THE WORLD BANK MONTHLY OPERATIONAL SUMMARY Contents User’s Guide ......................................................................................................................................................................3 The Global Environment Facility (GEF) ....................................................................................................................4 New Projects Added In This Issue.............................................................................................................................5 Africa ................................................................................................................................................................................. 11 East Asia And Pacific ................................................................................................................................................... 75 Europe And Central Asia............................................................................................................................................ 93 Latin America and The Caribbean....................................................................................................................... 112 Middle East And North Africa............................................................................................................................... 130 South Asia .................................................................................................................................................................... 141 Guarantee Operations............................................................................................................................................. 165 Sector Categorizations Agriculture, Fishing, and Forestry Education Energy and Mining Finance Health and Other Social Services Industry and Trade Information and Communications Public Administration, Law, and Justice Transportation Water, Sanitation, and Flood Protection April 2019 Monthly Operational Sum m ary PAGE 2 LIST OF ACRONYMS AUSAID A u stralian Agency for International IDB In ter-American Development Bank Dev el opm ent IFAD In ternational Fund for Agricultural ADB A si an Dev elopment Bank Dev el opm ent ADF A frican Dev elopment Fund IsDB Isl amic Dev elopment Bank Af DB A frican Dev elopment Bank JBIC Japan Bank for Internation al Cooperation APL A daptable Program Loan ITF In terim Trust Fund BADEA Ban qu e Arabe de Dév eloppement Kf W Kredi tanstalt für Wiederaufbau Écon om i que en Afriqu e (Germ any) BOAD Ban qu e Ouest Africaine LIL Learn ing and Innovation Loan de Dév el oppement NCB N ational Com petitive Bidding CDB Cari bbean Dev elopment Bank NGO N on governmental Organization CFD Cai sse Française de Dév eloppement NORAD N orwegian Agency for Dev elopment CIDA Can adian International Dev elopment Cooperati on A gen cy OECF Ov erseas Econ omic Cooperation Fund DANIDA Dan i sh Internation al Development Agency (Japan ) DFID Department for International OPEC Organ ization of Petroleum Exporting Dev el opm ent (UK) Cou n tries EBRD Eu ropean Bank for Recon struction PAD Project Appraisal Docu ment an d Dev elopment PCD Project Con cept Document EDF Eu ropean Dev elopment Fund PCF Prototy pe Carbon Fund EIB Eu ropean Investment Bank PCN Project Con cept Note EU Eu ropean Union PHRD Pol i cy and Human Resou rces FAC Fon ds d’A ide et de Coopération (France) Dev el opm ent (Japan) FAO Food an d A gricultural Organization PID Project Identification (Number) of th e Un ited Nations PPF Project Preparation Facility FAO/CP FA O Cooperati ve Program QCBS Qu al ity and Cost-Based Selection (wi th the World Bank) FINNIDA Fi n l and In ternation al Development SDC Swi ss Agency for Dev elopment A gen cy Cooperati on GEF Gl obal Environment Facility SIDA Swedi sh International Development A u thority GTZ Deu tsche Gesellschaft für Technische UNDP Un i ted N ations Development Programme Zu sammenarbeit IAPSO In ter-Agency Procurement Service Office UNFPA Un i ted N ations Population Fund IBRD In ternational Bank for Reconstruction UNICEF Un i ted N ations Children’s Fund an d Dev elopment USAID Un i ted States Agency for International ICB In ternational Com petitive Bidding Dev el opm ent IDA In ternational Development Association WHO Worl d Health Organization PAGE 3 Monthly Operational Sum m ary April 2019 GUIDE TO THE WORLD BANK MONTHLY OPERATIONAL SUMMARY The World Bank Monthly Operational Summary (MOS) reports on the status of projects in the World During NEGOTIATIONS, discussions are held with Bank’s pipeline from the time the operation is identi- the client government, and the agreements reached are fied to the signing of the Loan, Credit, or Grant Agree- written into the loan documents. Upon completion of ment. It is a detailed accounting of the projects in- negotiations, the project is presented to the Bank’s cluded in the country lending programs that are ac- Board of Ex ecutive Directors for approval. After ap- tiv ely being prepared for implementation. The lending proval, the financing agreement is signed. programs reflect the Bank’s strategy for each member country as set out in the Country Partnership Frame- Project IMPLEMENTATION normally starts within work (CPF) presented to the Board of Ex ecutive Direc- a few months after the project financing agreement is tors of the World Bank. On average, it takes about 13 signed. Countries, through their implementing agen- months for the Bank to process a project from concept cies, have full responsibility for executing World Bank- to approval. After a financing agreement is signed or a financed projects, including procuring goods and project is dropped from the program, the project entry works and hiring consultants. Contractors and suppli- is deleted from this summary. Each issue of the sum- ers, therefore, should contact appropriate officials of mary contains a list of projects reported for the first the implementing agency to express their interest in time and the list of projects deleted from the current specific projects and obtain information on what goods issue. Familiarity with the Bank’s project cycle, sum- and services will be needed and when and how to sub- marized in the following paragraphs, can help potential mit bids and proposals. bidders identify business opportunities with Bank bor- rowers. Each entry in the MOS indicates at what point Consultants are often used during project implementa- the operation is in the project cycle. tion to provide technical assistance and other project implementation support. Consultants in particular should contact the responsible implementing agency Project Cycle early in the project preparation period to express their interest. Contracts for consulting services, as well as During IDENTIFICATION, the client government some for goods and works, may also be procured prior and the Bank identify a specific operation as being to loan/credit/grant approval. This is known as ad- likely to support the country’s development strategy v ance contracting. and the Bank’s CPF. The information contained in the MOS is intended to During PREPARATION, the client government iden- enable companies to assess their interest in supplying tifies and discusses the technical and institutional al- Bank-financed projects. Further information should be ternatives for achieving the objectives of a project. requested from the country’s project implementing Preparation usually requires feasibility studies fol- agency. The likelihood of a timely response is greater if lowed by more detailed studies of the alternatives that the queries are brief and to the point. When possible, promise to yield the most satisfactory results. An envi- travel to the country; direct contact with relevant ronmental assessment is usually carried out duringthis agency officials is recommended. phase. (See below for more information on environ- mental assessment.) In the preparation stage of the Firms should contact the World Bank only if they are project cycle, clients often supplement their own efforts unable to obtain a response to their queries from the by hiring consultants to carry out a major part of the implementing agency. General information about busi- work. Contractors and suppliers of equipment and ness opportunities under Bank loans, credits, and goods need to start making contacts with country offi- grants may be obtained from the World Bank’s Pro- cials during this stage. curement Policy and Services Group’s website at http://www.worldbank.org/en/projects-opera- During APPRAISAL, the Bank conducts a compre- tions/products-and-services/procurement-projects- hensive review of all aspects of the project (technical, programs and (click on “ Browse Contract Awards and institutional, economic, and financial), laying the foun- Notices by Country” in the Related Links at the bottom dation for implementing the project and evaluating it of the webpage). when completed. Project appraisal is conducted by Bank staff and may be supplemented by individual ex- Business opportunities under World Bank-financed perts. The preparation of the Project Appraisal Docu- appear twice a month in UN Development Business ment concludes this stage. and are av ailable v ia the internet at April 2019 Monthly Operational Sum m ary PAGE 4 https://www.devbusiness.com/. . The website also in- Category C: Likely to have minimal or no adverse en- cludes invitations to bid and submit proposals, notices v ironmental impacts. Beyond screening, no further EA of contract awards, and General Procurement Notices. action is required. Environmental Categories Category FI: Involves inv estment of Bank funds through a financial intermediary, in subprojects that The type, timing, and scope of environmental analysis hav e adverse environmental impacts. An environmen- to be performed by Bank clients are confirmed when a tal framework may be required. giv en project is identified. Projects are assigned one of the following categories, depending on the nature, Category U: No category given. magnitude, and sensitivity of environmental issues: The World Bank has three basic lending instruments: Category A: The project may have adverse and signif- (ii) Investment Project Finance which provides finan- icant environmental impacts. Full environmental as- cial support for goods, works and services for a pre-de- sessment is normally required. fined specific project; (ii) Development Policy Finance (DPF) which supports countries’ policy and institu- Category B: The project may have specific environ- tional reforms in a sector or the economy as a whole mental issues. Partial env ironmental assessment is and provides quick-disbursing budget support; and (iii) normally required. Program-for-Results (PforR) which finances parts of a larger government program, with disbursements linked to results or performance indicators. A typical summary entry looks like this: The Global Environment Facility (GEF) In addition to projects financed by the World Bank, the sustainable forest management (SFM)/REDD+, and World Bank Monthly Operational Summary reports under the Least Developed Countries Fund (LDCF) and on projects financed by the Global Environment Facil- the Special Climate Change Fund—adaptation to cli- ity (GEF). mate change. The GEF consists of an Assembly of 183 participating countries, a Council, a Secretariat a Scien- The GEF was established in 1991 by a Resolution of the tific and Technical Advisory Panel, and 1 8 Implement- World Bank Ex ecutive Directors as a pilot program to ing Agencies – ADB, AfDB, BOAD, CAF, CI, DBSA, assist in the protection of the global environment and EBRD, FAO, FECO, FUNBIO, IADB, IFAD, IUCN, to promote env ironmentally sound and sustainable UNDP, UNEP, UNIDO, WBG, and WWF. economic development. The GEF operates as a mecha- nism for providing new and additional grant and con- As one of the Implementing Agencies of the GEF, the cessional funding to meet the agreed incremental costs World Bank assists its member countries conserve and of measures to achieve agreed global environmental sustainably use their biological diversity, reduce their benefits in the focal areas of climate change, biodiver- emissions of greenhouse gases and adapt to climate sity , international waters, land degradation chemicals, change, manage shared water bodies and reduce their PAGE 5 Monthly Operational Sum m ary April 2019 emissions of ozone-depleting substances by accessing For additional information on the GEF, contact the GEF resources to cover the incremental costs of addi- GEF secretariat or visit its website: www.thegef.org/gef tional actions on these global issues. The GEF Secretariat 1 818 H St. NW To be eligible for GEF co -financing, projects must be Washington DC 20433, USA consistent with at least one of the GEF's 'Operational Tel: (1 -202) 47 3-0508 Programs' and meet the GEF project eligibility criteria. Fax : (1-202) 522-3240, 522-3245 E-mail: Secretariat@TheGEF.org New Projects Added In This Issue Africa Region Bu rkina Faso Health, Nutrition & Population: Health Services Reinforcement Project Ca meroon Edu cation: Secondary Education and Skills Development Project Cot e d'Ivoire Env ironment & Natural Resources: Cote d'Ivoire: Forest Investment Project Additional Financing Gh ana Dig ital Development: Ghana eTransform Project - A dditional Financing Kenya Dig ital Development: Kenya Digital Acceleration Program Liberia Edu cation: Liberia GPE Getting to Best Additional Financing Ma dagascar Social, Urban, Rural and Resilience Global Practice: Support for resilient livelihoods in the South of Madagascar Ma l i En ergy & Extractives: Additional Financing t o the Mali Rural Electrification Hybrid Systems Project April 2019 New Projects Added In This Issue PAGE 6 Mozambique Gov ernance: MZ Public Revenue, Expenditure, and Fiscal Decentralization Enhancement and Reform project RE Social, Urban, Rural and Resilience Global Practice: Mozambique: Cyclone Idai Em ergency Recovery and Resilience Project Nigeria Edu cation: Nigeria Adolescent Girls Education Em powerment Project W ater: NG Sustainable Rural Water Supply and Sanitation Sector Project Rwanda Env ironment & Natural Resources: Kigali Environmental Management and Climate Compatible Development Program Sen egal Edu cation: Senegal Education Program for Results Sierra Leone A griculture: Sierra Leone Smallholder Commercialization and Agribusiness Development Project Additional Financing En ergy & Extractives: Sierra Leone - Renewable Energy Development and Energy Access Project Som alia Social, Urban, Rural and Resilience Global Practice: Somalia Urban Resilience Project Phase II Pov erty and Equity: Somali Integrated Statistics and Economic Planning Capacity Building Sou th Africa W ater: South Africa School Sanitation Im provement Project Sou thern Africa En ergy & Extractives: Temane Regional Electricity Project T anzania Health, Nutrition & Population: Tanzania Reproductive Maternal Neonatal Child and Adolescent Health Investment Project PAGE 7 Monthly Operational Sum m ary April 2019 Uga nda Env ironment & Natural Resources: Uganda Forests and Resilient Landscapes Project Zambia Edu cation: Zambia Education Enhancement Project En ergy & Extractives: Transforming Energy Access Matters East Asia And Pacific Region Ch ina Health, Nutrition & Population: Hainan Health Sector Reform Project Ea st Asia and Pacific Finance, Competitiveness and Innovation: Southeast Asia Disaster Risk Insurance Facility (SEADRIF): Strengthening Finan- cial Resilience in Southeast Asia In donesia Finance, Competitiveness and Innovation: Strengthening Disaster Risk Finance & Insurance Social, Urban, Rural and Resilience Global Practice: Indonesia Disaster Resilience Initiatives Project T ransport: National Urban Transport Support Program Micr onesia, Federated States of Dig ital Development: Digital FSM Mon golia En ergy & Extractives: Ulaanbaatar Heating Sector Im provement Project Europe And Central Asia Region A l bania W ater: Albania National Water Supply and Sanitation Sector Modernization Program Ka zakhstan Env ironment & Natural Resources: Circular Economy for Industrial Waste Management April 2019 New Projects Added In This Issue PAGE 8 Mol dova A griculture: Moldova Agriculture Competitiveness Project GEF Additional Financing North Macedonia Dig ital Development: North Macedonia Digital Economy (NODE) Romania Finance, Competitiveness and Innovation: Rom ania: Institutional Strengthening and Financial Safety Net Resilience Project T urkey En ergy & Extractives: Renewable Energy Integration Project Additional Financing Ukraine Edu cation: Ukraine Im proving Education for Results Project En ergy & Extractives: Municipal Energy Efficiency Guarantee Facility Uzbekistan En ergy & Extractives: Private Sector Power Generation Support Project Latin America And Caribbean Region Br a zil Edu cation: Program for Promoting Learning, Graduation and Em ployability of Sao Paulo Youth Gov ernance: Energy and Mineral Sectors Strengthening Project II Social, Urban, Rural and Resilience Global Practice: Southern Brazil Urban Resilience Program (SUL RESILIENTE) Dom inica Env ironment & Natural Resources: GEF Leveraging Eco-Tourism for Biodiversity Protection in Dom inica PAGE 9 Monthly Operational Sum m ary April 2019 Dom inican Republic Env ironment & Natural Resources: Integrated productive landscapes through land use planning; restoration; and sustainable in tensification of rice in Yaque and Yuna El Sa lvador Env ironment & Natural Resources: El Salvador: Biodiversity Conservation and Landscape Restoration Project Gu yana Social, Urban, Rural and Resilience Global Practice: Additional Financing to the Flood Risk Management project Ha iti T ransport: Caribbean Regional Air Transport Connectivity Project - Haiti Middle East And North Africa Region Ir a q Env ironment & Natural Resources: Iraq Community-based Natural Resources Management and Climate Resilience Project Gov ernance: Strengthening Public Financial Management Oversight and Accountability Institutions in Iraq Jor dan T ransport: Amman Development Corridor Project II - PPP Health, Nutrition & Population: Jordan Em ergency Health Project Additional Financing Finance, Competitiveness and Innovation: Y outh, Technology, and Jobs Lebanon En ergy & Extractives: Lebanon Electricity Transmission Project T ransport: Civil Aviation Reforms and Airport Expansion West Bank and Gaza En ergy & Extractives: Advancing Sustainability in Performance, Infrastructure and Reliability of Energy Sector April 2019 New Projects Added In This Issue PAGE 10 South Asia Region A fghanistan En ergy & Extractives: Scaling-up Solar in Afghanistan Guarantee Ba n gladesh Finance, Competitiveness and Innovation: Bangladesh Private Investment & Digital Entrepreneurship Project Bh utan Health, Nutrition & Population: Bhutan Pandemic Preparedness Project In dia A griculture: Chhattisgarh Inclusive Rural and Accelerated Agriculture Growth Project En ergy & Extractives: West Bengal Electricity Distribution Grid Modernization Project Social, Urban, Rural and Resilience Global Practice: Punjab Urban Governance and Water Supply Im provement Program Nepal Env ironment & Natural Resources: Investing in Forests for Prosperity at a Time of Transformation Social, Urban, Rural and Resilience Global Practice: Second Additional Financing Earthquake Housing Reconstruction Project T ransport: Nepal Strategic Road Connectivity Im provement Program Pa kistan En ergy & Extractives: Electricity Distribution Efficiency Im provement Project PAGE 11 Monthly Operational Sum m ary April 2019 Africa Angola Education Gir ls Empowerment and Learning for All II Project: T o improve service delivery in basic education and learning out- com es in early grade literacy and numeracy in Angola. Identification completed on 6 September 2018. US$250.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives A ngola - Electricity Sector Improvement Project: The Project Development Objective is to improve the operational and commercial performance of the electricity sector utilities and increase electricity access in selected cities in Angola Concept com pleted on 20 December 2018. Project: P166805. US$250.0 (IBRD). Consultants will be required. Ministerio da Energia e A guas. Governance (R) A ngola Decentralization for Improved Service Delivery: Support the g overnment’s transition t o a more decen- t ralized sy stem through improving assignment of responsibilities, financing, financial management and capacity at municipal lev el (autarquias) while strengthening intergovernmental collaboration for effective and efficient service delivery. Identifica- t ion completed on 19 December 2018. US$150.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. Health, Nutrition & Population Ch ild Health Expansion Angola: The Project Dev elopment Objective (PDO) is to increase the utilization and the quality of h ealth care services in target provinces and municipalities. Appraisal completed on 22 November 2018. Environmental A ssessment Category B. Project: P168956. US$ 9.7 (IDFH). Consultants will be required. Ministry of Health. Social Protection & Labor (R) A ngola Social Safety Nets: The objectives of the proposed Project are to provide temporary income support t o poor a n d vulnerable households in selected areas while strengthening the delivery mechanisms for the development of a basic social sa fety n et system Concept completed on 19 March 2019. Project: P1 69779. US$320.0 (IBRD). Consulting services t o be de- t ermined. Ministerio da Accão Social, Familia e Promocão da Mulher; Fundo de Apoio Social. A O-Local development Project - A F: The LDP Development Objectives are: (a) to improve access of poor households to ba sic services and economic opportunities, and (b) to enhance local institutional capacities among Angola's municipalities. A pproval completed on 25 July 2017. Environmental Assessment Category B. Project: P160105. US$70.0 (IBRD). Consultants w ill be required. Im plementing agency(ies) to be determined. Water Lu anda Bita Water Supply Project Guarantee: The Project Development Objective (PDO) is to improve access to pota- ble water service in selected areas of Luanda by m obilizing commercial financing for the Government of Angola. The Project Dev elopment Objective is to improve access to potable water service in selected areas of Luanda. April 2019 Africa PAGE 12 T h e Project is t o be supported through an IBRD guarantee currently estimated at US$150m, tentatively complemented by a MIGA guarantee. Identification completed on 30 March 2017. Environmental Assessment Category B. US$ 500.0 (GUAR). Con sulting services to be determined. Em preza Publica de Aguas de Luanda, E.P. (EPAL); Ministry of Energy and Water. (R) Lu anda Bita Guarantee (dropped PE code): The Project Development Objective (PDO) is to improve access to pot able water service in selected areas of Luanda by mobilizing commercial financing for the Government of Angola. Concept completed on 28 February 2019. Environmental Assessment Category B. Project: P163572. US$ 285.0 (GUAR). Consultants w ill be required. EPAL - EPAL: Em presa Pública de Águas de Luanda. A dditional Financing - Second Water Institutional Development Project: The Project Development Objective is to st r engthen the institutional capacity of selected water sector agencies and increase water service coverage in target cities. Ap- pr oval completed on 21 June 2018. Environmental Assessment Category B. Project: P1 67201. US$150.0 (IBRD). Consulting services to be determined. Ministry of Energy and Water. Benin Agriculture A GRICULTURAL COMPETITVENESS AND EXPORT DIVERSIFICATION PROJECT: The project development ob- jective (PDO) is t o improve competitiveness and access t o domestic and export markets for selected agricultural value chains. Identification completed on 1 3 July 2018. Environmental Assessment Category B. US$ 260.0 (IDA Credit). Consulting ser- v ices to be determined. Agence de Promotion des Investissements et des Exportations. A gricultural Productivity and Diversification Additional Financing: The PDO of the AF is to improve productivity a n d competitiveness for selected value chains (rice, fish farming, pineapple and cashew) and promote sm all scale animal hus- ba ndry in the Recipients territory. Approval completed on 14 April 2017. Environmental Assessment Category B. Project: P1 60029. US$ 45.0 (IDA Credit). No consultants are required. Ministry of Finance. Digital Development Ben in Digital Rural Transformation Project: To improve access to affordable broadband in rural communities and lev erage e-services to improve supply-chain efficiency and access to markets. Concept completed on 7 November 2017. Envi- r onmental Assessment Category B. Project: P1 62599. US$ 100.0 (IDA Credit). Consultants will be required. Ministère de l'E- con omie Numérique et de la Communication. Education (R) Ben in Gl obal Partnership for Education Project Phase 3: The Project Development Objectives (PDO) are to: (i) im prove the quality of teaching and learning in basic education with an em phasis on the early grades; and (ii) strengthen equ ity in primary education, particularly in four regions of the country. Appraisal completed on 18 April 2019. Environmental A ssessment Category C. Project: P167432. US$ 19.4 (FTIE). Consultants will be r equired. Ministry of Preschool and Primary Edu cation. Environment & Natural Resources (R) Benin: Gazetted Forests Management Project: To improve the integrated management of targeted GFs, to increase a ccess of the main consumption cities to fuelwood produced sustainably, and to strengthen selected NTFP value chains for for est-dependent communities Negotiations authorized on 10 April 2019. Environmental Assessment Category B. Project: P1 67678. US$ 75.0 (IDA Grant). Consulting services to be determined. Ministry of Environment and Sustainable Develop- m ent. Social Protection & Labor Youth Inclusion Project: The objective of the project is to promote the social and economic inclusion of youth in selected v ulnerable areas in Benin. Identification completed on 30 January 2019. US$ 40.0 (IDA Credit). Consulting services to be PAGE 13 Monthly Operational Sum m ary April 2019 det ermined. Im plementing agency(ies) t o be determined. Ben in Decentralized Community Driven Services Project - A ddl Financing: To improve access to decentralized ba sic social services and to mainstream the CDD approach for such services. Approval completed on 27 February 2014. Envi- r onmental Assessment Category B. US$ 30.0 (IDA Credit). Consultants will be required. Secretariat for Decentralized Com- m unity Driven Services T el: (229) 9003-3601, E-m ail: sepsdcc@yahoo.fr, Contact: Mr. Germain Ouin Ouro Social, Urban, Rural and Resilience Globa l Practice (R) Ben in - St ormwater Management and Urban Resilience Project: The proposed Project Development Objective is t o reduce flood risks in selected areas of Cotonou and strengthen urban resilience management and capacity at the city lev el. Negotiations authorized on 17 April 2019. Environmental Assessment Category A. Project: P167359. US$ 100.0 (IDA Credit). Con sultants will be required. Ministère du Cadre de Vie. Burkina Faso Agriculture Bu rkina Faso Agriculture Resilience and Competitiveness Project: The objective of the project is to increase agri- cu ltural productivity and market access for producers and agribusiness Small and Medium Enterprises (SMEs) in selected v alue chains in project areas. Concept completed on 28 September 2018. Environmental Assessment Category A. Project: P1 67945. US$ 200.0 (IDA Credit). Consultants will be required. Ministry of Agriculture and Irrigation Development. Su stainable Agricultural Intensification for Food and Nutrition Security Project: To increase agricultural produc- t iv ity and promote nutrition-sensitive agro-sylvo-pastoral value chains with potential to create jobs for sustainable food and n utrition security in targeted rural areas in Burkina Faso Identification completed on 12 May 2017. US$ 24.0 (GAFS). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Education Bu rkina Faso - Education Access and Quality Improvement Project Additional Financing: The project develop- m ent objective is to support the Government of Burkina Faso to increase access to pre-school education in the two poorest r egions, secondary education in the five poorest r egions and to improve teaching and learning. The components in support of t hese objectives have been designed to complement other activities financed by the Government and other development pa rtners. Identification completed on 19 February 2019. Environmental Assessment Category B. US$ 40.0 (IDA Credit). Con- su ltants will be required. Im plementing agency(ies) t o be determined. Energy & Extractives BURKINA FASO ELECTRICITY ACCESS PROJECT: The objective of the proposed project is to expand access to elec- t r icity services in rural areas. Concept completed on 25 February 2019. Project: P1 66785. US$ 50.0 (IDA Credit). No consult- a nts are required. ABER. Bu rkina Faso AF to Electricity Sector Support Project: The project development objectives are to: (i) increase access t o electricity, (ii) improve the reliability of electricity supply, and (iii) improve the efficient use of energy in targeted areas. A pproval completed on 8 June 2017. Environmental Assessment Category B. Project: P160344. US$ 80.0 (IDA Credit). Con- su ltants will be required. Im plementing agency(ies) t o be determined. Su stainable Mineral Development Support Project: The project's development objective is to enhance economic inte- g ration and governance in the management of the mineral sector. Concept completed on 2 November 2018. Environmental A ssessment Category B. Project: P167949. US$ 30.0 (IDA Grant). Consultants will be required. Ministry of Mines and Quar- r ies. April 2019 Africa PAGE 14 Finance, Competitiveness and Innovation (R) Financial Inclusion Support Project in Burkina Faso: The Project Development Objective is to increase access to dig ital financial services and facilitate access to credit for targeted beneficiaries. Negotiations authorized on 14 March 2019. Env ironmental Assessment Category B. Project: P1 64786. US$ 1 00.0 (IDA Credit). Consultants will be required. Directorate of T r easury and Public Accounting. Bu rkina Faso - Ba gre Growth Pole Project Additional Financing: To increase private investment, employment gen- er ation and agricultural production in the Project Area. T h e assumption is that increased economic activity will be a result of both improved infrastructure for irrigation contributing t o m ore successful agriculture (financed mainly under the original project) and increased private investments in the Bagre r egion incentivized by rehabilitated feeder roads, access to electricity and water supply, and increased opportunities for SMEs a n d targeted investment promotion activities. All of the a bove are cov ered by project a ctivities. A further assumption is that in creased economic activity in the Bagre region will lead t o increased job creation in the area and that the labor intensity of t h e supported agribusiness activities is relatively high. Approval completed on 29 March 2018. Environmental Assessment Ca tegory A. Project: P1 61234. US$ 50.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) t o be deter- m ined. Governance Bu rkina Faso Local Government Support Project AF: The development objective of the project is to strengthen the n ational capacity for decentralization, the institutional capacities of communes in a ll Regions and to increase citizen partici- pa tion in local governance. Approval completed on 4 August 2017. Environmental Assessment Category B. Project: P1 62742. US$ 60.0 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Health, Nutrition & Population (N) Health Services Reinforcement Project: The Project Development Objective (PDO) is to increase the quality and u t ilization of health services with a particular focus on m aternal, child and adolescent health, nutrition and disease surveillance Identification completed on 23 April 2019. Environmental Assessment Category B. US$ 10.0 (SUN). Consulting services to be determined. Im plementing agency(ies) to be determined. Poverty and Equity St atistical Ca pacity Development Pr oject: Strengthening National Statistical Capacity t o Produce and Disseminate Quality Products and Enhancing Economic Analysis for Ev idence-based Policy Making Identification com pleted on 29 June 2 018. US$ 30.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Social Protection & Labor (R) Sca le-Up & Responding to the needs of Refugees and Host Communities: The PDO is to increase access of poor a n d vulnerable households to safety nets and to lay the foundations for an adaptive safety net system in Burkina Faso. Ap- prais al completed on 3 April 2019. Environmental Assessment Category C. Project: P1 69252. US$ 7.0/93.0 (IDA Credit/IDA Grant). Consultants will be r equired. Ministry of Women, National Solidarity and Family; Ministry of Women, National Soli- da rity, the Family and Humanitarian Action. A dditional Financing for Social Safety Net Project: The PDO is to increase access of poor and vulnerable households t o safety nets and to lay the foundations for an adaptive safety net system in Burkina Faso. Approval completed on 7 December 2 016. Environmental Assessment Category C. Project: P1 60371. US$ 6.0 (AFRH). Consultants will be required. Ministry of Econ omics and Finances. Social, Urban, Rural and Resilience Global Practice Bu rkina Faso Land Reform Implementation Project: The Project Development Objective is to build the capacities and in stitutions necessary to support implementation of the land reform and to register customary land rights and property rights PAGE 15 Monthly Operational Sum m ary April 2019 in selected rural and urban areas. US$ 30.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Transport Bu rkina Faso Integrated Connectivity and Mobility Project: The proposed PDO is to improve connectivity in selected r egions of Burkina Faso, and to support the access of agriculture products and livestock to markets. Concept completed on 30 September 2018. Environmental Assessment Category B. Project: P1 68401. US$ 80.0 (IDA Credit). Consultants will be re- qu ired. MINISTRY OF INFRASTRUCTURE. Ou agadougou Urban Transport Project: To improve urban mobility along a high priority corridor in Ouagadougou in t erms of the quality and level of service, safety and security for passengers and im prove the ov er -all urban transport sy stem in tegration. Concept completed on 30 September 2018. Environmental Assessment Category A. Project: P1 68963. US$ 150.0 (IDA Credit). Consultants will be required. City of Ouagadougou. Water Ur ban Water Sector Project - Additional Financing: The overall objective of the project is to increase access to sus- t a inable water and sanitation services in selected urban areas. This will contribute to achievement of the water and sanitation MDGs. The project will achieve the objective through: (a) facilitating access to services through programs for constructing social water service connections, public standpipes, and on-site sanitation facilities; and (b) consolidating the achievements of t he urban water supply sub-sector reforms and strengthening capacities to deliver and manage services. The project will h elp t o provide clean water to 527,000 a dditional people and t o provide im proved sanitation services to 246,000 additional people." Approval completed on 12 January 2015. Environmental Assessment Category B. Project: P149556. US$ 80.0 (IDA Grant). Consultants will be required. Office National de l'Eau et de l'Assainissement (ONEA) Tel: (226) 5043-1900. Burundi Agriculture A gro-Pastoral Productivity and Markets Development - A F: The Project Development Objective is to increase sm all pr oducers' productivity and market access for Targeted Commodities in the Project Area. A pproval com pleted on 15 December 2016. Environmental Assessment Category B. US$ 25.0 (IDA Grant). Consulting ser- v ices to be determined. Ministry of Finance, Budget and Privatization; Ministry of Agriculture and Livestock. Education Bu rundi Youth Skills and Employability Project: To develop skills and improve em ployment outcomes of beneficiary y ouths Concept completed on 1 9 September 2018. Environmental Assessment Category B. Project : P1 64416. US$ 30.0 (IDA Grant). Consulting services t o be determined. Ministry of Education and Technical and Professional Training. Energy & Extractives Bu rundi Access t o Sustainable Energy: Expand access to energy services for Burundian households, businesses and pu blic institutions in rural areas. Identification completed on 13 October 2017. US$ 50.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Health, Nutrition & Population (R) Bu rundi Health System Support-Additional Financing: To increase the use of quality Reproductive, Maternal, Neonatal, Child and Adolescent Health services, and, in the event of an Eligible Crisis or Em ergency, to provide immediate a n d effective response to said Eligible Crisis or Emergency. Negotiations authorized on 5 March 2019. Environmental As- sessm ent Category B. Project: P1 66576. US$ 8.3 (GAVI). Consulting services to be determined. Ministry of Health. April 2019 Africa PAGE 16 (R) In vesting in Early Years and Fertility in Burundi (NKURIZA): Increase the coverage of community based nutri- t ion interventions among women of reproductive age and children under two and to increase utilization of family planning services in t argeted a reas Negotiations authorized on 19 March 2019. Environmental Assessment Category B. Project: P1 65253. US$ 30.0 (IDA Grant). Consultants will be required. Ministry of Public Health and Fight against AIDS. Social, Urban, Rural and Resilience Global Practice (R) Bu rundi North-East Region Refugee and Host Community Support Project: The Project Development Objec- t iv e is to improve nutrition, access to basic services and economic opportunities in the targeted areas. Concept completed on 9 April 2019. Project: P1 69315. US$ 55.0 (IDA Grant). Consultants will be required. International Conference on the Great La kes; National Office of Protection of Refugees and Stateless Persons (ONPRA). Cabo Verde Energy & Extractives RE IPPs in Cabo Verde: To increase Renewable Energy electricity generation in Cabo Verde Identification completed on 15 Ja nuary 2019. US$2.0/5 .0 (IBRD/ESMP). Consulting services to be determined. Implementing agency(ies) to be determined. Transport First Additional Financing to the Cabo Verde Transport Sector Reform Project: The objective of the project is to su pport the Recipient's efforts t o improve efficiency and management of its national r oad assets and lay the groundwork for t ransport sector State Owned Enterprise reform. Approval completed on 15 June 2017. Environmental Assessment Category B. Pr oject: P1 61248. US$ 27.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Cameroon Digital Development Ca meroon - ICT Sector Reform Project: The Development Objective is to further ICT sector's reforms in order to increase t h e reach and usage of ICT services in the Republic of Cameroon. Concept completed on 16 January 2017. Environmental A ssessment Category C. Project: P161219. US$ 40.0 (IDA Credit). Consultants will be required. Ministry of Posts and Tele- communications. Education (N) Secondary Education and Skills Development Project: to increase equitable access toquality secondary education a n d to improve the quality and relevance of and increase access to skills development programs in selected economic sectors. Identification completed on 6 March 2019. US$ 125.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Skills Development for Growth Project: To improve the quality and relevance of and increase access t o skills develop- m ent programs in selected economic sectors Appraisal completed on 5 February 2019. Environmental Assessment Category B. Pr oject: P1 64117. US$ 50.0 (IDA Credit). Consultants will be required. MINEFOP. Energy & Extractives Min ing Sector Capacity Building Add: The PDO is t o im prove (i) the efficiency and transparency of mining sector man- a g ement and (ii) the frameworks for sustainable mining development. Approval completed on 31 March 2017. Environmental A ssessment Category B. Project: P160917. US$ 26.9 (IDA Credit). No consultants are required. Ministry of Economy, Planning, a n d Regional Development. PAGE 17 Monthly Operational Sum m ary April 2019 ENEO Liquidity and Performance In centivization Guarantee: The Project Dev elopment Objective is to enhance ENEO's ability to improve the quality of electricity supply, by providing access to cost-effective financing for a CAPEX program a n d incentivizing ENEO to meet its performance requirements. Concept completed on 11 December 2018. Project: P1 69915. US$ 75.0 (GUAR). Consulting services t o be determined. Im plementing agency(ies) to be determined. CM- Ru ral Electricity Access Project for Underserved Regions: The Project Development Objective is to increase electricity a ccess in Underserved Regions of Cameroon. Approval completed on 13 December 2018. Environmental Assess- m ent Category B. Project: P1 63881. US$ 150.0 (IDA Credit). Consultants will be required. Rural Electrification Agency. Governance CA MEROON - St rengthening Public Sector Effectiveness and Statistical Capacity Project: The project develop- m ent objective is to improve the effectiveness of public spending in selected sectors and strengthen the statistics system for ev idence-based decision making. Approval completed on 20 November 2017. Environmental Assessment Category C. Project: P1 51155. US$ 31.0 (IDA Credit). Consulting services t o be determined. Ministry of Economy Planning and Regional Develop- m ent. Health, Nutrition & Population Hea lth System Performance Reinforcement Project - Additional Financing: The new Project Development Objec- t iv e (PDO) is t o: (i) increase utilization and improve the quality of health services with a particular focus on reproductive, m aternal, child and adolescent health, and nutritional services for the population of Cameroon, including refugees and refugee h ost communities, and (ii) in the event of an Eligible Em ergency, to provide immediate and effective response to said Eligible Em ergency Approval completed on 1 May 2018. Environmental Assessment Category B. Project: P164954. US$ 6.0/30.0 (IDA Cr edit/IDA Grant). Consulting services t o be determined. Ministry of Public Health. Social Protection & Labor Social Safety Nets for Crisis Response: The project development objective (PDO) is to support the establishment of a ba sic national safety net system including piloting targeted cash transfers and public works programs for the poorest and most v ulnerable people in participating areas within the Recipient's territory. Approval completed on 1 May 2018. Environmental A ssessment Category B. Project: P164830. US$ 30.0/30.0 (IDA Credit/IDA Grant). Consultants will be required. MINEPAT. Social, Urban, Rural and Resilience Global Practice Community Development Program Support Project Response to Forced Displacement: The development ob- jective of phase 3 (PNDP III) is to strengthen local public finance management and participatory development processes in communes for the delivery of quality and sustainable social and economic infrastructure. A pproval completed on 1 May 2018. Environmental A ssessment Category B. Project: P1 64803. US$ 8 .0/40.0 (IDA Cr edit/IDA Grant). Consultants will be required. Republic of Cameroon. Transport Ca meroon-Chad Transport Corridor SOP1 Cameroon Corridor: The proposed program development objective is to contribute to the efficient and safe movement of goods and people along the Douala-Ndjamena corridor. The proposed project dev elopment objective for CCTC-SOP1 in Cameroon is to im prove safety and efficiency of the railway sector through railway in frastructure rehabilitation and signaling modernization Identification completed on 19 September 2018. Environmental A ssessment Category B. US$ 200.0 (IDA Credit). Consulting services t o be determined. Im plementing ag ency(ies) t o be de- t ermined. Dou ala Urban Mobility Project: The Project Dev elopment Objective is to im prove urban m obility and support inclusive economic development along selected Bus Rapid Transit corridors and its feeder lines in Douala. Concept completed on 26 October 2018. Environmental Assessment Category A. Project: P1 67795. US$ 220.0 (IDA Credit). No consultants are required. Communaute Urbaine de Douala (CUD). April 2019 Africa PAGE 18 Central African Republic Agriculture (R) CA R-Agriculture Recovery and Agribusiness Development Support Project (ARADSP): Increase agriculture pr oductivity of small scale farmers, strengthen capacity of micro, small and medium agribusiness enterprises in the project a r ea, and provide immediate and effective response in the event of an Eligible Crisis or Em ergency Negotiations authorized on 25 March 2019. Environmental Assessment Category B. Project: P1 65855. US$ 25.0 (IDA Grant). Consulting services to be determined. Ministry of Agriculture and Rural Development. Governance Em ergency Public Services Response Project: The project development objective is to re-establish an operational gov- er nment payroll and related financial management systems. Approval completed on 19 May 2015. Environmental Assessment Ca tegory C. Project: P154304. US$ 10.0 (IDA Grant). Consultants will be required. Ministry of Finance and Budget/ CS REF, Contact: Remy Yakoro, Minister of Finance. Social, Urban, Rural and Resilience Global Practice CA R: LONDO+: To provide temporary employment to vulnerable people and to facilitate access to basic services throughout t h e entire t erritory of the country Identification completed on 21 May 2018. Environmental Assessment Category B. US$ 100.0 (IDA Grant). No consultants are required. Im plementing agency(ies) to be determined. Chad Agriculture Em ergency Food and Livestock Crisis Response AF: The project development objective is to improve the availability of a nd access to food and livestock productive capacity for targeted beneficiaries affected by the conflict in the Centr al African Republic on the Recipient's territory. Approval completed on 29 September 2017. Environmental Assessment Category B. Pr oject: P163258. US$ 16.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Education Ch ad Education Sector Reform Project Phase-2 Additional Financing: The Project Development Objective is to im prove t eaching and learning conditions in primary schools nationwide and upper secondary schools in selected areas. Ap- pr oval completed on 23 June 2017. Environmental Assessment Category B. Project: P163740. US$ 50.0 (IDA Grant). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. CHA D Skills Development for Youth Employability Project: The Project Development Objective is to improve the qu ality of skills and labor market outcomes for project beneficiaries. Concept com pleted on 14 September 2018. Environmen- t a l Assessment Category B. Project: P1 64297. US$ 50.0 (IDA Credit). Consultants will be required. Ministere de l'Education Na tionale et de la Promotion Civique; Ministere de la Formation Professionnelle et des Petits Metiers; Ministere de l'Economie et de la Planificatin du Development. Governance T D-Public Financial Mgmt. CB AF: The additional financing will scale up som e existing activities (technical assistance to t h e computerization of the public financial m anagement sy stem) while supporting new ones (implementation of the organic finance law, debt management). Approval completed on 12 May 2014. Environmental Assessment Category C. US$ 10.2 (IDA Grant). No consultants are required. Ministry of Economy and Finance Tel: (235-22) 5 20-452, E-m ail: pamfip@intnet.td, Contact: Chandanie Wijayawardene, Director General. PAGE 19 Monthly Operational Sum m ary April 2019 Social Protection & Labor Ch ad Safety Nets Additional Financing: The project development objective (PDO) is to pilot cash transfers and cash -for- w ork interventions to the poor and lay the foundations of an adaptive safety nets system. Identification completed on 5 Sep- t em ber 2018. Environmental Assessment Category B. US$ 1.2 (ASPP). Consultants will be required. Implementing agency(ies) t o be determined. Comoros Energy & Extractives Com oros Renewable Energy Transition and Integration Platform: T o a dd solar PV and energy storage facilities to t h e Comorian power generation m ix. Identification completed on 6 December 2016. Environmental Assessment Category B. US$ 20.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation (R) Integrated Development and Competitiveness Project: To promote the development of Micro, Small and Medium En t erprises (MSMEs) and relevant value chain actors in the agriculture, tourism and associated sectors in Comoros Negotia- tions authorized on 16 April 2019. Environmental Assessment Category B. Project: P164584. US$ 25.0 (IDA Credit). Consult- in g services t o be determined. Ministry of Energy, Agriculture, Environment and Fisheries (MEAPE). (R) Com oros Financial Inclusion and Stability Project: To increase access to and usage of digital payments and other financial services, including for women, while strengthening the institutional capacity and framework to promote financial st a bility and integrity. Concept completed on 5 February 2019. Project: P1 66193. US$ 15.0 (IDA Credit). Consulting services to be determined. Banque Centrale des Comores. Governance Econ omic Governance TechnicalAssistance - AF: 1. Comoros' three islands form one of the smallest African countries. W ith an estimated 760,000 inhabitants, spread among three islands, the country remains m ired in poverty. Gross Dom estic Pr oduct (GDP) per capita is estimated at US$785 and, based on 2004 estimates, about 45 percent of the population lived below t h e poverty line, an incidence that has probably increased since then . Poverty incidence varies considerably across regions a n d is typically higher in rural areas and on the island of Anjouan. The primary sector of the economy (mainly subsistence a griculture, a few cash crops, and fisheries) and retail services dominate the economy, representing about one-half and one- fifth of the country's GDP, respectively. Cash crops comprise m ainly three high-value export crops-v anilla, cloves and ylang- y lang -and constitute most of the export earnings in goods, equivalent to a mere 4 percent of GDP. The third largest sector is g ov ernment services, representing about 1 0 percent of GDP. Despite the potential in tourism, the country has failed so far to t a p into the growing role of this sector in the region. With longstanding outmigration, the country benefits from large and g r owing remittances-at close t o 20 percent of GDP-from the Comorian diaspora, mainly in France. The diaspora also repre- sen ts the main source of visitors from abroad. 2. Confirming a new commitment to reform, the Union of the Comoros adopted a Pov erty Reduction Strategy Paper (PRSP) for the period 2010-2014, which was endorsed by partners, including the World Ba nk.5 The strategy has the following core objectives: (i) stabilize the economy and lay the groundwork for strong and equita- ble growth; (ii) strengthen key sectors by focusing on institution -building and ensuring a broader role for the private sector; (iii) strengthen g overnance and social cohesion; (iv) improve the health status of the general public; (iv) promote education a n d vocational training with the a im of developing human capital; and (v) promote environmental sustainability and civilian security. 3. In support of its PRSP, the government has finalized a comprehensive Public Financial Management strategy for t h e coming decade (2010-1 9) and adopted a detailed Action Plan for 2010-12. The proposed strategy is organized around four pillars6: (i) modernizing the legislative and regulatory framework and strengthening institutional capacity; (ii) rationalizing bu dget preparation; (iii) strengthening budget execution; and (iv) increasing transparency through improved internal and ex ternal controls. The action plan (the first in a series of rolling triennial plans) provides a detailed, sequenced and budgeted list of actions mapped to specific lead institutions within the administration. Its implementation relies on two committees t hat in clude Union and island representatives: The CREF (which acts as a secretariat of the Comité Budgétaire) that is responsible for the implementation as well as monitoring and evaluation of the national PFM reform strategy, and the HASC that is in charge of leading the civil service reform, including management of personnel rosters, new recruitments into the civil service April 2019 Africa PAGE 20 a n d implementation of the organic frameworks. 4. Notwithstanding this new dynamism for PFM reforms, important chal- lenges remain. The 2007 Public Expenditure and Financial Assessment (PEFA) r eview rated Comoros at the lowest possible score, on 22 out of 28 key indicators. This evaluation emphasized weaknesses at all levels of public financial management (fr om formal institutions and procedures t o actual implementation and processes), and puts Comor os squarely in the 'lower per formance league' of African countries. 5. Ma jor weaknesses contribute to reduce the Government's efficiency in terms of bu dget preparation, execution, and reporting. Despite recent improvements and efforts to enhance cooperation via the Comité Bu dgétaire, budget preparation remains nonparticipatory with consultations between Union and Islands fragmentary and u nstructured. As a r esult, the budget is established m ainly on the basis of economic and financial constraints, and is largely disconnected from policy priorities. With r evenues barely covering wages and recurrent expenditures, there is limited scope for using the budget as a tool for resource allocations. In addition, the budgetary nom enclature is still based on administra tive classifications and does not permit establishing a direct link between the budget (preparation and monitoring) and the gov- er nment's policy priorities or tracking priority expenditures through the budget cycle. With respect to execution, the legal and pr ocedural framework is outdated and moreover poorly understood even by those in charge of the administrative phase of ex ecution (credit managers). As a r esult normal procedures are often circumvented through a proliferation of exceptional pr ocedures and significant gaps appear between budgeted and actual amounts. Thus the informational and authorization fu nctions of the budget are severely undermined. At the Treasury level, serious structural weaknesses were again compounded du ring the reconciliation period, which saw a breakdown in communication and systems across levels of Government. As a r esult key public accounts documents are simply never produced. 6. PFM information systems and financial control mecha- n isms are generally rudimentary and obsolete, and lack an integrated financial m anagement information sy stem. Except for t h e recently implemented ASYCUDA++ for customs operations, the only systems in place are software applications for wage bill calculation and external debt management. 7. Comoros' civil service absorbs an inordinate share of the Government's r esources, while delivering poor quality services to the population. During the period of decentralization, most central admin- ist rative structures were simply duplicated in each autonomous island (without regard for administrative efficiency or financial su stainability). Correspondingly the civil service roster increased from less than 6,000 in 1999 to som e 12,000 in 2008, with a concomitant rise of wage and salaries expenditures from 6.2 to 9 percent of Gross Dom estic Product (GDP), a loss of insti- t utional memory and a dilution of already scare human resources. Moreover, the often discretionary nature of these appoint- m ents has weakened the significance of positions and job descriptions within each public institution. 8. The government has t a ken steps to improve the effectiveness of public administration and gradually reduce the wage bill, but much remains to be don e. The HASC has supervised the establishment of a unified computerized civil service roster (for the Union and Islands) a n d contracted the development of an integrated civil service and wage management software. It has also carried out a vast r ev iew of the existing organizational structures of each administration (cadres organiques) an updated version of which has been adopted by Parliament in 2010 and will be gradually implemented. Nevertheless, there are numerous remaining chal- lenges. For example, the civil service roster will only become a useful m anagement tool once a physical census of all civil servants has been completed to clean up and validate the data. Also, much work is needed to develop feasible strategies for im plementing the new organizational structures over t ime and with due consideration for social consequences. 9. In January 31 2011, the Bank approved a grant in the amount of SDR 1.2 million (USD 1.8 million equivalent) to support the country's PFM a nd civil service reform programs. The original project development objectives are (i) to increase the efficiency, account- a bility and transparency of public financial management and (ii) to improve the management of civil service human resources a n d wages. The disbursement percentage as of December 18, 2012 is about 67%. 10. A midterm performance review was con ducted in March 2012 and followed by s supervision mission in October 2012. Overall, progress towards achieving the PDOs and implementation progress of the activities were found satisfactory. However, the team noted a financing gap of about $1 .5 million to implement the remaining activities of the project, including the PFM information sy stem and the implementa- t ion of the recommendations of the HR assessments and reviews (physical census of the civil servants, wages paid by checks, or ganic frameworks). In addition, the policy dialogue with the Ministry of Finance highlighted the weak macroeconomic man- a g ement capacities which undermine the country's ability to formulate expenditure policy decisions based on sound assump- t ions and data. To address this challenge, the authorities have requested the Bank's support to conduct econom ic management st udies to inform budget preparation processes and sectoral analysis. 12. The purpose of the additional financing is to support t h e implementation of those activities. More specifically, the additional activities are following: (i) Acquire and roll out a sys- tem covering budget preparation, budget execution, and accounting and reporting; (ii) design and build the required network (LA N and WAN) so that the module could be used by the Treasury services throughout the territory (iii) support the imple- m entation of the HR assessments and reviews (physical census of the civil servants, wages paid by checks, organic frameworks) (iv ) economic management studies t o inform budget preparation processes and sectoral analysis. 1 3. Moreover, the original da te closing date is set for December 31, 2013. According t o the IT master plan, the acquisition and roll out of the budget a nd a ccounting system would take up t o 18 months. Therefore an extension of the closing date of the parent project is proposed u ntil December 31,2015. 