate compensation wells, trees, etc. formal discussion Amount disbursed for productive Structured Schedule, informal and Proper Assistance assets grant (agriculture and formal discussion business) Amount disbursed for house Structured Schedule, informal and Proper Assistance construction grant, transitional formal discussion allowance, economic rehabilitation grant, shifting assistance, rent, assistance to tenants, Amount disbursed for restoration of Structured Schedule, informal and Community Welfare CPR, community infrastructure, formal discussion conservation of religious structures, Page 11-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Progress Assessment Methodology Expected Output Amount disbursed for extension of Structured Schedule, informal and Income Restoration development programmes, training formal discussion and capacity building, Fees paid to NGO for implementation Structured Schedule, informal and Implementation and of RAP and consultants for M&E formal discussion monitoring activities Amount disbursed for training of Formal Discussion with concerned Better implementation and implementation staff of PWD officials coordination Physical Number of PAFs whose residence and Structured Schedule Adequate Compensation business establishment affected and totally demolished Number of PAFs allotted residential Structured Schedule Assistance and structures Resettlement Number of PAFs allotted Commercial Structured Schedule Economic Rehabilitation structure Extent of and commercial structures Structured Schedule Economic Rehabilitation distributed Extent of residential structures Structured Schedule Assistance and distributed Resettlement Total area of community and Structured Schedule Assistance and government land transferred for Resettlement resettlement sites and infrastructure Number of PAFs received productive Structured Schedule Economic Rehabilitation asset grant (agriculture and business) Number of PAFs received house Structured Schedule Resettlement and construction grant, transitional, Assistance shifting and rental allowances Number of PAFs received economic Structured Schedule Economic Rehabilitation rehabilitation grant Implementation of IR Schemes Formal Discussion/ Structured Economic Rehabilitation Schedule Social Area and type of house and facility Core Rapid Appraisal Resettlement Morbidity and mortality rates Structured Schedule Social well being Communal harmony Core Rapid Appraisal Social well being Women time disposition and decision Participatory Appraisal Women Empowerment making power Literacy Level, drinking water, Structured Schedule Social well being schools, health facilities, and other community infrastructures Economy Annual Household Income and Structured Schedule Economic Status Expenditure Number of PAFs below poverty line Structured Schedule Poverty Status Utilisation of Compensation Structured Schedule Proper utilisation of compensation amount Number of PAPs and Women Structure Schedule Improvement of Economic gainfully employed in project Status and Women empowerment Number of PAFs brought above Structured Schedule Improved economic status, poverty line Poverty Alleviation Number of shop sites purchased Structured Schedule Proper utilisation of compensation amount and economic rehabilitation Page 11-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Progress Assessment Methodology Expected Output Extent of agriculture land purchased Structured Schedule Proper utilisation of compensation amount and economic rehabilitation Economy Annual Household Income and Structured Schedule Economic Status Expenditure Number of PAFs below poverty line Structured Schedule Poverty Status Utilisation of Compensation Structured Schedule Proper utilisation of compensation amount Number of PAPs and Women Structure Schedule Improvement of Economic gainfully employed in project Status and Women empowerment Number of PAFs brought above Structured Schedule Improved economic status, poverty line Poverty Alleviation Number of shop sites purchased Structured Schedule Proper utilisation of compensation amount and economic rehabilitation Extent of agriculture land purchased Structured Schedule Proper utilisation of compensation amount and economic rehabilitation Community Participation Number of meetings for Informal Discussion and structured Increased local participation dissemination of information on schedule resettlement Number of meetings with each PAF Informal Discussion and structured Involvement in project cycle to finalise R&R options schedule Number of PAFs approaching Structured Schedule Increased Awareness Grievance Redress Cell Selection of Resettlement Sites Informal Discussion and Structured Involvement in project cycle Schedule Number of PAFs self relocated Informal Discussion and Structured Informed choice of Schedule selection Grievance Number of PAPs moved to court Structured Schedule Adequate Compensation Cases referred to court pending Structured Schedule and IDI with Adequate Compensation settlement and those settled concerned officials Number of grievance cell meetings Structured Schedule Participation Number of village level meetings Structured Schedule Participation Number of field visits by SDO and Structured Schedule Involvement of concerned number of cases disposed by SDO to officials the satisfaction of EPs. The terms of reference for hiring of M&E Consultant is attached as annex 6. Page 11-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 12 IMPLEMENTATION SCHEDULE 12.1 Background Planning, surveying, assessing, policy development, institutional identification, participation, income restoration and implementation are typical activities of RAP. While these activities have discrete components that can be put on a time line, there is a close inter relationship of each activity to the whole. The breakdown of each activity according to a specific time frame has been given for Phase I and II to assist Public Works Department in implementation of RAP at various stages. It is further cautioned that specific situation may require an increase in time, allotted to a task. Such situations include, but not limited to local opposition; seasonal factors, social and economic concerns, training of support staff and financial constraints. Complementation Schedule will require detailed coordination between the project authorities and various line departments. Implementation plan has been spread over a period of five years for both phases. Implementation of both the phases will take three years each, but first year of phase II will overlap third year of phase I implementation. A simplified summary of the operational aspects of the implementation plan will be prepared when the project starts. It will be given to PWD, who along with a route wise selected NGOs will have to put the plan into action. 12.2 Implementation Procedure The implementation of the RAP will consist of four major stages: Identification of cut-off date and notification for land acquisition as per RFCTLARR Act 2013(for Phase II) Verification of properties of EPs and estimation of their type and level of losses. (for both the phases) Preparation of EPs for relocation/rehabilitation (for both the phases) Relocation and rehabilitation of the EPs (for both the phases) Implementation of Gender Action Plan 12.3 Timing of resettlement The resettlement process must be completed by the start of civil works on the particular route. Requisite procedure will be developed by the PWD to carry out resettlement of PAPs located within the COI, before the civil work starts on any section of the project road. These people will be given at least two months’ notice to vacate their property before civil works begins. During the field visit with UP PWD on 8 & 9th of November, 2014, the above milestone has been finalized for handing over to the Contractor. The Mile stone is based with no hindrance at the project corridors. Stretches, which are free of encroachment and other encumbrances, will be handed over first to contractor. The timetable of stretches to be handed over to the contractor is given below. Page 12-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 12.1: Plan for Handing Over the Stretches to Contractor Route Mile Chainage Date of handing over Road Name Total km No. Stone Start End to contractor 11 16 5 21 25 4 Hamirpur Rath 1 35 41 6 1 42 46 4 at starting date 52 57 5 59 76 17 Sub Total of Mile Stone-1 41 2 9 5 16 21 4 Hamirpur Rath 2 27 33 6 2 41 42 4 6th Month 46 50 5 57 59 17 Sub Total of Mile Stone-2 25 9 11 2 Hamirpur Rath 1 25 27 2 3 33 35 2 12th Month 50 52 2 Sub Total of Mile Stone-3 8 12.4 Miscellaneous Activities Miscellaneous activities include steps to be taken for diversion of traffic during construction and leasing of borrow areas by contractors. These steps include: Diversion route: Preparing plans with details of land required for diversion Compensation decided in mutual agreement and paid before physical possession Returning of land after restoration in original condition. Borrow Areas Submit details to PWD about the persons and area to be leased in by the contractor. The contract document signed between the PWD and the contractor will include the terms of payment and return the land to the owner. Complete payments will be made to the contractor after the PWD is satisfied that the terms and conditions of the contract document have been met. 12.5 Implementation Responsibility It is the responsibility of the PWD to ensure that the RAP is successfully implemented in a timely manner. The implementation plan of RAP for a specific route will be prepared by the PWD. PWD will be assisted by the partnering NGO selected for implementation. The implementation schedule proposed will be updated as the implementation progresses. Page 12-2| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Table 12.2: Roles and Responsibilities Implementation Staff Roles and Responsibilities Project Director Overall responsibilities for R&R activities in the field including land acquisition in Phase II Make budgetary provisions for R&R activities Liaison with district administration for land acquisition and implementation of RAP Participate in state and district level committee meetings Preparing TOR and Contracting NGO for implementation and external agency for monitoring and evaluation Organise training for PWD members and NGO for capacity building to implement the RAP Prepare TOR for any studies required and qualitative dimensions to the implementation of RAP Facilitate appointment of consultants to carry out the studies and co- ordinate them. Monitor financial progress on RAP implementation R&R Coordinator Co-ordinate with district administration and NGO responsible for RAP implementation Translation of R&R policy in Hindi Prepare pamphlets on policy for information dissemination Print policy and identity cards for PAPs Ensure that contractors has paid the mutually agreed amount to the landowner for borrow pits. To ensure that land is returned to the owner within the stipulated period as in agreement and land returned is not unproductive. Ensure the development of resettlement sites and agriculture land as and when required Ensure that land acquisition plans as per the alignment is submitted to district administration for acquisition (for Phase II) Participate in allotment of residential and commercial plots Liaison with district administration for dovetailing of government schemes for Income Restoration Schemes Co-ordinate with NGO appointed for implementation of RAP Ensure inclusion of PAPs who might not have been covered during the census survey Facilitate opening of joint account in local banks to transfer the rehabilitation assistance for the PAPs and also organise distribution of cheque payment of compensation and rehabilitation assistance, through transparent manner in Gram Sabha for distribution of cheques Monitor physical progress of RAP implementation including physical shifting of PAPs Participate in every district level meetings Prepare monthly progress report Organise by-monthly meetings with NGO to review the progress of R&R Implement GAP Non Governmental Co-ordinate with R&R Coordinator to implement RAP activities Organisation Verification of PAFs listed out in RAP Issue identity cards to the PAFs Develop rapport with PAPs Facilitate R&R Coordinator in organising public information campaign at the commencement of R&R activities Distribute the pamphlets of R&R policy and also explain to them the meaning and measures of mitigation to eliminate the feeling of insecurity among the PAPs Assist the PAPs in receiving the payment of compensation, opening of bank accounts and facilitate the vulnerable PAPs in ensuring that they get their dues on time and are not left out to deteriorate to the stages of impoverishment. Facilitate opening of joint bank accounts Page 12-3| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Implementation Staff Roles and Responsibilities Generate awareness about the alternate livelihood options and their viability, the resource base and other opportunities to enable the PAPs to make informed choices and participate in their own development. Conduct awareness campaigns regarding HIV/AIDS among truckers and CSWs along with regular campaigns Prepare micro-plans for economic rehabilitation of PAFs Enable PAPs to identify the alternate sites for relocation Participate in consultation process for allotment of residential and commercial plots Ensure preparation of resettlement sites as per the guidelines laid in the policy complete with basic facilities Participate in the meetings organised by PWD Submit monthly progress reports Identify training needs of PAPs for income generating activities and ensure they are adequately supported during the post-training period on enterprise development and management, the backward and forward linkages, credit financing and marketing of the produce. Participate in the disbursement of cheques at public meetings and Gram Sabhas Ensure the women headed households and other groups of vulnerable PAPs are given their dues both for payment of compensation and rehabilitation assistance. Assist PAPs in registering their grievances especially those who belong to vulnerable community and illiterates. Implement other actions under GAP Table 12.3: Summary of Role and Responsibilities of Other Project Partners in Various Stages of Project Local officials PAPs and Project Stage NGOs (in PAP and host Hosts Representative areas) Identification Receive Design and carry Assist in census Provide information on out information and socio- information and project impacts campaign economic surveys inputs to design of Representative on Assist in census Assist NGO in IG programs coordination and Socio- information Identify existing committee economic survey dissemination credit and IG Participate in Participate on Participate in and schemes census surveys Coordination arrange Discuss areas of Participation in Committee consultations possible conflict structured Participate in Arrange PAP with PAPs consultations to consultations transport to sites develop IG Representation on Help to document programs grievance tribunal consultations Keep records of Train VRWs where Support VRWs consultations required work Choose Facilitate PAP inter Examine feasibility resettlement group meetings of IG programmes locations or and discuss with housing schemes PAPs Inputs to design of resettlement locations Representation on grievance tribunal Implementation Monitor provision Provide on-going Process IG Assist PAPs in use of entitlements information for proposals of new production Labour and other PAPs and hosts Participate in systems input at site Provide support in grievance redress Form joint Credit and other group Provide assistance management group scheme management under local groups for Page 12-4| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Local officials PAPs and Project Stage NGOs (in PAP and host Hosts Representative areas) management Monitor schemes common resources O&M of sites and entitlement Membership of project input provision and implementation Management of implementation of committee common property IG programmes Process documents resources Members of for welfare and Manage common implementation socio-economic property resources committee services (ration and community card, BPL card) development funds Member of implementation committee Monitoring and Participate in Provide Ongoing Provide inputs to Evaluation grievance tribunals information to interaction with M&E of R&R Report to project project staff on PAPs to identify on IG schemes vulnerable groups problems in IG Report on service Act as external programs quality at sites monitors for Participants in project (where not correctional previously strategies involved) 12.6 Community Participation in the Implementation of RAP The institutional arrangement as explained in R&R policy already provides the continued involvement of the communities, especially the project-affected and the project-displaced persons in implementation of the RAP. The PWD will ensure: The stakeholders are consulted at every state of project The women perception is built into the RAP implementation plan The host community is consulted so that community assets are optimised and enhanced The PAPs participate in ensuring creation of community assets, and the upkeep and maintenance of assets created by the project An institutional mechanism is evolved involving the people, the gram panchayats and the formal and informal peoples’ committees to ensure sustainability of the process of development, beyond the RAP implementation period. 12.7 Tasks for NGO in Implementation and Tentative Methodology The table below details out the task to be carried out by NGO at different stages of the report. Table 12.4: Tasks of NGO Task Name Methodology Developing Rapport with the PAPs Fortnightly and Monthly meetings with PAPs & its Documentation. NGO to hold door to door meeting with PAPs and also community meetings including those who are not affected. Developing Rapport with the Project Authorities particularly Fortnightly meetings with R&R the Social Officer Coordinator of PWD & its Documentation Page 12-5| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) Task Name Methodology The need for eviction of Squatters & Encroachers Participatory The likely consequences of the project on the communities Participatory and by setting up of economic livelihood Public Information Centre Identifying PAPs & verifying on the basis of census survey Validity Survey and Participatory carried out & facilitating the distribution of Identity Cards Distribution of R&R policy and entitlement packages Participatory Assist PAPs in getting the compensation for their properties Participatory impacted by the project In consultation with PWD & Revenue Department help PAPs Participatory identify suitable land for relocation & assist in negotiating its transfer to the PAPs. In case suitable Government land is unavailable then assist PAP to locate a land owner willing to dispose and assist in the negotiation of the purchase price. Determination of the entitlements of each PAP by reviewing Discussion with PD and Officials the R&R Policy and the RAP and comparing it with the offer with Participatory tools made by the SOCIAL OFFICER and upon identifying discrepancy assisting the PAP in coming to some agreement with SOCIAL OFFICER & if need be pursuing the matter through grievance redress cell In close consultation with PAPs for ensuring acceptability help Regular Meeting with PAPs project authorities in making arrangements for smooth relocation of the PAPs and their business Advising PAPs on best use of grants under the R&R package Regular Meeting with PAPs ensuring sustainability of income Investigation of the availability of various Govt. development Literature survey of Secondary programmes and examining their relative merits for sources of information, Meetings recommending the same to the PAPs and accordingly with other functionaries orchestrate training programmes for sustainable livelihood of PAPs and assisting in required skill development by networking with Revenue department, other Government departments and NGOs of the area Helping PAPs in redress of their grievances by awareness Regular Meeting with PAPs. NGO generation amongst PAPs on grievance redress mechanism as will be first level of contact for per RAP & assisting PAPs with grievances for its mitigation grievance redress especially for illiterate and vulnerable PAPs. Developing Micro level plans for R&R in consultation with the Regular Meeting with PAPs PAPs and the SOCIAL OFFICER ensuring PAPs agreement on Capacity Building List of options open & choices made by PAPs upon being Identify specific IG Schemes assisted to do so Relocation site List of benefits due to the PAP Arrangement for Shifting Proposed utilisation of grant moneys due to PAPs Involvement of PAPs in existing Govt. development programmes Updating the data bank on PAPs due to any changes in project & development of impact indicators Specific assignments from the SOCIAL OFFICER for the welfare of the affected community Assisting in identifying tree species selected by the community and facilitates its plantation. Page 12-6| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) 13 COSTS AND BUDGET 13.1 Budget The implementation of RAP entails expenditure, which is a part of the overall project cost. The R&R budget, gives an overview of the estimated costs of the RAP and provides a cost-wise, item- wise budget estimate for the entire package of resettlement implementation, including compensation, assistance, administrative expense, monitoring and evaluation and contingencies. Values for compensation amounts and other support mechanism will be adjusted, based on annual inflation factor. The project promoter will bear the cost through PIU. Costs related to land acquisition and transfer of title to property from private individuals will be paid by project authorities. Around 5% of the total cost has been set aside for physical contingencies. Such type of contingencies may arise as a result of time overrun of the project or due to various other unforeseen circumstances The costs estimated mainly include structure cost and R&R assistance costs. Cost of Civil Works: While preparing the budget, the R&R team laid special emphasis on arriving at an estimate of the market value of the assets. The R&R team verified price data from a cross-section of the PAPs, revenue officials in the concerned district; local entrepreneurs engaged in these works and even non-PAPs in each kilometer stretch. The resettlement budget, particularly, the compensation has been computed on this basis. R&R assistance: The R&R assistance amounts such as shifting allowance; subsistence allowance and grant for working shed has been taken from approved R&R policy for the project. Cost towards implementation arrangement: The cost for hiring NGO; M&E agency and implementation of gender action plan has been estimated based on other projects; activities envisaged; and number of PAPs. The budget for RAP implementation comes to Rs. 4.85 crores. The detailed budget is presented below: Table 13.1: Estimated Cost of R&R Budget based on R&R Policy S. Total Item Unit Rate (INR) No. Amount Replacement cost for Structure Non Title A In Sq. mtr. holders 1 Replacement cost for Permanent Structure 199.48 13,000 25,93,240 2 Replacement cost for Semi Permanent Structure 725.74 12,000 87,08,880 3 Replacement cost for Temporary structure 2717.54 3,500 95,11,390 4 Replacement cost for Boundary Wall 138.7 2,000 2,77,400 Total 3781.46 2,10,90,910 Page 13-1| Rev: R2 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Draft Resettlement Action Plan Hamirpur – Rath Road (SH-42) S. Total Item Unit Rate (INR) No. Amount B Assistance Number Squatters One time grant of Rs 36000 as 1 203 36,000 73,08,000 subsistence allowance Shifting allowance of Rs 50,000 as one time 2 0 0 0 grant for a permanent structure Shifting allowance 30,000 as one time grant for 3 0 0 0 a semi - permanent structure Shifting allowance 10,000 as one time grant for 4 203 10,000 20,30,000 a temporary structure Kiosks only Rs. 5000 will be paid as one time 5 141 5,000 7,05,000 grant Grant for construction of working shed or shop 6 203 25,000 50,75,000 for self employed Training Assistance of Rs 10,000/- for income 7 310 10,000 31,00,000 generation Total 1,82,18,000 CPR-compensation for C In Sq. mtr. Community/Properties 1 Compensation for Religious St. 159.99 12000 19,19,880 2 Community Boundary Wall ( in Running mts.) 23 2000 46,000 3 Well (in number) 4 50000 2,00,000 4 Hand Pump (in number) 46 20000 9,20,000 Total 30,85,880 D Implementation Arrangement Implementation of GAP Lump sum 10,00,000 Hiring of NGO Lump sum 12,00,000 Hiring of M&E agency Lump sum 15,00,000 Training of Project Staff on RAP issues Lump sum 1,00,000 Total 38,00,000 GRAND TOTAL ( A +B+C +D) 46,194,790 Contingency 5% 23,09,739.5 Grand Total 4,85,04,530 Page 13-2| Rev: R2 Anneuxre-1 Draft Census and Socioeconomic Questionnaire Uttar Pradesh Core Road Network Development Program Annexure - 1 Census and Community Asset Survey Schedules Census Survey Questionnaires PART: 1 – ASSET INFORMATION Census Survey Code. GENERAL A. Questionnaire No: ………B. Subproject Road Name: .............................................. C. Village: ……..………………D. District: ………………….E. State: …………… F. Plot No. ........................ G. Km/Chainage……….H. Side 1. Left 2. Right I. Name of the person answering to survey……………………………………………………………. J. Relation to the owner:………………………………………………………………………………….. K. Years of Occupation of the Affected Property _____ Years L. Present Address of the Property: _________________________________________________ ________________________________________________________________________________ M. Mother Tongue ___________ (Hindi-1; Urdu-2; Others-3; in case of others specify.) DETAILS OF LAND 1. Ownership of the Land 1. Private 2. Government 3. Religious 4. Community 5. Others 2. Type of Land 1. Irrigated 2. Non-Irrigated 3. Barren 4. Forest 5. Other 3. Use of Land 1.Cultivation 2. Orchard 3. Residential 4. Commercial 5. Forestation 6. Others 7. No Use/ Barren 4. Affected area of the Land (in square meter) .......................................................................... 5. Total Area of the Land/Plot (in square meter) ........................................................................ 6. Rate of the Land (Per sq. m) 1. Market Rate (Rs)................. ……………….. 7. Status of Ownership Egis India Consulting Engineers Pvt. Ltd. Page 1 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 1. Titleholder (Pvt Owner) 2. Customary Right 3. Encroacher 4. Squatter 8. Name of the Owner/Occupier: ……………................................................... 9. Father’s Name: ........................................................................ 10. Name of the owner, if the occupier is tenant………………………………………………………….. …………………………………………………………………………………………………………………… 11. Total Land Holding (in Acre) ………………………………………….. 12. Any of the following people associated with the Land A. Agricultural Laborer 1. Yes 2. No (i). If Yes then How many …………………………………………….. B. Sharecropper 1. Yes 2. No (ii). If Yes then How many …………………………………………………………… 13. Number of trees within the affected area 1. Total………………2. Fruit Bearing………………3. Non-fruit Bearing……………… DETAILS OF STRUCTURES (cross check with part III) 14. Any structure in the Affected Land 1. Yes........ 2. No.......... 15. Area of the affected structure (in Square Meter) a) Length along the road..............…b) Width perpendicular to the road............….....c) Floor ……… 16. Area of the total structure (in Square Meter) a) Length along the road..............…b) Width perpendicular to the road..............….....c) Floor ……… 17. Distance of structure from center line of the road (in mtr.)………………………… 18. Type of Construction of the Structure 1. Temporary (buildings with mud/brick/wood made walls, thatched/tin roof) 2. Semi-Permanent (buildings, with tiled roof and normal cement floor) 3. Permanent (with RCC, Single/ Double storey building) 19. Market Value of the Structure (in Rs.)............................ 20. Use of the Structure (select appropriate code from below) A. Residential Structure 1 House 2 Hut 3 Other ……….. B. Commercial Structure 4 Shops 5. Hotel 6 Small Eatery 7 Kiosk 8 Farm House 9 Petrol Pump 10 Clinic 11 STD Booth 12 Workshop 13 Vendors 14 Com. Complex 15 Industry 16. Restaurant 17. Others………. C. Mixed Structure 18 Residential-cum-Commercial Structure D. Community Structure 19 Comm. Center 20 Club 21 Trust 22 Memorials 23 Other…. E. Religious Structure 24 Mosque, 25 Shrine 26 Burial 27. Temple 28. Other… Egis India Consulting Engineers Pvt. Ltd. Page 2 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 F. Government Structure 29 Govt. Office 30 Hospital 31 School 32 College 33 Other ………… G. Other Structure 34 Boundary Wall 35 Foundation 36 Cattle Shed 37 Well/Tube Well 21. Status of the Structure 1. Legal Titleholder 2. Customary Right 3. Encroacher 4. Squatter 22. Name of the Owner/Occupier: ……………................................................... 