PROCUREMENT PLAN Project information: Angola Health System Performance Strengthening Project (HSPSP) (P160948) Project Implementation agency: Ministry of Health – Direcção Nacional de Saúde Pública Date of the Procurement Plan: September 21, 2017 Period covered by this Procurement Plan: September 2017 – June 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Not Applicable When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Not Applicable Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable Other Relevant Procurement Information. None. PROCUREMENT Angola : Angola Health System Performance Strengthening Project (HSPSP) PLAN General Information Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2017-10-05 2019-05-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160948 GPN Date: 2018-08-30 Project Name: Angola Health System Performance Strengthening Project (HSPSP) Loan / Credit No: / , IBRD / P4850, IBRD / 88350 Executing Agency(ies): Ministry of Health, National Directorate of Public Health, Municipal Health Service Strengthening WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HSPSP/G-001 / Vehicles Request for Single Stage - One IBRD / P4850 Prior Open - National 0.00 Canceled 2018-07-06 2018-08-31 2019-02-27 UCC Quotations Envelope HSPSP/G-003 / Supply of Pending Request for Single Stage - One Office Furniture for PIU IBRD / P4850 Post Open - National 0.00 Implementati 2018-07-25 2018-09-19 2019-03-18 Quotations Envelope Office in Luanda on HSPSP/G-005 / UCC UN Agencies IBRD / P4850 Post Direct 166,971.58 Signed 2018-07-06 2018-07-11 2018-08-15 2019-02-11 Vehicles (Direct) HSPSP/C-046 / Printing of Request for Single Stage - One Health Centers Record Books IBRD / P4850 Post Limited 0.00 Canceled 2018-11-14 2019-01-09 2019-07-08 Quotations Envelope (RBF) HSPSP/C-047 / Equipment Request for Single Stage - One and Drugs (Kits) for the IBRD / P4850 Post Limited 0.00 Canceled 2018-12-03 2019-01-28 2019-07-27 Quotations Envelope Municipalities of RBF Pilot HSPSP/G-002 / Supply of Request for Single Stage - One IBRD / P4850 Post Open - National 0.00 Canceled 2018-11-26 2019-01-21 2019-07-20 IT equipment for FBR Quotations Envelope HSPSP/G-048 / Equipment Under Request for Single Stage - One and Drugs (Kits) for the IBRD / 88350 Post Open - National 0.00 Implementati 2018-12-02 2019-01-27 2019-07-26 Quotations Envelope Municipalities of FBR Pilot on HSPSP/G-049 / Supply of Request for Single Stage - One IBRD / 88350 Post Limited 21,705.61 Signed 2018-12-02 2019-01-27 2019-07-26 IT equipment for FBR Pilot Quotations Envelope HSPSP/G-006 / License Software Accounting IBRD / 88350 Post Direct Selection Direct 21,896.64 Signed 2018-12-12 2018-12-17 2019-01-21 2019-07-20 TOMPRO HSPSP/G-011 / Supply of Pending Single Stage - One IT equipment for UCC and IBRD / 88350 Post Request for Bids Open - National 0.00 Implementati 2019-01-25 2019-01-30 2019-03-13 2019-04-12 2019-05-17 2019-11-13 Envelope Provinces on HSPSP/G-010 / Basic Under Single Stage - One Equipments for Health IBRD / 88350 Post Request for Bids Open - National 0.00 Implementati 2019-01-25 2019-01-30 2019-03-13 2019-04-12 2019-05-17 2019-11-13 Envelope Facilities on Page 1 Under HSPSP/G-009 / Procurement Open - Single Stage - One IBRD / 88350 Prior Request for Bids 0.00 Implementati 2019-01-14 2019-01-19 2019-03-02 2019-04-01 2019-05-06 2019-11-02 of Essential Drugs Kits International Envelope on HSPSP/G-012 / Drugs for Under Request for Single Stage - One the Municipalities of FBR IBRD / 88350 Post Open - National 0.00 Implementati 2019-01-23 2019-03-20 2019-09-16 Quotations Envelope Provinces (II) on HSPSP/G-013 / Printing of Pending Request for Single Stage - One Health Centers Record Book IBRD / 88350 Post Limited 0.00 Implementati 2019-02-16 2019-04-13 2019-10-10 Quotations Envelope (RBF) II on HSPSP/G-014 / Printing of Pending Single Stage - One Maternal and Child Health IBRD / 88350 Post Request for Bids Open - National 0.00 Implementati 2019-04-12 2019-04-17 2019-05-29 2019-06-28 2019-08-02 2020-01-29 Envelope Notebook on HSPSP/G-15 / Tablets for Pending Request for Single Stage - One Data Collection for the DHS IBRD / 88350 Post Limited 0.00 Implementati 2019-04-17 2019-06-12 2019-12-09 Quotations Envelope 2 on HSPSP/G-016 / Printing Material of Education, Information and Request for Single Stage - One IBRD / 88350 Post Limited 0.00 Canceled 2019-04-20 2019-06-15 2019-12-12 Communication to Quotations Envelope Vaccination Campaigns - DNSP HSPSP/G-017 / Procurement of Contraceptives, Medical Pending UN Agencies Equipment Supplies and IBRD / 88350 Prior Direct 0.00 Implementati 2019-05-12 2019-05-17 2019-06-21 2019-12-18 (Direct) Others Reproductive Health on Drugs NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HSPSP/G-004 / License IBRD / P4850 Post Direct Selection Direct 0.00 Canceled 2018-07-06 2018-07-11 2018-08-15 2019-02-11 Software Primavera CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HSPSP/C-012 / Analysis of Consultant Open - implications of IIMS results / Post Qualification 0.00 Canceled 2018-02-09 2018-03-02 2018-04-15 2018-05-15 2018-06-19 2018-12-16 International in public health policies Selection HSPSP/C-005 / Project Consultant indicator Baseline / Post Qualification Open - National 0.00 Canceled 2017-11-24 2017-12-15 2018-01-28 2018-02-27 2018-04-03 2018-09-30 Assessment Selection HSPSP/-007 / Update the Consultant Sanitary Map in Kuando / Post Qualification Open - National 0.00 Canceled 2017-12-04 2017-12-25 2018-02-07 2018-03-09 2018-04-13 2018-10-10 Kubango Selection Page 2 HSPSP/C-011 / Support the reactivation of the Public Consultant Open - Health Emergency Program / Post Qualification 0.00 Canceled 2018-01-22 2018-02-12 2018-03-28 2018-04-27 2018-06-01 2018-11-28 International and the Emergency Selection Operations Center HSPSP/C-027 / Project Least Cost Open - Under IBRD / 88350 Post 0.00 2018-07-31 2018-08-21 2018-10-04 2018-11-01 2018-12-01 2019-01-05 2019-02-09 2019-08-08 Audit Selection International Implementation HSPSP/C-009 / Project design and supervision of Quality And Cost- IBRD / P4850 Prior Open - National 0.00 Canceled 2018-07-11 2018-08-01 2018-09-14 2018-10-12 2018-11-11 2018-12-16 2019-01-20 2020-01-20 the National School of Based Selection Public Health HSPSP/C-051 / Project design and supervision of Quality And Cost- Open - Under IBRD / P4850 Prior 0.00 2019-02-11 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 the National School of Based Selection International Implementation Public Health HSPSP/C-061 / Support the UN Agencies Pending Operation of the IBRD / 88350 Prior Direct 0.00 2019-06-22 2019-12-19 (Direct) Implementation Epidemiological Surveillance INDIVIDUAL CONSULTANTS Page 3