1 4. No other changes are proposed to the project's development objectives as the additional activities fit within the originally conceived objectives. Approval completed on 12 November 2013. Environmental Assessment Category C. US$ 3.5 (IDA Credit). Consultants will be required. Economic and Governance Project (ABGE) Tel: (263) 773-9900, E-mail: PAGE 21 Monthly Operational Sum m ary April 2019 m oinacharani@yahoo.fr, Contact: Moinafatima Charani, Coordinator, ABGE. Health, Nutri tion & Population Com prehensive Approach to Health System Strengthening: Im prove access to quality maternal and child health and n utrition services in selected geographical areas of the country Concept com pleted on 4 September 2018. Environmental A ssessment Category B. Project: P166013. US$ 30.0 (IDA Credit). No consultants are required. MINISTRY OF HEALTH, SOLIDARITY, SOCIAL PROTECTION AND GENDER PROMOTION. Congo, Democratic Republic of Agriculture National Agriculture Development Program: To improve agriculture productivity and market access of sm allholder fa rmers, and small and medium size agribusinesses in selected regions and strengthen public sector capacity to respond to eligible agriculture sector em ergencies. Identification completed on 3 October 2018. US$ 500.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Education Dem ocratic Republic of Congo - Skills for Employment & Productivity Project: The project development objective w ould be t o increase access to skills training programs and the employability of those being trained and strengthen sy stems for job placement in priority economic sectors with a focus on the vulnerable and women. Concept completed on 13 February 2 018. Environmental Assessment Category C. Project: P1 65090. US$ 1 00.0 (IDA Credit). Consultants will be required. Min- ist ry of Labor, Em ployment and Social Welfare. Energy & Extractives DRC Gr owth with Governance in the Mineral Sector - PROMINES II: To enhance government capacity to manage t h e extractive sector, a nd t o increase it s contribution t o local economic development. This im plies increased geological kn owledge, targeted capacity building and institutional reforms, and the promotion of local participation in mining value chains. Concept completed on 9 January 2018. Environmental Assessment Category B. Project: P1 66110. US$ 120.0 (IDA Grant). Consulting services t o be determined. PIU PROMINES (Ministry of Mines of DRC). Environment & Natural Resources (R) Im proved Forested Landscape Management Project (GEF AF): The project development objective is to test new a pproaches to improve community livelihoods and forested landscape management, and to reduce greenhouse gas emissions fr om deforestation and forest degradation in selected areas in the Recipient's territory. Negotiations authorized on 1 April 2019. Environmental Assessment Category B. Project: P1 60182. US$ 6.2 (GEFU). Consulting services to be determined. Min- ist ry of Environment, and Sustainable Development. DRC Ca pacity Strengthening for Environmental and Social Risk Management: The proposed Project Development Objective (PDO) is t o im prove the performance of DRC’s environmental and social risk management sy stems. Identification com pleted on 19 December 2018. US$ 60.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. CA FI AF Forest Dependent Community Support Project: The development objective (PDO) of the parent project is u nchanged: t o strengthen the capacity of targeted Indigenous Peoples and Local Communities (IPLCs) in selected territories a n d at the national level to participate in REDD oriented land and forest management activities. Concept completed on 23 October 2018. Environmental Assessment Category B. Project: P1 63835. US$ 1.8 (REDD). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. A groforestry project in the Kinshasa supply basin: The project development objective is to improve forested landscape m anagement and community livelihoods in the Kinshasa supply basin . April 2019 Africa PAGE 22 Identification completed on 5 September 2018. Environmental Assessment Category B. US$ 1 00.0/200.0 (IDA Credit/IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Governance Pu blic Financial Management and Accountability Project Additional Financing: The project development objec- t iv e (PDO) is t o im prove domestic revenue mobilization, public expenditure management, and accountability, at central level a n d in selected provinces. Approval completed on 15 February 2017. Environmental Assessment Category C. Project: P159160. US$ 5 0.0 (IDA Grant). Consultants will be required. COREF. Gov ernance II: This is additional financing for the ongoing GCEP operation P104041, as per the recommendation of the MT R, conducted in November 2010, and as per the detailed r equest from the Minister of Finance, received in January 2011. A dditional financing will fund a ctivities in a 4th provinces (Kasai Occidental) additional activity on supporting procurement r eform additional activity on public service identification process additional cost for IT investments due to price increases and ex pansion of the initially planned activities Approval completed on 9 May 2013. Environmental Assessment Category C. Pro- ject: P126115. US$ 67.0 (IDA Grant). No consultants are r equired. Ministry of In terior Tel: (243-99) 290-5743, E-m ail: pr cgrdc@gmail.com, Contact: Popaul Kizungu Chihiza, Project Coordinator. Pu blic Sector Reform and Rejuvenation Project - A F: The project development objective is to strengthen and rejuve- n ate the civil service in selected ministries at the central and provincial levels. Approval com pleted on 16 May 2017. Environ- m ental Assessment Category C. Project: P1 60612. US$ 45.0 (IDA Grant). Consultants will be required. Im plementing a g ency(ies) to be determined. Health, Nutrition & Population Hea lth System Strengthening for Better Maternal and Child Health Results AF2: The proposed project develop- m ent objective is to improve utilization and quality of maternal and child health services in targeted areas within the Recipi- en t's Territory. Approval completed on 2 March 2018. Environmental Assessment Category B. Project: P166004. US$ 10.0 (FSHN). No consultants are required. Ministry of Health; Democratic Republic of Congo; Ministry Of Finances. A F-DRC Human Development Systems Strengthening: The proposed project development objective is to strengthen select management sy stems for education and health services in targeted geographic areas in the Recipient's territory. Ap- pr oval completed on 29 Ma rch 2016. Environmental Assessment Category C. Project: P156421. US$ 30.0/1 0.0/1.1 (IDA Grant/GFF/PHRD). Consultants will be required. Democratic Republic of Congo, Contact: Henri Yav Mulang, Minister. A F III DRC Health System Strengthening for Better Maternal and Child Health Results: To im prove utilization a n d quality of maternal and child health services in targeted areas within the Recipient's Territory and, to provide an imme- diate and effective response to an eligible crisis or emergency. Approval completed on 27 February 2019. Environmental A ssessment Category B. Project: P169753. US$ 120.0 (IDA Grant). Consultants will be required. Ministry of Health; Demo- cr atic Republic of Congo; Ministry Of Finances. DRC Health System Strengthening Additional Financing: The proposed project development objective is to improve u t ilization and quality of maternal and child health services in targeted areas within the Recipient's Territory. Approval com- pleted on 31 Ma rch 2 017. Environmental A ssessment Ca tegory B. Pr oject: P1 57864. US$ 1 20.0/40.0/3.5 (IDA Cr edit/GFF/SPTF). No consultants are required. Alain Iyeti; Ministry of Finance. (R) DRC Mu ltisectoral Nutrition and Health Project: The development objective of this project is to increase the uti- lization of nutrition-specific and nutrition-sensitive interventions targeting children 0-23 months of age and pregnant and la ctating women in the project regions and to respond to an eligible crisis or emergency. Negotiations authorized on 16 April 2019. Environmental Assessment Category B. Project: P168756. US$ 492.0/1 0.0 (IDA Credit/GFF). No consultants are re- qu ired. National Nutrition Program (PRONANUT). Social Protection & Labor Social Protection Refugee Host Com munity Support: The project development objective is to improve access to live- lihoods and socio-econom ic infrastructure in vulnerable refugee and refugee hosting communities in the of DRC Identification PAGE 23 Monthly Operational Sum m ary April 2019 com pleted on 20 November 2018. US$ 22.5/122.5 (IDA Credit/IDA Grant). Consulting services t o be determined. Im ple- m enting agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice DRC - Ur ban Development Project Additional Financing: T o improve access to basic services and infrastructure and st r engthen urban and municipal management of the targeted cities. Approval completed on 4 May 2017. Environmental As- sessm ent Category B. Project: P157114. US$ 90.0 (IDA Credit). Consultants will be required. Ministry of Finance; Project Im - plem entation Unit. Ki n shasa Multisector Development and Resilience Project: To improve the living conditions and socio economic opportunities for the residents of targeted poor and vulnerable neighborhoods through selected investments and to strengthen t h e urban planning and management capacity of the City-Province of Kinshasa. Concept completed on 8 December 2017. Environmental Assessment Category B. Project: P161602. US$ 400.0 (IDA Credit). Con sultants will be required. Kinshasa Provincial Ministry of Plan, Budget and Infrastructure. Transport T ransport Reforms and Investment Project: The Project Development Objective is to re-establish lasting earth and pav ed road access between provincial capitals, districts and territories, in the project impact area and to improve the road sector institutional organization Concept completed on 29 June 2 017. Environmental A ssessment Category A. Project: P1 61877. US$ 300.0 (IDA Grant). Consultants will be required. Cellule Infrastructures. Water DRC Ur ban Water Supply Project Additional Financing and Restructuring: The revised PDO is to increase access t o su stainable water services in selected urban areas, and to improve the operational performances and viability of the Project Im plementing Entity. Approval completed on 25 February 2016. Environmental Assessment Category B. US$ 166.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Congo, Republic of Digital Development Central African Backbone SOP3 Republic of Congo Additional Financing: The development objective of the pro- posed project is consistent with the PDO for the CAB Program: t o contribute t o increase geographical reach and usage of r egional broadband network services and reduce their prices, in the Republic of Cong o. Approval completed on 30 March 2 017. Environmental Assessment Category B. Project: P1 60292. US$ 5 .0 (IDA Credit). Consultants will be required. Ministry of Post s and Telecommunications in Charge of ICT. Environment & Natural Resources Northern Congo Agroforestry Project: To strengthen climate sm art agriculture and conservation practices in Commu- n ity Dev elopment Zones in the departments of Sangha and Likouala. Concept completed on 3 August 2018. Environmental A ssessment Category B. Project: P166189. US$ 16.0 (CIF). No consultants are required. Ministry of Agriculture, Livestock and Fisheries; Ministry of Forest Economy. Health, Nutrition & Population Health System Strengthening Project: The project development objective is to increase utilization and quality of mater- n a l and child health services in targeted areas. Identification completed on 13 June 2018. US$ 20.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 24 Poverty and Equity A dditional Financing - RoC - Statistics Capacity Building Project: The objectives of the project are to: (i) strengthen t h e NSS in the production and dissemination of quality statistics relevant for policies and decision making; and, (ii) promote t h e demand for statistical information. Approval completed on 5 April 2018. Environmental Assessment Category C. Project: P1 62345. US$25.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. Social Protection & Labor LISUNGI Safety Nets System Project II: "Strengthen the social safety nets system and its programs aimed at improving bot h access to health and education services and productivity among poor and vulnerable households in pa rticipating areas." A pproval completed on 7 February 2019. Environmental A ssessment Category C. Pr oject: P1 66143. US$ 1 2.8/9.2 (IDA Cr edit/IDA Grant). Consultants will be required. Ministry of Social Affairs; UGP LISUNGI; Ministry of Social Affairs and Hu- m anitarian Action; PMU Lisungi. Lisungi Safety Nets System Project Additional Financing: "Strengthen the social safety nets system and its programs a im ed at improving both access to health and education services and productivity among poor and vulnerable households in pa rticipating areas." A pproval completed on 30 March 2017. Environmental Assessment Category C. Project: P1 61154. US$ 1 0.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Cote d'Ivoire Agriculture (R) Cocoa Integrated Value Chain Development Project: The project development objectives are to Increase the value a dded in the cocoa value chain and its distribution, in particular t o sm all producers, and support the long-term sustainable economic, social and environmental development of the cocoa sector. Concept completed on 9 April 2019. Project: P1 68499. US$300.0 (IBRD). Consultants will be required. Conseil du Cafe-Cacao. Education Youth Employment and Skills Development - A dditional Financing: The proposed Project Dev elopment Objective (PDO) is to improve access to temporary employment and skills development opportunities for young men and women in Cote d'Iv oire' s territory. Approval completed on 26 March 2015. Environmental Assessment Category B. Project: P151844. US$ 5 0.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Cot e d' Ivoire Education Services Delivery Enhancement Project Additional Financing: The Project Development Objective is to increase access to pre-school and improve learning outcomes in beneficiary primary schools in participating r egions Identification completed on 10 December 2018. Environmental A ssessment Category B. US$ 27.4 (EFAS). Consult- a nts will be required. Im plementing agency(ies) to be determined. (R) Cot e d'Ivoire Higher Education Development Support Project: The Project Development Objectives are: (a) im prove higher education m anagement; (b) increase enrollment in professional programs; (c) improve the quality and labor m arket relevance of degree programs of participating public tertiary institutions. Approval completed on 22 March 2019. Env ironmental Assessment Category B. Project: P160642. US$ 1 00.0 (IDA Credit). Consultants will be required. Ministry of Higher Education and Scientific Research. Energy & Extractives Cot e d'Ivoire: CI-ENERGIES Guarantee Project: The proposed development objective is t o improve the electricity sec- t or s financial performance by refinancing the short-term liabilities of CI-ENERGIES. Approval completed on 29 June 2018. Env ironmental Assessment Category B. Project: P164145. US$ 280.0 (GUID). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. PAGE 25 Monthly Operational Sum m ary April 2019 Environment & Natural Resources (N) Cot e d'Ivoire: Forest Investment Project Additional Financing: The Development Objective is to conserve and in crease the forest stock and improve access to sources of income from sustainable forest management for selected communi- t ies in target zones Identification completed on 5 April 2019. Environmental Assessment Category B. US$ 100.0 (IDA Credit). Con sultants will be required. Im plementing agency(ies) to be determined. Governance CI Gov ernance and Institu Dev Addit Fin: The project development objective (PDO) is to achieve enhanced transparency a n d efficiency in the management of public finances and improved governance and efficiency in the cocoa sector. Approval com pleted on 9 June 2014. Environmental Assessment Category B. Project: P1 47016. US$ 5 .0 (IDA Credit). Consultants will be r equired. Ministry of Planning and International Cooperation Tel: (967 -1) 250-118, E-m ail: ashater@mpic.gov.ye, Contact: A bdullah Al Shatter, Deputy Minister for Projects Programming. (R) En hancing Government Effectiveness for Improved Public Services: The PforR development objective is to st r engthen government capacity in program-based budgeting and procurement, delivery of selected education services, man- a g ement of roads contracts, and facilitating access to financial services. Approval completed on 5 April 2019. Environmental A ssessment Category C. Project: P164302. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Economy and Finance. Health, Nutrition & Population (R) St rategic Purchasing and Alignment of Resources & Knowledge in Health Project (SPARK-Health): To im prove the utilization and quality of health services towards reducing maternal and infant mortality in the Recipient's terri- t ory. Approval completed on 22 March 2019. Environmental Assessment Category B. Project: P167959. US$ 200.0/20.0 (IDA Cr edit/GFF). Consultants will be required. Ministere de la Sante et de l'Hygiene Publique (MSHP). Social Protection & Labor (R) Social Protection and Economic Inclusion Project (Productive Social Safety Net A dditional Financing): T o im prove access to cash transfers and earnings opportunities among poor households and develop a social protection deliv- ery system. Negotiations authorized on 25 April 2019. Environmental Assessment Category C. Project: P1 67623. US$ 1 00.0 (IDA Credit). Consultants will be required. Ministry of Em ployment and Social Protection; Ministry of Solidarity and Poverty Reduction. Social, Urban, Rural and Resilience Global Practice In frastructure Renewal and Urban Management Project Additional Financing: The objective of the project is to im prove access to basic infrastructure in targeted urban and rural areas, and, in the event of an Eligible Crisis or Em erg ency, t o provide immediate and effective response t o said Eligible Crisis or Emergency. Approval completed on 2 August 2016. Env ironmental Assessment Category A. Project: P156253. US$ 60.0 (IDA Credit). Consultants will be required. Im plementing a g ency(ies) to be determined. A bidjan Urban Resilience Project: The development objective of the project is to improve (i) resilience to flood risk and (ii) solid waste management services in vulnerable neighborhoods of the District of Abidjan and targeted secondary cities. Identification completed on 13 September 2018. US$150.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Transport A bidjan Urban Mobility Project: The Project Development Objective is to improve accessibility to opportunities and to in crease efficiency of the public transport sy stem along the Yopougon -Bingerville corridor and its feeder lines in Abidjan. Con cept completed on 30 October 2018. Environmental Assessment Category A. Project: P1 67401. US$ 300.0 (IDA Credit). Con sultants will be required. Ministry of Transport. April 2019 Africa PAGE 26 Water Cot e d'Ivoire Urban Water Supply and Sanitation Project: The revised project development objective is: to increase, in selected urban areas, (i) access and quality of water services and (ii) access t o sanitation, and (iii) to im prove planning and m onitoring of the urban water sector. Identification completed on 19 February 2019. Environmental Assessment Category B. US$ 150.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Equatorial Guinea Education Equ atorial Guinea Basic Education Project: to improve quality of basic education and to strengthen institutional ca- pa city. Concept completed on 19 June 2018. Environmental Assessment Category B. Project: P163543. US$5 0.0 (IBRD). Con- su ltants will be required. Ministry of Education, Higher Education, and Sports. Eswatini Energy & Extractives (R) Network Reinforcement and Access Project: To improve the reliability of electricity supply and increase access to electricity services in targeted areas of Eswatini. Appraisal completed on 23 April 2019. Project: P166170. US$40.0 (IBRD). Con sultants will be required. Eswatini Electricity Company. Governance IMPROVING PUBLIC SECTOR PERFORMANCE PROJECT: The project development objective is to improve public sector performance in selected m inistries, departments and agencies through the strengthening of human and public resources m anagement and use of data. Approval completed on 1 2 January 2017. Environmental Assessment Category C. Project: P1 5 2528. US$25.0 (IBRD). Consulting services to be determined. Ministry of Finance, Contact: Bheki Bhembe, Principal Sec- r etary; Prime Minister's Office, Contact: Mbuso C. Dlamini, Secretary t o Cabinet. Health, Nutrition & Population Eswatini Health System Strengthening Project: The project development objective is t o improve the quality and effi- ciency of health services delivery, with a focus on maternal and child health and non-communicable diseases. Identification com pleted on 25 September 2018. US$20.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be det ermined. M acroeconomics, Trade and Investment Swa ziland Private Sector Competitiveness: The development objective is: to support an im proved investment climate a n d strengthen competitiveness of firms, especially in the agribusiness and t ourism sectors. A pproval completed on 30 November 2015. Environmental Assessment Category B. Project: P151433. US$25.0 (IBRD). Con- su lting services to be determined. Ministry of Economic Planning and Development. Water eSwatini Water and Sanitation Access Project: To improve access to improved water supply and sanitation services in t argeted areas in eSwatini and strengthen the regulatory framework for national rural water supply and sanitation service pr ovision. Concept com pleted on 6 February 2019. Environmental A ssessment Category B. Pr oject: P1 66697. US$35.0 (IBRD). Consultants will be required. Eswatini Water Services Corporation. PAGE 27 Monthly Operational Sum m ary April 2019 Ethiopia Agriculture (R) Lowlands Livelihood Resilience Project: To Im prove Livelihood Resilience of Pastoral and Agro-Pastoral Commu- n ities in Ethiopia Negotiations authorized on 22 March 2019. Environmental Assessment Category B. Project: P164336. US$175.0/175.0/90.0 (IDA Credit/IDA Grant/IFAD). Consultants will be required. Ministry of Peace. A GP2 - Additional Financing: The Project Development Objective is to increase agricultural productivity and commercial- iza tion of sm all holder farmers targeted by the project. Identification completed on 13 September 2018. Environmental As- sessm ent Category B. US$ 250.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be deter- m ined. Education (R) A dditional Financing to GEQIP-E for Refugees Integration: The Program Development Objective (PDO) is to im prove internal efficiency, equitable access, and quality in general education (O-Class to Grade 1 2) Appraisal completed on 17 April 2019. Environmental Assessment Category B. Project: P168411. US$ 30.0/30.0 (IDA Credit/IDA Grant). Consultants w ill be required. Ministry of Education. Energy & Extractives Ren ewable Energy Guarantees Program: Objective to be Determined. Appraisal completed on 24 May 2017. Environ- m ental Assessment Category B. Project: P1 62607. US$ 10.0/800.0 (GUID/ZPCO). Consulting services t o be determined. Im - plem enting agency(ies) to be determined. Environment & Natural Resources (R) ET HIOPIA CLIMATE ACTION THROUGH LANDSCAPE MANAGEMENT PROGRAM FOR RESULTS: The Pr oject Development Objective (PDO) is to improve climate resilience, strengthen local institutions for watershed manage- m ent, reinforce participatory processes for watershed development, expand coverage of land use certification, and improve la nd administration service delivery, in rural areas of Ethiopia that are predominantly non -pastoral. Concept completed on 28 February 2019. Project: P170384. US$ 500.0 (IDA Grant). No consultants are required. Ministry of Agriculture. Et hiopia Resilient Landscapes and Livelihoods Project: To improve climate resilience, land productivity and carbon st orage, and increase access to diversified livelihood activities in selected rural watersheds. Approval completed on 30 July 2 018. Environmental Assessment Category B. Project: P1 63383. US$ 1 00.0/1 9.0 (IDA Credit/FSCO). Consultants will be re- qu ired. Ministry of Agriculture and Livestock Resource. Finance, Competitiveness and Innovation Et hiopia Competitiveness and Job Creation Pr oject -Additional Financing: The Project Development Objective (PDO) is to contribute t o job creation by attracting investments and improving competitiveness of enterprises in the targeted in dustrial parks and their linked domestic enterprises. Approval completed on 25 June 2018. Environmental Assessment Ca tegory A. Project: P1 64429. US$ 175.0 (IDA Credit). Consulting services to be determined. Industrial Parks Development Cor poration. Health, Nutrition & Population Et hiopia Health MDGs P4R Additional Financing: Objective t o be Determined. Approval completed on 9 May 2017. Env ironmental Assessment Category B. US$ 1 50.0/20.0/60.0 (IDA Credit/FSHD/GFF). Consulting services t o be deter- m ined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 28 Social Protection & Labor Pr oductive Safety Net 4 Project Additional Financing: The Project Development Objective is: increase access to effec- t iv e safety net and disaster risk management systems, and complementary livelihood and nutrition services for food-insecure h ouseholds in the Recipient ’s rural areas. Approval completed on 2 May 2017. Environmental Assessment Category B. Project: P1 63350. US$ 8.1 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. PRODUCTIVE SAFETY NET PROJECT (PSNP 4) ADDITIONAL FINANCING: The Project Dev elopment Objective is: increase access to effective safety net and disaster risk management sy stems, and complementary livelihood and n utrition services for food-insecure households in the Recipient ’s rural areas. Approval completed on 30 June 2016. Environmental A ssessment Category B. Pr oject: P1 5 8770. US$ 1 00.0/300.0/1 2.0/36.0/25.0/1 22.0/75.0/1 9.0/17.0/1 2.0 (IDA Cr edit/AID/AUSL/BMZ/CIDA/DFID/ECEU/JPPG/NEDA/SIDA). Consulting services t o be det ermined. Im plementing a g ency(ies) to be determined. Ur ban Safety Net and Jobs Project: The project will support the GoE in providing income support to urban poor and pr om ote their economic inclusion, particularly for women and youth. Identification completed on 29 November 2018. US$ 35 0.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Water (R) On e WASH—Consolidated Water Supply, Sanitation, and Hy giene Account Project (One WASH—CWA): T o a chieve increased and sustained coverage of safely managed water supply and sanitation in selected rural and urban areas Con cept completed on 28 February 2019. Environmental Assessment Category B. Project: P167794. US$ 300.0 (IDA Credit). Con sultants will be required. Ministry of Water, Irrigation and Electricity; Ministry of Education; Ministry of Health. Gabon Digital Development A dditional Financing CAB4: The development objective of the project is consistent with the PDO for the CAB Program: T o contribute to increase geographical reach and usage of regional broadband network services and reduce their prices in the t erritory of the Republic of Gabon. Approval completed on 29 June 2016. Environmental Assessment Category B. Project: P1 5 8299. US$23.0 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. eGa bon Additional Financing: The PDO is to Identification completed on 20 September 2017. Environmental Assessment Ca tegory B. US$35.0 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. Gambia, The Education Results for Education Achievement and Development Project (READ): T o increase access t o basic education, im- pr ove quality of teaching and learning in lower basic schools, and strengthen education systems. Approval completed on 14 September 2016. Environmental Assessment Category B. Project: P160282. US$ 7.5/1.0 (IDA Grant/ELP). No consultants are r equired. Im plementing agency(ies) to be determined. Governance Ga mbia State Owned Enterprises Restructuring Project: The Project Development Objective is to strengthen govern- m ent ov ersight and fiscal risk management of selected SOEs. Concept completed on 26 December 2018. Environmental A ssessment Category C. Project: P1 66695. US$ 30.0 (IDA Grant). Consultants will be required. Directorate of Public and Pr ivate Partnership and Public Enterprises - DPPP&PC. PAGE 29 Monthly Operational Sum m ary April 2019 Health, Nutrition & Population A F Maternal and Child Nutrition and Health Results Project: A. Proposed Development Objective T h e development objective of the project is to increase the utilization of community nutrition and primary maternal and child h ealth services in selected regions in the Recipient’s territory. Approval completed on 9 January 2017. Environmental Assess- m ent Category B. Pr oject: P159693. US$ 3.2/4.3 (IDA Credit/IDA Grant). No con sultants a re required. Im plementing a g ency(ies) to be determined. Social Protection & Labor (R) T he Gambia Social Safety Net Project: To im prove the coordination of social assistance activities and increase in- clusion of the extreme poor in the Nafa program. Negotiations authorized on 11 April 2019. Environmental Assessment Category C. Project: P167260. US$ 30.0 (IDA Grant). Con sultants will be required. National Nutrition Agency. Ghana Agriculture Gh ana Commercial Agriculture Project Additional Financing: The objective of the Project is to improve agricultural pr oductivity and production of both sm allholder and nucleus farms in selected project intervention areas of the Recipients t erritory. Approval completed on 31 May 2018. Environmental Assessment Category A. Project: P1 62525. US$ 50.0 (IDA Cr edit). Consulting services to be determined. Im plementing agency(ies) to be determined. Digital Development (N) Ghana eTransform Project - A dditional Financing: The Project Development Objective of the eTransform Project is t o improve the efficiency and coverage of government service delivery using ICT. Identification completed on 29 April 201 9. Environmental Assessment Category C. US$ 32.3 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be det ermined. Education Secon dary Education Improvement Project Additional Financing: The Project Development Objective is to increase a ccess to senior secondary education in underserved districts and improve quality in low -performing senior high schools in Ghana. Approval com pleted on 28 June 2017. Environmental Assessment Category B. Project: P1 63628. US$ 40.0 (IDA Cr edit). Consulting services to be determined. Im plementing agency(ies) to be determined. Gh ana Accountability for Learning Outcomes Project: To im prove literacy and numeracy in selected schools and st r engthen accountability in basic education in Ghana. Concept completed on 20 December 2018. Environmental Assessment Category C. Project: P165557. US$ 45.0/24.4 (IDA Cr edit/EFAF). Consulting services to be determined. Ministry of Education. Energy & Extractives Gh ana: Artisanal and Small-Scale Mining Formalization: The project development objective is to create enabling con ditions for the orderly, safe, sustainable, and environmentally sound development of artisanal and sm all-scale m ining for t h e benefit of Ghanaian nationals and Ghana. Identification completed on 25 June 2018. Environmental Assessment Category April 2019 Africa PAGE 30 B. US$ 30.0/1 0.0/7.8 (IDA Credit/CIF/GEFU). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. A dditional Financing for Ghana Oil and Gas Capacity Building Project: The project objective is to (i) improve public m anagement and r egulatory capacity while enhancing t ransparency; and (ii) strengthen local t echnical skills in Ghana's em erging oil and gas sector. Approval completed on 27 June 2014. Environmental Assessment Category C. Project: P1 48224. US$ 1 9.8 (IDA Credit). Consultants will be required. .., Contact: .. Environment & Natural Resources A dditional Financing for Ghana Forest Investment Program (FIP) - Enhancing Natural Forest and Agrofor- est Landscapes Project: To improve forest and tree management practices by cocoa farmers, CREMA communities and for est reserve managers to reduce forest loss and degradation and demonstrate rehabilitation of mined-out sites in selected la ndscapes in Ghana's High Forest Zone (HFZ). Negotiations authorized on 19 February 2019. Environmental Assessment Ca tegory B. Project: P1 63745. US$ 7.0/12.4 (CSCC/CSCF). Consultants will be required. Ministry of Lands and Natural Re- sou rces. Finance, Competitiveness and Innovation Gh ana Financial Sector Development Project: The objective of the project is to promote financial sector soundness and a ccess t o financial services by individuals. Approval completed on 20 September 2018. Environmental Assessment Category C. Project: P161787. US$ 30.0 (IDA Credit). Consultants will be required. Ministry of Finance. (R) Ghana Economic Transformation Project: The Project Development Objective is to promote private investments a n d firm growth in non-resource based sectors. Negotiations authorized on 26 April 2019. Environmental Assessment Cate- g ory B. Project: P166539. US$ 200.0 (IDA Credit). Consultants will be required. Ghana Investment Promotion Center; Minis- t ry of Trade and Industri; Ministry of Business Development. Gh ana Development Finance Project: The objective of the project is t o sustainably increase access to finance for Ghana- ia n enterprises, particularly SMEs. Identification com pleted on 1 2 November 2018. US$ 150.0 (IDA Credit). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Social Protection & Labor A F Ghana Social Opportunities Project: The Project Development Objectives (PDO) of this Additional Financing is to im prove targeting of social protection programs and provide income support to poor households through LEAP grants and LIPW infrastructure in targeted districts. Approval completed on 27 May 2014. Environmental Assessment Category B. Pro- ject: P1 46923. US$ 5 0.0 (IDA Credit). Consultants will be required. Ministry of Gender, Children and Social Protection, Con- t a ct: Abdullah Al Shatter, Deputy Minister for Projects Programming; Ministry of Local Government and Rural Development T el: (233-302) 818-1782, E-m ail: kofibedu@yahoo.com, Contact: Robert Austin, National Coordinator. Gh ana Jobs and Skills Project: The Development Objective is to promote access to new and better jobs. Concept com- pleted on 22 June 2018. Environmental Assessment Category C. Project: P1 66996. US$ 1 00.0 (IDA Credit). Consulting ser- v ices to be determined. Ministry of Em ployment and Labor Relations; Council of Technical and Vocational Education and T raining; National Board for Small Scale Industries. Social, Urban, Rural and Resilience Global Practice (R) Gr eater Accra Resilient and Integrated Development Project: The objective of the project is to improve flood r isk management and solid waste management in the Odaw River Basin of the Greater Accra Region and improve access to ba sic infrastructure and services in the targeted communities within the Odaw River Basin. Negotiations authorized on 19 March 2019. Environmental Assessment Category A. Project: P164330. US$ 200.0 (IDA Credit). Consultants will be required. Min istry of Works and Housing; Ministry of Inner City and Zongo Development; Ministry of Local Government and Rural Dev elopment; Ministry of Sanitation and Water Resources. PAGE 31 Monthly Operational Sum m ary April 2019 La nd Administration Phase 2 Additional Financing: To consolidate and strengthen land administration and manage- m ent sy stems for efficient and transparent land services delivery Approval completed on 21 November 2018. Environmental A ssessment Category B. Project: P166907. US$ 35.0 (IDA Credit). Consultants will be required. Ministry of Lands and Natural Resources; Land Commission. Transport Gh ana Transport Sector Project - Additional Fin: Objective to be Determined. Approval completed on 4 November 2 014. Environmental Assessment Category A. Project: P149444. US$ 25.0 (IDA Credit). Consulting services to be determined. Min istry of Roads and Highways and Ministry of Transport Tel: (233-302) 661-575, E-m ail: duaquaye@yahoo.com, Contact: Dr . D. D. Darku Water A F Sustainable Rural Water and Sanitation Project: The projects development objective is to expand access to, and en sure sustainability of water and sanitation services in rural and small town communities in six regions over the next 6 years. A pproval completed on 28 June 2017. Environmental Assessment Category B. Project: P1 63846. US$ 45.7 (IDA Credit). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Guinea Agriculture Gu inea Agribusiness Development Project: 23.The Project development objectives are to improve competitiveness of selected value-chains of selected value chains and create economic opportunities for women and youth in project intervention a r eas. Concept com pleted on 14 June 2018. Environmental Assessment Category A. Project: P164184. US$175.0 (IBRD). Con- su ltants will be required. Ministere de l'Agriculture. Education (R) Pr oject for Results in Early Childhood and Basic Education: The Project Development Objective is to improve a ccess to, and the quality of early childhood and basic education in areas of Project interventions and to st rengthen the capacity of t he education system to deliver better results Appraisal completed on 21 March 2019. Environmental Assessment Category B. Pr oject: P1 67478. US$ 50.0 (IDA Grant). Consultants will be required. Ministry of Education MEN-A. Energy & Extractives Power Sector Recovery Project - A dditional Financing: The Project Development Objective (PDO) is to im prove the t echnical and commercial performance of the national power utility. Approval completed on 16 March 2018. Environmental A ssessment Category B. Project: P1 60771. US$ 25.0 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. Gu inea Electricity Access Scale Up Project: The project development objective is to increase access to electricity in selected areas of Guinea A pproval completed on 15 February 2019. Environmental Assessment Category B. Project: P1 64225. US$ 25.0/25.0/58.5 (IDA Credit/IDA Grant/GFRC). Consulting services to be determined. Electricité de Guinée; Agence Guinéenne d'Electrifica- t ion Rurale (AGER). Environment & Natural Resources Gu inea Biodiversity Conservation Project: The Development Objective is t o strengthen the capacity of the Ministry of Env ironment, Water and Forests in biodiversity conservation and environmental management. Concept completed on 5 Oc- t ober 2018. Environmental Assessment Category B. Project: P168613. US$ 20.0 (IDA Credit). Consultants will be required. Min istry of Environment, Water and Forests. April 2019 Africa PAGE 32 Finance, Competitiveness and Innovation (R) Su pport to MSME Growth Competitiveness and Access to Finance: Support micro, small and medium enter- pr ises access to markets and access to finance in the Conakry urban area. Negotiations authorized on 23 April 2019. Envi- r onmental Assessment Category B. Project: P164283. US$ 30.0 (IDA Credit). No consultants are required. Ministry of Industry a n d SMEs. Governance Econ omic Governance Technical Assistance & Capacity Building - Additional Financing: The project develop- m ent objective (PDO) is to modernize public financial and human resource management and enhance statistical capacity in Gu inea. Approval completed on 9 June 2017. Environmental Assessment Category C. Project: P157662. US$ 15.0 (IDA Grant). Con sulting services to be determined. Ministry of Economy and Finance. Social Protection & Labor Pr oductive Inclusion and Systems Strengthening Programme (NAFA): The Project Development Objective is to (a) in crease opportunities for income, revenue and human capital development for targeted poor households; and (b) strengthen in stitutional capacity and sy stems for economic and social inclusion. Concept com pleted on 4 February 2019. Project: P1 68777. US$ 40.0 (IDA Grant). Consultants will be required. Cellule Filets Sociaux. Social, Urban, Rural and Resilience Global Practice (R) Gu inea Support to Local Governance Project: To improve local government capacity in managing their public financial resources in a transparent and participatory manner, and in mitigating local conflicts Approval completed on 22 March 2019. Environmental Assessment Category B. Project: P1 67884. US$ 40.0 (IDA Grant). Consultants will be required. Min istry of Territorial Administration and Decentralization. Guinea-Bissau Energy & Extractives Em ergency El ectricity and Water Rehabilitation Project - A dditional Financing: This Additional Financing of $2 .1m will aim to (i) cover any cost over-run on the 5 MW of thermal power plus fuel oil reservoir planned under the EEWRP w ith a budget of $6m, and/or (ii) cover any needed scale up of TA for reform/transformation of utility EAGB into a well- m anaged commercial entity, which has a budget of $1 .5m under EEWRP. Both of these components were constrained due to lim ited IDA CRW funds under emergency operation. Bids for 5 MW thermal power are expected in February 2011, by which t im e it will become clear t o what extent there is a shortage of funds for this component. Approval completed on 17 May 2011. Env ironmental Assessment Category B. Project: P1 25374. US$ 2.2 (IDA Grant). Consultants will be required. Ministry of Econ omy, Planning, and Regional Integration Tel: (245) 320-7286, E-m ail: hembalo@hotmail.com, Contact: Luis Alberto Gom es, Coordinator. Social Protection & Labor Ru ral Community-Driven Development Project Add Fin: Objective to be Determined. Approval completed on 7 Feb- r uary 2014. Environmental Assessment Category B. Project: P1 46746. US$ 15.0 (IDA Grant). Consulting services t o be deter- m ined. Project Coordination Unit Tel: 245955219738, E-mail: alfamajal@gmail.com, Contact: João S. Handem Jr., Project Coor dinator. Transport (R) Gu inea-Bissau - Rural Transport Project: The development objective is t o improve the rural population's physical a ccess to markets and social services in selected areas. Negotiations authorized on 15 April 2019. Environmental Assessment PAGE 33 Monthly Operational Sum m ary April 2019 Ca tegory B. Project: P1 61923. US$ 15.0 (IDA Credit). Consultants will be required. Project Management Unit located at Min- ist ry of Public Works. Water Em ergency Water and El ectricity Services - Additional Financing: The objective of the Project is to: (a) restore and in crease the access of the population of the Recipient's capital city of Bissau to safe water and improve the quality of water services; (b) improve the reliability of electricity supply to the population of Bissau; and (c) improve the performance of EAGB. A pproval completed on 30 May 2017. Environmental A ssessment Category B. Pr oject: P1 61630. US$ 1 8.0/7.0 (IDA Cr edit/IDA Grant). Consultants will be required. Ministry of Economic and Regional Integration; PHIMP. Kenya Digital Development (N) Kenya Digital Acceleration Program: PROJECT DEVELOPMENT OBJECTIVE: the Project Development Objectives a r e to expand access to high speed internet, improve the efficiency of government services, and strengthen the enabling envi- r onment for digital technology adoption. PROJECT DISCRIPTION T h e proposed project a ims at accelerating the increase in access to, and use of, digital t echnologies in Kenya. This proposed pr oject builds on the earlier Kenya Transparency and Communications In frastructure Project (KTCIP) through components t hat address: (i) Digital Ecosystem: strengthening the laws, policies, regulations, and institutional and human capacity needed t o promote ICT infrastructure investment, to enable eCommerce and data-driven development, enhance market competitive- n ess, digital engagement, job creation, and innovation; (ii) Digital Connectivity: ensuring universal access to affordable, h igh qu ality internet services for all citizens, firms and government institutions, in line with Digital Africa Moonshot targets; (iii) Dig ital Platforms and Services: building the technical capacity, institutions, and digital infrastructure for the Government to deliver services to citizens and firms, and to conduct its own business digitally, with a particular focus on citizen-facing line m inistries, such as Education and Health; and (iv) Project management, including Institutional strengthening and capacity bu ilding. Of the five pillars of the Digital Economy framework, it is proposed to focus in particular on infrastructure, platforms a n d skills. The project design will be adjusted during project identification to be in line with the recommendations of the br oadband strategy and forthcoming digital economy strategy. Identification completed on 24 April 2019. US$ 200.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Kenya Digital Transport Solutions Project: The project's development objective is to enhance the delivery of services a n d information available t o Kenyans in the transport sector through digital solutions. Concept completed on 26 September 2 018. Environmental Assessment Category B. Project: P1 64086. US$200.0 (IBRD). Consultants will be required. Kenya ICT A uthority; National Transport Safety Authority (NTSA); State Department for Transport (MoTIHUD); State Department for In frastructure. Education Kenya GPE Primary Education Development Project Additional Financing: The project development objectives a r e to improve early grade mathematics competency and t o strengthen management sy stems at school and national levels. Identification completed on 29 January 2019. Environmental Assessment Category B. US$ 9.7 (EFAF). Consultants will be r equired. Ministry of Education. April 2019 Africa PAGE 34 Energy & Extractives Kenya Electricity System Improvement Project: To increase the access, capacity and reliability of the transmission and distribution sy stem in Kenya. Concept com pleted on 26 February 2018. Environmental Assessment Category A. Project: P1 66646. US$ 370.0 (IDA Credit). Consultants will be required. The Kenya Power and Lighting Company Limited (KPLC); Kenya Electricity Transmission Company Limited (KETRACO); Ministry of Energy (MOE). A dditional Financing: Kenya Electricity Expansion Project: The project has two development objectives: (a ) increase the capacity, efficiency, and quality of electricity supply; and (b) expand access to electricity in urban, peri-urban, and rural areas Approval completed on 15 June 2016. Environmental A ssessment Category A. Project: P1 53179. US$ 68.0/3.0 (IDA Credit/GPBA). Consultants will be required. Im plementing a g ency(ies) to be determined. Ken Gen Guarantee Program: The proposed project development objective is to enhance KenGen's ability to attract long- t erm private capital for the sustainable development of renewable energy. Approval completed on 26 April 2018. Environ- m ental Assessment Category C. Project: P1 62422. US$ 180.0 (GUID). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Environment & Natural Resources Kenya Marine Fisheries and Socio-Economic Development Project (KEMFSED): The Project Development Ob- jective is to improve management and increase value-addition of priority fisheries and aquaculture, and to strengthen access t o livelihoods for coastal communities in Kenya. Concept completed on 16 October 2017. Environmental Assessment Category B. Pr oject: P1 63980. US$ 1 00.0 (IDA Credit). Consultants will be r equired. Ministry of Agriculture, Livestock, Fisheries and Ir r igation. Finance, Competitiveness and Innovation (R) Kenya Affordable Housing Finance Project: The development objective is to expand access to affordable housing finance t o targeted beneficiaries Negotiations authorized on 7 March 2019. Environmental Assessment Category F. Project: P1 65034. US$250.0 (IBRD). Consulting services to be determined. Kenya Mortgage Refinance Company; Kenya National T r easury and Planning; Kenya Ministry of Lands and Physical Planning. Lon g-term Finance for PPP/ Nairobi-Nakuru Toll Road Guarantee: Crowd in long term local currency financing in to PPP Infrastructure projects Concept completed on 8 February 2018. Project: P1 65545. US$ 80.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Kenya Infrastructure Finance Public Private Partnership Additional Financing Project: The ov erall objective of t h is project is to increase private investment in the Kenya infrastructure market across sectors and to sustain this participation ov er a n extended period of t im e. Approval com pleted on 5 July 2017. Environmental A ssessment Category A. Project: P1 62182. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Finance. Social Protection & Labor A dditional Financing for Cash Transfers for Or phans and Vulnerable Children: T o increase social safety net ac- cess for extremely poor OVC households and to build the capacity of the g overnment to more effectively deliver the National Sa fety Net Program. Approval completed on 31 October 2013. Environmental Assessment Category C. Project: P1 46161. US$ 1 0.0/5 6.4 (IDA Credit/DFID). Consultants will be required. Ministry of Labor, Social Security and Services Tel: NA, E-m ail: m wasiajiwf@yahoo.com, Contact: Winnie Mwasiaji, Social Protection Secretariat Coordinator. Social, Urban, Rural and Resilience Global Practice Kenya Informal Settlements Improvement Project 2: To improve access to basic services and enhance tenure security in urban informal settlements in Kenya Concept completed on 7 December 2018. Environmental Assessment Category B. PAGE 35 Monthly Operational Sum m ary April 2019 Pr oject: P167814. US$150.0 (IDA Credit). No consultants are required. State Department of Housing and Urban Development. Kenya Informal Settlements Improvement Projects - A dditional financing: To improve living conditions in infor- m al settlements in selected urban centers in selected counties in Kenya. Approval completed on 8 June 2015. Environmental A ssessment Category B. Project: P1 44966. US$ 8.3 (SPTF). Consulting services to be determined. Im plementing agency(ies) t o be determined. Transport Kenya Transparency and Infrastructure Project Additional Financing 2: The RCIP Program, the CIP 1,2,3 Projects a n d following CIP Projects have two ov erarching development objectives (i) to contribute t o lower prices for international ca pacity and extend the geographic reach of broadband networks (the "connectivity development objective") and (ii) contrib- u t e to improved Government efficiency and transparency through egovernment applications (the "transparency development objective"). Approval completed on 26 March 2014. Environmental Assessment Category B. Project: P1 49019. US$ 30.0 (IDA Cr edit). Consulting services t o be determined. ICT Authority T el: (254-20) 208-9061, E-m ail: vkyalo@ict.go.ke, Contact: Mr. V ictor Kyalo, vkyalo@ict.go.ke. Northeastern Transport Improvement Project: The proposed project development objectives are to improve the move- m ent of goods and people along Isiolo-Wajir-Mandera part of the Mom basa-Garissa- Wajir- Mandera- Mogadishu road corri- dor and t o enhance connectivity between Kenya and Som alia and Ethiopia. Concept completed on 1 9 October 2016. Envi- r onmental Assessment Category B. Project: P161305. US$ 500.0 (IDA Credit). Consulting services to be determined. Kenya Na tional Highways Authority (KeNHA); Ministry of Transport, Infrastructure, Housing and Urban Development; ICT Author- ity . Ma ss Rapid Transit Development Project: To improve transport mobility, accessibility, and safety along selected section of t h e Northern Corridor r oad (A104) in the Nairobi metropolitan area (NMA) and to enhance urban transport planning ca- pa city in the NMA and selected secondary cities in Kenya. Concept com pleted on 5 December 2017. Environmental A ssess- m ent Category A. Project: P159891. US$250.0 (IBRD). Consultants will be required. Minis try of Transport, Infrastructure, Housing and Urban Development; Kenya Railways Corporation (KRC); Kenya National Highways Authority (KeNHA); Nai- r obi Metropolitan Area Transport Authority (NAMATA). Water A ddl Financing - Kenya Water Security and Climate Resilience Project: The PDOs of KWSCRP-1 are to (a) increase a v ailability and productivity of irrigation water for project beneficiaries and (b) enhance the institutional framework and st r engthen capacity for water security and climate resilience in certain areas of the country. W ithin the PDO, ‘capacity for water security and climate resiliency’ primarily includes improved water services, flood protec- t ion, and analytical capacity to understand and manage hydrological variability. Approval completed on 26 June 2015. Envi- r onmental Assessment Category A. Project: P151660. US$ 58.0/3.5 (IDA Credit/KWBP). Consultants will be required. Im ple- m enting agency(ies) to be determined. Lesotho Agriculture (R) Sm allholder Agriculture Development Project - II: T he development objective of the project is to support in- cr eased a doption of climate sm art agricultural technologies in Lesotho's agriculture, enhanced commercialization and im- pr oved dietary diversity among targeted beneficiaries. Negotiations authorized on 11 April 2019. Environmental Assessment Ca tegory B. Project: P1 65228. US$ 50.0/2.0 (IDA Credit/PHRD). No consultants are required. Ministry of Agriculture and Food Security (MAFS). Lesotho Smallholder Agriculture Development Project Additional Financing: Increase in marketed output among pr oject beneficiaries in Lesotho’s sm allholder agriculture sector and, to improve the Recipients capacity to respond promptly a n d effectively to an Eligible Crisis or Em ergency. Approval completed on 29 September 2017. Environmental Assessment April 2019 Africa PAGE 36 Ca tegory B. Project: P1 62397. US$ 1 0.0 (IDA Credit). No consultants are required. Im plementing agency(ies) to be deter- m ined. Energy & Extractives (R) Lesotho Renewable Energy & Energy Access Project: The Project Development Objective is to scale up renewable en ergy-based off-grid electrification in rural and peri-urban areas of Lesotho. Concept completed on 25 March 2019. Envi- r onmental Assessment Category B. Project: P1 66936. US$ 40.0/12.9 (IDA Credit/CIF). Consulting services to be determined. Min istry of Energy, Mining and Water Affairs. Health, Nutrition & Population Lesotho Nutrition and Health System Strengthening Project: To increase utilization of nutrition services and quality of h ealth service delivery to improve selected health and nutrition outcomes in targeted areas. Identification completed on 17 January 2019. US$ 60.0 (IDA Credit). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Other Secon d Private Sector Competitiveness & Economic Diversification - AF: To improv e the business environment for firms, strengthen select government institutions, and further diversify the economy. Approval com pleted on 24 March 2017. Env ironmental Assessment Category B. Project: P160964. US$ 13.4 (IDA Credit). Consultants will be required. Ministry of Finance. Social Protection & Labor Lesotho Livelihoods Project: The objective of the project is to promote income generating opportunities for disadvantaged y outh in Lesotho. Concept completed on 1 March 2018. Environmental Assessment Category B. Project: P1 64981. US$ 31.5 (IDA Credit). Consultants will be required. Ministry of Social Development. A dditional Financing to Social Assistance project - CRW funds: The objective of the Project is to support the GoL in im proving the efficiency, equity and shock responsive function of selected Social Assistance programs and, in the ev ent of an Elig ible Crisis or Em ergency, to provide immediate and effective response to said Eligible Crisis or Emergency. A pproval com- pleted on 6 December 2016. Environmental Assessment Category C. Project: P160934. Consultants will be required. Ministry of Social Development; Ministry of Finance; Ministry of Finance. Water Lesotho WSIP2 AF LHWP Ph2 Hydropower: T o support the Kingdom of Lesotho in: (i) developing and sustaining an env ironmentally sound, socially responsible, and financially viable framework for the MDWSP, (ii) increasing the quantity of sa fe, bulk water supplied to Teyateyaneng, (iii) strengthening institutions and related instruments in the water sector; and (iv) a dv ancing strategic infrastructure investments. Approval completed on 20 June 2014. Environmental Assessment Category A . US$ 9.1/6.4 (IDA Credit/IDA Grant). Consultants will be required. Lesotho Highlands Development Authority Tel: (266- 2 2) 311-281, E-m ail: lhwp@lhda.org.ls, Contact: .. (R) Lesotho Lowlands Water Development Project - Phase II: The Proposed Dev elopment Objectives are to: (a) in- cr ease water availability and access to improved water supply services in two priority zones; and (b) improve technical and financial performance of WASCO. Negotiations authorized on 24 March 2019. Environmental Assessment Category A. Pro- ject: P1 60672. US$ 78.0 (IDA Credit). Consultants will be required. Lowlands Unit. PAGE 37 Monthly Operational Sum m ary April 2019 Liberia Education (R) Im proving Results in Secondary Education (IRISE): Im prove access and quality of secondary education in math, science, and vocational skills Concept completed on 29 April 2019. Environmental Assessment Category B. Project: P164932. US$ 50.0 (IDA Grant). Con- su lting services to be determined. Liberia Ministry of Education. (N) Liberia GPE Getting to Best Additional Financing: The Project Development Objectives (PDOs) are to : (a) improve equ itable a ccess to early childhood education, t eacher quality in early childhood education (ECE), and primary education in t argeted disadvantaged counties, and (b) strengthen National School Accountability Systems. Identification completed on 3 A pril 2019. Environmental Assessment Category C. US$ 5.9 (EFAF). Consultants will be required. Im plementing agency(ies) t o be determined. Health, Nutrition & Population In stitutional Foundations to Improve Services For Health: Strengthening institutional management for enhanced h ealth services to women, children and adolescents in Liberia. Identification completed on 6 November 2018. US$ 40.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) t o be determined. Liberia Health Systems Strengthening Project - Additional Financing: The new proposed PDO is to improve the qu ality of primary and secondary health care services, with a focus on maternal, neonatal and child health. Approval completed on 23 February 2017. Environmental Assessment Category B. Project: P162477. US$ 16.0 (GFF). Consultants will be required. Im plementing agency(ies) to be determined. Social Protection & Labor (R) Liberia Youth Opportunities Project Additional Financing:

The Project Dev elopment Objectives are to im- pr ove access t o income generation opportunities for targeted youth and strengthen the government's capacity to imple- m ent its cash transfer program.