23. Father’s Name: ........................................................................ 24. Name of the owner, if the occupier is tenant………………………………………………………….. …………………………………………………………………………………………………………………… a. Tenure Status…………………………………………….. (Own-1; Rented-2; Leasehold-3) b. Monthly Rent……………………………………………… c. Utility Connection…………………………………………(1-Electricity; 2- Water; 3- Sewer) 25. Any of the following people associated with the Structure? A. Employee/ wage earner in commercial structure 1. Yes 2. No (i). If Yes, How Many?…………………………………………………….. B. Employee/ wage earner in residential structure 1. Yes 2. No (ii). If Yes, How Many?.…………………………………………………….. 26. Number of trees within the affected area 1. Total………………2. Fruit Bearing………………3. Non-fruit Bearing……………… 27. Social Category 1. SC 2. ST 3. OBC 4. General 5. Others (specify)………………………… 28. Religious Category 1. Muslim 2. Hindu 3. Other (specify)………… 29. Vulnerability Status of the Household: A. Is it a woman headed household? 1. Yes 2. No B. Is it headed by physically/mentally challenged person? 1. Yes 2. No C. Is it a household Below Poverty Line (BPL) 1. Yes 2. No D. If BPL, provide BPL card number------------------------------------------- 30. Monthly income of the family in (Total of Q.No. 36) Rs.…………. Resettlement and Rehabilitation Option 31. Willing to shift 1. Voluntarily 2. Non-voluntarily 32. Assistance Option Egis India Consulting Engineers Pvt. Ltd. Page 3 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 1. Self Relocation 2. Cash for Land loss 3. Cash for House/ Shop loss 4. Project Assistance 33. Income Restoration Assistance (The most preferred option) 1. Employment Opportunities in Construction work 2. Assistance/ Loan from other ongoing development scheme 3. Vocational Training 4. Others (specify .................................................................................................... ) 34. Other Support from Project (Specify) .................................................................................................... Egis India Consulting Engineers Pvt. Ltd. Page 4 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 Part II SOCIOECONOMIC DETAILS 35. Name of the Head of the Household……………………………………………………… 36. Number of family members Total………….Male………..Female………… Details of Family Members above 18 years of age: (fill appropriate code) Egis India Consulting Engineers Pvt. Ltd. Page 5 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 Relationship Main Monthly Other Monthly Sl. with Sex Marital Educational Usual Name of Persons Age Occupation Income Occupation Income No Head of the (M/F) Status Qualification Activity Household 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Marital Status: Married-1; Unmarried-2; Divorcee-3; Separate-4; Widowed-5; Educational Qualification: Illiterate-1; Primary Schooling-2; Upper Primary Schooling-3; High School-4; Graduate-5; Post-Graduate-6; Technical-7 Usual Activity: Worker- 1; Non –worker- 2; Main worker- 3; Marginal worker- 4; home maker – 5; student; 6; below the age of 5-7; others -8 Occupation : Cultivator-1: Agricultural Labourer-2; Daily Wage Earner-3; Salaried-4; Business- 6; Other-7; in case of others specify. Egis India Consulting Engineers Pvt. Ltd. Page 6 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 37. Possession of Material /Assets (Please Record Numbers) Televisi Tape Radio Refrigerat Telepho Vehicles Cookin Any on Record or ne Cycles Three Two- Four Bus / g Gas Other er Wheeler Wheeler Wheeler Truck (specify ) 37 Live Stock Assets (Please Record Numbers) Classification Cows Buffaloes Sheep Goats Poultry Others Give Number 37. Likely Loss of Other Assets Tree Well Other Category I (Specify) Individual Assets No. Species No. Type No. Egis India Consulting Engineers Pvt. Ltd. Page 7 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 38. Participation in economic activities of family members S.No. Economic/Non-economic Activities Male Female Both 1 Cultivation 2 Allied Activities (Dairy, Poultry, Sheep rearing, etc.) 3 Collection and Sale of forest products 4 Trade & Business 5 Agricultural Labor 6 Non Agricultural Labor 7 HH Industries 8 Service 9 Households Work 10 Collection of Water 11 Collection of Fuel 12 Others (Specify): 38. Decision making and participation at Household Level Sl. No. Subject Male Female Both 1 Financial matter 2 Education of child 3 Health care of child 4 Purchase of assets 5 Day to day household activities 6 On social function and marriages 7 Women to Earn for Family 8 Land and property 9 Others Egis India Consulting Engineers Pvt. Ltd. Page 8 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 39. Women Participation at Community level 1 Do women of the household participate in decision making processes at community level Yes- 1 No- 2 2 Is any member of the household a member or office bearer of village / block / zilla panchayat? Yes – 1; No – 2; If Male Female yes whether such member is male or female? 3 Is any women member of the household works as Anganwadi worker or ANM? Yes No 4 Is any household member also a member of any self help groups? Yes - ; No -2 Male Female If yes, whether male or female? 5 If yes, is that SHG still active? Yes No 40. Employment opportunity in the area 1. Seasonal 2. Employed throughout the Year 3. None 41. Do family members migrate for work 1. Yes 2. No, if no, skip the table S. No. Type of Work In Rs. Per year Do men migrate for work Do women also migrate outside the village for work outside the Daily -1 village Seasonal - 2 Daily -1 Long term – 3 Seasonal - 2 No - 4 Long term – 3 No - 4 1 Agriculture 2 Shopkeeper/Business (including petty business) 3 Employer (industrialist/Factory/Mill owner, etc) 4 Government Service 5 Private Service 6 Wage Labour (Agriculture) 7 Wage Labour (Non Agriculture) 8 Self employed (insurance, finance, doctor, engineer, lawyer) 9 Not employed (income recipient such as retired, remittance, property rent, bank interest, etc) Egis India Consulting Engineers Pvt. Ltd. Page 9 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 S. No. Type of Work In Rs. Per year Do men migrate for work Do women also migrate outside the village for work outside the Daily -1 village Seasonal - 2 Daily -1 Long term – 3 Seasonal - 2 No - 4 Long term – 3 No - 4 10 Household work 13 Others (specify ) Total 42. Quality of Life (Consumption Pattern) Kindly indicate the consumption/expenditure on different items in last one year Sl. No. Particulars Monthly Expenditure in Rank them from Rs. highest to lowest 1 Food 2 Agriculture 3 Housing 4 Cooking Fuel 5 Clothing 6 Health 7 Education 8 Transport 9 Communication 7 Social functions Others Egis India Consulting Engineers Pvt. Ltd. Page 10 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 43. Loan and Indebtedness 1 Have you taken any loan? 1-Yes, 2-No 2 Who has taken the loan? 1. Head of the HH; 2. Spouse; 3. Son; 4. Daughter in law; 5.Head and spouse together; 6. Son and Head of the HH; 7. Daughter in law and Mother in law; 8. Other……… 3 If yes, tell us sources of loan: 1-Bank, 2-NGO, 3-Money lender, 4-Relative/friend, 5- SHG; 6. Others (specify……………) 4 If yes, Amount of loan (in Rs.) 5 Could you please tell us the purpose of loan? 1-Productive investment, 2-Purchasing durables, 3-Meeting up emergencies, 4-Marrying of children, 5- Paying off loan, 6-Others (specify………………………) 44. Access to facilities Code Distance of following facilities/amenities from the Approx. km Mode to access Frequency Trips made by Trips made by location of interview? male members female members 1 Primary School 2 Secondary School 3 College 4 Regular Market 5 Commonly visited health service place 6 Hospital 7 District Office 8 Block Office Mode: Walk-1; Cycle-2; Personal transport-3; Public transport-4; Frequency: Daily-1; Weekly-2; Monthly-3; Very Rare-4; Egis India Consulting Engineers Pvt. Ltd. Page 11 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 45. Health Seeking Behaviour 1 Has any of your family members suffered from any If yes, who suffered: Code : disease during last 12 months? Men – 1, Women - 2 1-Yes, 2-No, 3-Don’t Know Both- 3, Boy child- 4 Girl child – 5, Both children - 6 2 If yes, please specify type of disease? 3 Type of treatment taken: 1-Allopathic Government, 2-Allopathic Private, 3- Allopathic Govt. & Private both, 4- Homeopathy, 5- Ayurved /Unani, 6- Faith healers; 7- quacks; 8- No Treatment, 9-Others (specify…………) 4 Which is the nearest formal medical facility available? PHC – 1; CHC- 2; District Hospital – 3; Private clinic – 4; Private Hospital – 5; Others - 6 5 Did you avail any health/medical facility (like Yes - 1 If coded 1 or 3 skip the next question medicine, routine check-up, advice from doctor No - 2 etc.) during the last pregnancy? Has not been pregnant yet - 3 6 If no, who attended while giving birth to the baby? Females neighbour - 1 (Multiple responses possible) relatives and friends - 2 Mother-in-law - 3 Sister-in-law - 4 Others specify - 5 7 Have you heard about HIV/AIDS: Yes 1; No - 2 8 If yes, what is the source? Newspaper – 1; TV- 2; radio- 3; NGO camp– 4; Govt. camp – 5; Signature of a person Answering the Survey………………………………… (Name of the Investigator) Date: ........................ (Signature of the investigator) Egis India Consulting Engineers Pvt. Ltd. Page 12 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 PART III EXTENT OF LOSS (NOT TO BE ASKED BUT TO BE ASSESSED BY THE INVESTIGATOR) 1. Losing Total House 2. Losing Partial House 3. Losing Total House and part of Plot (Aangan or Courtyard) 4. Losing Total Plot and Total House 5. Losing Total Plot and Partial House 6. Losing Partial Plot 7. Losing Total Commercial Structure 8. Losing Partial Commercial Structure 9. Losing Total Commercial Structure and Partial Plot 10. Losing Total Commercial Structure and Total Plot 11. Losing Partial Commercial Structure and Plot 12. Losing Total House and Total Commercial Structure 13. Losing Total House, Total Commercial Structure and Total Plot 14. Losing Total House, Total Commercial Structure 15. Losing Total House, Partial Commercial Structure and Part of Plot 16. Losing Partial House, Partial Commercial Structure and Part of Plot 17. Losing Total House and Partial Commercial Structure 18. Losing Total Commercial Structure and Part of House 19. Losing Total Boundary Wall 20. Losing Partial Boundary Wall 21. Losing Total Agricultural Land 22. Losing Partial Agricultural Land 23. Losing Total Cattle Shed 24. Losing Part of Cattle Shed 25. Losing Water bodies 26. Losing Total Livelihood for Commercial Tenant 27. Others (Specify) Status of Occupier of affected property 1. Status of Occupier (Tick in the appropriate box) Owner Legal Non-title Holders Vacant Tenant/sharecropper Squatter Encroacher 2. Since how long your family has been using this property (in years) _____________________ 3. Do you possess a documentary proof 1. Yes 2. No. Egis India Consulting Engineers Pvt. Ltd. Page 13 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 4. If yes, Type of documentary proof of occupation of affected property Ration card no___________Voter IC no ______________Receipt/Bill __________Bank/A/c _ 5. Land Ownership (Tick under appropriate type and enter the no. of households under the same) Single Joint Trust Community Government Forest Unclear (specify) 5.1 Type of ownership Male Female 5.2 Ownership by Gender ( if private) 6. Does the family have legal document to prove ownership of Structure 1. Yes 2. No. RTC No. Sub No. land 1. Yes 2. No. RTC No. Sub No. (to be asked only to the owner) (If yes, ask for the legal document and check with the Land Revenue Office) Measurements 2.1 Structure Offset From Existing Offset from Edge of Asset Central Line up to Area Getting Affected Land Structure Land Structure Starting Meter Ending Meter Width Total Area (in sq.m) No. of Floors (G, G+1, G+n) 2.2 land Total Affected Sl. Area Length Width Total Length Width Total No. Area (in Area (in sqm) sqm) 1. Built up area 2. Open Space 3. Total Area Egis India Consulting Engineers Pvt. Ltd. Page 14 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 2.3 Boundary Wall Details Sl. Boundary / Length Total length No. Compound Wall affected (in sqm) 1. Barbed wire fencing 2. Stone Dry Masonry 3. Brick / Stone Masonry 4. Mud Wall 5. Others (Specify) 2.4 Gate Details Sl. Type of Gate Length Height No. (in m) (in m) 1. MS 2. Wooden 3. Others 2.5 WATER SOURCES GETTING AFFECTED Sources (in No.) User (use code)* Units to be acquired Dug Wells Tube Wells Supply Points *[1.Domestic 2.Agriculture 3.Industrial 4. Others (to be specified)] 6 Diagram of the affected property (Rough diagram with dimension – Not to scale) (PHOTOGRAPH TO BE ATTACHED – STRUCTURE ALONG WITH HEAD OF HOUSEHOLD/ RESPONDENT) Egis India Consulting Engineers Pvt. Ltd. Page 15 of 16 Uttar Pradesh Core Road Network Development Program Annexure - 1 In case the tenancy/ownership is under dispute (legal or otherwise) please make a short note below Field Supervisor: _________________________________ Date: ________________________ _________________________________ Endorsed by: Revenue Officer: _________________________________ Date: ________________________ _________________________________ MoRT&H / PWD Officer: __________________________________ Date: _____________________ __________________________________ Egis India Consulting Engineers Pvt. Ltd. Page 16 of 16 Anneuxre-2 R&R Policy Anneuxre-3 Details of Census and Socio-Economic Survey Uttar Pradesh Core Road Network Development Program Annexure - 3 Uttar Pradesh Core Road Network Development Project Details of Census and socio-economic Survey Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 1 HR/ KU / EN / L-01 Hamirpur Hamirpur Kuchhechha 2+100 1 2 1 2 9.80 8.50 0.20 1.70 3 2 1 WHH Smt. Indi W/o sayaari SELF F 70 2 5 1 1 1 1000 - - Jai Ram SON M 45 1 2 1 1 1500 2 1000 syanmati D/L F 40 1 1 1 1 Sulekha G/D F 14 2 2 2 Rajesh G/S M 12 2 2 2 Shiv Kumar G/S M 10 2 2 6 Maya G/D F 8 2 2 6 Lavkush G/S M 5 2 1 7 Pawan G/S M 2 2 1 7 2 HR/ KU / K / L-02 Hamirpur Hamirpur Kuchhechha 2+110 1 4 1 1 9.00 NA NA NA 3 2 1 caste Jeetu S/o Vidhya Sasar SELF M 25 1 2 1 1 5 2000 - - 3 HR/ KU / EN / L-03 Hamirpur Hamirpur Kuchhechha 2+112 1 2 1 2 9.50 8.50 0.50 4.25 3 2 1 caste Vidhya Sasar S/o Mathura SELF M 65 2 1 2 1 1 2000 - - Pan Kumar WIFE F 60 1 2 5 6 saya Prasad SON M 30 1 3 1 3 Jayshri D/L F 28 1 1 5 6 Baby G/S M 1 2 1 7 - seetu DAUGHTER F 13 2 3 6 4 HR/ KU / K / L-04 Hamirpur Hamirpur Kuchhechha 2+145 1 4 1 1 7.00 NA NA NA 3 2 1 caste dhani Ram S/o Ram Kishun SELF M 30 1 1 3 4 5 2500 - - Archana WIFE F 25 1 2 1 6 Mannu DAUGHTER F 5 2 2 7 - Moti SON M 4 2 2 7 - 5 HR/ KU / SQ / L-05 Hamirpur Hamirpur Kuchhechha 2+260 1 3 1 2 7.00 2.40 3.20 7.68 3 1 1 BPL Nizamuddin S/o Saddik SELF M 30 1 1 3 1 5 2000 - - Noori WIFE F 28 1 2 1 6 Mohd. Hashin SON M 8 2 2 5 - Mohd.Samir SON M 5 2 2 7 - Hina DAUGHTER F 2 2 1 7 - 6 HR/ KU/ K / L-06 Hamirpur Hamirpur Kuchhechha 2+300 1 4 1 1 7.20 NA NA NA 3 2 1 caste Ram Sinsh S/o Ram Avtar SELF M 24 1 1 1 1 5 2000 - - Preeti WIFE F 22 1 2 6 Chandni DAUGHTER F 2 2 1 7 7 HR/ KU/ SQ / L-07 Hamirpur Hamirpur Kuchhechha 2+335 1 3 1 2 9.30 7.80 0.70 5.46 3 2 1 caste Ram Avtar S/o Shvi Prasad SELF M 70 2 1 1 1 5 4000 Kalawati WIFE F 65 1 1 8 6 1800 8 HR/ KU/ SQ / L-08 Hamirpur Hamirpur Kuchhechha 2+345 1 3 1 2 9.10 8.60 0.90 7.74 3 2 1 caste Bal Ram S/o Ram Avtar SELF M 34 1 1 2 1 5 3000 Radha WIFE F 30 1 2 4 5 Pushpendra SON M 2 2 1 7 9 HR/ KU/ SQ / L-09 Hamirpur Hamirpur Kuchhechha 2+350 1 3 1 2 9.50 6.20 0.50 3.10 3 2 1 caste devi Ram S/o Ram Avtar SELF M 28 1 1 2 1 3 2500 Egis India Consulting Engineers Pvt. Ltd. Page 1 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age dulari WIFE F 25 1 1 1 1 10 HR/ KU/ SQ / L-10 Hamirpur Hamirpur Kuchhechha 2+355 1 3 1 2 9.00 6.50 1.00 6.50 3 2 1 caste devi Parsad S/o Ram Avtar SELF M 26 1 2 2 1 3 4500 11 HR/ KU/ SQ / L-11 Hamirpur Hamirpur Kuchhechha 2+365 1 3 1 2 8.50 6.90 1.50 10.35 3 2 1 caste Kamta prasad S/o Ram Avtar SELF M 36 1 1 3 1 3 4000 Shiv devi WIFE F 32 1 1 1 5 sudiya DAUGHTER F 7 2 2 6 Lakman SON M 5 2 1 7 - 12 HR/ KU/ SQ / L-12 Hamirpur Hamirpur Kuchhechha 2+375 1 3 1 2 9.50 8.30 1.50 12.45 3 2 1 BPL Ram Prakash S/o Pyare SELF M 57 3 1 1 1 3 4000 Ramjanki WIFE F 55 1 1 1 3 Brijrani DAUGHTER F 20 2 1 8 Kiran DAUGHTER F 18 2 3 6 Malti DAUGHTER F 10 2 3 6 Muskan DAUGHTER F 7 2 3 6 13 HR/ KU/ SQ / L-13 Hamirpur Hamirpur Kuchhechha 2+380 1 3 1 2 9.00 6.60 1.00 6.60 3 2 1 caste Ram Naresh S/o Ram Prasad SELF M 24 1 1 1 1 1 2000 Champa WIFE F 20 1 1 1 1 14 HR/ KU/ SQ / L-14 Hamirpur Hamirpur Kuchhechha 2+400 1 3 1 2 8.50 7.80 1.50 11.70 3 2 1 WHH Bhuri W/o Ram Prakash SELF F 60 1 4 1 1 3 2200 Sukharani DAUGHTER F 15 2 1 2 Tinki DAUGHTER F 13 2 1 2 sudiya DAUGHTER F 10 2 1 2 Ajay DAUGHTER F 8 2 1 2 Anjali DAUGHTER F 6 2 1 2 15 HR/ KU/ SQ / L-15 Hamirpur Hamirpur Kuchhechha 2+410 1 3 1 2 8.50 8.80 1.50 13.20 3 2 1 caste sannu S/o SELF M 45 3 1 1 1 5 3000 Shakuntala WIFE F 42 1 1 1 Mulayam SON M 22 2 1 1 5 Raju SON M 18 2 1 1 Pooja DAUGHTER F 16 2 1 2 Veeru SON M 7 2 1 2 Vishnu SON M 1 2 1 7 16 HR/ KU/ SQ / R-01 Hamirpur Hamirpur Kuchhechha 2+435 2 3 1 2 8.50 6.30 1.50 9.45 4 2 Jaseshwar S/o Mishri Lal SELF M 60 3 1 1 1 5 3000 Susar kali WIFE F 45 1 1 1 6 Amit SON M 26 1 3 1 5 Vishekha D/L F 22 1 3 1 6 Akhilesh SON M 21 2 2 1 5 17 HR/ KU / K / R-02 Hamirpur Hamirpur Kuchhechha 2+440 2 4 1 1 6.40 NA NA NA 3 2 1 caste Parkash S/o Pyare SELF M 25 1 2 1 1 5 2000 - - 18 HR/ HEP/ EN / R-01 Hamirpur Hamirpur Helapur 3+590 2 2 1 2 7.80 9.00 2.20 19.80 3 2 1 caste Ram Swwak S/o Shiv Prasad SELF M 65 2 1 3 1 1 2000 Raj Kumari WIFE F 60 1 3 1 Munni devi DAUGHTER F 28 3 5 4 4 4000 19 HR/ HEP/ K / L-01 Hamirpur Hamirpur Helapur 3+ 625 1 4 1 1 9.50 NA NA NA 3 2 1 caste Harishankar alias dayaram SELF M 18 1 2 5 6 5 1800 S/o kallu Egis India Consulting Engineers Pvt. Ltd. Page 2 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 20 HR/ HEP/EN / L-02 Hamirpur Hamirpur Helapur 3+ 650 1 2 1 3 7.20 3.50 2.80 9.80 3 2 1 caste Maika S/o Swamideen SELF M 48 3 1 2 1 5 2000 2000 Ramawati WIFE F 45 1 1 1 6 Pappu SON M 20 1 1 1 Chandarkala D/L F 18 1 2 1 deepu SON M 18 2 2 1 Anil SON M 16 2 2 1 Kapil SON M 14 2 2 1 Sanseeta DAUGHTER F 5 2 1 7 21 HR/ HEP/EN / L-03 Hamirpur Hamirpur Helapur 3+ 670 1 2 2 2 9.50 3.00 0.50 1.50 3 2 1 caste Awdhesh S/o Mathura SELF M 36 1 1 1 1 1 3000 Ramshri WIFE F 32 1 1 1 Lalji SON M 16 2 2 5 Sulekha DAUGHTER F 14 2 2 5 Shiv Babu SON M 8 2 2 6 Prakash Bobu SON M 6 2 2 6 22 HR/ HEP/EN / L-03A Hamirpur Hamirpur Helapur 3+ 673 1 2 2 2 9.50 3.00 0.50 1.50 3 2 1 caste Lakhana S/o Mathura SELF M 28 1 1 1 1 5 1500 3 2000 shyanmati WIFE F 25 1 1 5 Neeraj SON M 6 2 1 2 Kusamkali DAUGHTER F 5 2 1 7 Chandari DAUGHTER F 3 2 1 7 Akansha DAUGHTER F 1 2 1 7 23 HR/ HEP/EN / L-03B Hamirpur Hamirpur Helapur 3+ 678 1 2 2 2 9.50 3.00 0.50 1.50 3 2 1 WHH Koloiya W/o Kripali SELF F 30 1 5 1 1 1 1000 2 1500 Anikesh SON M 13 2 1 2 Sundari DAUGHTER F 10 2 1 2 Ankush SON M 7 2 1 2 24 HR/ HEP/K / L-04 Hamirpur Hamirpur Helapur 3+ 680 1 4 1 1 8.00 NA NA NA 3 2 1 caste Udaybhan urf Rahul S/o Raj SELF M 22 1 2 4 1 5 2000 Kumar 25 HR/ HEP/EN / L-05 Hamirpur Hamirpur Helapur 3+ 695 1 2 2 2 9.50 7.20 0.50 3.60 3 2 1 BPL Raj kumar S/o Rajaram SELF M 48 2 1 4 1 5 8000 Ramabai WIFE F 45 1 2 6 Shashi DAUGHTER F 19 2 5 6 Richa DAUGHTER F 14 2 2 6 Chanbhan SON M 12 2 3 6 26 HR/ HEP/ EN / R-02 Hamirpur Hamirpur Helapur 3+ 695 2 2 1 1 8.50 2.70 1.50 4.05 3 2 1 caste Ram Kishun S/o Jansi SELF M 70 2 1 2 1 1 3000 Leela WIFE F 65 1 1 1 1 Raju SON M 35 3 3 1 1 27 HR/ HEP/EN / L-06 Hamirpur Hamirpur Helapur 3+ 700 1 2 1 5 7.00 6.60 3.00 19.80 3 2 1 caste Rakesh kunmar S/o Rajaram SELF M 1 28 HR/ HEP/EN / L-07 Hamirpur Hamirpur Helapur 3+ 780 1 2 1 5 9.80 4.30 0.20 0.86 3 2 1 caste Balkuwar S/o Ram Sahai SELF M 38 1 1 1 1 3 3000 Rajeswari WIFE F 35 1 1 1 1 Krishan SON M 15 2 3 6 Egis India Consulting Engineers Pvt. Ltd. Page 3 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Vishnu SON M 10 2 2 6 29 HR/ HEP/K / L-08 Hamirpur Hamirpur Helapur 3+ 780 1 4 1 1 8.00 NA NA NA 3 2 1 WHH Vimla W/o Sipahi Lal SELF F 37 1 1 1 1 5 1500 Sipahilal HUSBAND M 38 1 2 1 3 1500 Rahul SON M 13 2 3 6 Rohit SON M 10 2 3 6 30 HR/ HEP/K / L-09 Hamirpur Hamirpur Helapur 3+ 825 1 4 1 1 8.00 NA NA NA 3 2 1 caste Rajesh Kumar S/o Baburam SELF M 28 1 1 1 3 5 4000 Pappi WIFE F 25 1 1 2 Shobha Kumari DAUGHTER F 5 2 2 7 Varsha DAUGHTER F 1 2 1 7 31 HR/ HEP/ K / R-03 Hamirpur Hamirpur Helapur 3+ 835 2 4 1 1 7.50 NA NA NA 3 2 1 caste Shrikishan S/o Bhikhu SELF M 38 1 5 3 1 3 3000 Sarvesh Kumar SON M 16 2 2 6 Siyajanki DAUGHTER F 12 2 2 6 Rasani DAUGHTER F 9 2 2 6 32 HR/ HEP/ SQ/ R-04 Hamirpur Hamirpur Helapur 3+ 840 2 3 1 2 8.50 3.80 1.50 5.70 3 2 1 caste Ram Chandar S/o Bhikkhu SELF M 35 1 1 2 1 3 2000 Rajakli WIFE F 32 1 1 1 3 Khushbu DAUGHTER F 13 2 3 6 Reetu DAUGHTER F 8 2 2 6 Ashu SON M 6 2 2 6 Ashish SON M 3 2 1 7 Bebi DAUGHTER F 1 2 1 7 33 HR/ HEP/ K / R-05 Hamirpur Hamirpur Helapur 3+850 2 4 1 1 5.10 NA NA NA 3 2 1 caste devicharn S/o Shivnarayan SELF M 48 4 1 2 1 4 6000 Bhoori WIFE F 45 1 1 2 Ramshankar SON M 27 1 1 1 3 Satti D/L F 24 1 1 2 Vikas G/S M 6 2 2 6 Akas G/S M 2 2 1 7 laxmi SON M 22 2 3 1 3 Chhotelal SON M 18 2 3 1 3 Babulal SON M 16 2 3 8 3 34 HR/ HEP/ K / L-10 Hamirpur Hamirpur Helapur 3+890 2 4 1 1 9,20 NA NA NA 3 2 1 caste Raju S/o Akhilesh SELF M 27 1 1 2 1 5 3000 Manju WIFE F 24 1 2 1 Shikha DAUGHTER F 5 2 1 7 Mohit SON M 2 2 1 7 35 HR/ HEP/ SQ / R-06 Hamirpur Hamirpur Helapur 3+940 2 3 1 1 7.10 3.40 4.80 16.32 3 1 1 caste Rajjaq Hasan S/o SELF M 40 3 1 2 1 5 3000 Mohd.Hasan Nurjahan WIFE F 38 1 2 2 Roshani DAUGHTER F 20 2 5 6 Roshn banoo DAUGHTER F 18 2 4 6 Egis India Consulting Engineers Pvt. Ltd. Page 4 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Kishmtul SON M 13 2 3 6 36 HR/ HEP/ EN / L-11 Hamirpur Hamirpur Helapur 3+960 1 2 1 5 8.50 3.60 1.50 5.40 3 1 1 caste Bhasirath S/o Mullu SELF M 50 2 1 1 1 1 4000 Kunti devi WIFE F 45 1 1 2 Tejpratap SON M 27 1 2 1 Roma D/L F 24 1 2 2 Arun Kumar G/S M 4 2 1 7 Ketan Kumar G/S M 2 2 1 7 SONu Kumar SON M 15 2 4 6 Monu Kumar SON M 12 2 1 2 37 HR/ HEP/ K / L-12 Hamirpur Hamirpur Helapur 3+975 1 4 1 1 9.20 NA NA NA 3 1 1 caste Mohd. Haseen S/o Naseer SELF M 30 1 5 2 1 5 3000 Mohd 38 HR/ KLT / K / R-01 Hamirpur Hamirpur Kalaulitir 5+315 2 4 1 1 9.70 NA NA NA 1 2 1 Caste sansa ram S/o Shayam SELF M 40 1 1 3 1 5 3500 - - Sundar Smt. Pankaj WIFE F 38 1 3 1 Narayan SON M 12 1 2 1 Karan SON M 10 2 2 6 Chotu SON M 8 2 2 6 Kaushalya DAUGHTER F 5 2 1 7 39 HR/ KLT / EN / R-02 Hamirpur Hamirpur Kalaulitir 5+350 2 2 1 1 9.50 4.10 0.50 2.05 3 2 1 caste Sewa ram S/o Shyamsundar SELF M 45 3 1 4 1 5 3500 - - Ram devi WIFE F 42 1 3 1 Heeru SON M 20 2 4 6 Preeti DAUGHTER F 18 2 3 6 SONam DAUGHTER F 15 2 4 6 Priyanka DAUGHTER F 12 2 3 6 Veeru SON M 10 2 2 6 40 HR/ KLT/ K / L-01 Hamirpur Hamirpur Kalaulitir 5+530 1 4 1 1 6.50 NA NA NA 3 2 1 caste Daya Ram S/o Babo Lal SELF M 50 1 1 3 1 5 3000 - - Jaishri WIFE F 45 1 3 5 4 Poonam DAUGHTER F 12 2 3 6 Atishkumar SON M 10 2 3 6 SONam DAUGHTER F 7 2 3 6 Satish Kumar SON M 5 2 2 7 41 HR/ KLT/ K / L-02 Hamirpur Hamirpur Kalaulitir 5+545 1 4 1 1 8.80 NA NA NA 3 2 1 caste Pratapi Yadav S/o devidayal SELF M 38 2 1 4 1 5 4000 Nokha devi WIFE F 35 1 2 1 Shalu DAUGHTER F 14 2 4 6 Rakhi DAUGHTER F 13 2 3 6 Ankit SON M 12 2 3 6 Reshma DAUGHTER F 7 2 2 6 42 HR/ KLT/ EN / R-03 Hamirpur Hamirpur Kalaulitir 5+550 2 2 1 5 8.50 4.80 1.50 7.20 Shyan Sinsh S/o Shivnarayan SELF M 1 43 HR/ KLT/ EN / R-04 Hamirpur Hamirpur Kalaulitir 5+550 2 2 1 1 6.50 1.00 3.00 3.00 3 2 1 caste Baladeen S/o Ratiram SELF M 55 1 4 3 1 3 2000 Egis India Consulting Engineers Pvt. Ltd. Page 5 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 44 HR/ KLT/ K / R-05 Hamirpur Hamirpur Kalaulitir 5+580 2 4 1 1 8.80 NA NA NA 3 2 1 caste Mulayam S/o Baladeen SELF M 25 1 1 4 1 5 1500 Rrrna devi WIFE F 20 1 3 5 45 HR/ KLT/ K / R-06 Hamirpur Hamirpur Kalaulitir 5+590 1 4 1 1 6.00 NA NA NA 3 2 1 caste Maheswri Yadav S/o Jankuwa SELF M 1 46 HR/ KLT/ K / L-03 Hamirpur Hamirpur Kalaulitir 5+620 1 4 1 1 7.50 NA NA NA 3 2 1 caste Anil Kumar S/o Ram Kishun SELF M 40 1 1 3 1 5 3500 Ram Kumari WIFE F 38 1 1 1 Rashmi DAUGHTER F 15 2 4 6 Yosendar SON M 13 2 3 6 Ravindar SON M 11 2 3 6 Alok SON M 10 2 3 6 47 HR/ KLT/ EN / -L-04 Hamirpur Hamirpur Kalaulitir 5+665 2 4 1 1 7.50 NA NA NA 1 2 1 Caste Shirram S/o Malkhan SELF M 60 3 1 2 1 5 4000 Rani devi WIFE F 55 1 1 1 Rajveer SON M 35 1 4 1 3 Prema D/L F 30 1 2 5 Shiva G/S M 8 2 2 6 Annu G/S M 6 2 2 6 Laxmi G/D F 2 2 1 7 dhirendar SON M 30 1 3 1 3 Savirti D/L F 25 1 3 1 Sani G/S M 5 2 1 7 Arun G/S M 2 2 1 7 48 HR/ KLT/ EN / R-07 Hamirpur Hamirpur Kalaulitir 5+675 2 2 1 5 6.50 4.20 3.50 14.70 3 2 1 caste Sukhalal S/o Muluwa SELF M 70 1 1 1 1 1 3000 Kalawati WIFE F 65 1 1 1 1 49 HR/ KLT/ EN / R-08 Hamirpur Hamirpur Kalaulitir 5+675 2 4 1 2 7.50 NA NA NA 3 2 1 caste Shatrushan Prasad S/o Ram SELF M 43 2 1 4 1 5 1500 Baroose Kapoori WIFE F 40 1 2 5 5 Madhu DAUGHTER F 16 2 4 2 Saty Kumar SON M 14 2 3 2 Amit Kumar SON M 12 2 3 2 50 HR/ KLT/ K / R-09 Hamirpur Hamirpur Kalaulitir 5+780 2 4 1 2 9.00 NA NA NA 3 2 1 caste Surendar S/o Premnarayan SELF M 31 1 1 4 1 5 1500 Rani WIFE F 26 1 3 1 Sweta DAUGHTER F 7 2 2 6 Harsh SON M 5 2 1 7 51 HR/ KLT/ K / R-10 Hamirpur Hamirpur Kalaulitir 5+790 2 4 1 2 9.00 NA NA NA 3 2 1 caste Akhilesh S/o Jhandu Prasad SELF M 24 1 1 2 1 5 3000 Rani WIFE F 20 1 2 1 6 Kartik SON M 3 2 7 7 Ashish SON M 1 2 7 7 52 HR/ KLT/ SQ / R-11 Hamirpur Hamirpur Kalaulitir 5+800 2 3 1 1 7.00 4.20 3.10 13.02 1 2 1 Caste Sanjay Kumar S/o SELF M 35 1 1 3 1 1 4000 Shrirameshwar Rekha WIFE F 32 1 2 6 6 Egis India Consulting Engineers Pvt. Ltd. Page 6 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age sulsan SON M 16 2 4 6 deepk SON M 14 2 4 6 Kiran DAUGHTER F 13 2 3 6 Rohan SON M 11 2 3 6 53 HR/ KTP/ SQ / R-01 Hamirpur Hamirpur Keeratpur 7+730 2 3 1 1 7.50 3.80 3.00 11.40 3 2 1 caste Jaykishor S/o sayari Yadav SELF M 24 1 2 1 1 5 1500 54 HR/ KTP / SQ / R-02 Hamirpur Hamirpur Keeratpur 7+740 2 3 1 1 8.00 3.20 2.60 8.32 1 2 1 Caste Prahalad S/o Jas/dev SELF M 35 1 1 3 1 1 2500 Firoj devi WIFE F 30 1 1 5 Sawet DAUGHTER F 3 2 1 7 Bhuri DAUGHTER F 1 2 1 7 55 HR/ PTY/ EN / R-01 Hamirpur Hamirpur Pauthiya 9+300 2 2 1 5 6.80 4.10 3.20 13.12 3 2 1 caste Vasudev Nisad s/o Late Ram SELF M 55 3 1 2 1 1 2000.0 Sajivan Prasad Sumirati WIFE F 52 1 1 5 Ram ji Nisad SON M 35 1 4 1 5 3000 Sita D/L F 30 1 1 5 Shyam ji SON M 30 1 4 1 1 Mamta D/L F 26 1 4 5 56 HR/ PTY/ SQ / R-02 Hamirpur Hamirpur Pauthiya 9+930 2 3 1 1 7.25 3.20 2.30 7.36 4 2 Rahul Joshi s/o Ayodhya SELF M 29 2 2 3 1 5 3500 Prasad Ayodhya Prasad FATHER M 55 1 1 1 5 Vimla MOTHER F 50 1 1 1 5 57 HR/ PTY/ SQ / R-03 Hamirpur Hamirpur Pauthiya 9+950 2 3 1 1 8.75 5.00 3.30 16.50 4 2 Shiv Nandan s/o Ram Baran SELF M 54 1 1 2 1 5 2000 Krishna WIFE F 51 1 2 5 58 HR/ PTY/ SQ / L-03 Hamirpur Hamirpur Pauthiya 10+250 1 3 1 1 7.25 3.70 2.75 10.18 1 2 1 Caste Natthu S/o Puttu SELF M 65 3 1 1 1 5 3000 Kranti WIFE F 60 1 1 1 5 seeta DAUGHTER F 20 2 5 5 5 Sharda DAUGHTER F 18 2 5 6 Vivek SON M 16 2 4 6 59 HR/ PTY/ SQ / L-06 Hamirpur Hamirpur Pauthiya 10+325 1 3 1 3 5.00 6.80 4.30 29.24 3 2 1 caste Malkhan S/o Kishan Prasad SELF M 58 2 1 1 1 6 2500 Kalawati WIFE F 55 1 1 1 6 Jeetu SON M 18 2 3 1 Roshani DAUGHTER F 15 2 3 6 Jyoti DAUGHTER F 13 2 2 6 60 HR/ PTY/ ENO / L-07 Hamirpur Hamirpur Pauthiya 10+435 1 2 2 5 7.10 2.80 3.00 8.40 3 2 1 caste sore Lal S/o Ram Sewak SELF M 45 1 1 6 1 6 16000 Rajeshwari WIFE F 42 1 1 1 Anamika DAUGHTER F 14 2 3 6 Navnit Kumar SON M 10 2 2 6 Neha DAUGHTER F 8 2 2 8 61 HR/ PTY/EN / L-08 Hamirpur Hamirpur Pauthiya 10+440 1 2 2 3 7.10 3.10 2.90 8.99 3 2 1 caste Vinay Prajapati S/o Ram SELF M 46 2 1 5 1 4 7000 Shuwak Phoola devi WIFE F 42 1 5 5 Egis India Consulting Engineers Pvt. Ltd. Page 7 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Amit Kumar SON M 18 2 5 6 Shani Kumar SON M 16 2 4 6 Chotu Kumar SON M 14 2 4 6 Shalu DAUGHTER F 10 2 3 6 62 HR/ PTY/ K / R-08 Hamirpur Hamirpur Pauthiya 10+550 2 4 1 1 7.00 NA NA NA 3 2 1 caste Vikas supta s/o Prakash SELF M 35 1 1 3 1 5 3000 Chand supta kanchan WIFE F 30 1 4 5 Utkarash SON M 5 2 1 7 Shobha DAUGHTER F 3 2 1 7 63 HR/ PTY/ K / L-12 Hamirpur Hamirpur Pauthiya 10+560 1 4 