Approval completed on 28 March 2019. Environmental Assessment Category B. Project: P1 69722. US$ 3.5 (MSC1). Consult- a nts will be required. Ministry of Youth and Sports. Social, Urban, Rural and Resilience Global Practice Mon rovia Integrated Development Project: (i) support off-network sustainable solutions for physical, economic and social infrastructure services in select unserved locations in Monrovia city; and (ii) enhance job creation through support for en trepreneurs in Monrovia Identification completed on 7 November 2018. US$ 40.0 (IDA Grant). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Transport Sou theastern Corridor Road Asset Management Project: The project aims to support the Recipient’s efforts to en- h ance road connectivity for residents living along selected sections of the Ganta -to-Zwedru Road Corridor, and to improve in stitutional capacity to manage the road sector. Approval completed on 18 December 2018. Environmental Assessment Cat- eg ory B. Project: P1 49279. US$ 29.0/2.0/48.0/24.0 (IDA Credit/GIF/GUID/LRTF). Consultants will be required. Infrastruc- t ure Im plementation Unit. Secon d Additional Financing to Liberia Road Asset Management Project: The objective of the project is to support t h e Recipient's efforts t o reduce transport costs along the road corridor from Monrovia to the Guinea border and to maintain t h e road in good condition ov er a 1 0-y ear period. Approval completed on 8 May 2017. Environmental Assessment Category April 2019 Africa PAGE 38 B. Pr oject: P161939. US$ 28.0 (IDA Credit). Consultants will be required. Ministry Of Finance; Infrastructure Implementation Un it. Liberia South Eastern Corridor Road Asset Management Guarantee Project: The Project Development Objectives (PDOs) are t o support the Recipient's effort to reduce motorized vehicles' travel t ime a long the selected sections of South Ea st ern Ganta-Zwedru-Harper corridor and to improve institutional arrangements and capacity in the road sector. Approval com pleted on 1 8 December 2018. US$ 48.0 (GUID). Consulting services t o be determined. Im plementing agency(ies) to be det ermined. Water Liberia Urban Water Supply Project Additional Financing:

The project development objective (PDO) is to in- cr ease a ccess t o piped water supply services in t he project a rea in Monrovia and im prove the operational efficiency of LW SC.

Negotiations authorized on 29 Ja nuary 2019. Environmental Assessment Category B. Project: P1 69031. US$ 30.0 (IDA Credit). Consultants will be required. Liberia Water and Sewer Corporation. Madagascar Agriculture (R) Ma dagascar Agriculture Rural Growth and Land Management - A dditional Financing: The proposed devel- opm ent objective is to improve rural land tenure security and access to markets of targeted farming households in selected a gricultural value chains in the Project Areas, and t o provide immediate and effective response t o an Eligible Crisis or Em er- g ency. Approval completed on 1 March 2019. Environmental Assessment Category B. Project: P1 66133. US$ 5 2.0 (IDA Grant). Con sultants will be required. MINISTERE DE L’AGRICULTURE. Energy & Extractives Ma dagascar Electricity Sector Operations and Governance Improvement Project - AF to ESOGIP:

The Pro- ject Development Objective is to improve the operational performance of the national electricity utility (JIRAMA) and improve t h e reliability of electricity supply in the project area and, in the event of an eligible crisis or emergency, to provide immediate a n d effective response to said eligible crisis or emergency. A pproval completed on 1 4 June 2018. Environmental Assessment Category B. Project: P1 64318. US$ 40.0 (IDA Credit). Con sulting services to be determined. JIRAMA; Ministry of Water Energy and Hydrocarbons. (R) Ma dagascar - Least-Cost Electricity Access Development Project - LEAD: The Project Development Objective is t o increase access to electricity services for households, enterprises, and health facilities in Madagascar. Approval completed on 1 March 2019. Environmental Assessment Category B. Project: P1 63870. US$ 150.0 (IDA Credit). Consultants will be r equired. JIRAMA; Ministère de l'Eau, de l'Energie et des Hydrocarbures. MG - Sca ling Solar Guarantee Project: The project development objective is t o increase solar electricity generation ca- pa city and diversify electricity g eneration resources in Madagascar. Identification completed on 27 February 2018. US$ 2.0 (GUID). Consulting services to be determined. Im plementing agency(ies) t o be determined. Governance (R) MG-Digital Governance and Identification Management System Project - PRODIGY: The Project Develop- m ent Objective t o increase inclusive access to legal identity and t o im prove service delivery in selected sectors. Concept com- pleted on 22 March 2019. Project: P169413. US$ 150.0 (IDA Credit). Consulting services to be determined. Programme de Réforme pour l'Efficacité de l'A dministration. PAGE 39 Monthly Operational Sum m ary April 2019 Health, Nutrition & Population A F-Emergency Su pport Critical Education Health and Nutrition Services: The Project Development Objective (PDO) is to preserve critical education, health and nutrition service delivery in targeted vulnerable areas in the recipient’ s t erritory. A pproval completed on 27 February 2014. Environmental Assessment Category B. Project: P1 48749. US$ 9.8/0.2 (IDA Credit/IDA Grant). Consultants will be required. PNNC, Contact: .. Social Protection & Labor A F Social Safety Net Drought Response: The project development objective (PDO) is to support the government in in creasing the access of extremely poor households to safety net services and in laying the foundations for a social protection sy stem. A pproval completed on 10 Nov ember 2016. Environmental Assessment Category B. Project: P1 60554. US$ 15.0 (IDA Grant). Con sultants will be required. Im plementing agency(ies) to be determined. (R) Ma dagascar Social Safety Net Project Additional Financing: The project development objective (PDO) is to su pport the government in increasing the access of extremely poor households to safety net services and in laying the founda- t ions for a social protection system. Approval completed on 1 March 2019. Environmental Assessment Category B. Project: P1 67881. US$ 90.0 (IDA Credit). Con sultants will be required. ONN/PNNC-SEECALINE; Ministry of Population, Social Protection and Promotion of Women; FID. Social, Urban, Rural and Resilience Global Practice (N) Su pport for resilient livelihoods in the South of Madagascar: The proposed project aims to support community- led approaches for local development by improving basic infrastructure services and livelihood opportunities in rural areas in t h e south of Madagascar. The project will have a primary focus on youth and women inclusion for improved economic oppor- t unities, with a longer-term vision of supporting local government in fostering meaningful and sustained citizen engagement in the south. Identification completed on 25 April 2019. US$ 60.0 (IDA Credit). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Transport Ma dagascar Connectivity for Rural Livelihood Improvement: The Project Dev elopment Objective is to enhance t ransport connectivity in selected areas in support of economic growth and livelihood of communities and to provide immedi- a t e response to an eligible crisis or emergency as needed. The Program objective of the Series of Projects (SOP) is the same as t h e PDO of this Project. Concept completed on 27 November 2018. Environmental Assessment Category A. Project: P1 66526. US$ 1 40.0 (IDA Credit). Consultants will be required. Autorité Routière de Madagascar; Ministère des Transports et de la Mét éorologie; Ministère des Travaux Publics. Malawi Education (R) Equ ity with Quality and Learning at Secondary (EQUALS): The Project Development Objective (PDO) is to im- pr ove quality of science and mathematics instruction in Community Day Secondary Schools (CDSSs) and increase access to secondary education in selected remote areas. Approval completed on 13 March 2019. Environmental Assessment Category B. Pr oject: P1 64223. US$ 90.0 (IDA Credit). Consultants will be required. Ministry of Education, Science and Technology. Energy & Extractives Mpatamanga Hydropower Project: The objective is to increase hydropower generation capacity through a public private April 2019 Africa PAGE 40 pa rtnership in Malawi. Concept completed on 8 June 2018. Environmental Assessment Category A. Project: P165704. US$ 2 00.0/1 50.0 (IDA Credit/GUID). Consultants will be required. Ministry of Natural Resources Energy & Mining. (R) Ma lawi - Electricity Access Project: The development objective of the project is to increase access to electricity in Ma lawi. Appraisal completed on 24 April 2019. Environmental Assessment Category B. Project: P164331. US$ 150.0 (IDA Cr edit). Consultants will be required. Ministry of Natural Resources Energy & Mining; Electricity Supply Corporation of Ma- lawi, Ltd.. Finance, Competitiveness and Innovation Financial Inclusion and Entrepreneurship Scaling Project: The Project Development Objective is to enhance private en terprise growth and job creation in Malawi by increasing MSME’s access to financial services and improving their capabili- t ies. Identification completed on 20 September 2018. US$ 60.0 (IDA Credit). Consulting services t o be determined. Im ple- m enting agency(ies) to be determined. Governance Ma lawi Governance to Enable Service Delivery Project: To improve institutional capacity and performance of central g ov ernment and (select) district and municipal councils to deliver basic services. Concept completed on 15 August 2018. En- v ironmental Assessment Category B. Project: P164961. US$ 50.0 (IDA Credit). Consulting services to be determined. Ministry of Finance; Ministry of Local Government and Rural Development. Health, Nutrition & Population A dditional Financing to Nutrition and HIV/AIDS Project: To increase coverage of selected nutrition, HIV and AIDS services and strengthen disease outbreak preparedness in project areas. Approval completed on 23 June 2016. Environmental A ssessment Category B. Project: P1 56129. US$ 22.6 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. Social Protection & Labor A dditional Financing Strengthening Safety Nets Systems Proj. (MASAFIV): The Project Development Objective of t h e proposed project is to strengthen Malawi’s social safety net delivery systems and coordination across programs. Approval com pleted on 26 Ma rch 2015. Environmental A ssessment Category B. Project: P1 48617. US$ 6.8/68.2 (IDA Credit/IDA Grant). Consulting services t o be determined. National Local Government Finance Committee. Ma lawi Platform for National Social Support Project: T o im prove resilience among the poor and vulnerable popula- t ion and strengthen the national platform for safety nets. Concept completed on 21 December 2018. Project: P169198. US$ 7 5 .0 (IDA Credit). Consultants will be required. Malawi National Local Government Finance Committee. Secon d AF for Strengthening Safety Nets Systems Project MASAF IV: The Project Development Objective is to im- pr ove resilience among poor households and to strengthen Malawi’s social safety net delivery sy stems and coordination across pr ograms. Approval completed on 8 November 2016. Environmental Assessment Category B. Project: P160519. US$ 22.3/47.7 (IDA Credit/IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Transport In clusive Access for Rural Transformation: The proposed Project Development Objective (PDO) is to improve rural a ccessibility and increase economic and social connectivity in selected districts, and to strengthen capacity for sustainable r ural road management. Identification completed on 12 November 2018. US$ 50.0 (IDA Credit). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Water Ma lawi Resilient Productive Landscapes Project: Increase adoption of resilience-enhancing landscape management pr actices in targeted watersheds and strengthen capacity for improved water resources management Concept completed on PAGE 41 Monthly Operational Sum m ary April 2019 1 6 January 2019. Project: P167860. US$ 120.0/5 .0 (IDA Credit/GEFU). Consulting services to be determined. Ministry of A griculture, Irrigation and Water Development. Lil ongwe Bulk Water Supply Guarantee: To increase access to improved water services and safely managed sanitation services in Lilongwe City Concept completed on 22 October 2018. Environmental Assessment Category B. Project: P1 67859. US$ 8.4 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Mali Education (R) Ma li Education Quality for Improved Learning Project: The project development objective is to increase equitable a ccess to the second cycle of basic education in underserved regions, to improve teaching and learning conditions in basic education, and to enhance the resilience of the education system, with a focus on girls Concept completed on 28 February 2019. Project: P1 68786. US$ 45.7 (MSC1). Consulting services to be determined. Kinane AG Gadeda. Ma l i Improving Education Quality and Results for All Project (IQRA): The Project Development Objective is to im prove the access t o secondary education, put in place sy stems which govern its quality, and enhance the capacity of the Min istry of Education for better education service delivery. Concept completed on 3 May 2018. Environmental Assessment Ca tegory B. Project: P164032. US$ 30.0/50.0/45.7 (IDA Credit/IDA Grant/MSC1). Consulting services to be determined. Kinane AG Gadeda. Energy & Extractives Ba n da Gas to Power Guarantee: The Gas To Power Project will use natural gas discovered offshore of Mauritania for a pow er station to be built near Nouakchott. The power will be sold to SOMELEC in Mauritania, SENELEC in Senegal and EDM in Mali using the existing OMVS regional grid. A PRG is required t o guarantee gas payments t o the producer Tullow Oil esti- m ated at $1 04m. Government of Mali needs to provide a counter-guarantee to cover the proportion of the energy that will be ex ported to EDM estimated at $17m (equivalent t o IDA allocation of $4.25m given 1:4 leverage for IDA PRGs). Approval com pleted on 29 May 2014. Environmental Assessment Category A. Project: P1 45664. US$ 32.0 (GUID). Consulting services t o be determined. Im plementing agency(ies) to be determined. FCS RE Segou Solaire Mali Project: The Project Development Objective is to prom ote the introduction of grid-connect ed r enewable energy in Mali through an IPP Approval completed on 8 June 2017. US$ 8.2/6.2 (AFDB/GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Ma l i Electricity Sector Improv ement Project (MESIP): The Program Development Objective (PDO) is to improve EDM-S.A. operational performances; expand electricity access in selected areas; Concept completed on 4 April 2018. Envi- r onmental Assessment Category B. Project: P1 66796. US$ 150.0 (IDA Credit). Consultants will be required. Energie du Mali - S.A. (N) A dditional Financing to the Mali Rural Electrification Hybrid Systems Project: The objective of the Project is t o ex pand access t o electricity in rural areas of the Recipient and to increase renewable energy generation in target areas. Identification completed on 2 April 2019. Environmental Assessment Category B. US$ 20.0/2.7 (IDA Credit/PHRD). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Ma l i Rural Electrification Hybrid System Project - GPOBA: The Mali Rural Electrification Hybrid System Project (US$25 million – IDA ; US$ 15.5 million - Climate Investment Funds) prepared under the Scaling Up Renewable Energy Pro- g ram in Low Income Countries (SREP) aims i) to increase the share of renewable energy generation in rural electricity supply a n d ii) to contribute to increased access to modern energy services in rural areas. The proposed GPOBA com ponent (US$ 5 m illion) will support the objectives of the Program by partially subsidizing the investment cost of mini -grids’ densification/ex- t ension, SHSs and internal wiring t o make access to clean energy affordable to low income households in rural, isolated areas. Pr om oting OBA approaches in the rural electrification program is important for unlocking additional US$1.6 million of private sou rces of funding for rural energy development, maximizing the benefits of renewable energy generation (hybridization of m ini-grids with solar energy under IDA project) through increased access, enhancing the performance of private operators April 2019 Africa PAGE 42 w hile making off-grid connections affordable to the poor. The grant will be managed by AMADER and implemented by se- lected private operators. Approval completed on 11 December 2013. Environmental Assessment Category B. US$ 5.0 (GPBA). Con sulting services to be determined. Im plementing agency(ies) to be determined. Ma l i Governance of Mining Sector: Strengthen the capacity of the mining sector to contribute to sustainable, inclusive a n d shared growth, through improved sector management and governance. Concept completed on 12 January 2018. Environ- m ental Assessment Category B. Project: P1 64242. US$ 40.0 (IDA Credit). Consultants will be required. Ministere des Mines. Finance, Competitiveness and Innovation Ma l i A ccess t o Finance Pr oject: T o enhance a ccess t o finance for individuals and MSMEs including start-ups and st r engthen the enabling environment for firms in Mali Identification completed on 25 October 2018. US$ 30.0 (IDA Credit). Con sulting services to be determined. Im plementing agency(ies) to be determined. Governance (R) Ma l i Deployment of State Resources for Better Service Delivery: The project will improve the availability and t im eliness of resources from the central government to Local Governments (LGs), and service centers, as well as the manage- m ent and accountability of these resources by LGs and service centers. Negotiations authorized on 9 April 2019. Environ- m ental Assessment Category C. Project: P1 64561. US$ 50.0 (IDA Grant). N o consultants are required. Ministry of Finance. Health, Nutrition & Population (R) Ma li - Accelerating Progress Towards Universal Health Coverage: The objective of the project is to improve the u t ilization and quality of r eproductive, m aternal, neonatal, child, adolescent health and nutrition services, especially among t h e poorest households, in targeted areas. Approval completed on 19 March 2019. Environmental Assessment Category B. Pr oject: P165534. US$ 50.0/1 0.0/29.4 (IDA Grant/GFF/NEDA). No consultants are required. Ministère de la Santé. Social Protection & Labor Ma l i Youth Employment and Productive Inclusion Project: The objective of the project is to provide young wom en a n d men with access to income-generating opportunities in selected poor and conflict-affected areas in Mali. Identification com pleted on 8 November 2018. US$ 30.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice A dditional Financing - Mali Reconstruction and Economic Recovery Project: The objective of the proposed project is t o rehabilitate basic infrastructure and restore productive activities of communities impacted by the crisis in Mali. Appr oval com pleted on 30 October 2018. Environmental Assessment Category B. Project: P167396. US$ 30.0/2.2 (IDA Grant/GFRC). Con sultants will be required. Project Coordination Unit. Mauritania Agriculture (R) In tegrated Agriculture and Livestock in Rainfed Areas: The PDO is to “Improve agricult ure and livestock produc- t iv ity and strengthen resilience of beneficiary rural households in the targeted rainfed areas". T h e proposed PDO indicators of the project are: (i) yields per hectare in crop production, (ii) production of livestock products (m ilk and meat), (iii) total hectares under improved technologies disseminated by the project (including the percentage under climate sm art t echnologies, (iv) number of beneficiary households of the project; (v) satisfaction of beneficiaries with the ser- v ices, works and inputs provided by the project. Concept completed on 3 March 2019. Project: P168847. US$ 40.0 (IDA PAGE 43 Monthly Operational Sum m ary April 2019 Credit). Consulting services to be determined. Ministere du Development Rural. Education Ma uritania Education Sector Support Project: To improve quality of teaching and education services in selected re- g ions. Quality of teaching is expected to be improved through the availability of: (i) better qualified, m otivated and m anaged teachers; a n d (ii) revised curriculum and t eaching practices t o a dapt instruction t o students’ needs. This objective will have an impact on the whole Mauritanian education sy stem, irrespective of the location. Edu cation services will be improved in selected two regions, through a more efficient division of respon sibilities between the v arious institutional players at central and decentralized levels; and empowerment of stakeholders at the school level: Schools h eadmasters, teachers, parents and communities. Concept completed on 26 September 2018. Environmental Assessment Category B. Project: P163143. US$ 40.0/11.8 (IDA Grant/EFAF). Consultants will be required. Ministry of National Education. Energy & Extractives Ma uritania Electricity Access Project: The Project Development Objective is to increase grid electricity access in the Republic of Mauritania Identification completed on 9 January 2019. US$ 30.0 (IDA Credit). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. MR-Ba nda Gas to Power Guarantee: The gas to power project will use natural gas discovered offshore for a power station t o be built near Nouackchott. The power will be sold t o SOMELEC in Mauritania, Senelec in Senegal and EDM in Mali using t h e existing OMVS r egional grid Approval com pleted on 29 May 2014. Environment al A ssessment Category A. Project: P1 07940. US$ 130.0 (GUID). Consultants will be required. Ministry of Energy Tel: (222-46) 431-5 37, E-mail: kane@acces.mr, kane@hydraulique.gov.mr, Contact: Mamadou Amadou Kane, Directeur General de l'Electricite. Finance, Competitiveness and Innovation (R) Nouadhibou Eco-Seafood Cluster Project AF: The objective of the proposed project t o support the development of a seafood cluster that promotes the sustainable management of fisheries and creates value for communities in Nouadhibou a n d to improve the business environment to boost private sector development in Mauritania Negotiations authorized on 29 March 2019. Environmental Assessment Category B. Project: P163645. US$ 8.0 (IDA Grant). Consultants will be required. Nouadhibou Free Zone Authority; NESC - Project Coordination Unit. Governance Ma uritania Public Sector Governance Project Additional Financing: The revised Project Development Objective (PDO) is t o enhance transparency and improve the mobilization, allocation and management of public resources Approval com pleted on 12 July 2018. Environmental Assessment Category C. Project: P165501. US$ 14.5 (IDA Credit). Consultants will be r equired. Ministry of Economy and Finance. Social Protection & Labor Ma uritania Refugees and Host Communities Support Project: The proposed development objective is to balance the su pport provided to vulnerable refugees and host communities by supporting the Mauritanian Government's ability to provide a ccess t o social services, basic infrastructure and economic opportunities. Identification completed on 9 October 2018. US$ 3 0.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. (R) Ma uritania Youth Employability Project: The Project Development Objective is to promote the employability of v ulnerable youth in selected areas. Concept completed on 17 April 2019. Project: P162916. US$ 30.0 (IDA Grant). Consultants w ill be required. Ministry of em ployment, vocational training and information and communication technologies. April 2019 Africa PAGE 44 (R) Ma uritania Social Safety Net System Additional Financing: The Project Development Objectives are to support t h e establishment of key building blocks of the national social safety net sy stem and to improve access to targeted cash trans- fer s for poor and v ulnerable households Negotiations authorized on 7 March 2019. Environmental Assessment Category C. Pr oject: P168232. US$ 2.3 (ASPP). No consultants are required. AGENCE TADAMOUN. Social, Urban, Rural and Resilience Global Practice (R) Pr oductive & Resilient Intermediate Cities: The development objectives of this operation are: (i) to improve access t o services for the population and the private sector in selected areas; and (ii) to improve the capacity of local government in t h e areas of planning and municipal management. Concept completed on 4 April 2019. Project: P1 69332. US$ 50.0 (IDA Grant). Consultants will be required. Cellule du PNIDDLE. Water (R) Ma uritania Water and Sanitation Sectoral Project: Increasing access t o water and sanitation services in selected r ural areas and sm all t owns, as well a s build the institutional capacities of Mauritania’s water and sanitation sector Concept completed on 27 March 2019. Project: P167328. US$ 40.0 (IDA Grant). No consultants are required. Ministere de l'Hy- dr aulique et de l'A ssainissement. Mozambique Agriculture A dditional Financing t o the A griculture and Natural Resources Landscapes Management Pr oject (SUS- T ENTA): The project development objective is t o integrate rural households into sustainable agriculture and forest -based v alue chains in the Project area and, in the event of an Eligible Crisis or Em ergency, to provide immediate and effective re- spon se t o said Eligible Crisis or Emergency. Identification completed on 11 September 2018. Environmental Assessment Cat- eg ory B. US$ 40.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Education A dditional Financing for the Education Sector Support Project: The original PDO is to improve access to and, quality a n d equity of education. No changes to the PDO are proposed in the restructuring. Approval completed on 2 June 2017. Env ironmental Assessment Category B. Project: P160959. US$ 59.0 (IDA Credit). Consultants will be required. Im plementing a g ency(ies) to be determined. MZ- A F to Education Sector Support Project: The objective is to assist the Government to: (a) pilot various types of community-based ECD interventions; (b) include provision of nutrition services for pregnant mothers and young children; a n d (c) create an ECD unit within the Ministry of Education. Approval completed on 1 May 2012. Environmental Assessment Ca tegory B. Project: P124729. US$ 40.0 (IDA Credit). Consulting services to be determined. Government of Mozambique Tel: (25 8-21) 480-700, Contact: HE Said Baragoita, Minister. A dditional Financing for Mozambique Higher Education Science and Technology Project: The objectives of the Pr oject are t o: (a) increase the number and raise the quality of g raduates at the undergraduate and graduate levels; (b) st r engthen the national research capacities t o produce research outputs of relevance to the Recipient’s strategic economic sectors; and (c) strengthen the institutional framework for TVET. Approval completed on 28 April 2015. Environmental As- sessm ent Category B. Project: P1 46602. US$ 45.0 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be det ermined. (R) Im provement of Skills Development in Mozambique: Im prove the governance and the quality of training in pri- or ity areas of the higher education and TVET sectors. Concept completed on 18 March 2019. Environmental Assessment Ca tegory B. Project: P167054. US$ 84.0 (IDA Credit). Consultants will be required. Ministry of Science and Technology Higher a n d Technical and Professional Education (MCTESTP); National Authority for Professional Education (ANEP). PAGE 45 Monthly Operational Sum m ary April 2019 Energy & Extractives Min ing a nd Ga s T echnical A ssistance A dditional Financing: T he proposed pr oject development objective is to st r engthen the capacity and governance systems of key institutions to manage the mining and hydrocarbon sectors in Mozam- bique. Approval completed on 1 November 2017. Environmental Assessment Category B. Project: P1 61683. US$ 28.0/1 .0 (IDA Grant/FSCO). Consultants will be required. Im plementing agency(ies) to be determined. (R) Mozambique Energy For All (ProEnergia): The Project Development Objective is to increase access to electricity service in Mozambique. Approval completed on 28 March 2019. Environmental Assessment Category B. Project: P165453. US$ 82.0 /66.0 ( IDA Grant/MSC1). Consulting services t o be determined. Fundo de En ergia (FUNAE); Electricidade de Mozam bique (EdM). Governance (N) MZ Public Revenue, Expenditure, and Fiscal Decentralization Enhancement and Reform project RE: The pr oposed project development objective (PDO) is t o enhance public financial management by strengthening (a) revenue mo- bilization, (b) expenditure management and control, and (c) fiscal decentralization. Identification completed on 17 April 2019. US$ 1 6.0 (MSC1). Consulting services to be determined. Im plementing agency(ies) t o be determined. Mozambique Public Revenue, Expenditure, and Fiscal Decentralization Enhancement and Reform (PRE- FER) Pr oject: The proposed project development objective (PDO) is t o enhance public financial m anagement by strength- en ing (a) revenue m obilization, (b) expenditure management and control, and (c) fiscal decentralization. Identification com- pleted on 18 December 2018. US$ 26.8 (MSC1). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Health, Nutrition & Population (R) Mozambique Primary Health Care Strengthening Additional Financing: The Program Development Objective is t o im prove the utilization and quality of reproductive, maternal, child and adolescent health and nutrition services, partic- u larly in underserved areas. Approval completed on 28 February 2019. Environmental Assessment Category B. Project: P1 68314. US$ 90.2 (MPHT). Consultants will be required. Ministry of Health. Social Protection & Labor Social Protection Project - A dditional Financing: The objective of the project is to provide temporary incom e support t o extremely poor households and t o put in place the building blocks of a social safety net sy stem. Approval completed on 10 Ma rch 2017. Environmental Assessment Category B. Consultants will be required. National Institute of Social Action. Ha rnessing the Demographic Dividend: The PDO is to improve access to social services, em ployment and earnings opportunities for targeted y outh. Concept com pleted on 20 July 2018. Environmental A ssessment Category C. Project: P1 66100. US$ 55.0 (IDA Grant). Consultants will be required. Ministerio da Juventude e Desportos. Social, Urban, Rural and Resilience Global Practice A dditional Financing for the Emergency Resilient Recovery Project:

The Project Development Objective is to r estore the functionality of critical infrastructure in a resilient manner in the disaster -affected provinces; and to im prove the Gov ernment of Mozambique’ s capacity t o respond promptly and effectively to an eligible crisis or emergency.

A pproval completed on 13 January 2017. Environmental Assessment Category B. Project: P161559. Consultants will be re- qu ired. Im plementing agency(ies) to be determined. (R) Mozambique Disaster Risk Management and Resilience Program: The Program Development Objective is to st r engthen the Government of Mozambique's program to finance and prepare for disaster response and to increase the climate r esilience of vulnerable education infrastructure in risk-prone areas. Approval completed on 19 March 2019. Environmental A ssessment Category B. Project: P166437. US$ 90.0/6.0 (IDA Grant/GFDR). Consultants will be required. National Institute for Disaster Management (INGC); Ministry of Education and Human Development. April 2019 Africa PAGE 46 Mozambique Urban Development and Decentralization Project: Objective to be Determined. Concept completed on 8 December 2017. Environmental Assessment Category B. Project: P1 63989. US$ 100.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. 2n d Additional Financing to Emergency Resilient Recovery Project: The Project Development Objective is to restore t h e functionality of critical infrastructure in a resilient manner in the disaster-affected provinces; and to improve the Govern- m ent of Mozambique's capacity to respond promptly and effectively to an eligible crisis or emergency. A pproval completed on 30 October 2018. Environmental Assessment Category B. Project: P166063. US$ 13.0 (IDA Grant). Con sultants will be required. National Directorate of Water Resources Management (DNGRH); Ministry of Education and Human Development (MINEDH); Water and Sanitation In frastructure Administration (AIAS); National Institute for Irriga- t ion (INIR). Cities and Climate Change PPCR AF: The proposed Additional Financing (AF) is one of the pilot investments expected t o be financed by the Pilot Project for Climate Resilience (PPCR). These pilots aim at to reduce current and future weather in duced impacts on poor population and on Mozambique's fragile economy. This specific pilot will support green infrastruc- t ure investments in the City of Beira aiming at protecting existing natural drainages courses to increase the city resilience to floods. Approval completed on 23 October 2014. Environmental Assessment Category B. US$ 6.5/9.3 (CSCC/CSCF). Consult- in g services t o be determined. Administration for Water Supply and Sanitation Infrastructure (AIAS). (N) Mozambique: Cyclone Idai Emergency Recovery and Resilience Project: The Project Dev elopment Objective is t o support the rapid recovery and climate resilience of basic services and critical infrastructure in areas affected by Cyclone Ida i. Identification completed on 18 A pril 2019. US$ 90.0 (IDA Grant). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Transport MZ-A dditional Financing for Roads and Br idges Management and Maintenance Program - Ph-2 (AF3): The pr oject development objective of this phase of the APL is to improve access of the population to all-season roads through m aintenance, rehabilitation and u pgrading of the classified r oad network. Approval completed on 31 March 2015. Environ- m ental Assessment Category B. Project: P150956. US$ 73.6 (IDA Credit). No consultants are required. ROAD FUND (Fundo de Est radas), Contact: Cecilio Granchane, Chairman; National Road Administration (ANE), Contact: Atanasio Mugunhe, Di- r ector General. Water MZ - A dditional Financing - Water Services and Institutional Support II: The objectives of the Project are to: (i) In crease water service coverage in key cities of Mozambique's territory; (ii) Strengthen the institutional and r egulatory ca pacity for water supply services in the northern, central and southern r egions of Mozambique's territory; and (iii) Su pport Mozambique to respond promptly and effectively to an Eligible Crisis or Em ergency. Identification completed on 11 October 2018. Environmental Assessment Category B. US$ 74.0/21.0 (IDA Grant/NETH). Con sultants will be required. Im plementing agency(ies) to be determined. (R) Mozambique Urban Sanitation Project: To increase access to safely managed sanitation services and strengthen m unicipal sanitation service delivery capacity in selected cities. Negotiations authorized on 24 April 2019. Environmental A ssessment Category A. Project: P161777. US$ 115.0 (IDA Grant). Consultants will be required. National Directorate of Water Su pply and Sanitation (DNAAS); Administração de Infraestruturas de Água e Saneamento (AIAS). Niger Agriculture NIGER - A GRICULTURAL AND LIVESTOCK TRANSFORMATION PROJECT: The Development Objective (PDO) PAGE 47 Monthly Operational Sum m ary April 2019 is “ to increase productivity and commercialization for selected agriculture and livestock value chains and strengthen the coun- t ry’s capacity to respond to eligible crisis or emergency”. Concept completed on 7 May 2018. Environmental Assessment Cat- eg ory B. Project: P1 64509. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Agriculture and Livestock. Digital Development Niger: Smart Villages for rural growth and digital inclusion: The project aims at improving digital inclusion in rural a r eas, in order to bring transformative services based on digital technologies for selected social and economic sectors. Concept com pleted on 20 January 2019. Environmental Assessment Category B. Project: P167543. US$ 80.0/15.0 (IDA Grant/GFRC). Con sultants will be required. ANSI. Education Niger Learning Improvement for Results in Education Project: To enhance teacher effectiveness and the instruc- t ional conditions in basic education Concept completed on 21 February 2019. Project: P1 68779. US$ 100.0 (IDA Credit). No con sultants are required. Ministries of Basic Education. Niger Skills Development for Growth Project Additional Financing: The project development objective is to improve t h e effectiveness of formal technical and vocational training, short term skills development and apprenticeship programs in pr iority sectors. Approval com pleted on 10 April 2018. Environmental Assessment Category B. Project: P163467. US$ 50.0 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Energy & Extractives A dditional Financing Electricity Access Expansion Project:

The Project Dev elopment Objective (PDO) is to in- cr ease access t o electricity.

A pproval completed on 31 August 2018. Environmental Assessment Category B. Project: P164090. US$ 56.0/14.0/22.0/70.0 (IDA Credit/IDA Grant/ECEU/EUIB). No consultants are required. Im plementing agency(ies) to be determined. Environment & Natural Resources (R) A dditional Financing for Niger CAPCR: The project development objective (PDO) is to improve the resilience of the populations and of production systems to climate change and variability in targeted Communes. Approval completed on 25 April 2019. Environmental Assessment Category B. Project: P165397. US$ 5.0/9.6 (IDA Credit/CRLD). Consulting services to be determined. Ministry of Planning - Project Coordination Unit. Governance Gov ernance of Extractives for Local Development Project: The project development objective is to improve state h uman and financial resource deployment and enhance extractive sector contribution to local development. Identification com pleted on 8 June 2017. US$ 100.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Health, Nutrition & Population Im proving Nutrition Outcomes - KAR CHẺ TAMOWA: To increase utilization and improve the quality of key nutrition in terventions in targeted regions Identification completed on 18 December 2018. US$ 50.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) A F-Niger Disaster Risk Management and Urban Development Project: The Project Development Objective (PDO) is to improve Niger’s resilience to natural hazards through selected disaster risk management interventions in target ed pr oject sites and strengthening of Government's capacity to respond promptly and effectively to an eligible crisis or an em er- g ency. Negotiations authorized on 28 March 2019. Environmental Assessment Category B. Project: P167352. US$ 25.0 (IDA April 2019 Africa PAGE 48 Cr edit). Consultants will be required. Cabinet du Premier Ministre. Transport (R) Ru ral Mobility and Connectivity Project: The project development objective is to improve and sustain road access of fa rming communities to production sites, markets and basic social services in selected areas. Approval completed on 18 March 2019. Environmental Assessment Category B. Project: P1 64498. US$ 50.0 (IDA Credit). Consultants will be required. Min istry of Equipment. Water Ur ban Water and Sanitation Project - AF: To increase access to sustainable water supply services and to improved san- it ation services in som e urban areas in the recipient's t erritory. A pproval completed on 30 June 2016. Environmental A ssessment Category B. Pr oject: P1 59240. US$ 1 0.0/60.0 (IDA Cr edit/IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Nigeria Agriculture Livestock Productivity and Resilience Support Project: The Project Development Objectives (PDO) is to improve pr oductivity, resilience and market access of selected livestock value chains, and to strengthen institutional capacity in service delivery. Concept completed on 18 July 2017. Environmental Assessment Category B. Project: P1 60865. US$ 200.0 (IDA Cr edit). Consultants will be required. Federal Ministry of Agriculture and Rural Development. Secon d Additional Financing to Third National Fadama Development Proj: The new PDO will be: to increase the in comes for users of rural lands and water resources in a sustainable m anner, and to contribute to restoration of the livelihoods of conflict affected households in the selected area in the North East of the Recipient’s territory. Approval completed on 7 June 2 016. Environmental Assessment Category B. Project: P158535. US$ 50.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Ogun State Economic Transformation Project: The Project Development Objective (PDO) is improve the business- en abling environment, strengthen agricultural value chains and upgrade skills of the Ogun State economy. Identification com- pleted on 23 May 2017. Environmental Assessment Category B. US$ 350.0 (IDA Credit). Consulting services to be determined. Ogun State Government. Digital Development Nigeria Digital Identification for Development Project: T h e Development Objective of the project is t o increase the number of persons in Nigeria who have government-recognized pr oof of unique identity that enables them to access services. Concept completed on 10 September 2018. Environmental As- sessm ent Category B. Project: P1 67183. US$ 115.0/215.0/100.0 (IDA Credit/EUIB/FRDE). No consultants are required. Na- t ional Identity Management Commission. Education (N) Nigeria Adolescent Girls Education Empowerment Project: Increase girls access t o, and completion of, quality secondary education in participating states. Identification completed on 11 March 2019. US$ 500.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Nigeria: AF - State Education Program Investment Project: The project development objective is to strengthen the educational system by supporting: (a) need-based teacher deployment; (b) school-level management and accountability; and PAGE 49 Monthly Operational Sum m ary April 2019 (c) measurement of student learning in the Participating States. Approval completed on 7 June 2016. Environmental Assess- m ent Category B. Project: P157890. US$ 100.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be det ermined. In novation Development and Effectiveness in the Acquisition of Skills (IDEAS): To enhance the quality and rele- v ance of skills development in Nigeria. Concept completed on 1 3 August 2018. Environmental Assessment Category B. Project: P1 66239. US$ 200.0 (IDA Credit). Consultants will be required. Federal Ministry of Education. Energy & Extractives Nigeria Electrification Project: The development objective is to increase access to electricity services for households, pub- lic educational institutions, and underserved micro, small and medium enterprises. Approval com pleted on 27 June 2018. Env ironmental Assessment Category B. Project: P1 61885. US$ 350.0 (IDA Credit). Consultants will be required. Rural Elec- t r ification Agency. Power Sector Recovery Performance Based Operation: Objective to be Determined. Negotiations authorized on 29 Ma rch 2018. Environmental Assessment Category C. Project: P1 64001. US$ 1000.0 (IDA Credit). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. NG-El ectricity Transmission Project: The project development objective is to increase the transfer capacity of the trans- m ission network in Nigeria. A pproval completed on 15 February 2018. Environmental A ssessment Category B. Project: P1 46330. US$ 486.0 (IDA Credit). Consulting services to be determined. Transmission Company of Nigeria, Contact: Mr. Ma ck Kast, Managing Director/CEO. Nigeria Electricity and Gas Improvement Project Additional Financing: Additional financing t o the Nigeria Elec- t r icity and gas improvement project to cover additional PRGs for Gas supply to government owned power plants, in particular t h e Sapele, Olorunsogo and Alaoji plants held by the NIGER DELTA POWER HOLDING COMPANY. The NDPHC is scheduled t o commission power generation units in three of the NIPP plants at Sapele, Olorunsogo and Alaoji. The units t o be commis- sion ed will have a combined initial generation capacity of 575 MW. The 3 plants will have a final generation capacity of 1,974 MW u pon completion. These plants urgently require executed Gas Sales Supply Agreements (GSAs) with prospective gas sup- pliers and IOCs who have emphasized the n eed for a payment guarantees to enter into long t erm supply agreements for the fu el deliveries. In accordance with World Bank PRG guidelines, the Federal Ministry of Finance on behalf of the Federal Gov- er nment of Nigeria is required to nominate partieswith whom the World Bank Gan enter into negotiations on PRGs. Therefore, I am writing to request that the World Bank extends the coverage of NEGIP to include NDPHC's NIPP plants and to nominate t h e NDPHC as a party with whom the World Bank can enter into formal negotiations on the potential provision of PRGs for t h e individual projects. Approval completed on 19 June 2012. Environmental Assessment Category B. Project: P1 26190. US$ 2 00.0 (GUID). Consulting services to be determined. Power Holding Company of Nigeria Tel: (234-9) 413-6684, E-m ail: ma- g aniyu@nepapmu.org, Contact: Mansuru A. Ganiyu, Project Manager. Nigeria Distribution Sector Recovery Program: The Program Development Objective is to improve financial and tech- n ical performance of the electricity distribution sector t o mobilize private sector investment Identification completed on 9 Ja nuary 2018. Environmental Assessment Category B. US$1000.0 (IBRD). Consulting services to be determined. Implement- in g agency(ies) t o be determined. Environment & Natural Resources Nigeria Erosion and Watershed Management Project (NEWMAP) - Additional Financing: To reduce vulnerabil- ity to soil erosion in targeted sub-watersheds. Approval completed on 27 June 2018. Environmental Assessment Category A. Pr oject: P164082. US$ 400.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Nigeria Integrated Landscape Resilience and Restoration Program: T o contain landscape degradation and st r engthen climate resilience in selected Landscapes in Nigeria. Identification completed on 13 February 2019. US$ 200.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 50 Finance, Competitiveness and Innovation Nigeria Affordable Housing Project: To increase access t o mortgage finance for targeted underserved households. Con- cept completed on 11 July 2018. Environmental Assessment Category F. Project: P165296. US$ 150.0 (IDA Credit). Consulting services to be determined. Family Homes Fund. Governance Su stainable Procurement, Environmental and Social Standards Enhancement Project (SPESSE): The objec- t iv e of the project is to develop sustainable capacity in m anaging procurement, environment and social safeguards in the public sector Identification completed on 6 November 2018. US$ 80.0 (IDA Credit). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Fiscal Governance and Institutions Project: The project development objective (PDO) is to improve the credibility of pu blic finance and national statistics. Approval completed on 27 June 2018. Environmental Assessment Category C. Project: P1 63540. US$ 125.0 (IDA Credit). Consulting services to be determined. Federal Ministry of Finance. St ates Fiscal Transparency, Accountability and Sustainability PforR: To improve sy stems for collection and man- a g ement of public funds, enhance fiscal performance, and improve service delivery of States in Nigeria Approval completed on 27 June 2018. Environmental Assessment Category C. Project: P1 62009. US$ 750.0 (IDA Credit). Consulting services to be determined. Federal Ministry of Finance. Health, Nutrition & Population Nigeria Polio Eradication Support Project Additional Financing: To assist the Recipient, as part of a global polio er adication effort, to achieve and sustain a t least 80 percent coverage with oral polio vaccine immunization in every state in t h e Recipient’s territory , and im prove national routine immunization coverage. Approval completed on 27 June 2018. Envi- r onmental Assessment Category B. Project: P1 65247. US$ 150.0 (IDA Credit). Consultants will be required. National Primary Health Care Development Agency. A dditional Financing Nigeria State Health Investment Project: T o increase the delivery and use of high impact ma- t ernal and child health interventions and improve quality of care available t o the people of Nasarawa, Ondo and all the states in the North East. Approval completed on 7 June 2016. Environmental Assessment Category B. US$ 125.0 (IDA Credit). Con sultants will be required. Im plementing agency(ies) to be determined. A dditional Financing NG-Polio Eradication Support Project: T o a ssist the Recipient, a s part of a global polio eradi- ca tion effort, to achieve and sustain at least 80% coverage with oral polio vaccine immunization in every state in the Recipient's t erritory, and sustain national r outine immunization coverage. Approval completed on 7 June 2016. Environmental Assess- m ent Category B. US$ 125.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) t o be determined. Nigeria Improved Child Survival Program for Human Capital MPA: The PDO of this Multi-Phased Approach (MPA) is t o cut under five mortality rate in half in a decade. Concept completed on 30 August 2018. Environmental Assessment Ca tegory B. Project: P1 67156. US$ 650.0 (IDA Credit). No consultants are required. Federal Ministry of Health. M acroeconomics, Trade and Investment Edo Economic Transformation Program for Results: To provide viable economic opportunities for Edo citizens by im proving the environment for private investments, expanding the digital economy and im proving the quality of education. Identification completed on 6 December 2018. US$ 75.0 (IDA Credit). Consulting services to be determined. Edo State Gov- er nment. Social Protection & Labor Community and Social Development A F-2: The new PDO is t o increase a ccess by the poor people, and particularly by t h e internally displaced and vulnerable people in the North East of Nigeria, to improved social and natural resource infrastruc- t ure services in a sustainable manner throughout Nigeria. Approval completed on 7 June 2016. Environmental Assessment PAGE 51 Monthly Operational Sum m ary April 2019 Ca tegory B. Project: P157898. US$ 75.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) t o be deter- m ined. Nigeria Youth Employment and Social Support AF: The project development objective is to increase access of the poor a n d vulnerable, using improved social safety net sy stems, t o youth employment opportunities in all Participating States and t o provide Targeted Cash Transfers to the poor, vulnerable and internally displaced people (IDPs) in the North East States. A pproval completed on 7 June 2016. Environmental Assessment Category B. Project: P157899. US$ 100.0 (IDA Credit). Con- su ltants will be required. Im plementing agency(ies) t o be determined. Transport Nigeria Green Belt Corridors Development Program: The proposed Program Development Objective (PDO)of the Nig eria green belt corridors development program is t o im prove transport and trade connectivity and facilitate m arket inte- g ration along Nigeria’s key economic corridors. T h is is a m ulti-sectoral com plex a nd long-term undertaking t hat r equires a dopting a m ultiphase pr ogrammatic instru- m ent/approach (MPA). The Government of Nigeria (GON) has requested financing for the im provement of critical road in- fr astructure and logistics services along the economic corridors spread in the gateway states, south eastern region, north west- er n region and River Nile corridor. The request includes23 road projects with a total length of about 2,400km. The investment r equirement for the urban renewal is anticipated to be high. Private investment is required to operat ionalize the SEZs and est ablish commodity exchange centers. Therefore, the proposed program will be implemented in phases. T h is MPA will support an integrated approach t o economic corridor development with a focus on: i) upgrading priority transport corridors at the national and sub-national levels; ii) improving logistics infrastructure and services; and iii) creating a n enabling environment for private investment. Ph ase 1 will focus on improving priority transport corridors at the national and sub-national levels, whilst developing the in terventions that will support the economic transformation by addressing key regulatory gaps along the economic corridors. Ph ases 2 and 3 will expand the support for spatial transformation and regional economic integration through the development of economic development corridors and other complementary interventions with multi-sectoral interventions at national and su b-national levels. Identification completed on 13 September 2016. Environmental Assessment Category A . US$ 400.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Nigeria Rural Access and Agricultural Marketing Project: The objective of the proposed Nigeria Rural Access and A gricultural Marketing (RAAMP) is to improve rural access and agricultural marketing in selected participating states, whilst en hancing sustainability of the rural and state road network. 1 3.This operation is the successor of the Second Rural Access and Mobility Project (RAMP 2-P095003) designed to enhance t h e impact of the rural access initiative in improving agricultural productivity and value chain, as well as income and compet- it iveness of small family farmers. The focus on connecting rural communities to local agricultural markets - roadside agro- log istics hubs – t o support the ongoing agricultural transformation initiative makes RAAMP unique from its predecessors. RA AMP will facilitate the provision of services that will enhance agricultural productivity, help build rural agricultural v alue chains, and help producers market agricultural products competitively. RAAMP will build on its successor, RAMP 2, by incor- por ating agricultural marketing/agro-logistics services. The project also proposes adopting an innovative output-based ap- pr oach to help the states function as full-fledged im plementing entities capable of implementing development partners’ sup- por t. Concept completed on 30 June 2017. Environmental Assessment Category B. Project: P163353. US$ 180.0/236.0 (IDA Cr edit/FRDE). Consultants will be required. Federal Ministry of Agriculture and Rural Development. Water (N) NG Sustainable Rural Water Supply and Sanitation Sector Project: The Project Development Objective (PDO) is t o increase the access t o water and sanitation services in se lected poor rural areas of Nigeria through the consolidation of W SS sector institutions and the provision of adequate infrastructure. Identification completed on 21 March 2019. US$ 350.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 52 Rwanda Agriculture (R) Rwanda - A dditional Financing for the Transformation of Agriculture Sector Program 4 PforR Phase 2: T o promote the commercialization of agriculture value chains in Rwanda. Negotiations authorized on 26 April 2019. Project: P1 69514. US$ 75.0 (MSC1). Consulting services to be determined. Ministry of Agriculture and Animal Resources (MINAGRI). T ransformation of Agriculture Sector Program Phase 3 PforRAdditional Financing: Objective to be Determined. A pproval completed on 28 February 2017. Environmental Assessment Category B. US$ 46.0/10.0 (IDA Credit/RWAG). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Education Qu ality Basic Education for Human Capital Development in Rwanda: To improve student learning and progression in basic education in Rwanda. Concept completed on 28 November 2018. Project: P1 68551. US$ 200.0 (IDA Credit). Con- su ltants will be required. Ministry of Education, Republic of Rwanda. Environment & Natural Resources (N) Ki gali Environmental Management and Climate Compatible Development Program: The PDO is to support in tegrated environmental m anagement in Kigali for climate mitigation and resilience, protection of biodiversity, and reduction of u r ban wetland degradation. The project will cover urban and peri-urban areas of Kigali. Identification completed on 7 Ma rch 2 019. US$ 9 .0/20.0/0.6/6.8 (GEFU/GITA/LDC/NDF). Con sulting services t o be det ermined. Im plementing a g ency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) Socio-economic Inclusion of Refugees & Host Communities in Rwanda Project: T o im prove access to basic services and economic opportunities for refugees and host communities, and support environmental management , in the tar- g et areas in Rwanda Negotiations authorized on 25 March 2019. Environmental Assessment Category B. Project: P1 64130. US$ 35.0/25.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry in Charge of Em ergency Management; Devel- opm ent Bank of Rwanda. Rwanda Urban Development Project II: To strengthen urban management and deliver improved basic infrastructure a n d services in participating urban areas of Rwanda Identification completed on 2 August 2017. US$ 90.0 (IDA Credit). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Sao Tome and Principe Education ST P Quality Education for All - AF: The Development Objective of the proposed operation is to improve the system of in - service teacher training and to strengthen the management of human resources in the education sector in São Tomé and Prín- cipe. Approval com pleted on 27 June 2014. Environmental Assessment Category C. Project: P150828. US$ 3.5 (IDA Grant). Con sultants will be required. AFAP, Contact: Jorge Bom Jesus, Minister. Gir ls Empowerment and Quality Education for All: T o improve the quality and the overall efficiency of the education sy stem in Sao Tome and Principe. Identification completed on 11 October 2018. US$ 15.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 53 Monthly Operational Sum m ary April 2019 Energy & Extractives A dditional Financing to STP Power Sector Recovery Project: The project development objectives are t o (i) increase r enewable energy generation and (ii) improve the reliability of the electricity supply. Identification completed on 17 October 2 018. Environmental Assessment Category B. US$ 1 0.0 (IDA Grant). No consultants are required. Im plementing agency(ies) t o be determined. Transport (R) Sa o T ome e Principe Transport Sector Development and Coastal Protection Project: The proposed PDOs is t o im prove connectivity, sustainability, safety and climate resilience of selected roads. Approval completed on 22 March 2019. Env ironmental Assessment Category B. Project: P161842. US$ 29.0 (IDA Grant). No consultants are required. INAE (instituto Na cional das Estradas); AFAP. Senegal Agriculture Gr oundnut Competitiveness and Agriculture Diversification Program For Results: to im prove the competitive- n ess of the groundnut value chain and to increase the resilience to climate and market risks of farmers and herders in the Gr oundnut Basin. Concept completed on 28 September 2018. Environmental Assessment Category B. Project: P1 64967. US$ 1 5 0.0 (IDA Credit). No consultants are required. Ministry of Agriculture and Rural Equipment. Education (N) Senegal Education Program for Results: Support Government Basic Education Sector Im provement Identification com pleted on 7 March 2019. US$ 50.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Sen egal-Quality Improvement and Equity of Basic Education - AF: The project development objective is to improve learning outcomes for early grades, increase access to the science and mathematics tracks of secondary schools, and to improve equ ity in access to basic education. Approval completed on 31 May 2018. Environmental Assessment Category B. Project: P1 63575. US$ 60.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Sen egal Investing in the Early Years for Human Development: Im prove delivery of select services that promote early ch ildhood development in underserved areas of Senegal Approval completed on 28 September 2018. Environmental Assess- m ent Category B. Project: P161332. US$ 75.0 (IDA Credit). Consultants will be r equired. Ministry of Governance and Protec- t ion of the Child. Energy & Extractives Pr oject to Promote a Shift towards Lower Carbon Power Generation in Senegal: to promote a shift towards low er ca rbon t echnologies in the power sector in Senegal Identification completed on 1 9 November 2018. US$ 150.0 (IDA Credit). Con sulting services to be determined. Im plementing agency(ies) to be determined. Governance Pu blic Financial Management Strengthening Technical Assistance Project: To enhance budget credibility, trans- pa rency and accountability mechanisms in the use and management of central Government financial resources. T h e project aims to support the modernization of the Public Financial Management system and the implementation of a Public Sector performance based system in Senegal. April 2019 Africa PAGE 54 It in cludes five components: (1) Strengthening Fiscal Policies and Planning; (2) Im proving Budget Execution and Reporting Pr ocesses; (3) Strengthening the Capacity of External Audit and Legislative Oversight; (4) Project Management; and (5) Sup- por ting the Im plementation of a Public Sector Performance-Based Management and Results Monitoring System. Approval com pleted on 31 July 2014. Environmental Assessment Category C. Project: P146859. US$ 30.0 (IDA Credit). Consultants w ill be required. PFM Reform Secretary Tel: (221) 821-4587, E-mail: ctdiopmef@yahoo.fr, Contact: Cheikh Tidiane Diop, Co- or dinator. Health, Nutrition & Population In vesting in Maternal and Child Health: The Project Development Objective is to increase utilization and im prove the qu ality in priority regions with a particular focus on reproductive, maternal, adolescent and child health and nutrition services. Con cept completed on 31 May 2018. Environmental A ssessment Category B. Project: P1 62042. US$ 30.0/1 0.0 (IDA Cr edit/GFF). Consultants will be required. Ministry of Health and Social Action. Social Protection & Labor Social Safety Net: The objectives of the Project are t o: (a) support the establishment of building blocks for the social safety n et sy stem; and (b) increase the access of poor and vulnerable households to targeted and adaptive cash transfers programs. A pproval completed on 24 August 2016. Environmental Assessment Category C. Project: P156160. US$ 11.1 (AFRH). Consult- a nts will be required. Im plementing agency(ies) to be determined. Sen egal - A dditional Financing to the Social Safety Net Project: The objectives of the Project are to: (a) support the est ablishment of building blocks for the social safety net system; and (b) increase the access of poor and vulnerable households t o t argeted and adaptive cash transfers programs. Approval completed on 3 January 2019. Environmental Assessment Cate- g ory C. Project: P162354. US$ 57.0 (IDA Credit). Consultants will be required. Delegation Generale a la Protection Sociale et la Solidarite Nationale. Social, Urban, Rural and Resilience Global Practice Sen egal Municipal Solid Waste Management Project: The development objective of the project is to strengthen the g ov ernance of solid waste management in Senegal and improve solid waste management services in selected Senegalese cities. Con cept com pleted on 25 Ju ly 2 017. Env ironmental A ssessmen t Ca tegory A . Pr oject: P1 61477. US$ 5 0.0/20.0/20.0/5 6.5/5 .5/37.5 (IDA Credit/EUIB/GFRC/GSPN/UNGF/ZPCO). Consultants will be required. Unite de Coor- dination et de Gestion (UCG). A dditional Financing - St ormwater Management and Climate Change Adaptation Project: T o im prove flood pr evention management in peri-urban areas of Dakar and to promote city sustainability management practices, including climate r esilience, in two selected urban areas Approval completed on 27 May 2015. Environmental Assessment Category A. Pr oject: P152150. US$ 35.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Water Sen egal Urban Water and Sanitation Project - Additional Financing: The proposed Project Development Objective (PDO) is to improve access to water and sanitation services in selected urban areas in a financially sustainable manner. A pproval completed on 6 July 2017. Environmental Assessment Category B. Project: P162537. US$ 30.0 (IDA Credit). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Seychelles Social Protection & Labor (R) St rengthening Quality of the Social Protection System: The development objective is t o strengthen the efficiency of social protection services. Identification completed on 10 September 2018. US$10.0 (IBRD). Consulting services to be det ermined. Ministry of Family Affairs. PAGE 55 Monthly Operational Sum m ary April 2019 Sierra Leone Agriculture (N) Sierra Leone Smallholder Commercialization and Agribusiness Development Project Additional Financ- in g:

The project development objective is to promote smallholder commercialization by fostering productive business linkages between smallholder farmers and selected agribusiness firms and other commodity off-takers in Sierra Leone. The Pr oject has four components: (1) Support t o agribusiness-farmer linkages and SMEs along selected agricultural value chains (US$ 1 9 million); (2) Market Access Im provement (US$26 million); (3) Capacity Building for Government and Other Institu- t ions r elevant for agribusiness development (US$ 6 million); and (4) Project Coordination, Monitoring and Ev aluation (US$ 4 m illion). Identification completed on 12 March 2019. Environmental Assessment Category B. US$ 30.0 (IDA Grant). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Education Sierra Leone Free Education Project: T o increase the number of students in better functioning schools. Concept com- pleted on 11 December 2018. Project: P167897. US$ 70.0 (IDA Credit). Consultants will be required. Ministry of Basic and Senior Secondary Education. Sierra Leone Higher Education Development Program: The proposed higher education program aims to strengthen t h e capacity of the higher education sy stem to deliver better quality, to increase access and enhance governance and financing in higher education. Identification completed on 19 January 2018. US$ 10.0 (IDA Credit). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. A dditional Financing of the Revitalizing Education Development in Sierra Leone Project: The Project Develop- m ent Objective is t o im prove the learning environment in targeted schools and establish systems for monitoring of education in terventions and outcomes. To do this, the Project will finance elements of the ESP th at deliver intermediate results while sim ultaneously addressing critical issues in the system to build the foundation for better management and efficiency within t h e sector. A pproval completed on 20 June 2017. Environmental Assessment Category B. Project: P163161. US$ 10.0 (IDA Credit). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Energy & Extractives SL _ Bu mbuna II Hydropower Project: The project development objective is to provide affordable renewable energy by m obilizing private and development finance Identification completed on 7 December 2017. Environmental Assessment Cate- g ory A. US$ 120.0/80.0 (IDA Credit/GUID). Consulting services to be determined. Im plementing agency(ies) t o be deter- m ined. (N) Sierra Leone - Renewable Energy Development and Energy Access Project: Increase renewable capacity and electricity access rate. Identification completed on 29 April 2019. US$ 100.0 (IDA Grant). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. SL_Bumbuna II Hydropower Project: The project development objective is t o provide affordable clean energy and mo- bilize private and development finance Identification completed on 5 A pril 2018. US$ 1 20.0/80.0 (IDA Credit/GUID). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. (R) Sierra Leone Energy Sector Utility Reform Project Additional Financing: The Project Development Objective is t o im prove the operational performance of the national electricity distribution utility. Negotiations authorized on 1 April 2019. Environmental Assessment Category B. Project: P166390. US$ 50.0 (IDA Credit). No consultants are required. Ministry of En ergy; Electricity Distribution and Supply Authority (EDSA). April 2019 Africa PAGE 56 Finance, Competitiveness and Innovation Sierra Leone - Economic Diversification Project: To contribute t o sustainable tourism development in Sierra Leone. Con cept completed on 26 January 2018. Environmental Assessment Category B. Pr oject: P1 64212. US$ 30.0/0.8 (IDA Cr edit/KWBP). Consultants will be required. Ministry of Tourism & Cultural Affairs. Governance Pu blic Financial Management Improvement and Consolidation -Additional Financing Project: The modified pr oject development objective reads as follows: to improve the public financial management sy stem and accountability in the u se of government finances. Approval completed on 7 June 2017. Environmental Assessment Category C. Project: P1 62667. US$ 1 0.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Social Protection & Labor Social Safety Nets Additional Financing: The project development objective is to establish the key building blocks for a ba sic national safety net system and t o provide income support to extremely poor households in Sierra Leone. Approval com- pleted on 6 August 2015. Environmental Assessment Category C. Project: P154454. US$ 10.0/4.3 (IDA Grant/ERR). Consult- a nts will be required. Im plementing agency(ies) to be determined. (R) Sierra Leone SSN Project Second Additional Financing: The project development objective is to establish the key bu ilding blocks for a basic national safety net sy stem and t o provide income support t o extremely poor households in Sierra Leon e. Appraisal completed on 25 April 2019. Environmental Assessment Category C. Project: P1 67757. US$ 30.0 (IDA Grant). No consultants are required. National Commission for Social Action. Sierra Leone Productive Safety Nets Project: The development objective of this project is to provide consumption and liv elihoods support to extreme poor households in Sierra Leone. Identification completed on 10 December 2018. US$ 20.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Sierra Leone Western Area Resilience Project: The Project Development Objectives are to: improve institutional ca- pa city and performance of select District councils, increase access t o r esilient services and infrastructure, and enhance tech- n ical and financial capacities for emergency preparedness and response. Identification completed on 15 August 2018. US$ 50.0/5.0/10.0 (IDA Grant/DFID/GEFU). Consulting services to be determined. Im plementing agency(ies) to be determined. Transport (R) In tegrated and Resilient Urban Mobility Project: The Project Development Objective (PDO) is to improve quality pu blic transport, address climate resilience, improve road safety in selected areas and enhance institutional capacity in the t ransport sector. Negotiations authorized on 18 April 2019. Environmental Assessment Category B. Project: P164353. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Transport and Aviation. Somalia Digital Development A dditional Financing: ICT Sector Support in Somalia (Phase 2): Objective to be Determined. Approval completed on 1 5 November 2017. Environmental Assessment Category C. US$ 14.0/2.0 (SOMP/SPBF). Consulting services t o be det er- m ined. Im plementing agency(ies) to be determined. PAGE 57 Monthly Operational Sum m ary April 2019 Finance, Competitiveness and Innovation (R) Som alia Ca pacity A dvancement, Livelihoods and Entrepreneurship, through Digital Uplift Project (SCA LED-UP): The Project Development Objective (PDO) is to support progress towards increased access to basic digital financial and government services targeting entrepreneurship and employment, particularly for women. Approval completed on 7 March 2019. Environmental Assessment Category B. Project: P1 68115. US$ 18.0/1 3.0 (IDA Grant/SOMP). Consulting services to be determined. Ministry of Finance, Federal Republic of Somalia. Governance Recurrent Cost & Reform Financing Project - Additional Financing: To support the Federal Government of Somalia a n d Eligible Federal Member States to strengthen resource management systems, the inter-governmental fiscal framework, a n d service delivery systems in health and education. Approval completed on 25 September 2018. Environmental Assessment Ca tegory C. Project: P1 67224. US$ 6 0.0/2.0 (IDA Grant/SOMP). Consultants will be required. Im plementing agency(ies) to be determined. Dom estic Revenue Mobilization a nd Public Financial Management Ca pacity Strengthening Project: To st r engthen systems of domestic revenue m obilization, expenditure control and accountability in the Federal Government, Pu ntland State of Somalia, and Somaliland. Approval completed on 25 September 2018. Environmental Assessment Category C. Project: P166206. US$20.0/1 0.0 (IDA Grant/SOMP). Consultantswill be requ ired. Ministry of Finance, Puntland; Ministry of Finance of Somaliland Hargeisa; Ministry of Finance Federal Government. Poverty and Equity (N) Somali Integrated Statistics and Economic Planning Capacity Building: To strengthen the governance and ca pacity of t h e National Planning, Statistical a nd M&E Sy stems t o fill st atistical data g aps; design and im plement the NDP/IPRSP; and regularly assess, analyze and improve their public policies performance and results Identification completed on 1 9 March 2019. US$ 25.0 (MSC1). Consulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (N) Som alia Ur ban Resilience Project Phase II: T o strengthen public service delivery capacity at the municipal level a n d support the reconstruction of key urban infrastructure in targeted areas. Identification completed on 10 April 2019. US$ 5 0.0/62.0 (IDA Credit/SOMP). Consulting services to be determined. Im plementing agency(ies) to be determined. (R) Somalia Urban Resilience Project Phase II: To strengthen public service delivery capacity at the municipal level a n d support the reconstruction of key urban infrastructure in targeted areas. Concept completed on 19 March 2019. Project: P1 70221. US$ 70.0 (SOMP). Consulting services t o be determined. Benadir Regional Administration/Mogadishu Municipal- ity ; Baidoa Municipality/South West State; Kismayo Municipality/Jubbaland; Garowe Municipality. Water Som alia - Water for Agro-pastoral Productivity and Resilience: Develop water and agricultural services among agro- pa storalist communities in dryland areas of Som alia. Negotiations authorized on 26 February 2019. Environmental A ssess- m ent Category B. Project: P167826. US$ 42.0 (IDA Grant). Consultants will be requ ired. Participating States and Somaliland. South Africa Environment & Natural Resources Sou th Africa: Catalyzing Financing and Capacity for the Biodiversity Economy around Protected Areas: To lev erage financial resources and improve capacity to implement the Biodiversity Economy and increase benefits from selected PA landscapes t o local communities. Identification completed on 8 January 2019. US$ 9.0 (GEFU). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. April 2019 Africa PAGE 58 Water (N) South Africa School Sanitation Improvement Project: To increase access to and enhance delivery capacity for sa fely managed sanitation facilities in South African schools, Identification completed on 21 March 2019. US$150.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. South Sudan Agriculture Sou th Sudan Resilient Agricultural Livelihoods Project: The project seeks to improve food availability in the country t hrough increased investment in seed production, farmer capacity building, and promoting m echanization in agriculture. Identification completed on 23 September 2018. Environmental Assessment Category B. US$ 5 0.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Health, Nutrition & Population Sou th Sudan Health Rapid Results Project AF: The proposed revised PDO is to: i) improve delivery of high impact pr imary health care services, including pharmaceuticals in Upper Nile and Jonglei states; and iii) to strengthen coordination a n d M&E implementation capacities of the MOH. Approval completed on 27 June 2016. Environmental Assessment Category B. Pr oject: P156917. US$40.0 (IDA Grant). Consultants will be required. Ministry of Finance and Economic Planning, Contact: Moses Ma bior Deu, Director of Aid Co-ordination. Sou th Sudan Health Rapid Results AF: The additional financing to Rapid Results Health Project will ensure continuity of h igh impact primary health care services in Upper Nile and Jonglei States of South Sudan. The project development objec- t iv es (PDOs) are: (i) to improve the delivery of high impact primary health care services in Recipient's states of Jonglei and Upper Nile; and (ii) to strengthen coordination and monitoring and evaluation capacities of the Ministry of Health. The addi- t ional financing will provide support to the two original components: i) Component 1 will support Delivery of high impact Pr imary Health Care services; ii) Component 2 will strengthen capacity of MOH at the national level. The project will also su pport performance based contracting, exact details of the amounts to be financed from the HRITF (possibly for amounts up t o US$15 million) are still being discussed. Approval completed on 13 March 2014. Environmental Assessment Category B. Pr oject: P146413. US$ 10.0/25.0 (IDA Credit/IDA Grant). Consulting services to be determined. .., Contact: .. Social Protection & Labor Sou th Sudan Sa fety Net Project (SSSNP): Provide a ccess to t emporary income opportunities t o selected poor and vul- n erable households and strengthen safety net delivery tools. Appraisal completed on 26 February 2019. Environmental As- sessm ent Category B. Project: P169274. US$ 40.0 (IDA Grant). Consulting services to be determined. Ministry of Finance and Planning. Social, Urban, Rural and Resilience Global Practice Sou th Sudan Enhancing Community Resilience Project: To enhance community resilience by improving access to ba sic socio-economic services and strengthening community institutions that can better manage local conflicts and nurture in ter-communal social cohesion. Identification completed on 2 December 2018. US$ 65.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Sudan Education Su dan Basic Education Support Project: The proposed Project Development Objective (PDO) is to improve reading PAGE 59 Monthly Operational Sum m ary April 2019 pr oficiency of pupils in early grades and improve progression to the upper grades of primary education in disadvant aged sch ools, and to strengthen the education management systems. Concept completed on 12 September 2018. Environmental A ssessment Category B. Project: P167169. US$ 5 9.0 (FTIE). Consultants will be required. Federal Ministry of Education. Environment & Natural Resources Su dan Sustainable Natural Resources Management Project (SSNRMP) A dditional Financing (Phase 2): The Pr oject Development Objective (PDO) and Global Environment Objective is “to increase the adoption of sustainable land and w ater management practices in targeted landscapes”. Approval completed on 10 August 2018. Environmental Assessment Ca tegory B. Project: P1 61304. US$ 5.5 (GEFU). Consultants will be required. Ministry of Environment, Natural Resources Ma nagement and Physical Development; Ministry of Agriculture and Forestry. Su stainable Natural Resources Management Project (SSNRMP3) Second Additional Financing: The Project Dev elopment Objective (PDO) and Global Environment Objective is “to increase the adoption of sustainable land and water m anagement practices in targeted landscapes”. Identification completed on 25 September 2018. Environmental Assessment Ca tegory B. US$ 1.4/4.6 (GEFU/LDC). Consultants will be required. Im plementing agency(ies) t o be determined. Tanzania Digital Devel opment Digital Tanzania Program Phase I: Digital Foundations Project: T o increase access t o affordable, high quality inter- n et services for government, businesses and citizensand to improve the government's capacity to deliver digital public services. Con cept completed on 31 October 2018. Environmental Assessment Category B. Project: P1 60766. US$ 127.1 (IDA Credit). Con sulting services to be determined. President's Office - Public Service Management; Ministry of Works, Transport and Com- m unication (Communication Sector). Education T anzania Secondary Education Quality Improvement Program: To enhance equitable access to and improve learn- in g environments in government secondary schools with a focus on mathematics and science. Negotiations authorized on 7 February 2018. Environmental Assessment Category B. Project: P1 63439. US$ 300.0 (IDA Credit). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. T anzania Secondary Education Quality Improvement Project (SEQUIP): T o increase gir ls’ access t o safe, gender- r esponsive learning environments and improve completion of quality secondary education of girls and boys. Identification com pleted on 6 February 2019. US$ 300.0 (IDA Credit). Consulting services to be determined. Im plementing ag ency(ies) to be determined. Boost Primary Student Learning: To enhance the teaching and learning environment in public primary schools. Identi- fication completed on 1 1 October 2018. US$ 300.0 (IDA Credit). Consulting services t o be determined. Im plementin g a g ency(ies) to be determined. Higher Education for Economic Transformation Project: To increase enrolment in and improve the quality and labor m arket relevance of degree programs in priority disciplines in select public universities and improve the management of the h igher education system. Identification completed on 6 December 2017. Environmental Assessment Category B. US$ 300.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives T anzania Utility Strengthening Project (TUSP): The project development objective of the Tanzania Utility Strengthen- in g Project (TUSP) is to expand electricity access, improve supply services and enhance operational performance of the utility. T h e project has five components: a-) distribution grid densification program, including grid extension, rehabilitation and me- t ering; b-) electricity transmission strengthening (selected priority investment in extension and rehabilitation of transmission in frastructure); c-) distribution control center upgrade in Dar es Salaam; d -) strengthening utility operations and revenue April 2019 Africa PAGE 60 m anagement through upgrading the MIS, GIS, advanced metering and billing sy stems; and e -) technical assistance & capacity bu ilding. Identification completed on 21 November 2017. US$ 400.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Za nzibar Energy Sector Transformation Project: The Project development objective is to is to expand electricity access, im prove efficiency of electricity supply and diversify electricity supply though increasing renewable electricity generation. Identification completed on 21 Nov ember 2018. US$ 70.3 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. T Z Su stainable Management of Mineral Resources: To strengthen the Governments capacity to manage the m ineral sector to improve the socioeconom ic impacts of large and small-scale mining for Tanzania and Tanzanians and enhance private local and foreign investment. Approval completed on 7 May 2015. Environmental Assessment Category B. Project: P151124. US$ 45.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation Hou sing Finance Project: The revised PDO is as follows: To facilitate the development of the housing finance market t hrough the provision of mediumand long-term liquidity to lenders. Approval completed on 24 February 2015. Environmental A ssessment Category B. US$ 60.0 (IDA Credit). Consultants will be required. BANK OF TANZANIA, Contact: Albert Mkenda, Pr ogram Manager (PIU). Health, Nutrition & Population In vesting in the Early Years: Im prove coverage and quality of the early childhood development services for the first 1,000 day s in selected regions. Concept completed on 28 November 2017. Environmental Assessment Category B. Project: P164758. US$ 200.0 (IDA Credit). Consulting services to be determined. President’s Office Regional Administration and Local Govern- m ent; Ministry of Health, Community Development, Gender, Elderly and Children. (N) Tanzania Reproductive Maternal Neonatal Child and Adolescent Health Investment Project: The proposed objective is t o strengthen and scale-up delivery of essential Reproductive Maternal Neonatal Child and Adolescent Health services Identification completed on 4 March 2019. US$ 200.0 (IDA Credit). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Infrastructure, PPP's & Guarantees T anzania Public-Private Partnership Project: The development objective of the TSPF is sustainable private financing of su b-sovereign public services. Concept completed on 21 March 2018. Environmental Assessment Category B. Project: P1 5 9192. US$ 14.0 (TZPP). Consultants will be required. PPP Node, President's Office Regional Administration and Local Gov ernment, GoT; Ministry of Finance and Planning, RGoZ; PPP Department/Centre, Ministry of Finance and Planning, GoT. M acroeconomics, Trade and Investment Pr ivate Sector Competitiveness Project Additional Financing: Objective to be Determined. Approval completed on 27 December 2013. Environmental Assessment Category C. US$ 60.2 (IDA Credit). Consulting services to be determined. Un ited Republic of Tanzania, Contact: Chandanie Wijayawardene, Director General. Poverty and Equity Dev elopment Support for Tanzania Statistics: To strengthen the capacity of the national statistical bureau to collect, pr ocess, and disseminate data and statistics on living standards, labor markets, and agriculture. Approval com pleted on 14 A ugust 2018. Environmental Assessment Category C. Project: P159954. US$ 8.6 (EUDF). Consultants will be required. Na- t ional Bureau of Statistics. Social Protection & Labor T Z-PSSN Additional Financing: The Project Development Objective of APL Phase 1 is to create a comprehensive, efficient, PAGE 61 Monthly Operational Sum m ary April 2019 w ell-targeted productive social SafetyNet system for the poor and vulnerable section of the Tanzanian population. Approval com pleted on 16 June 2016. Environmental Assessment Category B. Project: P151838. US$ 200.0 (IDA Credit). No consult- a nts are required. Im plementing agency(ies) to be determined. T anzania Productive Social Sa fety Net Project II: T o improve access t o income-earning opportunities and socio-eco- n om ic services for targeted poor households while enhancing and protecting the human capital of their children. Concept com pleted on 2 2 October 2 018. Env ironmental A ssessment Ca tegory B. Pr oject: P1 69165. US$ 450.0 /3.4/2.9/113.3/50.0/17.5/70.0 (IDA Credit/AID/BMGF/DFID/IFAD/NORW/SIDA). No consultants are required. Tan- za nia Social Action Fund. Social, Urban, Rural and Resilience Global Practice Boost ing Inclusive Growth for Zanzibar: Integrated Development Project: The development objective of the pro- ject is to improve the livability and economic potential of Zanzibar in targeted areas, with enhanced service delivery, mobility, cu ltural heritage revitalization, and urban management. Concept completed on 8 May 2018. Environmental Assessment Cat- eg ory B. Project: P1 65128. US$ 150.0 (IDA Credit). Consultants will be required. Ministry of Finance and Planning. Za nzibar Urban Services Project Additional Financing: Im prove access t o urban services and conserve physical cul- t ural heritage in Zanzibar. Approval completed on 13 June 2016. Environmental Assessment Category A. Project: P155392. US$ 55.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. T anzania Strategic Cities Project AF: To improve the quality of and access to basic urban services in Participating LGAs. A pproval completed on 29 May 2014. Environmental Assessment Category B. Project: P148974. US$ 50.0 (IDA Credit). Con- su ltants w ill be r equired. Pr ime Min ister's Office - Reg ional A dministration and Local Government Tel: (255-26) 232- 1 908/2848, E-m ail: NA, Contact: Chandanie Wijayawardene, Director General. La nd Tenure Improvement Project: To strengthen the land administration sy stem and increase tenure security for both m en and wom en. Concept completed on 1 February 2018. Environmental Assessment Category B. Project: P1 64906. US$ 150.0 (IDA Credit). Consultants will be required. Ministry of Lands, Housing and Human Settlements Development. T SCP Second Additional Financing: T o im prove the quality of and access to basic urban services in Participating LGAs. A pproval completed on 27 February 2017. Environmental Assessment Category B. Project: P159489. US$ 130.0 (IDA Credit). Con sultants will be required. Im plementing agency(ies) to be determined. Transport T anzania Roads to Inclusion and Socioeconomic Opportunities (RISE) Program: To im prove road connectivity in support of livelihoods of rural population, both male and female, in selected rural areas, and build capacity in the sustainable m anagement of rural r oads Concept completed on 18 April 2018. Environmental Assessment Category A. Project: P1 64920. US$ 300.0 (IDA Credit). No consultants are required. Tanzania Rural and Urban RoadsAgency (TARURA); Tanzania National Roa ds Agency (TANROADS). T anzania Development Corridors Transport Project: The PDO is to improve transport connectivity in selected devel- opm ent corridors a nd institutional capacity for enhanced m anagement of efficient, r esilient, and sa fe road and airport t ransport systems. Concept completed on 16 April 2018. Environmental Assessment Category A. Project: P165660. US$ 550.0 (IDA Credit). Consulting services to be determined. Tanzania National Roads Agency (TANROADS). Water Su stainable Rural Water Supply and Sanitation Program: Objective to be Determined. Approval completed on 26 Ju ne 2018. Environmental Assessment Category B. Project: P163732. US$ 350.0/65.0 (IDA Credit/DFID). Consulting services t o be determined. Ministry of Water and Irrigation. T anzania Water Sector Support Project - A dditional Financing: The Additional finance will contribute to the coun- t ry's water sector development program (WSDP) achieve its first phase target of providing access to the originally planned beneficiaries of 10 villages per local Government Administration (LGAs). This target was down sized during restructuring of April 2019 Africa PAGE 62 t h e project due t o shortage of funding. Given the increased a ttention g iven to the Rural water supply in governments recent in itiative of Big Result Now (BRN), the AF will be a timely response to assist government achieve its objective. It will also be u ninterrupted continuation of the Bank support during the transition from phase I to Phase II of the program. The AF will finance RWS schemes and completion works in urban component while at the same t ime provide program management as- sistance to Government's effort to streamline the new BRN initiative with the W SDP arrangement. It is expected that devel- opm ent partners such as the DFID will join the initiative. It is also envisaged that preparation of the follow on project to su pport the second phase of government's WSDP will be initiated in parallel to implementation of the Additional financing. A pproval completed on 16 June 2014. Environmental Assessment Category A. Project: P146700. US$ 44.9/1 3.0/15.0 (IDA Cr edit/DFID/KFW). Consultants will be required. Ministry of Water Tel: (255-22) 245-1530, E-m ail: b.psmw@mowi.go.tz, Contact: EgR. Bashir J. Mrindoko, Permanent Secretary. T anzania Water Security for Growth: The proposed development objective of the project is to enhance water security of pr ioritized urban areas and bring critical water-source areas under sustainable watershed management. Identification com- pleted on 3 October 2018. US$ 350.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Togo Agriculture PA SA Additional Financing: The objectives of the Project are to (i) rehabilitate and reinforce productive capacities among t argeted beneficiaries across Selected Value Chains, and (ii) foster an enabling environment for the development of the agri- cu ltural sector, in the Recipient's territory. Pr oject Beneficiaries (within all five administrative regions of Togo) 1 ) 60,000 crop farmers 2 ) 13,000 animal herders 3 ) 1 ,600 fish producers 4 ) 500 fish merchants 5 ) 650,000 households raising poultry and/or small ruminants will benefit from dedicated animal vaccination campaigns PDO Lev el Results Indicators 1 ) Farm output subject to project supported post-harvest value-adding schemes (rice,corn); 2 ) Increase of crop (coffee, cocoa) and continental fisheries output, and of livestock population (small ruminants, poultry) a m ong project beneficiaries; 3 ) Rates of PNIASA financial execution (for PASA, PADAT and WAAPP altogether) and; 4 ) Number of direct beneficiaries. Approval completed on 14 April 2017. Environmental Assessment Category B. Project: P1 5 9637. US$ 20.0 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. Health, Nutrition & Population T ogo Health System Performance Strengthening Project: To improve utilization and quality of reproductive, mater- n a l, neonatal, and child health services in selected regions. Concept com pleted on 8 December 2017. Environmental Assess- m ent Category B. Project: P164886. US$ 25.0 (IDA Grant). C onsultants will be required. Ministère de la Santé et de l'Hygiène Pu blique. PAGE 63 Monthly Operational Sum m ary April 2019 Poverty and Equity T ogo: Data for a fact based society: To im prove the quality of welfare and macro-economic statistics and to strengthen t h e institutional, financial and human infrastructure needed to sustain improved data production. Concept completed on 1 6 October 2018. Environmental Assessment Category C. Project: P166135. US$ 10.0 (IDA Grant). Consultants will be required. In st itut National de la Statistique et des Etudes Economiques et Demographiques: INSEED. Social Protection & Labor Community Development and Sa fety Nets Project Additional Financing: The proposed Project Dev elopment Ob- jective is to provide poor communities with greater access t o basic socio-economic infrastructures and social safety nets. Ap- pr oval completed on 7 March 2014. Environmental Assessment Category B. Project: P146598. US$ 12.1 (IDA Credit). Con- su ltants will be required. Technical Secretariat of the Community Development and Safety Nets Project Tel: (228) 220-7597, E-m ail: pdctogo@yahoo.fr, Contact: Yawavi Agboka-Abalo, Coordonatrice du Secretariat Technique. Social, Urban, Rural and Resilience Global Practice Em ergency Infrastructure Rehabilitation & Energy Project - A dditional Financing: The objectives are to: (a) in- cr ease access to infrastructure and urban services in Lom e; and (b) support the Government's efforts to demonstrate concrete im provements in the lives of its citizens, a critical step for sustaining social and political stability in the country. Approval com pleted on 4 June 2013. Environmental Assessment Category B. US$ 14.0 (IDA Grant). Consultants will be required. A g ence deExecution des Travaux Urbains (AGETUR) Tel: (229) 313-645, E-m ail: agetur@intnet.bj, Contact: Yuba Raj Pandey, V ice Chairman. Uganda Education (R) Uganda Secondary Education Expansion Project: The project development objective is to enhance equitable access t o lower secondary education by focusing on underserved areas and populations, including refugees and hosting communities, a n d girls. Appraisal completed on 10 April 2019. Environmental Assessment Category B. Project: P166570. US$ 100.0/5 0.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Education and Sports. Energy & Extractives Uga nda Energy Access Scale-up Project (EASP): The Project Development Objective is to increase access to energy for h ouseholds, commercial enterprises, and public institutions. Identification completed on 2 February 2018. Environmental A ssessment Category B. US$ 350.0/50.0 (IDA Credit/IDA Grant). Consulting services to be determined. Rural Electrification A g ency (REA). IDA Guarantee for Renewable Energy Development Program: The project will provide for amongst others counter- pa rt r isk guarantee to cover the payment risk from Uganda Electricity Transmission Company Approval completed on 1 8 Ma rch 2014. Environmental Assessment Category B. Project: P133318. US$ 160.0 (GUID). Consultants will be required. Min- ist ry of Energy and Mineral Development Tel: (256-41) 434-9342, E-mail: info@energy.go.ug, Contact: Hon. Irene Muloni, Min ister. Environment & Natural Resources (N) Uganda Forests and Resilient Landscapes Project: To improve management and economic productivity of forest ecosy stems in target landscapes Identification completed on 28 March 2019. US$ 150.0/25.0 (IDA Credit/GCF). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 64 Finance, Competitiveness and Innovation A gribusiness and SME Development Project (AGSME): The development objective of the proposed Second Competi- t iv eness and Enterprise Development Project (CEDP2) is to strengthen conditions for private sector led growth and boost job cr eation by: improving the business environment, increasing firm growth in agribusiness, upgrading innovation capacity of SMEs, enhancing market linkages and promoting entrepreneurship, and im proving MSME access t o finance. This will be ba sed on supporting the GoU in fostering innovation, enhancing competitiveness of the agribusiness sector by developing effective industrial infrastructure with linkages t o SMEs through targeted interventions, such as strengthening links between a griculture and manufacturing, improving quality infrastructure and g enerating investments. Identification completed on 1 8 October 2017. US$ 150.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. COMPET ITIVENESS AND ENTERPRISE DEVELOPMENT PROJECT: To increase private sector investment in the t ourism sector and strengthening a ccess to and effectiveness of the land administration system. Identification completed on 31 October 2018. Environmental Assessment Category B. US$ 150.0 (IDA Credit). Consultants will be required. Im plementing a g ency(ies) to be determined. Governance Na rrowing the Governance Implementation Gap in Uganda (NGIGU): Objective t o be Determined. Concept com- pleted on 2 May 2017. Environmental Assessment Category C. Project: P1 61981. US$ 100.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. M acroeconomics, Trade and Investment Uga nda Intergovernmental Fiscal Transfers Program: Objective t o be Determined. Approval completed on 27 June 2 017. Environmental Assessment Category B. Project: P160250. US$ 200.0 (IDA Grant). Consulting services to be determined. Min istry of finance, Planning, and Economic Development. Social, Urban, Rural and Resilience Global Practice Uga nda Support t o Municipal Infrastructure Development Program - A dditional Financing: Objective to be Det ermined. Approval completed on 15 May 2018. Environmental Assessment Category B. Project: P1 63515. US$ 360.0 (IDA Cr edit). Consulting services to be determined. Im plementing agency(ies) to be determined. UG - St r engthening Social Risk Management and Gender-Based Violence Prevention and Response Project: T h e Project Development Objectives are t o increase: (i) participation in Gender-Based Violence (GBV) prevention programs; a n d (ii) utilization of multi-sectoral response services for survivors of GBV in targeted districts. Approval completed on 20 Ju ne 2017. Environmental Assessment Category B. Project: P1 60447. US$ 40.0 (IDA Credit). Consultants will be required. Min istry of Gender, Labor and Social Development. (R) Dev elopment Response t o Displacement Impacts Project in the HoA: The Project Development Objective (PDO) is t o improve access t o basic social services, expand economic opportunities, and enhance environmental management for communities hosting refugees in the target areas of Djibouti, Ethiopia and Uganda. T h e proposed regional project will embed the essential features of ensuring citizen participation and engagement in identifying a n d prioritizing developmental needs, including socio-economic infrastructure and livelihood opportunities t o improve self- r eliance of refugee hosting communities; improving social cohesion between refugees and refugee hosting communities; in- cr easing citizen voice and role in development decision making; and eliciting greater demand for social accountability. The operational approach will be Community Driven Development (CDD) and will involve: (i) building and capacitating grassroots in stitutions; (ii) ensuring the voice of all communities is heard in decision making; (iii) strengthening decentralized gover n- m ent administrative functions; and (iv) investing in public service delivery and social mobilization to enhance social cohesion a m ong beneficiary communities. Approval completed on 17 April 2019. Environmental Assessment Category B. Project: P1 64101. US$150.0 (IDA Grant). Consultants will be required. IGAD; Agence Djiboutienne de Développement Social; Ministry of A griculture and Natural Resources; Office of the Prime Minister. Ka mpala Institutional and Infrastructure Development Project 3: To enhance mobility within the Greater Kampala PAGE 65 Monthly Operational Sum m ary April 2019 Met ropolitan Area (GKMA) and economic productivity of Kampala City. Identification completed on 9 April 2018. US$ 200.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Water Ir r igation for Climate Resilience Project: To provide irrigation and drainage services, and develop institutional capacity for irrigated agriculture production in the project areas. Concept completed on 1 May 2018. Environmental Assessment Cat- eg ory A. Project: P1 63836. US$ 200.0 (IDA Credit). Consultants will be required. Ministry of Water and Environment; Min- ist ry of Agriculture, Animal Industry and Fishery. Zambia Agriculture Zambia Integrated Forest Landscape Project (GEF): To improve landscape management and increase environmental a n d economic benefits for targeted rural communities in the Ea stern Province and t o improve the Recipient’s capacity to re- spon d promptly and effectively to an Eligible Crisis or Emergency. Approval completed on 4 May 2017. Environmental As- sessm ent Category B. Project: P157521. US$ 8.1 (GEFU). Consultants will be required. Ministry of National Development Plan- n ing (MoNDP). Zambia a gricultural growth clusters for rural jobs and diversified economic development: to promote agricul- t ural diversification and agricultural market opportunities in rural Zambia Identification completed on 29 June 2018. US$ 1 00.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Education (N) Zambia Education Enhancement Project: The project development objective is to improve the quality of teaching a n d learning in mathematics and science in targeted primary and secondary schools and t o increase equitable access t o sec- on dary education. Identification completed on 1 5 A pril 2019. Environmental Assessment Category B. US$ 1 60.0 (IDA Cr edit). Consultants will be required. Im plementing agency(ies) to be determined. Energy & Extractives Zambia Power Sector Financial Recovery Guarantee Project: The Project development objective (PDO) is to enhance Zam bia power sector financial and operational viability. Identification completed on 24 April 2018. US$ 300.0 (GUID). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. (N) Transforming Energy Access Matters: The Project Development Objective is to increase access to reliable and af- for dable energy services in targeted areas. Identification completed on 22 April 2019. US$ 200.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. ZM-Guarantee for Scaling Solar (Round 2): To increase solar electricity generation capacity and diversify electricity g eneration resources in Zambia. Identification completed on 3 October 2017. Environmental Assessment Category B. US$ 1 5 .0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Secon d Scaling Solar Guarantee: To increase solar electricity generation capacity and diversify electricity generation re- sou rces in Zambia. Approval completed on 20 December 2017. Environmental Assessment Category B. Consulting services to be determined. Im plementing agency(ies) to be determined. Environment & Natural Resources (R) T ransforming Landscapes for Resilience and Development in Zambia: To improve natural resource manage- m ent in select districts to support sustainable livelihoods, and in the event of an eligible crisis or emergency, to provide imme- diate and effective response to the eligible crisis or emergency. April 2019 Africa PAGE 66 Negotiations authorized on 15 March 2019. Environmental Assessment Category B. Project: P1 64764. US$ 100.0 (IDA Cr edit). Consultants will be required. Ministry of National Development Planning; National Project Coordination Unit. Governance Pu blic Sector Governance for Service Delivery Program: The Project Development Objective is to strengthen institu- t ions for accountable local service delivery in Zambia. Concept completed on 20 February 2019. Project: P1 69384. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Finance; Ministry of Local Government (Overall Project Coordinator); Decentralization Secretariat; Office of the Auditor General. Social Protection & Labor A dditional Financing for Girls' Education and Women's Empowerment and Livelihood Project (GEWEL): T h e project development objective is to support the Government of Zambia to increase access to livelihood support for wom en a n d access t o secondary education for disadvantaged adolescent girls in extremely poor households in selected districts. Iden- t ification completed on 12 December 2018. Environmental Assessment Category C. US$ 125.0 (IDA Credit). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Zimbabwe Health, Nutrition & Population Zimbabwe Health Sector Development Support Project III - A F: The Project Development Objective (PDO) is to in crease coverage of key maternal and child health interventions in targeted rural and urban districts consistent with the Re- cipient's ongoing health initiatives. Approval completed on 17 July 2017. Environmental Assessment Category B. Project: P1 63976. US$ 5.0 (GFF). Consultants will be required. Im plementing agency(ies) t o be determined. Zimbabwe Health Sector Development Support Project IV - AF: The Project Development Objective is to increase cov erage and quality of key health interventions with an emphasis on MCH services in targeted rural and urban districts and st r engthen capacity for results-based financing contract management, consistent with the Recipients’ ongoing health initia- t iv es. Approval completed on 31 January 2019. Environmental Assessment Category B. Project: P1 68734. US$ 3.0 (GFF). Con sultants will be required. Stitching Cordaid. Zimbabwe Health Sector Development Support Project AF II: The Project Development Objective (PDO) is to in- cr ease coverage of key maternal and child health interventions in targeted rural and urban districts consistent with the Recip- ient's ongoing health initiatives. Approval completed on 23 December 2015. Environmental Assessment Category B. Project: P1 5 6879. US$ 10.0 (HRBF). Consultants will be required. Im plementing agency(ies) to be determined. Regional Agriculture A ssociation for Strengthening Agricultural Research in East and CentralAfrica Multi-Donor Trust Fund: This is a r equest for Additional Financing to support the existing ASARECA MDTF (P112600, TF071104). A Multi-Donor Trust Fu nd (MDTF) was established at the World Bank in 2008 t o support a program of integrated agricultural research for devel- opm ent, as described in ASARECA's 5-year OP (2008/09-2013/14). The MDTF is intended to facilitate donor interaction, coor dination and harmonization (including harmonization of procedures and formats to be applied by ASARECA), which is essential to effectively and efficiently assist the further institutional development of ASARECA. The project has been under im plementation for the past 3.5 years and implementation progress has been satisfactory. Original donor pledges were ex- pected t o r each $5 5 million and this target has been met. New contributions t otaling $4 million will be used to scale up the r esults of existing sub-projects within the remaining timeframe of the grant (19 months). No new activities are planned. Iden- t ification completed on 21 May 2012. Environmental A ssessment Category B. US$ 5.6 (CDP4). Consulting services to be de- t ermined. Association for Strengthening Agricultural Research in Ea stern and Central A frica (ASARECA), Contact: Seyfu Ket ema, Executive Director. PAGE 67 Monthly Operational Sum m ary April 2019 V alorization of Investments in the Valley of the Benue: To contribute t o the Regional Climate Resilience Investment Plan by improving irrigation services and sustaining climate resilient agricultural productivity in the Benue River Valley. Con- cept completed on 15 February 2019. Environmental Assessment Category A. Project: P166072. US$ 200.0 (IDA Credit). Con sulting services to be determined. MEADEN. A dditional Financing for West Africa Agricultural Productivity Program (WAAPP - 1C): To generate and accel- er ate the adoption of improved technologies in the participating countries' top agricultural commodity priority areas that are a ligned with the sub-region's top agricultural commodity priorities, as outlined in the ECOWAP. Approval completed on 3 February 2017. Environmental Assessment Category B. Project: P158983. US$ 53.0 (IDA Credit). No consultants are required. Min istere de l’Economie et de Finances/ Caisse Autonome d’Amortissement; Ministere de l’Economie et des Finances; Minis- t ere du Plan du Niger; Ministre de l’Economie et des Finances. A ssociation for Strengthening Agricultural Research in East and Central Africa Multi Donor Trust Fund: This is a r equest for an extension of and additional financing for the ongoing Association for Strengthening Agricultural Research in Eastern and Central Africa (ASARECA) Multi-Donor Trust Fund (MDTF) (P112600/TF071104). It is currently financed by t h e Canadian International Development Agency (CIDA), UK's Department for International Development (DfID); the Euro- pean Commission (EC); and United States Agency for International Development (USAID), and managed by the Agriculture, Ru ral Development and Irrigation unit (AFTAI). ASARECA, a sub-regional not-for-profit association has been operating based on a 1 0 year Strategic Plan (2008-2018) developed to support the sustainable com petitiveness of Eastern and Central Africa a gricultural research sy stems through support to prioritized areas of research for development. The strategy was designed to be im plemented in 2 five year phases with corresponding Medium Term O perational Plans (MTOPs) which detail implemen- t a tion of the strategy. The ASARECA MDTF was established at the World Bank in 2008 to support the first phase of the stra- t egic plan, OPI (2008-2013). It has been under im plementation for the past 4 and a half y ears and implementation has been sa t isfactory. It is scheduled to close on December 31, 2013. Donor support has been very strong for the OPI. Original donor pledges t otaled $55 million. This target was not only met, but exceeded following an additional con tribution of $5.6 million in t h e second half of 2012. Total contributions to date have passed $60 million. A number of the MDTF participating donors are in favor of and have recommended a 5 year extension of the MDTF to support a sm ooth transition to ASARECA' second MTOP (OPII) (2014-2018). The associated proposed Additional Financing would support implementation of OPII. Initial confirmed fu nding to launch im plementation has a lready been secured from two donors. Identification com pleted on 23 July 2013. Env ironmental Assessment Category B. US$ 30.0 (CDP4). Consulting services to be determined. Implementing agency(ies) to be determined. Ea stern and Central Africa Agriculture Transformation Project II: The development objective is to increase produc- t iv ity, climate r esilience, and sm allholder farmer access t o m arkets for selected agricultural commodities in selected areas of pr oject countries Identification completed on 28 September 2018. US$ 60.5/95.0 (IDA Credit/IDA Grant). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. St r engthening Agricultural Higher Education in Africa: To strengthen linkages between selected African universities a n d regional agricultural sector needs for developing required human resources to accelerate agri-food systems transformation in Africa Concept completed on 23 January 2018. Environmental Assessment Category B. Project: P1 64702. US$ 90.0/10.0 (IDA Credit/IDA Grant). Consulting services t o be determined. Ministry of Edu cation (Malawi); Ministry of Education (Ghana); RUFORUM. A FCC2/RI-Regional Pastoral Livelihoods Resilience: To enhance livelihood resilience of pastoral and agro-pastoral communities in cross-border drought prone areas of se lected countries and improve the capacity of the selected countries’ g ov ernments to respond promptly and effectively t o an eligible crisis or emergency. Approval completed on 21 October 2014. Env ironmental Assessment Category B. Project: P150006. US$ 75.0 (IDA Credit). Consultants will be required. Ministry of Finance (Federal Democratic Republic of Ethiopia) Tel: (251-9) 2771-8854, E-m ail: faberra@mofed.gov.et, Contact: Fisseha A berra, Director. Ea stern and Central Africa Agriculture Transformation Project I: The development objective is to enhance regional collaboration to improve productivity, climate resilience, and competitiveness of selected agricultural commodity value chains a n d increase smallholder farmer access to the regional market for food commodities and products Concept completed on 4 A pril 2018. Environmental Assessment Category B. Project: P1 62416. US$ 160.0/1 0.0 (IDA Credit/IDA Grant). Consulting services to be determined. Uganda: Ministry of Agriculture, Animal Industry and Fisheries; Kenya: Ministry of Agriculture, Liv estock and Fisheries; Rwanda: Rwanda Agriculture and Animal Resources Board. April 2019 Africa PAGE 68 WAAPP -2A - Su pport to Groundnut Value Chain in Senegal: The development objective of WAAPP-2A is to scale- u p the generation, dissemination and a doption of improved technologies in the participating countries’ priority agricultural commodity areas. Approval completed on 17 May 2016. Environmental Assessment Category B. Project: P158265. US$ 20.0 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. For um for Agricultural Research in Africa MDTF - Additional Financing: This is a request for an extension of and a dditional financing for the ongoing Forum for Agricultural Research in Africa (FARA) Multi-Donor Trust Fund (MDTF) (P1 126840/TF071192). It is currently financed by the Canadian International Development Agency (CIDA), UK's Department for In ternational Development (DfID); the European Commission (EC); and The Netherlands, and managed by the Agricul- t ure, Rural Development and Irrigation unit (AFTA2). FARA has been operating on a 10-year Strategic Plan (2007-2016) de- v eloped to add value to the support provided by the sub-regional organizations (SROs) to strengthen African National Agri- cu ltural Research Systems (NARS). The strategy was designed to be implemented in 2 five year phases with corresponding Medium Term Operational Plans (MTOPs) which detail implementation of the strategy. Due to delays in obtaining donor fu nding under the original MDTF, the Strategic Plan period was adjusted to cover the period 2009-2018. The FARA MDTF w as established at the World Bank in 2009 to support the first phase of the strategic plan, MTOP I (2009-2013). It has been u nder implementation for the past three and a half years and implementation has been satisfactory. It is scheduled to close on December 31, 2013. Several of the MDTF participating donors are in favor of and have recommended a 5 -year extension of the MDT F (in line with the Bank's revised guidelines on extension of closing dates, April 2013) to support a sm ooth transition to FA RA's second MTOP (2014-2018). The associated proposed Additional Financing would support implementation of MTOP II. In itial confirmed funding to launch im plementation has already been secured from one donor. Approval completed on 13 December 2013. Environmental Assessment Category B. US$ 20.0 (CDP4). Consulting services to be determined. Forum for A gricultural Research in Africa (FARA) T el: (233-302) 772-823, E-m ail: y akinbamijo@fara-africa.org, Contact: Dr. Yemi A kinbamijo, Executive Director. West Africa Agricultural Transformation Project: The PDO is to accelerate the adoption of innovations by agricultural pr oducers and processors and t o facilitate regional m arket access for targeted t echnologies and products Concept completed on 1 8 April 2018. Environmental A ssessment Category B. Pr oject: P1 64810. US$ 1 98.0/55.0/24.0 (IDA Credit/IDA Grant/GAFS). Consulting services to be determined. CORAF/WECARD; Ministère de l’Agriculture et du Développement Ru ral (Cote d'Ivoire); Ministry of Agriculture, Forestry and Food Security (Sierra Leone); Ministry of Food and Agriculture (Ghana ); Min istère de l’Agriculture et des Aménagements Hydrauliques (Burkina Faso). Digital Development Bu rkina Faso - West Africa Regional Communications Infrastructure Project - A dditional Financing: The de- v elopment objective of WARCIP is t o increase the geographical reach of broadband networks and reduce costs of communica- t ions services in West Africa. For APL1B, the Project's development objectives are to contribute to increasing the geographical r each of broadband networks and to reducing the costs of communications services in each of the territories of The Gambia, Gu inea and Burkina Faso. Approval completed on 25 April 2018. Environmental Assessment Category B. Project: P1 61836. US$ 20.