1 1 6.60 NA NA NA 1 2 1 Caste Sopal S/o Maisrideen SELF M 56 4 1 1 1 3 2500 Kusum WIFE F 46 1 1 5 Rajni Kant SON M 27 1 4 1 3 3000 Anjana D/L F 25 1 3 5 Pradeep SON M 23 2 7 1 dharmendra SON M 21 2 5 6 Vijay SON M 19 2 5 6 Asha DAUGHTER F 17 2 4 6 64 HR/ PTY/ EN / L-13 Hamirpur Hamirpur Pauthiya 10+680 1 2 2 4 6.60 NA NA 6.30 3 2 1 WHH Sarju devi W/o Brijmohan SELF F 65 2 1 3 1 6 25000 Kundal Lal HUSBAND M 70 1 3 1 6 Radha Krishna SON M 35 1 5 1 1 sudiya devi D/L F 30 1 3 5 Ajay G/S M 14 2 3 6 Abhay G/S M 12 2 3 6 Pooja G/D F 10 2 2 6 Kanchan G/D F 6 2 2 6 65 HR/ PTY/ K / L-15 Hamirpur Hamirpur Pauthiya 10+690 1 4 1 1 6.00 NA NA NA 3 2 1 caste Ram Prakash s/o Babu SELF M 20 1 2 2 1 5 1500 66 HR/ PTY/ EN/ L-16 Hamirpur Hamirpur Pauthiya 10+740 1 2 2 4 6.00 NA NA 9.10 Dharmendra Sachana S/o SELF M 1 Shambhu 67 HR/ PTY/ EN/ L-17 Hamirpur Hamirpur Pauthiya 10+750 1 2 2 4 6.00 NA NA 7.30 3 2 1 caste Satya Kumar Sachan s/o SELF M 64 3 1 4 1 1 9000 chhota lal Prabha devi WIFE F 60 1 3 5 6 Swapnil Sachan SON M 30 1 6 1 1 Reetu Sachan D/L F 28 1 5 5 6 Krish Sachan G/S M 2 2 1 7 Pratyaksha Sacahan SON M 18 2 5 6 6 68 HR/ PTY/ K / L-18 Hamirpur Hamirpur Pauthiya 10+752 1 4 1 1 6.50 NA NA NA 3 2 1 caste dilip Kumar Sachan s/o Ram SELF M 30 1 2 4 1 5 2000 Swaroop Sachan 69 HR/ PTY/ K / R-16 Hamirpur Hamirpur Pauthiya 10+820 2 4 1 1 6.20 NA NA NA 3 2 1 caste Ramesh Sahu s/o Sri dursa SELF M 53 3 1 2 1 5 3000 Prasad Urmila WIFE F 50 1 1 5 Sanjay SON M 26 1 2 1 3 2000 Maya D/L F 23 1 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 8 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Jyoti G/D F 6 2 2 6 Manish G/S M 4 2 1 7 SONil SON M 20 2 3 5 Anil SON M 17 2 2 5 Ankit SON M 14 2 2 5 70 HR/ PTY/ K / L-22 Hamirpur Hamirpur Pauthiya 10+885 1 4 1 1 6.10 NA NA NA Maiku S/o SELF M 1 71 HR/ PTY/ K / L-25 Hamirpur Hamirpur Pauthiya 10+950 1 4 1 1 5.50 NA NA NA 1 2 1 Caste Kallu s/o Late ramju SELF M 66 2 1 5 1 5 2000 Rani WIFE F 60 1 1 5 Sanjay SON M 22 1 4 1 Kamla D/L F 20 1 2 5 Arind D/S M 1 2 1 7 72 HR/ PTY/ K / R-17 Hamirpur Hamirpur Pauthiya 10+950 2 4 1 1 6.50 NA NA NA Raj kishor S/o Bhaswan das SELF M 1 73 HR/ PTY/ EN/ L-26 Hamirpur Hamirpur Pauthiya 10+960 1 2 1 3 7.00 3.10 3.00 9.30 1 2 1 caste Bardani s/o kalla SELF M 35 1 1 2 1 5 3200 Bhuri WIFE F 30 1 1 5 Beenu SON M 12 2 3 6 Reenu SON M 10 2 2 6 Anita DAUGHTER F 7 2 2 6 Puneet SON M 5 2 2 7 Ashesh SON M 4 2 2 7 74 HR/ PTY/ K / L-27 Hamirpur Hamirpur Pauthiya 10+970 1 4 1 1 6.70 NA NA NA 1 2 1 Caste Arvinda s/o Hrish chandra SELF M 27 1 1 1 1 6 2000 Manju WIFE F 25 1 1 5 Mohit SON M 3 2 1 7 Bebi DAUGHTER F 1 2 1 7 75 HR/ PTY/ SQ/ R-20 Hamirpur Hamirpur Pauthiya 12+500 2 3 1 1 6.10 9.20 3.00 27.60 3 2 1 BPL sayari s/o sukul SELF M 65 4 1 1 1 5 2000 Rani WIFE F 60 1 1 5 Indra pal SON M 30 2 3 1 3 2000 sovinde SON M 28 2 3 1 3 1000 Arunda SON M 15 2 3 1 3 1000 Laxmi DAUGHTER F 14 2 2 5 76 HR/ PTY/ SQ/ L-29 Hamirpur Hamirpur Pauthiya 12+525 1 3 1 1 6.70 2.20 2.00 4.40 3 2 1 BPL Maiyadin Prajapati s/o Late SELF M 65 1 1 5 1 5 2000 saya deen Ramkali WIFE F 60 1 1 5 77 HR/ LLP/ SQ / L-01 Hamirpur Hamirpur Lallpura 16+945 1 3 1 1 7.70 4.30 3.80 16.34 3 2 1 caste Jetendra kumar vishwkarma SELF M 46 1 1 4 1 5 2400 S/o jai narain Sunita WIFE F 40 1 1 5 6 Ampit SON M 15 2 4 6 Ankit SON M 10 2 3 6 Amit SON M 10 2 3 6 78 HR/ LLP/ SQ / L-02 Hamirpur Hamirpur Lallpura 16+950 1 3 1 1 7.75 7.75 3.30 25.58 3 2 1 caste Rashapal S/o Babu Ram SELF M 32 1 2 3 1 5 4000 Egis India Consulting Engineers Pvt. Ltd. Page 9 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 79 HR/ LLP/ EN / L-03 Hamirpur Hamirpur Lallpura 16+955 1 2 1 1 7.90 4.60 3.30 15.18 3 2 1 caste Ram Lakhan s/o Ram sahai SELF M 50 3 1 2 1 5 3200 Swarrania WIFE F 45 1 1 1 2500 brajend SON M 25 1 4 1 5 ram janki DAUGHTER F 22 1 1 1 lakshmi G/D F 2 2 1 7 kumari kiran DAUGHTER F 13 2 3 6 kumari sanseeta DAUGHTER F 11 2 3 6 80 HR/ LLP/ K / L-04 Hamirpur Hamirpur Lallpura 16+960 1 4 1 1 7.30 NA NA NA 1 2 1 Caste Ram Sajeewan s/o Ram SELF M 30 1 1 1 1 5 3000 charan Menka WIFE F 28 1 3 5 Mohit SON M 11 2 2 6 Kajal DAUGHTER F 9 2 2 6 Komal DAUGHTER F 6 2 2 6 Rinsi DAUGHTER F 2 2 1 7 81 HR/ LLP/ K / L-05 Hamirpur Hamirpur Lallpura 16+965 1 4 1 1 7.30 NA NA NA 3 2 1 caste Mukesh s/o Hetram SELF M 38 1 1 1 1 5 2000 Neelam WIFE F 32 1 2 1 Kajal DAUGHTER F 2 2 1 7 82 HR/ LLP/ EN / R-01 Hamirpur Hamirpur Lallpura 16+970 2 2 3 1 8.50 4.50 2.20 9.90 3 2 1 caste Shyam babu S/o dursa SELF M 50 3 5 3 1 5 4000 devendra SON M 30 1 3 1 5 ram kumari D/L F 28 1 1 1 Komal G/D F 6 2 2 6 Kanchan G/D F 5 2 1 7 Shahjal G/D F 4 2 1 7 Baby shrawan G/S F 2 2 1 7 dursa prasad FATHER M 70 5 1 1 83 HR/ LLP/ SQ/ R-02 Hamirpur Hamirpur Lallpura 16+975 2 3 1 1 9.00 6.30 2.10 13.23 3 2 1 caste Arun kumar s/o Ram Rarayan SELF M 45 2 1 4 1 5 3200 suddi WIFE F 42 1 1 1 Anjli DAUGHTER F 19 2 4 6 Arti DAUGHTER F 17 2 4 6 Vikas SON M 13 2 3 6 Subhash SON M 10 2 2 3 84 HR/ LLP/ EN / R-03 Hamirpur Hamirpur Lallpura 16+980 1 2 1 1 9.00 5.20 1.00 5.20 Ram Sanehi S/o SELF M 1 85 HR/ LLP/ EN/ R-04 Hamirpur Hamirpur Lallpura 16+985 1 2 1 1 8.50 6.30 1.50 9.45 Mahesh S/ o SELF M 1 86 HR/ LLP/ K / R-05 Hamirpur Hamirpur Lallpura 16+995 1 4 1 1 7.40 NA NA NA 1 2 1 Caste Arvind kumar s/o Ram jeevan SELF M 35 1 1 4 1 5 2200 Rajni WIFE F 30 1 1 1 Karunesh SON M 6 2 1 6 Sumit SON M 4 2 1 7 87 HR/ LLP/K/ R-06 Hamirpur Hamirpur Lallpura 16+998 1 4 1 1 7.80 NA NA NA Yaseen S/o SELF M 1 Egis India Consulting Engineers Pvt. Ltd. Page 10 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 88 HR/ SWK/K/ R-01 Hamirpur Hamirpur Swasa KhurD 18+800 2 4 1 1 9.50 NA NA NA 1 2 1 Caste deviya s/o panna SELF M 58 3 5 1 1 3 4000 rajesh SON M 35 1 3 1 5 asha D/L F 30 1 3 1 3 kajal G/D F 5 2 7 7 shudha G/D F 1 2 7 7 ravendra SON M 28 1 2 1 3 poonam D/L F 23 1 2 1 3 89 HR/ SWK/EN/ R-02 Hamirpur Hamirpur Swasa KhurD 18+820 2 2 1 2 8.20 10.40 1.80 18.72 1 2 1 Caste Balendra s/o sri nattu SELF M 25 1 1 5 1 5 3200 mithlesh kumar WIFE F 20 1 5 5 vikas SON M 2 2 1 7 90 HR/ SWK/SQ/ R-03 Hamirpur Hamirpur Swasa KhurD 18+850 2 3 1 1 6.90 5.00 3.10 15.50 4 2 1 BPL Jasat sins s/o balik sinsh SELF M 44 1 1 3 1 5 2000 seeta devI WIFE F 30 1 1 5 rakhi DAUGHTER F 5 2 1 7 91 HR/ SWK/SQ/ R-04 Hamirpur Hamirpur Swasa KhurD 18+900 2 3 1 1 8.10 14.80 3.10 45.88 4 2 1 BPL Salik sinsh s/o hanuman SELF M 65 2 1 1 1 5 2400 sinsh ram sakhi WIFE F 60 1 1 5 vijay sins SON M 30 1 3 2 92 HR/ SWK/SQ/ R-05 Hamirpur Hamirpur Swasa KhurD 18+950 2 3 1 1 7.10 5.30 3.40 18.02 1 2 1 caste Kalika prasad s/o natthu SELF M 40 1 1 5 1 5 6000 jai devi WIFE F 35 1 3 1 rashani khushi DAUGHTER F 15 2 3 5 mahindra SON M 13 2 3 5 ravi SON M 11 2 2 5 karan SON M 9 2 2 5 93 HR/ SWK/SQ/ R-06 Hamirpur Hamirpur Swasa KhurD 19+010 2 3 1 1 7.80 2.79 2.20 6.14 1 2 1 caste Zalim s/okisna SELF M 50 2 1 1 1 5 2200 kaushlya WIFE F 48 1 1 5 sunita DAUGHTER F 18 2 2 5 pawan kumar SON M 15 2 2 5 pooja DAUGHTER F 8 2 2 6 kanchan DAUGHTER F 5 2 1 7 aman SON M 2 2 1 7 94 HR/ SWK/SQ/ R-07 Hamirpur Hamirpur Swasa KhurD 19+030 2 3 1 1 9.60 4.40 2.40 10.56 1 2 1 caste Sopi Varma s/o Hori lal SELF M 29 1 1 2 3 5 3000 anita WIFE F 25 1 2 4 6 ayush SON M 3 2 1 7 95 HR/ SWK/SQ/ L-01 Hamirpur Hamirpur Swasa KhurD 19+060 1 4 1 1 9.30 4.60 2.40 11.04 3 1 1 caste Rahish S/o Jamir SELF M 1 96 HR/ SWK/SQ/ R-08 Hamirpur Hamirpur Swasa KhurD 19+080 2 3 1 1 7.80 3.20 2.40 7.68 3 2 1 caste Krishana kumar s/o lakhan SELF M 30 1 1 5 1 5 3500 pushpa WIFE F 25 1 3 1 rasini DAUGHTER F 10 2 2 5 akash SON M 8 2 2 5 Egis India Consulting Engineers Pvt. Ltd. Page 11 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 97 HR/ SWB/EN/ R-01 Hamirpur Hamirpur Swasa Bujrag 20+500 2 2 2 4 8.80 NA NA 9.90 3 2 1 caste Ram prasad s/o saktideen SELF M 60 2 1 5 1 4 58000 smt santosh kumar WIFE F 55 1 5 5 manoj kumar SON M 32 1 5 1 1 sneeto deve D/L F 27 1 5 6 ishant G/S M 4 2 7 7 98 HR/ SWB/EN/ R-02 Hamirpur Hamirpur Swasa Bujrag 20+580 2 2 2 5 7.60 2.40 2.30 5.52 Bhurelal S/o Mattu SELF M 1 99 HR/ SWB/K/ L-01 Hamirpur Hamirpur Swasa Bujrag 20+650 1 4 1 1 7.10 NA NA NA 3 2 1 caste Sunil Kumar S/o Balak Ram SELF M 20 4 2 5 1 5 1500 Balak Ram FATHER M 50 1 2 6 Rani devi MOTHER F 47 1 3 5 Hemant BROTHER M 28 2 6 1 Kalyan BROTHER M 18 2 3 1 100 HR/ SWB/EN/ R-03 Hamirpur Hamirpur Swasa Bujrag 20+660 2 4 1 1 9.00 NA NA NA daya Ram S/o SELF M 1 101 HR/ SWB/EN/ R-03a Hamirpur Hamirpur Swasa Bujrag 20+670 2 4 1 1 8.00 1.50 4.30 6.45 Shrikishan S/o Lakkhu SELF M 1 102 HR/ SWB/K/ R-04 Hamirpur Hamirpur Swasa Bujrag 20+690 2 4 1 1 8.00 NA NA NA 3 2 1 caste Jitendra kumar s/o nand SELF M 20 1 2 5 1 5 5000 kishaor 103 HR/ SWB/K/ L-02 Hamirpur Hamirpur Swasa Bujrag 20+695 1 4 1 1 6.00 NA NA NA 3 2 1 caste Ajay Kumar S/o SELF M 25 1 1 1 1 5 2000 Bharti WIFE F 22 1 1 1 SONakshi DAUGHTER F 2 2 1 7 104 HR/ SWB/EN/ R-05 Hamirpur Hamirpur Swasa Bujrag 20+700 2 2 2 5 7.60 2.40 2.70 6.48 3 2 1 caste Tiriyan s/o kalkaya SELF M 44 3 1 1 1 3 3000 shakuntala WIFE F 39 1 1 1 ravi kumar SON M 20 2 3 1 rishi SON M 18 2 3 1 3 rajkumar SON M 16 2 3 5 105 HR/ SWB/EN/ R-06 Hamirpur Hamirpur Swasa Bujrag 20+710 2 2 2 5 9.00 3.40 2.50 8.50 3 2 1 caste Brijesh kumar s/o sayadeen SELF M 42 1 1 4 1 4 28000 sandhya WIFE F 37 1 4 1 shalini DAUGHTER F 17 2 2 5 sapna DAUGHTER F 15 2 4 5 shaivani DAUGHTER F 13 2 3 5 amrita DAUGHTER F 11 2 3 5 namrita DAUGHTER F 9 2 2 1 sukh priya DAUGHTER F 5 2 2 7 ravi SON M 1 2 1 7 106 HR/ SWB/SQ/ R-07 Hamirpur Hamirpur Swasa Bujrag 20+750 2 3 1 1 9.50 4.40 5.10 22.44 3 2 1 BPL Sudhakar s/o mayadeen SELF M 35 1 1 4 1 3 2200 maya devI WIFE F 32 1 1 5 preeti DAUGHTER F 13 2 3 5 nitesh SON M 10 2 2 5 anamika DAUGHTER F 8 2 2 5 anpam SON M 6 2 2 2 Egis India Consulting Engineers Pvt. Ltd. Page 12 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 107 HR/ SWB/SQ/ R-08 Hamirpur Hamirpur Swasa Bujrag 20+760 2 3 1 1 8.30 4.10 3.80 15.58 3 2 1 BPL Ram dev s/o maiya deen SELF M 45 3 1 4 1 3 3000 ram devi WIFE F 42 1 1 5 archana DAUGHTER F 20 2 5 5 akhilesh kumar SON M 18 2 4 5 ankit kumar SON M 15 2 4 5 kavita DAUGHTER F 13 2 2 5 108 HR/ SWB/SQ/ R-09 Hamirpur Hamirpur Swasa Bujrag 20+770 2 3 1 1 8.80 5.20 3.80 19.76 3 2 1 BPL Ram lakhan s/o Shikdori SELF M 35 1 1 4 1 3 2000 rekhadevi WIFE F 32 1 1 5 raj kumar SON M 13 2 4 5 bhupender kumar SON M 10 2 3 5 anirudh kumar SON M 5 2 2 7 109 HR/ CNK /K/ L-1 Hamirpur Hamirpur Chhani KhurD 25+340 1 4 1 1 7.20 NA NA NA 1 2 1 Caste Ram prakash s/o ratan SELF M 52 4 1 4 1 4 3000 Sampat devi WIFE F 45 1 1 1 Shive kumar SON M 24 2 3 1 3 saya charan SON M 21 2 3 1 3 Jas mohan SON M 19 2 3 1 3 seema DAUGHTER F 16 2 5 6 110 HR/ CNK /K/ L-2 Hamirpur Hamirpur Chhani KhurD 25+380 1 4 1 1 5.00 NA NA NA 3 2 1 Caste SELF Kamta prasad s/o ram chand prajapati M 48 1 1 2 1 3 2500 Kusum kali WIFE F 45 1 1 1 Nand kishor SON M 14 2 2 5 Rosan lal SON M 13 2 2 5 Mankuwar DAUGHTER F 18 2 5 5 prem lalli DAUGHTER F 15 2 5 5 111 HR/ CNK /K/ L-3 Hamirpur Hamirpur Chhani KhurD 25+380 1 4 1 1 5.00 NA NA NA Shrikant S/o Sanjiwan SELF M 1 112 HR/ CNK /K/ R-5 Hamirpur Hamirpur Chhani KhurD 25+440 2 4 1 1 6.00 NA NA NA 3 2 1 Caste Kamlesh s/o har swroop SELF M 27 1 1 3 1 5 4000 Radha WIFE F 22 1 3 1 5 Shyam prakash SON M 6 2 1 2 Pranjali DAUGHTER F 4 2 1 7 Rajni DAUGHTER F 2 2 1 7 113 HR/ CNK /K/ L-4 Hamirpur Hamirpur Chhani KhurD 25+440 1 4 1 1 5.20 NA NA NA 1 2 1 BPL Pappu s/o fatti SELF M 35 1 1 2 1 5 2000 pan kuwar WIFE F 30 1 1 5 Rohit SON M 11 2 3 6 114 HR/ CNK /K/ L-5 Hamirpur Hamirpur Chhani KhurD 25+445 1 4 1 1 5.20 NA NA NA Radheshyam S/o SELF M 1 115 HR/ CNK /K/ L-6 Hamirpur Hamirpur Chhani KhurD 25+450 1 4 1 1 5.20 NA NA NA Rajaram S/o SELF M 1 116 HR/ CNK /K/ R-8 Hamirpur Hamirpur Chhani KhurD 25+500 2 4 1 1 6.00 NA NA NA 3 2 1 Caste Chhote lal s/o suljari SELF M 22 2 1 5 1 5 Mamta WIFE F 18 1 3 5 suljari FATHER M 60 1 1 1 Egis India Consulting Engineers Pvt. Ltd. Page 13 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Shanti MOTHER F 55 1 1 2 117 HR/ CNB /K/ R-13 Hamirpur HamirpurChhani Bujurag 25+810 2 4 1 1 7.00 NA NA NA 3 2 1 Caste Merraj s/o buddu SELF M 30 1 1 2 1 5 3000 Ashiya WIFE F 27 1 1 5 Siraj SON M 4 2 1 7 Riyaj SON M 3 2 1 7 Rehana DAUGHTER F 2 2 1 7 118 HR/ CNB /SQ/ R-15 Hamirpur Hamirpur Chhani KhurD 25+900 2 3 1 1 7.00 2.50 2.70 6.75 4 2 Saurabh s/o saroj prasad SELF M 22 1 1 6 1 5 2400 119 HR/ CNB /SQ/ L-11 Hamirpur HamirpurChhani Bujurag 25+910 1 3 1 1 6.80 2.30 4.30 9.89 4 2 Nasim khan s/o shasoor SELF M 40 2 1 3 1 5 4000 Shaheen WIFE F 38 1 3 5 Anam DAUGHTER F 18 2 5 6 Amir SON M 16 2 4 6 Atika DAUGHTER F 14 2 3 6 Aqih SON M 11 2 2 6 120 HR/ CNB /SQ/ L-12 Hamirpur HamirpurChhani Bujurag 25+920 1 3 1 1 7.00 3.40 3.00 10.20 4 2 Ram avtar s/o rashunath SELF M 75 2 1 1 1 5 4500 Shanti WIFE F 70 1 1 4 Rama kant SON M 30 1 3 3 Khushboo D/L F 26 1 1 4 Poorni G/D F 4 2 1 7 Shamar G/S M 3 2 1 7 121 HR/ CNB /SQ/ R-23 Hamirpur HamirpurChhani Bujurag 25+970 2 3 1 3 6.20 7.20 3.80 27.36 3 2 1 WHH Meera pachiya SELF F 65 3 5 1 1 5 1800 Babli DAUGHTER F 25 2 1 1 5 Santosh SON M 22 1 1 1 3 Roopa D/L F 20 1 1 4 Kranti DAUGHTER F 20 2 2 1 5 Sanjay SON M 16 2 2 1 Kundan SON M 14 2 2 2 122 HR/ CNB /SQ/ R-24 Hamirpur HamirpurChhani Bujurag 25+975 2 3 1 3 6.30 8.30 3.70 30.71 3 2 1 Caste Raju pachhaiys s/o kamta SELF M 35 1 1 1 1 5 2000 prasad Arti WIFE F 32 1 1 1 5 Kajal DAUGHTER F 14 2 1 2 Anil SON M 12 2 1 5 Preeti DAUGHTER F 4 2 1 7 123 HR/ CNB /SQ/ R-25 Hamirpur HamirpurChhani Bujurag 25+980 2 3 1 3 7.00 4.20 3.00 12.60 3 2 1 WHH Batulin W/o jamil ahmed SELF F 70 1 5 1 1 5 1800 124 HR/ CNB /SQ/ R-30 Hamirpur HamirpurChhani Bujurag 26+030 2 3 1 1 7.10 2.10 2.90 6.09 4 2 Santosh s/o sidhsopal SELF M 35 1 1 3 1 5 3000 Mamtesh WIFE F 34 1 1 5 Radhika DAUGHTER F 14 2 3 6 Abhished SON M 14 2 2 6 Ritik SON M 14 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 14 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Sumit SON M 8 2 2 6 Ausha DAUGHTER F 6 2 2 6 125 HR/ CNB /SQ/ R-31 Hamirpur HamirpurChhani Bujurag 26+050 2 3 1 1 7.10 2.10 3.30 6.93 4 1 Hasan khan SELF M 65 2 1 4 1 5 1800 Aysha bano WIFE F 60 1 1 5 126 HR/ CNB /SQ/ R-32 Hamirpur HamirpurChhani Bujurag 26+065 2 3 1 1 6.60 5.10 4.40 22.44 3 1 1 caste Abdul khaliq s/o bhoora SELF M 50 3 1 2 1 5 4000 Rabuya WIFE F 45 1 2 5 Mahmood SON M 21 2 2 1 3 Rukhsar DAUGHTER F 15 2 2 2 Nasma DAUGHTER F 2 2 1 7 Bhoora FATHER M 85 1 1 2 Kariman MOTHER F 80 1 1 2 127 HR/ CNB /SQ/ L-18 Hamirpur HamirpurChhani Bujurag 26+100 1 3 1 1 7.10 1.80 3.20 5.76 4 2 Neeraj kuram s/o banwari lal SELF M 27 2 1 4 1 3600 Rachna deve WIFE F 25 1 1 1 Anshiki DAUGHTER F 3 2 1 7 Pankaj kumar BROTHER M 26 1 6 1 shani S/L F 24 1 7 1 yash kumar SON M 5 2 1 7 128 HR/ CNB /SQ/ R-39 Hamirpur HamirpurChhani Bujurag 26+160 2 3 1 1 7.00 3.30 4.50 14.85 4 2 Harish chandra s/o shive prasad SELF M 31 4 2 5 3 5 6000 shiv prasad FATHER M 70 1 2 2 kasturi devi MOTHER F 60 1 2 5 satya prakash BROTHER M 28 2 4 1 om prakash BROTHER M 26 1 7 1 rasna SISTER F 22 1 7 1 shubh BROTHER M 3 2 1 7 129 HR/ CNB /SQ/ R-50 Hamirpur HamirpurChhani Bujurag 26+455 2 3 1 1 6.80 1.90 2.60 4.94 3 2 1 caste shive dass s/o ram prasad SELF M 39 1 1 5 1 5 3200 sunita WIFE F 29 1 5 5 nikhil SON M 10 2 2 6 janvi DAUGHTER F 2 2 2 7 sakil SON M 4 2 1 7 130 HR/ CNB /K/ R-54 Hamirpur HamirpurChhani Bujurag 26+530 2 4 1 1 8.30 NA NA NA Pradeep s/o ram swaroop SELF M 40 1 1 1 1 6 2000 usha devo WIFE F 35 1 1 1 akash SON M 16 2 3 1 moni DAUGHTER F 14 2 2 1 subhash SON M 10 2 2 6 131 HR/ CNB /EN / L-35 Hamirpur HamirpurChhani Bujurag 26+550 1 2 1 5 7.50 3.15 4.25 13.39 1 2 1 BPL Nand kishro s/o naunia SELF M 40 2 1 2 1 3 2200 Phusa rani WIFE F 35 1 1 5 Kamta SON M 19 2 3 1 3 Egis India Consulting Engineers Pvt. Ltd. Page 15 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Laxmi DAUGHTER F 16 2 3 6 Rahul SON M 12 2 2 6 Vipin SON M 12 2 2 6 Akansha DAUGHTER F 10 2 2 6 132 HR/ CNB /SQ / L-36 Hamirpur HamirpurChhani Bujurag 26+600 1 3 1 1 9.40 2.40 3.35 8.04 3 2 1 caste Amit s/o babu SELF M 21 3 2 3 1 5 5000 sri babu FATHER M 52 1 1 1 3 Asha devi MOTHER F 47 1 1 5 Anis BROTHER M 19 2 3 1 3 Sorekha SISTER F 20 2 3 5 Anish BROTHER M 13 2 2 6 Avinash BROTHER M 9 2 2 6 jeetu SISTER M 14 2 3 6 133 HR/ CNB /EN / L-37 Hamirpur HamirpurChhani Bujurag 26+650 1 2 1 1 9.40 4.40 1.20 5.28 1 2 1 caste Bardani s/o sattideen SELF M 55 2 1 3 1 5 10000 media WIFE F 48 1 1 5 dinesh SON M 32 1 5 1 1 Vidya D/L F 30 1 3 5 Akansha G/S M 10 2 2 2 Rohit G/S M 8 2 2 6 Mohit G/S M 5 2 7 7 Rasma G/D F 3 2 7 7 134 HR/ NWD /SQ / L-1 Hamirpur Maudaha Newada 29+850 1 3 1 1 7.80 2.70 2.50 6.75 3 2 1 caste Shiv sahay s/o kamta` SELF M 21 2 2 5 3 5 5000 kamta prasad FATHER M 55 1 1 2 meena devi MOTHER F 52 1 1 1 preeti devi SISTER F 18 2 3 6 vineeta SISTER F 15 2 3 6 anchal BROTHER M 1 2 2 7 135 HR/ NWD /SQ/ L-2 Hamirpur Maudaha Newada 29+860 1 3 1 1 9.25 1.70 2.10 3.57 3 2 1 BPL Ramesh sumar s/o ram dulare SELF M 20 2 2 5 6 5 3500 Ram dulare FATHER M 60 1 1 1 3 ram dulari MOTHER F 55 1 1 5 136 HR/ NWD /SQ / L-3 Hamirpur Maudaha Newada 26+650 1 3 1 3 8.70 4.00 2.50 10.00 3 2 1 BPL Kamta s/o gareeb das SELF M 28 1 1 2 1 5 3000 sushma WIFE F 25 1 1 5 parul DAUGHTER F 2 2 2 7 salil SON M 4 2 1 7 137 HR/ NWD /SQ / L-4 Hamirpur Maudaha Newada 29+890 1 3 1 1 8.70 5.30 2.50 13.25 3 2 1 BPL Gariba s/o maiya deen SELF M 62 4 1 2 1 5 3000 dagarani WIFE F 60 1 1 5 sushma D/L F 25 1 1 1 paurl G/S F 6 1 1 2 Egis India Consulting Engineers Pvt. Ltd. Page 16 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age sahail G/D M 4 2 2 7 pan basant SON M 19 2 4 6 shaiv prasad SON M 18 2 5 6 138 HR/ NWD /K/ L-5 Hamirpur Maudaha Newada 30+350 1 4 1 1 6.70 NA NA NA 3 2 1 caste Shiv kshanker s/o kala deen SELF M 28 1 1 3 1 5 2000 susheela WIFE F 24 1 2 1 preeti DAUGHTER F 4 2 2 7 139 HR/ NWD /SQ / R-1 Hamirpur Maudaha Newada 30+350 2 3 1 1 7.50 2.40 2.50 6.00 3 2 1 caste Ram sajeevan s/o sudwa SELF M 45 3 1 5 3 5 1500 rajjan WIFE F 40 1 1 5 dinesh SON M 20 2 5 6 mukesh SON M 15 2 4 6 foolmati MOTHER F 70 1 1 2 140 HR/ NWD /SQ / L-6 Hamirpur Maudaha Newada 30+910 1 3 1 1 8.00 2.00 2.20 4.40 Raghu veer S/o SELF M 1 141 HR/ NWD /SQ / L-7 Hamirpur Maudaha Newada 30+920 1 3 1 1 8.80 2.50 2.00 5.00 1 2 1 caste Rameshur s/o Ujagar SELF M 45 3 1 5 1 5 5000 kali WIFE F 40 1 1 5 lavitri devi DAUGHTER F 25 2 1 2 shankar dayal SON M 20 2 5 3 priyanka devi DAUGHTER F 18 1 5 6 142 HR/ NWD /SQ/ R-2 Hamirpur Maudaha Newada 30+930 2 3 1 1 5.20 3.70 2.10 7.77 3 2 1 BPL Mool chand s/o khalishah SELF M 50 2 1 1 1 3 3000 sheela WIFE F 45 1 1 1 6 brijesh SON M 30 1 3 5 bhajwan das D/L F 25 1 2 5 sidghan G/S F 1 2 7 7 143 HR/ NWD /SQ/ L-8 Hamirpur Maudaha Newada 31+005 1 3 1 1 8.50 4.30 3.20 13.76 3 2 1 caste Gaya prasad s/o gothilal SELF M 70 1 1 3 1 5 2200 malti WIFE F 65 1 2 5 144 HR/ NWD /SQ / L-9 Hamirpur Maudaha Newada 31+010 1 3 1 1 8.30 4.40 3.40 14.96 3 2 1 caste Murli dhar s/o khemchand SELF M 65 1 4 4 1 5 2500 145 HR/ NWD /SQ/ L-10 Hamirpur Maudaha Newada 31+015 1 3 1 1 7.50 2.10 2.00 4.20 3 2 1 caste Shiv saran s/ochunnu SELF M 40 1 1 3 1 5 2000 gomti WIFE F 36 1 1 5 ajay SON M 11 2 3 6 sumit SON M 8 2 2 6 arti DAUGHTER F 4 2 1 7 146 HR/ NWD /SQ / L-11 Hamirpur Maudaha Newada 31+020 1 3 1 1 8.00 5.30 4.50 23.85 3 2 1 caste Shiv prasad kuswaha s/o SELF M 42 1 1 4 3 5 10000 chunubad guddi WIFE F 38 1 2 5 radha DAUGHTER F 10 2 2 6 rusmin DAUGHTER F 8 2 2 6 lalta DAUGHTER F 7 2 2 6 datanjali DAUGHTER F 5 2 2 7 147 HR/ NWD /SQ/ L-12 Hamirpur Maudaha Newada 31+025 1 3 1 1 8.30 2.70 3.40 9.18 3 2 1 caste Vijay kumar s/o ramanand SELF M 37 1 1 4 1 5 3200 Egis India Consulting Engineers Pvt. Ltd. Page 17 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age ninita WIFE F 32 1 3 5 nidha DAUGHTER F 10 2 2 6 148 HR/ NWD /SQ / L-13 Hamirpur Maudaha Newada 31+350 1 3 1 1 8.75 5.40 3.10 16.74 1 2 1 WHH Rani W/o ram dulari SELF M 52 2 1 1 5 3 2000 ram dulare HUSBAND F 57 1 1 1 1 sorendra SON M 35 1 3 1 3 sunita DAUGHTER F 30 1 2 5 gagan G/S M 3 2 7 7 roshani G/D F 1 2 7 7 149 HR/ NWD /SQ/ L-14 Hamirpur Maudaha Newada 31+400 1 3 1 1 8.75 1.90 2.00 3.80 Sunil Kumar S/o Jiykaran SELF M 1 2 1 1 5 2400 150 HR/ NWD /K / L-15 Hamirpur Maudaha Newada 31+600 1 3 1 1 8.00 NA NA NA 1 2 1 caste Sukhdeve s/o dhunku SELF M 60 1 2 1 1 5 2200 151 HR/ NWD /SQ / L-16 Hamirpur Maudaha Newada 31+650 1 3 1 2 9.40 5.50 3.40 18.70 1 2 1 caste Avdhesh s/o pooran lal SELF M 48 2 1 7 1 4 25000 nathi WIFE F 45 1 3 5 akshlesh SON M 28 1 3 1 6 vijay laxmi D/L F 25 1 4 5 proyasi G/D F 6 2 2 6 adatiya G/S M 4 2 1 7 natik G/S M 4 2 1 7 dharmendra SON M 2 2 1 7 puspendra SON M 17 2 5 6 152 HR/ NWD /SQ / L-17 Hamirpur Maudaha Newada 31+660 1 3 1 1 6.70 2.20 2.30 5.06 1 2 1 caste Kamta s/o ajgar SELF M 60 3 1 1 2 5 4000 meena WIFE F 57 1 1 1 shiv sahay SON M 21 2 5 3 reeeti devi DAUGHTER F 19 2 3 5 vineeta DAUGHTER F 15 2 3 6 anchal SON M 10 2 2 6 153 HR/ BWR/SQ / L-1 Hamirpur Maudaha Biwar 33+580 1 3 1 1 7.50 2.20 2.50 5.50 4 2 1 BPL Suresh Diwedi s/o Sita ram SELF M 52 1 1 5 3 5 5000 Diwedi Geeta WIFE F 46 1 3 5 Shivend SON M 8 2 2 6 154 HR/ BWR/SQ / L-2 Hamirpur Maudaha Biwar 33+650 1 3 1 1 6.00 2.30 3.00 6.90 1 2 1 WHH Chanda devi w/o Shivraj SELF F 40 4 5 1 1 5 1800 raj SON M 26 2 1 1 5 Gyani SON M 24 2 2 3 satendra SON M 21 2 2 3 155 HR/ BWR/SQ / L-3 Hamirpur Maudaha Biwar 33+970 1 3 1 3 5.80 3.20 4.80 15.36 3 2 1 caste Mahadev s/o Bhagwandin SELF M 60 1 1 1 1 6 1500 Bitola WIFE F 55 1 1 5 156 HR/ BWR/SQ / L-4 Hamirpur Maudaha Biwar 33+975 1 3 1 3 5.80 3.20 4.70 15.04 3 2 1 caste Vijay s/o Sarvan SELF M 35 1 1 1 3 5 2200 Suneeta WIFE F 30 1 1 1 Aakash SON M 6 2 1 2 Egis India Consulting Engineers Pvt. Ltd. Page 18 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Sapna DAUGHTER F 4 2 1 7 Arti DAUGHTER F 3 2 1 7 157 HR/ BWR/SQ / L-5 Hamirpur Maudaha Biwar 33+980 1 3 1 1 7.00 2.50 2.20 5.50 3 2 1 caste kamlesh s/o Swamidin SELF M 48 1 1 3 1 5 2400 Gaura WIFE F 43 1 1 5 Reena DAUGHTER F 18 2 3 6 Ram Bharosa SON M 15 2 3 6 158 HR/ BWR/K / L-12 Hamirpur Maudaha Biwar 34+140 1 4 1 1 7.00 NA NA NA 3 2 1 caste Munna Vishwakarma s/o SELF M 28 1 1 7 1 5 2000 laknath Pooja WIFE F 25 1 4 5 Sonakshi DAUGHTER F 4 2 1 7 159 HR/ BWR/SQ / L-14 Hamirpur Maudaha Biwar 34+150 1 3 1 1 7.00 6.50 3.50 22.75 4 2 Neeraj s/o Avdhesh SELF M 20 3 1 4 1 5 8000 Avadhesh FATHER M 55 2 3 1 1 Jai devi MOTHER F 50 2 1 5 Pankaj BROTHER M 25 1 4 1 4 Priya SISTER F 16 1 5 6 160 HR/ BWR/K / L-30 Hamirpur Maudaha Biwar 34+770 1 4 1 1 6.70 NA NA NA Sone Lal S/o Nandu SELF M 1 161 HR/ BWR/K / L-31 Hamirpur Maudaha Biwar 34+835 1 4 1 1 6.80 NA NA NA Majit S/o Ranjit SELF M 1 162 HR/ BWR/K / L-32 Hamirpur Maudaha Biwar 35+060 1 4 1 1 9.00 NA NA NA 3 2 1 Caste Jai singh s/o Bhoora SELF M 30 1 1 6 3 5 2200 Radha WIFE F 28 1 3 5 Aman SON M 9 2 3 6 Pawan SON M 7 2 2 6 163 HR/ BWR/K / L-33 Hamirpur Maudaha Biwar 35+080 1 4 1 1 7.60 NA NA NA 3 2 1 BPL Ram Prakash s/o Dassi SELF M 50 2 1 2 1 5 2500 Mon kuwar WIFE F 45 1 1 5 Suresh SON M 19 2 5 6 6 164 HR/ BWR/SQ/ L-34 Hamirpur Maudaha Biwar 38+200 1 3 1 3 8.90 2.30 2.50 5.75 3 2 1 caste Suresh s/o Baddu SELF M 57 3 1 1 1 1 2400 Budnia WIFE F 50 1 1 5 Babloo SON M 25 1 1 1 6 Keshkali D/L F 22 1 1 1 Govinda G/S M 1 2 1 7 Beeri SON M 22 1 1 6 Anuradha DAUGHTER F 10 2 1 2 Anita DAUGHTER F 16 2 1 2 Rubi DAUGHTER F 14 2 1 2 165 HR/ BWR/SQ/ L-35 Hamirpur Maudaha Biwar 38+210 1 3 1 3 7.00 3.90 3.00 11.70 1 2 1 caste Rohan s/o Baij Nath SELF M 32 1 1 2 3 2 2000 Shimla Devi WIFE F 30 1 2 5 Roshni DAUGHTER F 7 2 2 6 Kajal DAUGHTER F 5 2 2 7 Kalpnana DAUGHTER F 3 2 2 7 Egis India Consulting Engineers Pvt. Ltd. Page 19 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 166 HR/ BWR/EN/ R-1 Hamirpur Maudaha Biwar 33+380 2 2 1 2 9.30 9.20 0.70 6.44 Mulayam S/o Maiyadeen SELF M 1 167 HR/ BWR/EN/ R-2 Hamirpur Maudaha Biwar 33+400 2 2 1 1 7.40 4.00 2.60 10.40 4 2 1 BPL Sri Prakash s/o sita ram SELF M 68 2 1 3 1 5 5000 Panna devi WIFE F 65 1 1 5 Manish kumar SON M 22 2 4 1 Kanhaia SON M 13 2 2 6 168 HR/ BWR/EN / R-3 Hamirpur Maudaha Biwar 33+750 2 2 2 1 9.70 3.00 3.70 11.10 3 2 1 caste Brijesh Kumar s/o Devideen SELF M 33 1 1 7 1 5 6000 Geeta WIFE F 30 1 3 5 Parul DAUGHTER F 8 2 3 6 Ashi DAUGHTER F 7 2 3 6 Mayank SON M 5 2 3 7 169 HR/ BWR/SQ / R-4 Hamirpur Maudaha Biwar 33+850 2 3 1 1 8.50 4.20 3.40 14.28 3 2 1 BPL Akhilesh Kumar s/o Nathu SELF M 38 3 1 5 3 5 5000 ram Kapoori devi WIFE F 35 1 2 5 Narendra kumar SON M 18 2 4 6 Nathu ram FATHER M 65 4 4 1 170 HR/ BWR/K/ R-5 Hamirpur Maudaha Biwar 33+880 2 4 1 1 8.10 NA NA NA 4 2 Suresh tiwari s/o kalka SELF M 28 2 2 6 3 5 4000 Prasad Kalka Prasad FATHER M 75 1 4 2 Vidya Devi MOTHER F 70 1 3 5 Mukesh Kumar BROTHER M 24 2 6 2 171 HR/ BWR/K/ R-6 Hamirpur Maudaha Biwar 33+900 2 4 1 1 7.10 NA NA NA 4 2 Girish Chandra s/o Kalika SELF M 44 3 1 5 3 5 3200 Prasad Ram Kishori WIFE F 40 1 7 5 Priyanka DAUGHTER F 22 2 1 6 Shanu SON M 20 2 6 6 Ashu SON M 16 2 6 6 172 HR/ BWR/K/ R-7 Hamirpur Maudaha Biwar 33+910 2 4 1 1 9.00 NA NA NA 3 2 1 caste Rafeeq S/o Ismlm SELF M 28 3 2 4 3 5 6000 Islam FATHER M 50 2 3 1 3 Saidan MOTHER F 45 2 1 5 Salim BROTHER M 32 2 4 1 5 Sitara S/L F 30 2 3 5 Shamshd BROTHER M 12 2 3 6 173 HR/ BWR/SQ/ R-8 Hamirpur Maudaha Biwar 33+915 2 3 1 1 6.20 2.50 2.20 5.50 3 2 1 caste Rohini Prasad s/o Kamta SELF M 35 1 1 1 1 5 3000 Anita WIFE F 30 1 3 5 Kajal DAUGHTER F 3 2 1 7 Bachchi DAUGHTER F 1 2 1 7 174 HR/ BWR/SQ/ R-9 Hamirpur Maudaha Biwar 33+935 2 3 1 1 7.10 2.50 3.90 9.75 4 2 1 BPL Ratan s/o Bhawanidin SELF M 40 1 1 2 1 5 3000 175 HR/ BWR/K/ R-10 Hamirpur Maudaha Biwar 33+950 2 4 1 1 9.20 NA NA NA 3 1 1 caste Mustaq Ahmad s/o SELF M 40 1 1 1 1 5 5000 Akhatari WIFE F 35 1 5 5 Shitazam DAUGHTER F 16 2 3 6 Egis India Consulting Engineers Pvt. Ltd. Page 20 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Irshad ali SON M 13 2 3 6 Shizat zam DAUGHTER F 10 2 2 6 Gulsad ali SON M 7 2 2 6 Babu SON M 4 2 1 7 176 HR/ BWR/SQ/ R-11 Hamirpur Maudaha Biwar 33+955 2 3 1 1 9.20 2.50 2.00 5.00 1 2 1 caste Sandeep s/o Ram balak SELF M 22 3 2 3 1 5 7000 Ram Balak FATHER M 45 1 5 1 4 Asha Rani MOTHER F 40 1 1 5 Pradeep BROTHER M 18 2 3 1 6 Manju DAUGHTER F 16 2 5 6 177 HR/ BWR/K/ R-12 Hamirpur Maudaha Biwar 33+960 2 4 1 1 9.10 NA NA NA Rajesh s/o Nathuram SELF M 1 178 HR/ BWR/SQ/ R-13 Hamirpur Maudaha Biwar 33+965 2 3 1 1 9.10 3.10 3.50 10.85 1 2 1 caste Nand Kishor s/o Gasita SELF M 32 1 1 1 1 5 4400 Rani WIFE F 25 1 1 5 Rashi DAUGHTER F 1 2 1 7 179 HR/ BWR/EN / R-14 Hamirpur Maudaha Biwar 43+030 2 2 3 1 9.70 5.00 0.30 1.50 Udaybhan Singh S/o Jagatpal SELF M 1 Singh 180 HR/ BWR/K/ R-15 Hamirpur Maudaha Biwar 43+035 2 4 1 1 9.80 NA NA NA 4 2 Avadh Kishor Shukla s/o Ram SELF M 25 5 1 6 3 5 6000 Kishor Shukla Sonam Shukla WIFE F 21 1 5 5 Ram Kishor Shukla FATHER M 50 1 3 2 Gayatri Devi MOTHER F 45 1 3 2 Bhramm Kishor Shukla BROTHER M 28 1 7 1 Pooja Shukla S/L F 25 1 1 5 Kaushal Kishor BROTHER M 21 2 6 1 Ram het Shukla G. FATHER M 90 1 2 2 Manna Shukla G. MOTHER F 80 1 2 2 181 HR/ BWR/K/ R-16 Hamirpur Maudaha Biwar 43+040 2 4 1 1 8.50 NA NA NA 1 2 1 caste Shiva Kant s/o Bhavindeen SELF M 36 1 1 3 3 5 2000 Sudha Devi WIFE F 31 1 2 5 Aakancha DAUGHTER F 11 2 2 6 Preeti DAUGHTER F 9 2 2 6 Arti DAUGHTER F 6 2 2 6 Bharti DAUGHTER F 3 2 2 7 182 HR/ BWR/K/ R-17 Hamirpur Maudaha Biwar 43+045 2 4 1 1 6.30 NA NA NA 4 2 Prakash Pathak s/o Ramesh SELF M 26 5 1 5 3 5 6000 Pathak Ranni Pathak WIFE F 22 1 5 5 Mahesh Datt Pathak FATHER M 55 1 4 2 Sharda MOTHER F 50 1 3 2 Manoj Pathak BROTHER M 35 1 5 2 Ram Kumari S/L F 30 1 5 5 Princi NEHPI F 10 2 2 6 Deepti NEHPI F 8 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 21 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Jitendra BROTHER M 23 2 5 2 Nitin BROTHER M 20 2 5 2 183 HR/ BWR/K/ R-18 Hamirpur Maudaha Biwar 43+050 2 4 1 1 7.50 NA NA NA 4 2 Deepk Mishra S/o SELF M 1 184 HR/ BWR/SQ/ R-19 Hamirpur Maudaha Biwar 43+280 2 3 1 1 9.50 7.40 0.50 3.70 4 2 1 BPL Satyawati w/o Munna singh SELF F 38 2 1 3 1 5 2200 Munna HUSBAND M 42 1 3 1 5 Ankit SON M 20 2 3 1 3 Pooja DAUGHTER F 15 2 3 6 Vipul SON M 12 2 3 6 Ravi SON M 9 2 2 6 185 HR/ BWR/SQ/ R-20 Hamirpur Maudaha Biwar 43+290 2 3 1 1 9.00 2.30 2.80 6.44 3 1 1 caste Bablu Khan s/o Phool Khan SELF M 30 1 1 3 1 5 4000 Ramjano WIFE F 27 1 2 5 Shoma DAUGHTER F 8 2 2 6 Shobna DAUGHTER F 6 2 2 6 Samar SON M 2 2 1 7 186 HR/ BWR/SQ/ R-21 Hamirpur Maudaha Biwar 43+295 2 3 1 1 9.00 2.20 2.50 5.50 3 1 1 caste Hari Shankar s/o Janki SELF M 28 2 1 6 1 5 4400 Prasad Neelam WIFE F 25 1 3 5 5 Anshika DAUGHTER F 2 2 1 7 Janki Prasad FATHER M 70 1 1 1 Kunti Devi MOTHER F 65 1 1 1 187 HR/ BWR/SQ/ R-22 Hamirpur Maudaha Biwar 43+300 2 3 1 1 9.00 4.10 3.80 15.58 3 1 1 caste Munna yadav s/o Kali Charan SELF M 42 2 1 2 1 3000 Raj kumari WIFE F 38 1 1 5 Vikas SON M 8 2 2 6 Akash SON M 5 2 1 7 Prakash SON M 3 2 1 7 Kedar BROTHER M 65 2 1 1 188 HR/ BWR/SQ/ R-23 Hamirpur Maudaha Biwar 43+330 2 3 1 1 9.20 2.00 3.80 7.60 3 1 1 caste Hamid Ahmad s/o Habib SELF M 50 1 1 2 1 5 2500 Noor Jahan WIFE F 45 1 1 1 6 Ashmin DAUGHTER F 17 2 3 6 Shamir SON M 14 