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Regional Connectivity and Transformation Program: The program aims to deepen reforms for connectivity and to ex tend the benefits of connectivity t o people regionally u sing enabling ICT applications. Identification completed on 15 No- v ember 2017. US$ 75.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Education A frica Higher Education Centers of Excellence Project Add. Fin.: The Project Development Objective is to support t h e Recipients to promote regional specialization among participating universities in areas that address regional challenges by st r engthening the capacities of these universities t o deliver quality training and a pplied research. Approval completed on 10 September 2015. Environmental Assessment Category B. Project: P153111. US$15.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. (R) Second Africa Higher Education Centers of Excellence for Development Impact: To improve quality, quantity a n d development impact of postgraduate education in selected universities through regional specialization and collaboration. Con cept completed on 20 Nov ember 2018. Environmental Assessment Category B. Project: P1 69064. US$ 139.0/83.0 (IDA PAGE 69 Monthly Operational Sum m ary April 2019 Cr edit/FRDE). No consultants are required. The Association of African Universities. (R) Fir st Africa Higher Education Centers of Excellence for Development Impact Project: To improve quality, qu antity and development impact of postgraduate education in selected universities through regional specialization and col- la boration. Approval completed on 27 March 2019. Environmental Assessment Category B. Project: P164546. US$ 118.3/24.7 (IDA Credit/IDA Grant). Consulting services to be determined. The Association of African Universities. Energy & Extractives ECOWAS - Ba ttery Energy Storage Systems (BESS) Project: The project aims at financing the equipment to ensure sy nchronization of the systems, and building regional institutions for power trade under ECOWAS (Regional regulator -ERERA a n d information coordination Center-ICC) Identification com pleted on 1 3 September 2018. US$ 120.0/20.0/50.0 (IDA Credit/IDA Grant/CCTF). Consulting services t o be determined. Im plementing agency(ies) to be determined. CA R-DRC Cross-Border Electrification Project: The development objective for the Series of Projects (SOP) is to in- cr ease electricity access in the targeted countries through regional power trade. T h e Project Development Objective (PDO) is to: (i) increase grid electricity supply and access in targeted border cities, and (ii) st r engthen the capacity of the Central Africa Power Pool for regional power trade. Identification completed on 6 February 2 018. Environmental Assessment Category A. US$1 05.0/1 37.0 (IDA Credit/IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. (N) T emane Regional El ectricity Project: The Project Development Objectives is t o enhance transmission capacity for dom estic and regional markets and increase electricity generation capacity through private sector participation. Concept com- pleted on 18 April 2019. Project: P170397. US$ 270.0/30.0/1 20.0 (IDA Grant/FSCO/GUID). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. (R) Ca meroon - Chad Power Interconnection Project: The Project Dev elopment Objective is to increase Cameroon’s t ransmission capacity from Southern t o Northern Cameroon to enable exports towards Chad. Concept completed on 23 October 2018. Environmental Assessment Category A. Project: P1 68185. US$ 295.0/95.0 /215.0 ( IDA Credit/IDA Grant /AFDB). Consulting services to be determined. SONATREL; SNE; Central Africa Power Pool Secretar- ia t. WA PP-APL4 (Phase 1): Côte d'Ivoire Liberia Sierra Leone and Guinea Regional Interconnector - Additional Financing: The r evised PDOs for the WAPP CLSG Power Interconnection are to: (a) reduce the cost of electricity supply at t h e utility level for Liberia and Sierra Leone and (b) increase the amount of electricity traded among all the participating countries. The Development Objective of the WAPP TA is to increase the technical integration of the WAPP network. Approval com pleted on 1 7 Nov ember 2 017. Environmental A ssessment Category A . Pr oject: P1 63033. US$ 82.2/40.2/4.6 (IDA Cr edit/IDA Grant/KFW). Consultants will be required. Im plementing agency(ies) to be determined. Pa rticipatory Forest and Energy Management Regional Project involving The Gambia, Guinea-Bissau, and Sen egal: The proposed PDO is to increase the incomes of rural communities in selected border areas of Gambia, Guinea- Bissau and Senegal by fostering sustainable wood-based energy and forest products and to increase capacity for cross-border collaboration to tackle illegal trade in forest products. T h e project will support forest policy coordination, cooperation and enforcement across the sub-region; reduction of risk of for est degradation by promoting more efficient and cleaner stoves, kilns and fuels; and enhancement of local management of for ests and forest products through creation of a shared forest information network, clarification of forest ownership and use pa tterns and community planning engaging women, youth, and other vulnerable groups. Concept completed on 11 April 2018. Environmental Assessment Category B. Project: P1 64342. US$ 138.0 (IDA Credit). No con sultants are required. Minister of Environment and Sustainable Development (Senegal). Zambia-Tanzania Interconnector: The Dev elopment Objective for the Series of Pr ojects is t o establish cross-border t ransmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power t rade. April 2019 Africa PAGE 70 T h e Project Development Objective (PDO) is to increase power transmission and distribution capacity in northern regions of Zam bia enabling regional interconnection with Tanzania. Concept completed on 17 July 2018. Environmental Assessment Category A. Project: P166099. US$ 210.0 (IDA Credit). Con- su lting services to be determined. ZESCO. (R) Regional Off-Grid Electrification Project: PDO for SOP1 is to increase electricity access of households and busi- n esses using modern stand-alone solar systems through a harmonized regional approach. Approval completed on 17 April 2019. Environmental Assessment Category F. Project: P1 60708. US$ 140.0/1 0.0/74.7 (IDA Cr edit/IDA Grant/CCTF). No consultants are required. ECOWAS Centre for Renewable En ergy and En ergy Efficiency (ECREEE); West African Development Bank (BOAD). (R) A dditional Financing for SAPP AREP Program - MDT F: The Project Development Objective is to advance the pr eparation of selected priority regional energy projects in the Southern African Power Pool participating countries. Negotia- tions authorized on 25 April 2019. Environmental Assessment Category A. Project: P1 63545. US$ 8.5 (FSAF). Consultants w ill be required. Im plementing agency(ies) to be determined. Environment & Natural Resources WA RFP Fisheries Phase 2 GEF in Cape Verde, Gambia, Guinea-Bissau, Senegal: Increased sharing of fisheries in formation by project countries, im proved regulation of access t o priority fisheries and improve secure access to priority fisheries by small scale fishers and increase the post-harvest value of catch. Concept completed on 21 July 2018. Project: P1 63396. US$ 7.3 (GEFU). Consulting services to be determined. Sub Regional Fisheries Commission (Commission Sous Ré- g ionale des Pêches); Ministry of Fisheries (Ministério das Pescas); Ministry of Maritime Economy (Ministério da Econom ia Ma r itima); Ministry of Fisheries, Water Resources and National Assembly Matters; Ministry of Fisheries and Maritime Econ- om y (Ministère de la Pêche et de l'Economie Maritime). In vestments towards Resilient Management of GCLME: To strengthen the resilience of targeted communities and a r eas in coastal Western Africa. Approval completed on 9 April 2018. US$ 20.3 (GEFU). Consultants will be required. Sao T om e and Principe - Ministry of Infrastructures, Natural Resources and Environment; Mauritania - Ministry of Environment a n d Sustainable Development; Benin - Ministry of Environment and Sustainable Development; Togo - Ministry of Environ- m ent and Forest Resources (MEFR) (Directorate of Environment); International Union for Conservation of Nature; Cote d'Iv oire - Ministry of Salubrity, Environment and Sustainable Development; Senegal - Ministry of Environment and Sustain- a ble Dev elopment (Directorate of Environment (DECC)); Cote d'Iv oire - Ministry of Economy and Finances; West Africa Econ omic and Monetary Union. (R) La ke Tanganyika Environmental Management Project: To contribute to the establishment of sustainable inte- g rated watershed and fisheries management in the Lake Tanganyika Basin, while strengthening regional and national institu- t ional framework and capacity to manage natural resources. Concept com pleted on 15 October 2018. Environmental Assess- m ent Category B. Project: P165749. US$ 117.5 (IDA Credit). Consulting services to be determined. Lake Tanganyika Authority. West Africa Regional Fisheries Program Phase 2 in Cabo Verde, The Gambia, Guinea Bissau and Senegal: In creased sharing of fisheries information by project countries, improved regulation of access to priority fisheries and impr ove secure access to priority fisheries by small scale fishers and increase the post-harvest value of catch. Concept completed on 21 Ju ly 2018. Environmental Assessment Category B. Project: P1 61906. US$ 73.0 (IDA Credit). Consulting services to be deter- m ined. Sub Regional Fisheries Commission (Commission Sous Régionale des Pêches); Ministry of Fisheries (Ministério das Pescas); Ministry of Maritime Economy (Ministério da Economia Maritima); Ministry of Fisheries, Water Resources and Na- t ional Assembly Matters; Ministry of Fisheries and Maritime Economy (Ministère de la Pêche et de l'Economie Maritime). A FFC2/RI-Lake Victoria Environmental Management Project APL-1 AF: The objectives of the Project are to con- t r ibute t o: (i) the improvement of the collaborative m anagement of th e trans-boundary natural r esources of the LVB among t h e Partner States; and (ii) the improvement of environmental management of targeted pollution hotspots and selected de- g raded sub-catchments for the benefit of communities who depend on the natural resources of LVB. Approval completed on 2 6 May 2015. Environmental Assessment Category A. Project: P1 53466. US$ 20.0/2.0 (IDA Credit/IDA Grant). Consulting PAGE 71 Monthly Operational Sum m ary April 2019 services to be determined. Im plementing agency(ies) to be determined. West Africa Regional Fisheries Program Phase 2 in Liberia and Sierra Leone: To improve the management of selected fisheries, increase the post-harvest value of catch in targeted landing sites and improve the enabling environment for a quaculture development. Concept completed on 8 March 2018. Environmental Assessment Category A. Project: P162343. US$ 81.0 (IDA Credit). Consultants will be required. Ministry of Agriculture; Ministry of Fisheries and Marine Resources (MFMR); Sub-Regional Fisheries Commission (SRFC); Committee of Fisheries for the West Central of the Gulf of Guinea (FCWC); Liberia National Fisheries and Aquaculture Authority (NaFAA). La ke Victoria Environmental Management Project Phase Three: The Project Development Objective (PDO) is to st r engthen planning, coordination and monitoring of environmental pollution in Lake basin and reduce sediment loads in selected hotspot areas. Concept completed on 27 October 2018. Environmental Assessment Category B. Project: P165352. US$1 95.0/38.0/1 0.0 (IDA Cr edit/IDA Grant/GEFU). Consulting services t o be determined. Lake Victoria Basin Commission. A frica Environmental Health and Pollution Management Program: The program aims to reduce environmental h ealth risks related to harmful chemicals and waste through strengthened institutional partnership and capacity building in pollution management in selected countries including Ghana, Kenya, Senegal, Tanzania, and Zambia. Concept completed on 2 0 November 2018. Project: P1 67788. US$ 37.9 (GEFU). Consultants will be required. The National Env ironmental Manage- m ent Council (NEMC); Environmental Protection Agency (EPA); National Environmental Management Authority (Ministry of Env ironment and Forests); Zambia Environmental Management Agency; Division de l’Environnement et des Etablisse- m ents Classés - DEEC. West Africa Regional Fisheries Program Phase 1 in Cote d'Ivoire: The development objective of this first phase of t h e West Africa Regional Fisheries Program in Cote d'Ivoire is to strengthen governance and management of targeted fisheries a n d improv e handling of landed catch at selected sites. Identification completed on 26 March 2018. US$ 30.0 (IDA Credit). Con sulting services to be determined. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation A frica Region - Improved Investment Climate within the Organization for the Harmonization of Business La ws in Africa (OHADA) AF: To strengthen OHADA’s institutional capacity and sustainability to support, in its member countries, selected aspects of investment climate reforms. T h e reason for the change is to include sustainability of the organization as a result of Project activities. T h e assumption is that strengthened OHADA institutions with additional capacity to elaborate, adopt and disseminate a new g eneration of investment climate reform regulations, enforce contracts, and provide fee based services to the private sector will contribute to improved investment climate in OHADA member countries and make the organization more sustainable. T h e assumption is also that the elaboration of norms, provision of tools and training will contribute to improved corporate financial reporting. Approval completed on 8 June 2018. Environmental Assessment Category C. Project: P164728. US$ 15.0 (IDA Grant). Consultants will be required. Organization for the harmonization of Business Law in Africa. EA C Financial Sector Development and Regionalization Project I: A F: To establish the foundation for financial sector integration among EAC Partner States. For the purposes of this additional financing the "foundation of financial sector in tegration refers to formulating a regional approach to financial inclusion, furthering legal and regulatory harmonization a nd bu ilding institutional capacity to manage the increasingly integrated financial sector in the EAC. Approval completed on 30 September 2016. Environmental A ssessment Category C. Project: P1 60770. US$ 10.5 (IDA Grant). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. (R) Da kar-Bamako Regional Trade Facilitation and Competitiveness Program: Reduce the trade and transport t im e and cost of carrying goods through the Port of Dakar, and along the Dakar-Bamako road trade corridor. Concept com- pleted on 30 September 2018. Environmental Assessment Category B. Pr oject: P165754. US$ 150.0 (IDA Credit). Consulting s ervices to be determined. Dakar-Bamako Corridor Organization. April 2019 Africa PAGE 72 Governance Su pport for Capacity Development of the AUC and Other African Union Organs: The Project Development Objec- t iv e (PDO) is to strengthen AUC’s capacity to facilitate regional integration results and transformation through enhanced in- st itutional efficiency. Approval completed on 31 July 2018. Environmental Assessment Category C. Project: P1 66316. US$ 1 5 .0 (IDA Grant). Consultants will be required. African Union Commission. Regional Public Sector Capacity Building: The project development objective (PDO) is to strengthen, through regional cooperative networks and public goods, the capacity of select schools and institutes of public administration (SIPAs) to build pu blic sector leadership and management capacity. Concept completed on 1 October 2017. Environmental Assessment Cate- g ory C. Project: P1 60923. US$ 30.0 (IDA Grant). Consultants will be required. New Partnership for Africa’s Deve lopment Planning and Coordinating Agency. Health, Nutrition & Population (R) Regional Disease Surveillance Systems Enhancement (REDISSE) Phase IV: The project development objec- t iv es are: (i) to strengthen national and regional cross-sectoral capacity for collaborative disease surveillance and epidemic pr eparedness in ECCAS Region; and (ii) in the event of an eligible crisis or emergency, to provide immediate and effective r esponse to said eligible crisis or emergency. Concept completed on 27 December 2018. Environmental Assessment Category B. Pr oject: P167817. US$60.0/90.0/130.0 (IBRD/IDA Credit/IDA Grant). Consulting services to be determined. ECCAS Sec- r etariat; Ministry of Health and Population. SWEDD A dditional Financing for Benin: The development objective is to increase women and adolescent girls’ empow- erm ent and their access to quality reproductive, child and maternal health services in selected areas of the participating coun- t ries, including the Recipients' territory, and to improve regional knowledge generation and sharing aswell as regional capacity a n d coordination. Approval completed on 25 January 2019. Environmental Assessment Category C. Project: P166813. US$ 9 0.0 (IDA Grant). Consulting services t o be determined. Ministere de l'amenagement du t erritoire et de la population; Minis- t ere de la Population; Ministre du Plan. A frica CDC Regional Investment Financing Program: The project development objective is to assist Africa CDC, Ethi- opia and the Southern Africa regional collaborating center in Zambia to establish infectious disease control systems for the benefit of African Union member states and its citizens. Concept com pleted on 2 October 2018. Environmental Assessment Ca tegory B. Project: P1 67916. US$ 165.0/85.0 (IDA Credit/IDA Grant). No consultants are required. Zambia National Public Health Institute; Federal MOH Ethiopia; Africa Centres for Disease Control and Prevention. A FCC2/RI-3A EA PH Laboratory Networking Project Additional Financing: To establish a network of efficient, h igh quality, accessible public health laboratories for the diagnosis and surveillance of tuberculosis and other communicable diseases. Approval completed on 7 July 2015. Environmental Assessment Category B. US$ 5 0.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. M acroeconomics, Trade and Investment A FR RI-Great Lakes Trade Facilitation - SOP2: The development objective is to enhance the capacity for commerce and im prove processes and conditions for cross-border trade at targeted border locations in the GLR T h e "Capacity for commerce in the context of this project is defined as the capacity of core trade infrastructure, such as border m arkets, border facilities, and ports, to handle an increased flow of goods, services, and people, and the capacity of government a g encies at the border t o provide high quality and efficient services. Service providers include those individuals who directly su pport the immediate cross-border trade value chains, including, among others, market vendors in border markets, trans- por ters, and government agents. The a ssumption is that improving the a dequacy of trade infrastructure, simplifying and im- pr oving border processing procedures (including standards for treatment), and enhancing the knowledge and capacity of trad- er s and border officials would lead to reduced trade costs (be they material and immaterial, the latter related to harassment a n d waste of time) that the target-groups have to bear each t ime they cross the border. Taken together, and in the absence of a ny other factors of influence that are not under the control of the project (such as conflict, disaster, major political and/or economic crisis), these project outcomes w ould help increase t he volume of g oods traded through t he r espective border post s/crossing points and improve the livelihoods of those involved in the cross-border v alue chains in the sub-region. Concept PAGE 73 Monthly Operational Sum m ary April 2019 com pleted on 30 September 2016. Environmental Assessment Category B. Project: P155329. US$ 37.0/23.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Commerce. Na cala Corridor Regional Trade Project: The development objective of this project is to reduce trade and transport costs a n d trade barriers along the Nacala Corridor, with a focus on Malawi and Mozambique. Identification completed on 17 August 2 017. Environmental Assessment Category A. US$ 27.0/1 28.0 (IDA Credit/IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Poverty and Equity Ha rmonizing and Improving Statistics in Ghana, Liberia and Sierra Leone Project: Strengthen the capacity of t h e National Statistical Agencies of Ghana, Liberia and Sierra Leone to produce a set of core harmonized econom ic and social st atistics, and enhance the dissemination of statistical data. Identification completed on 16 October 2018. Environmental A ssessment Category B. US$ 25.0/71.0 (IDA Credit/IDA Grant). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Social Protection & Labor A dditional Financing to Eastern Recovery Project: The project development objective is to improve access to liveli- h oods and socio-economic infrastructure in vulnerable communities in the eastern provinces of DRC. Approval completed on 1 1 December 2015. Environmental Assessment Category B. Project: P157303. US$ 34.0/1 6.0 (IDA Credit/IDA Grant). Con- su ltants will be required. Im plementing agency(ies) t o be determined. West Africa Unique Identification for Regional Integration and Inclusion - Phase II: Project Development Ob- jectives (PDO): For phase 2 of the Project: Increase the number of persons in the Republic of Niger, Republic of Benin and the Republic of Burkina Faso who have government-recognized proof of unique identity that facilitates their access to services. Identification completed on 25 October 2018. US$ 1 95.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice West Africa Regional Hydrometeorological Services Modernization Program Phase I: The proposed Project De- v elopment Objective (PDO) of the Series of Project is to strengthen climate, hydrological and meteorological services in par- t icipant countries and regional entities to improve forecasting, early warning and disaster response systems. T h e proposed Project Development Objective (PDO) for the Phase I is t o strengthen climate, hydrological and meteorological services in Chad, Mali and Togo and regional entities to improve forecasting, early warning and disaster response systems. Con cept completed on 1 3 August 2018. Environmental A ssessment Category B. Pr oject: P1 66987. US$ 7 9.2/22.5 (IDA Grant/GCF). Consultantswill be required. Agence Nationale de la Protection Civile (Togo); Permanent Inter -States Committee for Dr ought Control in the Sahel (CILSS); Centre Régional AGRHYMET; Direction Générale de la Météorologie Nationale (DGMN - Chad); Direction Générale de la Protection Civile (DGPC - Mali). (R) La ke Chad Region Recovery and Development Project: To contribute to the recovery of the Lake Chad Region t hrough supporting regional coordination and crisis monitoring, connectivity and agricultural livelihoods in selected provinces of Cam eroon, Chad and Niger. Concept completed on 1 9 October 2018. Environmental Assessment Category B. Project: P1 61706. US$ 60.0/1 05.0 (IDA Credit/IDA Grant). Consulting services to be determined. (TBC) Republic of Cameroon - Min- ist ry of Economy, Planning and Regional Development; (TBC) Republic of Niger - Executive Secretariat for the SDS Sahel Nig er (SE/SDS Sahel-Niger). Gr eat Lakes Region Displaced Persons and Border Communities Project Additional Financing: to (i) improve a ccess t o livelihoods and socio-economic infrastructure for displaced people and host communities in target areas of the ter- r itory of the Republic of Zambia, and (ii) support regional learning on development responses to forced displacement. Ap- pr oval completed on 25 July 2017. Environmental Assessment Category B. Project: P1 63895. Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. April 2019 Africa PAGE 74 Transport A frica Air Transport Development Program (AATDP): The proposed Project Development Objective is to improve the en abling environment for a private sector driven air transport sector in Africa, through a mix of policy reforms and infrastruc- t ure investments. Identification completed on 9 October 2018. Environmental Assessment Category G. US$ 50.0 (IDA Grant). Con sulting services to be determined. Im plementing agency(ies) to be determined. (R) La ke Tanganyika Transport Program - SOP1 Tanzania Phase: The program development objective for the Lake T anganyika Transport Program has been identified as the following: to facilitate the sustainable movement of goods and peo- ple to and across Lake Tanganyika, whilst strengthening the institutional framework for navigation and maritime safety. Concept com pleted on 1 2 March 2018. Environmental A ssessment Category A . Project: P1 65113. US$ 200.0/3.0 (IDA Cr edit/IDA Grant). Consulting services to be determined. TANROADS; Tanzania Port Authority; Central Corridor Transit T ransport Facilitation Agency; East Africa Community. La ke Tanganyika Transport Program - SOP2 - Burundi: The project development objective has been identified as the following: to facilitate the sustainable movement of goods and people to and across Lake Tanganyika, whilst strengthening the in stitutional framework for navigation and maritime safety. Concept completed on 12 March 2018. Environmental Assess- m ent Category A. Project: P1 65119. US$ 50.0/2.0 (IDA Credit/IDA Grant). Consultants will be required. Autorité Maritime Por tuaire et Ferroviaire; Office des Routes; Lake Tanganyika Authority. Lom e-Ouagadougou-Niamey Regional Corridors: The proposed PDO is t o im prove regional connectivity between Bu rkina Faso, Niger and Togo along Lomé-Ouagadougou and Lomé-Niamey road trade corridors. Concept completed on 2 October 2018. Environmental Assessment Category B. Project: P168386. US$ 210.0 (IDA Credit). Consulting services to be det ermined. Ministry of Transport, Niger; Ministry of Planning and Development, T ogo; Ministry of Infrastructure, Burkina Fa so. La ke Victoria Transport Program - Phase 3 Tanzania: The PDO is to facilitate the sustainable movement of goods and people across Lake Victoria, whilst strengthening the institutional framework for navigation and maritime safety Concept com pleted on 1 8 January 2018. Environmental Assessment Category A. Project: P1 60955. US$ 200.0/5 .0 (IDA Credit/IDA Grant). Consultants will be required. TANROADS; TANZANIA PORTS AUTHORITY; Lake Victoria Basin Commission. Water Nile Cooperation for Results Project (NCORE) - Additional Financing 2: The development objective for the pro- posed project is t o facilitate cooperative water resource management and development in the Nile Basin. Approval completed on 27 April 2017. Environmental Assessment Category B. Project: P162304. US$ 8.5 (CIWA). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. (R) Su pport t o sustainable water r esource management and navigation development in the Congo river ba- sin : The Project Development objective is to strengthen the capacity of CICOS to improve the water resource management in t h e Congo river basin, and t o improve of the navigability of the Kinshasa -Brazzaville-Bangui waterway. Concept com pleted on 20 June 2 018. Env ironmental A ssessment Category A . Project: P1 6488 0. US$ 30.0/75.0 (IDA Cr edit/IDA Grant). Consulting services to be determined. Commission internationale du bassin Congo-Sangha-Oubangui (CI- COS). Bu ilding Cl imate Resilience in t he Niger Basin - Pr oject 1: T h e pr ogram Phase 1 dev elopment objective is to st r engthen NBA’s capacity for integrated, transboundary water resources management. Concept completed on 24 January 2 018. Environmental Assessment Category A. Project: P161262. US$ 45.0/1 0.0/10.0 (IDA Credit/IDA Grant/CIWA). Consult- a nts will be required. Niger Basin Authority; Ministry of Agriculture and Livestock. Econ omic growth and water security in the Sahel through improved groundwater governance: The Project Dev elopment Objective (PDO) is to improve the knowledge on groundwater potential in the Sahel and to strengthen ground- water governance arrangements at local, national, and regional levels. Concept completed on 25 October 2017. Environmental A ssessment Category B. Project: P1 63252. US$ 13.6 (GEFU). No consultants are required. Sahara and Sahel Observatory (OSS). PAGE 75 Monthly Operational Sum m ary April 2019 V alorization of Investments in the Valley of the Logone: The Project Development Objective (PDO) is to improve ir rigation services, rice production and commercialization in targeted irrigation schemes of the Logone valley. Concept com- pleted on 24 January 2019. Environmental Assessment Category B. Project: P1 68772. US$ 200.0 (IDA Credit). Consultants w ill be required. SEMRY (Société d'Expansion et Modernisation de Riziculture de Yagoua). East Asia And Pacific Cambodia Environment & Natural Resources (R) Cambodia Sustainable Landscape and Ecotourism Project: The Project Development Objective is to improve pr otected areas management, and to promote ecotourism opportunities and non -timber forest product value chains in the Ca rdamom Mountains-Tonle Sap landscape. Negotiations authorized on 29 March 2019. Environmental Assessment Cate- g ory B. Project: P1 65344. US$ 50.7 (IDA Credit). Consulting services to be determined. Ministry of Environment; Ministry of Ru ral Development. Health, Nutrition & Population Ca mbodia Pre Service Training for Health Workers Project: To improve population health outcom es through en- h anced clinical skills and competencies among health workers in Cambodia Identification completed on 2 December 2018. US$ 15.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. (R) Cambodia Nutrition Project: The PDO is to improv e utilization and quality of priority maternal and child health and n utrition services for targeted groups in Cambodia. Approval completed on 4 April 2019. Environmental Assessment Category B. Pr oject: P162675. US$ 15.0/2.0/1 0.0/5.0/9.0 (IDA Credit/FSHN/GFF/IDFH/KHFS). Consultants will be required. Minis- t ry of Health; National Committee for Sub-National Democratic Development Secretariat. A dditional Financing for Health Equity and Quality Improvement Project (H-EQIP): To improve access toquality h ealth services for the targeted population groups, with protection against impoverishment due t o the cost of health services in the Kingdom of Cambodia, and t o provide immediate and effective response in case of an eligible crisis or emergency. Ap- pr oval completed on 18 December 2018. Environmental Assessment Category B. Project: P1 67351. US$ 6.0 (KHFS). Consult- a nts will be required. Ministry of Health; Ministry of Health. Social, Urban, Rural a nd Resilience Global Practice Ca mbodia Secondary Cities Development Project: The project development objectives are to improve access to urban in frastructure in the project cities and to improve integrated urban planning capacity. Identification completed on 23 July 2 018. US$ 60.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Transport Roa d Asset Management Project II Additional Financing: The PDO is to improve the condition, safety and climate r esilience of selected national road corridors in Cambodia and t o provide immediate and effective response in case of an Eli- g ible Crisis or Em ergency. April 2019 East Asia And Pacific PAGE 76 A pproval completed on 21 June 2018. Environmental Assessment Category B. Project: P1 65249. US$ 110.0 (IDA Credit) . Con sultants will be required. Ministry of Public Works and Transport. Ca mbodia Road Connectivity Improvement: To enhance market access, improve climate resilience and support human ca pital development in selected provinces through improvement of priority national, provincial and rural roads. Identification com pleted on 18 December 2018. US$ 100.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) t o be determined. Water (R) Water Supply and Sanitation Improvement Project: The Project Development Objective (PDO) is to increase ac- cess to piped water supply and improved sanitation services and strengthen the operational performance of service providers in selected towns and/or communes. Approval completed on 28 March 2019. Environmental Assessment Category B. Project: P1 63876. US$ 55.0 (IDA Credit). Consultants will be required. Ministry of Industry and Handicraft; Ministry of Public Works a n d Transport. China Agriculture Ch ina Food Safety Improvement Project: The project development objective is to demonstrate improved food safety m anagement approaches at the national and targeted subnational levels; and reduce food safety risks in selected value chains. Identification completed on 8 November 2016. Environmental Assessment Ca tegory B. US$300.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. Hu bei Safe, Sustainable, Smart Agriculture Project: Indicative PDO: To strengthen the management of environmen- t a l, climatic, and food safety risks in targeted locations and agri-food v alue chains in Hubei Province. Concept completed on 1 5 November 2018. Environmental Assessment Category B. Project: P168061. US$100.0 (IBRD). Consulting services to be det ermined. Hubei Provincial Department of Agriculture. Henan Green Agriculture Finance Fund: The proposed objective of the project is to strengthen the green agriculture in itiatives in Henan. Identification completed on 1 5 November 2018. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives (R) Ch ina Distributed Renewable Energy Scale-Up Project: Promote the scale-up of distributed renewable energy a n d GHG emission reduction in China through policy interventions and pilots Negotiations authorized on 25 March 2019. Env ironmental Assessment Category B. Project: P1 62299. US$ 7.3 (GEFU). Consultants will be required. National Energy A dm inistration (NEA). (R) Ch ina Renewable Energy and Battery Storage Promotion Project: The project development objective is to pro- m ote the integration and use of renewable energy (RE) through the deployment of battery storage sy stems and innovative a pplications of RE. Negotiations authorized on 21 April 2019. Project: P1 63679. US$300.0 (IBRD). Consultants will be re- quired. Huaxia Bank. Environment & Natural Resources (R) Ch ina Partnership for Market Readiness: The Project Development Objective is to enable China to design a national ca rbon emissions trading scheme. Approval completed on 10 April 2019. Environmental Assessment Category C. Project: P1 66983. US$ 2.0 (PMR). Consultants will be required. National Center for Climate Change Strategy and International Coop- er ation (NCSC). Cl imate Smart Management of Grassland Ecosystems: To pilot climate smart and participatory grassland manage- m ent practices and an evidence-based PES scheme at selected sites. Concept completed on 15 November 2018. Environmental PAGE 77 Monthly Operational Sum m ary April 2019 A ssessment Category B. Project: P1 66853. US$ 3.8 (GEFU). Consultants will be required. Ministry of Agriculture and Rural A ffairs. For est Development in the Yangtze River Economic Belt PforR: To improve ecological and sustainable forest land- sca pe restoration with significant ecological environmental benefits in support of Sichuan’s Large -Scale Green Program Iden- t ification completed on 31 May 2017. Environmental Assessment Category C. US$150.0 (IBRD). Consulting services to be det ermined. Forestry Station, Sichuan Provincial Forestry Department. Finance, Competitiveness and Innovation Yangtze River Economic Belt Industrial Transformation: Objective to be Determined. The development objective of t h e project is t o support the g overnment's plan t o make Yangtze River Economic Belt (YREB) a leading and m odel region in in novation driven development, industrial transformation, regional coordination and win-win cooperation by improving in- n ov ation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. Iden- t ification completed on 30 August 2017. Environmental Assessment Category B. US$400.0 (IBRD). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Health, Nutrition & Population (N) Ha inan Health Sector Reform Project: The Project Development Objective is to contribute to improving the quality a n d efficiency of primary health care services in Hainan. Identification completed on 24 April 2019. US$200.0 (IBRD). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. Social Protection & Labor (R) Gu izhou Aged Care System Development Program: The PDO is t o increase equitable access to a basic package of a g ed care services and to strengthen the quality of services and the efficiency of the aged care system. Approval completed on 21 March 2019. Environmental Assessment Category C. Project: P162349. US$350.0/114.5 (IBRD/FRDE). No consultants a r e required. Guizhou Provincial Department of Civil Affairs. Social, Urban, Rural and Resilience Global Practice (R) Sh aanxi Sustainable Towns Development Project: The proposed project development objective is t o foster re- g ional collaboration, reduce flood risk, and improve urban services in selected towns in the southern part of Shaanxi. Negoti- ations authorized on 5 April 2019. Environmental Assessment Category B. Project: P1 62623. US$100.0/5 0.0 (IBRD/KFW). Con sultants will be required. Foreign Debt Management Office, Shaanxi Provincial Development and Reform Commission. (R) Ga nsu Revitalization and Innovation Project: The project development objectives are to increase incom e-generat- in g opportunities, improve access to infrastructure and services, and strengthen institutional capacity of participating ent ities. Negotiations authorized on 23 April 2019. Environmental Assessment Category A. Project: P158215. US$180.0 (IBRD). Con- su ltants will be required. Gansu Provincial Department of Culture and Tourism; Gansu Financing Holding Group. (R) Ch ongqing New Urbanization Pilot and Demonstration Project: The project development objective is to improve t h e use of public space and increase pedestrian mobility in selected districts of Chongqing’s Central City. Appraisal completed on 6 July 2018. Environmental Assessment Category A. Project: P158142. US$100.0 (IBRD). Consulting services to be deter- m ined. Chongqing PMO. (R) Gr een Urban Financing and Innovation Project: The project development objective is to increase access to sus- t a inable, long-term financing for selected green urban investments benefitting local gov ernments in the Yangtze River Delta Reg ion. Negotiations authorized on 2 April 2019. Environmental Assessment Category F. Project: P158124. US$200.0/172.0 (IBRD/KFW). Consultants will be required. Shanghai Green Urban Financing and Services Co., Ltd (FSC). Ch ina: Greening Fuzhou High Tech Zone Demonstration Project: To contribute to balanced spatial development in t h e Yangtze Riv er Belt Concept completed on 24 April 2018. Environmental A ssessment Category B. Project: P1 58079. US$200.0 (IBRD). Consulting services to be determined. Fuzhou High-Tech Industrial Development Zone. April 2019 East Asia And Pacific PAGE 78 Transport Ch ina: GEF Efficient and Green Freight Transport Project: The development objective of the project is to (i) improve t h e Recipient’s institutional capacity to formulate and evaluate policies and strategies to promote green freight transport sys- t em s; and (ii) pilot innovative carbon em ission r eduction measures in the freight transport sector in selected provinces. Ap- pr oval completed on 18 December 2018. Environmental Assessment Category B. Project: P159883. US$ 8.3 (GEFU). Consult- a nts will be required. Ministry of Transport. (R) Chuzhou-Nanjing Intercity Railway PPP Project: The project development objective is to demonstrate a public- pr ivate partnership consistent with good international practices t o implement an intercity railway project between Chuzhou a n d Nanjing Municipalities. Concept completed on 18 April 2019. Environmental Assessment Category A. Project: P1 68181. US$1 50.0 (IBRD). Consultants will be required. Anhui Development and Reform Commission. Water (R) Sichuan Water Supply and Sanitation PPP Project: The project development objective is to improve water supply a n d sanitation services through a public private partnership in selected areas of Deyang Municipality. Concept completed on 4 February 2019. Project: P1 68025. US$100.0 (IBRD). Consulting s ervices to be determined. Jingyang Project Management Office. Indonesia Education (R) Realizing Education's Promise: Support to Indonesia's Ministry of Religious Affairs for Improved Qual- ity of Education: To improve the management of primary and secondary education services under the Ministry of Religious A ffairs (MoRA). Appraisal completed on 19 March 2019. Project: P1 68076. US$250.0 (IBRD). Consultants will be required. Min istry of Religious Affairs. Im proving Efficiency and Effectiveness in Education Expenditure: T o im prove learning conditions for students in t h e first nine years of formal education in selected districts by strengthening governance and management practices in the education sector. Concept com pleted on 10 August 2018. Environmental Assessment Category C. Project: P163217. US$300.0 (IBRD). Consulting services to be determined. Ministry of Education and Culture. Energy & Extractives In donesia Geothermal Resource Risk Mitigation Project (GREM): The proposed development objective is to scale u p investment in geothermal energy development and reduce greenhouse gas em issions in Indonesia. Concept completed on 8 Nov ember 2 018. Env ironmental A ssessment Category F. Pr oject: P1 66071. US$150.0/75.0/2.5/100.0/2.5 (IBRD/CCTF/ESMP/GCF/GIF). Consulting services t o be determined. PT Sarana Multi Infrastruktur (Persero). Environment & Natural Resources ID: Su stainable Landscape Program in Jambi: The program’s proposed development objective is to reduce land-based g r eenhouse gas em issions and promote sustainable land-use in the selected provinces of Indonesia. Concept completed on 5 A pril 2018. Environmental Assessment Category B. Project: P166672. US$ 13.5 (BIOA). Consultants will be required. Ministry of Env ironment and Forestry. Im provement of Solid Waste Management t o Support Regional and Metropolitan Cities: The Project Develop- m ent Objective (PDO) is to improve solid waste m anagement services for urban populations in selected cities across Indonesia. Neg otiations authorized on 4 May 2018. Environmental Assessment Category A. Project: P157245. US$100.0 (IBRD). Con- su ltants will be required. Bappenas; Ministry of Environment and Forestry; Ministry of Health; Ministry of Hom e Affairs; Min istry of Public Works and Housing. PAGE 79 Monthly Operational Sum m ary April 2019 In donesia: HCFC Phase-out in the PU Foam Sector: Additional Financing for Stage 2: The Project Development Objective is to reduce the consumption of HCFC-1 41b in the foam sector in Indonesia in order to contribute to the government's effort t o comply with In donesia's HCFC phase-out obligations under the Montreal Protocol. Approval completed on 22 De- cem ber 2017. Environmental Assessment Category B. Project: P161588. US$ 4.3 (MPIN). Consultants will be required. Im ple- m enting agency(ies) to be determined. ID: St r engthening of Social Forestry in Indonesia: The Project Development Objective (PDO) is to improve access to for est land use rights and community management in selected priority areas allocated for social forestry. Identification com- pleted on 23 February 2018. US$ 14.3 (GEFU). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Finance, Competitiveness and Innovation (N) St rengthening Disaster Risk Finance & Insurance: The Project Development Objective is to strengthen the finan- cial and fiscal r esilience of the Government of In donesia t o natural disasters. This will be achieved by establishing a pooling fu nd to protect the budget against disaster shocks; linking this to pre-arranged disbursement channels to provide targeted and t im ely response following disaster shocks; and building capacity in the government for the implementation of the National Disa ster Risk Financing and Insurance Strategy. Identification completed on 26 April 2019. US$500.0/10.0 (IBRD/GFDR). Con sulting services to be determined. Minstry of Finance. In donesia Infrastructure Finance Facility - A dditional Financing: T o strengthen the financial capacity of IIF to in- cr ease the access to private sector financing for infrastructure in Indonesia Approval completed on 24 March 2017. Environ- m ental Assessment Category F. Project: P1 54779. US$200.0 (IBRD). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Social Protection & Labor In donesia Skills Development Project: To support the Government of Indonesia in reforming its technical vocational education and training system to ensures qualifications provides the skills that employers, government and industry need. Identification com pleted on 1 4 January 2 018. US$200.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (N) In donesia Disaster Resilience Initiatives Project: To improve the preparedness of the central government and selected local governments against natural hazards. Identification completed on 31 March 2019. US$165.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Regional Infrastructure Development Fund - Phase 2: The project development objective (PDO) is to expand the range of in frastructure finance options at the subnational level through a financially sustainable financial intermediary. Identifica- t ion com pleted on 29 October 2018. US$150.0/150.0 (IBRD/AIIB). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Central Sulawesi Rehabilitation and Reconstruction Project: The PDO is t o reconstruct and strengthen public facil- it ies and safer housing in selected disaster-affected areas. Identification com pleted on 9 October 2018. US$256.2 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. National Urban Development Project (NUDP): To increase the number of participating cities carrying out integrated planning and prioritizing their capital investments. Negotiations authorized on 20 February 2019. Environmental Assessment Ca tegory B. Project: P1 63896. US$49.6 (IBRD). No consultants are required. Ministry of Public Works a nd Housing (MPWH); Min istry of National Development Planning (BAPPENAS); Ministry of Home Affairs (MOHA). (R) In stitutional Strengthening for Improved Village Service Delivery: To strengthen institutional capacity for im- pr oved quality of spending in participating villages. April 2019 East Asia And Pacific PAGE 80 Negotiations authorized on 5 March 2019. Environmental Assessment Category B. Project: P165543. US$350.0 (IBRD). Con sultants will be required. Ministry of Home Affairs; National Development Planning Agency; Ministry of Villages, Disa d- v antaged Areas and Transmigration. ID-T F ADDITIONAL FINANCING PNPM GENERASI PROGRAM: The new PDO is t o empower local communities in poor , rural sub-districts in the project provinces t o increase utilization of health and education services. Approval completed on 23 June 2014. Environmental Assessment Category B. Project: P147658. US$ 121.8 (IDPN). Consultants will be required. Dir ector Generals for Village Community Em powerment Tel: 6221-7 990419, E-mail: ppkpmd@yahoo.com, Contact: Nata Ira- w an, SH, MSi, Directorate of Traditional and Community Social and Cultural. Transport (N) National Urban Transport Support Program: T o support selected Indonesian cities t o provide effective public t ransport sy stems of a ppropriate quality along high priority corridors Identification completed on 1 6 April 2019. US$5 00.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Water T he National Rural Water Supply and Sanitation Project (PAMSIMAS AF): To increase the number of under-served r ural and peri-urban populations accessing sustainable water supply and sanitation servicesApproval completed on 8 January 2 016. Environmental Assessment Category B. Project: P154780. US$300.0 (IBRD). Consultants will be required. Ministry of Pu blic Works and Housing, Contact: Andreas Suhono, Director General of Human Settlements; Ministry of Public Works and Housing, Contact: Andreas Suhono, Director General of Human Settlements. National Urban Waste Water Management Program: The Project Development Objective (PDO) is to increase capac- ity of national and local governments for wastewater management and increase access to safely managed sanitation to the population living in selected cities in Indonesia. Concept completed on 24 December 2017. Environm ental Assessment Cate- g ory A. Project: P158310. US$200.0 (IBRD). Consulting services to be determined. Ministry of Public Works, Directorate General of Human Settlement. Da m Operational Improvement and Safety Project Phase 2: The new Project Development Objective is proposed to in crease the safety and functionality of dams in selected locations and strengthen the operation and management capacity for dam sa fety. A pproval com pleted on 2 7 February 2 017. En v ironmental A ssessment Ca tegory B. Pr oject: P1 61514. US$1 25.0/125.0 (IBRD/AIIB). Consultants will be required. Ministry of Public Works and Housing; Ministry of Finance. Kiribati Environment & Natural Resources Pa cific Islands Regional Oceanscape Program - Ki ribati: The PDO is to enhance the sustainable value of large-scale oceanic fisheries, diversify sustainable marine -based sources of revenue for coastal communities and strengthen coastal and m arine pollution management capacity in Kiribati. Concept completed on 6 December 2018. Environmental Assessment Cat- eg ory B. Project: P1 65821. US$ 15.0 (IDA Grant). No consultants are required. Ministry of Fisheries and Marine Resource Dev elopment. Transport Ki r ibati Outer Islands Transport Infrastructure Investment Project: The PDO is to improve the safe and resilient t ransport connectivity of selected outer islands in the Gilbert Islands Chain of Kiribati, and in the event of an eligible cr isis or em ergency, to provide an immediate response to the eligible crisis or emergency. Concept completed on 28 September 2018. Env ironmental Assessment Category B. Project: P165838. US$ 21.0/1 0.0 (IDA Grant/ASDB). Consulting services to be deter- m ined. Ministry of Infrastructure and Sustainable Energy; Ministry of Information, Communications, Transport & Tourism Dev elopment. PAGE 81 Monthly Operational Sum m ary April 2019 Ki r ibati Aviation Investment Project Additional Financing: The project development objective is to improve opera- t ional safety and ov ersight of international air transport and associated infrastructure. Approval completed on 9 March 2016. Env ironmental Assessment Category B. Project: P153381. US$ 7.1/5.4 (IDA Grant/PRIF). Consultants will be required. Min- ist ry of Communication, Transport, & Tourism Development Tel: 686-26-004, E-mail: tmwemwenikeaki@gmail.com, Con- t a ct: Terieta Mwemwenikeaki, Secretary. Water Sou th Tarawa Water Supply Project: The proposed PDO is t o increase access and quality of water supply services, and t o im prove the operational performance of the water supply services provider in South Tarawa. Concept completed on 12 September 2018. Environmental Assessment Category B. Project: P1 62938. US$ 15.0/15.0/28.6 (IDA Grant/ASDB/GCF). Con sulting services to be determined. Ministry of Infrastructure and Sustainable Energy. Lao People's Democratic Republic Energy & Extractives La os - Vietnam Interconnector Project: To increase the export of renewable energy from Laos to Vietnam in a financially a n d environmentally sustainable way. Concept completed on 5 July 2018. Environmental Assessment Category B. Project: P1 64500. US$ 25.0 (IDA Credit). No consultants are required. Ministry of Energy and Mines; Electricite du Laos. La o PDR Clean Cook Stove Initiative: Enhance energy efficiency in cook stoves and reduce carbon emissions from house- h olds a cross three provinces in La o PDR Concept com pleted on 1 3 February 2019. Project: P1 69538. US$ 5.6/0.9 (CDEV/ESMP). Consulting services to be determined. The Ministry of Energy and Mines (MEM). Finance, Competitiveness and Innovation (R) La o PDR Financial Sector Sa fety Net Strengthening: t o strengthen the financial and institutional capacity of the Deposit Insurance Office to enable it to fulfill its deposit insurance mandate. Concept completed on 2 April 2019. Project: P1 69194. US$ 20.0 (IDA Credit). Consulting services to be determined. Deposit Protection Office. Governance (R) Enhancing Public Finance Management through Information and Communication Technology and Skills (E-FIT S) Project: The PDO is t o contribute t o the coverage, timeliness, and transparency of financial reporting and to en- h ance public financial management skills. Approval completed on 14 March 2019. Environmental Assessment Category C. Pr oject: P167534. US$ 20.0 (IDA Credit). Consultants will be required. Ministry of Finance of Lao PDR. Health, Nutrition & Population La o People’s Democratic Republic Civil Registration and Vital Statistics Project: To establish a functional elec- t r onic civil m anagement information sy stem and improve the coverage of civil registration of vital ev ents particularly births a n d deaths in Lao PDR Concept completed on 28 August 2018. Environmental Assessment Category B. Project: P167601. US$ 20.0 (IDA Credit). Consultants will be required. Ministry of Home Affairs. Hea lth and Nutrition Services Access Project: To improve access to quality health and nutrition services while ensuring financial protection, in targeted areas of Lao PDR. Concept completed on 27 September 2018. Environmental Assessment Ca tegory B. Project: P1 66165. US$ 15.0/1 0.0/5.0 (IDA Credit/GFF/IDFH). Consultants will be required. Ministry of Health. Social Protection & Labor (R) Reducing Rural Poverty and Malnutrition Project: The Project Development Objective is to support the design a n d implementation of a nutrition-sensitive social assistance program to improve nutrition behaviors, and enhance the con- v ergence of nutrition-focused interventions. Approval completed on 14 March 2019. Environmental Assessment Category B. April 2019 East Asia And Pacific PAGE 82 Pr oject: P162565. US$ 27.0 (IDA Credit). Consultants will be required. Ministry of Agriculture and Forestry. Social, Urban, Rural and Resilience Global Practice Pov erty Reduction Fund III Additional Financing: To improve access to basic infrastructure and services as well as the pr oduction and consumption of diverse and nutritious foods in the Project’s t argeted poor communities. Identification com- pleted on 23 September 2018. Environmental A ssessment Category B. US$ 1 0.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. En hancing Systematic Land Registration Project: The objective of the project is to support the Government of Lao PDR in scaling systematic land r egistration and improving delivery of land administration services. Identification completed on 21 November 2018. US$ 25.