2 3 6 Shohail SON M 12 2 2 6 189 HR/ BWR/K/ R-24 Hamirpur Maudaha Biwar 43+345 2 4 1 1 6.80 NA NA NA 1 2 1 caste Kallu s/o subedaar SELF M 25 1 1 3 3 5 2000 Sajra WIFE F 22 1 3 5 Sanam DAUGHTER F 1 2 1 7 190 HR/ BWR/K/ R-25 Hamirpur Maudaha Biwar 43+565 2 4 1 1 6.00 NA NA NA 3 2 1 caste Maya w/o Ram kripal SELF F 40 4 1 1 3 3 1800 Ram kripal HUSBAND M 45 1 4 1 Mahesh SON M 23 2 3 1 Santosh SON M 20 2 3 1 Egis India Consulting Engineers Pvt. Ltd. Page 22 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 191 HR/ BWR/EN / R-26 Hamirpur Maudaha Biwar 43+635 2 2 1 1 9.70 3.00 0.30 0.90 3 2 1 caste Govind s/o Guru Dayal SELF M 27 2 2 3 1 5 4000 Guru Dayal FATHER M 60 1 2 1 1 Rajrani MOTHER F 55 1 1 5 192 HR/ BWR/EN / R-27 Hamirpur Maudaha Biwar 43+770 2 2 1 5 8.50 4.50 1.50 6.75 3 2 1 caste Habib s/o sadhu SELF M 58 4 1 2 3 2 2800 Idia WIFE F 55 1 1 5 Mizan ali SON M 26 2 4 1 Noor mohd. SON M 24 2 4 1 Madina DAUGHTER F 21 2 3 5 Sitara DAUGHTER F 18 2 4 5 193 HR/ BWR/EN / R-28 Hamirpur Maudaha Biwar 43+780 2 2 1 1 8.00 5.20 1.50 7.80 3 2 1 caste Rameshuar Prjapati s/o sidh SELF M 60 3 1 7 3 2 3200 Gopal Shiv rani WIFE F 56 1 1 5 Jai pal SON M 30 1 7 1 Poonam D/L F 25 1 1 5 Jyoti G/D F 3 2 1 7 Ashok Kumar SON M 22 2 6 6 194 HR/ BWR/EN / R-29 Hamirpur Maudaha Biwar 43+800 2 2 1 5 8.80 4.70 1.20 5.64 3 2 1 BPL Iqbal s/o maula yakhsha SELF M 42 1 1 2 1 3 5000 Bano WIFE F 40 1 1 5 Shabina DAUGHTER F 15 2 3 6 Mohd. Siddiq SON M 14 2 3 6 Sazid SON M 9 2 2 6 195 HR/ BWR/EN / R-30 Hamirpur Maudaha Biwar 43+825 2 2 2 1 8.70 2.70 2.90 7.83 3 2 1 caste Idrish s/o saiyyad SELF M 30 2 1 3 3 3000 Julekha WIFE F 28 1 1 5 Imran SON M 5 2 2 7 ilshan SON M 3 2 1 7 Muskan DAUGHTER F 1 2 7 7 Khimiya MOTHER F 55 4 1 2 196 HR/ BWR/EN / R-31 Hamirpur Maudaha Biwar 43+835 2 2 1 1 8.10 2.80 1.90 5.32 3 2 1 caste Jodha S/o Bahora SELF M 65 3 1 1 1 1 6000 Munni Khatoon WIFE F 60 1 1 5 Usman SON M 36 1 4 1 3 Nasima bano D/L F 32 1 3 1 5 Imam ali SON M 24 2 6 1 3 197 HR/ BWR/EN / R-32 Hamirpur Maudaha Biwar 35+060 2 2 1 5 9.00 3.90 3.00 11.70 3 2 1 caste Jai Hind s/o Buddha SELF M 34 1 1 2 1 3 3000 Raj kumari WIFE F 32 1 1 5 Himansu SON M 13 2 3 6 Pransu SON M 11 2 3 6 Anshu SON M 6 2 2 6 Aarti DAUGHTER F 14 2 3 6 Egis India Consulting Engineers Pvt. Ltd. Page 23 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 198 HR/CLI /SQ/ R-1 Hamirpur Maudaha Chilli 40+590 2 3 1 1 6.70 2.10 2.80 5.88 4 2 1 BPL Shivk aran s/o mohan lal SELF M 65 2 1 2 1 3 3000 Shyama deve WIFE F 60 1 1 1 Jaindro SON M 35 2 1 1 6 199 HR/CLI /EN/ R-2 Hamirpur Maudaha Chilli 41+340 2 2 1 2 8.10 5.20 1.90 9.88 3 2 1 BPL Bharat sing s/o sunder lal SELF M 45 2 5 1 5 2400 Kesh kali WIFE F 40 1 5 1 Patchan singh SON M 20 2 1 5 Roshni DAUGHTER F 17 2 4 6 200 HR/CLI /K/ R-3 Hamirpur Maudaha Chilli 41+350 2 4 1 1 6.70 NA NA NA 3 2 1 caste Maheshwari deen s/o ram gulam SELF M 65 1 1 3 1 5 4200 Saraswat WIFE F 60 1 1 5 201 HR/CLI /SQ/ R-4 Hamirpur Maudaha Chilli 41+365 2 4 1 1 6.70 3.10 2.80 8.68 3 2 1 caste Devi charan s/o sheetal prasad SELF M 22 2 2 4 1 5 2800 Smt Puspa deve MOTHER F 42 5 1 5 Kanchan SISTER F 16 2 4 6 202 HR/CLI /EN/ L-1 Hamirpur Maudaha Chilli 41+410 1 2 1 2 8.80 2.10 5.20 10.92 1 2 1 BPL Badri prasad s/o mahaveer SELF M 45 1 1 1 1 3 3500 Bhoori WIFE F 40 1 1 1 1 Akash SON M 14 2 3 6 Amrita DAUGHTER F 10 2 2 6 Malti DAUGHTER F 8 2 5 5 203 HR/CLI /EN/ L-2 Hamirpur Maudaha Chilli 41+420 1 2 2 4 8.30 4.10 NA 4.10 1 2 1 caste Madan pal s/o mahaveer SELF M 52 4 1 3 1 3 7000 om shree WIFE F 50 1 2 5 Divendra SON M 23 2 6 1 3 Ajeet kumar SON M 18 2 5 6 Satyaprakash SON M 30 1 6 1 3 Manisha D/L F 26 1 4 1 Shiva G/S M 1 2 1 7 204 HR/CLI /EN/ R-5 Hamirpur Maudaha Chilli 41+430 2 2 1 4 7.50 23.50 NA 23.50 3 2 1 caste Krishan dutta saini s/o ranehi SELF M 50 3 1 6 1 4 10000 Munni devi WIFE F 55 1 1 5 Amit kumar SON M 30 1 7 1 4 Bharti D/L F 27 1 4 5 Annanya G/D F 2 2 1 7 Pravesh saini SON M 25 2 6 6 205 HR/CLI /SQ/ R-6 Hamirpur Maudaha Chilli 41+440 2 3 1 1 5.80 2.00 2.30 4.60 3 2 1 caste Subhash kumar s/o ram autar SELF M 45 2 1 2 1 5 6000 Premrani WIFE F 40 1 1 5 Lavlesh SON M 15 2 4 6 Preeti DAUGHTER F 12 2 3 6 Yogesh SON M 10 2 3 6 Kapoori devi MOTHER` F 65 5 1 1 206 HR/CLI /EN/ L-3 Hamirpur Maudaha Chilli 41+445 1 2 1 5 8.80 2.10 2.00 4.20 4 2 1 BPL Drig pal s/o mangle sing SELF M 62 3 1 4 1 1 4200 Egis India Consulting Engineers Pvt. Ltd. Page 24 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Krishna WIFE F 58 1 4 5 Dherendra SON M 32 1 4 1 3 Rekha D/L F 30 1 3 1 Rudra pratap G/S M 1 2 4 7 Jetendra SON M 29 2 4 1 3 207 HR/CLI /EN/ L-4 Hamirpur Maudaha Chilli 41+445 1 2 1 2 7.10 9.10 2.90 26.39 1 2 1 caste Rajesh s/o ramfal SELF M 35 1 1 5 1 1 3500 Asha WIFE F 30 1 3 5 Prerna DAUGHTER F 5 2 7 7 Horilal SON M 2 2 7 208 HR/CLI /EN/ L-5 Hamirpur Maudaha Chilli 41+490 1 2 3 3 9.60 5.30 0.40 2.12 3 2 1 caste Ganesh shanker s/o ganga deen SELF M 51 1 1 6 1 5 4000 Suman lata WIFE F 47 1 1 5 6 Richa DAUGHTER F 20 2 4 6 Rishabh SON M 16 2 5 6 209 HR/CLI /EN/ L-6 Hamirpur Maudaha Chilli 41+560 1 2 1 2 9.70 11.50 0.40 4.60 3 2 1 caste Raj kumar s/o bridawan SELF M 45 3 1 5 1 5 6000 suman WIFE F 40 1 2 5 Ramakant SON M 22 1 6 1 6 Kusum dev D/L F 20 1 3 5 Shivakant SON M 18 2 5 1 6 Pragya DAUGHTER F 16 2 4 6 210 HR/CLI /EN/ L-7 Hamirpur Maudaha Chilli 41+590 1 2 1 2 8.20 4.70 1.80 8.46 3 2 1 caste Santosh s/o gayadeen SELF M 50 4 1 6 3 7000 pan kumari WIFE F 45 1 3 5 Jetendra SON M 28 2 6 6 Dhirendra SON M 24 2 3 6 Nitendra SON M 18 2 5 6 Sushila MOTHER F 70 5 1 2 211 HR/CLI /EN/ L-8 Hamirpur Maudaha Chilli 41+600 1 2 2 2 9.60 4.90 0.40 1.96 3 2 1 caste Sri prakash s/o babu ram SELF M 35 1 1 3 1 3 6000 seta WIFE F 30 1 3 5 Ashi DAUGHTER F 3 2 7 212 HR/CLI /EN/ L-9 Hamirpur Maudaha Chilli 41+670 1 2 1 4 6.70 14.00 NA 14.00 4 2 1 WHH Ram kumari s/o ranveer singh SELF F 48 3 5 3 5 4 3000 Atul SON M 26 1 7 5 Ankita D/L F 25 1 7 5 Anuj SON M 23 2 7 3 213 HR/CLI /EN/ L-10 Hamirpur Maudaha Chilli 41+670 1 2 2 1 8.80 2.80 1.20 3.36 3 2 1 caste Ganga deen s/o govind dass SELF M 62 2 1 6 3 5 5000 214 HR/CLI /EN/ L-10A Hamirpur Maudaha Chilli 41+675 1 2 2 4 7.00 22.00 NA 22.00 Rutmin WIFE F 65 1 1 5 Suresh kumar SON M 40 1 5 1 Keerti D/L F 26 1 3 5 Egis India Consulting Engineers Pvt. Ltd. Page 25 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Arish G/S M 16 2 5 6 Akanksha G/D F 14 2 5 6 Anshika G/D F 3 2 1 7 Baby G/S M 1 2 1 7 215 HR/CLI /K/ R-7 Hamirpur Maudaha Chilli 41+690 2 4 1 1 6.70 NA NA NA 3 2 1 caste Santosh kumar s/o Prabhu SELF M 45 3 1 2 1 3 3500 smt Shakuntala WIFE F 40 1 1 5 3 Ram kishor SON M 25 1 7 1 5 Ramakanti D/L F 22 1 3 5 Pawan SON M 18 2 5 6 Bharat kumar SON M 14 1 3 6 216 HR/CLI /EN/ L-11 Hamirpur Maudaha Chilli 41+725 1 2 1 2 9.70 5.20 0.30 1.56 1 2 1 caste Durga s/o Kinna SELF M 58 4 1 1 3 3 3000 Rani WIFE F 55 1 1 5 Mahesh SON M 25 1 1 1 Gomti D /L F 24 1 1 5 Naresh SON M 23 1 1 1 Rita D /L F 20 1 1 5 Suresh SON M 18 2 1 1 Raja DAUGHTER F 17 2 1 5 Sarita DAUGHTER F 15 2 4 6 Anshu DAUGHTER F 16 2 4 6 217 HR/CLI /EN/ L-12 Hamirpur Maudaha Chilli 41+735 1 2 1 2 8.40 4.40 1.60 7.04 1 2 1 caste Ram raj S/o Kinna SELF M 60 3 1 1 3 3 3500 Prenvati WIFE F 65 1 1 5 Sughram SON M 35 1 1 1 Chunni D/L F 30 1 2 5 Shivpal SON M 30 1 1 1 Kasture D/L F 28 1 1 5 Sajju SON F 20 2 2 1 Anil SON M 19 2 5 1 218 HR/CLI /EN/ L-13 Hamirpur Maudaha Chilli 41+750 1 2 1 2 5.30 2.60 2.20 5.72 1 2 1 caste Ram gopal s/o gajraj SELF M 40 1 1 1 1 2500 Munni WIFE F 38 1 1 5 Roobi DAUGHTER F 15 2 4 6 Anil SON M 12 2 3 6 Sunny SON M 6 2 2 6 219 HR/CLI /EN/ L-13A Hamirpur Maudaha Chilli 41+755 1 2 1 2 8.10 3.20 1.90 6.08 1 2 1 caste Ram prakash s/o gajraj SELF M 34 1 1 1 3 2 3000 Sangeta WIFE F 30 1 1 5 Ajay SON M 12 2 3 6 Rishi SON M 8 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 26 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Milan SON M 5 2 2 7 Reeta DAUGHTER F 4 2 2 7 220 HR/CLI /EN/ L-13B Hamirpur Maudaha Chilli 41+760 1 2 1 2 8.10 3.20 1.90 6.08 1 2 1 caste Rajesh s/o gajraj SELF M 27 1 1 3 3 2 2500 Chandra WIFE F 25 1 1 5 Anita DAUGHTER F 5 2 2 7 Sachin SON M 3 2 2 7 Anshika DAUGHTER F 1 2 1 7 221 HR/CLI /EN/ L-13C Hamirpur Maudaha Chilli 41+765 1 2 1 2 8.10 3.20 1.90 6.08 1 2 1 caste Ramu prasad s/o gajraj SELF M 26 1 2 3 3 2 3500 222 HR/CLI /EN/ L-13D Hamirpur Maudaha Chilli 41+765 1 2 1 2 8.10 3.20 1.90 6.08 1 2 1 caste Raju s/o gajraj SELF M 35 1 1 1 3 2 4000 Vandana WIFE F 32 1 1 5 Roshni DAUGHTER F 6 2 2 6 Barish SON M 5 2 2 7 Rohit SON M 3 2 1 7 223 HR/CLI /K/Ll-14 Hamirpur Maudaha Chilli 41+780 1 4 1 1 7.70 NA NA NA 3 2 1 caste Sarif s/o Lal bahadur SELF M 55 1 1 6 1 5 2600 Sabina WIFE F 52 1 2 5 Shomin SON M 3 2 1 7 Sabir SON M 1 2 1 7 224 HR/CLI /SQ / L-15 Hamirpur Maudaha Chilli 43+765 2 3 1 1 8.20 2.20 3.10 6.82 3 2 1 caste Vinod s/o pannalal SELF M 40 2 1 2 1 5 2200 Gomti WIFE F 35 1 1 5 Sheelu DAUGHTER F 18 2 5 6 Dhrendra SON M 16 2 3 6 Mohini DAUGHTER F 14 2 3 6 Shivam SON M 12 2 2 6 225 HR/CLI /K/L-16 Hamirpur Maudaha Chilli 41+790 1 4 1 1 9.20 NA NA NA 3 2 1 caste Jagram s/o bhaiya deen SELF M 60 2 5 1 3 3 2000 Shivpati WIFE F 56 1 3 1 Santosh SON M 30 1 1 1 Vimla D/L F 25 1 1 5 Saurabh G/S M 8 2 2 6 Gaurav G/S M 6 2 2 6 226 HR/RS/DMP/EN/COM/1 Hamirpur Maudaha Damupurwa 46+00 2 2 1 1 5.30 2.10 4.70 9.87 1 2 1 caste Dharam das s/o har dayal SELF M 48 3 1 1 1 1 18000 Kuwan Bai WIFE F 45 1 1 5 1 Manoj SON M 24 2 3 1 3 Raj narain SON M 22 2 3 1 3 Mokesh SON M 18 2 4 6 Narendra SON M 15 2 7 6 227 HR/RS/DMP/EN/RES/2 Hamirpur Maudaha Damupurwa 46+150 2 2 1 2 9.50 5.90 0.50 2.95 1 2 1 caste Hajari prasad s/o nandi SELF M 40 1 1 1 1 3 16000 Hem WIFE F 35 1 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 27 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Nilesh SON M 13 2 2 6 Reena DAUGHTER F 10 2 2 6 Asan SON M 8 2 2 6 228 HR/LS/DMP/EN/RES/1 Hamirpur Maudaha Damupurwa 46+190 1 2 1 2 8.40 8.00 1.60 12.80 3 2 1 BPL Mohan lal s/o ganpat SELF M 50 2 1 3 1 3 8000 Kusmarani WIFE F 45 1 1 5 Santram SON M 27 2 6 1 3 Sandip SON M 19 2 5 1 3 Guriya DAUGHTER F 16 2 5 6 229 HR/RS/DMP/EN/RES/3 Hamirpur Maudaha Damupurwa 46+200 2 2 1 2 9.20 4.00 0.80 3.20 3 2 1 BPL Mangi s/o chaperi lal SELF M 85 1 5 1 1 1 2000 230 HR/LS/DMP/EN/RES/2 Hamirpur Maudaha Damupurwa 46+205 1 2 2 2 9.00 3.40 1.00 3.40 3 2 1 BPL Raja ram s/o prasram SELF M 42 1 1 3 1 3 6000 Vimla WIFE F 40 1 1 5 Harendra SON M 19 2 4 1 3 Satyendra SON M 18 2 1 3 Sudha DAUGHTER F 13 2 3 1 231 HR/LS/DMP/EN/RES/3 Hamirpur Maudaha Damupurwa 46+210 1 2 1 2 9.00 10.20 1.00 10.20 3 2 1 BPL Bheekham s/o chhiriya SELF M 62 3 1 2 1 2200 Indrani WIFE F 60 1 1 2 Prem Narayan SON M 40 2 1 1 3 6000 Jai naraiyan SON M 38 1 3 1 3 Rani DAUGHTER F 35 1 3 5 Sumit SON M 8 2 2 6 Khushi DAUGHTER F 5 2 2 7 Ria DAUGHTER F 2 2 1 7 232 HR/LS/DMP/K-4 Hamirpur Maudaha Damupurwa 46+220 1 4 1 1 6.10 NA NA NA 3 2 1 BPL Rajesh s/o chayya lal SELF M 30 1 1 1 3 5 5000 Tara rani WIFE F 25 1 1 5 Anjali DAUGHTER F 6 2 2 6 Smita DAUGHTER F 4 2 1 7 Shika DAUGHTER F 1 2 1 7 Kajal DAUGHTER F 1 2 1 7 233 HR/LS/DMP/K-5 Hamirpur Maudaha Damupurwa 46+230 1 4 1 1 5.90 NA NA NA 3 2 1 BPL Ramesh s/o raj bahadur SELF M 48 2 1 3 1 5 6000 Lajja devi WIFE F 45 1 4 1 5 Sanjay SON M 21 2 4 6 Anand SON M 2 4 6 7 234 HR/LS/DMP/EN/RES/6 Hamirpur Maudaha Damupurwa 46+250 1 2 2 2 8.40 5.70 1.60 9.12 4 2 1 BPL Hardayal s/o subedar SELF M 55 2 1 4 3 3 6000 Prem rani WIFE F 50 1 1 5 Sarvesh SON M 23 2 6 2 Arun kumar SON M 18 2 5 6 235 HR/LS/DMP/EN/RES/7 Hamirpur Maudaha Damupurwa 46+270 1 2 1 2 6.70 5.20 3.30 17.16 1 2 1 caste Asharfi s/o Govind Dass SELF M 55 2 1 2 3 3 20000 Egis India Consulting Engineers Pvt. Ltd. Page 28 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Sunder WIFE F 52 1 2 5 Jitender SON M 30 1 3 1 Meena D/L F 25 1 3 5 Sugam G/S M 5 2 2 7 236 HR/LS/DMP/K-8 Hamirpur Maudaha Damupurwa 46+290 1 4 1 1 7.30 NA NA NA 3 2 1 BPL Jai hind s/o sukhnandan SELF M 25 1 1 6 3 5 5000 Aneeta WIFE F 22 1 1 5 Chanchal DAUGHTER F 2 2 1 7 kamal DAUGHTER F 2 2 1 7 237 HR/LS/DMP/EN/RES-9 Hamirpur Maudaha Damupurwa 46+330 1 2 1 2 7.30 14.00 2.70 37.80 3 2 1 WHH Malti devi s/o indra kumar SELF F 45 2 1 1 3 5 6000 indra kumar HUSBAND M 50 1 1 1 Abhilash DAUGHTER F 23 2 2 6 Dinesh SON M 20 2 6 6 238 HR/LS/DMP/EN/RES-10 Hamirpur Maudaha Damupurwa 46+335 1 2 1 2 9.80 16.80 0.20 3.36 3 2 1 BPL Munna s/o tika ram SELF M 32 2 1 1 3 5 18000 shega WIFE F 32 1 5 5 Ansuiya devi DAUGHTER F 22 2 2 6 Mukesh SON M 19 2 4 6 Sandeep SON M 16 2 4 6 239 HR/RS/BSW/K-1 Hamirpur Maudaha Baswari 47+700 2 4 1 1 6.20 NA NA NA 3 2 1 caste Gururar Prasad S/o Laxmi SELF M 1 240 HR/RS/BSW/En -1 Hamirpur Maudaha Baswari 47+725 1 2 1 5 8.60 3.30 1.40 4.62 3 2 1 caste Kishori SELF M 1 241 HR/RS/BSW/EN -2 Hamirpur Maudaha Baswari 47+750 2 2 2 2 9.20 3.00 0.80 2.40 Raj Kr. S/o Ratan SELF M 1 242 HR/RS/BSW/En- 3 Hamirpur Maudaha Baswari 47+950 2 2 2 3 6.00 11.60 4.00 46.40 3 2 1 caste Shiv prasad s/o buddha SELF M 85 1 1 4 1 4 4000 savita WIFE F 60 1 1 5 243 HR/RS/BSW/SQ/COM/4 Hamirpur Maudaha Baswari 47+960 2 3 1 1 6.50 3.00 2.00 6.00 4 2 Kripal singh s/o bhayadeen SELF M 64 1 1 1 3 3 3200 Sivkuriya WIFE F 60 1 1 5 244 HR/RS/BSW/K-5 Hamirpur Maudaha Baswari 47+995 2 4 1 1 7.20 NA NA NA 3 2 1 caste Surendra s/o srikisan SELF M 22 1 1 3 1 5 2000 rajni WIFE F 20 1 3 5 ritikpal SON M 1 2 1 7 245 HR/LS/BSW/SQ/COM/2 Hamirpur Maudaha Baswari 48+600 1 3 1 1 7.70 3.10 2.90 8.99 1 2 1 caste Hindupat s/o boocha SELF M 50 2 1 3 3 5 2800 vidya WIFE F 40 1 3 5 ram sing SON M 25 2 3 1 rem chandra SON M 20 2 3 1 246 HR/LS/BSW/SQ/COM/3 Hamirpur Maudaha Baswari 48+620 1 3 2 1 8.60 2.60 1.40 3.64 3 1 1 caste Madar Bakhsh S/o Mannu SELF M 1 247 HR/RS/MKR/ENC/OTHER/1Hamirpur Maudaha Muskra 50+350 2 2 2 5 9.70 6.20 0.30 1.86 4 2 Rajendra S/o Babu Ram SELF M 1 Gupta 248 HR/RS/MKR/ENC/COM/2 Hamirpur Maudaha Muskra 50+385 2 2 2 1 8.60 3.80 1.40 5.32 Shiv Karan S/o Hari Das SELF M 1 249 HR/RS/MKR/SQ/COM/03 Hamirpur Maudaha Muskra 50+400 2 3 2 1 8.80 7.30 1.20 8.76 4 2 Ram Saran s/o Late Ayodhya SELF M 54 2 1 5 1 5 10000 Prasad Raj Kumari WIFE F 53 1 2 5 Adarsh SON M 22 2 5 6 5 Egis India Consulting Engineers Pvt. Ltd. Page 29 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Anjana DAUGHTER F 24 2 2 5 250 HR/LS/MKR/SQ/COM/01 Hamirpur Maudaha Muskra 50+450 1 3 1 1 6.80 5.00 3.30 16.50 1 2 1 caste Munna Baba S/O Murlidhar SELF M 55 1 5 1 3 5 3000 251 HR/RS/MKR/SQ/COM/04 Hamirpur Maudaha Muskra 50+455 2 3 1 1 7.80 3.00 6.00 42.00 1 2 1 BPL Hari Singh s/o Matadeen SELF M 45 1 1 2 1 5 5000 Rekha Rani WIFE F 40 1 1 5 Manoj SON M 18 2 2 1 6 Meera DAUGHTER F 12 2 3 6 Priyadam SON M 8 2 2 6 252 HR/LS/MKR/K/02 Hamirpur Maudaha Muskra 50+470 1 4 1 1 8.80 NA NA NA 3 2 1 caste Santosh S/O Rameshwar SELF M 35 1 1 4 3 5 3500 Mamta WIFE F 32 1 1 5 Vikas SON M 11 2 2 6 Pooja DAUGHTER F 8 2 2 6 253 HR/RS/MKR/EN/COM/05 Hamirpur Maudaha Muskra 50+480 2 2 2 2 7.80 7.00 2.20 15.40 3 2 1 caste Ram Babu s/o Basant Singh SELF M 50 2 1 6 1 4000 Ram Janki WIFE F 45 1 3 1 Meenu DAUGHTER F 22 2 2 2 Abhishek SON M 20 2 5 6 Sonam DAUGHTER F 18 2 4 6 Monjeet SON M 16 2 3 6 254 HR/RS/MKR/EN/COM/06 Hamirpur Maudaha Muskra 50+485 2 2 1 3 9.70 5.30 0.30 1.59 3 2 1 caste Arjun Singh Rajpoot s/o Desh SELF M 60 2 1 1 1 3 4000 Raj Kumari WIFE F 58 1 1 5 Jai Indra SON M 27 1 2 1 3 2000 Pushpa D/L F 25 1 2 5 Ankit G/S M 5 2 1 7 Piyush G/S M 3 2 1 7 Arvind SON M 20 2 3 1 255 HR/LS/MKR/En/R+C/03 Hamirpur Maudaha Muskra 50+490 1 2 3 3 8.20 3.40 1.80 6.12 4 2 Pragi Lal S/o Sheetal Prasad SELF M 75 1 1 2 1 2 2000 Lachhi WIFE F 70 1 1 2 Bhaskar SON M 10 2 3 6 256 HR/RS/MKR/SQ/COM/09 Hamirpur Maudaha Muskra 50+550 2 3 1 1 6.00 5.20 4.00 20.80 Nazim S/o Mohar Khan SELF M 1 257 HR/RS/MKR/SQ/COM/10 Hamirpur Maudaha Muskra 50+565 2 3 1 1 6.00 2.50 3.00 7.50 3 2 1 caste Deen Dayal s/o Nandu SELF M 24 1 1 2 1 5 10000 Kasturi WIFE F 20 1 1 5 Abhilasha DAUGHTER F 1 2 1 7 258 HR/RS/MKR/K-11 Hamirpur Maudaha Muskra 50+570 2 4 1 1 6.70 NA NA NA Absent SELF M 1 259 HR/RS/MKR/K/COM/12 Hamirpur Maudaha Muskra 50+580 2 4 1 1 6.70 NA NA NA 3 2 1 caste Mahipat s/o Laxman SELF M 26 1 2 1 1 5 2000 Manoj BROTHER M 24 2 3 1 1 260 HR/RS/MKR/K/COM/13 Hamirpur Maudaha Muskra 50+585 2 4 1 1 6.70 NA NA NA 1 2 1 caste Govind Das s/o Hardayal SELF M 37 1 1 2 1 5 2000 Seema WIFE F 32 1 1 5 Raj Kumar SON M 15 2 3 6 Egis India Consulting Engineers Pvt. Ltd. Page 30 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Jitendra SON M 13 2 2 6 Yogendra SON M 11 2 2 6 Pawan SON M 9 2 2 6 261 HR/RS/MKR/SQ/R+C/14 Hamirpur Maudaha Muskra 50+595 2 3 1 3 7.30 7.30 3.30 24.09 3 2 1 caste Puran s/o Durga SELF M 55 2 1 1 1 3 3000 Bittan WIFE F 20 1 1 1 3 Delli SON M 22 2 1 1 6 Hema DAUGHTER F 18 2 1 5 soni DAUGHTER F 16 2 1 5 262 HR/RS/MKR/K-15A Hamirpur Maudaha Muskra 50+620 2 4 1 1 7.00 NA NA NA 3 2 1 caste Triloki s/o Kunwar SELF M 48 3 5 2 1 5 2000 Subhash SON M 26 1 5 1 3 Arti D/L F 23 1 3 5 Manish SON M 23 1 4 1 3 Kajal D/L F 20 1 4 5 263 HR/RS/MKR/k-16 Hamirpur Maudaha Muskra 50+620 2 4 1 1 7.20 NA NA NA Mukesh S/o Akhilesh SELF M 1 264 HR/RS/MKR/SQ/COM/17 Hamirpur Maudaha Muskra 50+640 2 3 1 1 6.60 7.50 3.90 29.25 1 2 1 caste Pramod s/o Ramaiya SELF M 30 1 1 3 1 5 4000 Anita WIFE F 25 1 1 5 Roshani DAUGHTER F 6 2 2 6 Abhishek SON M 8 2 2 6 265 HR/RS/MKR/k-18 Hamirpur Maudaha Muskra 50+650 2 4 1 1 6.60 NA NA NA Shyam S/o SELF M 1 266 HR/RS/MKR/SQ/R+C/19 Hamirpur Maudaha Muskra 50+655 2 3 1 1 7.50 7.30 2.50 18.25 Munna S/o Parsi SELF M 1 267 HR/RS/MKR/SQ/COM/22 Hamirpur Maudaha Muskra 50+680 2 3 1 1 7.30 3.50 3.10 10.85 Madan S/o Jagannath SELF M 30 1 1 4 1 5 4500 maheswri WIFE M 26 1 1 1 1 268 HR/RS/MKR/en/COM/24 Hamirpur Maudaha Muskra 50+720 2 2 2 1 7.00 2.80 3.40 9.52 Jaiveer Singh S/o Mahesh SELF M 1 Vari deen 269 HR/RS/MKR/SQ/COM/28 Hamirpur Maudaha Muskra 50+815 2 4 2 1 7.30 5.80 2.70 15.66 3 2 1 caste Raj Kishor s/o Late Jai Lal SELF M 70 1 1 5 1 5000 Ansuia Rani WIFE F 65 1 2 5 270 HR/RS/MKR/SQ /32 Hamirpur Maudaha Muskra 50+840 2 4 1 1 6.50 4.70 3.50 NA 3 2 1 caste BALLU .S/O.BABU LALL SELF M 1 271 HR/LS/MKR/SQ/COM/20 Hamirpur Maudaha Muskra 50+920 1 3 1 1 7.00 2.80 3.00 8.40 3 2 1 caste Jai Karan S/O Kallu SELF M 38 1 1 1 3 5 6000 Maan Kunwar WIFE F 34 1 3 5 Seema DAUGHTER F 12 2 5 6 Nitin SON M 10 2 2 6 Reena DAUGHTER F 9 2 2 6 Himanshu SON M 7 2 2 6 Rani DAUGHTER F 6 2 2 6 272 Hamirpur Maudaha HR/LS/MKR/EN/R+COM/35 Muskra 51+165 1 2 2 3 6.50 5.00 3.50 17.50 4 2 Gayasi Ram S/o Bhogga SELF M 42 1 1 5 1 1 5000 Shagun WIFE F 37 1 1 5 Amar Chandra SON M 20 2 5 6 Amrish SON M 18 2 4 6 Egis India Consulting Engineers Pvt. Ltd. Page 31 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Ashish SON M 16 2 3 6 273 Hamirpur Maudaha HR/LS/MKR/EN/R+COM/36 Muskra 51+175 1 2 2 3 6.50 5.00 3.50 15.00 3 2 1 caste Paltu Ram S/o Ram Charan SELF M 60 1 1 1 1 1 5000 kamli WIFE F 55 1 1 5 274 Hamirpur Maudaha HR/LS/MKR/EN/R+COM/37 Muskra 51+185 1 2 3 3 7.60 5.90 2.40 14.16 3 2 1 caste Kamal Kumar S/o virenchi Lal SELF M 55 3 1 3 1 6 6000 Vimla Devi WIFE F 50 1 2 5 Reena DAUGHTER F 24 2 7 5 Priyanka DAUGHTER F 22 2 7 5 275 Hamirpur Maudaha HR/LS/MKR/EN/R+COM/38 Muskra 51+195 1 2 3 3 7.20 6.10 2.80 17.08 Abhishek Rajpoot S/O Jagat Pal SELF M 1 276 HR/RS/MKR/EN/R+C/51 Hamirpur Maudaha Muskra 51+225 2 2 2 2 7.00 4.00 3.00 12.00 4 1 Salim Beg s/o Himmat Beg SELF M 60 2 1 1 1 6 8000 Sadda WIFE F 55 1 1 5 Samim Beg SON M 28 1 3 1 1 Angum D/L F 24 1 5 1 277 45 HR/LS/MKR/EN/COM/41 &Hamirpur Maudaha Muskra 51+225 1 2 3 1 5.70 9.00 4.30 38.70 4 1 Fareed Khan S/o Lt. Sagir Khan SELF M 29 1 1 5 1 1 20000 Anjum Khan WIFE F 25 1 3 5 Farhan Khan SON M 5 2 1 7 Afsha Kahtoon DAUGHTER F 2 2 1 7 278 HR/LS/MKR/EN/COM/44 Hamirpur Maudaha Muskra 51+235 1 2 2 1 6.60 7.80 3.40 26.52 3 2 1 caste Suraj Pd. S/o Pooran Lal SELF M 1 279 HR/RS/MKR/K/53 Hamirpur Maudaha Muskra 51+235 2 4 1 1 6.00 NA NA NA 3 1 1 caste Kamruddin s/o Shamsuddin SELF M 41 1 1 3 1 3 4000 Kamar jahan WIFE F 36 1 5 1 Irfan SON M 16 2 4 6 Rizwan SON M 14 2 3 6 Lookman SON M 12 2 2 6 280 HR/RS/MKR/K/55 Hamirpur Maudaha Muskra 51+250 2 4 1 1 7.00 NA NA NA Geeta Agrawal w/o Prakash SELF F 1 Agrawal 281 HR/RS/MKR/K/56 Hamirpur Maudaha Muskra 51+250 2 4 1 1 6.00 NA NA NA Ram Shankar S/o SELF M 70 3 1 3 1 5 2400 Rameshwar Niwada devi WIFE F 68 1 1 2 Sanjit SON M 32 2 7 3 Nirmla DAUGHTER F 30 2 3 5 Dinesh SON M 27 2 6 3 282 HR/LS/MKR/K-47 Hamirpur Maudaha Muskra 51+255 1 4 1 1 4.00 NA NA NA 3 1 1 caste Khalil S/o Jalaluddin SELF M 55 2 1 3 3 5 6000 Jannat WIFE F 50 1 1 5 Bahidan DAUGHTER F 21 2 3 6 Sadiq SON M 19 2 5 6 Jaan Mohd. SON M 18 2 4 6 283 HR/RS/MKR/SQ/COM/57 Hamirpur Maudaha Muskra 51+255 2 3 2 1 6.70 2.90 3.20 9.28 3 1 1 BPL Khairati mohd. s/o Maula SELF M 55 3 1 1 3 5 3200 Bakhsh Nasso WIFE F 52 1 1 5 Chanda SON M 25 1 2 2 Mubeena D/L F 22 1 3 5 Egis India Consulting Engineers Pvt. Ltd. Page 32 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Jamaluddin SON M 20 2 3 1 Munna SON M 19 2 4 6 Shahna DAUGHTER F 18 2 4 6 Kammo DAUGHTER F 14 2 4 6 Shanno DAUGHTER F 10 2 3 6 284 HR/RS/MKR/K/58 Hamirpur Maudaha Muskra 51+260 2 4 1 1 6.70 NA NA NA 3 1 1 caste Rustam ali s/o Hamid SELF M 41 4 1 4 3 5 3000 Shabnam WIFE F 38 1 3 5 Peer Bano DAUGHTER F 20 2 2 2 Khushbu Bano DAUGHTER F 19 2 5 2 Ruskhsaar Bano DAUGHTER F 18 2 4 2 Chaman SON M 16 2 3 2 Abir SON M 12 2 3 2 Muskan DAUGHTER F 10 2 2 2 285 HR/LS/MKR/K-48 Hamirpur Maudaha Muskra 51+260 1 4 1 1 4.00 NA NA NA 4 1 1 BPL Ramzan S/o Kadeer Khan SELF M 45 1 1 1 3 5 4000 Sultana WIFE F 40 1 1 5 Sonali DAUGHTER F 15 2 2 6 Munni DAUGHTER F 10 2 2 6 Sameer SON M 8 2 2 6 amir SON M 5 2 2 7 286 HR/LS/MKR/SQ/COM/49 Hamirpur Maudaha Muskra 51+265 1 3 1 1 6.60 2.20 3.40 7.48 4 2 Alok Kumar S/O Babu Lal SELF M 42 2 1 5 3 5 5000 Manisha WIFE F 35 1 5 5 Pranjal SON M 10 2 2 6 Sajal SON M 8 2 2 6 Asha devi MOTHER F 65 5 4 2 287 HR/RS/MKR/SQ/COM/60 Hamirpur Maudaha Muskra 51+270 2 3 1 1 6.00 2.10 4.00 8.40 1 2 1 caste Munna lal s/o Rajuwa SELF M 60 3 1 1 1 5 3000 Shyam WIFE F 55 1 1 1 Ram kumar SON M 30 1 3 1 2 Jitendra SON M 25 1 3 3 Shanti D/L F 22 1 4 5 288 HR/RS/MKR/SQ/COM/61 Hamirpur Maudaha Muskra 51+275 2 3 1 1 6.20 2.20 3.80 8.36 Absent SELF M 1 289 HR/RS/MKR/K /62 Hamirpur Maudaha Muskra 51+275 2 4 1 1 5.50 NA NA NA 3 2 1 caste Bhanvati w/o Bhagirath SELF F 50 2 1 1 1 5 2200 Bhagirath HUSBAND M 55 1 1 1 5 Ramwati DAUGHTER F 18 2 1 5 Dinesh SON M 14 2 1 2 290 HR/RS/MKR/K-63 Hamirpur Maudaha Muskra 51+275 2 4 1 1 5.50 NA NA NA 3 2 1 caste Hari Narain s/o ramdin SELF M 55 4 1 1 3 5 2000 Ram kali WIFE F 45 5 2 5 Nirmala DAUGHTER F 20 2 1 6 Egis India Consulting Engineers Pvt. Ltd. Page 33 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age kavita DAUGHTER F 28 2 1 6 Veer singh BROTHER M 45 1 4 1 Arti S/L F 35 1 1 5 Neelam NEPHEW F 15 2 3 6 Raj NEPHEW M 5 2 2 7 291 HR/LS/MKR/SQ/COM/50 Hamirpur Maudaha Muskra 51+275 1 3 1 1 6.70 2.15 3.30 7.10 4 2 Ramesh Chand S/o Manik Chand SELF M 42 5 1 7 3 5 4500 Prabha Devi WIFE F 40 1 5 5 Sneh Lata DAUGHTER F 22 2 1 6 Nishi DAUGHTER F 20 2 3 6 Divya DAUGHTER F 18 2 4 6 Anurag SON M 12 2 6 6 Manik Chand FATHER M 80 5 5 2 292 HR/LS/MKR/SQ/COM/51 Hamirpur Maudaha Muskra 51+277 1 3 1 1 6.70 2.10 3.30 6.93 4 1 Zakir Ahmad S/o Natthu Khan SELF M 44 2 1 5 3 5 5000 Bushra Nasim WIFE F 40 1 1 5 Asma Atiya Hayat DAUGHTER F 8 2 2 6 Abda Begam MOTHER F 73 5 1 2 293 HR/LS/MKR/SQ/COM/52 Hamirpur Maudaha Muskra 51+285 1 3 1 1 6.70 1.90 3.30 6.27 3 2 1 caste Ram Manohar S/o Pooran Lal SELF M 39 2 1 5 3 5 4000 Mamta WIFE F 37 1 5 5 Om Narain SON M 10 2 3 6 294 HR/LS/MKR/SQ/COM/53 Hamirpur Maudaha Muskra 51+290 1 3 1 1 4.00 2.00 6.00 12.00 3 2 1 caste Lekhraj S/o Neemnath SELF M 46 2 1 4 3 5 5000 Mithila WIFE F 40 1 1 5 Dahrmendra SON M 20 2 6 6 vimlesh DAUGHTER F 18 2 5 6 Jitendra SON M 13 2 3 6 Govind SON M 10 2 3 6 295 HR/RS/MKR/EN/R+C/67 Hamirpur Maudaha Muskra 51+300 2 2 3 3 5.50 4.20 1.00 4.20 3 2 1 caste Rameshwar Prasad s/o SELF M 63 4 1 5 3 6 4000 Maheshwari deen Uma devi WIFE F 60 1 3 1 Jagdish SON M 28 1 4 1 Lovely DAUGHTER F 23 1 7 6 Ram Gopal BROTHER M 37 1 3 3 Arun kumar S/L M 34 1 6 1 Alpana NEPHI F 13 2 4 6 Tanu NEPHI F 11 2 3 6 Raji NEPHI F 7 2 2 6 Rishabh NEPHEW M 3 2 2 7 296 HR/LS/MKR/SQ/COM/54 Hamirpur Maudaha Muskra 51+300 1 3 1 1 4.50 1.10 5.50 6.05 4 2 Arun Kr. S/o Ram Sahai SELF M 35 2 1 4 3 5 6000 Urmila WIFE F 32 1 4 5 Egis India Consulting Engineers Pvt. Ltd. Page 34 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Abhishek SON M 12 2 3 6 Akhancha DAUGHTER F 10 2 3 6 Ram Sahai FATHER M 70 1 2 2 Shaotra Rathore MOTHER F 65 1 1 2 297 HR/LS/MKR/EN/COM/55 Hamirpur Maudaha Muskra 51+310 1 2 2 1 4.50 2.90 5.50 15.95 4 2 Mool Chand S/o Prabhu Dayal SELF M 42 2 1 4 3 5 5000 Ranjana Gupta WIFE F 38 1 4 5 Muskan DAUGHTER F 10 2 2 6 Mansi DAUGHTER F 7 2 2 6 Ansh SON M 2 2 1 7 Kesar Gupta MOTHER F 65 5 1 1 298 HR/LS/MKR/SQ/COM/57 Hamirpur Maudaha Muskra 51+320 1 3 2 1 4.50 2.20 5.50 12.10 4 2 Sushil Chand S/o Manik Chand SELF M 60 3 1 7 3 5 12000 LeelaVati WIFE F 58 1 3 5 Mukesh SON M 32 1 6 6 sonam, D/L F 30 1 7 5 Sanish SON M 26 2 6 6 Kavya DAUGHTER F 2 2 1 7 299 HR/RS/MKR/EN/R+C/69 Hamirpur Maudaha Muskra 51+328 2 2 2 3 5.20 8.40 4.80 40.32 4 1 Raza Beg s/o Ahsan Beg SELF M 52 3 1 4 3 5 3000 Afsana WIFE F 48 1 3 5 Waseem beg SON M 25 1 6 1 Saneela D/L F 20 1 5 5 Ammar G/S M 1 2 1 7 kaseem Beg SON M 22 2 6 6 sadaf beg SON M 19 2 4 6 Sana DAUGHTER F 18 2 5 6 300 HR/LS/MKR/SQ/COM/59 Hamirpur Maudaha Muskra 51+335 1 3 1 1 5.20 2.30 4.80 11.04 3 2 1 caste Chain Sukh S/o Lt. Laxman SELF M 52 1 1 2 1 5 4500 sheela Devi WIFE F 48 1 1 5 anamika DAUGHTER F 14 2 5 6 301 HR/LS/MKR/SQ/COM/60 Hamirpur Maudaha Muskra 51+340 1 3 1 1 4.00 2.80 6.00 16.80 3 1 1 BPL Maan Veg S/o Subhani SELF M 52 2 1 4 3 5 5000 Jummi WIFE F 48 1 1 5 Mo.Taaj SON M 21 2 4 6 Yusuf SON M 19 2 6 6 302 HR/LS/MKR/SQ/COM/61 Hamirpur Maudaha Muskra 51+345 1 3 1 1 5.20 2.00 1.50 3.00 3 2 1 caste Bhagwan Das S/o Kishori Lal SELF M 32 1 1 2 1 5 6000 Asha Devi WIFE F 28 1 3 5 Khushbu DAUGHTER F 10 2 3 6 Rahul SON M 8 2 2 6 Prince SON M 5 2 1 7 303 HR/LS/MKR/SQ/COM/62 Hamirpur Maudaha Muskra 51+350 1 3 1 1 6.50 2.80 2.50 7.00 3 2 1 caste Jagat Ram S/o Kishori Lal SELF M 45 2 1 3 1 5 6000 Egis India Consulting Engineers Pvt. Ltd. Page 35 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Kusum Rani WIFE F 40 1 3 1 Rashmi DAUGHTER F 22 2 1 5 Sandip SON M 19 2 5 6 Kuldeep SON M 16 2 5 6 Shivam SON M 14 2 4 6 304 64 HR/LS/MKR/SQ/COM/63 &Hamirpur Maudaha Muskra 51+355 1 3 1 1 7.00 2.80 2.50 7.00 3 2 1 caste Jagdish Prasad S/o Kishori Lal SELF M 45 1 1 5 1 5 5000 Ramakanti WIFE F 40 1 5 5 Atul Kumar SON M 19 2 6 6 Ankit Kumar SON M 14 2 4 6 Anjali DAUGHTER F 13 2 3 6 305 HR/RS/MKR/EN/com/70 Hamirpur Maudaha Muskra 51+360 2 2 3 1 6.50 3.20 3.50 11.20 Lalri Devi W/o Lt.Dharam Pal SELF F 1 306 HR/RS/MKR/SQ/COM/71 Hamirpur Maudaha Muskra 51+370 2 3 1 1 6.50 2.90 4.10 11.89 3 1 1 caste Mohd. Syed s/o Mohd. SELF M 40 2 1 3 1 5 4000 Murtaza Rabiya WIFE F 35 1 2 5 Rukhsar DAUGHTER F 18 2 1 6 Mohd. Yasir SON M 12 2 3 6 Mahek DAUGHTER F 8 2 2 6 307 HR/LS/MKR/SQ/COM/65 Hamirpur Maudaha Muskra 51+380 1 3 1 1 5.70 1.50 2.00 3.00 3 2 1 caste Keshav Kumar S/o Bhola SELF M 28 1 1 6 1 5 5000 Laxmi WIFE F 25 1 5 5 308 HR/LS/MKR/SQ/COM/66 Hamirpur Maudaha Muskra 51+380 1 3 1 1 5.70 2.50 6.20 15.50 3 2 1 caste Vinod Kr. S/o Hari Narain SELF M 35 2 1 7 1 5 6000 Paan Kumari WIFE F 28 1 1 5 Tanishk Raj SON m 7 2 2 6 Pari Raj DAUGHTER F 1 2 1 7 Hari Narain FATHER M 62 1 4 1 Atar Kumari MOTHER F 58 1 2 2 309 HR/RS/MKR/EN/R+C/72 Hamirpur Maudaha Muskra 51+380 2 2 3 3 7.50 16.00 2.50 40.00 3 2 1 caste Rajendra singh s/o rajdhar SELF M 65 4 1 6 1 1 22000 singh Arilya devi WIFE F 60 1 1 5 Ajet shatru SON M 37 1 7 1 5 Updesh Kumari D/L F 3 1 4 7 Rajvardhan singh G/S M 6 2 2 6 Jai verdhan singh G/S M 2 2 1 7 Babhrubahan SON M 35 1 7 1 1 Parvati D/L F 30 1 7 5 Paarth G/S M 2 2 1 7 Dushyant dev SON M 32 2 7 1 1 310 HR/LS/MKR/EN/COM/67 Hamirpur Maudaha Muskra 51+385 1 2 2 1 7.50 3.00 2.50 7.50 4 2 Ram Gopal S/o Basant Srivastava SELF M 80 3 1 3 1 7000 Yashoda Rani WIFE F 75 1 1 2 Satish Chandra SON M 38 1 3 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 36 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Kirti D/L F 30 1 6 5 Anuj SON M 25 2 6 8 311 HR/RS/MKR/SQ/COM/73 Hamirpur Maudaha Muskra 51+410 2 3 1 1 7.20 2.30 3.50 8.05 3 2 1 caste Ashok Rajpoot s/o surendra SELF M 1 singh rajpoot 312 HR/RS/MKR/EN/COM/74 Hamirpur Maudaha Muskra 51+415 2 2 3 1 6.00 6.20 4.00 24.80 3 1 1 caste Jainab w/o Mohd. Alli SELF F 60 1 1 1 5 Mohd. Alli HUSBAND M 65 1 1 1 5 Gulfam SON M 20 2 2 1 5 313 HR/RS/MKR/SQ/COM/76 Hamirpur Maudaha Muskra 51+425 2 3 2 1 6.70 2.50 3.25 8.13 3 1 1 BPL Ali Mohd. s/o Dalli SELF M 49 4 1 2 3 5 2200 Kaushi WIFE F 46 1 1 5 Jubeda DAUGHTER F 23 2 5 5 Hakeem SON M 22 1 6 1 Rabia D/L F 20 1 3 5 Ajmat G/S M 1 2 1 7 Haseena DAUGHTER F 19 2 3 6 314 HR/RS/MKR/SQ/COM/77 Hamirpur Maudaha Muskra 51+430 2 3 1 1 6.70 2.50 2.50 6.25 1 2 1 caste Nasim s/o Usman Saudagar SELF M 30 1 2 2 1 2 5000 315 HR/LS/MKR/K-73 A Hamirpur Maudaha Muskra 51+430 1 4 1 1 6.00 NA NA NA 3 1 1 caste Fariyad Mohd. S/o Maqbool Mo. SELF M 40 1 1 3 3 3 2500 Sitara Bano WIFE F 36 1 3 5 Injimam SON M 20 2 5 6 Afridi SON M 18 2 5 6 Barish SON M 13 2 3 6 Khushi DAUGHTER F 5 2 2 7 316 HR/LS/MKR/K-74 Hamirpur Maudaha Muskra 51+435 1 4 1 1 6.20 NA NA NA 3 1 1 caste Sajjan S/o Babu Khan SELF M 29 1 1 3 3 5 4000 Asma WIFE F 26 1 1 5 Sohail SON M 10 2 3 6 Mohil SON M 7 2 2 6 317 HR/RS/MKR/SQ/COM/78 Hamirpur Maudaha Muskra 51+435 2 3 1 1 7.20 1.80 2.50 4.50 3 1 1 BPL Sahboob Ali s/o Azimulla SELF M 30 1 1 3 1 5 Anjum Aara WIFE F 28 1 4 5 Sama DAUGHTER F 5 2 2 7 318 HR/RS/MKR/SQ/COM/79 Hamirpur Maudaha Muskra 51+440 2 3 1 1 7.50 2.20 2.90 6.38 3 2 1 caste Haseena w/o Ajeemulla SELF F 50 1 1 1 1 5 5000 Ajeemulla HUSBAND M 55 1 1 1 5 319 HR/LS/MKR/K-75 Hamirpur Maudaha Muskra 51+440 1 4 1 1 6.70 NA NA NA 3 1 1 BPL Iqbal S/o Halke SELF M 50 3 1 1 3 5 3000 Sammo WIFE F 46 1 1 5 Sahkeel SON M 27 1 3 1 Jamila D/L F 25 1 1 5 Wakeel SON M 24 2 4 6 Simran DAUGHTER F 13 2 3 6 Hina DAUGHTER F 11 2 3 6 Saniya DAUGHTER F 9 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 37 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 320 HR/RS/MKR/SQ/COM/80 Hamirpur Maudaha Muskra 51+445 2 3 1 1 6.00 1.80 3.50 6.30 1 2 1 BPL Siyarani w/o Kashi ram SELF F 40 2 1 1 1 5 2200 Kashi ram HUSBAND M 45 1 7 1 5 Swatantra Kumari DAUGHTER F 20 2 6 6 Sandeep kumar SON M 18 2 5 6 Sangita DAUGHTER F 16 2 4 6 Rohini DAUGHTER F 13 2 3 6 321 HR/LS/MKR/K-76 Hamirpur Maudaha Muskra 51+447 1 4 1 1 6.75 NA NA NA 1 2 1 caste Virendra Kr. S/o Lt. Matadeen SELF M 42 1 1 4 1 5 6000 Sahji WIFE F 38 1 1 5 Sandeep Kr SON M 20 2 5 1 3 Dileep Kr. SON M 18 2 5 1 Sapna DAUGHTER F 14 2 4 6 322 HR/RS/MKR/K /81 Hamirpur Maudaha Muskra 51+452 2 3 1 1 5.50 NA NA NA 3 2 1 BPL Ram Autar s/o Gayadin SELF M 36 1 1 5 3 3 2000 Sunita WIFE F 32 1 1 5 Himanshu SON M 15 2 2 6 Dipanshu SON M 10 2 2 6 Naisi DAUGHTER F 7 2 2 6 323 HR/RS/MKR/K /81A Hamirpur Maudaha Muskra 51+452 2 3 1 1 5.50 NA NA NA 4 2 1 caste Lakhan Prasad s/o Gayadin SELF M 40 1 1 5 3 3 4000 Sheela devi WIFE F 35 1 1 5 Ravi SON M 18 2 4 6 Shilpi DAUGHTER F 15 2 3 6 Sapna DAUGHTER F 13 2 3 6 pankaj SON M 10 2 2 6 Shalendra SON M 8 2 2 6 Payal DAUGHTER F 2 2 2 7 324 HR/RS/MKR/K /81B Hamirpur Maudaha Muskra 51+452 2 3 1 1 5.50 NA NA NA 4 2 1 BPL Ram Prakash s/o Gayadin SELF M 55 3 1 4 3 3 1800 Pushpa rani WIFE F 50 1 3 5 Ran vijay SON M 26 1 5 1 Ram sakhi D/L F 21 1 5 5 Pari G/D F 1 2 1 7 Arvind SON M 22 2 4 6 Virendra SON M 19 2 3 6 325 HR/RS/MKR/K /81C Hamirpur Maudaha Muskra 51+452 2 3 1 1 5.50 NA NA NA 4 2 1 BPL Brindavan s/o Gayadin SELF M 54 2 1 6 3 3 2200 Kusuma rani WIFE F 48 1 1 5 Deepak kumar SON M 26 1 6 6 Puspa rani D/L F 20 1 3 5 Vivek Kumar SON M 19 2 4 6 Kavita Devi DAUGHTER F 18 2 5 6 Egis India Consulting Engineers Pvt. Ltd. Page 38 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Sandhya devi DAUGHTER F 15 2 5 6 Seema DAUGHTER F 13 2 3 6 326 HR/RS/MKR/K /81D Hamirpur Maudaha Muskra 51+452 2 3 1 1 5.50 NA NA NA 4 2 1 BPL Abhishek s/o Lt.Malkhan SELF M 18 1 2 5 3 3 2400 Pradeep Kumar BROTHER M 15 2 4 1 maya MOTHER F 38 5 5 5 327 HR/RS/MKR/SQ/COM/82 Hamirpur Maudaha Muskra 51+455 2 3 1 1 6.20 2.00 2.00 4.00 3 2 1 caste Shiv kumar s/o Late Bhoore SELF M 55 3 1 1 1 5 3200 lal Santosh Devi WIFE F 50 1 1 5 Bhagwat Prasad SON M 25 2 6 1 5 Anita DAUGHTER F 20 2 6 6 Kuldeep SON M 18 2 5 6 328 HR/RS/MKR/SQ/COM/83 Hamirpur Maudaha Muskra 51+460 2 3 1 1 4.50 2.20 2.50 5.50 3 1 1 caste Irfan s/o Mohd. Alli SELF M 25 1 1 5 1 5 4000 Palak WIFE F 23 1 7 5 329 HR/RS/MKR/SQ/COM/84 Hamirpur Maudaha Muskra 51+465 2 3 1 1 5.20 3.10 5.50 17.05 3 1 1 BPL Ramjan s/o Baddu SELF M 48 3 1 1 1 5 2200 Sayta Bano WIFE F 45 1 1 5 Mazid SON M 24 2 1 1 5 Sazid SON M 22 2 4 1 5 Gulam Husain SON M 18 2 5 6 Yaein SON M 16 2 4 6 Khudiza DAUGHTER F 14 2 4 6 Nasir SON M 13 2 3 6 Rabia DAUGHTER F 12 2 3 6 Abid SON M 9 2 2 6 Javed SON M 6 2 2 6 330 HR/RS/MKR/SQ/COM/85 Hamirpur Maudaha Muskra 51+470 2 3 1 1 5.50 1.80 3.10 5.58 3 2 1 caste Sumitra w/o Late Gaya SELF F 68 1 5 1 1 5 4000 Prasad 331 HR/RS/MKR/SQ/COM/86 Hamirpur Maudaha Muskra 51+475 2 3 1 1 5.50 2.00 2.20 4.40 3 2 1 BPL Jai ram s/o Maiyadin SELF M 47 2 1 5 1 5 2200 Rajendri wife WIFE F 42 1 4 5 Abhishek Kumar SON M 22 2 6 6 Lavkush kumar SON M 19 2 5 6 Vivek kumar SON M 18 2 5 6 Kandam DAUGHTER F 15 2 4 6 332 HR/RS/MKR/SQ/COM/87 Hamirpur Maudaha Muskra 51+480 2 3 1 1 5.50 3.20 2.10 6.72 1 2 1 BPL Ram Ratan s/o Late Sumera SELF M 60 1 1 3 1 5 2000 Phoola rani WIFE F 55 1 1 5 333 HR/LS/MKR/SQ/COM/81 Hamirpur Maudaha Muskra 51+480 1 3 1 1 5.50 3.50 2.80 9.80 4 1 Rahman Ahmad S/o Sareef SELF M 30 3 1 3 3 5 5000 Islamunnisha WIFE F 28 1 5 5 Yasir SON M 6 2 2 6 Hasir SON M 2 2 1 7 Tahir BROTHER M 26 2 4 1 Egis India Consulting Engineers Pvt. Ltd. Page 39 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Maryam MOTHER F 60 5 1 2 334 HR/RS/MKR/SQ/COM/88 Hamirpur Maudaha Muskra 51+485 2 3 1 1 5.50 2.00 2.20 4.40 Shiv Karan S/o Banvari SELF M 1 335 HR/RS/MKR/SQ/COM/89 Hamirpur Maudaha Muskra 51+490 2 3 1 1 6.00 2.00 2.15 4.30 3 2 1 caste Ram Avtar s/o Dhani ram SELF M 62 1 1 2 1 5 3000 Javitri WIFE F 35 1 2 1 5 Kuldeep SON M 12 2 2 6 Pradeep SON M 9 2 2 6 336 HR/RS/MKR/SQ/COM/90 Hamirpur Maudaha Muskra 51+495 2 3 1 1 6.00 2.00 2.20 4.40 1 2 1 caste Ganpat S/o Ganesha SELF M 1 337 HR/RS/MKR/SQ/COM/91 Hamirpur Maudaha Muskra 51+497 2 3 1 1 6.00 2.00 2.10 4.20 1 2 1 caste Desh Raj S/o Ganpat SELF M 1 338 HR/RS/MKR/SQ/COM/92 Hamirpur Maudaha Muskra 51+500 2 3 1 1 6.00 2.00 1.15 2.30 1 2 1 caste Parmeshvari Dayal S/o SELF M 1 Ganesha 339 HR/RS/MKR/SQ/COM/93 Hamirpur Maudaha Muskra 51+502 2 3 1 1 6.00 2.00 2.50 5.00 3 2 1 caste Ram Sewak s/o Laxman SELF M 53 1 1 3 1 5 5000 Prasad Kunjan WIFE F 48 1 2 5 Arvind SON M 20 2 4 1 5 340 HR/RS/MKR/SQ/COM/94 Hamirpur Maudaha Muskra 51+505 2 3 1 1 6.00 2.00 2.50 5.00 3 2 1 caste Surendra s/o Ram Sewak SELF M 25 1 1 3 1 5 6000 Mohini WIFE F 22 1 3 5 Sonam DAUGHTER F 4 2 1 7 341 HR/LS/MKR/K-82 Hamirpur Maudaha Muskra 51+507 1 4 1 1 6.00 NA NA NA 1 2 1 caste Dalli Pat S/o Kadhaura SELF M 42 1 1 3 1 5 3000 Natthi WIFE F 40 1 1 5 Bhola SON M 13 2 2 2 neeraj SON M 10 2 2 6 Roopa DAUGHTER F 8 2 2 6 Sapna DAUGHTER F 5 2 1 7 Kavita DAUGHTER F 3 2 1 7 342 HR/RS/MKR/SQ/COM/95 Hamirpur Maudaha Muskra 51+507 2 3 1 1 6.00 2.50 2.80 7.00 3 2 1 caste Surendra soni s/o Ram SELF M 27 3 2 4 1 5 5000 Shankar soni Ram Shankar FATHER M 48 1 1 2 Sudha MOTHER F 45 1 1 1 5 Rajendra BROTHER M 25 2 7 1 6 Chootu BROTHER M 22 2 4 2 Shivam BROTHER M 16 2 4 6 343 HR/RS/MKR/SQ/COM/96 Hamirpur Maudaha Muskra 51+510 2 3 1 1 6.00 2.00 2.50 5.00 3 2 1 caste Vijay Kumar s/o Ayodhya SELF M 35 1 1 6 1 5 4500 Prasad Shashi Devi WIFE F 28 1 3 5 Astha DAUGHTER F 11 2 2 6 Abhinav kumar SON M 9 2 2 6 Reena DAUGHTER F 7 2 2 6 344 HR/RS/MKR/SQ/COM/97 Hamirpur Maudaha Muskra 51+515 2 3 1 1 6.00 2.00 2.30 4.60 Mahboob s/o Azimulla SELF M 1 345 HR/RS/MKR/SQ/COM/98 Hamirpur Maudaha Muskra 51+517 2 3 1 1 5.50 2.00 2.50 5.00 3 2 1 caste Manoj kumar s/o Chandra SELF M 28 2 2 4 1 5 4000 Shekhar soni Chandra Shekhar FATHER M 62 1 3 1 5 Ram sakhi MOTHER F 58 1 2 5 Egis India Consulting Engineers Pvt. Ltd. Page 40 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 346 HR/RS/MKR/SQ/COM/99 Hamirpur Maudaha Muskra 51+520 2 3 1 1 5.50 1.90 2.50 4.75 4 2 Maya devi w/o Bhupendra SELF M 40 1 1 2 1 5 5000 Gupta Bhupendra Gupta WIFE F 42 1 2 1 5 Ravi SON M 20 2 6 6 Akash SON M 16 2 4 6 347 HR/RS/MKR/SQ/COM/100 Hamirpur Maudaha Muskra 51+525 2 3 1 1 5.50 2.20 3.50 7.70 3 2 1 caste Suresh lakhera s/o sukh SELF M 40 2 1 3 1 3 5200 nandan Brij rani WIFE F 36 1 1 1 5 Priyanka DAUGHTER F 18 2 5 6 Pooja DAUGHTER F 16 2 4 6 Subodh SON M 13 2 3 6 Priyanka DAUGHTER F 11 2 2 6 348 HR/RS/MKR/SQ/COM/101 Hamirpur Maudaha Muskra 51+528 2 3 1 1 5.50 2.50 2.50 6.25 3 2 1 caste Neeraj Kumar Lakhera s/o SELF M 26 2 1 6 1 5 4200 sattidin Sweta WIFE F 25 1 2 5 Deepak kumar BROTHER M 20 2 6 1 5 Sattidin FATHER M 58 1 4 1 5 Leelawati MOTHER F 55 1 1 5 349 HR/RS/MKR/SQ/COM/102 Hamirpur Maudaha Muskra 51+532 2 3 1 1 5.50 2.10 2.50 5.25 3 1 1 caste Basir s/o Hamid Ali SELF M 28 1 1 2 1 5 3000 Sabina Khatoon WIFE F 25 1 2 5 Altaba DAUGHTER F 8 2 2 6 Esab SON M 6 2 2 6 350 HR/RS/MKR/SQ/COM/103 Hamirpur Maudaha Muskra 51+532 2 3 1 1 5.50 1.80 2.80 5.04 3 2 1 BPL Sahidan Khatoon w/o Noor SELF F 50 3 1 3 1 5 4200 mohd. Noor Mohd HUSBAND M 55 1 3 1 5 Nasim SON M 30 1 6 1 5 Jalakha D/L F 27 1 3 5 Mahaq G/D F 8 2 2 6 Rehan G/S M 6 2 2 6 Shamim SON M 27 1 7 1 5 Afsana D/L F 24 1 6 5 351 HR/RS/MKR/SQ/COM/104 Hamirpur Maudaha Muskra 51+535 2 3 1 1 5.50 1.90 3.00 5.70 3 2 1 caste Debendra Kumar s/o Brij SELF M 35 1 1 4 3 5 4000 mohan Basanti WIFE F 30 1 4 5 Nagendra SON M 11 2 3 6 Satyam SON M 8 2 2 6 352 HR/RS/MKR/SQ/COM/105 Hamirpur Maudaha Muskra 51+538 2 3 1 1 5.50 1.90 3.50 6.65 3 2 1 caste Kesh rani w/o Late Indrajeet SELF F 60 2 5 1 1 5000 Bablu SON M 40 1 4 1 Sunita D/L F 37 1 1 1 Mohini G/D F 16 2 4 6 Versha G/D F 14 2 3 6 Lucky G/S M 8 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 41 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Aadi G/S M 1 2 1 7 353 HR/RS/MKR/SQ/COM/106 Hamirpur Maudaha Muskra 51+543 2 3 1 1 6.00 2.50 3.00 7.50 Hari Narain S/o SELF M 1 354 HR/RS/MKR/SQ/COM/107 Hamirpur Maudaha Muskra 51+545 2 3 1 1 6.00 2.50 3.00 7.50 3 2 1 caste Kedar Nath s/o Late Shiv SELF M 62 4 1 2 1 5 5000 Charan Munni Devi WIFE F 60 1 1 5 Govind das soni SON M 30 2 3 1 3 Suraj soni SON M 25 2 3 1 5 Arjuna soni DAUGHTER F 22 2 5 6 355 HR/RS/MKR/SQ/COM/108 Hamirpur Maudaha Muskra 51+550 2 3 1 1 6.10 2.20 3.00 6.60 3 2 1 caste Girish Kumar s/o Babu ram SELF M 38 1 1 4 1 5 4500 Anita WIFE F 35 1 2 5 Neeraj SON M 15 2 4 6 Muskan SON M 10 2 2 6 356 HR/RS/MKR/SQ/COM/109 Hamirpur Maudaha Muskra 51+553 2 3 1 1 6.00 2.10 3.50 7.35 3 2 1 caste Khem chand pal s/o Laxman SELF M 52 3 1 2 1 5 5000 pal Kunwar bai WIFE F 48 1 1 1 5 Mahesh SON M 30 1 4 1 5 Amar D/L F 27 1 1 5 Ayush G/S M 2 2 1 7 Awdhesh SON M 28 1 4 1 5 Pushpa D/L F 25 1 1 5 Piyush G/S M 6 2 2 6 Princee G/D F 3 2 1 7 Naincee G/D F 2 2 1 7 357 HR/RS/MKR/SQ/COM/110 Hamirpur Maudaha Muskra 51+555 2 3 1 1 6.00 2.10 3.10 6.51 3 2 1 caste Rampal s/o Shiv balak SELF M 39 1 1 5 1 5 4400 Gayatri Devi WIFE F 35 1 1 5 Vishakha DAUGHTER F 14 2 3 6 Vikash SON M 10 2 2 6 358 HR/RS/MKR/SQ/COM/111 Hamirpur Maudaha Muskra 51+560 2 3 1 1 6.50 2.20 3.10 6.82 3 1 1 caste Ibrahim s/o Lal mo. SELF M 44 2 1 4 3 5 5000 Bismillah WIFE F 40 1 1 5 Khushmuma DAUGHTER F 18 2 6 6 Razi Nisha DAUGHTER F 16 2 5 6 Azhar SON M 12 2 3 6 Sahna DAUGHTER F 10 2 3 6 359 HR/RS/MKR/SQ/COM/112 Hamirpur Maudaha Muskra 51+565 2 3 1 1 6.50 2.10 2.90 6.09 3 2 1 caste Hari Shankar s/o Guddu SELF M 36 1 1 6 3 5 5400 Geeta WIFE F 34 1 1 5 Seema DAUGHTER F 13 2 4 6 Saurabh SON M 10 2 3 6 Sachin SON M 9 2 3 6 360 HR/RS/MKR/K/113 Hamirpur Maudaha Muskra 51+570 2 3 1 1 5.50 NA NA NA 3 2 1 caste Heera Pal s/o Laxman SELF M 55 3 1 1 3 5 3000 Egis India Consulting Engineers Pvt. Ltd. Page 42 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Gyanwati WIFE F 50 1 1 5 Kalpna DAUGHTER F 20 2 3 6 Roobi DAUGHTER F 18 2 3 6 Sanjay SON M 15 2 2 6 Mahendra SON M 10 2 2 6 361 HR/RS/MKR/SQ/COM/114 Hamirpur Maudaha Muskra 51+572 2 3 1 1 7.00 1.80 2.00 3.60 3 1 1 BPL Mohd. Mazid s/o abdul Khaliq SELF M 37 1 1 4 3 5 2200 Gulshan WIFE F 32 1 1 5 Arif gulzar SON M 14 2 5 6 Aafrin DAUGHTER F 10 2 3 6 Asma DAUGHTER F 6 2 2 6 362 HR/RS/MKR/SQ/COM/115 Hamirpur Maudaha Muskra 51+575 2 3 1 1 7.00 1.80 2.00 3.60 3 2 1 caste Kallu ram s/o Fool singh SELF M 35 1 1 4 3 5 4000 Saroj WIFE F 30 1 2 5 Sanjana DAUGHTER F 7 2 2 6 Pradeem SON M 4 2 2 7 363 HR/RS/MKR/SQ/COM/117 Hamirpur Maudaha Muskra 51+585 2 3 1 1 7.00 1.80 2.00 3.60 3 2 1 caste Sughar Singh s/o Babu lal SELF M 28 2 1 3 3 5 5200 Rachna WIFE F 25 1 3 5 Tinku SON M 6 2 2 6 Rinku SON M 4 2 1 7 Babu lal FATHER M 55 1 1 2 Kailash rani MOTHER F 50 1 1 2 364 HR/RS/MKR/SQ/COM/118 Hamirpur Maudaha Muskra 51+590 2 3 1 1 6.00 1.80 2.00 3.60 1 2 1 caste Sita ram s/o Girdhan SELF M 62 4 1 1 3 5 3200 Ram Pyari WIFE F 60 1 1 5 Ramesh SON M 32 1 3 1 Pramila D/L F 30 1 3 5 Arjun G/S M 5 2 2 7 Khushbu G/D F 3 2 2 7 Baby G/S M 1 2 1 7 Dev Kumar SON M 28 1 2 1 Suman D/L F 26 1 3 5 Rohtak G/S M 3 2 1 7 Chotu G/S M 1 2 1 7 Manoj SON M 24 2 5 1 365 HR/RS/MKR/SQ/COM/119 Hamirpur Maudaha Muskra 51+592 2 3 1 1 6.00 1.80 2.20 3.96 3 2 1 caste Shiv Kumar s/o Raja ram SELF M 54 2 1 4 1 5 5000 kamla rani WIFE F 50 1 1 5 Aradhana DAUGHTER F 19 2 5 5 Sunita DAUGHTER F 16 2 1 6 Atul Kumar SON M 13 2 3 6 Egis India Consulting Engineers Pvt. Ltd. Page 43 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 366 HR/RS/MKR/K/120 Hamirpur Maudaha Muskra 51+595 2 3 1 1 5.00 NA NA NA 1 2 1 caste Nand Kishor s/o Ram Adhar SELF M 39 1 1 5 1 5 4500 Usha WIFE F 35 1 2 5 Mithlesh DAUGHTER F 15 2 3 6 Akansh DAUGHTER F 8 2 2 6 Ananya DAUGHTER F 1 2 7 7 367 HR/RS/MKR/SQ/COM/121 Hamirpur Maudaha Muskra 51+600 2 3 1 1 7.00 2.00 2.00 4.00 Ram Gopal S/o Krishn SELF M 1 368 HR/RS/MKR/SQ/COM/124 Hamirpur Maudaha Muskra 51+610 2 3 1 1 5.50 1.50 2.30 3.45 3 2 1 caste Asharam s/o Gayadin SELF M 45 2 1 3 1 5 4000 Sitarani WIFE F 42 1 2 5 Sorira DAUGHTER F 18 2 3 6 Rahul SON M 15 2 5 6 369 HR/LS/MKR/SQ/COM/84 Hamirpur Maudaha Muskra 51+610 1 3 1 1 6.00 3.00 3.00 9.00 Har Swaroop S/o Shiv Ram SELF M 1 370 HR/RS/MKR/SQ/COM/125 Hamirpur Maudaha Muskra 51+610 2 3 1 1 7.00 1.80 2.00 3.60 3 2 1 caste Amar Chandra s/o Prabhu SELF M 40 1 1 4 1 5 6000 Dayal Mamta WIFE F 37 1 3 5 Tarun SON M 12 2 3 6 Khushi DAUGHTER F 9 2 2 6 Pratima DAUGHTER F 5 2 2 7 371 HR/RS/MKR/SQ/COM/127 Hamirpur Maudaha Muskra 51+625 2 3 1 1 4.00 2.00 2.50 5.00 Kesari Devi W/o Arjun SELF F 1 372 HR/RS/MKR/SQ/COM/128 Hamirpur Maudaha Muskra 51+630 2 3 1 1 5.00 2.10 2.50 5.25 Shiv Prasad S/o SELF M 1 373 HR/RS/MKR/SQ/COM/129 Hamirpur Maudaha Muskra 51+632 2 3 1 1 5.00 2.20 2.00 4.40 bhaiyya lal So/ SELF M 1 374 HR/RS/MKR/SQ/COM/130 Hamirpur Maudaha Muskra 51+637 2 3 1 1 6.30 2.20 2.10 4.62 3 2 1 caste Sushil s/o Guru Dayal SELF M 29 1 1 2 1 5 4400 Suman WIFE F 28 1 2 5 Ankit SON M 9 2 2 6 Nairshi DAUGHTER F 7 2 2 6 Adarsh SON M 5 2 1 7 375 HR/RS/MKR/SQ/COM/131 Hamirpur Maudaha Muskra 51+640 2 3 1 1 6.30 2.10 1.80 3.78 Fool Bano SELF F 1 376 HR/RS/MKR/SQ/COM/132 Hamirpur Maudaha Muskra 51+645 2 3 1 1 6.30 2.00 1.80 3.60 4 2 Narendra Kumar s/o Raj SELF M 42 2 1 3 1 5 4000 naraen Bhawani WIFE F 37 1 2 5 Nagish SON M 18 2 5 6 Nishu SON M 16 2 3 6 Rajindi MOTHER F 65 1 7 1 377 HR/RS/MKR/EN/COM/135 Hamirpur Maudaha Muskra 51+665 2 2 1 3 7.60 9.00 2.40 21.60 3 2 1 caste Ram Gopal s/o Har dayal SELF M 60 3 1 6 1 5 7000 Kaushalya WIFE F 55 1 1 5 Sunil SON M 30 2 6 1 6 Anil SON M 24 2 6 1 6 378 HR/RS/MKR/EN/COM/136 Hamirpur Maudaha Muskra 51+675 2 2 3 1 6.70 9.00 3.30 29.70 Mahipal & Chatra Pal SELF M 1 379 HR/RS/MKR/K /137 Hamirpur Maudaha Muskra 51+687 2 4 1 1 6.00 NA NA NA 4 2 Mangal singh s/o Shiv Prasad SELF M 30 1 1 3 1 5 3000 Gomti WIFE F 27 1 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 44 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Raj kumar SON M 9 2 2 6 Radha DAUGHTER F 7 2 2 6 Munni DAUGHTER F 5 2 2 7 Sonu SON M 2 2 1 7 380 HR/LS/MKR/K-90 Hamirpur Maudaha Muskra 51+745 1 4 1 1 7.00 NA NA NA 4 2 1 BPL Sunil S/O BrijLal Gupta SELF M 27 2 2 3 1 5 3000 Rani Gupta MOTHER F 62 5 2 5 381 HR/RS/MKR/K-40 Hamirpur Maudaha Muskra 51+762 1 4 1 1 6.50 NA NA NA Bablu SELF M 1 382 HR/RS/MKR/K /145 Hamirpur Maudaha Muskra 51+788 2 4 1 1 6.00 NA NA NA Ghamandi SELF M 1 383 HR/RS/MKR/K /146 Hamirpur Maudaha Muskra 51+790 2 4 1 1 6.00 NA NA NA ABSENT SELF M 1 384 HR/RS/MKR/K /147 Hamirpur Maudaha Muskra 51+795 2 4 1 1 6.20 NA NA NA ABSENT SELF M 1 385 HR/RS/MKR/K /148 Hamirpur Maudaha Muskra 51+805 2 4 1 1 6.75 NA NA NA Ansar S/o SELF M 1 386 HR/RS/MKR/K /149 Hamirpur Maudaha Muskra 51+810 2 4 1 1 6.75 NA NA NA 3 2 1 caste Chatur bhuj s/o Ram krapal SELF M 25 1 1 4 1 5 2400 Ram kumari WIFE F 22 1 1 5 Princee DAUGHTER F 3 2 1 7 Lal singh SON M 1 2 1 7 387 HR/RS/MKR/K /150 Hamirpur Maudaha Muskra 51+812 2 4 1 1 6.75 NA NA NA 4 2 Raju Kumar s/o mohar singh SELF M 30 1 1 3 1 5 2400 Saroj WIFE F 27 1 3 5 Gautam SON M 2 2 1 7 388 HR/RS/MKR/SQ/COM/151 Hamirpur Maudaha Muskra 51+820 2 3 1 1 7.00 3.00 3.50 10.50 1 2 1 caste Gulab s/o Mohar singh SELF M 35 1 1 3 1 5 3000 Ram sri WIFE F 30 1 2 5 Sahil SON M 5 2 1 7 Erjle SON M 3 2 1 7 389 HR/RS/MKR/K /152 Hamirpur Maudaha Muskra 51+825 2 4 1 1 7.00 NA NA NA Kushal SELF M 1 390 HR/RS/MKR/SQ/COM/153 Hamirpur Maudaha Muskra 51+835 2 3 1 1 6.00 3.50 3.00 10.50 Malhu SELF M 1 391 HR/RS/MKR/SQ/COM/154 Hamirpur Maudaha Muskra 51+840 2 3 1 1 6.50 3.50 4.10 14.35 3 2 1 caste Masooq Mohd. s/o Barati SELF M 25 3 2 3 1 5 4000 Mubaraq Mohd. BROTHER M 28 2 3 1 5 Bafari FATHER M 55 1 3 2 Usha khatoon MOTHER F 50 1 2 5 392 HR/RS/MKR/SQ/COM/156 Hamirpur Maudaha Muskra 51+860 2 3 1 1 6.50 5.50 3.00 16.50 4 2 Shyam swaroop s/o SELF M 62 3 1 3 1 3 6000 Bhagirath Kamlesh WIFE F 58 1 1 1 3 Amrish kumar SON M 30 5 3 1 3 Anand kumar SON M 22 2 3 1 3 Rajni G/D F 10 2 2 6 Pooja G/D F 7 2 2 6 Poonam G/D F 5 2 1 7 Mayank G/S M 2 2 1 7 393 HR/RS/MKR/SQ/RES/156 AHamirpur Maudaha Muskra 51+870 2 3 1 2 6.50 3.00 2.50 7.50 3 2 1 caste Suniya w/o Late Ram sanehi SELF F 57 1 5 1 1 3 2200 Egis India Consulting Engineers Pvt. Ltd. Page 45 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 394 HR/RS/MKR/SQ/RES/157 Hamirpur Maudaha Muskra 51+873 2 3 1 2 6.50 3.50 2.50 8.75 3 2 1 caste Ram Avtar s/o Late Ram SELF M 62 1 5 6 1 5 4000 Swaroop 395 HR/RS/MKR/SQ/R+C/158 Hamirpur Maudaha Muskra 51+890 2 3 1 3 5.50 6.70 4.50 30.15 3 2 1 caste Vachan Kumar s/o Ram SELF M 36 1 1 2 1 5 5000 Sanehi Kusum WIFE F 32 1 2 1 5 Shailya DAUGHTER F 14 2 3 6 Prince SON M 12 2 3 6 Nidhi DAUGHTER F 10 2 2 6 Nitish SON M 8 2 2 6 396 HR/RS/MKR/SQ/RES/160 Hamirpur Maudaha Muskra 51+930 2 3 1 2 7.60 8.25 4.50 37.13 3 2 1 caste Moorat singh s/o Raja ram SELF M 40 1 1 4 1 8000 Shanti WIFE F 35 1 3 5 Jyotish kumar SON M 15 2 3 6 Anju DAUGHTER F 12 2 3 6 Pinki DAUGHTER F 10 2 3 6 Pooja DAUGHTER F 6 2 2 6 397 HR/RS/MKR/SQ/RES/161 Hamirpur Maudaha Muskra 51+935 2 3 1 2 7.60 8.25 4.80 39.60 3 2 1 caste Ram Sewak s/o Raja ram SELF M 55 1 1 1 1 6000 Rajrani WIFE F 45 1 1 5 Laxmi DAUGHTER F 14 2 4 6 Neeta DAUGHTER F 12 2 3 6 Pushpendra Kumar SON M 10 2 3 6 Chhaya DAUGHTER F 7 2 2 6 398 HR/RS/BUK/EN/Res/3 Hamirpur Maudaha Vihuni 57+220 2 2 2 2 7.60 10.50 2.40 25.20 1 2 1 caste Vishwanath s/o chidwa SELF M 70 2 1 1 3 2 24000 suniya WIFE F 65 1 1 5 nirmal SON M 30 1 3 1 paj kumari D/L F 26 1 1 5 susuma devi G/D F 10 2 2 6 vipendra SON M 2 2 2 7 399 HR/RS/BUK/EN/Other/3 Hamirpur Maudaha Vihuni 57+500 2 2 2 5 9.00 8.60 1.00 8.60 1 2 1 caste Shia W/O Shiv lal SELF M 52 2 5 1 1 1 5400 awadhesh SON M 28 1 4 1 3 suman D/L F 25 1 3 3 sharasti G/D F 5 2 1 7 yasharay G/D M 4 2 1 7 brijesh SON M 20 1 6 1 3 rajesh SON M 16 2 5 3 400 HR/LS/BUK/K-01 Hamirpur Maudaha Vihuni 57+500 1 4 1 1 6.50 NA NA NA Absent SELF M 1 401 HR/RS/BUK/EN/Res/5 Hamirpur Maudaha Vihuni 57+560 2 2 2 2 7.80 6.20 2.20 13.64 Ram Kishun S/O Kandhai SELF M 1 402 HR/RS/BUK/EN/BW/6 Hamirpur Maudaha Vihuni 57+600 2 2 2 4 6.70 15.10 NA 15.10 Ram Narain S/O SELF M 1 403 HR/RS/BUK/EN/Res/7 Hamirpur Maudaha Vihuni 57+615 2 2 2 2 6.70 11.60 3.30 38.28 4 2 Arvind S/O Shiv shahai SELF M 42 2 1 3 3 5 4400 pinki WIFE F 32 1 3 5 Egis India Consulting Engineers Pvt. Ltd. Page 46 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age shivani DAUGHTER F 15 2 4 6 arti DAUGHTER F 12 2 3 6 kamal SON M 5 2 2 7 rinki DAUGHTER F 30 1 1 5 pooja DAUGHTER F 12 2 3 6 404 HR/LS/BUK/SQ/RES/02 Hamirpur Maudaha Vihuni 57+620 1 3 1 2 5.00 7.00 3.70 25.90 4 2 Prakash Rani W/o Lt. Shiv Sahai SELF F 72 1 5 1 1 2 2000 405 HR/RS/BUK/EN/CS/8 Hamirpur Maudaha Vihuni 57+625 2 2 1 5 6.70 8.50 3.30 28.05 3 2 1 caste Basanta s/o kallo SELF M 70 3 1 2 1 9000 rambai WIFE F 65 1 2 1 chatram SON M 45 1 3 5 3 somwati D/L F 42 1 3 5 preeti G/D F 18 2 4 6 406 HR/RS/BUK/EN/CS/9 Hamirpur Maudaha Vihuni 57+632 2 2 1 5 6.70 11.20 3.30 36.96 3 2 1 caste Mahipal s/o gangadeen SELF M 65 1 1 1 1 7000 janaktulari WIFE F 60 1 1 5 baldew SON M 1 1 1 7 407 HR/RS/BUK/EN/Res/10 Hamirpur Maudaha Vihuni 57+640 2 2 2 2 7.40 8.30 2.60 21.58 3 2 1 caste Omkar Pd S/O Sukhnandan SELF M 52 2 1 4 3 2 6000 vjehmma rani WIFE F 50 1 1 5 ravi SON M 25 1 4 1 savitri D/L F 22 1 3 5 indiya G/D F 5 2 2 7 guddi G/D F 3 2 2 7 408 HR/LS/BUK/EN/RES/03 Hamirpur Maudaha Vihuni 57+790 1 2 1 2 9.80 7.20 0.20 1.44 Ram Kishan S/o Tejwa SELF M 1 409 HR/RS/BUK/EN/CS/12 Hamirpur Maudaha Vihuni 57+940 2 2 1 5 7.30 4.00 2.70 10.80 Kripal S/O Kali Charan SELF M 1 410 HR/RS/BUK/EN/Res/13 Hamirpur Maudaha Vihuni 57+950 2 2 2 2 5.70 9.60 4.30 41.28 Sripal S/o Bala Deen SELF M 1 411 HR/RS/BUK/EN/Res/14 Hamirpur Maudaha Vihuni 57+975 2 2 2 2 5.80 8.40 4.20 35.28 3 2 1 caste Fool Singh S/O Hri Prasad SELF M 50 1 1 5 3 2 3000 Santosh Rani WIFE F 45 1 1 5 412 HR/RS/BUK/EN/COM/15 Hamirpur Maudaha Vihuni 57+982 2 2 2 1 8.00 2.90 2.00 5.80 4 2 Khem Chand S/o Hannu SELF M 28 1 1 6 3 3 5000 Akhilesha WIFE F 25 1 1 5 yasendra SON M 5 2 2 7 Krash SON M 2 2 1 7 413 HR/RS/BUK/EN/COM/16 Hamirpur Maudaha Vihuni 57+990 2 2 1 1 6.60 3.30 3.40 11.22 1 2 1 caste Ghan Shyam S/o Gayasi SELF M 26 1 1 4 1 3 4000 Uma Devi WIFE F 24 1 4 5 Divya DAUGHTER F 5 2 2 7 Pratiksha DAUGHTER F 3 2 1 7 Diksha DAUGHTER F 1 2 1 7 414 HR/LS/BUK/EN/RES/04 Hamirpur Maudaha Vihuni 57+990 1 2 2 2 9.80 3.20 0.20 0.64 1 2 1 caste Nirdosh S/o Banshi Dhar SELF M 41 2 1 3 1 3 3000 Mamta WIFE F 37 1 2 5 Arti DAUGHTER F 18 2 2 5 Egis India Consulting Engineers Pvt. Ltd. Page 47 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Akash SON M 9 2 2 6 Amit SON M 6 2 2 6 415 Hamirpur Maudaha HR/RS/BUK/EN/R+COM/17 Vihuni 57+995 2 2 1 3 6.30 5.60 3.70 20.72 1 2 1 caste Prmeshwari Dyal S/o Gayasi SELF M 31 1 2 6 1 4 4000 416 Hamirpur Maudaha HR/RS/BUK/EN/R+COM/18 Vihuni 58+00 2 2 1 3 6.30 4.30 3.70 15.91 1 2 1 caste Guru Dayal S/o Gayasi SELF M 37 1 1 3 3 5 4000 Ram Devi WIFE F 35 1 1 5 Kajal DAUGHTER F 12 2 2 6 Poonam DAUGHTER F 10 2 2 6 Akansha DAUGHTER F 8 2 2 6 anshu DAUGHTER F 6 2 2 6 dipendra SON M 4 2 2 7 417 HR/LS/BUK/EN/RES/05 Hamirpur Maudaha Vihuni 58+050 1 2 2 2 7.80 6.00 2.20 13.20 1 2 1 caste Govind Das S/o Bari Lal SELF M 60 4 1 1 1 25000 BhagWati WIFE F 58 1 1 5 Ram Das SON M 30 2 6 1 5 Chandra Prakash SON M 27 2 3 1 5 Munna SON M 25 2 4 1 5 Pawan SON M 22 2 4 1 5 418 Hamirpur Maudaha HR/RS/BUK/EN/R+COM/19 Vihuni 58+050 2 2 1 3 5.00 3.30 5.00 16.50 1 2 1 caste Bhaiyyan S/o Chhota SELF M 38 1 1 3 1 3 6000 Meena WIFE F 32 1 1 5 3 Radha DAUGHTER F 1 2 1 7 419 HR/LS/BUK/EN/RES/06 Hamirpur Maudaha Vihuni 58+065 1 2 2 2 9.50 8.00 0.50 4.00 1 2 1 caste Anar Kali W/o Lt.Munna SELF F 42 2 5 1 1 2 6000 Arvind SON M 20 2 3 3 Seema DAUGHTER F 18 2 1 5 4 Dharmendra SON M 15 2 2 6 Devendra SON M 10 2 2 6 Ravendra SON M 6 2 2 6 420 HR/LS/BUK/EN/RES/07 Hamirpur Maudaha Vihuni 58+075 1 2 1 2 8.50 7.00 1.50 10.50 1 2 1 caste Lalju S/o Santram SELF M 38 1 1 3 3 3 4000 Ram Devi WIFE F 35 1 1 1 Shankar SON M 18 2 3 1 Kamal SON M 14 2 3 6 Pinki DAUGHTER F 13 2 3 6 421 HR/LS/BUK/EN/RES/08 Hamirpur Maudaha Vihuni 58+085 1 2 1 2 8.70 6.50 1.30 8.45 1 2 1 caste Kapil S/o Natthu SELF M 38 1 1 1 3 3 3000 Kahrgi WIFE F 34 1 1 5 Lalta DAUGHTER F 14 2 1 5 Maan Kunwar SON M 12 2 1 5 Ghanshyam SON M 10 2 1 2 422 HR/LS/BUK/EN/RES/09 Hamirpur Maudaha Vihuni 58+100 1 2 2 2 8.00 5.50 2.00 11.00 1 2 1 caste Charn Singh S/o Sukh Nandan SELF M 40 1 1 2 1 3 4000 Sushma WIFE F 35 1 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 48 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Rohit SON M 15 2 3 6 Mohit SON M 12 2 2 6 423 HR/RS/BUK/EN/BW/20 Hamirpur Maudaha Vihuni 58+100 2 2 1 4 7.40 7.50 NA 7.50 Paras Ram S/o Sunder Lal SELF M 1 424 HR/RS/BUK/SQ/RES/21 Hamirpur Maudaha Vihuni 58+115 2 3 1 2 8.20 3.20 1.80 5.76 Kali Charan S/o Baijnath SELF M 1 425 HR/LS/BUK/EN/RES/10 Hamirpur Maudaha Vihuni 58+130 1 2 1 2 5.60 6.15 4.40 27.06 1 2 1 caste Jai Ram S/o Bala Prasad SELF M 55 2 1 5 1 3 3000 Deo Rati WIFE F 50 1 1 5 Seema DAUGHTER F 18 2 3 5 426 HR/LS/BUK/EN/LT/11 Hamirpur Maudaha Vihuni 58+150 1 2 2 5 8.20 2.80 2.50 7.00 1 2 1 caste Ram Jeevan S/o Gayasi SELF M 42 1 1 4 1 1 5000 Ram Devi WIFE F 38 1 2 5 Dileep SON M 16 2 3 6 Sandeep SON M 14 2 3 6 Khushbu DAUGHTER F 12 2 2 6 427 HR/LS/BUK/EN/RES/12 Hamirpur Maudaha Vihuni 58+175 1 2 2 2 9.70 10.00 0.30 3.00 3 2 1 caste Pyare lal S/o Vishvanath SELF M 50 2 1 2 1 3 6000 Ashok Rani WIFE F 46 1 1 5 Ganga Ram SON M 22 2 3 1 3 Khenia DAUGHTER F 13 2 3 6 Raju SON M 10 2 3 6 428 HR/LS/BUK/EN/RES/13 Hamirpur Maudaha Vihuni 58+200 1 2 1 2 9.70 5.60 0.30 1.68 3 2 1 caste Vinod S/o Ghaseeta SELF M 30 1 1 1 3 3 4000 Munni WIFE F 28 1 1 5 Pooja DAUGHTER F 10 2 2 6 Sudeep SON M 7 2 2 6 429 HR/RS/BUK/SQ/RES/22 Hamirpur Maudaha Vihuni 58+280 2 3 1 2 7.00 13.00 3.00 39.00 1 2 1 caste Hari Das So/ Jagannath SELF M 45 3 1 1 3 2 5000 Kanji WIFE F 42 1 1 5 Balwan SON M 23 2 1 1 pratap SON M 20 2 1 1 Lalti DAUGHTER F 18 2 1 5 Bauran SON M 11 2 1 2 Jai Kumari DAUGHTER F 7 2 1 2 430 HR/RS/BUK/SQ/COM/23 Hamirpur Maudaha Vihuni 58+300 2 3 1 1 7.20 2.50 3.00 7.50 Vinod S/o Ghaseeta SELF M 1 431 HR/LS/BUK/K-14 Hamirpur Maudaha Vihuni 58+300 1 4 1 1 7.60 NA NA NA 3 2 1 caste Mahesh S/o Sudarshan SELF M 28 1 1 2 3 5 5000 Foola Rani WIFE F 26 1 1 5 Sanju SON M 12 2 3 6 Raj Kumari DAUGHTER F 5 2 1 7 432 HR/LS/BUK/K-15 Hamirpur Maudaha Vihuni 58+310 1 4 1 1 7.60 NA NA NA 3 2 1 caste Pawan S/o Babu lal SELF M 24 1 2 6 3 5 3000 Santosh Rani MOTHER F 55 5 1 5 433 HR/RS/BUK/SQ/COM/24 Hamirpur Maudaha Vihuni 58+310 2 3 1 1 7.10 2.00 2.00 4.00 Bhanvar Singh S/o Ghaseeta SELF M 1 434 HR/RS/BUK/SQ/COM/25 Hamirpur Maudaha Vihuni 58+320 2 3 1 1 7.20 2.50 2.00 5.00 Nand Kishor S/o SELF M 1 Egis India Consulting Engineers Pvt. Ltd. Page 49 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 435 HR/LS/BUK/K-16 Hamirpur Maudaha Vihuni 58+325 1 4 1 1 7.60 NA NA NA 3 2 1 caste Shiv Pal S/o Gore Lal SELF M 50 1 1 1 3 3 3000 Kaushi WIFE F 45 1 1 5 Dasha Ram SON M 18 2 3 6 Laxman SON M 15 2 2 6 436 HR/RS/BUK/SQ/COM/25 A Hamirpur Maudaha Vihuni 58+335 2 3 1 1 7.50 2.50 2.00 5.00 3 2 1 caste Randheer S/o Ghaseeta SELF M 35 1 1 1 1 5 8000 Asha WIFE F 32 1 1 5 Sandeep SON M 18 2 3 1 5 Kuldeep SON M 15 2 3 6 Princei DAUGHTER F 13 2 3 6 437 HR/RS/BUK/SQ/COM/26 Hamirpur Maudaha Vihuni 58+350 2 3 1 1 7.50 5.50 2.50 13.75 3 1 1 caste Shankar S/o Shyam Lal SELF M 39 1 1 1 1 5 5000 Madhu WIFE F 35 1 1 5 Neha DAUGHTER F 10 2 2 6 Preeti DAUGHTER F 7 2 2 6 Roshni DAUGHTER F 5 2 2 7 Anjani DAUGHTER F 2 2 1 7 438 HR/RS/BUK/SQ/COM/27 Hamirpur Maudaha Vihuni 58+360 2 3 1 1 8.40 3.20 1.60 5.12 3 2 1 caste Mahesh S/o Shiv Dayal SELF M 38 1 1 3 1 5 5000 sunita WIFE F 33 1 2 5 Khushbu DAUGHTER F 12 2 3 6 Vikas SON M 10 2 3 6 Ramji SON M 7 2 2 6 Mahak DAUGHTER F 6 2 2 6 439 HR/LS/BUK/K-17 Hamirpur Maudaha Vihuni 58+370 1 4 1 1 8.75 NA NA NA 4 2 1 WHH Rao Rani W/o Bihari Lal SELF F 57 3 1 1 3 5 6000 Bihari Lal HUSBAND M 60 1 1 1 Lakhan SON M 30 1 1 1 Asha Rani D/L F 28 1 1 5 6 Makhan SON M 28 1 1 1 Prabha D/L F 26 1 1 5 6 440 HR/LS/BUK/K-18 Hamirpur Maudaha Vihuni 58+380 1 4 1 1 8.75 NA NA NA Siddha S/o Shiv Dayal SELF M 1 441 HR/LS/BUK/K-19 Hamirpur Maudaha Vihuni 58+390 1 4 1 1 5.50 NA NA NA Shiv Chand Chadami SELF M 1 442 HR/LS/BUK/K-20 Hamirpur Maudaha Vihuni 58+395 1 4 1 1 5.50 NA NA NA Sita Ram S/o Teeka Ram SELF M 1 443 HR/RS/BUK/K-28 Hamirpur Maudaha Vihuni 58+395 2 4 1 1 6.00 NA NA NA Bardani s/o Shiv Dayal SELF M 1 444 HR/LS/BUK/EN/RES/21 Hamirpur Maudaha Vihuni 58+425 1 2 2 2 9.50 10.00 0.50 5.00 3 2 1 caste Asha Ram S/o Kallu SELF M 45 1 1 1 1 3 4000 Suman WIFE F 40 1 1 5 Umesh SON M 20 2 4 6 Dayavati DAUGHTER F 16 2 3 5 Sandhya DAUGHTER F 12 2 2 6 Vikas SON M 8 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 50 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 445 HR/LS/BUK/EN/RES/22 Hamirpur Maudaha Vihuni 58+435 1 2 2 2 9.00 5.40 1.00 5.40 3 2 1 caste Gulab S/o Ram Das SELF M 52 1 1 3 1 3 4000 shiv kumari WIFE F 47 1 1 5 Prince SON M 12 2 2 6 Praveen SON M 10 2 2 6 446 HR/LS/BUK/EN/RES/23 Hamirpur Maudaha Vihuni 58+480 1 2 2 2 9.30 16.00 0.70 11.20 1 2 1 caste Jai Singh S/o Hari Ram SELF M 45 1 1 1 1 3 6000 Ram Rati WIFE F 40 1 1 5 Pooran SON M 18 2 2 1 3 Aarti DAUGHTER F 15 2 2 5 447 HR/LS/BUK/EN/RES/24 Hamirpur Maudaha Vihuni 58+500 1 2 2 2 9.50 7.50 0.50 3.75 1 2 1 caste Ram Nath S/o Ganesh SELF M 40 1 1 3 1 3 4000 Santosh Rani WIFE F 35 1 1 1 3 Kranti DAUGHTER F 14 2 3 6 Jyoti DAUGHTER F 12 2 2 6 448 HR/RS/BUK/EN/RES/29 Hamirpur Maudaha Vihuni 58+500 2 2 1 1 8.00 9.70 2.00 19.40 3 2 1 caste Santosh S/O Gulzari SELF M 45 1 1 3 3 2 4000 Rama WIFE F 42 1 1 5 Bhagvati DAUGHTER F 10 2 3 6 Munna DAUGHTER F 8 2 2 6 Babita DAUGHTER F 6 2 2 6 Sahailendra SON M 5 2 2 