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be deter- m ined. Water A dditional Financing for Mekong Integrated Water Resources Management (Lao PDR): The Project Develop- m ent Objective is to improve water resource and fisheries management in selected areas of the Lower Mekong Basin. Approval com pleted on 6 July 2017. Environmental Assessment Category B. Project: P159447. US$ 25.0 (IDA Credit). Consultants will be r equired. Mekong River Commission; Ministry of Finance, Lao PDR; Ministry of Natural Resources and Environment. (R) Sca ling-Up Water Supply, Sanitation and Hygiene Project: To provide access t o im proved water supply, sanita- t ion and hygiene services in selected areas identified for nutrition convergence, and strengthen capacity of select institutions t o im prove service delivery. Approval completed on 14 March 2019. Environmental Assessment Category B. Project: P164901. US$ 25.0 (IDA Credit). Consultants will be required. The Ministry of Public Works and Transport; Ministry of Health. Marshall Islands Health, Nutrition & Population (R) Mu ltisectoral Early Childhood Development Project: To improve coverage of multisectoral early childhood de- v elopment services Approval completed on 28 February 2019. Environmental Assessment Category B. Project: P1 66800. US$ 13.0 (IDA Grant). No consultants are required. Ministry of Finance; Ministry of Culture and Internal Affairs; Office of Ch ief Secretary; Ministry of Health and Human Services; Ministry of Education, Sports and Training. Social, Urban, Rural and Resilience Global Practice A dditional Financing for the Pacific Resilience Project under the Pacific Resilience Program: To strengthen the financial protection of the Republic of the Marshall Islands from natural disasters. Approval completed on 27 Septemb er 2 018. Environmental Assessment Category B. Project: P1 66974. US$ 2.5 (IDA Grant). Consulting services to be determined. Min istry of Finance. Transport (R) Ma rshall Islands Maritime Investment Project: To improv e the safety, efficiency and climate resilience of maritime in frastructure and operations in the Recipient's territory, and in the event of an Eligible Crisis or Emergency, to provide a n im mediate response to the Eligible Crisis or Em ergency. Negotiations authorized on 27 March 2019. Environmental Assess- m ent Category B. Project: P161382. US$ 33.1 (IDA Grant). Consultants will be required. The Republic of the Marshall Islands Por t Authority; Ministry of Finance; Ministry of Justice; National Disaster Management Office. PAGE 83 Monthly Operational Sum m ary April 2019 Micronesia, Federated States of Digital Development (N) Digital FSM: T o increase access t o more a ffordable internet, promote private sector investment in digital services and im prove Government's capacity to deliver digital government services. Identification completed on 12 March 2019. US$ 20.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. P2: Pa lau-FSM Connectivity Project: AF Kosrae Connectivity: The development objective of the Project is to reduce t h e cost and increase the availability of information and communication t echnology services in the Recipient's territory. Ap- pr oval completed on 31 May 2017. Environmental Assessment Category B. Project: P1 61363. US$ 1.6 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. Transport (R) Federated States of Micronesia Maritime Investment Project: To improve the safety, efficiency and climate re- silience of m aritime infrastructure and operations in the Recipient's t erritory, and in the ev ent of an Eligible Crisis or Em er- g ency, to provide an immediate response to the Eligible Crisis or Em ergency. Negotiations authorized on 25 March 2019. Env ironmental Assessment Category B. Project: P163922. US$ 38.5 (IDA Grant). Consultants will be required. Department of T ransportation, Communication & Infrastructure; Department of Justice; Department of Environment, Climate Change a n d Em ergency Management. Mongolia Agriculture National Livestock and Agriculture Commercialization Project: T o improve livestock and crop productivity and commercialization of targeted value chains in project locations Concept completed on 18 July 2018. Environmental A ssess- m ent Category B. Project: P165945. US$ 50.0 (IDA Credit). No consultants are required. Ministry of Food Agriculture and Light Industry, Government of Mongolia. Energy & Extractives (N) Ul aanbaatar Heating Sector Improvement Project: To help meet growing demand and reduce air pollution by im proving efficiency and sustainability of Ulaanbaatar’s h eating sector. Identification completed on 7 March 2019. US$ 2 1 .0/20.0 (IDA Credit/AIIB). Consulting services to be determined. Im plementing agency(ies) to be determined. A dditional Financing to Ulaanbaatar Cl ean Air Project: The development objective (PDO) is to enable consumers in g er areas to access heating appliances producing less particulate matter emissions and to further develop selected medium- t erm particulate matter abatement measures in Ulaanbaatar in coordination with development partners. Negotiations author- ized on 26 November 2018. Environmental Assessment Category B. Project: P167421. US$ 12.0 (IDA Credit). Consultants will be r equired. UBCAP Project Management Unit. Myanmar Agriculture My anmar National Food and Agriculture Systems Project: The Project Development Objective (PDO) is to, “increase pr oductivity of select h igh value commodities, enhance agricultural diversification and competitiveness, and diet diversity in selected agro-ecological zones of My anmar”. This will be achieved through the provision of key public goods and services that w ill facilitate and further enhance the engagement of (and with) the private sector. Concept completed on 29 June 2018. Env ironmental Assessment Category B. Project: P164448. US$ 100.0 (IDA Credit). Consulting services to be determined. Min- ist ry of Agriculture, Livestock, and Irrigation. April 2019 East Asia And Pacific PAGE 84 Digital Development MM: Digital Myanmar Project: The objective is to (i) increase integration and efficiency of digital investments for targeted pu blic sector agencies using a shared digital government platform, and (ii) increase availability and transparency of selected dig ital services for My anmar people, businesses and government employees. Concept completed on 22 November 2018. En- v ironmental Assessment Category C. Project: P167978. US$ 100.0 (IDA Credit). Consulting services to be determined. Minis- t ry of Transport and Communications. Education In clusive Access and Quality Education project: Objective to be Determined. Concept completed on 18 September 2 017. Environmental Assessment Category B. Project: P1 63389. US$ 100.0/70.0/1 0.0 (IDA Credit/EFAF/EUDF). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives Power System Energy Efficiency Improvement Project: The development objective of the proposed project is to in- cr ease capacity and efficiency of generation and transmission system in the project area. Concept completed on 10 November 2 017. Environmental Assessment Category B. Project: P1 62151. US$ 160.0 (IDA Credit). Consultants will be required. Electric Pow er Generation Enterprise; Ministry of Electricity and Energy. Environment & Natural Resources My anmar Forest Restoration, Development and Investment Program: T o im prove collaborative forest management and increase benefits for forest dependent communities in targeted sites. Iden- t ification completed on 1 8 October 2018. US$ 200.0/4.0 (IDA Credit/GEFU). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Finance, Competitiveness and Innovation My anmar Inclusive and Sustainable Tourism Development: To improve the accessibility and attractiveness of se- lected tourism destinations in My anmar and increase economic inclusion of local workers and firms in the tourism sector. Identification completed on 24 October 2018. US$ 150.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Governance (R) En hancing Institutional Capacity of State and Region Governments in Myanmar: The project development objective is to improve the institutional capacity of selected state and region governments to manage public funds and coordi- n ate with the union government for efficient and inclusive delivery of services. Concept completed on 18 April 2019. Project: P1 69070. US$ 100.0 (IDA Credit). No consultants are required. Ministry of Planning and Finance. Health, Nutrition & Population A dditional Financing: Essential Health Services Access Project: In support of the Myanmar National Health Plan 2 017-2021, increase access t o a basic essential package of health services of acceptable quality focusing on health and nutri- t ional outcomes of women and children, while increasing financial protection. Negotiations authorized on 29 September 2017. Env ironmental Assessment Category B. Project: P160208. US$ 100.0/10.0 (IDA Credit/GFF). Consulting services to be de- t ermined. Im plementing agency(ies) to be determined. M acroeconomics, Trade and Investment My anmar Pr ivate Sector Gr owth and Competitiveness: T o pr omote pr ivate sector growth and com petitiveness t hrough: (i) upgrading the enabling environment for investment; (ii) facilitating cross-border trade; and (iii) strengthening PAGE 85 Monthly Operational Sum m ary April 2019 t h e internal capability of SMEs. Concept com pleted on 3 August 2018. Environmental Assessment Category C. Project: P1 66776. US$ 100.0 (IDA Credit). Consultants will be required. My anmar Customs Department; Dept of Investment and Com pany Administration. Social Protection & Labor Ra khine Recovery and Development Support Project: The Project Development Objective is to improve access to economic opportunities for diverse communities in selected areas of Rakhine State. Identification completed on 10 September 2 018. US$ 100.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Ma ternal and Child Cash Transfers for Improved Nutrition Project: To increase the coverage of nutrition interven- t ions proven to improve the nutritional status of wom en and children in the first 1,000 days of life, in the selected high burden St ates / Regions of My anmar. Concept completed on 12 November 2017. Environmental Assessment Category B. Project: P1 64129. US$ 1 00.0 (IDA Credit). No consultants are required. Ministry of Social Welfare, Relief and Resettlement. Social, Urban, Rural and Resilience Global Practice National Community Driven Development Project: The development objective is to enable poor rural communities to benefit from improved access t o and use of basic infrastructure and services through a people-centered approach and to en- h ance the Recipient's capacity t o respond promptly and effectively to an eligible crisis or emergency. Approval completed on 3 0 June 2015. Environmental Assessment Category B. Project: P153113. US$ 400.0/22.5 (IDA Credit/ITAL). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. En hancing Community Driven Development Project: The development objective is to enable poor rural communities t o benefit from improved access to and use of basic infrastructure and services through a people-centered approach. Appraisal com pleted on 30 January 2018. Environmental Assessment Category B. Project: P162647. US$ 25.0 (JSDF). Consulting ser- v ices to be determined. Department of Rural Development, Ministry of Agriculture, Livestock and Irrigation. My anmar National Community Driven Development Project: The development objective is to enable poor rural com- m unities t o benefit from im proved access t o and use of basic infrastructure and services through a people-centered approach a n d to enhance the government’s capacity to respond promptly and effectively t o an eligible crisis or emergency. Approval com pleted on 27 June 2018. Environmental Assessment Category B. Project: P1 66734. US$ 3.0 (MMSP). No consultants are r equired. Ministry of Agriculture, Livestock and Irrigation. My anmar Peaceful and Prosperous Communities Project: T o improve the quality of services and economic opportu- n ities for vulnerable communities in conflict-affected areas of Myanmar. Concept completed on 6 October 2018. Environmen- t a l Assessment Category B. Project: P1 68107. US$ 200.0 (IDA Credit). No consultants are required. Ministry of Agriculture, Liv estock and Irrigation. Papua New Guinea Agriculture PNG Agriculture Commercialization and Diversification Project: To increase the productivity and access to markets of t arget sm allholder farmers and sm all and medium enterprises (SMEs) for selected agricultural value-chains, in selected economic corridors. Concept completed on 5 June 2018. Environmental Assessment Category B. Project: P1 66222. US$ 40.0 (IDA Credit). Consultants will be required. Department of Agriculture and Livestock; Coffee Industry Corporation; Cocoa Boa rd. Energy & Extractives En ergy Utility Performance and Reliability Improvement Project: To improve the operational performance of the n ational electricity utility (PNG Power Limited) and improve the reliability of electricity supply in the project area Concept com pleted on 17 January 2019. Environmental Assessment Category A. Project: P1 67820. US$30.0/2.2 (IBRD/GIF). Con- su ltants will be required. PNG Power Limited (PPL). April 2019 East Asia And Pacific PAGE 86 Health, Nutrition & Population Im proving Access to and Value from Health Services in PNG: Financing the Frontlines: To contribute to the im provement of a ccess to and use of quality essential health services in selected provinces Conce pt completed on 7 October 2 018. Environmental Assessment Category B. Project: P167184. US$ 30.0 (IDA Credit). Consulting services to be determined. Na tional Department of Health. Social, Urban, Rural and Resilience Global Practice (R) Ur ban Youth Employ ment Project II: The development objective is to improve the capacity of participating young m en and women in project areas to engage in productive income generating activities. Negotiations authorized on 7 April 2019. Environmental Assessment Category B. Project: P166420. US$ 35.0 (IDA Credit). Consulting services to be determined. Na tional Capital District Commission; Lae City Authority. Transport Pa pua New Guinea Resilient Transport Project: test Concept completed on 23 October 2018. Environmental Assess- m ent Category B. Project: P1 66991. US$50.0/19.0 (IBRD/PNGS). Consultants will be required. Department of Works. Philippines Agriculture Ph ilippine Rural Development Project 2nd Additional Financing: The PRDP aims to increase rural incomes and en hance farm and fishery productivity in the targeted areas. Identification completed on 26 September 2018. Environmental A ssessment Category B. US$280.0 (IBRD). Consultants will be required. Im plemen ting agency(ies) to be determined. Ph ilippine Rural Development Project Additional Financing: The PRDP aims to increase rural incomes and enhance fa rm and fishery productivity in the targeted areas. Approval completed on 11 January 2018. Environmental Assessment Cat- eg ory B. Project: P1 61944. US$170.0 (IBRD). Consultants will be required. Secretary Em manuel F. Piñol. Min danao Inclusive Agriculture Development Project: The objective of the proposed project would be to increase a gricultural productivity and integration in agricultural value-chains of sm allholder farmers and fisherfolk in targeted areas in Mindanao. Concept completed on 11 October 2018. Environmental Assessment Category B. Project: P163107. US$100.0 (IBRD). Consulting services to be determined. Department of Agriculture; Mindanao Development Authority. Education T eacher effectiveness and competencies enhancement project: To improve teaching in kindergarten to grade 3 and im prove elementary school management in project-supported areas Concept completed on 1 November 2018. Environmental A ssessment Category B. Project: P164765. US$100.0 (IBRD). Consultants will be required. Department of Education. Energy & Extractives FINANCING MECHANISM FOR DISTRIBUTED SOLAR POWER IN THE PHILIPPINES: The proposed project a im s at catalyzing investment in distributed renewable energy in the Philippines. Identification completed on 1 4 July 2017. US$ 1 8.2 (PHFS). Consulting services to be determined. Im plementing agency(ies) t o be determined. Environment & Na tural Resources Ph ilippines Stage II HCFC Phase-out: The project development objective is to contribute to the Philippines’ efforts to m eet the 2020 HCFC consumption phase-out obligations of the Montreal Protocol and the initial requirements of the Kigali Am endment. Concept completed on 7 March 2018. Environmental Assessment Category B. Project: P165341. US$ 2.8 (MPIN). PAGE 87 Monthly Operational Sum m ary April 2019 Con sultants will be required. Environmental Management Bureau. In tegrated Water Quality Management Project: The development objective of this project is to strengthen institutional capacity and systems to manage water pollution in Manila Bay and its Tributaries Concept completed on 30 October 2018. Env ironmental Assessment Category B. Project: P168670. US$ 7.4 (GEFU). Consultants will be required. Laguna Lake Devel- opm ent Authority. Finance, Competitiveness and Innovation Ph ilippines Customs Modernization Project: The Project Development Objective is to improve the efficiency, effective- n ess and transparency of the Bureau of Customs. Conce pt completed on 19 September 2017. Environmental Assessment Cat- eg ory B. Project: P1 63428. US$150.0 (IBRD). Consultants will be required. Bureau of Customs. Governance Civil Service Modernization and Human Resources Management in the Philippines: To strengthen and improve h uman resources management functions and systems, and the capacity of selected civil service institutions to perform their fu nctions. Identification com pleted on 14 September 2018. US$100.0 (IBRD). Consulting services t o be determined. Im ple- m enting agency(ies) to be determined. Social Protection & Labor (R) Social Welfare Development and Reform Project II Additional Financing: To support the Conditional Cash T ransfer Program of DSWD t o improve the use of health and education services by poor children Negotiations authorized on 14 April 2019. Environmental Assessment Category B. Project: P1 69637. US$300.0 (IBRD). Consulting services to be deter- m ined. DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT. Social, Urban, Rural and Resilience Global Practice Mu lti Donor Facility - PH Mindanao Reconstruction & Development: T o im prove social and economic recovery in t argeted conflict-affected communities of Mindanao through activities which promote confidence-building, peace and de- m and-driven g ov ernance. A pproval com pleted on 22 December 2015. Env ironmental A ssessment Category B. Project: P1 57966. US$ 7.0 (PHMF). Consultants will be required. Mindanao Land Foundation, Contact: Damaso Vertido, Executive Dir ector; Bangsamoro Development Agency, Contact: Mohammad Shuaib Yacob, Executive Director; Community and Family Services International Tel: (63-2) 556-1 618, E-mail: smuncy@cfsi.ph, Contact: Steve Muncy, Executive Director; International La bor Organization, Contact: Hideki Kagohashi, Enterprise Development Specialist. Mu lti Donor Facility - PH Mindanao Reconstruction & Development: T o im prove social and economic recovery in t argeted conflict-affected communities of Mindanao through activities which promote confidence-building, peace and de- m and-driven g overnance. Approval completed on 4 August 2014. Environmental Assessment Category B. Project: P147008. US$ 6.6 (PHMF). Consultants will be required. Mindanao Land Foundation, Inc. Tel: (63-64) 278-3077, E-m ail: minland- cm o@minland.ph, Contact: Damaso Vertido, Executive Director; International Labor Organization Tel: (63-2) 5 80-9900, E- m ail: johnsonl@ilo.org, Contact: Mr. Lawrence Jeff Johnson, Director; Community and Family Services International Tel: (63-91) 7812-8523, E-m ail: vhernandez@cfsi.ph, Contact: Vladimir Hernandez, Director, Philippine Programs. Samoa Agriculture Sa moa Agriculture & Fisheries Productivity and Marketing Project (SAFPROM): To increase the productivity and a ccess to markets by selected producers, to improve management of targeted productive natural resources and, in the event of a n Eligible Crisis or Emergency, to provide an immediate response to the Eligible Crisis or Emergency. Negotiations authorized on 1 8 February 2019. Environmental Assessment Category B. Project: P165873. US$ 20.0/3.6 (IDA Grant/IFAD). Consultants w ill be required. Ministry of Agriculture & Fisheries; Ministry of Finance. April 2019 East Asia And Pacific PAGE 88 Health, Nutrition & Population Sa moa Health System Strengthening Program: The Program Development Objective (PDO) is to improve the quality a n d capacity of the service delivery in Samoa for tackling the rising NCDs. Concept completed on 18 April 2018. Project: P1 64382. US$ 9.3 (IDA Credit). No consultants are required. Ministry of Health. Social, Urban, Rural and Resilience Global Practice SA MOA - Pacific Resilience Project under Pacific Resilience Program Additional Finance: To strengthen early w arning, resilient investments and financial protection of Samoa. A pproval completed on 1 October 2018. Environmental Assessment Category B. Project: P167152. US$ 2.5 (IDA Grant). Con- su ltants will be required. Ministry of Natural Resources and Environment; Ministry of Finance. Transport Sa moa Aviation Investment Project Additional Financing: The project development objective is to improve opera- t ional safety and ov ersight of international air transport and associated infrastructure. Approval completed on 3 June 2016. Env ironmental Assessment Category B. Project: P1 57241. US$ 16.6 (IDA Credit). Consultants will be required. Im plementing a g ency(ies) to be determined. (R) Sa moa Aviation Investment Project Additional Finance II: The project development objective is to improve op- er ational safety and oversight of international air transport and associated infrastructure. Negotiations authorized on 8 April 2019. Environmental Assessment Category B. Project: P169279. US$ 2.2 (IDA Grant). Consultants will be required. Samoa A irport Authority. En hanced Road Access Project Additional Financing: To restore key road sector assets damaged by extreme weather ev ents and enhance the climate resilience of critical roads and bridges in Samoa. Approval completed on 31 May 2018. Envi- r onmental Assessment Category B. Project: P1 65943. US$ 3.4 (PRAB). Consultants will be required. Land Transport Author- ity . Solomon Islands Social, Urban, Rural and Resilience Global Practice Ra pid Employment Project Additional Financing: The proposed new PDO is: to assist targeted vulnerable urban pop- u lations in the Recipient’s ter ritory to (i) increase their incomes through the provision of short term employment; (ii) improve t h eir knowledge, experience and basic employment skills that are valued in the workplace and society; and (iii) improve their a ccess t o services and markets through r epaired, more climate r esilient roads and access infrastructure. Approval completed on 1 8 November 2016. Environmental Assessment Category B. Project: P1 60738. US$ 1.9 (IDA Grant). Consulting services to be determined. Ministry of Finance and Treasury; HONIARA CITY COUNCIL; Ministry of Infrastructure Development. A dditional Financing to Rural Development Program II: The proposed development objective for the project is to im prove basic infrastructure and services in rural areas and to strengthen the linkages between smallholder farming house- h olds and markets. Identification com pleted on 28 January 2019. Environmental Assessment Category B. US$ 1.1/1.1 (IDA Cr edit/IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Sol omon Islands Rapid Employment Project Additional Financing: The proposed new PDO is: to assist targeted v ulnerable urban populations in the Recipient’s territory to (i) increase their incomes through the provision of short term em ployment; (ii) improve their knowledge, experience and basic employment skills that are valued in the workplace and soci- ety ; and (iii) improve their access to services and markets through repaired, more climate resilient roads and access infrast ruc- t ure. Approval completed on 31 July 2015. Environmental Assessment Category B. Project: P152709. US$ 0.5 (IDA Grant). Con sulting services to be determined. Honiara City Council Tel: (677) 21-133/4, E-m ail: cityclerk@solomon.com.sb, Contact: Charles Kelley, City Clerk; Ministry of Infrastructure Development Tel: (677) 25-783, E-m ail: msv24247@gmail.com, Contact: Moses V irivolomo, Permanent Secretary. PAGE 89 Monthly Operational Sum m ary April 2019 Water (R) Ur ban Water Supply and Sanitation Sector Project: To increase access and quality of water supply and quality of sa nitation services in selected service areas of Solomon Water, and to improve the operational performance of Solomon Water. Negotiations authorized on 4 April 2019. Environmental Assessment Category B. Project: P165872. US$ 1 5.0/38.0/20.3 (IDA Cr edit/ASDB/ECDF). Consulting services t o be determined. Solomon Islands Water Authority. Thailand Environment & Natural Resources T hailand HCFC Phase-Out Stage II: The project development objective is to contribute to Thailand's efforts to meet the 2 020 HCFC consumption phase-out obligations and requirements of the Kigali Amendment of the Montreal Protocol and the agreement between Thailand and the Executive Committee of the Multilateral Fund. Concept completed on 22 February 2018. Env ironmental Assessment Category B. Project: P165235. US$ 5.1 (MPIN). Consultants will be required. Department of In- du strial Works. Timor-Leste Education (R) Ba sic Education Strengthening and Transformation Project: The development objective is to improve learning fa cilities in basic education and teaching quality in Grades 1 - 4 (Cycle 1) Concept completed on 14 March 2019. Environmental A ssessment Category B. Project: P166744. US$ 15.0 (IDA Credit). Consultants will be required. Ministry of Education and Cu lture. Transport T imor-Leste Branch Roads Project: The PDO is t o upgrade the Aituto-Hatubuilico-Letefoho-Gleno corridor, improving it s climate resilience, and strengthen government capacity t o manage road assets, and to provide immediate and effective r esponse to an Eligible Crisis or Em ergency. Concept com pleted on 20 October 2018. Environmental Assessment Category B. Pr oject: P155203. US$ 59.0 (IDA Credit). Consultants will be required. Ministry of Public Works. Roa d Climate Resilience Project Second Additional Financing: The project will deliver sustainable climate resilient r oad infrastructure on the Dili-Ainaro corridor. Approval completed on 27 April 2017. Environmental Assessment Category B. Pr oject: P252338. US$ 35.2 (IDA Credit). Consultants will be required. Ministry of Finance; Ministry of Public Works, T ransport, and Communications. Water T imor Leste Water Supply and Sanitation Project: The Project Development Objective is to increase access to water su pply, sanitation and urban drainage services by providing investments in infrastructure and by supporting institutional and ca pacity strengthening Identification completed on 27 Nov ember 2018. US$ 15.0 (IDA Credit). Consulting services t o be de- t ermined. Im plementing agency(ies) to be determined. Tonga Digital Development (R) T onga Digital Government Support Project: The objective of the Project is t o im prove the Recipient’s capacity for dig ital public service delivery. Negotiations authorized on 15 March 2019. Environmental Assessment Category C. Project: April 2019 East Asia And Pacific PAGE 90 P1 5 4943. US$ 4.7 (IDA Grant). Consultants will be required. Ministry of Finance. Environment & Natural Resources (R) T onga: Pathway to Sustainable Oceans: To improve management of selected fisheries and aquaculture in the Re- cipient's territory. Approval completed on 17 April 2019. Environmental Assessment Category B. Project: P1 64941. US$ 10.0 (IDA Grant). Consultants will be required. Ministry of Fisheries. Social, Urban, Rural and Resilience Global Practice A dditional Financing for the Pacific Resilience Project under the Pacific Resilience Program: The objective of t h e Project is to strengthen early warning, resilient investments and financial protection of Tonga. A pproval completed on 1 8 July 2018. Environmental Assessment Category B. Pr oject: P1 67166. US$ 1 5.0/2.0 (IDA Grant/GAUL). Consulting services to be determined. Ministry of Finance and National Planning; Ministry of Environment, En ergy, Climate Change, Disaster Mgmt, Meteorology, Information and Comms. Transport T onga Aviation Investment Project - A dditional Financing: The project development objective is t o im prove opera- t ional safety and oversight of international air transport infrastructure. Approval completed on 9 March 2016. Environmental A ssessment Category B. Pr oject: P156018. US$ 7 .3/0.3 (IDA Grant/PRIF). Consultants w ill be r equired. Im plementing a g ency(ies) to be determined. Tuvalu T uvalu Aviation Investment Project Additional Finance III: The project development objective is to im prove the sa fety and security of air transport and associated infrastructure. Approval completed on 16 November 2017. Environmental A ssessment Category B. Project: P1 63856. US$ 8.8 (IDA Grant). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. T uvalu Aviation Investment Project Additional Financing II: The project development objective is to improve the sa fety and security of air transport and associated infrastructure. Approval completed on 31 March 2016. Environmental A ssessment Category B. Project: P157779. US$ 2.9 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be det ermined. Vanuatu V anuatu Climate Resilient Transport Project: To strengthen the climate resilience of the project roads on Santo Island a n d in the event of an Eligible Crisis or Emergency, to provide an immediate response t o the Eligible Crisis or Em ergency. Con cept completed on 21 November 2018. Environmental Assessment Category B. Project: P1 67382. US$ 31.0/31.0 (IDA Cr edit/IDA Grant). Consultants will be required. Ministry of Infrastructure and Public Utilities. V anuatu Aviation Investment Project Additional Financing: The project development objective is to improve opera- t ional safety and oversight of international air transport and associated infrastructure in Vanuatu. Approval completed on 10 Ja nuary 2017. Environmental Assessment Category B. Project: P1 61454. US$ 9.5/4.6 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of Finance and Econom ic Management. A dditional Financing 2 for Vanuatu Aviation Investment Project: The project development objective is to improve operational safety and oversight of international air transport and associated infrastructure in Vanuatu. Identification com- pleted on 1 October 2018. Environmental Assessment Category B. US$ 4.0/3.5 (IDA Credit/IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. PAGE 91 Monthly Operational Sum m ary April 2019 Vietnam Education V ietnam National University Development Project: T o improve the relevance and quality of the graduates and re- search products of Vietnam National University-Hanoi, Vietnam National University-Ho Chi Minh City and the University of Da Nang (UD) and to improve their governance and financing mechanisms. Concept completed on 24 February 2019. Envi- r onmental Assessment Category B. Project: P1 66656. US$300.0 (IBRD). No consultants are required. Vietnam National Uni- v ersity, HCMC; The University of Danang; Vietnam National University, Hanoi. Energy & Extractives (R) V ietnam Scaling Up Energy Efficiency Project: The Project Development Objective is to improve energy efficiency in Vietnam's industrial sector. Appraisal completed on 13 February 2019. Environmental Assessment Category F. Project: P1 64938. US$ 11.3 (GCF). Consulting s ervices to be determined. Department of Energy Efficiency and Sustainable Develop- m ent , Ministry of Industry and Trade. V ietnam Scaling Up Energy Efficiency Guarantee: The Project Development Objective is to improve energy efficiency in Vietnam’s industrial sector through the m obilization of comm ercial financing. The project would thereby contribute to a chieving the g overnment’s energy efficiency and GHG reduction objectives. Concept completed on 31 August 2017. Project: P1 64909. US$ 11.3 (GCF). Consulting services t o be determined. Im plementing agency(ies) to be determined. V ietnam Second Distribution Efficiency Project: The project development objectives is to improve the quality and r eliability of electricity services to final consumers by Vietnam’s Power Corporations. Concept completed on 11 September 2 017. Environmental Assessment Category B. Project: P162173. US$350.0 (IBRD). Consultants will be required. Electricity of V ietnam. Environment & Natural Resources (R) T ransforming the Mekong Delta GCF Program for Vietnam: The project development objective (PDO) is to scale u p the transition of small-holder farmers to climate resilient livelihoodsand strengthen their participation in flood-based value chains in select areas of the upper Mekong Delta in Vietnam. T h is Project is part of the ov erall Mekong Program for Vietnam and Cambodia. Concept completed on 28 April 2019. Project: P1 67595. US$ 40.0 (GCF). Consultants will be required. Ministry of Agriculture and Rural Development (MARD). Health, Nutrition & Population (R) In vesting and Innovating for Grassroots Health Service Delivery: The Project Development Objective is to im- pr ove the quality and utilization of grassroots health services, with a focus on the commune level, in the Project Provinces. Negotiations authorized on 13 March 2019. Environmental Assessment Category B. Project: P161283. US$ 80.0/5.0/3.0 (IDA Credit/IDFH/PHGF). Consultants will be required. Ministry of Health; Ha Giang Department of Health; Bac Kan De- pa rtment of Health; Tra Vinh Department of Health; Hoa Binh Department of Health; Quang Ngai Department of Health; Quang Tri Department of Health; Long An Department of Health; Yen Bai Department of Health; Quang Binh Department of Health; Son La Department of Health; Bac Lieu Department of Health; Hau Giang Department of Health; Ninh Thuan De- pa rtment of Health. Social, Urban, Rural and Resilience Global Practice A dditional Financing for Danang Sustainable City Development Project: The project development objective is to ex pand access of city residents to improved drainage, wastewater collection and treatment services, the arterial road network, a n d public transport in selected areas of Da Nang City. Approval completed on 26 May 2017. Environmental Assessment Ca tegory B. Project: P159049. US$ 72.5 (IDA Credit). Consulta nts will be required. Im plementing agency(ies) t o be deter- m ined. April 2019 East Asia And Pacific PAGE 92 V ietnam - Additional Financing for Medium Cities Development Project: The development objective of the project is t o increase access to improved urban infrastructure services in selected m edium-sized cities in Vietnam. Approval completed on 9 June 2017. Environmental Assessment Category A. Project: P159426. US$ 53.0 (IDA Credit). Consultants will be re- qu ired. State Bank of Vietnam; Project Management Unit (PMU) in Vinh; Project Management Unit (PMU) in Lao Cai; Project Ma nagement Unit (PMU) in Phu Ly. V ietnam - Dynamic Cities Integrated Development Project: To increase access to urban infrastructure and to improve in tegrated urban planning in the project cities. Negotiations authorized on 14 February 2019. Environmental Assessment Ca tegory B. Project: P168290. US$ 194.4 (IDA Credit). Consultants will be required. Thanh Hoa Project Management Unit; Ky Anh Project Management Unit; Hai Duong City Project Management Unit; Yen Bai Project Managem ent Unit. Transport (R) Sou thern Waterways Logistics Corridor: The project development objective is t o improve the efficiency and safety of t wo key inland waterways in Southern Vietnam. Concept completed on 29 March 2019. Project: P1 69954. US$ 300.0 (IDA Credit). Consultants will be required. Ministry of T ransport. Northern Delta Transport Development Project Additional Financing: The Project's development objective is to en hance the efficiency, environmental sustainability and safety of transport infrastructure and services, through the alleviation of physical and institutional bottlenecks in two major waterway corridors in the Northern Delta Region. Approval completed on 5 May 2017. Environmental Assessment Category A. Project: P158976. US$ 78.7 (IDA Credit). No consultants are required. Pr oject Management Unit for Waterways (PMU-W); Ministry of Transport. Water V ietnam Urban Water Supply and Wastewater Project - A dditional Financing: To increase access to sustainable w ater services and environmental sanitation in selected urban areas in the Project Provinces Approval completed on 26 May 2 016. Environmental Assessment Category B. Project: P156678. US$69.0/5 0.0 (IBRD/IDA Credit). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Mekong Regional Water Security Project: 17.The project development objective (PDO) is t o increase the availability of a n d improve access t o water supply services, and im prove the operational and financial perform ance of the water supply and sa nitation (WSS) service providers in select provinces in the Mekong delta. Identification completed on 21 January 2016. Env ironmental Assessment Category A. US$ 400.0 (IDA Credit). Consulting services t o be determined. Im plem enting a g ency(ies) to be determined. Regional Finance, Competitiveness and Innovation (N) Sou theast A sia Disaster Risk In surance Facility (SEADRIF): Strengthening Financial Resilience in Sou theast Asia: The project development objective is to improve access to post-disaster finance for response and recovery t o Southeast Asia Countries. Identification completed on 26 April 2019. US$ 11.0 (SDRI). Consulting services to be deter- m ined. Im plementing agency(ies) to be determined. Poverty and Equity St atistical Innovation and Capacity Building in Pacific Islands: Program Level Development Objective T o im prove the quality and efficiency of welfare data collection, and accessibility to welfare data in the Pacific Island Cou ntries. PAGE 93 Monthly Operational Sum m ary April 2019 Country Project Development O bjective T o im prove the efficiency of HIES implementation, quality of data production, and accessibility to welfare data in Tonga / Kir ibati / the Solom on Islands. Reg ional Organization Project Development Objective T o st rengthen the capacity of SPC t o foster innovation and promote im proved statistics management practices in the region. Con cept completed on 11 January 2019. Project: P1 68122. US$ 1 0.0 (IDA Grant). Consulting services t o be determined. Sta- t istics for Development Division - Pacific Community. Transport Pa cific Aviation Sa fety Office Reform Project A dditional Financing II: The project development objective is to st r engthen the coordination capacity of the Pacific Aviation Safety Office to deliver regional aviation safety and security ov er- sight, and technical and advisory services to the Pacific Island Countries. Approval completed on 23 May 2018. Environmental A ssessment Category C. Project: P164468. US$ 3.6 (IDA Grant). Consultants will be required. Pacific Aviation Safety Office. Su stainability of Aviation in the Pacific Island Countries: T o improve the sustainability of key regional aviation in- fr astructure in Pacific Island Countries. Identification completed on 17 January 2018. Environmental Assessment Category C. US$ 21.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) t o be determined. Europe And Central Asia Albania Energy & Extractives Secon d Additional Financing for Energy Community of South East Europe APL Program APL 5 for Albania Da m Safety: The development objectives of the project are to: (i) contribute to safeguarding the major hydroelectric dams of A lbania; and (ii) improve their operational efficiency and enhance the stability of power supply for the regional electricity m arket. The proposed project supports the development of the Energy Community in a ccordance with the objectives of the En ergy Community of South Eastern Europe (ECSEE) APL. T h e key objectives of the ECSEE Program are to: (a) Create a stable regulatory and market framework to attract investment in g a s networks and power systems so that all states in the region have access to the stable and continuous energy supply, essen- t ial for economic development and social stability; (b) Establish integrated regional markets in South East Europe, closely linked to the internal energy market of the European Union, and complying with the rules applicable within the European Un ion; (c) Enhance the energy security of South East Europe and the European Union by providing incentives to connect the Ba lkans t o Caspian and North African gas reserves; and (d) Im prove the environmental situation in relation to energy in the r egion. A pproval completed on 25 May 2018. Environmental Assessment Category B. Project: P166469. US$14.9/7.6 (IBRD/EBRD). Con sultants will be required. Albanian Power Corporation (KESH). Environment & Natural Resources En vironmental Services Project: The Project Development Objective (PDO) is to support sustainable land management April 2019 Europe And Central Asia PAGE 94 pr actices and increase communities’ monetary and non-m onetary benefits in targeted Project areas which are mainly in ero- sion prone rural upland areas. T h is PDO is to be achieved through the support of alternative livelihoods and provision of environmental services and through su stainable utilization of wood and pasture products in the long term. The Project will particularly focus on enhancing the financial, economic, and institutional sustainability of land use and natural resources management, and will help build capac- it ies of Albania farmers, community organizations and government institutions t o efficiently use EU funding. Approval com- pleted on 8 July 2014. Environmental Assessment Category B. US$ 10.6 (FSCO). Consultants will be required. Ministry of Env ironment, Contact: Ardiana Sokoli, Director. Social Protection & Labor A dditional Financing Social Assistance Modernization project: The project would support the Albania's implemen- t a tion of reforms to improve the equity and efficiency of its social assistance programs. Approval completed on 4 May 2018. Env ironmental A ssessment Category C. Project: P1 62079. US$11.0 (IBRD). No consultants are r equired. Im plementing a g ency(ies) to be determined. Water (N) A lbania National Water Supply and Sanitation Sector Modernization Program: To support the government of A lbania in establishing an ov erall policy, governance and financing framework for improved performance of water supply a n d sanitation (WSS) service providers and sustainable services. Identification completed on 29 March 2019. US$80.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. A l bania Water Resources and Irrigation Project Additional Financing: The Revised Project Development Objective (PDO) is to: (i) establish the strategic framework to manage water resources at the national level and at the level of the Drin- Bu na and Semani River basins; and (ii) improve irrigation service delivery in Selected Irrigation Systems. Approval completed on 22 February 2018. Environmental Assessment Category B. Project: P1 62786. US$27.2 (IBRD). Consultants will be re- qu ired. Im plementing agency(ies) to be determined. Armenia Energy & Extractives Ut ility Scale Solar Power Project: Objective to be Determined. Appraisal com pleted on 16 November 2017. Environmen- t a l A ssessment Category B. Project: P155662. US$ 4.0 (GUAR). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Transport (R) LIFELINE ROAD NETWORK IMPROVEMENT PROJECT - Second Additional Financing: The Project Devel- opm ent Objective is to improve access of rural communities to markets and services through upgrading of selected lifeline r oads, and to strengthen the capacity of the Borrower's line ministry in charge of roads to manage the lifeline road network. Negotiations authorized on 6 March 2019. Environmental Assessment Category B. Project: P169158. US$15.0 (IBRD). Con- su ltants will be required. Ministry of Transport, Communications and Information Technologies. Water A dditional Financing Irrigation System Enhancement Project: The PDO is (i) t o reduce the amount of energy used a n d to improve the irrigation conveyance efficiency in targeted irrigation schemes; and (ii) to improve the availability and r eliability of important sector data and information for decision makers and other stakeholders. Approval completed on 14 Nov ember 2017. Environmental Assessment Category B. Project: P161538. US$2.0 (IBRD). Consultants will be required. Wa- t er Sector Projects Im plementation Unit State Agency; State Committee of the Water Economy. PAGE 95 Monthly Operational Sum m ary April 2019 Azerbaijan Social, Urban, Rural and Resilience Global Practice A zerbaijan Third Rural Investment Project: Using Technology for Development: Im prove access to quality rural in frastructure and livelihoods opportunities for target rural communities. Negotiations authorized on 2 February 2018. Envi- r onmental Assessment Category B. Project: P1 59962. US$100.0 (IBRD). Consultants will be required. State Service on Agri- cu ltural Projects and Credits, Ministry of Agriculture. A dditional Financing to IDP Living Standards and Livelihoods Project: The objective of the Project is to improve liv ing conditions and increase the economic self-reliance of targeted internally displaced persons. Approval completed on 17 Ju ne 2016. Environmental Assessment Category B. Project: P155110. US$66.7 (IBRD). Consultants will be required. Im ple- m enting agency(ies) to be determined. National Sol id Waste Management Project: T o enhance the availability and quality of waste m anagement services in selected regions in Azerbaijan. Concept completed on 22 June 2018. Environmental Assessment Category A. Project: P167007. US$1 17.0 (IBRD). Consultants will be required. Ministry of Economy. Secon d Rural Investment Project Additional Financing: The Project Dev elopment Objective is to im prove access to a n d use of community-driven rural infrastructure and expand econom ic activities for rural households. This would be achieved t hrough: (i) the provision of grants to finance eligible demand-driven micro-projects in rural infrastructure; (ii) the provision of t raining and consultants’ services to support micro -project development by enhancing the capacity of engaged local stake- h olders in all aspects of micro-project program development; (iii) building opportunities for rural employment and liv elihood su pport services through the provision of training and consultants’ services to carry out pilot livelihood support services i n six communities; and, (iv) supporting project management capacity at the Project Management Unit and its Regional Operations Offices for the purposes of effective management, implementation and monitoring and evaluation of Project activities. Ap- pr oval completed on 9 July 2014. Environmental Assessment Category B. Project: P147861. US$50.0 (IBRD). Consultants w ill be required. AZRIP PMU in State Agency on Agricultural Credit Tel: /Fax: (994-12) 493-4813, E-m ail: subhan@azrip.org, Contact: Soubhan Asgerov, Project Director. Transport A zerbaijan Highway 3 Additional Financing: “To contribute to a more efficient and safer Baku-Shamakhi and Yeni- kend-Shorsulu roads and higher quality road services as part of the general network upgrading to motorway standard, and to im prove the management of the nascent motorway network.” Approval completed on 28 March 2016. Environmental Assess- m ent Category A. Project: P156377. US$140.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be det ermined. Belarus Education (R) Belarus Education Modernization Project - Additional Financing: The objectives of the proposed Project are to: (i) improve access to a quality learning environment in selected general secondary education institutions; and (ii) strengthen t h e Belarus' student assessment and education management information systems. Approval completed on 18 April 2019. Env ironmental Assessment Category B. Project: P1 66719. US$101.8 (IBRD). Consulting services to be determined. Ministry of Edu cation. Bel arus T ertiary Education Project: The DO is to modernize Belarus' t ertiary education sector to im prove the teaching a n d learning environment and the labor market relevance of programs. Concept com pleted on 25 October 2018. Environmen- t a l Assessment Category B. Project: P167992. US$100.0 (IBRD). Consultants will be required. Ministry of Education. April 2019 Europe And Central Asia PAGE 96 Energy & Extractives (R) Su stainable Energy Scale-Up Project: The Project Development Objective is to scale up efficient energy use in space h eating of multi-apartment buildings and renewable wood biomass fuel utilization in selected urban localities in Belarus. Ne- gotiations authorized on 7 April 2019. Environmental Assessment Category B. Project: P1 65651. US$102.3/102.3/3.7 (IBRD/EUIB/GFIA). Consultants will be required. Energy Efficiency Department, State Committee for Standardization. Environment & Natural Resources Bel arus Forestry Development Project - A dditional Financing: The Project Dev elopment Objective is to enhance silv icultural management and reforestation and afforestation, increase the use of felling residues and improve the public good contribution from forests in targeted forest areas. Approval completed on 1 2 March 2018. Environmental Assessment Cate- g ory B. Project: P1 65121. US$14.4 (IBRD). Consulting services to be determined. Ministry of Forestry; BellesExport. Water (R) Ut ility Efficiency and Quality Improvement Project: The Project Development Objective (PDO) is to improve the qu ality and efficiency of water and wastewater services, and support the introduction of regional solid waste management. Negotiations authorized on 2 March 2019. Environmental Assessment Category A. Project: P1 64260. US$102.6 (IBRD). No con sultants are required. Ministry of Housing and Utilities. Bosnia and Herzegovina Energy & Extractives A dditional Financing for the Bosnia and Herzegovina Energy Efficiency Project: The project development objec- t iv e is to improve energy efficiency in public buildings, and to support the development and implementation of scalable energy efficiency financing m odels A pproval com pleted on 30 October 2018. Environmental A ssessment Category B. Project : P1 65405. US$32.0 (IBRD). Consultants will be required. FBH Ministry of Physical Planning; RS Ministry of Spatial Planning, Civ il Engineering and Ecology. Finance, Competitiveness and Innovation (R) BiH Bu siness Environment Strengthening Project (BESP): The Project Development Objective is to enhance com petitiveness and strengthen the environment in which enterprises operate. Concept completed on 29 March 2019. Envi- r onmental Assessment Category B. Project: P160775. US$60.0 (IBRD). Consultants will be required. Federation BiH Ministry of Finance; RS Ministry of Finance; Ministry of Science and T echnology of Republika Srpska; Ministry of Dev elopment, En- t r epreneurship and Crafts of Federation BiH. Social, Urban, Rural and Resilience Global Practice Secon d Solid Waste Management Project Additional Financing - EC IPA: The objective is to improve the availabil- ity , quality, environmental soundness, and financial viability of solid waste management services in participating utilities/re- g ions. Approval completed on 18 December 2012. Environmental Assessment Category B. US$ 6.0 (F7U4). Consulting ser- v ices to be determined. FBiH Ministry of Environment and Tourism T el: (387 -33) 726-374, E-m ail: sswmp@fmoit.gov.ba, Contact: Mr. Anto Covic, T eam Leader; RS Ministry of Spatial Planning T el: (387-51) 339-504, E-m ail: s.cvijic@mgr.vla- da rs.net, swmp2@mgr.vladars.net, Contact: Mr. Sveto Cvijic, Team Leader. Rea l Estate Registration Project - Additional Financing: The project development objective is to support development of a su stainable real estate registration sy stem with harmonized land register and cadastre records in urban areas of both th e Federation of Bosnia and Herzegovina and the Republic of Srpska. Identification completed on 20 February 2019. Environ- m ental Assessment Category B. US$23.7 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. PAGE 97 Monthly Operational Sum m ary April 2019 Transport Republika Srpska Roads Program: The Program Dev elopment Objective are to im prove the financial sustainability, the con ditions, the climate resilience and the safety of the road network in Republika Srpska. Identification completed on 19 Jan- u ary 2019. US$50.1 (IBRD). Consulting services t o be determined. Republika Sr pska Ministry of Communications and T ransport; Republika Srpska Roads Agency. Water BiH Water and Sanitation Services Modernization Program: The project development objective is to support the g ov ernment of Bosnia and Herzegovina in building the institutions, infrastructure and information needed to deliver sustain- a ble WSS services. Identification completed on 12 September 2018. US$75.0/25.0 (IBRD/ENP). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Bulgaria Finance, Competitiveness and Innovation Bu l garia - Deposit Insurance Contingency Financing Project: The Project Development Objective is to strengthen Bu lgaria's financial sector safety net by enabling contingent financing to the Bulgarian Deposit Insurance Fund, in order for it t o m eet potential deposit insurance and bank resolution obligations. Identification completed on 9 July 2018. Consulting services to be determined. Im plementing agency(ies) to be determined. Croatia Education (R) T ransforming the Education System in Croatia: Better Schools, Better Learning, Better Life: To improve t h e quality and efficiency of education through increased instructional time and better t ime on task, school optimization and better school management Concept completed on 5 April 2019. Project: P1 70178. US$100.0 (IBRD). Consulting services to be determined. Ministry of Science and Education. Governance Ju stice for Business Program: To improve efficiency and quality of selected justice services in targeted justice institutions in Croatia aiming at support of implementation of competitive business environment policies. Identification completed on 9 May 2018. US$20.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice In tegrated Land Administration System - Additional Financing: The objective of the proposed Project is to modern- ize the land administration and management system to improve the efficiency, transparency and cost effectiveness of govern- m ent services. Approval completed on 1 August 2018. Environmental Assessment Category B. Project: P1 66324. US$24.1 (IBRD). Consultants will be required. Ministry of Justice; State Geodetic Authority. Transport Modernization and Restructuring of the Road Sector: Objective to be Determined. Approval completed on 28 April 2 017. Environmental Assessment Category B. US$23.3/265.0/370.7/424.3 (IBRD/EBRD/GUAR/ZPCO). Consulting services t o be determined. Im plementing agency(ies) to be determined. April 2019 Europe And Central Asia PAGE 98 Georgia Digital Development Log In Georgia: Affordable Broadband for All: T o increase a ccess t o high-speed broadband services in Project areas, a n d t o increase beneficiaries’ access t o services, markets, and knowledge. Identification completed on 17 January 2019. US$35.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. Education (R) Georgia I2Q - Innovation, Inclusion and Quality: The project development objectives are to (i) expand access to pr eschool education and (ii) improve the quality of education and learning environments. Negotiations authorized on 8 March 2019. Environmental Assessment Category B. Project: P1 68481. US$102.7 (IBRD). Consulting services t o be deter- m ined. Ministry of Education, Science, Culture and Sport/Municipal Development Fund. Energy & Extractives En ergy Supply Reliability and Financial Recovery Guarantee: The project development objective is to increase elec- t r icity supply reliability and improve the financial viability of the electricity transmission company. Concept completed on 14 February 2019. Pr oject: P1 70552. US$60.0/5 0.0 (IBRD/GUAR). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. (R) En ergy Supply Reliability and Financial Recovery: The project development objectives are t o increase electricity su pply reliability in the western part of Georgia, im prove financial viability of GSE, and help it access long-term commercial financing. Negotiations authorized on 1 April 2019. Project: P1 69117. US$70.7/5 0.0 (IBRD/GUAR). Consultants will be re- qu ired. Georgian State Electro system. Environment & Natural Resources Geor gia - Forests for Resilience and Economic Transformation (FoRET) Project: Im proving national capacity for su stainable forest management and strengthening socio-economic and environmental services from forests in target areas Identification completed on 13 October 2018. US$25.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Health, Nutrition & Population Geor gia Human Development Services Improvement Project: The project development objective is to im prove the efficiency and effectiveness of health, social and employment services. Identification completed on 18 October 2017. Environ- m ental Assessment Category C. US$30.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be de- t ermined. Social, Urban, Rural and Resilience Global Practice Secon d Regional Development Project Additional Financing: The Project Dev elopment Objective is to improve in- fr astructure services and institutional capacity to support increased contribution of tourism in the local economy of the Im ereti Reg ion. Approval com pleted on 4 April 2016. Environmental Assessment Category B. Project: P157465. US$9.0 (IBRD). Con- su ltants will be required. Im plementing agency(ies) t o be determined. (R) In tegrated Regional and Local Development Project: The Project’s development objectives are to improve living con ditions and economic activity in selected lagging areas by improving infrastructure for service provision , tourism, and r elated productive a ssets and to strengthen institutional and local capacity to support local economic development. Concept completed on 14 April 2019. Project: P1 69747. US$50.0 (IBRD). Consultants will be required. Municipal Development Fund of Georgia under the Ministry of Regional Development and Infrastructure. PAGE 99 Monthly Operational Sum m ary April 2019 Transport Ea st West Highway Corridor Improvement Project Additional Financing:

The proposed PDOs are to: (i) re- du ce road user costs along the East-West Highway Corridor section upgraded under the project; and (ii) strengthen the capac- ity of the Roads Department and the Ministry of Economy and Sustainable Development to respectively m anage the road n etwork and provide an enabling environment to improve logistics services.