7 449 HR/RS/BUK/EN/RES/30 Hamirpur Maudaha Vihuni 58+520 2 2 2 2 8.80 11.50 1.20 13.80 3 2 1 caste Matadeen S/o Gulzari SELF M 50 2 5 1 3 2 5000 Dhirendra SON M 22 1 3 1 Somvati D/L F 20 1 3 5 Dharmendra SON M 12 2 3 6 450 HR/RS/BUK/EN/RES/31 Hamirpur Maudaha Vihuni 58+535 2 2 2 2 8.60 10.20 1.40 14.28 Pyare Lal S/o Shiv Nath SELF M 1 451 HR/LS/BUK/EN/RES/25 Hamirpur Maudaha Vihuni 58+540 1 2 2 2 8.60 10.45 1.40 14.63 3 2 1 caste Chhiddhu S/o Brij Lal SELF M 50 2 1 1 1 3 5000 Kesar Rani WIFE F 45 1 1 5 Suresh SON M 20 1 3 1 3 Bhagvati D/L F 18 1 3 5 Pushpendra SON M 13 2 2 6 452 HR/LS/BUK/EN/RES/26 Hamirpur Maudaha Vihuni 58+550 1 2 2 2 8.60 16.30 1.40 22.82 3 2 1 caste Natthu S/o Brij lal SELF M 50 2 1 2 1 3 5000 Awdh Rani WIFE F 45 1 1 5 Ramsh SON M 22 2 3 1 3 Pooja DAUGHTER F 14 2 2 5 453 HR/LS/BUK/EN/RES/27 Hamirpur Maudaha Vihuni 58+570 1 2 2 2 8.50 7.40 1.50 11.10 3 2 1 BPL Jagdeesh S/o Brij Lal SELF M 40 3 1 3 1 3 3000 Shiv Pyari WIFE F 35 1 1 5 Amita DAUGHTER F 21 2 5 6 Basanti DAUGHTER F 14 2 2 6 Sadhna DAUGHTER F 12 2 2 6 Egis India Consulting Engineers Pvt. Ltd. Page 51 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Brijesh DAUGHTER F 10 2 2 6 Vikas SON M 8 2 2 6 Siya Rani MOTHER F 85 5 1 8 454 HR/LS/BUK/K-28 Hamirpur Maudaha Vihuni 58+600 1 4 1 1 8.00 NA NA NA 4 1 Pappu S/o Chunna SELF M 35 1 1 1 3 5 4000 Doli WIFE F 30 1 1 5 Raja SON M 10 2 2 6 Raj SON M 4 2 2 7 Azam SON M 1 2 1 7 455 HR/LS/BUK/EN/RES/29 Hamirpur Maudaha Vihuni 58+650 1 2 2 2 9.30 7.70 0.70 5.39 3 2 1 caste Thakur Deen S/o Gauri Shankar SELF M 34 2 1 4 3 2 3500 Anshu WIFE F 30 1 1 5 Rachna DAUGHTER F 7 2 2 6 Rohit SON M 5 2 2 7 Sangeeta DAUGHTER F 3 2 1 7 Genda rani MOTHER F 60 5 1 2 456 HR/LS/BUK/EN/BW/30 Hamirpur Maudaha Vihuni 58+670 1 2 2 4 6.60 14.20 NA 14.20 3 2 1 caste Bhola S/o Raja Ram SELF M 35 2 1 4 3 3 4000 Gudda WIFE F 32 1 5 5 Ajay SON M 14 2 3 6 Arun SON M 12 2 3 6 Ravi SON M 10 2 3 6 Bhuvan Devi MOTHER F 80 5 1 2 457 HR/RS/BUK/EN/RES/32 Hamirpur Maudaha Vihuni 58+710 2 2 2 2 9.00 5.70 2.50 14.25 3 2 1 caste Ram Vilas S/o Shivkar Singh SELF M 56 2 1 2 1 4 6000 Shanti Devi WIFE F 55 1 1 5 Manki SON M 22 1 4 2 sangeeta D/L F 20 1 3 5 458 HR/RS/BUK/EN/BW/33 Hamirpur Maudaha Vihuni 58+770 2 2 2 4 7.30 5.70 NA 5.70 4 2 1 caste Banne Khan S/o Muneer Khan SELF M 56 4 1 3 1 3 22000 Haseena Khatoon WIFE F 52 1 2 5 Niyaz SON M 27 1 4 1 4 Firdaus D/L F 25 1 4 5 Afzal SON M 18 2 3 1 3 Rizvana DAUGHTER F 20 2 4 5 Khushnuma DAUGHTER F 28 5 4 5 459 HR/RS/BUK/EN/RES/34 Hamirpur Maudaha Vihuni 58+785 2 2 2 2 8.60 14.00 1.40 19.60 3 2 1 caste VishvaNAth S/o Baladeen SELF M 50 2 1 3 1 3 6000 Parvati WIFE F 48 1 1 5 Shyam Sunder SON M 30 1 4 1 3 Poonam D/L F 26 1 1 5 Uttra G/D F 1 2 1 7 arjun SON M 18 2 4 6 Egis India Consulting Engineers Pvt. Ltd. Page 52 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age 460 HR/DNR / K / L-1 Hamirpur Maudaha Dhanauri 66+500 1 4 1 1 8.50 NA NA NA 3 2 1 caste Sita w/o Prem Chandra SELF F 45 2 1 1 1 5 2000 Prem Chandra HUSBAND M 50 1 1 1 1 Puspa DAUGHTER F 24 2 2 4 1 461 HR/DNR /EN/ L-2 Hamirpur Maudaha Dhanauri 66+800 1 2 1 2 9.50 6.00 0.50 3.00 3 2 1 caste Ram Bharose s/o Kallu SELF M 55 2 1 2 1 1 2500 samal rani WIFE F 50 1 1 5 Chandra shekhar SON M 25 1 3 1 1 kamlesh D/L F 22 1 2 5 Munna SON M 20 2 3 6 462 HR/DNR / K / L-3 Hamirpur Maudaha Dhanauri 66+910 1 4 1 1 8.60 NA NA NA Anil Singh S/o SELF M 1 463 HR/DNR / K / R-1 Hamirpur Maudaha Dhanauri 66+910 2 4 1 1 5.80 NA NA NA 3 2 1 caste Lallo s/o SELF M 65 1 1 1 3 5 1800 Nirmal WIFE F 60 1 1 1 464 HR/DNR / K / L-4 Hamirpur Maudaha Dhanauri 66+920 1 4 1 1 8.00 NA NA NA Absent SELF M 1 465 HR/DNR / K / R-2 Hamirpur Maudaha Dhanauri 66+920 2 4 1 1 6.00 NA NA NA 1 2 1 Caste Munna s/o Ram Chandra SELF M 45 3 1 1 1 5 2800 Vidya WIFE F 42 1 1 5 Tara DAUGHTER F 20 2 1 6 Sunita DAUGHTER F 18 2 4 6 Ajay SON M 15 2 3 6 Kiran DAUGHTER F 13 2 3 6 Mehar kumari DAUGHTER F 8 2 2 6 466 HR/DNR / K / L-5 Hamirpur Maudaha Dhanauri 66+925 1 4 1 1 8.10 NA NA NA Absent SELF M 1 467 HR/DNR / K / R-3 Hamirpur Maudaha Dhanauri 66+925 2 4 1 1 6.00 NA NA NA 3 2 1 caste Kamla pati s/o Bhagwati prasad SELF M 30 1 1 3 1 5 4000 Ranno WIFE F 28 1 2 5 Puspendra SON M 12 2 3 6 Keerti DAUGHTER F 7 2 2 6 Bal mukund SON M 5 2 1 7 468 HR/DNR / K / R-4 Hamirpur Maudaha Dhanauri 66+930 2 4 1 1 6.20 NA NA NA 3 2 1 caste Daya shankar S/o Jiwan Lal SELF M 22 1 2 4 1 5 2200 469 HR/DNR / K / L-6 Hamirpur Maudaha Dhanauri 66+930 1 4 1 1 8.60 NA NA NA Absent SELF M 1 470 HR/DNR / K / R-5 Hamirpur Maudaha Dhanauri 66+933 2 4 1 1 6.00 NA NA NA 3 2 1 caste Laxman s/o Prahlad SELF M 30 1 1 3 1 5 3500 Kasturi WIFE F 28 1 1 5 Jamuntri DAUGHTER F 8 2 2 6 Roshani DAUGHTER F 6 2 2 6 Premwati DAUGHTER F 4 2 1 7 Brijesh SON M 2 2 2 7 471 HR / DNR / K / L-7 Hamirpur Maudaha Dhanauri 66+935 1 4 1 1 8.00 NA NA NA Absent SELF M 1 472 HR/DNR / K / L-8 Hamirpur Maudaha Dhanauri 66+935 1 4 1 1 9.00 NA NA NA 3 2 1 caste Shyam Karan S/o Bhan Singh SELF M 25 1 2 5 1 5 5000 473 HR/DNR / K / R-6 Hamirpur Maudaha Dhanauri 66+940 2 4 1 1 6.00 NA NA NA 1 2 1 Caste Jauhari s/o Parsuram SELF M 32 1 1 1 1 5 2500 Prem Rani WIFE F 30 1 1 5 Egis India Consulting Engineers Pvt. Ltd. Page 53 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Narendra SON M 10 2 2 6 Aman SON M 6 2 2 6 Praveen SON M 4 2 1 7 Seema DAUGHTER F 2 2 1 7 474 HR/DNR / K / R-7 Hamirpur Maudaha Dhanauri 66+945 1 4 1 1 6.20 NA NA NA Absent SELF M 1 475 HR/DNR / K / L-9 Hamirpur Maudaha Dhanauri 66+950 1 4 1 1 9.00 NA NA NA 1 2 1 Caste Sant Ram s/o Bahadur SELF M 32 1 1 3 1 5 3000 Sunita WIFE F 30 1 1 5 Jai Narayan SON M 14 2 3 6 Jai shree DAUGHTER F 12 2 3 6 Mahendra SON M 8 2 2 1 6 476 HR/DNR / K / L-10 Hamirpur Maudaha Dhanauri 66+955 2 4 1 1 9.00 NA NA NA 3 2 1 caste Peer Ali s/o sahadat Ali SELF M 40 1 1 5 1 5 3200 Shabnam WIFE F 38 1 1 5 Unis SON M 17 2 2 2 Usuf SON M 15 2 2 2 Haseena DAUGHTER F 11 2 2 6 Gulfasan DAUGHTER F 9 2 2 6 477 HR/DNR / K / R-8 Hamirpur Maudaha Dhanauri 66+965 2 4 1 1 6.00 NA NA NA 1 2 1 Caste Matadin s/o Bhagirath SELF M 50 3 1 3 1 5 3000 Ahilya Rani WIFE F 48 1 1 5 Hemlata DAUGHTER F 25 2 3 2 Rama DAUGHTER F 23 2 3 2 Ajay SON M 20 2 5 6 Sanjay SON M 18 2 4 6 478 HR/DNR / K / R-9 Hamirpur Maudaha Dhanauri 66+975 2 4 1 1 6.10 NA NA NA Absent SELF M 1 479 HR/DNR / K / R-10 Hamirpur Maudaha Dhanauri 66+980 2 4 1 1 7.00 NA NA NA 3 2 1 Caste Shital S/o Bahgirthi SELF M 26 1 2 1 4 5 2200 480 HR/DNR / SQ / R-11 Hamirpur Maudaha Dhanauri 66+980 2 3 1 1 7.00 4.10 3.00 12.30 3 2 1 Caste Jai singh s/o Gangadin SELF M 28 1 1 3 1 5 5000 Yasoda WIFE F 25 1 1 5 Bhupendra SON M 4 2 1 7 Roshani DAUGHTER F 1 2 1 7 481 HR/DNR / SQ / R-12 Hamirpur Maudaha Dhanauri 66+985 2 3 1 1 7.00 4.50 3.00 13.50 3 2 1 Caste Brij Gopal s/o Gangadin SELF M 35 1 1 2 1 5 6000 Ram sati WIFE F 32 1 2 1 5 Rajni DAUGHTER F 8 2 2 6 Madhu DAUGHTER F 6 2 2 6 Tinku SON M 4 2 1 7 482 HR/DNR / SQ / R-13 Hamirpur Maudaha Dhanauri 67+000 2 3 1 2 7.40 9.30 2.60 24.18 1 2 1 Caste Maiku s/o Ram Chandra SELF M 55 3 1 1 1 3 4000 Kesar WIFE F 54 1 1 5 Pushpa DAUGHTER F 25 2 2 2 Tulsa DAUGHTER F 22 2 4 2 Egis India Consulting Engineers Pvt. Ltd. Page 54 of 55 Uttar Pradesh Core Road Network Development Program Annexure - 3 Details of Structures Social Status of Househol family Status of General Ownership Type of Social Religious Vulnerability Type of Loss Measurement of Structure Sructure Category Category Status 1. SC 2. ST 3. OBC 4. General 5. (2), Resi + Comm (3) Boundry Total affected Area of structure 1. Titleholder 2. Encroacher 3. Permanent (2) Permanent (3) Commercial (1), Residential 1. Muslim 2. HinDu 3. Other Squatter 4 Kiosk ,Tenant 5 Educational Qualification Sl.No. Census Survey Code Distance fron CL in (M) Name of the Owner Temporary (1) Semi- Base of Vulnerability Wall ( 4 ) Other (5) Side 1. Left 2. Right Relation with HoH Other Occupation District Tehsil Village Main Occupation Monthly Income Monthly Income No. of Families Km / Chainage Marital Status Usual Activity (in Sq Mtr.) Sex (M/F) (specify ) Remarks Length Others Width 1.Vul Age Leelan SON M 18 2 3 6 Shama DAUGHTER F 16 2 2 6 Ram kumari DAUGHTER F 15 2 3 6 Sangeeta DAUGHTER F 10 2 2 1 Akash SON M 5 2 1 7 483 HR/DNR / SQ / R-14 Hamirpur Maudaha Dhanauri 67+010 2 3 1 2 7.40 9.70 2.60 25.22 1 2 1 Caste Munna s/o Ram Chandra SELF M 45 3 1 1 1 3 6000 Vidya WIFE F 42 1 1 5 Tara DAUGHTER F 20 2 1 2 Sunita DAUGHTER F 18 2 4 6 Ajay SON M 15 2 3 6 Kiran DAUGHTER F 13 2 3 6 Mehar kumari DAUGHTER F 8 2 2 6 484 HR/DNR / K / R-15 Hamirpur Maudaha Dhanauri 67+050 2 4 1 1 7.00 NA NA NA 1 2 1 Caste Haripal S/o SELF M 36 1 1 4 4 5 1800 Chandi WIFE F 33 1 2 2 Rekha DAUGHTER F 14 2 3 3 Preeti DAUGHTER F 12 2 3 3 Anita DAUGHTER F 9 2 2 2 Kavita DAUGHTER F 7 2 2 2 Sheelu DAUGHTER F 4 2 1 7 Jyoti DAUGHTER F 1 2 1 7 485 HR/DNR / SQ / L-11 Hamirpur Maudaha Dhanauri 67+050 1 3 1 1 9.50 8.70 0.50 4.35 1 2 1 Caste Narayan Das s/o ratiram SELF M 22 1 1 3 1 5 5000 Sumitra WIFE F 20 1 1 5 1 Kiran DAUGHTER F 2 2 1 7 Divyanshi DAUGHTER F 1 2 1 7 486 HR/AUNTA / SQ / R-1 Hamirpur Rath Aouta 70+600 2 3 1 1 5.50 3.40 2.50 8.50 4 2 Bharat Kumar s/o Arjun SELF M 23 1 1 1 4 1 3000 Meena Kumari WIFE F 21 1 1 3 1 Nishi DAUGHTER F 3 2 1 7 Diksha DAUGHTER F 1 2 1 7 487 HR/RATH / SQ / L-1 Hamirpur Rath Rath 75+080 1 3 1 2 6.50 5.60 3.70 20.72 3 2 1 Caste Indrani w/o Jagdish prasad SELF F 50 3 1 5 1 5000 Jagdish HUSBAND M 55 3 3 1 Divya DAUGHTER F 21 2 1 2 Shalni DAUGHTER F 20 2 1 2 Deepti DAUGHTER F 17 5 3 2 488 HR/RATH / SQ / R-1 Hamirpur Rath Rath 75+450 2 3 1 2 6.00 5.00 2.80 14.00 3 2 1 Caste Rambai s/o chhanga SELF M 80 1 1 3 8 1 1500 Egis India Consulting Engineers Pvt. Ltd. Page 55 of 55 Anneuxre-4 Consultation Uttar Pradesh Core Road Network Development Program Annexure-4 Photograph During Public consultations ESMF Workshop: The development of the ESMF is based on a consultative process that engaged key stakeholders at the state and local levels and sought their feedback. Key government agencies have been consulted at the various levels to obtain their consent on the ESMF in general and specially on the land acquisition process and resettlement framework. The state level consultation was carried out on November 7, 2014. The objective of consultation was to receive feedback from various stakeholders and wider dissemination. The consultation was carried out in Hindi and was attended by nearly 50 stakeholders representing academics, civil society, administration, project affected persons and technocrats. The executive summary of draft ESMF and project specific R&R policy in Hindi was circulated prior to the consultation. The issues discussed during the consultation included: • Minimizing adverse environmental and social impacts such as minimize tree cuttings; provide safety measures near schools and health centres • Safety of women and children during construction • Safety measures for road users and public • Project should provide bus stops at major habitations • Drains in urban areas • Land prices and prices of the properties affected to be finalized in consultation with the community • Replacement of community properties • Facilities for solid waste management in urban areas Project assured stakeholders that all measures suggested will be incorporated in design to the extent possible. Following the State level consultations, public consultations have been carried out in sample sub project areas to get feedback and suggestions from the community on the ESMF. The translated version of executive summary of draft ESMF was disclosed on the websites and placed with the offices of the nodal agencies prior to the consultation meetings. The minutes of the meeting was prepared highlighting the key discussions and issues raised by the stakeholders. The issues raised during the consultations were similar to those raised in state level consultation. Plan for Continued Participation The following set of activities is required for effective implementation of RAP. This will also help in timely execution of RAP. Information Disclosure For the benefit of the community in general and PAPs in particular, RAP and R&R policy will be translated in Hindi and kept at • Public Libraries of the districts • Office of Chief Development Officer, and • Libraries of various colleges in the district. • PWD offices in project districts • Schools of the villages affected, and • Any other public place along the highway Page 1 of 3 Uttar Pradesh Core Road Network Development Program Annexure-4 A copy of RAP and R&R policy will also be placed at the office of Chief Engineer,UP PWD, Lucknow and respective PWD circles and divisions. Public Information Dissemination PWD offices located along the Project Corridors will provide actual information and policies and other rehabilitation actionplan to the people in continous manner. For this, following are proposed • The NGOs involved in the implementation of RAP will organise Public meetings, and will appraise the communities about the progress in the implementation of limited works. • The NGO will organise public meetings to inform the community about the payment and assistance paid to the community. Regular update of the program of resettlement component of the project will be placed for public display at the PWD office. Community Participation For effective implementation of RAP, it is essential to provide scope of involving communities and PAPs in the process. The mechanism of involving communities is suggested below: Page 2 of 3 Uttar Pradesh Core Road Network Development Program Annexure-4 Page 3 of 3 Anneuxre-5 NEO Uttar Pradesh Core Road Network Development Program Annexure - 5 Uttar Pradesh CORE ROAD NETWORK DEVELOPMENT PROJECT Implementation of Resettlement Action Plan TERMS OF REFERENCE FOR FACILITATING NGOs 1. Background of the Project 1.1 The Government of Uttar Pradesh has requested the World Bank through Government of India to provide assistance for improvement of the Core Road Network of the state. 1.2 The state has a road network of 299,604 km, out of which 174,451 km are under the U.P.P.W.D. The roads under U.P.P.W.D. comprise 7,550 km of National Highways (NHs) 7,530 km of State Highways (SHs), 7,264 km of Major District Roads (MDRs), 39,245 km of Other District Roads (ODRs) and 118,166 km of Village Roads. Only about 60% of SHs are double lane. In the entire state 62% of MDRs and 83% of ODRs have widths less than 7 m. 1.3 A strategic option study carried earlier in 1996 indicated that the state lacked in terms of good quality roads compared to many other states of the country in terms of traffic capacity and road condition and a strategic core road network was identified for improvement. Based on that study, the U.P. State Roads Project-II was completed in the year 2010, wherein almost 2,600 km of roads out of the network were upgraded or rehabilitated with World Bank assistance. 1.4 It is amply clear in view of the emerging traffic trends that there is an urgent need for further improving the road network of the state and redefining the core road network from time to time. Keeping this in mind a study to prepare a road network master plan of the state was under way, wherein the consultants have identified an updated Core Road Network for the state comprising: National Highway 7,550 km State Highways 7,530 km Major District Roads 5,761 km Other District Roads 3,254 km Total 24,095 km 1.5 The Government of Uttar Pradesh has a long-term program to improve the Core Road Network (CRN) and, as part of this program, has applied for a financial assistance from the World Bank for developing the Uttar Pradesh Core Road Network Development Project (UPCRNDP) – hereinafter referred as “the Project”. Although National Highways are an integral and significant part of Core Road Network, their widening/strengthening and maintenance activities are carried out through the resources of t h e Government of India (GoI). Therefore the entire 7,550 km length of National Highways within the state has not been included in the UPCRNDP. Instead the project will focus on remaining part of the CRN. 1.6 Uttar Pradesh Core Road Network Development Project (UPCRNDP) will envisage approximately upgradation of 1000 km. of State Highways and a Bridge over river Sharda at Pachperighat in district Lakhimpur-kheri. Government of UP has identified 30% civil works under UPCRNDP as follows: S. No. Name of Road/Bridge Length (km.) 1 Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) (Ch. 0.000 to Ch. 168 168.000 km) 2 Gola-Shahjahanpur Road (SH-93 59 (Ch. 0.000 to Ch. 59.000 km) 3 Utraula-Faizabad Road (SH-9) 59 (Ch. 0.000 to Ch. 59.000 km) Egis India Consulting Engineers Pvt. Ltd. Page 1 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 S. No. Name of Road/Bridge Length (km.) 4 Lipulekh-Bhind Road (In district Farrukhabad & Mainpuri) (SH-29) 54 (Ch. 524.000 to 577.000 km) 5 Badaun-Bilsi-Bijnaur Road (SH-51) 79 (Ch. 58.500 to 137.500 km) 6 Bridge over river Sharda at Pachperighat in district Lakhimpur-Kheri -- Rest of the 70% civil works are to be finalized by Project Management Consultant on board from 08-08-2014 from the following list: S. No. Name of Road/Bridge Length (km.) 1 Etah-Tundla Road (SH-31) 58 (Ch. 0.000 to 58.000 km) 2 Panipat-Khatima Road (SH-12) 40 (Ch. 131.000 to Ch. 170.000 km) 3 Moradabad-Haridwar-Dehradoon Road (SH-49) 36 (Ch. 37.000 to Ch. 74.000 km) 4 Pilibhit-Puranpur-Lakhimpur-Balrampur-Basti Road (SH-26) 49 (Ch. 376.000 ls Ch. 422.000 km.) 5 Panipat-Khatima Road (SH-12) 113 (Ch. 18.000 to Ch. 130.000 km.) 6 Bijnaur-Chajlait Road (SH-76) 65 (Ch. 0.00 to Ch. 65.000 km) 7 Hamidpur-Kuchesar Road (SH-100) 36 (Ch. 1.000 to Ch. 36.000 km) 8 Chandausi-Devai-Aligarh-Agra Road (SH-39) 81 (CH. 194.000 to Ch. 274.000 km) The total estimated cost of the project is Rs. 3500 crore. This is evident from the above two list of works that works are likely to be scattered all along the UP. 2. OBJECTIVES OF THE ASSIGNMENT 2.1 The main objective of the NGO consultancy is to facilitate the affected community in their resettlement and rehabilitation processes and help UP PWD in the implementation of RAP. Specifically, the main tasks of the selected NGO would be as follows: Assist PMC consultants in identification of PAPs Assist UP PWD/Project in undertaking information, education and communication (IEC) campaigns in the project areas to inform about the project and proposed measures. Educate PAPs regarding their likely losses due to the project, their entitlements as per the Resettlement policy of UP PWD and the obligations under the RAP. Ensure that PAPs get the compensation for the loss of their land and other assets at the prevailing market value. At the same time, it is important to ensure that PAPs receive their full entitlements under the RAP and use them productively. Where options are available, the NGO shall provide advice to PAPs on the relative benefits of each option. Assist the physically displaced PAPs in their relocation including counselling and coordination with the local authorities, particularly on housing and infrastructure in the places where PAPs will be relocated. Egis India Consulting Engineers Pvt. Ltd. Page 2 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 Assist PAPs in their economic rehabilitation including counselling and coordination with the local authorities, particularly those implementing the government schemes for the socio- economic upliftment of the affected communities. Assist PAPs in the redress of their grievances through the system implemented as part of the RAP. In this regard, inform PAPs about the functional aspects of various committees set up by the project/ District Administration and assist them in benefiting from such institutional mechanisms. Assist UP PWD / Project in ensuring social responsibilities of the project, such as compliance with the labour laws, prohibition of child labour, HIV/AIDS and gender issues. Any other relevant task that would be assigned by the project during the course of the consultancy period 3. SCOPE OF WORK 3.1 The NGO will be one of the stakeholders in the entire project cycle with primary responsibility of facilitating the implementation of RAP and help UP PWD in mitigating the adverse impacts of the project. This necessarily requires the selected NGO to only work with PAPs but also interface between the local communities of the project area and UP PWD. At the same time, NGO will function as a link between the UP PWD and the District Administration and relevant government agencies. The NGOs shall remain responsible for the development of a comprehensive livelihood system and facilitate PAPs to take advantage of the options available (as per the RAP). More detailed scope of work is provided in the following sections. 3.2 Administrative Responsibilities Develop rapport with the Project authority, project staff as well as with the head quarter level Social and Environmental Cell of the UP PWD. This will be achieved through regular meetings and attending reviews carried out by the Project/UP PWD. Assist UP PWD in ensuring compliance with the safety, health and hygiene norms; gender mainstreaming and actions proposed for HIV/AIDS and Child labour awareness/prevention campaign, . Report to the project office at district level on a monthly basis. The report should include physical and financial progress both in terms of quantitative and qualitative reporting. The report should prominently feature the problems and issues addressed and tackled with the PAPs and the solutions found. The report should have a separate chapter covering the gender issues, their problems and what has been done (within the framework of the RAP) to ensure their participation in decision making as well as the options made available for them to access economic opportunities, marketing and credit. The report should clearly include the number of field units made by the NGO’s staff and the outcome of consultation with the people. NGO shall also produce quarterly process documentation report for UP PWD head quarter at Lucknow. 4. Responsibility of implementation of the RAP will include: 4.1 Undertake IEC Campaigns Undertake a public information campaign at the commencement of the project as well as continuing through project implementation to inform the affected communities of Egis India Consulting Engineers Pvt. Ltd. Page 3 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 i. The need for land acquisition ii. The reasons and need for eviction of displaced households; and iii. The likely consequences of the project on the community’s livelihood iv. Proposed mitigation measures. Thus the NGOs shall establish rapport with the PAPs, consult them, provide them information about the respective entitlements as proposed under the RAP and distribute identity cards to the eligible PAPs. 4.2 Verify Social Assessment Results Undertake a verification exercise of PAPs identified in the SIA Report to check the validity of the information on the affected and eligible families including the individual losses. This activity will be simultaneously carried out while PMC consultants will be carrying out census survey. Based on the above verification exercise, the NGO shall prepare a list of PAPs eligible for R&R assistance and relocation, enlisting their entitlement as per the Policy and RAP after verification. The NGO shall display the list of eligible PAPs in prominent public places like Panchayat office or village school or any other public place in the vicinity. During the verification of the eligible PAPs, the NGO shall ensure that each of the PAPs is contacted and consulted either in groups or individually. The NGO shall specially ensure consultation with the women headed families. Participatory methods should be applied in assessing the needs of the PAPs, especially, with regard to the vulnerable group. The methods of contact may include (i) village level meetings (ii) gender participation through group interactions (iii) individual meetings and interactions. Based on the final list of PAPs, NGOs will help the Project to prepare Identity Cards for individual PAPs and distribute it to them. Prepare micro plan for each PAP and get it approved from competent authority 4.3 Land Acquisition and Counselling PAPs Assist project in arriving at land cost for private negotiation Facilitate private negotiation with the land owners Explain to the PAPs, the need for land acquisition, the provisions of the policy and the entitlements under the RAP Help project in disbursement of compensation in timely manner Hold specific discussions with the vulnerable groups of the affected community and help them understand their losses and entitlements Distribute the copy of approved project specific Resettlement & Rehabilitation Policy and the translated version of the policy (into Hindi) to each and every PAF which would help them understand their entitlements and decide on their R&R options Disseminate information to the PAPs on the possible consequences of the project on the community’s’ livelihood systems and the option available. Egis India Consulting Engineers Pvt. Ltd. Page 4 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 Help PAPs in making decisions and finalizing their option with regard to relocation and income restoration measures. Help PAF to enter in to a written agreement with /UP PWD as an acceptance to the R&R options. 4.3. Disbursement of R&R Assistance Determine the R&R alternatives opted by PAPs and accordingly document their R&R entitlements (for each PAF) on the basis of the RAP. In case of discrepancies, the NGO shall try to resolve it in consultation with the UP PWD on the basis of policy guidelines and if necessary, pursue the matter through the grievance redress mechanism. Assist the project in ensuring a smooth transition during the relocation of the displaced families. In close consultation with the PAPs, the NGO shall inform the UP PWD about the shifting dates agreed with the PAPs in writing and the arrangements (to be made by the Project) desired by the PAPs with respect to their relocation. Assist the PAPs in opening a joint bank accounts explaining the implications, the rules and the obligations of a joint account, and how she / he can access the resources she / he is entitled to. Ensure proper utilization of the R&R support provided to PAPs and help restore their lost income/assets. Identify means and accordingly advise the UP PWD to disburse the entitlements to the eligible persons / families in a manner that is transparent. 4.4 Address Grievances of PAPs The NGO shall ensure that PAF’s representatives are nominated in the Grievance Redress Committee (GRC) and also a suitable person from its own staff to be a member of the GRC. The NGO shall make PAPs aware of the availability of GRC and the grievance redress procedures. Organize training for PAPs on the procedures to file a grievance application and to confirm that a statement of claim from the concerned PAF accompanies each grievance application. In this regard, the NGO shall help PAPs in filing their grievances and also in clearing their doubts about the procedure as well as the context of the GRC award. The NGO shall record the grievance and bring the same to the notice of the GRC within a reasonable time (at least within 15 days) after receiving the grievance from the PAPs. It shall submit a draft resolution with respect to the particular grievance of the PAF, suggesting multiple solutions, if possible, and deliberate on the same in the GRC meeting through the NGO representation in the GRC. The NGO shall accompany PAPs to the GRC meeting on the decided date, help them express his / her grievance to GRC members. The NGO will inform the PAPs of the decision taken by the GRC within 3 days of receiving a decision from the GRC (The time frame for the GRC to take a decision is 45 days). 4.5 Assist Displaced Families in Their Relocation Obtain PAPs’ choice in terms of (i) site for relocation; (ii) identification of land for alternate housing; (iii) shifting plan and arrangements; (iv) resettlement assistance utilization plan; (v) Egis India Consulting Engineers Pvt. Ltd. Page 5 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 community asset building plan; and (vi) institutional arrangements for maintenance of the community assets developed by the project for resettlers. Assist PAPs in accessing government housing program (particularly for vulnerable groups) and in accessing institutional housing construction loans. Guide PAPs in the construction of houses using locally available construction material, in procuring quality construction material at reasonable prices and check exploitation by vested interests. 