A pproval completed on 8 November 2017. Environmental Assessment Category A. Project: P1 60152. US$20.0/90.0 (IBRD/EUIB). Consultants will be r equired. Roads Department of the Ministry of Regional Dev elopment and Infrastructure (RDMRDI). Kazakhstan Agriculture Su stainable Livestock Development Project: The proposed development objective of the PforR Program is to enhance t h e Government Program t o facilitate safe, sustainable and inclusive livestock sector in Kazakhstan. Identification completed on 30 January 2019. US$500.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Digital Development Ka zakhstan Data Economy and Digital Innovation Project: The project development objective is to support the gov- er nment of Kazakhstan in driving digital transformation of its economy within the regional digital economy framework of Central Asia, including through the creation of a world-class multi-stakeholder platform for artificial intelligence and data- dr iven development. Identification completed on 24 January 2019. US$100.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Environment & Natural Resources (N) Circular Economy for Industrial Waste Management: The Project Dev elopment Objective (PDO) is to promote circular economy solutions in industrial waste management and improve hazardous/POPs waste and contaminated site man- a g ement. US$ 11.7 (GEFU). Consulting services to be determined. Im plementing agency(ies) t o be determined. Transport Center West Regional Development Corridor: The Project Dev elopment Objectives are t o improve the transport con- n ectivity within the regions a long the Kazakhstan Center W est Corridor and strengthen the capacity of selected agencies for t h e effective implementation of the corridor development, and road asset preservation policies. Approval completed on 9 June 2 016. Environmental Assessment Category A. Project: P153497. US$977.9 (IBRD). Consulting services to be determined. Com- m ittee for Roads, Contact: Satjan Ablaliev, Deputy Chairman; Ministry of Finance, Contact: Mr. Ruslan Beketayev, Vice Min- ist er; JSC KazAvtoZhol, Contact: Ermek Kizatov, Chairman. Water A ral Sea Development and Revitalization Project in Kazakhstan: The Project Development Objective (PDO) is to fu rther restore water and environmental functions in the Aral Sea and delta and catalyze revitalization of economic activities. Identification completed on 8 January 2019. US$161.5 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. April 2019 Europe And Central Asia PAGE 100 Kosovo Agriculture Kosov o Agriculture and Rural Development Project - Third Additional Financing: The development objective of t h e project is t o improve productivity of and access t o markets by project beneficiaries in the h orticulture and livestock sub- sectors of Kosovo and strengthen the institutional capacity of the Ministry of Agriculture, Forestry and Rural Development. A pproval completed on 28 April 2017. Environmental Assessment Category B. Project: P158710. US$ 22.0 (IDA Credit). Con- su ltants will be required. Ministry of Finance; Ministry of Agriculture, Forestry and Rural Development. Energy & Extractives Kosov o Energy Efficiency and Renewable Energy Additional Financing: The project development objectives are to: (i) reduce energy consumption and fossil fuel use in public buildings through energy efficiency and renewable energy invest- m ents; and (ii) enhance the policy and regulatory environment for renewable energy and energy efficiency. Identification com- pleted on 1 0 May 2018. Environmental Assessment Category B. US$ 10.6 (EUDF). Consultants will be required. Im plementing a g ency(ies) to be determined. Finance, Competitiveness and Innovation (R) Kosovo Financial Sector Strengthening Project: The objective of the Project is to improve access to finance for Micro, Small and Medium Size Enterprises by strengthening the financial and t echnical capacity of the Kosovo Credit Guar- a ntee Fund. Negotiations authorized on 16 April 2019. Environmental Assessment Category F. Project: P165147. US$ 25.0 (IDA Credit). Consultants will be required. Kosovo Credit Guarantee Fund; Central Bank of Kosovo. Social, Urban, Rural and Resilience Global Practice Kosov o Youth Inclusion and Entrepreneurship: The project aims to improve the socioeconomic inclusion of disadvan- t aged young women and men, aged 15 –29, by increasing their access to civic participation, skills building and entrepreneur- sh ip. Ben eficiary groups would include low-income, peri-urban and rural y outh who are underemployed or not in education, em- ployment or training (NEETs; a minimum of 50 percent of which would be women) invulnerable communities. Concept com- pleted on 30 October 2018. Environmental Assessment Category B. Project: P166093. US$ 10.4 (IDA Credit). No consultants a r e required. Ministry of Innovation and Entrepreneurship. Water Fost ering and Leveraging Opportunities for Water Security: The proposed project development objective is to (i) st r engthen national capacity for m anaging Kosovo’swater resources for water security, and (ii) in selected basin areas, improve in tegrated land and water resource m anagement practices and services, in a resilient manner. Identification com pleted on 7 Nov ember 2018. US$ 40.0/11.4 ( IDA Credit/ECEU). Consulting services to be determined. Implementing agency(ies) to be det ermined. Kyrgyz Republic Education Hu man Capital For Kyrgyz Republic: To enhance child readiness and teacher effectiveness in pre-school through sec- on dary education for skills acquisition. Identification completed on 15 February 2019. US$ 25.0 /5.0 (IDA Credit/FTIE). Con- su lting services to be determined. Im plementing agency(ies) t o be determined. PAGE 101 Monthly Operational Sum m ary April 2019 Governance T a x Administration and Statistical System Modernization Project: To improve effectiveness of tax collection and ca pacity of t he national statistical system in the Kyrgyz Republic. Identification completed on 31 May 2017. US$ 40.0 (IDA Cr edit). Consulting services to be determined. Im plementing agency(ies) to be determined. Health, Nutrition & Population (R) Pr imary Health Care Quality Improvement Program: The Program Development Objective is to contribute to im proving the quality of primary health care services in the Kyrgyz Republic. Negotiations authorized on 18 March 2019. Env ironmental Assessment Category C. Project: P1 67598. US$ 10.0/1 0.0/17.0 (IDA Credit/IDA Grant/PFR). No consultants a r e required. Ministry of Health; Mandatory Health Insurance Fund; Ministry of Finance. Social, Urban, Rural and Resilience Global Practice CA SA1000 Community Support Project - Kyrgyz Republic: To engage communities in the development of social and economic infrastructure in order to enhance services, livelihoods and inclusion in target v illages near the CASA1000 Trans- m ission Line. A pproval com pleted on 1 0 April 2018. Environmental A ssessment Category B. Pr oject: P1 63592. US$ 5 .0/5 .0/1 .0 (IDA Credit/IDA Grant/CASA). Consulting services t o be determined. Community Development and Investment A g ency. Loca l Integrated Development Project: The PDO is to support the GoKR to improve local and regional infrastructure a n d assets, strengthen market linkages and enhance institutional capacity in the participating regions and cities. Identification com pleted on 24 August 2018. US$ 22.5/22.5 (IDA Credit/IDA Grant). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Water Su stainable Rural Water Supply and Sanitation Development Project – Additional Financing: The project de- v elopment objectives (PDO) are to assist the Kyrgyz Republic to (i) improve access to and quality of water supply and sanitation services in the Participating Rural Communities; and (ii) strengthen capacity of the Recipient's institutions in the water supply a n d sanitation sector. Approval completed on 22 June 2017. Environmental Assessment Category B. Project: P1 62840. US$ 1 9.8/16.2 (IDA Credit/IDA Grant). Consultants will be required. Im plementing agency(ies) t o be determined. National Water Resource Management Project Additional Financing: The project development objective of the NW RMP is t o improve water resources management capability and irrigation service delivery for the benefit of wat er users. Identification completed on 21 February 2018. Environmental Assessment Category B. US$ 5.1 (F7VP). Consultants will be r equired. Im plementing agency(ies) to be determined. Moldova Agriculture Mol dova Agriculture Competitiveness Project Additional Financing: The Project Dev elopment Objective is to en- h ance the competitiveness of the agro-food sector by supporting the modernization of the food safety management system, fa cilitating market access for farmers, and mainstreaming agro-environmental and sustainable land management practices. A pproval completed on 19 May 2015. Environmental Assessment Category B. Project: P154238. US$ 12.0 (IDA Credit). No con sultants are required. Im plementing agency(ies) t o be determined. (N) Mol dova Agriculture Com petitiveness Project GEF Additional Financing: The Project Development Objective is t o enhance the competitiveness of the agro-food sector by supporting the modernization of the food safety management sy stem, facilitating market access for farmers, and mainstreaming agro-environmental and sustainable land management pr actices. Identification completed on 3 April 2019. Environmental Assessment Category B. US$ 3.1 (GEFU). Consultants w ill be required. Im plementing agency(ies) to be determined. April 2019 Europe And Central Asia PAGE 102 Mol dova Agriculture Competitiveness Follow-up Project: The Project Development Objective is to enhance the com- pet itiveness of the agro-food sector by supporting the modernization of the food safety management system. Identification com pleted on 17 December 2018. US$ 15.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Mol dova Agriculture Competitiveness Project 2nd Additional Financing: The Project Development Objective is to en hance the competitiveness of the agro-food sector by supporting the modernization of the food safety management system, fa cilitating market access for farmers, and mainstreaming agro-environmental and sustainable land management practices. A pproval completed on 7 July 2016. Environmental Assessment Category B. Project: P1 57765. US$ 1 0.0 (IDA Credit). Con- su ltants will be required. Im plementing agency(ies) t o be determined. Education (R) Mol dova Higher Education Project: The Project Development Objectives are to improve the quality of teaching and learning environments of project-supported institutions and the labor m arket relevance of higher and adult education in Moldov a. Concept completed on 4 April 2019. Project: P167790. US$ 30.0 (IDA Credit). Consultants will be required. Minis- t ry of Education, Culture and Research. Mol dova Education Reform Additional Financing: The Project Development Objective is t o improve learning condi- t ions in targeted schools and strengthen the Recipient's education monitoring systems, while promoting efficiency reforms in t h e education sector. Approval completed on 16 February 2018. Environmental Assessment Category B. Project: P156657. US$ 1 0.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Energy & Extractives Mol dova Power System Development Project: The Project Development Objective is to increase capacity and improve r eliability of the power transmission system in Moldova. Negotiations authorized on 13 February 2019. Environmental As- sessm ent Category A. Project: P160829. US$ 70.0 (IDA Credit). Consultants will be required. Ministry of Economy and Infra- st ructure; Moldova Energy Projects Im plementation Unit (MEPIU). Environment & Natural Resources Cl imate Adaptation Project: The Project Development Objective (PDO) is to enhance the adoption of climate-smart prac- t ices in agriculture, forestry and pasture management in targeted landscapes and strengthen national disaster management sy stems. A pproval completed on 9 June 2017. Environmental A ssessment Category B. Project: P1 55968. US$12.4/1 2.8 (IBRD/IDA Credit). Consultants will be required. Ministry of Environment; Ministry of Agriculture and Food Industry; Min- ist ry of Internal Affairs. Cl imate Adaptation Project: The Project Development Objective (PDO) is to enhance the adoption of climate-smart prac- t ices in agriculture, forestry and pasture management in targeted landscapes and strengthen national disaster management sy stems. Approval completed on 9 June 2017. US$ 2.0 (GEFU). Consultants will be required. Ministry of Environment; Min- ist ry of Agriculture and Food Industry; Ministry of Internal Affairs. Social, Urban, Rural and Resilience Global Practice Disaster and Climate Risk Management Project Additional Financing: The Project development objective (PDO) is t o strengthen the State Hydrometeorological Service's ability to forecast severe weather and improve Moldova's capacity to pr epare for and respond to natural disasters. Approval completed on 19 May 2015. Environmental Assessment Category B. Pr oject: P148125. US$ 2.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Montenegro Agriculture A dditional Financing to MIDAS: The new objectives of the Project are: (i) to improve delivery of government assistance PAGE 103 Monthly Operational Sum m ary April 2019 for sustainable agriculture and rural development in a manner consistent with the EU's pre-accession requirements; (ii) to in crease the experience of Montenegrin authorities in administering rural development grants in accordance with EU-IPARD cor e rules, and (iii) t o support a selected number of agricultural holdings and food establishments in upgrading towards EU st andards. A pproval completed on 9 September 2016. Environmental Assessment Category B. Project: P1 59115. US$3 .3 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation Mon tenegro Growth and Jobs IPF: Support government r eforms that stimulate growth and private, formal sector jobs. Identification c ompleted on 7 February 2019. US$20.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. M acroeconomics, Trade and Investment Mon tenegro Second Fiscal and Financial Sector Resilience PBG: The objective is to provide support to Montenegro in order to restore fiscal stability and ensure financial sector resilience to shocks. Concept completed on 22 May 2018. Project: P1 67665. US$ 70.0 (GUAR). Consulting services to be determined. Im plementing agency(ies) to be determin ed. North Macedonia Agriculture (R) A griculture Modernization Project: Im prove competitiveness and strengthen public institutions in the agriculture sector. Concept completed on 11 March 2019. Project: P168014. US$35.5/4.5 (IBRD/ECEU). Consultants will be required. Min istry of Agriculture, Forestry and Water Economy. Digital Development (N) North Macedonia Digital Economy (NODE): The Project Development Objective (PDO) for the North Macedonia Dig ital Economy (NODE) Project is t o im prove a ccess t o high-speed broadband services in project areas and to online kn owledge sources, services and labor markets among citizens and public institutions. Identification completed on 26 April 2 019. US$33.8 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives (R) North Macedonia Public Sector Energy Efficiency Project: The project development objectives are: (i) reduce en ergy consumption in the municipal sector; and (ii) support the establishment and operationalization of a sustainable financ- in g mechanism for the public sector Concept completed on 27 March 2019. Environmental Assessment Category B. Project: P1 49990. US$28.4/3.4 (IBRD/ECEU). Consultants will be required. Ministry of Economy Tel: (389-2) 309-3489, E-m ail: n eriman.dzeladini@economy.gov.mk. Social Protection & Labor Social Insurance and Pension Administration Project: Im prove the efficiency of the social insurance and pension a dm inistrations and increase the participation of certain categories of early retirees and persons with disabilities in the labor m arket. Identification completed on 25 January 2019. US$15.1 (IBRD). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Transport North Macedonia: Local Roads Connectivity: The project development objectives are to provide safe and resilient access t o education and market facilities, and improve the municipalities capacity to manage road assets. Identification completed April 2019 Europe And Central Asia PAGE 104 on 27 February 2019. US$79.5 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Poland Energy & Extractives (R) Poland Energy Efficiency in Single Family Buildings Program: The Program development objective is to increase en ergy efficiency of single-family buildings in selected most polluted cities in Poland, strengthening the National Program’s in stitutional capacity, a nd enhance its a ccess t o commercial financing. Concept completed on 20 March 2019. Project: P1 70131. US$300.0 (IBRD). No consultants are required. National Fund for Environment Protection and Water Management (NFOSiGW). Romania Environment & Natural Resources In tegrated Nutrient Pollution Control Project - A dditional Financing: The development objective of the project is t o support the Government of Romania towards meeting EU Nitrate Directive requirements at a national scale. Approval com- pleted on 28 March 2016. Environmental Assessment Category B. Project: P155594. US$52.4 (IBRD). Consultants will be r equired. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation (N) Romania: Institutional Strengthening and Financial Safety Net Resilience Project: The PDO is to strengthen t h e institutional and financing mechanism in Rom ania to effectively deal with a financial s ector crisis by provision of a con- t ingency financing instrument to the Bank Deposit Guarantee Fund (FGDB) to effectively meet the deposit insurance and bank r esolution obligations of Romania. Identification completed on 29 April 2019. US$452.0 (IBRD). Con sulting services to be det ermined. Im plementing agency(ies) t o be determined. Health, Nutrition & Population (R) Romania Health Program for Results: The Program Development Objective (PDO) is to improve access to effective pr imary health care in Romania. Concept completed on 24 April 2019. Project: P1 69927. US$570.0 (IBRD). Consulting ser- v ices to be determined. Ministry of Health. Social, Urban, Rural and Resilience Global Practice St r engthening Preparedness and Critical Emergency Infrastructure Project: The objective of the Project is to en- h ance the resilience of Romanian Gendarmerie Facilities that are critical to respond to Em ergency Situations and disasters a n d to strengthen the institutional capacities for emergency preparedness and response. Negotiations authorized on 10 Jan- u ary 2019. Environmental Assessment Category B. Project: P168120. US$45.6 (IBRD). No consultants are required. Ministry of In t ernal Affairs (General Inspectorate of the Romanian Gendarmerie). Ju stice Quarter Development Project: The Project Development Objective is t o support the Government of Romania a n d City of Bucharest in developing an integrated urban redevelopment model for central Bucharest through development of a m ulti-use urban development plan anchored by a new Justice complex. Concept completed on 1 February 2018. Environ- m ental Assessment Category B. Project: P157654. US$150.0 (IBRD). Consulting services to be determined. Ministry of Justice. Im proving Resilience and Emergency Response Project: The proposed Project Development Objective (PDO) is to en hance the resilience of Romanian Police Facilities that are critical to respond to Em ergency Situations and disasters and t o st r engthen the institutional capacities for em ergency preparedness and response. Negotiations authorized on 1 0 January 2 019. Environmental Assessment Category B. Project: P168119. US$57.0 (IBRD). No consultants are required. Ministry of In t ernal Affairs (General Inspectorate of Romanian Police). PAGE 105 Monthly Operational Sum m ary April 2019 Russian Federation Finance, Competitiveness and Innovation Micr ofinance Development Project: The objectives of the project are to: (i) develop a proper legal, regulatory, and su- pervisory framework to enable safe and sound growth of the microfinance and credit cooperative sectors; and (ii) develop the in dustry's capacity to meet sectoral regulations and institutional standards. Approval completed on 31 January 2013. Envi- r onmental Assessment Category C. Project: P095554. US$20.0 (IBRD). No consultants are required. Ministry of Finance Tel: (7 -495) 648-3541, E-m ail: p0530_ka@minfin.ru, Contact: Alexey Savatyugin, Deputy Minister. Serbia Agriculture Ser bia: Competitive Agriculture Project (SCAP): Im prove market access for sm all and medium agricultural producers in Serbia Identification completed on 1 9 June 2018. Environmental Assessment Category B. US$50.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives Ser bia - Managing a Mining Sector Transition for Future Development: To support the Government of Serbia in r epositioning its mining sector away from coal and establishing new metallic and industrial mineral developments. Identifi- ca tion completed on 1 2 December 2018. US$70.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) t o be determined. Finance, Competitiveness and Innovation Ser bia Accelerating Innovation and Growth Entrepreneurship: The project’s development objective is to increase in novation activities of individuals and businesses, through: 1 ) increased excellence and relevance of scientific pursuits, and 2 ) improved access of early stage companies to funds, markets, and knowledge necessary for their growth. Identification com- pleted on 19 January 2019. US$48.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Governance (R) En abling Digital Governance Project: To improve access, quality, and efficiency of selected administrative e-Gov- er nment services. Approval completed on 24 April 2019. Environmental Assessment Category B. Project: P164824. US$50.0 (IBRD). No consultants are required. Office for Information Technologies and Electronic Government. (R) T ax Administration Modernization Project: To improve effectiveness of tax collection and lower the compliance burden for taxpayers. Approval completed on 24 April 2019. Environmental A ssessment Category B. Project: P1 63673. US$5 2.0 (IBRD). No consultants are required. Serbian Tax Administration. Health, Nutrition & Population A dditional Financing for Second Serbia Health Project: The PDO is to contribute to improving the efficiency and qu ality of the public health system of the Republic of Serbia through the strengthening of: (i) health financing, purchasing, a n d maintenance sy stems; and (ii) quality improvement sy stems and management of selected priority non-communicable diseases. Approval completed on 29 March 2018. Environmental Assessment Category B. Project: P166025. US$31.1 (IBRD). Con sultants will be required. Ministry of Health. April 2019 Europe And Central Asia PAGE 106 Social, Urban, Rural and Resilience Global Practice Ser bia - Real Estate Management Project Additional Financing: To improve the efficiency, transparency, accessibil- ity and reliability of Serbia’s real property management systems. Identification completed on 24 December 2018. Environ- m ental Assessment Category B. US$23.9 (IBRD). Consultants will be required. Im plementing agency(ies) t o be determined. Transport Cor ridor X Highway Additional Financing: The Project Development Objective is t o increase transport efficiency and im prove traffic safety on the three project sections of Corridor X, between Nis and Dimitrov grad and Grabovnica and Donji Neradovac respectively, and to improve road management and road safety in Serbia. Approval completed on 25 October 2016. Env ironmental Assessment Category A. Project: P158413. US$38.9 (IBRD). No consultants are required. Ministry of Finance. Tajikistan Agriculture A griculture Commercialization Project Additional Financing: The project development objective is to increase the commercialization of farm and agribusiness products and to support micro-, small and medium enterprise development in r ural areas by providing better access t o finance and strengthened capacity of project beneficiaries. Approval completed on 15 December 2017. Environmental Assessment Category B. US$ 1 5.0 (IDA Credit). Consultants will be required. Im plementing a g ency(ies) to be determined. Education T a jikistan Early Childhood Development Services Im provement Project: To support the development of a national ea rly childhood development (ECD) strategy and increase access and utilization of effective services in intervention areas Identification completed on 12 November 2018. US$ 40.0 (IDA Grant). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Energy & Extractives T a jikistan Power Utility Financial Recovery: The program development objectives are to improve the financial viability of t h e power sector and increase the reliability of electricity supply Concept completed on 4 February 2019. Project: P1 68211. US$ 116.0/40.0/35.0 (IDA Grant/AIIB/ASDB). Consulting services t o be determined. Barqi Tojik; Ministry of Energy and W ater Resources. Ru ral Electrification Project: The project development objectives are to provide electricity access to target settlements in Kh atlon and Gorno-Badakhshan Autonomous Oblast (GBAO) regions of Tajikistan, and improve reliability of electricity supply in GBA O. Concept com pleted on 8 February 2 019. Pr oject: P1 70132. US$ 2 0.0/2.8/22.6/10.0/4.0/11.3 (IDA Grant/AID/EAR/EURS/FOFE/KFW). Consultants will be required. Pamir Energy Company; Barqi Tojik. Environment & Natural Resources En vironmental Land Management and Rural Livelihoods - Additional Financing: The overall Project Develop- m ent Objective (PDO) and Global Environmental Objective (GEO) is to enable rural people to increase their productive assets in ways that im prove natural r esource m anagement and r esilience t o climate change in selected climate vulnerable sites Ap- pr oval completed on 30 June 2015. Environmental Assessment Category B. Project: P153709. US$ 1.8/2.0 (IDA Grant/CSCF). Con sultants will be required. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation Ru ral Economy Development Project: The Project Development Objective is to create income-generation opportunities in tourism and agribusiness in Khatlon and GBAO. Concept completed on 12 December 2018. Project: P168326. US$ 30.0 PAGE 107 Monthly Operational Sum m ary April 2019 (IDA Grant). No consultants are required. The Tourism Development Committee under the Government of Tajikistan; The MoF of t he RT State Institution "PIU for Access t o Green and Rural Development Finance". Social Protection & Labor Social Safety Net Strengthening Project: To achieve national geographic coverage of the Targeted Social Assistance Pro- g ram and to ensure integrated delivery of services. Approval completed on 30 January 2018. Environmental Assessment Ca tegory C. Project: P165831. US$ 0.9/0.9 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Health and Social Pr otection; State Agency for Social Protection (SASP). Social, Urban, Rural and Resilience Global Practice (R) T a jikistan Socio-Economic Resilience Strengthening Project: The development objectives of this project are to st r engthen participatory local g overnance, improve the quality of local infrastructure, both in targeted communities, and in- cr ease extracurricular or livelihood opportunities for youth. Negotiations authorized on 23 April 2019. Environmental As- sessm ent Category B. Project: P1 68052. US$ 37.0 (IDA Grant). Consultants will be required. National Social Investment Fund of T a jikistan. Water (R) Ru ral Water Supply and Sanitation Project: The project development objectives (PDO) are to (i) improve access to ba sic water supply and sanitation services in selected districts; and (ii) strengthen the capacity of institutions in the wat er su pply and sanitation sector. Approval completed on 28 February 2019. Environmental Assessment Category B. Project: P1 62637. US$ 58.0 (IDA Grant). Consultants will be required. State Unitary Entity "Khojagii Manziliyu Kommunali"; Munic- ipa l Infrastructure Development Project Management Unit under the Government of the RT. A dditional Financing for Tajikistan PAMP II: The project development objectives for PAMP II are to: (i) provide access t o t emporary employment to food-insecure people through the rehabilitation of irrigation and drainage infrastructure, (ii) in crease yields of selected crops in response to improved irrigation and infrastructure, and (iii) strengthen the capacity of T a jikistan to introduce integrated water resource management. By improving food access and food availability these measures im prove the food security of low -income people in the poor rural areas supported by the project. Approval completed on 22 Ju ne 2015. Environmental Assessment Category B. Project: P154327. US$ 12.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. T a jikistan Second Dushanbe Water Supply Project - Additional Financing: The project development objective is t o im prove water utility performance and water supply services in selected areas of Dushanbe. Approval completed on 30 June 2 015. Environmental Assessment Category B. Project: P154729. US$ 5.5/4.5 (IDA Credit/IDA Grant). Consultants will be re- qu ired. Im plementing agency(ies) to be determined. (R) Du shanbe Water Supply and Wastewater Project: The PDOs are to improve the reliability of water and wastewater services in selected areas in Dushanbe and t o improve the operational performance of the utility. Negotiations authorized on 23 April 2019. Environmental Assessment Category B. Project: P163734. US$ 30.0 (IDA Grant). No consultants are required. St ate Unitary Entity "Obu Korezi Dushanbe". Turkey Education En gaging At-Risk Youth: School to Work Transition: Strengthening existing services to support out-of-school adoles- cents to re-enter schooling and increase educational attainment. Concept completed on 1 August 2017. Environmental As- sessm ent Category C. Project: P1 64181. US$ 32.0 (EUDF). Consulting services to be determined. Ministry of National Educa- t ion - Directorate General for Life Long Learning. April 2019 Europe And Central Asia PAGE 108 Energy & Extractives Ga s Sector Development Additional Financing: The Project objective is to increase the reliability and stability of gas su pply in Turkey by implementing critically needed gas storage and network infrastructure, and support BOTAS in strength- en ing its operations as a financially stable and commercially managed corporation. Approval completed on 2 July 2014. En- v ironmental Assessment Category A. Project: P133565. US$400.0 (IBRD). Consultants will be required. BOTAS Turkish Pipe- line Company T el: (90-312) 297-2018, E-m ail: m gazi.dulger@botas.gov.tr, Contact: Mr. Mehmet Gazi Dulger, Project Direc- t or . (N) Renewable Energy Integration Project Additional Financing: The PDO is “To assist Turkey in meeting its in- cr eased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation”. T h e GEO is“To avoid Green House Gas (GHG) emissions from fossil fuel based power through greater integration of renewable en ergy sources based generation in Turkey”. Identification completed on 10 April 2019. Environmental Assessment Category B. US$311.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. T urkey Energy Efficiency in Public Buildings: The project development objective is to reduce energy use in public bu ildings and develop, test and scale-up of suitable sustainable financing and institutional mechanisms to support a national pr ogram. Concept completed on 7 May 2018. Environmental Assessment Category B. Project: P1 62762. US$150.0/5 0.0 (IBRD/CCTF). Consultants will be required. Ministry of Energy and Natural Resources; Ministry of Environment and Urban- iza tion, General Directorate of Construction Works. Social, Urban, Rural and Resilience Global Practice Su stainable Cities Project 3: The Project Development Objective is t o improve the access to targeted municipal services in participating municipalities and utilities. Identification completed on 5 November 2018. US$502.5 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. (R) Su stainable Cities Project 2 - A dditional Financing: The Project Development Objective is to improve the access t o t argeted m unicipal services in participating m unicipalities and utilities. Negotiations authorized on 10 April 2019. Envi- r onmental Assessment Category F. Project: P170612. US$561.2 (IBRD). Consultants will be required. Ilbank. National Disaster Risk Management Project - Sa fer Schools: The development objective of the project is to increase t h e safety of students, teachers and staff in selected schools in high-risk seismic zones in Turkey. Negotiations authorized on 2 9 June 2018. Environmental Assessment Category B. Project: P157683. US$300.0 (IBRD). Consultants will be required. Min istry of National Education. La nd Registration and Cadastre Modernization Project - A F: The objective of the Project is to improve the effective- n ess and efficiency of the land registry and cadastre services through: (i)renovating and updating cadastre maps to support dig ital cadastre and land registry information; (ii) making the digital land registry and cadastre information available to public a n d private entities; (iii) improving customer services in land registry and cadastre offices; (iv) improving human resources in T KGM; and (v) developing policies and capacity t o introduce best international practices in property valuation in Turkey. A pproval completed on 15 October 2015. Environmental Assessment Category B. Project: P154259. US$90.6 (IBRD). Con- su ltants will be r equired. General Directorate for Land Registry and Cadastre, Contact: Gungor Guzel, Head of Department; Republic of Turkey, Under-secretariat of Treasury, Contact: Gokben Yener, Head of Department for Economic Relations. Transport Im proving Rail Connectivity in Turkey: To increase the freight modal share of railways in Turkey through last-m ile connectivity im provements and strengthening of institutional capacity Identification completed on 1 3 February 2019. US$300.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Water T urkey Municipal Services in Refugee Affected Areas Project: The Project Development Objective is to support the Gov ernment of Turkey in improving access to targeted m unicipal services in municipalities and utilities in areas impacted by t h e influx of refugees in Turkey. Identification completed on 11 January 2019. US$50.0/150.0 (IBRD/EUDF). Consulting PAGE 109 Monthly Operational Sum m ary April 2019 services to be determined. Im plementing agency(ies) to be determined. GEF T urkey Irrigation Modernization: The objective of the project is to improve irrigation delivery, through rehabilita- t ion and modernization of distribution infrastructure in selected schemes, and through strengthening of capacity of WUAs. A pproval completed on 22 January 2019. Project: P1 67363. US$ 2.0/398.0 (GEFU/HTWB). Consultants will be required. Dev let Su İşleri (DSI). Ukraine Agriculture (R) A ccelerating Private Investment in Agriculture Program: The Program Development Objective is to remove se- lect constraints t o increased participation of private sector, in particular small and medium-sized enterprises (SMEs), in the a gricultural input and output markets of Ukraine. Negotiations authorized on 19 March 2019. Project: P1 66941. US$200.0 (IBRD). No consultants are required. Ministry of Agrarian Policy and Food. Education (N) Ukraine Improving Education for Results Project: The proposed development objective is to improve conditions for strengthening quality, equity and efficiency in upper secondary and tertiary education in Ukraine. Identification complet ed on 25 April 2019. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Energy & Extractives (N) Mu nicipal Energy Efficiency Guarantee Facility: Scale up commercial financing in municipal energy efficiency inv estments Concept completed on 8 April 2019. Project: P170871. US$ 200.0/3.0 (GUAR/SECO). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Transport Ky iv urban mobility: The Development Objective is to improve the mobility conditions for the citizens of Ky iv. Identifica- t ion completed on 22 January 2019. US$30.1 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Uzbekistan Agriculture Modernization and Competitiveness Project: The proposed PDO is to strengthen generation and delivery of selected a gricultural public services in Uzbekistan. Such services would include generation of new agricultural technologies and inno- v ations, their dissemination through extension services, support to productive partnerships, and improvement of sanitary and phytosanitary and food safety systems. Concept completed on 6 February 2019. Project: P1 58372. US$195.0/5.0 (IBRD/IDA Cr edit). Consultants will be required. Agroindustry and Food Security Agency (UZAIFSA). A dditional Financing - Hor ticulture Development Pr oject: The project development objective is to enhance the pr oductivity and profitability of horticulture sector in the project area. Approval completed on 30 January 2018. Environ- m ental Assessment Category B. Project: P164226. US$500.0/25.0 (IBRD/FSCO). Consultants will be required. Rural Restruc- t uring Agency. Digital Development Digital CASA - Uzbekistan: Digital CASA – Regional Program PDO: The proposed regional program PDO is to increase a ccess to more affordable internet, crowd-in private investment in the ICT sector, and improve participating government’s April 2019 Europe And Central Asia PAGE 110 ca pacity to deliver digital government services in Central Asia and parts of South Asia, through the development of a regiona lly in tegrated digital infrastructure and enabling environment. Dig ital CASA – Uzbekistan PDO: The proposed country-specific PDO for Uzbekistan is t o increase access to more affordable in ternet, crowd-in private investment in the ICT sector, and improve the government’s capacity to deliver digita l government services in Uzbekistan, by contributing to the development of a regionally integrated digital infrastructure and enabling env i- r onment. Concept completed on 18 September 2018. Environmental Assessment Category B. Project: P1 66615. US$ 100.0 (IDA Credit). Consultants will be required. National Agency for Project Management (NAPM). Education (R) Uzbekistan Promoting Early Childhood Development Project: The project development objectives are to in- cr ease access to early childhood education, improve the quality of learning environments in selected public preschools, and en able a systematic measurement of education quality for informed decision -making. Negotiations authorized on 5 April 2019. Environmental Assessment Category C. Project: P1 65737. US$ 59.5/9.5/4.9 (IDA Credit/EFAS/GPBA). Consulting ser- v ices to be determined. Ministry of Preschool Education. Energy & Extractives (N) Pr ivate Sector Power Generation Support Project: The development objective is to increase electricity generation ca pacity through private investment in the energy sector. Concept completed on 11 March 2019. Project: P170598. US$ 15.0 (GUID). Consulting services to be determined. Im plementing agency(ies) t o be determined. En ergy Efficiency Facility for Industrial Enterprises, Phase 3: T he project objective is to im prove energy efficiency in Industrial Enterprises (IEs) by designing and establishing a financing mechanism for energy saving investments. A pproval completed on 30 January 2018. Environmental Assessment Category F. Project: P165054. US$200.0 (IBRD). Con- su ltants will be required. Ministry of Economy; ASAKA Bank; Hamkorbank; Uzpromstroy bank; Invest Finance Bank; Asia A lliance Bank; National Bank of Uzbekistan. Finance, Competitiveness and Innovation (R) In stitutional Capacity Building Project: The Project Development Objective is to strengthen public financial man- a g ement and enable the market operation of the corporate sector. Negotiations authorized on 15 April 2019. Environmental Assessment Category C. Project: P1 68180. US$ 33.0 (IDA Credit). Con sultants will be required. Ministry of Finance. Uzbekistan Science Commercialization Project: The loan objective is to improve commercialization relevance of Uz- bekistan's science Identification completed on 13 January 2019. US$36.0 (IBRD). Consulting services to be determined. Im - plem enting agency(ies) to be determined. Health, Nutrition & Population A dditional Financing to Health System Improvement Project: The main project plans to equip with modern medical equ ipment 100 Rayon Medical Unions out of 157 current ones as well as 76 urban policlinics from 155 ones, that are established on the basis of the existing outpatient establishments. Allocation of additional IDA funds in the amount of up to US$63.0 mln w ill equip the remaining primary health care units which are not covered by the Health-III Project. Approval completed on 7 Ma rch 2013. Environmental Assessment Category B. Project: P1 33187. US$ 93.0 (IDA Credit). Consulting services t o be de- t ermined. Ministry of Health Tel: (998-71) 239-4808, E-m ail: office@jpib.uz, Contact: Djamshed Djabriyev, Executive Direc- t or . PAGE 111 Monthly Operational Sum m ary April 2019 Social Protection & Labor Uzbekistan: Strengthening the Social Protection System: The Project Development Objective is to improve the social a n d labor market inclusion of the poor and vulnerable people, including those t emporarily a ffected by the economic reforms in Uzbekistan. Concept completed on 16 November 2018. Environmental Assessment Category B. Project: P166447. US$ 50.0 (IDA Credit). No consultants are required. Ministry of Employment and Labor Relations. Social, Urban, Rural and Resilience Global Practice Su pport to Uzbekistan Prosperous Village s (Obod Qishloq): To increase access to quality basic infrastructure and services in targeted rural communities. Concept completed on 14 October 2018. Environmental Assessment Category B. Pro- ject: P1 68233. US$ 100.0 (IDA Credit). Consultants will be required. Institute for Forecasting and Macroeconom ic Research. Water Wa ter Services and Institutional Support Program: The Program / Pr oject Development Objective is to: (i) improve cov erage, quality and efficiency of water supply and sanitation services in selected project areas; and (ii) strengthen the capac- ity of sector institutions for improved service delivery. Concept completed on 16 March 2018. Environmental Assessment Ca tegory B. Project: P162263. US$ 210.0/11.4/113.6/5.7 (IDA Credit/ECEU/EUIB/SWTZ). Consultants will be required. Kom- m unkhizmat Agency. A dditional Financing for Bukhara and Samarkand Sewerage Project: The proposed PDOs are to reduce wastewater pollution and im prove the performance of utilities r esponsible for wastewater management in Bukhara and Samarkand. Ap- pr oval completed on 23 June 2015. Environmental Assessment Category B. Project: P152801. US$ 105.0 (IDA Grant). Con- su ltants will be required. Uzkommunkhizmat Tel: (998-712) 354-497, E-m ail: waterproject@unitech.uz. Regional Environment & Natural Resources Cl imate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB Additional Financing:

To en- h ance regionally coordinated access to improved climate change knowledge services for key stakeholders (e.g., policy makers, communities, and civil society) in participating Central Asian countries, as well as to increased investments and capacity build- in g that, com bined, will address climate challenges common to these countries.