4.6 Assist PAPs in Their Economic Rehabilitation Define, evolve and implore alternative methods of livelihood using the local skill, resources and opportunities available both in the project and outside. Help the PAPs in realizing and optimizing the indigenous technology knowledge through the use of local resources. Assist PAF, interested in land-based economic rehabilitation, in identifying suitable land for continuing with agriculture. This will require a survey of land market in the area, both for identification of land and negotiating price. Land based economic rehabilitation for tribal PAPs is an essential feature of the R&R policy agreed for the project. Inform eligible PAPs about various economic opportunities available with UP PWD such as employment (including with contracting agencies); allotment of shops/kiosks, award of petty contracts, vehicle hiring; PCO/internet kiosk; news paper vending; etc. NGO shall also help PAPs and local people in the formation of cooperatives and facilitate in their registration. Coordinate with the project staff to ensure that these cooperatives get contracts from the project on a prefential basis. Undertake a training need assessment for PAPs, particularly on the activities opted by PAPs for their economic rehabilitation. Organize training programs on various income generation activities. Coordinate the training and capacity building program with the project and relevant government and non-government training agencies and ensure that skill level of PAPs is upgraded to help them in their income restoration process. This will include the training to be given to members of the self-help group in accounting, record maintenance, skill acquisition in the chosen enterprise and marketing etc. This will also include training to the members of the labour cooperatives. Establish linkages with the district administration for ensuring that the PAPs get access to public sector schemes available for the socio-economic development of the people, particularly those belonging to vulnerable sections. Similar efforts need to be made for the PAPs interested in availing institutional credit for scaling the operation of economic schemes. The focus for this component of the NGO’s work shall be the vulnerable PAPs for their income restoration. The NGO shall maintain a detailed record of such facilitation. 4.7 Inter-agency Linkages for Income Restoration and Other R&R Support Develop good rapport with the local financial institutions and facilitate PAPs to access credit at acceptable terms and conditions. Work closely with local Government agencies and District Administration to ensure dovetailing their socio-economic development programs and help enrolling PAPs in their development schemes, particularly for housing and improving the economic the economic status of PAPs. Egis India Consulting Engineers Pvt. Ltd. Page 6 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 Coordinate with the local Training institutes for imparting skill and management of training programs for enterprise development. Identify and work with marketing agencies and ensure forward and backward linkages to the economic activities opted by PAPs. 4.8 Assisting UP PWD in its Social Responsibility As part of social responsibility, UP PWD might plan and implement a number of programs focused on the socioeconomic development of the communities in the project area. The facilitating NGO will help UP PWD to plan this component in such way that it meets the requirement of the local population (including the affected community) as well as to ensure that such activities help in their socioeconomic development. Undertake IEC campaign and media/advertisement in collaboration with line agencies (such as National AIDS Control Organization and Uttarakhand State AIDS Control Society) local NGOs and international donor agencies active in the State. Besides NGO needs to ensure that signage / hoardings are available at suitable locations in and around the project area. There is also a need to link the HIV/AIDS and other sexually transmitted diseases with the medical facilities available in the area. In this regard, focussed attention is required on labour camps of the project and flow of new population in the project area. The NGO shall assist the UP PWD to implement these measures, including collaborating with the line agencies. The NGO shall assist UP PWD to ensure that the contractors are abiding by the applicable laws, concerning women’s and the child labour issues, parity in wages, control of HIV/AIDS, etc. Any divergence from women’s and child labour issues should be brought to the notice of the HQ level Social Development Specialist and Project Director of UP PWD. 5. Monitoring and Evaluation 5.1 The implementation of RAP requires regular monitoring – both internal and external monitoring. The NGO involved in the implementation of the RAP will not only monitor the implementation and collect the required information, it should also provide the required information and documents for both internal and external monitoring. To this end, the contracted NGO shall keep proper documentation of its work and the R&R processes employed in RAP implementation. The NGO will be responsible for the upkeep and updating of such data/information and relevant documents regularly. The documents shall include photographs and videotapes of the pre-intervention, intervention and post intervention scenario of all R&R measures undertaken in the area. 6. Reporting System 6.1 The NGO selected for the assignments shall be responsible to Prepare and submit an inception report within three weeks on signing up of the contract, detailing the plan of action, manpower deployment, time schedule, detailed methodology and a withdrawal plan at the end of the period of contract. The withdrawal plan shall be detailed and shall reflect how the PAPs/local communities will maintain the assets created and transferred to the PAPs. Prepare monthly progress reports to be submitted to the Project/UP PWD indicating the weekly progress and its synchronization with the project construction schedule. Prepare any other report as required by the Project. Collect data required on monitoring of RAP implementation and on selected impact indicators at monthly frequency. Egis India Consulting Engineers Pvt. Ltd. Page 7 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 Submit a completion report at the end of the contract period summarizing the actions taken during the project, the methods and personnel used to carry out the assignment, a summary of supports / assistance given to the PAPs and lessons drawn. Submit all other reports / documentation as described in the terms of reference. 6.2 All progress reports shall include data on input and output indicators as required by the Project. Documentation should be in writing as well as in photographs, videotapes etc. taken during the assignment which should be submitted to the Project long with the reports. Accounts on expenditure, office administration, training and other heads shall be submitted in the form of quarterly reports and final report along with the completion report. 6.3 The NGO shall document in full details the consultation / counselling processes, the process of identification of the resettlement sites (if found necessary) and a full description of the training imparted (or facilitated) as part of the assignment. These documents shall be submitted to the UP PWD as annual reports. 7. Conditions of Services 7.1 The NGO shall ensure that the RAP is implemented on an effective and proper manner. The prime responsibility of the NGO shall be to ensure that each and every eligible PAF receive appropriate and due entitlement (within the R&R policy of UP PWD). Additionally, the NGO shall help the UP PWD in all other matters deemed to be required to implement the RAP in its spirit and entirety. All documents created, generated or collected during the period of contract in carrying out the services under this assignment will be the property of the UP PWD. No information gathered or generated during and in carrying out this assignment shall be disclosed by the NGO without the explicit permission of the UP PWD. 7.2 In order to carry out above tasks, NGO staff (responsible for RAP implementation) will have to be stationed in the project area. While the NGO will have its office at Lucknow, its team members will be stationed in project corridors. Besides contacting PAPs on an individual basis to regularly update the baseline information, group meetings and Gram Panchayat (village level or habitation level in case of urban or peri urban areas) meetings will be conducted by the NGOs on a regular basis. The frequency of such meetings will depend on the requirements of the PAPs but should occur at least once a month to allow the PAPs to remain up to date on project development. NGO will encourage participation of individual PAPs in such meetings by discussing their problems. 8 Time Frame for Services 8.1 The NGOs will be contracted initially for a period of Thirty six months from the date of their appointment. This contract can be renewed, on mutual agreement, for another year based on the performance of the selected NGO to the satisfaction of the Project/UP PWD. 9 Data, Services and Facilities to be provided by the Client 9.1 The UP PWD will provide the NGO copies of the social assessment report, RAP, R&R policy, the list of the PAPs, the land acquisition plan and any other relevant reports/data prepared by the Social Assessment Consultants. 9.2 All facilities and support required in the performance of the assignment. shall be extended to the NGO. Egis India Consulting Engineers Pvt. Ltd. Page 8 of 9 Uttar Pradesh Core Road Network Development Program Annexure - 5 10. Staff Requirement 10.1 The NGO team will have the following staff. S. No. Of Position Qualification No. Positions 1. Team Leader 1 The Team Leader should be a post-graduate, preferably in social sciences, and should have experience of working in road sector projects and specifically in state or national highways. S/he should have about 5 years experience in implementing R&R and rural development works. S/he should have held management position in previous assignments should possess participatory management skills and must have good knowledge of the local language. Experience of working in conflict situation is preferred. 2. R&R Expert 1 Should be at least a graduate in social sciences. S/he should have about 5 years of working experience of which about 2 years in road sector. Should have specific experience in R&R of road projects. Should have sound understanding of the land acquisition process and experience in participatory management. Knowledge of local language is a desirable qualification. Experience of working in other linear projects is preferred. 3. Documentation 1 Should be at least Graduate in Social Sciences and have about 5 years Specialist working experiences of which 2 years in either R&R or Rural Development Projects in documenting the implementation processes. Should have adequate knowledge of handling large scale database and qualitative survey techniques. Should have participated in awareness campaigns of HIV/AIDS and Child Labour in previous projects. 4. Livelihood expert 4 Should be at least Post Graduate in Social Sciences and have about 5 years working experiences of which 2 years in either R&R or Rural Development Projects. Should have adequate knowledge of various poverty alleviation schemes of state and central government. Should have knowledge about the local area, its people and socio-political set up. 10.2 The organization will deploy a 'technical support' team to work at the site. Knowledge of local language is necessary qualification. Administrative staff will not be considered as 'technical support' professionals. The support staff should have one qualified accounts professional who shall be responsible for maintenance of not only internal accounts of the NGO, but also the disbursements made to the PAPs under different heads as per the approved R &R policy. 10.3 The accounts of NGO will be subjected to internal audit by UP PWD on half yearly basis. Egis India Consulting Engineers Pvt. Ltd. Page 9 of 9 Anneuxre-6 Terms of Reference for Concurrent Monitoring and Midterm Evaluation Uttar Pradesh Core Road Network Development Program Annexure - 6 TERMS OF REFERENCE FOR CONCURRENT MONITORING AND MIDTERM EVALUATION 1 AIM, OBJECTIVES AND SCOPE OF WORK The aim of the monitoring is not only to ensure smooth implementation of the R&R program, but also to ensure that NGOs have followed the steps provided in RAP and approved policy of the project authority. The periodic evaluation will provide an assessment of RAP implementation to enable timely adjustments of implementation setup and also to verify whether the objectives of resettlement have been achieved or not. To achieve this aim, objectives of the project are: to ensure timely implementation of Resettlement Action Plan (RAP) without deviation to assess whether the implementation of the RAP is as per the R&R policy and RAP document to evaluate whether the outcome of the social development objectives of the project are being achieved with respect to those who have been physically resettled (displaced families) those who have been assisted in re-establishing their income those who have lost their land functioning of reconstructed common property resources 2 SCOPE OF WORK The scope of work for consultants would be: 2.1 Concurrent Monitoring a) To develop methodology and formats for concurrent monitoring b) To ensure that deployment of professionals by NGO is as agreed in their technical proposal. c) Based on available information, prepare baseline monitoring indicators d) To provide on the job training to NGO and PWD project staff and guide them on RAP implementation e) To ensure that PWD / NGO aadheres to the agreed time-plan during implementation f) To ensure proper documentation by PWD / NGO interalia (i) documentation of socioeconomic data; (ii) preparation of micro plans; (iii) documentation of consultations; (iv) documentation of GRC meetings; (v) NGO's monthly progress reports; and (vi) skill mapping and income restoration activities g) Field-checking of the delivery of the (i) preparation and adequacy of resettlement sites; (ii) adequacy and quality of houses in resettlement sites; (iii) IRP and strategy in terms of adequacy and potential income level; (iv) various trainings, including process adopted for training needs assessment, selection of trainees, trades selected for training, selection process of master trainer or training agency; (v) identification and rehabilitation (including assistance) of vulnerable groups in line with the entitlement framework; (vi) identification of relocation sites for PAPs and CPRs; and (vii) relocation of PAPs h) Survey among sample PAPs to assess their knowledge and concerns regarding the resettlement process, entitlements, and rehabilitation process. i) Observe public consultations for PAPs; review the documentation of consultations held by implementing NGO; identification of gaps (if any) and suggest remedial measures (defined format for documentation). Egis India Consulting Engineers Pvt. Ltd. Page 1 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 j) Observe the functioning of the resettlement operation at all levels in order to assess its effectiveness and compliance with RAP. k) Check the type of grievance issues and the functioning of grievance redress mechanisms by reviewing appeals at all levels and interviewing aggrieved PAPs. l) Advise PWD regarding possible improvements in RAP implementation. m) To validate and sign off monthly progress report submitted by NGO and PWD (Results of validation should come in the progress report) n) To conduct consultation with PAPs in order to validate progress report o) To ensure that compensation and R&R assistance is paid prior to physical possession of land and structure 2.2 Midterm Evaluation The consulting agency (CA) shall undertake mid-term Evaluation of the R&R components of the project. The midterm evaluation primarily focuses on the effectiveness of the processes adopted for implementation and extent of implementation and its relative completeness. It shall include but not limited to the following aspects: The process of implementation of the RAP; Consultations; Transparency; Delivery of the R&R services within the timeframe; The grievance redress processes and systems; Compensation disbursement and assistance; Relocation; Rehabilitation, which includes restoration of livelihood; Training of staff of the PWD and the PAPs; Institutional arrangement and capacity to implement the RAP. Gender sensitivity and empowerment (decision making power at household and community level) To assess whether the compensation and resettlement assistances provided were sufficient for short term income restoration Utilisation pattern of compensation and assistances Quality of resettlement sites including civic amenities provided Benefits accrued to PAPs and difficulties encountered HIV/AIDS prevention awareness especially in labour camps and habitation close to labour camps- the relocated Haat village The CA shall undertake an assessment of people’s perception about the processes adopted for implementation of the RAP including about the (a) compensation and/or assistance received; (b) new relocation sites; (c) relation with the host communities; (d) grievance redress committees; and (e) the services of the NGO and PWD 3 SAMPLING The consultants shall take at least 50 percent of the total affected households as sample size for concurrent monitoring and at least 25% of the total households for impact evaluation. The distribution of households for both concurrent monitoring and impact evaluation should be proportionate to the number of households in different categories of impact. In case of host Egis India Consulting Engineers Pvt. Ltd. Page 2 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 population, consultant must consult at least 10% of the total host population. 4 CONSULTANTS’ TEAM Consultant shall provide following experts to carry out the assignment: No. Of Deployment Position Qualification Positions Period Key Professionals Resettlement 1 10 months The Team Leader should be a post-graduate, Expert cum preferably in social sciences, and should have Team Leader experience of working in World Bank projects. S/he should have about 7 years experience in implementing R&R and rural development works. S/he should have held management position in previous assignments should possess participatory management skills and must have good knowledge of the local language. The team leader should have working knowledge of land acquisition process. Income 1 6 months Should be at least a post graduate in social Restoration sciences. S/he should have about 5 years of Expert experience in R&R or rural development projects. Should have sound understanding of the working of SHGs; income restoration schemes / options and experience in participatory management. Knowledge of local language is a desirable qualification. Support Professionals Research 1 12 months Should be at least a post graduate in social Associate sciences. S/he should have about 2 years of experience in R&R or rural development projects. Should have sound understanding of the working of SHGs; income restoration schemes / options and experience in participatory management. Knowledge of local language is a desirable qualification. Research Should be at least graduate in social science. Investigators Should be able to speak the local language and and should have knowledge of the local area, its Facilitators* people and socio-political set up. The curriculum viate of key professionals will be evaluated. *as per consultants’ own understanding. 5 TIME FRAME FOR SERVICES The consultancy firm will be contracted for a period of twenty four months from the date of their appointment. 6 DATA, SERVICES AND FACILITIES TO BE PROVIDED BY THE CLIENT The PWD will provide the copies of the social assessment report, RAP, R&R policy, the list of the PAFs, the land acquisition plan and any other relevant reports/data prepared by the Social Assessment Consultants. Egis India Consulting Engineers Pvt. Ltd. Page 3 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 All facilities and support required in the performance of the assignment shall be extended to the consultants. PWD will provide office space to the consultants for the period of consultancy. 7 DELIVERABLES The consultants shall provide following deliverables: S. No. Output Timeframe 1 Inception Report – (will describe proposed approach, Within 30 days of signing of the methodology, formats for field surveys, schedule of contract field work; and procedures proposed to be adopted for data collection.) 2 Monthly progress report Every month for one year from the date of signing of contract 3 Quarterly process documentation Every quarter for two years from the date of singing of the contract 4 Half yearly progress report Every sixth month from the start of second year. 5 Midterm impact evaluation At the end of 18 month from the date of signing of contract 6 Project Completion Report At the end of 24th month from the date of signing of contract Egis India Consulting Engineers Pvt. Ltd. Page 4 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 TERMS OF REFERENCE FOR END TERM EVALUATION 1 AIM, OBJECTIVES AND SCOPE OF WORK The aim of the project is provide an assessment of RAP implementation to enable timely adjustments of implementation setup and also to verify whether the objectives of resettlement have been achieved or not. To achieve this aim, objectives of the project are: to evaluate whether the outcome of the social development objectives of the project are being achieved with respect to those who have been physically resettled (displaced families) those who have been assisted in re-establishing their income those who have lost their land functioning of reconstructed common property resources 2 SCOPE OF WORK The scope of work for consultants would be: The consultants shall undertake an end-term Evaluation of the R&R components of the project. The end term evaluation mainly focuses on the outcomes of the implementation. It shall include but not limited to the following aspects:: Assess whether the goal of the RAP to improve or restore the livelihood of the PAPs has been achieved; Assess the changes in the living standards and occupational pattern of the affected people as a result of acquisition of land for the project; Assess as to whether the consultations and participation of the people enabled better implementation of the RAP; Assess as to whether the vulnerable groups benefited from the project, and to what extent; Assess the effectiveness of the provisions of the RAP in the context of the diverse social and cultural groups; Assess the socio-economic impacts of the project on agriculture and the agrarian population in the vicinity of the project Assess the impact of the project specific measures to address the issues of (a) the quality of life of the PAPs; (b) health and hygiene; (c) gender sensitivity and empowerment; (d) sexually transmitted diseases (STDs) including HIV/AIDS; and (e) trafficking of women and children The consultants shall undertake an assessment of people’s perception about the processes adopted for implementation of the RP including about the (a) compensation and/or assistance received; (b) new relocation sites; (c) relation with the host communities; (d) grievance redress committees; (e) the services of the NGO and PWD. Egis India Consulting Engineers Pvt. Ltd. Page 5 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 3 SAMPLING The consultants shall take at least 50 percent of the total affected households as sample size for the end term impact evaluation. The distribution of households for impact evaluation should be proportionate to the number of households in different categories of impact. In case of host population, consultant must consult at least 10% of the total host population. 4 CONSULTANTS’ TEAM Consultant shall provide following experts to carry out the assignment: No. Of Deploymen Position Qualification Positions t Period Resettlement 1 1 month The Team Leader should be a post-graduate, Expert cum preferably in social sciences, and should have Team Leader experience of working in World Bank projects. S/he should have about 5 years experience in implementing R&R and rural development works. S/he should have held management position in previous assignments should possess participatory management skills and must have good knowledge of the local language. Income 1 1 months Should be at least a post graduate in social Restoration sciences. S/he should have about 5 years of Expert working experience of which about 2 years in R&R or rural development projects. Should have sound understanding of the working of SHGs; income restoration schemes / options and experience in participatory management. Knowledge of local language is a desirable qualification. Research 10 5 months Should be at least graduate in social science. Investigators (0.5months* Should be able to speak the local language and Facilitators 10 ) and should have knowledge of the local area, its people and socio-political set up. The curriculum viate of first two positions will be evaluated. 5 TIME FRAME FOR SERVICES The consultancy firm will be contracted for a period of three months from the date of their appointment. 6 DATA, SERVICES AND FACILITIES TO BE PROVIDED BY THE CLIENT The PWD will provide the copies of the social assessment report, RAP, R&R policy, the list of the PAFs, the land acquisition plan, midterm evaluation report and any other relevant reports/data prepared by the Social Assessment Consultants. All facilities and support required in the performance of the assignment shall be extended to the consultants. Egis India Consulting Engineers Pvt. Ltd. Page 6 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 6 7 DELIVERABLES The consultants shall provide following deliverables: S. Output Timeframe No. 1 Inception Report – (will describe proposed approach, Second week from the date of methodology, formats for field surveys, schedule of signing of the contract field work; results of pre-testing and procedures proposed to be adopted for data collection.) 2 Draft end term impact evaluation 10th week from the date of signing of contract 3 Final End term impact evaluation Within 15 days of receiving comments from the client 8 TERMS OF PAYMENT Cumulative Payment S. No. Time Frame (% of total) 1 10% on signing of the contract 10 2 15% on submission of the inception report 25 3 60% on submission of the draft report 85 4 15% on approval of the final report 100 Egis India Consulting Engineers Pvt. Ltd. Page 7 of 7 Anneuxre-7 Details of CPRs Hamirpur SH- 42 Uttar Pradesh Core Road Network Development Program Annexure - 7 Uttar Pradesh Core Road Network Development Project Detailes of Affected Community Property Resouceso (CPR) Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) General Measurement of Structure Distance fron CL in (M) Side 1. Left 2. Right Total affected Area of structure (in Sq Type of CPRs Km / Chainage Sl.No. Census Survey Code District Tehsil Village Remarks Length Width Mtr.) 1 HR/ HEP / CPR/ L-01 Hamirpur Hamirpur Helapur 3+100 1 9.30 1.50 1.20 1.80 Shrine With Pipal Tree 2 HR/ PTY/ CPR/ L-02 Hamirpur Hamirpur Pauthiya 9+810 1 7.45 1.40 1.00 1.40 Shrine With Pipal Tree 3 HR/ PTY/ CPR/ L-03 Hamirpur Hamirpur Pauthiya 10+315 1 4.80 7.10 3.10 22.01 Brahm dev and Hanuma ji Temple 4 HR/ UJN / CPR/ L-04 Hamirpur Hamirpur Ujneri 13+900 1 5.50 1.00 Community Well 5 HR/ LLP/ CPR/ R-02 Hamirpur Hamirpur Lalpura 16+700 2 9.70 10.00 9.00 90.00 Shiv Temple Suwasha 6 HR/ SWB/ CPR/ R-03 Hamirpur Hamirpur 20+615 2 6.30 3.10 2.40 7.44 Shiv Temple Bujurg Suwasha Boundary Wall of Hanuma ji 7 HR/ SWB/ CPR/ L-05 Hamirpur Hamirpur 20+700 1 9.00 12.50 Bujurg Temple 8 HR/ CLL/ CPR/ R-06 Hamirpur Maudaha Chilli 41+455 2 9 3.20 2.40 7.68 Shiv Temple 9 HR/ CLL/ CPR/ L-06 Hamirpur Maudaha Chilli 41+500 1 5.40 1.40 1.00 1.40 Shrine 10 HR/ DMP/ CPR/ R-07 Hamirpur Maudaha Damuprwa 46+300 2 6.30 1.00 Community Well 11 HR/ DMP/ CPR/ R-08 Hamirpur Maudaha Damuprwa 46+330 2 4.80 10.50 Boundary Wall 12 HR/ BSW/ CPR/ R-09 Hamirpur Maudaha Baswari 48+350 2 6.00 2.50 2.40 6.00 Courtyard of Brahm dev 13 HR/ MUK/ CPR/ R-11 Hamirpur Maudaha Muaskra 50+425 2 7.70 4.20 5.30 22.26 Shiv Temple 14 HR/ RATH / CPR/ L-12 Hamirpur Rath Aouta 70+650 2 7.50 1.00 Community Well 15 HR/ RATH / CPR/ L-08 Hamirpur Rath Rath 75+670 1 4.50 1.00 Community Well Egis India Consulting Engineers Pvt. Ltd. Page 1 of 1 Anneuxre-8 Details of GHP Hamirpur SH-42 Uttar Pradesh Core Road Network Development Program Annexure - 8 Uttar Pradesh Core Road Network Development Project List of Hand Pump Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) Distance fron Government Chainage CL in (M) Remarks Sl. Hand Pump Side 1. District Tehsil Village Left 2. No. Right Km / 1 Hamirpur Hamirpur Kuchechha 2+430 2 9.00 GHP 2 Hamirpur Hamirpur Helapur 3+690 2 9.60 GHP 3 Hamirpur Hamirpur Helapur 3+735 1 4.50 GHP 4 Hamirpur Hamirpur Helapur 3+990 1 9.00 GHP 5 Hamirpur Hamirpur Kalaulitir 5+690 2 9.20 GHP 6 Hamirpur Hamirpur Kalaulitir 5+750 2 9.00 GHP 7 Hamirpur Hamirpur Pauthiya 10+820 1 7.50 GHP 8 Hamirpur Hamirpur Pauthiya 12+525 1 7.50 GHP 9 Hamirpur Hamirpur Ujneri 13+900 1 5.50 GHP 10 Hamirpur Hamirpur Lalpura 16+850 2 7.20 GHP 11 Hamirpur Hamirpur Lalpura 16+860 1 7.40 GHP 12 Hamirpur Hamirpur Lalpura 16+995 1 7.60 GHP 13 Hamirpur Hamirpur Swasa Khurd 18+830 2 7.40 GHP 14 Hamirpur Hamirpur Swasa Bujurg 20+585 2 7.00 GHP Egis India Consulting Engineers Pvt. Ltd. Page 1 of 4 Uttar Pradesh Core Road Network Development Program Annexure - 8 Uttar Pradesh Core Road Network Development Project List of Hand Pump Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) Distance fron Government Chainage CL in (M) Remarks Sl. Hand Pump Side 1. District Tehsil Village Left 2. No. Right Km / 15 Hamirpur Hamirpur Swasa Bujurg 20+585 1 8.50 GHP 16 Hamirpur Hamirpur Swasa Bujurg 20+680 1 8.50 GHP 17 Hamirpur Hamirpur Swasa Bujurg 20+950 1 8.00 GHP 18 Hamirpur Hamirpur Chhani Khurd 25+310 2 7.10 GHP 19 Hamirpur Hamirpur Chhani Bujurg 26+660 1 8.85 GHP 20 Hamirpur Hamirpur Chhani Bujurg 26+775 1 9.65 GHP 21 Hamirpur Maudaha Niwada 30+300 1 7.30 GHP 22 Hamirpur Maudaha Niwada 31+025 2 6.30 GHP 23 Hamirpur Maudaha Niwada 31+900 2 9.00 GHP 24 Hamirpur Maudaha Jallu Biwar 38+500 2 8.00 GHP 25 Hamirpur Maudaha Chilli 40+590 2 8.20 GHP 26 Hamirpur Maudaha Chilli 41+380 2 7.70 GHP 27 Hamirpur Maudaha Chilli 41+455 2 7.10 GHP 28 Hamirpur Maudaha Chilli 41+790 2 6.20 GHP Egis India Consulting Engineers Pvt. Ltd. Page 2 of 4 Uttar Pradesh Core Road Network Development Program Annexure - 8 Uttar Pradesh Core Road Network Development Project List of Hand Pump Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) Distance fron Government Chainage CL in (M) Remarks Sl. Hand Pump Side 1. District Tehsil Village Left 2. No. Right Km / 29 Hamirpur Maudaha Chilli Khorehi Lodha 43+795 1 7.20 GHP 30 Hamirpur Maudaha Daamu Purwa 46+600 2 9.30 GHP 31 Hamirpur Maudaha Daamu Purwa 46+050 2 6.80 GHP 32 Hamirpur Maudaha Daamu Purwa 46+165 2 9.30 GHP 33 Hamirpur Maudaha Daamu Purwa 46+300 1 6.30 GHP 34 Hamirpur Maudaha Baswsari 48+175 2 8.50 GHP 35 Hamirpur Maudaha Baswsari 48+400 2 9.50 GHP 36 Hamirpur Maudaha Muskara 49+900 2 6.00 GHP 37 Hamirpur Maudaha Muskara 50+305 2 8.30 GHP 38 Hamirpur Maudaha Muskara 50+375 2 8.00 GHP 39 Hamirpur Maudaha Muskara 51+125 2 7.00 GHP 40 Hamirpur Maudaha Vihooni 57+210 2 9.30 GHP 41 Hamirpur Maudaha Vihooni 57+600 2 7.80 GHP 42 Hamirpur Maudaha Vihooni 57+925 1 8.80 GHP Egis India Consulting Engineers Pvt. Ltd. Page 3 of 4 Uttar Pradesh Core Road Network Development Program Annexure - 8 Uttar Pradesh Core Road Network Development Project List of Hand Pump Hamirpur-Rath-Gursahayganj-Jhansi Road (SH-42) Distance fron Government Chainage CL in (M) Remarks Sl. Hand Pump Side 1. District Tehsil Village Left 2. No. Right Km / 43 Hamirpur Maudaha Vihooni 58+020 1 7.00 GHP 44 Hamirpur Rath Jakheri 61+950 1 6.00 GHP 45 Hamirpur Rath Rath 75+580 1 6.00 GHP 46 Hamirpur Rath Rath 75+680 1 6.00 GHP Egis India Consulting Engineers Pvt. Ltd. Page 4 of 4 Anneuxre-9 Detailed specification for Socio-Economic Baseline Studies (BSES) and Preparation of a Resettlements and Rehabilitation Action Plan (RAP) Uttar Pradesh Core Road Network Development Program Annexure - 9 Detailed specification for Socio-Economic Baseline Studies (BSES) And Preparation of a Resettlements and Rehabilitation Action Plan (RAP) I INTRODUCTION AND OBJECTIVES 1. The improvements mostly include road rehabilitation with raising of formation levels, pavement strengthening, widening and realignment, where necessary. 3. Where the project will entail acquisition of land, structures and other assets, and/or cause displacement of loss of assets within the public Right of Way (ROW), the National Rehabilitation and Resettlement Policy, 2007 GOI and subsequent adoption thereof by U.P. Government with certain amendments applies . The project is under consideration for World Bank financing, and must therefore also be in compliance with the World Bank’s policy on ‘’ Involuntary Resettlement’’ as described in Operational Directive 430 . 4. It is the responsibility of the Borrower to prepare a plan complies with the Government of India’s, Government of UP’s and the World Bank’s policy gui delines and directives on land acquisition and involuntary resettlement. This Plan is referred to as a Resettlement and Rehabilitation Action Plan (RAP). The RAP will be prepared in two phases. The Government of U.P. and the World Bank will first agree on an appropriate Entitlement Framework, on the basis of which a detailed RAP will be developed. 5. The RAP has three main objectives (a) to present the project area and the impacts of land acquisition for project civil works on the people who own properties to be acquired, live on the land to be acquired, and/or derive their income from the land or enterprises operating on the land to be acquired. (b) to present the entitlement policy for compensation and assistance to people affected by the project. (c) to present an action plan for delivery of the compensation and assistance outlined in the policy, to the persons identified as entitled to such assistance. 6. GOI ,GoUP and World Bank policy is based on the principle that the population affected by the project should receive benefits from it, or at the very least not be worse off than before. Acquisition of land and other assets, both of private holdings and within the ROW, are integral part of project design and implementation. Undertaking a social impact assessment and preparing a RAP should be incorporated as part of the project design from the start, and undertaken in close coordination with environmental analysis, the Environmental action plan, and the engineering design and implementation. 7. The World Bank policy emphasizes that involuntary resettlement should be avoided or minimized where possible by exploring other alternative project designs. Therefore, the initial screening for social and environmental impacts should be part of the feasibility studies to determine the final selection of roads to be included in the project. 8. In cases where displacement, loss of assets, or other negative impacts of people are unavoidable, the project shoud assist the project Affected Persons (PAPs) with the means to improve their former living standards, income earning capacities, production levels or at least maintain the previous standards of living of those suffering losses. 9. Since a key principle is that no civil works should be undertaken on any stretch of road before land acquisition has been completed and compensation or assistance carried out according to the RAP, it is essential that the planning and implementation of civil works be coordinated with the RAP. Egis India Consulting Engineers Pvt. Ltd. Page 1 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 10. Preparation of a RAP requires thorough understanding of social, economic and cultural factors influencing the lives of the adversely affected people. Detailed baseline studies need to be conducted, and a participatory approach through consultation with potentially affected persons and other stakeholders such as local NGOs, municipal authorities, etc is essential. Appropriate skills and experience to coordinate and implement this must be available within the responsible agencies. 11. In cases of impacts of indigenous communities, the World Bank’s Operational Directive 4.20 on Indigenous People also applies. In such cases, the TOR requires the consultants to prepare the plans mandated by this directive, in addition to the other elements of the RAP. This planning will specifically include the consultation with and informed participation of the tribal population. The outcome of the consultation process should be the formulation of either an Indigenous People’s Development Plan (IPDP) or a specific strategy to ensure that the affected tribal population benefits from the project activities. In the case of an IPDP, the information guidelines mandated by OD 4.20 should be followed. 12. The Terms of Reference for the work undertaken may be modified according to local contexts, subject to approval by the State Government and the World Bank. II SCOPE OF WORK Social Impact Assessment 13. The objectives of the Social Impact Assessments are (a) to provide the minimum information on social impacts as part of the preliminary screening of road sections. (b) to verify the legal boundaries of the Right of Way, document existing structures, land plots, and other physical assets within the ROW to establish a cut-off date for entitlements in accordance with the policy to be developed, and (c) to provide the socio-economic baseline information required for preparation of the entitlement framework. 14. Preliminary Screening: The consultant shall make initial visits to all the different stretches of road under consideration for project. Coordinated with the other screening exercises being undertaken (environmental, techno-economic), an assessment shall be made of the potential magnitude of social impacts, Any major social impact issues such as large scale resettlement, dense urban clusters, and tribal population shall be identified. Stretches with no or minor social impacts shall be identified, and given priority in the selection of roads to be improved. 15. Following the selection of road stretches to be included in the project, a verification exercise is undertaken. The verification shall establish the legal boundaries of the Right of Way, and identified current usage of the land in terms of squatters, land encroachments, fixed and movable structures, trees and wells, etc. This shall be jointly verified by the (PWD) and the State’s Department of Revenue, in the field, the information gathered should be reflected in maps and records, jointly verified by signature of the responsible senior (PWD) and Revenue officials. The following guidelines shall be followed. (a) Where it is likely that dislocation of people will be required, suitable resettlement sites of government owned land in close proximity to the current locations of the affected persons should be recorded. (b) All encroachments within the public ROW, as well as private holding of land and other assets in areas where it is probable that the corridor of impact will go shall be documented. (d) Assets both within and outside of the ROW such as structure, land holdings, tree and wells, etc shall be recorded on strip maps, and be numbered in each named settlement and administrative unit. Egis India Consulting Engineers Pvt. Ltd. Page 2 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 (e) The information gathered shall be recorded on strip maps, and if possible computerized Photography and/or video recordings should be used to document existing structures and land holdings, and circumstances for identification and planning. 16. Following this a public notification of the intent to undertake a project shall be issued, in accordance with the legal requirements of the State. This represents the cut-off date for entitlements under the project. Only those people with land or other assets identified as existing prior to this date will be entitled to support under the project. This is to prevent land invasions, erection of new structures for speculation purposes, and other attempts at false claims. The consultants shall assist the appropriate authorities in undertaking this work. 17. Socio-economic baseline information: This will be collected by means of a sample socio-economic survey, of the pre-selected roads. The survey shall gather information on the various categories of losses and other adverse impacts likely under the project. The losses shall be categorized according to type. These losses will vary based on the local context. They may include but not be limited to (a) loss of land and other productive resources such as trees. (b) loss of structures, temporary of fixed, within or outside of ROW. (c) loss of access to public services (roads, water supply, schools, medical facilities, shops). (d) loss of customers and supplies. (e) loss of fishing, grazing, or forest areas. (f) loss of access to common property resources, and (g) Disruption of social, cultural, religious, or economic ties and networks. 18. Furthermore, the sample socio-economic survey shall identify potentially affected populations, with special attention to vulnerable groups such as indigenous/tribal populations, scheduled castes, landless households, and women-headed households. It shall include but not be limited to (a) demographic characteristics (ages, sex, numbers, and categories of affected people) (b) ethnic/tribal/caste composition of the population, and settlement pattern by ethnic/tribal/caste groups. (c) main forms of livelihood including specification of the resource base, seasonal and permanent use of resources including land based of salaried employment for different household members, labor mobility, the importance of informal networks and labor exchange patterns and the potential impact of disrupting these patterns, and (d) if any persons have already been displaced, information on them should be collected for two time periods at the time of displacement and at present 19. As part of the sample socio-economic survey, an assessment shall also be made of what the likely replacement value of the various assets lost is based on the following considerations (a) entitlements to affected persons shall be based on replacement value rather than registered land prices etc. which tend to be undervalued. (b) this assessment is also important as a means of preventing inflated claims to compensation. (c) as part of this assessment, consultations and discussions shall be held with a representative number to the different categories of affected persons, to assess their views on what constitutes fair compensation or assistance, their preferences for resettlement actions, and reactions towards the project and (d) a suitable methodology shall be developed to classify different types of assets, and the measurements taken to determine quantities of losses, i.e different types of land, tree, crops, structures, businesses etc, and the unit of measurement such as area of land, number of trees, floor area or other measurements for houses etc. 20. The sample survey shall form the basis for the full base line socio-economic survey to be undertaken subsequently of all PAPs. By conducting if first for a sample population, it may be modified and improved prior to undertaking the full survey. Egis India Consulting Engineers Pvt. Ltd. Page 3 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 21. Reporting. The findings from the Social Impact Assessment shall be presented in a report. This shall include (a) assessment of current land acquisition practices, their appropriateness and potential impacts for this project. (b) estimates of the type of losses expected as a result of the project, broken up in categories of cultivated, homestead, enumeration of structures, trees and other assets (c) identification of the categories of affected persons, bases on the identified losses, and estimates of their numbers. (d) it is important to analyze the data in such a way that the report captures the likelihood that some persons may lose different kinds of assets. Therefore, the number under each category is not mutually exclusive and in identifying different person’s losses and entitlements, provision must be made for recording and compensation for more than one. Kind off loss and (e) the status of squatters and encroachers within the public Right of Way. 22. Based on this information the consultants shall prepare a draft Entitlement Framework, which will form part of the agreement between the State Government and the Bank. The following considerations are essential (a) the framework will be adopted as policy for this project, and will have an objective to provide a basis for development of more general, sectoral policy for social impacts and resettlement within the State’s road infrastructure sub-sector. (b) the entitlement framework shall be prepared by the consultants. However , its is essential that this be done in close consultation with the agencies responsible for the subsequent implementation of the Resettlement Action Plan, to ensure full understanding and agreement on the issues. (c) the framework should be placed within the legal context of India and the State and the Bank’s Operational Directive 4.30 must be adhered to, if there is a divergence between domestic law and practice, and the World Bank’s Directives, this should be clearly identified and analyzed before the framework is finalized. If necessary, consultation between the Bank and the State authorities should be held to arrive at a framework acceptable to both. (d) a key consideration should be to develop a methodology to document to what extent the objectives are achieved. Indicators should be developed which can be used for systematic monitoring and comparison with the baseline data over time. (e) as a general principle, there ought to be more than one option offered to PAPs within each category of impact. The entitlement framework should analyze these options, the risks and benefits of each, and how to implement the various programs in a transparent manner. (f) Wherever possible, land for land ought to be a priority. Cash compensation should only be undertaken when it can be clearly documented that land for land or other types of assistance are not available. If cash payments are made, special arrangements should be made to assist the most vulnerable in marking productive use of the money. The entitlement framework should also describe how payments can be made in a transparent manner, for example by doing it publicly with independent verification. (g) the entitlement framework shall specify the period of notification about acquisition of assets, and establish that no civil works may start on a stretch of road before the Resettlement Action Plan has been implemented there. This is a key principle, and must be taken account of when awarding contracts for civil works. Improper or delayed implementation of the RAP may lead to costly delays in civil works. (h) As the project will work in different areas at different time, the framework and RAP should be prepared in such a way that people’s assets are not acquired many months or years before actual work stats. The framework should therefore also contain provisions as how the compensation and assistance levels may be re-evaluated and adjusted in case of price increases. Such reassessment should be done at least on an annual basis, ideally on a six-monthly basis. Egis India Consulting Engineers Pvt. Ltd. Page 4 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 23. The framework shall be presented in a tabular form Type of Loss Entitled Entitlement Implementation Organizations person Issues/Guidelines Responsible Preparation of Resettlement Action Plan 24. The information collected during the Social Impact Assessment shall form the basis for preparing a Resettlement and Rehabilitation Action Plan (RAP). The RAP should contain at a minimum the following section (a) Summary findings from the Social Impact Assessment (b) Entitlement framework. (c) Data on expected impacts and numbers and categories of affected persons. (d) Institutional arrangements, (e) Implementation procedures (f) Consultation and participation arrangements, of RAP and other stakeholders including grievance procedures. (g) Budget and costs, (h) Timetable of activities, with Gantt charts showing the various elements of the plan, coordination of land with road design, contracting, and construction, and (i) Monitoring and evaluation of land acquisition and resettlement process. 25. In preparing the RAP, the likely alignment and corridor of impact for the roads to be improved shall be determined. This shall be done as a joint exercise, coordinating the various design aspects of the project (engineering, environmental, socio-economic). The corridor of impact is defined as the width required for the improved road and the civil works necessary to construct it, including the new pavements, shoulders, support slopes, and necessary safety zone. People who live or have assets outside of this corridor of impact and who will not be affected by the project will not be considered as PAPs and will not be entitled to compensation of other forms of assistance. The following considerations are important. (a) The identification of the corridor of impact shall be undertaken as a joint exercise between the planners responsible for engineer design environmental assessment, and social impact and R& R planning. (b) Public consultation shall be undertaken, to determine what local people consider to be the best alignment for the improved road. (c) The corridor of impact will normally fall within the existing Right of Way, but the study shall assess where private land acquisition may be required. (d) It is likely that the exact road alignment and therefore the corridor of impact may shift following detailed engineering designs. The purpose of this early estimate is to get as complete a picture as possible of the expected scope of land acquisition required, number of PAPs categories and entitlements, and budgets and time frame required for the implementation of the Resettlement Action Plan. However, this shall be updated and corrected as required following the final engineering designs. (i) the land acquired should be the minimum needed to improve and upgrade the existing road alignment to the defined technical standard, (ii) lower value land should be acquired where possible (iii) wherever possible, the alignment should be designed so as to avoid acquiring buildings in which permanent businesses operate. Egis India Consulting Engineers Pvt. Ltd. Page 5 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 (iv) re-alignments should only be done where it is necessary for safety reasons or when it is preferable for environment reasons or because it has less asset acquisition impact. 26. Based on the agreed entitlement framework, the full baseline socio-economic survey and a joint on-site verification shall take place for the total length of highways to be improved. The baseline socio-economic survey shall be conducted within the corridor of impact. 27. The survey shall be full census of all entitled persons and a baseline socio-economic survey. It shall uniquely identify all entitled persons under the policy. The survey shall use the methodology developed for the sample survey undertaken earlier, and provide the data for an overall estimate of total numbers of people affected, assets to be acquired by the project, and scope of resettlement and rehabilitation measures to be taken. The joint on-site verification will determine the precise nature and quantity of assets to be acquired and the losses to be compensated. 28. The consultants shall advise the project authorities about the best way to coordinate this activity. The following considerations are important. (a) the survey and verification should be done jointly by representatives of the project authorities and the PAPs and other authorities such as local revenue officials, as appropriate based in local rules. (b) during this survey, the PAPs shall be explained the likely impact of the project authorities and presented with a copy the entitlement framework in his/her local language. (c) the assets to be acquired shall be tabulated, bearing in mind that each PAP may have losses in more than one category. The compensation or assistance he/she is entitled to shall be clearly explained, as well as the likely timetable for when the acquisition is likely to take place. (d) Where different options have been developed, these shall be explained along with the likely risks involved. Wherever possible, the principal of high vulnerability/ low risk should be followed i.e. those among the PAPs identified as particularly vulnerable should be encouraged to choose the assistance or compensation that offers the least risk. This choice shall not be made on the spot, but provision should be made in the RAP for further consultation, and sufficient time should be given to the PAPs to make their choices. (e) the table of likely losses and types of entitlements shall be verified by the three parties present, and signed by each of them. The PAP shall be given a copy this will serve as proof of his status as PAP, and each PAP should be given a unique identification code. Other measures such as identity cards may be considered if necessary. (f) this information should be coded and computerized, and updated as required following finalization of the data. Developing a data base to track PAPs entitlement and compensation of assistance given should be considered to ensure accurate and efficient implementation of the RAP. (g) it should be made clear to the PAP that if the final road design and the choice of alignment mean that he/she is no longer within the corridor of impact, no compensation will be given. (i) the PAP shall also be informed about the mechanism set up for grievance procedures. (j) provision should be made for how missing data can be collected later, and other mechanisms for information sharing and local participation should also be developed. (k) undertaking the baseline socio-economic survey and joint verification is a time consuming exercise. People are not always available, and it may be difficult to coordinate the movements of local government officials with the project authorities. It is therefore essential to allow sufficient time for the survey and verification before any civil work start, and to coordinate the planning of the different project components. (l) Summary information shall be tabulated based on districts, with length of road, land to be acquired (cultivated and homestead listed separately), temporary and permanent buildings, and number of households and total persons affected (broken down by gender by gender and other relevant categories such as major/minors tribal’s, etc.) Egis India Consulting Engineers Pvt. Ltd. Page 6 of 7 Uttar Pradesh Core Road Network Development Program Annexure - 9 29. Institutional Arrangements. Responsibilities for implementation of various parts of the RAP should be clearly delineated (a) while elements of the plan may be undertaken by other institutions (for example by contracting with NGOs to facilitate R & R , awareness raising and income-generating activities the overall coordination and capacity to monitor the project should be maintained by the PWD as the main responsible agency. (b) for task involving coordination among different agencies of government of community organization, appropriate mechanisms should be identified and established. The organizational structure and type of skills required should be creating a joint task force or steering committee with representatives of different agencies involved as well as from local government and representatives of the PAPs should be explored. (c) Appropriate monitoring and evaluation arrangements should be developed. It should be the responsibility of the implementing agency to systematically monitor the progress of the RAP, and analyze and report on its impacts compared with the baseline data. Suitable indicators should be developed for this. Independent evaluation or supervision should be provided for, and guidelines prepared for how this is to be undertaken. (d) A grievances and appeals mechanism should be evolved. (e) It is essential to document the institutional capacity of the agency or agencies responsible for implementing the RAP. Where institutional capacity is yet to be developed or identified, a realistic plan shall be presented for how this is to be achieved, bearing in mind likely constraints and delays. 30. Assessment of institutional capacity will be a key factor in the appraisal of the RAP 31. Following agreement on an entitlement framework, a summary publication with project description, estimates of land acquisition losses and entitlements, both in English and local languages, should be prepared. This is to be distributed among the local communities and to other stakeholders. Egis India Consulting Engineers Pvt. Ltd. Page 7 of 7