Identification completed on 15 March 2017. Environmental Assessment Category B. US$ 19.0 (GCF). Consulting services to be determined. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation (R) Western Balkans Trade and Transport Facilitation: The Proposed Development Objective is to reduce the trade cost s and increase transport efficiency in Albania, North Macedonia, and Serbia Approval completed on 18 April 2019. Envi- r onmental Assessment Category B. Project: P162043. US$90.0 (IBRD). Consultantswill be required. Ministry of Construction, T ransport and Infrastructure (Serbia); Ministry of Transport and Communication (North Macedonia); Ministry of Finance a n d Economy (Albania). Social, Urban, Rural and Resilience Global Practice (R) CA SA1000 Community Support Project for Tajikistan: The Project Development Objective is to increase the qual- ity of, and access to, energy, social and economic infrastructure services, and t o contribute t o the strengthening of local g ov- er nance in communities in the project area. Approval completed on 21 March 2019. Environmental Assessment Category B. Pr oject: P165313. US$ 24.0/2.0 (IDA Grant/CASA). Consultants will be required. State Enterprise Project Management Unit for the Energy Sector (ESPMU); OJSHC Barqi Tojik; National Social Investment Fund of Tajikistan (NSIFT). Central Asia Hydrometeorology Modernization Project (CAHMP) Additional Financing: The objective of the April 2019 Latin Am erica And Caribbean PAGE 112 Central Asia Hydrometeorology Modernization Project (CAHMP) is t o im prove the accuracy and timeliness of hydromet ser- v ices in Central Asia, with particular focus on Kyrgyz Republic and Republic of Tajikistan. Approval completed on 1 August 2 018. Environmental Assessment Category C. Project: P1 64780. US$ 4.0/7 .5 (IDA Credit/IDA Grant). Consultants will be r equired. Tajikhydromet; Kyrgyzhydromet; EC-IFAS Regional Center of Hydrology (RCH); Ministry of Em ergency Situations. Transport Fou rth Phase of the Central Asia Regional Links Program: The development objective of the proposed Fourth Phase of t h e Central Asia Regional Links Program (CARs-4) is t o increase r egional connectivity and improve market opportunities for t rade and travel in GBAO and Khatlon Oblasts. Identification com pleted on 15 October 2018. US$ 125.0/1 25.0 (IDA Cr edit/IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. T hird Phase of the Central Asia Regional Links Program (CARs -3): The project development objective of the pro- posed Third Phase of the Central Asia Regional Links Program (CARs-3 Project) is to increase regional connectivity and sup- por t sustainable tourism development in Issy k-Kul Oblast. A pproval completed on 5 October 2018. Environmental A ssessment Category B. Project: P1 59220. US$ 27.5/27.5 (IDA Cr edit/IDA Grant). Consultants will be required. Ministry of Transport and Roads. Water Da nube Water Program Third Phase: Building a Danube Water Security Platform: To support the improvement of: (i) water sector related institutions, policies and regulations in participating countries from the Danube region and (ii) the su stainability of DWP developed activities. Approval completed on 31 December 2018. Environmental Assessment Category C. Pr oject: P1 67702. US$ 1.7 (MSC1). Consultants will be required. International A ssociation of Water Supply Companies in t h e Danube River Catchment Area (IAWD). (R) Sa va and Drina River Corridors Integrated Development Program: The Development Objective of the Sava- Dr ina River Corridor Integrated Development Project is to strengthen capacity for integrated river basin management and dev elopment through improved transport connectivity, flood protection, and landscape management in selected catchment a r eas of t h e Sava and Dr ina r iver corridors. Concept completed on 22 March 2019. Pr oject: P1 68862. US$94.0/65.8 (IBRD/ECEU). Consultants will be required. Bosnia and Herzegovina - Ministry of Foreign Trade and Economic Relations; Republic of Serbia Ministry of Agriculture and Environment Protection; Montenegro Ministry of Agriculture and Rural Devel- opm ent; Republic of Serbia Ministry of Construction, Transport and Infrastructure; Slovenia Ministry of Environment and Spatial Planning; Croatia Ministry of Environment and Energy. Latin America And Caribbean Argentina Education (R) Im proving Inclusion in Secondary and Higher Education: The objectives of the Operation are to (i) reduce drop- ou t rates in basic and higher education among the m ost vulnerable; and (ii) strengthen the Borrower’s education evaluation sy stems. Appraisal completed on 22 April 2019. Project: P168911. US$341.0 (IBRD). Consultants will be required. Ministerio de Educacion, Cultura, Ciencia y Tecnologia. Energy & Extractives Ren ewable Fund Guarantee: Support the development of renewable energy in Argentina through private sector invest- m ents. Approval completed on 15 March 2018. Project: P1 65085. US$ 250.0 (GUAR). Consulting services to be determined. PAGE 113 Monthly Operational Sum m ary April 2019 Im plementing agency(ies) to be determined. Health, Nutrition & Population A F for AR Provincial Public Health Insurance Development Project: The PDOs are to: (a) increase utilization and qu ality of key health services for the uninsured target population; and (b) improve institutional management by strengthening t h e incentives for results in Participating Provinces and among Authorized Providers. Approval completed on 7 July 2015. Env ironmental Assessment Category C. Project: P1 54431. US$200.0 (IBRD). Consultants will be required. Im plementing a g ency(ies) to be determined. Other A dditional Financing for the Unleashing Productive Innovation Project: The project development objective (PDO) is t o ex pand Argentina’s capacity to g enerate productive innovation in knowledge-based areas by (i) facilitating the creation of n ew knowledge-based companies; (ii) developing specialized human capital; (iii) supporting productive research innovation pr ojects and their commercialization in three priority technology areas (biotechnology, nanotechnology, and information and t elecommunications); (iv) upgrading research infrastructure in the areas of science, technology and productive innovation; a n d (v) strengthening the policy framework governing science, technology, and productive innovation. Approval completed on 8 July 2016. Environmental Assessment Category B. Project: P159747. US$45.0 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. Social Protection & Labor Im proving the Electricity Social Tariff in the Buenos Aires Province: The development objective is to strengthen t h e institutional capacity to administer the electricity social tariff scheme and improve its effectiveness in the Buenos Aires Pr ov ince. Identification completed on 4 February 2019. US$150.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. A dditional Financing Children and Youth Protection Project: The Project Development Objectives are to: (i) expand cov erage of the Family Allowances programs; and (ii) improve transparency of social protection programs implemented by A NSES. Approval com pleted on 1 November 2018. Environmental A ssessment Category C. Project: P1 67851. US$450.0 (IBRD). No consultants are required. ANSES - Administracion Nacional de la Seguridad Social; Ministerio de Desarrollo So- cial. Social, Urban, Rural and Resilience Global Practice (R) Met ropolitan Bu enos Aires Urban Transformation Project Additional Financing: The Project Dev elopment Objectives are to improve housing conditions and access to selected basic services and infrastructure in selected disadvantag ed n eighborhoods in the Buenos Aires Metropolitan Area (AMBA), and strengthen the institutional capacity for urban manage- m ent a t the m etropolitan level. Appraisal completed on 9 April 2019. Environmental Assessment Category A. Project: P1 66935. US$100.0 (IBRD). Consultants will be required. Ministry of Infrastructure and Public Services, Province of Buenos A ires; Secretariat for Social and Urban Integration (SECISYU), Autonom ous City of Buenos Aires; Ministry of Economy and Finance, Autonomous City of Buenos Aires; Ministry of Economy, Province of Buenos Aires; General Secretariat, Autonom ous City of Buenos Aires; Provincial Organization for Social and Urban Integration (OPISU), Province of Buenos Aires. Transport Met ropolitan Areas Urban Transport Project: The ov erall development objective of the program is to improve the qual- ity and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral deci- sion making frameworks and by giving priority to public transport modes in the urban transport sector. The project (APL1) dev elopment objectives contribute t o the overall program development objective by: (i) supporting the design and creation of a m ultijurisdictional Metropolitan Transport Agency for the Buenos Aires Metropolitan Area (AMBA); (ii) strengthening the in stitutional capacity of the transport authorities in decision making, planning, priority setting, and resource allocation in u rban transport; (iii) improving the quality and performance of urban transport infrastructure and/or services in medium size April 2019 Latin Am erica And Caribbean PAGE 114 Met ropolitan Areas; and (iv) improving the physical integration and access to public transport networks in the Buenos Aires Met ropolitan Area. A pproval completed on 27 January 2017. Environmental A ssessment Category B. Project: P1 61393. US$45.0 (IBRD). No consultants are required. Im plementing agency(ies) to be determined. Water Pl an Belgrano Water Supply and Sanitation Services Development Project: The proposed new Project Develop- m ent Objectives are to increase access to water supply and sanitation services and to improve the operational and financial per formance of the water supply and sanitation service providers in the project area. Approval completed on 24 March 2017. Env ironmental Assessment Category A. Project: P162712. US$125.0 (IBRD). Consultants will be required. Ministry of Interior, Pu blic Works and Housing, UCPyPFE. Bolivia Agriculture BO Community Investment in Rural Areas Project Additional Financing: To improve access to sustainable basic in frastructure and services for the most disadvantaged rural communities selected in some of the poorest municipalities of Boliv ia. Approval completed on 4 August 2015. Environmental Assessment Category B. Project: P1 54854. US$ 60.0 (IDA Cr edit). No consultants are required. Im plementing agency(ies) t o be determined. A dditional Finance BO Rural Alliances Project II: The re-written PDO would be: The Objective of the Project is to im prove accessibility to markets and climate resilience for small -scale rural producers in the country. Approval completed on 1 3 April 2017. Environmental Assessment Category B. Project: P1 58532. US$100.0 (IBRD). Consultants will be required. EMPODERAR; EMPODERAR; EMPODERAR; Ministry of Development Planning. Social, Urban, Rural and Resilience Global Practice Bol ivia Urban Resilience: To reduce vulnerability to hydrometeorological hazards and improve living conditions in pri- m arily low income areas in selected areas of participating municipalities. Appraisal completed on 14 January 2019. Environ- m ental Assessment Category B. Project: P1 65861. US$150.0 (IBRD). Consulting services to be determined. Ministry of Public W orks, Services and Housing – Vice ministry of Housing and Urbanism. Water Bol ivia - Water and Sanitation in Peri-Urban Areas: The Project Development Objective (PDO) is to increase access t o water and sewerage services in targeted areas and to improve climate resilience in the operations of targeted participatin g u t ilities. Neg otiations a uthorized on 2 4 Ja nuary 2 019. En v ironmental A ssessment Ca tegory B. Pr oject: P1 62005. US$24.2/45.8 (IBRD/IDA Credit). Consulting services to be determined. Ministry of Environment and Water - MMAyA. BO Wa stewater T reatment and Reuse: The Pr oject Dev elopment Objective is t o r educe wastewater pollution and st r engthen the capacity of the participating institutions tom anage wastewater treatment systems in La Paz and Tarija. Concept com pleted on 21 February 2018. Environmental Assessment Category A. Project: P162305. US$140.0 (IBRD). Consultants w ill be required. Ministry of Environment and Water (Ministerio de Medio Ambiente y Agua MMAyA). Brazil Agriculture Cea ra Rural Sustainable Development and Competitiveness Phase II: The Project Development Objective (PDO) is PAGE 115 Monthly Operational Sum m ary April 2019 t o enhance access to markets and access to water and sanitation, adopting clim ate resilient approaches, by targeted benefi- ciaries in selected areas of the State of Ceará. Negotiations authorized on 21 February 2019. Environmental Assessment Cat- eg ory B. Project: P1 67455. US$100.0 (IBRD). Consultants will be required. Secretariat of Agrarian Development. Education (N) Pr ogram for Promoting Learning, Graduation and Employability of Sao Paulo Youth: Increase learning, g raduation and employability of the Youth in the State of São Paulo with more efficient use of public resources. Identification com pleted on 25 March 2019. US$300.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be de- t ermined. Energy & Extractives Financial In struments for Brazil Energy Efficient Cities - FinBRAZEEC: The Project Development Objective is to u nlock private financing for urban energy efficiency projects in Brazil by reducing the credit risk and enhancing the technic al qu ality of Efficient Street Lighting subprojects and Industrial Energy Efficiency subprojects. Approval com pleted on 29 June 2 018. Env ironmental A ssessment Ca tegory F. Pr oject: P1 62455. US$200.0/20.0/0.5/1 95.0/0.5 (IBRD/CCTF/ESMP/GCF/GIF). Consultants will be required. Caixa Economica Federal. Environment & Natural Resources (R) Su staining Healthy Coastal and Marine Ecosystems Project: To strengthen management of the MCPA system a n d the enabling conditions for the blue economy in targeted areas. Concept completed on 8 April 2019. Environmental As- sessm ent Category B. Project: P1 68989. US$ 14.5 (GEFU). No consultants are required. ICMBIO; Funbio. Finance, Competitiveness and Innovation Br a zil-Unlocking infrastructure financing: Enhance private financing for infrastructure through the development of financial instruments that will attract institutional investors. Identification completed on 5 October 2018. US$100.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Governance Pa rana Public Sector Performance and Productivity for Service Delivery: To support the Government to enhance per formance of public administration and im prove efficiencies in the delivery of health and education services Identification com pleted on 22 August 2018. US$220.0 (IBRD). Consulting services to be determined. Secretariat of Planning. A lagoas P4R Public Sector Efficiency for Service Delivery: Support the Government of Alagoas t o enhance the effi- ciency and performance of public administration and improve service delivery Identification com pleted on 12 February 2019. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. (N) En ergy and Mineral Sectors Strengthening Project II: To strengthen the capacity of key public sector institutions t o im prove the contribution of energy and mineral resources to accelerated national economic growth and increased social and env ironmental sustainability. T h e principal outcome expected from the project is to improve capacity of key institutions in both the energy and the mineral sectors to ensure that they deliver the regulatory adjustments, the improved planning and the modernization of infrastructure - in particular related t o in formation systems and t echnology development - t hat are needed in order to support accelerated economic growth that is su stainable from both environmental and social perspectives. Identification completed on 11 April 2019. US$40.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Latin Am erica And Caribbean PAGE 116 Social, Urban, Rural and Resilience Global Practice (N) Southern Brazil Urban Resilience Program (SUL RESILIENTE): To promote urban resilience in the municipal- it ies of Southern Region of Brazil by increasing their access t o financial and technical support aimed at designing and imple- m enting context-specific structural and non-structural solutions to cope with floods and geotechnical risks. T o a chieve the Development Objective, the specific objectives have been defined as follows: i) T o improve physical infrastructure of southern municipalities, directing resources to resilient infrastructure delivery to cope w ith extreme natural events (floods and geotechnical risks and droughts); ii) To provide technical and institutional capacity building for municipalities in the southern region of Brazil in the area of u rban resilience, through technical assistance (involving, among others: risk awareness and citizen participation, qualification a n d training of employees, preparation of studies, sectoral plans and projects); iii) To leverage the results of financial resources traditionally used in municipal investments in the southern region, combining t h em with international resources and t echnical assistance; and iv ) T o extend the capillarity of credit t o municipalities with a population of less than 100 thousand inhabitants. Identification com pleted on 6 March 2019. US$100.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Ma naus Urban Resilience: The Dev elopment Objective is t o enhance urban resilience in the Municipality of Manaus t hrough integrated urbanization with higher density and lower disaster risk. Identification com pleted on 25 September 2017. US$64.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. For taleza Sustainable Urban Development Project: The objectives of the Project are to: (a) strengthen the capacity of t h e Municipality of Fortaleza for land use planning and land -based financing; and (b) enhance urban environment and reha- bilitate public spaces, through interventions in selected areas of the Vertente Maritima Basin and of the Rachel de Queiroz Pa rk. Approval completed on 28 April 2017. Environmental Assessment Category B. Project: P153012. US$73.3 (IBRD). Con- su ltants will be required. Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA). Transport Im proving Mobility and Urban Inclusion in Belo Horizonte: The Project Development Objective is to improve (i) the qu ality of service and accessibility t o jobs for public transport users in the area of influence of the Ex presso Amazonas BRT ; a n d (ii) the connectivity of low-income beneficiaries to the Expresso Amazonas BRT. Identification completed on 19 Septem- ber 2018. US$80.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Sa o Paulo Aricanduva Corridor: T o improve public transport services delivery along the Aricanduva corridor in Sao Pa ulo. Identification completed on 19 September 2018. US$97.2 (IBRD). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Water SA BESP - IMPROVING WATER SERVICE ACCESS AND SECURITY IN THE METROPOLITAN REGION OF SÃ O PAULO PROJECT: The Project Development Objectives are to increase access of vulnerable people to water services a n d to contribute to the reduction of water losses and pollution loads in the Metropolitan Region of São Paulo. Approval com- pleted on 18 December 2018. Environmental Assessment Category B. Project: P1 65695. US$250.0 (IBRD). Consultants will be r equired. SABESP. (R) Pa raiba Improving Water Resources Management and Services Provision: T o (i) strengthen capacity for in- t egrated water resources management in the State; (ii) improve reliability of water services in the Agreste and Borborema r egions; and (iii) improve the operational efficiency of water and wastewater services in the Joao Pessoa Metropolitan Region. PAGE 117 Monthly Operational Sum m ary April 2019 Approval completed on 28 February 2019. Environmental Assessment Category B. Project: P165683. US$126.9 (IBRD). Con- su ltants will be required. CAGEPA - State Water and Sanitation Company; AESA - State Water Resources Management Exec- u t ive Agency. BR A F Teresina Enhancing Municipal Governance and Quality of Life Proj: The objectives of the Project are to (a) im prove the financial and environmental management capacity of the Borrower, and (b) improve access to services by the low - in come population of the Lagoas do Norte Region. Approval completed on 24 February 2016. Environmental Assessment Ca tegory A. US$88.0 (IBRD). Consultants will be required. Im plementing agency(ies) to be determined. (R) Cea rá Water Security and Governance: The proposed Project's Dev elopment Objective (PDO) is to strengthen ca- pa city for water resources management in the State, improve reliability of water services in select municipalities, and improve operational efficiency of water services in the city of Fortaleza. Negotiations authorized on 28 March 2019. Environmental A ssessment Category B. Project: P165055. US$139.9 (IBRD). Consultants will be required. Secretariat of Water Resources - SRH; Ceara Water and Sanitation Utility - CAGECE; Ceara Economic Research and Strategy Institute - IPECE. Chile Health, Nutrition & Population Ch ile - Public Health Sector Support Project: The objectives of the Project are to: (i) improve the efficiency of the public h ealth care sector; and (ii) improve the quality of Non-Communicable Diseases-related health care services. Approval com- pleted on 8 June 2017. Environmental Assessment Category B. Project: P1 61018. US$80.0 (IBRD). Consultants will be re- qu ired. Ministry of Health. Water CL In tegrated Water Resources Management & Infrastructure Development: The Project Development Objective (PDO) is to strengthen the capacity of the Borrower for water resources management and public infrastructure planning and con cession. A pproval completed on 4 November 2015. Environmental Assessment Category B. Project: P1 52319. US$40.9 (IBRD). Con- su lting services to be determined. Ministry of Finance, Contact: José Pablo Gomez, Jefe División Finanzas Publicas. Dirección de Pr esupuestos; Ministry of Public Works, Contact: Sergio Galilea, Undersecretary of Public Works. Colombia Education A dditional Financing for Access and Quality in Higher Education Project - PACES: The objective of the project is t o im prove the quality of tertiary education in participating institutions and to increase the enrollment of students from dis- a dv antaged socioeconomic backgrounds in quality programs. Approval completed on 29 March 2018. Environmental Assess- m ent Category C. Project: P1 66177. US$160.0 (IBRD). No consultants are required. ICETEX. Energy & Extractives CT F Clean Energy Development Project: The Project Development Objective is to assist Colombia in increasing electric- ity y generation capacity from non-conventional renewable energy sources and energy savings in the industrial sector, through m obilization of private investment. Approval completed on 1 6 July 2018 . Environmental Assessment Category F. Project: P1 61713. US$ 41.0 (GUAR). Consulting services to be determined. Im plementing agency(ies) t o be determined. April 2019 Latin Am erica And Caribbean PAGE 118 Environment & Natural Resources (R) Or inoquia Integrated Sustainable Landscapes: Im prove ecological representation and connectivity of selected pri- or ity production-conservation landscapes in the Orinoquia region. Concept completed on 25 March 2019. Project: P1 67830. US$ 6.5/20.0 (GEFU/ISFL). Consultants will be required. World Wildlife Fund Colombia. Health, Nutrition & Population Su pport the financial sustainability of the Colombian health system: To support the Government of Colombia in its efforts to ensure the medium and long-term financial sustainability of the health system through improvements in quality and efficiency. Identification completed on 5 December 2018. US$200.0 (IBRD). Consulting services t o be determined. Ministry of Health and Social Protection. Social, Urban, Rural and Resilience Global Practice (R) Mu ltipurpose Cadaster Project: The Project Development Objective is to establish the multipurpose cadaster in the selected municipalities to a) strengthen t enure security, and b) provide access t o cadaster information. Approval completed on 14 March 2019. Environmental Assessment Category B. Project: P162594. US$100.0 (IBRD). Consultants will be required. Departamento Nacional de Planeacion; Agencia Nacional de Tierras (ANT); Superintendencia de Notariado y Registro (SNR); In st ituto Geográfico Agustín Codazzi (IGAC). Con struyendo Comunidades de Paz: To improve access and quality of basic public infrastructure and economic oppor- t unities in conflict- affected communities in Colombia. Identification completed on 21 February 2019. US$200.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. Transport En hancing Waterway Connectivity and Water Service Provision in Colombia’s Plan Pazcifico: The Project De- v elopment Objective (PDO) is to improve: (i) waterway transport; and (ii) coverage and quality of water supply and sanitation services, in the Participating Municipalities. A pproval completed on 14 December 2017. Environmental Assessment Category B. Project: P156880. US$41.9 (IBRD). Con- su ltants will be required. FTSP, r epresented by its Fiduciary Ag ent and Trustee FIDUCIARIA LA PREVISORA, S.A. (FI- DUPREVISORA), Contact: Linda Mondragon, Advisor; National Unit for Disaster Risk Management, Contact: Gerardo Jara- m illo, Manager. Costa Rica Education Learning for All in Costa Rica: The objective of the program is t o strengthen teaching quality, the use of educational r esources, and the education sy stem management in basic education. Identification completed on 4 December 2018. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Environment & Natural Resources (R) Costa Rica Sustainable Fisheries Development Project: The Project Development Objective (PDO) is to improve m anagement of priority fisheries and enhance economic opportunities from those fisheries for Costa Rica. Negotiations au- thorized on 27 March 2019. Environmental Assessment Category B. Project: P1 68475. US$90.0 (IBRD). Consultants will be r equired. Instituto Costarricense de Pesca y Acuicultura (INCOPESCA). PAGE 119 Monthly Operational Sum m ary April 2019 Dominica Energy & Extractives (R) Dom inica Geothermal Risk Mitigation Project: The objective of the proposed Project is to help: a) diversify the dom estic power g eneration mix in Dom inica by integrating clean, renewable geothermal energy; and b) demonstrate the po- t ential of larger development of the geothermal resource. Approval completed on 18 March 2019. Environmental Assessment Ca tegory A. Project: P1 62149. US$ 17.2/1 0.0/2.0/10.0/2.0 (IDA Credit/CCTF/DOCK/FSSP/NZL). Consultants will be re- qu ired. Dominica Geothermal Development Company. Environment & Natural Resources (N) GEF Leveraging Eco-Tourism for Biodiversity Protection in Dominica: Project Development Objective is to im prove management of Dom inica’s three national parks and the tourist trail network. Identification completed on 25 March 2 019. US$ 3.7 (GEFU). Consulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice A dditional Financing Dominica Disaster Vulnerability Reduction Project: The objective of the Project is to reduce v ulnerability to natural hazards and climate change impacts in Dominica through: (i) investment in resilient infrastructure, a nd (ii) improved hazard data collection and monitoring systems. Approval completed on 28 September 2018. Environmental A ssessment Category B. Project: P1 66540. US$ 31.0 (IDA Credit). Consultants will be required. Ministry of Environment; Min istry of Environment, Climate Resilience, Disaster Management and Urban Renewal. Dominican Republic Agriculture DR Resilient Agriculture and Integrated Water Resources Management: The Project Development Objective is to contribute to improved sustainable landscape management and access to water supply and sanitation services in targeted river ba sins. Approval com pleted on 1 3 December 2018. Environmental A ssessment Category B. Project: P1 63260. US$80.0 (IBRD). Consultants will be required. Ministerio de Economia, Planificacion y Desarrollo; Instituto Nacional de Recursos Hid- r aulicos; Ministerio de Agricultura; Instituto Nacional de Aguas Potables y Alcantarillado (INAPA); Ministerio de Medio Am- biente y Recursos Naturales. Education A dditional Financing - Su pport to the National Education Pact Project: The objective of the Project is to improve t h e Borrower ’s capacity to: (i) recruit and train primary and secondary school teachers, (ii) assess student learning in primary a n d secondary education, (iii) evaluate the quality of service provided by Public Early Childhood Development Centers, and (iv ) enhance the process for decentralizing public school management. A pproval completed on 1 3 December 2018. Environmental Assessment Category C. Project: P1 67815. US$100.0 (IBRD). Con sultants will be required. Ministry of Education. Environment & Natural Resources (N) Integrated productive landscapes through land use planning; restoration; and sustainable intensifica- t ion of rice in Yaque and Yuna: To strengthen integrated landscape management and expand the area under improved la nd use practices in targeted watersheds in the Dominican Republic Identification completed on 25 March 2019. US$ 4.1 (GEFU). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Latin Am erica And Caribbean PAGE 120 Transport Ca ribbean Regional Communications Infrastructure Prog - Dominican Rep.: The project development objective is t o increase access to regional broadband networks and advance the development of ICT-enabled services in the Dom inican Republic and in the Caribbean Region. Approval completed on 25 September 2014. Environmental Assessment Category B. Pr oject: P1 47483. US$30.0 (IBRD). Consultants w ill be r equired. INDOTEL T el: 1 8293786151, E-m ail: jroques@in- dot el.gob.do, Contact: Jorge Roques, Coordinador de Proyectos (Projects Coordinator). Ecuador Environment & Natural Resources Ecu ador Forest Investment Program: To improve management of forest and agricultural landscapes in selected areas of t h e coastal provinces. Concept completed on 4 October 2018. Environmental Assessment Category B. Project: P1 67752. US$ 2 3.6 (CSCC). Consultants will be required. Ministry of Environment. Social Protection & Labor (R) Social Safety Net Project: The Project development objective is t o im prove the equity, integration and sustainability of selected social safety net programs. Approval completed on 3 April 2019. Project: P167416. US$350.0 (IBRD). Consultants w ill be required. Ministry of Social Inclusion and Equity (MIES); Secretaria Nacional de Planificacion y Desarrollo (SEN- PLA DES). Transport A dditional Financing Quito Metro Line One Project: The proposed Project development objective (PDO) is to improve u rban mobility in the city of Quito serving the growing demand for public transport. The Project will reduce travel times, decrease operational costs of the transport service, improve connectivity, security and comfort of the current sy stem and re- du ce emissions of pollutants and greenhouse gases. Approval completed on 22 June 2018. Environmental Assessment Cate- g ory A. Project: P1 58756. US$230.0/152.2/250.0 (IBRD/CAFL/IADB). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Water Gu ayaquil Wastewater Management Project AF: The Project Development Objective (PDO) is to increase access to im proved sanitation services and to reduce wastewater pollution in selected areas of the City of Guayaquil. Approval completed on 29 June 2018. Environmental Assessment Category A. Project: P1 65716. US$233.6 (IBRD). Consultants will be required. EMA PAG-EP. El Salvador Energy & Extractives (R) ES In creasing power generation from geothermal resources in El Salvador: The Development Objective is to in crease electricity g eneration fr om geothermal r esources in El Salvador Concept completed on 19 April 2019. Project: P1 70089. US$200.0 (IBRD). Consultants will be required. LaGeo. Environment & Natural Resources (N) El Salvador: Biodiversity Conservation and Landscape Restoration Project: To promote land restoration and biodiversity conservation in the Conservation Area of El Im possible – Barra de Santiago. Identification completed on 25 Ma rch 2019. US$ 4.0 (GEFU). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 121 Monthly Operational Sum m ary April 2019 Health, Nutrition & Population Pr omoting Human Capital in El Salvador: To promote human capital accumulation at the different stages of the life course in El Salvador by fostering healthy environments, preventing the early onset of diseases, and ensuring the provision of qu ality health care. Identification completed on 6 November 2018. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) El Sa lvador Local Economic Resilience Project: The Project Development Objective is to improve institutional per formance of municipalities and increase access for citizens t o services and resilient infrastructure. Approval completed on 17 April 2019. Environmental Assessment Category B. Project: P169125. US$200.0 (IBRD). Consultants will be required. Min istry of Finance; Fondo de Inversion Social para el Desarrollo Local de El Salvador. Grenada Governance Gr enada Digital Governance for Resilience: To enhance the delivery of selected public services and fortify government r esiliency by modernizing Grenada's public sector management systems through digital platforms and institutional reform. Con cept completed on 12 December 2018. Environmental Assessment Category C. Project: P1 67588. US$ 15.0 (IDA Credit). Con sulting services to be determined. Ministry of Im plementation. Guatemala Environment & Natural Resources For est landscapes and ecosystem services in Guatemala: To strengthen governance of forest management and in- cr ease a ccess to im proved livelihoods for forest-dependent communities in selected areas in Guatemala. Concept completed on 7 August 2018. Environmental Assessment Category B. Project: P167131. US$ 10.8/1 .4 (CSCC/CSCF). Consultants will be r equired. Instituto Nacional de Bosques (INAB). Governance T ransparency and Efficiency in Tax Administration: The project development objective is t o increase levels of com- pliance with tax and customs obligations. Approval completed on 17 January 2017. Environmental Assessment Category C. Pr oject: P153366. US$55.0 (IBRD). Consultants will be required. Superintendencia de Administracion T ributaria, Contact: Er n esto Ramirez, PMO; Ministry of Public Finance, Contact: Mynor Argueta, Head, Management and Negotiation of Interna- t ional Cooperatio. Health, Nutrition & Population Cr ecer Sano: Guatemala Nutrition and Health Project: The Project Development Objective (PDO) is t o improve se- lected practices, services and behaviors known to be key determinants of chronic malnutrition (with an emphasis on the first 1 ,000 days of life) in the intervention areas. Approval completed on 24 March 2017. Env ironmental Assessment Category B. Pr oject: P159213. US$100.0 (IBRD). Consultants will be required. Social Development Fund/ Ministry of Social Development (MIDES); Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social - M. Social, Urban, Rural and Resilience Global Practice GT : Ur ban Infrastructure and Violence Prevention: The Project's Development Objective (PDO) is to increase access t o basic urban infrastructure and services and mitigate key risk factors of crime and violence in selected communities. Approval com pleted on 17 January 2017. Environmental Assessment Category B. Project: P1 43495. US$45.0 (IBRD). Consultants will April 2019 Latin Am erica And Caribbean PAGE 122 be r equired. Mancomunidad Gran Ciudad del Sur T el: 50255179845, E-m ail: thomashl1@hotmail.com, Contact: Thomas Henry, PIU Manager. Guyana (N) A dditional Financing to the Flood Risk Management project: The objective of the project is to reduce the risk of flooding in the low -lying areas of the East Demerara. Identification com pleted on 26 March 2019. Environmental Assessment Category B. US$ 4.5 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Haiti Agriculture Resilient Productive Landscapes in Haiti: The Project Development Objectives are: (i) to improve the adoption of resil- ience-enhancing agricultural and landscape management practices in selected sub-watersheds; and (ii) to enable the Govern- m ent t o respond promptly and effectively to an eligible emergency. A pproval completed on 1 March 2018. Project: P1 65551. US$ 6.2 (GEFU). Consultants will be required. Ministry of Agricul- t ure, Natural Resources and Rural Development (MARNDR); Ministry of Environment. Rel aunching Agriculture: Strengthening Agriculture Public Services II Project - Additional financing: The n ew proposed PDO is: to (a) reinforce the capacity of the Ministry of Agriculture, Natural Resources and Rural Dev elopment t o provide or facilitate access to services in the agricultural sector; (b) increase market access to small producers and food security in Selected Areas; (c) improve livelihood in areas a ffected by Hurricane Matthew and (d) enable the Government to r espond promptly and effectively to an eligible emergency. Approval completed on 14 June 2017. Environmental Assessment Ca tegory B. Project: P163081. Consultants will be required. Ministry of Agriculture, Natural Resources and Rural Develop- m ent; Ministry of Economy and Finance. Education (R) HT - A F t o Providing an Education of Quality in Haiti: The objectives of the Project are to: (i) strengthen public m anagement of the education sector; (ii) im prove learning conditions in selected public and non-public primary schools; and (iii) support enrollment of students in selected public and non-public primary schools. Negotiations authorized on 11 April 2019. Environmental Assessment Category B. Project: P165507. US$ 39.0/1 8.0 (IDA Grant/DFTD). Consultants will be re- qu ired. Ministère d’Education et Formation Professionnelle; MENFP. Governance A dditional Financing to Haiti Statistical Capacity Building Project: The objectives of the project are to (a) assist in t h e production, analysis, and dissemination of the findings of the Fifth Population and Housing Census and strengthen the h uman and technological capacities of the IHSI and (b) enhance expenditure management practices and the timeliness and cov erage of budgetary and financial information, to contribute to improved budget management and ov ersight. Approval com- pleted on 31 May 2018. Environmental Assessment Category C. Project: P1 64093. US$ 15.0 (IDA Grant). Consultants will be r equired. Im plementing agency(ies) to be determined. Health, Nutrition & Population A dditional Financing for the Improving Maternal and Child Health Throu gh Integrated Social Services Pro- ject : To increase the access and use of maternal and child health services, strengthen cholera control, and improve targeting of social services in the Recipients territory, with a particular focus on areas affected by Hurr icane Matthew. Approval com- pleted on 14 June 2017. Environmental Assessment Category B. Project: P163313. Consultants will be required. Ministry of Econ omic and Finance. (R) St rengthening Primary Health Care and Surveillance in Haiti: The PDO of the proposed Project is to: (i) increase PAGE 123 Monthly Operational Sum m ary April 2019 u t ilization of primary health care services in selected geographical areas; and(ii) strengthen surveillance capacity especially for cholera. Negotiations authorized on 5 April 2019. Environmental Assessment Category B. Project: P1 67512. US$ 55.0/1 5.0 (IDA Grant/GFF). No consultants are required. Ministère de la Santé Publique et de la Population. Social, Urban, Rural and Resilience Global Practice (R) St r engthening DRM and Climate Resilience Project: The Project Dev elopment Objective is to im prove: (i) early w arning and emergency evacuation capacity in selected municipalities in high climate risk-prone areas, and (ii) the provision of a nd accessibility to safe havens. Negotiations authorized on 9 April 2019. Environmental Assessment Category B. Project: P1 65870. US$ 35.0 (IDA Grant). Consulting services to be determined. Ministry of Interior and Local authorities. Disaster Risk Management and Reconstruction Additional Financing: The Project Development Objective is to su pport the Recipient in improving disaster response capacity and enhancing the resiliency of critical transport infrastructure a n d to support the post-hurricane Matthew emergency recovery. Approval completed on 8 June 2017. Environmental Assess- m ent Category B. Project: P1 63199. Consulting services t o be determined. Im plementing agency(ies) to be determined. Ca p Haitien Urban Development Project: The proposed Project Development Objective is to improve selected urban in frastructure and public spaces to support a more livable and resilient urban development in the Cap-Haïtien city-region Identification completed on 7 December 2018. US$ 45.0 (IDA Grant). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Transport (N) Caribbean Regional Air Transport Connectivity Project - Haiti: The development objective is to enhance Haiti’s in ternational airports air transport capability and improve PAP’s resilience to climate change and natural disasters. Identification completed on 8 April 2019. US$ 30.0 (IDA Grant). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Secon d Additional Financing Infra & Instit Emergency Recovery: The Revised PDO is to support the Recipient in it s sustainable recovery efforts from the effects of the Em ergency, through selected interventions aiming to rebuilding key in stitutions and infrastructure. Approval completed on 10 Nov ember 2016. Environmental Assessment Category A. Project: P1 5 6049. US$ 2.8 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. Water Su stainable Rural and Small Town Water Supply and Sanitation Additional Financing: The proposed objectives of t he Project are to: (i) increase access to improved water supply and sanitation in targeted rural areas and small towns in zon es affected by cholera; (ii) strengthen the Recipient’s water and sanitation service delivery mechanism at the deconcen- t rated level; and (iii) improve the Recipient’s capacity to respond promptly and effectively to an Eligible Emergency. Approval com pleted on 14 June 2017. Environmental Assessment Category B. Project: P163194. Consultants will be required. Im ple- m enting agency(ies) to be determined. Honduras Agriculture A dditional Financing for Rural Competitiveness Project (COMRURAL): The revised PDO is (a) to contribute to in creased productivity and com petitiveness among organized rural sm all-scale producers through their participation in pro- du ctive alliances and (b) to enable the Government to respond promptly and effectively to an eligible emergency. Approval com pleted on 18 May 2017. Environmental Assessment Category B. Project: P158086. US$ 25.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Latin Am erica And Caribbean PAGE 124 (R) In tegrating Innovation for Rural Competitiveness in Honduras - COMRURAL II: The PDO is to improve a ccess t o m arkets and climate-smart practices and contribute t o the economic inclusion of targeted beneficiaries in select a gricultural value chains. Negotiations authorized on 12 April 2019. Environmental Assessment Category B. Project: P1 68385. US$ 75.0 (IDA Credit). Consulting services to be determined. Inversion Estrategica - Honduras (INVEST-H). Education Hon duras Early Childhood Education Improvement Project: The Project’s objective is t o im prove (a) SEDUC’s in- st itutional capacity for preschool management; (b) t eaching practices of preschool educators nationwide; and (c) physical learning environments in selected pr eschools in targeted r egions. Identification com pleted on 5 Nov ember 2018. US$ 3 0.0/10.0 (IDA Credit/EFAS). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy & Extractives Setting the foundations for a more sustainable Electricity Sector in Honduras: The Program Development Objec- t iv e is to support the implementation of the Electricity Sector Law and contribute t o improving the conditions for a more su stainable electricity sector in Honduras in the short, medium and long term. Identification completed on 5 November 2018. US$ 1 00.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Social Protection & Labor (R) Social Protection Integration: The objectives of the Project are t o improve the outcomes of the urban compon ent of t h e CCT Program and to strengthen the integration of the social protection system for the extreme poor. Negotiations author- ized on 14 March 2019. Environmental Assessment Category B. Project: P152057. US$ 30.0 (IDA Credit). No consultants are r equired. Secretariat of Development and Social Inclusion. Water Wa ter Security in the Dry Corridor of Honduras: The Project Development Objective (PDO) is to strengthen capacity for water resources management and improve water harvesting in the Dry Corridor of Honduras. Concept completed on 29 January 2019. Project: P1 69901. US$ 60.0 (IDA Credit). No consultants are required. Honduran St rategic Investment Office (INVEST-H). (R) T EGUCIGALPA: WATER SUPPLY ST RENGTHENING PROJECT: The Project Dev elopment Objective (PDO) is t o strengthen institutional capacity for increased efficiency and reliability of water services in select areas of Tegucigalpa. Con- cept completed on 19 March 2019. Project: P170469. US$ 50.0 (IDA Credit). No consultants are required. Municipality of T egucigalpa (AMDC). Jamaica Agriculture Secon d Rural Economic Development Initiative (REDI II) Project: To enhance access to markets and to climate r esilient approaches for targeted beneficiaries. Negotiations authorized on 17 January 2019. Environmental Assessment Cat- eg ory B. Project: P1 66279. US$40.0 (IBRD). Consulting services to be determined. Jamaica Social Investment Fund (JSIF); Min istry of Finance and Public Sector. Social Protection & Labor Social Protection System Strengthening Project: The Project development objectives are to: (i) improve coordination a n d responsiveness of the social protection delivery systems; (ii) improve the identification of poorest households; and (iii) st r engthen productive inclusion of the poor and vulnerable. Identification completed on 20 February 2019. US$40.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. PAGE 125 Monthly Operational Sum m ary April 2019 Mexico Agriculture Gr ain Storage and Information for Agricultural Competitiveness Additional Financing: Im prove access to grain st orage and information for agricultural producers in Mexico Identification completed on 24 December 2018. Environmental A ssessment Category B. US$400.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Education Mexico Higher Education Project: Strengthen the institutional capacity for innovative teaching, collaborative applied r esearch, and internal quality a ssurance across participating public higher education institutions. Approval completed on 17 Ma rch 2017. Environmental Assessment Category B. Project: P1 60309. US$130.0 (IBRD). Consultants will be r equired. Sec- r etariat of Public Education (Secretaría de Educación Pública). Energy & Extractives DEV ELOPMENT OF CARBON CAPTURE, UTILIZATION AND STORAGE IN MEXICO - PHASE II: The project dev elopment objective (PDO) is t o im plement pilot projects to assess the feasibility of, and build expert capacity for, carbon ca pture, utilization and storage in Mexico. Concept completed on 22 May 2017. Environmental Assessment Category B. Project: P161311. US$ 15.0 (CARB). Consultants w ill be required. The National Institute of Electricity and Clean Energy (INEEL). A dditional Financing for Energy Efficiency in Public Facilities Project (PRESEMEH): The objective is to promote t h e efficient use of energy in the Borrower’s municipalities and other eligible public faci lities by carrying out energy efficiency inv estments in selected public sectors and to contribute t o strengthening the enabling environment. Approval completed on 3 0 March 2018. Environmental Assessment Category B. Project: P1 65585. US$50.0/5.8 (IBRD/GEFU). Consultants will be r equired. Secretaría de Energía (SENER). Finance, Competitiveness and Innovation (R) Expanding Rural Finance Project: The project’s development objective is to expand the availability of finance to the r ural economy. Approval completed on 28 March 2019. Environmental Assessment Category F. Project: P1 69156. US$400.0 (IBRD). Consultants will be required. Financiera Nacional de Desarrollo Agropecuario, Rural, Forestal y Pesquero. Governance Modernization of Public Financial Management Systems in Mexico: The objective of the proposed Project is to is to im prove the coverage, quality, timeliness, transparency, and use of public financial information in Mexico. Identification com- pleted on 4 December 2018. US$150.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Social Protection & Labor A dditional Financing for Social Protection System Project: The proposed Project Development Objectives are to sup- por t the Government’s effort to: (i) increase access of PROSPERA beneficiaries to social and productive programs, and (ii) dev elop instruments for an integrated social protection system. Approval completed on 29 January 2018. Environmental A ssessment Category C. Project: P164152. US$300.0 (IBRD). Con sultants will be required. SEDESOL/PROSPERA. Water Wa ter Security and Resilience for the Valley of Mexico (PROSEGHIR): The objectives of the Project are to improve t h e reliability of the Cutzamala System and strengthen the management of groundwater resou rces in the Valley of Mexico April 2019 Latin Am erica And Caribbean PAGE 126 Neg otiations authorized on 31 January 2018. Environmental Assessment Category B. Project: P1 64389. US$200.0 (IBRD). Con sultants will be required. CONAGUA. Nicaragua Agriculture Dr y Corridor Climate Resilient Agriculture Project: T o strengthen agricultural productivity and climate resilience in selected municipalities of the Dry Corridor of Nicaragua. Negotiations authorized on 24 April 2018. Environmental A ssess- m ent Category B. Project: P1 62982. US$ 50.0 (IDA Credit). Consultants will be r equired. Ministry of Family, Communal, Cooperative, and Associative Economy - MEFCCA. Education A dditional Financing - Second Support to the Education Sector Project: The objectives of the Project are to: (a) im prove the students' retention rate in Primary Education Schools located in Participating Municipalities; and (b) strengthen MINED’s education management capacity. Approval completed on 22 September 2016. Environmental Assessment Category C. Project: P160057. US$ 5.0 (IDA Credit). Consultants will be required. Ministerio de Educacion; Ministry of Finance and Pu blic Credit (MHCP). Environment & Natural Resources Resilient Landscapes Management Project: The Project Development Objective (PDO) is to strengthen the National Pr otected Areas System and support sustainable land use and restoration practices in selected areas of the Dry Corridor of Nicaragua to foster biodiversity conservation, resilient landscapes, and local livelihoods. Concept completed on 31 July 2017. Environmental Assessment Category B. Project: P160688. US$1 0.3 (GEFU). Consultants w ill be r equired. Min istry of Env ironment a nd Natural Resources (MARENA); Na tional For est Dev elopment Fund (FONADEFO). Governance Nicaragua - In creasing Government Effectiveness through Public Sector Modernization: The project aims at in creasing g overnment effectiveness by (i) im proving the quality of public policies and services through better and m ore ac- cessible data; and (b) enabling private sector participation in the provision of public infrastructure and services through an im proved public investment management framework. T h is project would contribute to the higher level objective of achieving greater development impact. Identification completed on 1 8 May 2018. US$ 50.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice A dditional Financing for Nicaragua Second Land Administration Project: The Project Development Objectives a r e: (a) to strengthen the property rights of the population in the Project area through improved regularization, titling, and r egistry services; and (b) to improve Nicaragua's capacity to respond promptly and effectively to an eligible emergency. Ap- pr oval completed on 14 June 2017. Environmental Assessment Category B. Project: P163246. US$ 18.0 (IDA Credit). Con- su ltants will be required. Im plementing agency(ies) t o be determined. Transport Ru ral and Urban Access Improvement Project Additional Financing: The objectives of the Project are to: (a) im- pr ove safe and sustainable access to markets and services in targeted rural and urban areas of the Recipient; and (b) in the ev ent of an Eligible Em ergency, provide immediate and effective response to said Eligible Emer gency. Approval completed on 1 5 March 2018. Environmental Assessment Category B. Project: P165467. US$ 35.0 (IDA Credit). Consultants will be required. Min isterio de Transporte e Infraestructura (Ministry of Transport and Infrastructure); Road Maintenance Fund (FOMAV). PAGE 127 Monthly Operational Sum m ary April 2019 Water Wa ter Management Capacity and Infrastructure Development Project: The Project Development Objective is to i) st r engthen the institutional capacity for water resources management at national level ii) promote planning and implementa- t i on of water resilient infrastructure; and iii) improve the recipient’s capacity to respond promptly and effectively to an e ligible em ergency. Concept completed on 5 April 2018. Environmental Assessment Category A. Project: P1 64286. US$ 50.0 (IDA Cr edit). Consultants will be required. Em presa Nicaraguense de Acueductos y Alcantarillados Sanitarios. Paraguay Agriculture Pr oductive Alliances Project: To enhance access to markets and adoption of climate risk management approaches by pr oject beneficiaries in a sustainable manner. Concept completed on 13 November 2018. Project: P168153. US$100.0 (IBRD). Con sulting services to be determined. Ministry of Agriculture and Livestock Production. Health, Nutrition & Population (R) Pa raguay Public Health Sector Strengthening: The objectives of this Project are t o: (i) strengthen the public pri- m ary health care micro-networks; and (ii) expand access t o quality primary health care services for the population covered by t h e Ministry of Public Health and Social Welfare (MSPBS). Negotiations authorized on 9 April 2019. Environmental Assessment Category B. Project: P167996. US$115.0 (IBRD). No con sultants are required. Ministry of Public Health and Social Welfare. Peru Digital Development CENTRALIZED EMERGENCY RESPONSE SYSTEM IN PERU: Increase response efficiency to the population of Peru in case of an emergency Identification completed on 27 February 2019. US$60.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Finance, Competitiveness and Innovation Mobilizing Private Long-Term Finance for Infrastructure and Water Security for Lima: Support the Government of Peru in leveraging private sector long-term financing for infrastructure under a fiscally sustainable m odel through the de- sign and provision of partial project based guarantees Identification completed on 15 September 2017. Environmental Assess- m ent Category A. US$ 200.0 (GUAR). Consulting services to be determined. Im plementing agency(ies) to be determined. Governance (R) Im proving the Performance of Non-Criminal Justice Services: The Project’s development objective is to improve efficiency, access, transparency, and user satisfaction, in the delivery of adequate non -criminal justice services. Negotiations authorized on 19 March 2019. Environmental Assessment Category B. Project: P1 62833. US$85.0 (IBRD). Consultants will be r equired. Ministry of Justice and Human Rights; Judiciary of Peru. Social, Urban, Rural and Resilience Global Practice National Urban Cadaster and Municipal Support Project: The project development objective is to establish and / or April 2019 Latin Am erica And Caribbean PAGE 128 st r engthen urban cadasters in selected municipalities in Peru. Concept completed on 5 Nov ember 2018. Environmental As- sessm ent Category B. Project: P162278. US$50.0 (IBRD). Consultants will be required. Agency for the Formalization of Infor- m al Property - COFOPRI. Transport Lima Metropolitan North Extension: The Project Development Objective (PDO) is to improve urban transport services, m obility and accessibility to jobs in the North of the City of Lima. Identification com pleted on 21 February 2019. US$87.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Lima Teleferico San Juan de Lurigancho: The Project will: i) improve coverage and quality; and ii) integrate the public t ransport provision services (the BRT and metro lines) in the North of Lima Identification completed on 26 February 2019. US$1 00.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. Water PE A F-Second Optimization of Lima Water & Sewerage: The proposed development objective of this project is to im prove efficiency, continuity and reliability of water supply and sanitation services in the Northern Area of Lima. Approval com pleted on 15 January 2015. Environmental A ssessment Category B. US$5 5.0 (IBRD). Consultants will be required. SEDA PAL Tel: (51-1 ) 317-3095, E-m ail: ysanchez@sedapal.com.pe, Contact: Marco Vargas Medina, General Manager (a.i.). St Maarten Finance, Competitiveness and Innovation (R) Sint Maarten Enterprise Recovery Project: The development objective is t o support the recovery of m icro, sm all, a n d medium sized enterprises through direct financial assistance to contribute to the restoration of economic activity. Ap- proval completed on 4 April 2019. Environmental Assessment Category F. Project: P1 68549. US$ 35.0 (MSC1). Consultants w ill be required. National Recovery Program Bureau / Interim Recovery Committee; Centrale Bank van Curacao en Sint Maar- t en. Transport Sint Maarten Airport Terminal Reconstruction Project: The development objective is the reconstruction of the Prin- cess Juliana International Airport to the pre-Irma passenger capacity with increased natural disaster resilience. Concept com- pleted on 19 December 2018. Environmental Assessment Category B. Project: P167974. US$ 50.0/51.0 (EUIB/FSSP). Con- su ltants will be required. Princess Juliana International Airport Operating Company N.V.. St. Lucia Education St . Lucia Human Capital Resilience Project: The objectives of the Project are to strengthen the quality of service delivery in education, to improve efficiency of social protection sy stems, and to improve effectiveness of labor market systems in Saint Lu cia. Identification completed on 11 February 2019. US$ 20.0 (IDA Credit). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Energy & Extractives Ren ewable Energy Sector Development Project: The development objective of the Renewable Energy Sector Develop- m ent (RESD) Project is t o support the Government of Saint Lucia t o a ssess the viability of harnessing indigenous renewable PAGE 129 Monthly Operational Sum m ary April 2019 en ergy resources, in particular geothermal energy. Concept completed on 30 May 2017. Environmental Assessment Category B. Pr oject: P1 61316. US$ 5.0/9.5/1.9/4.2 (IDA Credit/CCTF/DOCK/FSSP). Consulting services to be determined. Project Co- or dination Unit. Social, Urban, Rural and Resilience Global Practice SLU Disa ster Vulnerability Reduction Project (Additional Finance): The Project Development Objective (PDO) is t o r educe vulnerability to natural hazards and climate change im pacts in Saint Lucia. Approval completed on 23 November 2 016. Environmental Assessment Category B. Project: P155324. US$1 .6/6.5 (IDA Credit/EUDF). Consultants will be required. Min istry of Finance, Economic Growth, Job Creation, External Affairs and Public Service; Ministry of Education, Innovation, Gender Relations and Sustainable Development; Ministry of Infrastructure, Ports, Energy and Labor; Department of Sustain- a ble Development; Department of Physical Planning. St. Vincent and the Grenadines Regional Disaster Vulnerability Reduction Project (Additional Finance): The Program aims at measurably reduc- in g vulnerability to natural hazards and climate change impacts in the Eastern Caribbean Sub-region. The objective of the Project in Grenada is to measurably reduce vulnerability to natural hazards and climate change impacts in Grenada and in the Ea st ern Caribbean Sub-region. The objective of the Project in Saint Vincent and the Grenadines is to measurably reduce v ulnerability to natural hazards and climate change impacts in Saint Vincent and the Grenadines and in the Eastern Caribbean Su b-region. The achievement of the Program Development Objectives of the Regional Disaster Vulnerability Reduction Pro- g ram (RDVRP) would be measured using the following key indicators: (a) Reduced risk of OECS population to failure of public bu ildings and infrastructure due to natural hazards or climate change impacts; and (b) Increased capacity of OECS Govern- m ents to identify and monitor climate risk and impacts. Approval completed on 9 May 2014. Environmental Assessment Ca tegory B. Project: P1 46768. US$ 35.6/5 .0 (IDA Credit/CSCF). Consultants will be required. Ministry of Finance, Planning, Su stainable Development and Information Technology, Contact:, Public Sector Investment Program Management Unit. Suriname Finance, Competitiveness and Innovation Com petitiveness and Sector Diversification: The project development objective is t o support sector governance im- pr ovements and increase competitiveness in targeted industries in Suriname. Appraisal completed on 13 February 2019. En- v ironmental Assessment Category B. Project: P1 66187. US$23.0 (IBRD). Consultants will be required. Ministry of Trade, In- du stry & Tourism; Ministry of Natural Resources. Uruguay Agriculture A F- Sustainable Management of Natural Resources and Climate Change: The development objective of the project is t o support Uruguay's efforts to promote farmer adoption of climate smart agricultural and livestock practices, and improved n atural resource management practices in project areas. Approval com pleted on 30 November 2017. Environmental Assess- m ent Category B. Project: P1 63444. US$42.0 (IBRD). Consultants will be required. Im plementing agency(ies) t o be deter- m ined. Social, Urban, Rural and Resilience Global Practice Mon tevideo Urban Resilience Project: The Development Objective is to enhance Montevideo's urban resilience and re- du ce socio-territorial disparities and disaster risks in the Pantanoso river basin. Identification com pleted on 28 January 2019. US$1 00.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. April 2019 Middle East And North Africa PAGE 130 Water Ur u guay Efficiency Water and Sanitation Project: The Project Development Objective (PDO) is to support OSE to im prove the sustainability and efficiency of the water supply and sanitation services in targeted areas. Identification completed on 27 August 2018. US$40.0 (IBRD). Consulting services to be determined. Obras Sanitarias del Estado (OSE). Regional Health, Nutrition & Population OECS Regional Health Project: The Project aims to improve preparedness of health systems for public health emergencies in select OECS countries. Concept completed on 10 October 2018. Environmental Assessment Category B. Project: P168539. US$ 21.0/6.0 (IDA Credit/IDA Grant). Consultants will be required. Dominica - Ministry of Health and Environment; Gre- n a da - Ministry of Health, Social Security and International Business; St. Lucia - Ministry of Health and Wellness; St. Vincent a n d the Grenadines - Ministry of Health, Wellness and The Environment. Middle East And North Africa Djibouti Agriculture DJ- Secon d Additional Financing for the Rural Community Development and Water Mobilization Project (PRODERMO): The objective of the Project is t o increase access of rural communities to water and enhance their capacity t o m anage water and agro-pastoral resources in the project areas using a participatory approach t o community -based devel- opm ent. Approval completed on 31 May 2016. Environmental Assessment Category B. Project: P157282. US$7.0 (IDA Credit). Con sulting services to be determined. Im plementing agency(ies) to be determined. Education (R) Expanding Opportunities for Learning: Support the Government of Djibouti in increasing equitable access to, and st r engthening the t eaching and learning conditions in, pre-primary and basic education Concept completed on 28 February 2019. Environmental Assessment Category B. Project: P166059. US$ 10.0/5 .0/9.3/3.8 (IDA Credit/IDA Grant /EFA/FSSP). Consultants will be required. Ministry of Education and Vocational Training (Ministere de l'Education Nationale et de la For- m ation. Health, Nutrition & Population (R) Im proving Health Sector Performance Project Second Additiona l Financing: The project development objec- t iv e is to improve the utilization of quality maternal and child health services. Negotiations authorized on 1 April 2019. Envi- r onmental Assessment Category B. Project: P168250. US$ 1.0/5 .0 (IDA Credit/IDA Grant). Consultants will be required. Min- ist ry of Health. DJ HRIT F Health AF: The HRITF additional financing will support the ongoing Health Im provement Project, which is an RBF operation. Approval completed on 8 April 2015. Environmental Assessment Category B. US$ 7.0 (HRBF). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 131 Monthly Operational Sum m ary April 2019 Other Gov ernance for Private Sector and Finance Development Additional Fin.: To improve the efficiency of business r egulation and establish an automated National Payment System. Approval completed on 14 December 2016. Environ mental A ssessment Category C. Project: P158952. US$ 5.1 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be det ermined. Social Protection & Labor Djibouti Social Safety Net Second Additional Financing: The PDO is t o support a social safety net sy stem for (i) im- pr oved targeting, (ii) improved nutrition practices, and (iii) access to short-term employment for the poor and vulnerable. A pproval completed on 31 May 2016. Environmental Assessment Category B. US$ 4.0 (IDA Credit). Consult ants will be re- qu ired. Im plementing agency(ies) to be determined. DJ Social Safety Net Project Additional Financing: The project development objectives are to: (a) support the provision of sh ort-term employment opportunities in community-based labor-intensive works for the poor and vulnerable; and (b) sup- por t the im provement of n utrition practices among participating h ouseholds focusing on pre-school children and preg- n ant/lactating women. Approval completed on 28 October 2014. Environmental Assessment Cat egory B. Project: P1 49621. US$ 5.0 (IDA Credit). Consultants will be required. Agence Djiboutienne de Développement Social (ADDS) Tel: (253-21) 358- 6 55, E-m ail: mahdi.mohamed.djama@gmail.com , Contact: Mahdi Mohamed Djama, Director General. (R) In tegrated Cash Transfer and Human Capital Project: The Project Development Objectives are to: i) support an ex panded and more enhanced social safety nets system; and ii) support access t o basic services in targeted poor communities. Not e: for the purpose of the PDO statement, "enhanced" is taken to mean (i) improved targeting of program beneficiaries, (ii) a n enlarged social registry, and (iii) effective accompanying measures in conjunction with conditional cash transfers. Negoti- ations authorized on 4 March 2019. Environmental Assessment Category B. Project: P166220. US$ 10.0/5 .0 (IDA Credit/IDA Grant). Consultants will be required. State Secretariat for Social Affairs. Egypt, Arab Republic of Finance, Competitiveness and Innovation (R) Ca talyzing Entrepreneurship for Job Creation: The project development objective is to foster job creation and im prove other econom ic opportunities for targeted beneficiaries Approval completed on 17 April 2019. Environmental As- sessm ent Category F. Project: P1 62835. US$200.0 (IBRD). Consulting services to be determined. Micro, Small, Medium En- t erprise Development Agency - MSMEDA. (R) EG In clusive Housing Finance Program Additional Financing: The objective of t he Program is to improve the a ffordability of formal housing for low-income households in the Arab Republic of Egypt and to strengthen the Social Housing Fu nd's capacity to design policies and coordinate programs in the social housing sector. Concept completed on 1 April 2019. Env ironmental Assessment Category C. Project: P1 68582. US$500.0 (IBRD). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Social Protection & Labor Egy pt Strengthening Social Safety Net Additional Financing: The project development objective (PDO) is to support t h e Borrower to establish an efficient and effective Takaful and Karama Cash Transfer Program and improve access to eco- n om ic opportunities. “Efficient” is defined and m easured by good targeting of the poor. “ Effective” is defined and measured by coverage of the poor and having basic administrative building blocks of the Program. “Improved access to economic oppor- t unities” in this context is defined a s better access t o wage or self -employment for targeted poor and vulnerable households. A ppraisal completed on 21 November 2018. Environmental Assessment Category C. Project: P168414. US$500.0 (IBRD). Con sulting services to be determined. Ministry of Social Solidarity. April 2019 Middle East And North Africa PAGE 132 Social, Urban, Rural and Resilience Global Practice Sinai Peninsula Integrated Development Program: The proposed Program Dev elopment Project is to promote peace a n d stability while creating sustainable economic growth in Sinai Peninsula. Identification completed on 29 June 2018. US$5 00.0 (IBRD). Consulting services to be determined. Ministry of Housing, Utilities & Urban Communities. Water A F to Sustainable Rural Sanitation Services Program: The Program Development Objective is to strengthen institu- t ions and policies for increasing access and improving rural sanitation services in the Governorates of Beheira, Dakahliya, and Sharkiya in the Arab Republic of Egypt. A pproval completed on 21 September 2018. Environmental Assessment Category B. Project: P1 66597. US$300.0 /300.0 ( IBRD/AIIB). Consulting services to be determined. Im plementing agency(ies) t o be d etermined. Iraq Agriculture National Horticulture Development Project: The proposed project objective is to develop contestable agricultural input m arkets for machinery, livestock and credit. Concept com pleted on 18 June 2018. Environmental Assessment Category B. Pr oject: P166229. US$100.0 (IBRD). Consulting services to be determined. Ministry of Agriculture. Education (R) Ir aq Education Sector Development Project: The project development objective is to restore equitable learning opportunities in pre-tertiary education. Concept completed on 18 March 2019. Environmental Assessment Category B. Pro- ject: P166250. US$500.0 (IBRD). No consultants are required. Ministry of Education; Ministry of Education - Education Pro- ject Management Team (MOED-PMT). Energy & Extractives (R) Ir aq Electricity Services Reconstruction and Enhancement Project: To improve the reliability and operational a n d commercial efficiency of electricity services in the selected project areas. Negotiations authorized on 23 March 2019. Env ironmental Assessment Category B. Project: P1 62454. US$200.0 (IBRD). Consultants will be r equired. South Electricity T ransmission Company; South Electricity Distribution Company. Environment & Natural Resources (N) Ir aq Community-based Natural Resources Management and Climate Resilience Project: The proposed DO is t o im prove natural r esource management and climate r esilience in targeted communities and areas of Iraq. Identification com pleted on 12 March 2019. US$40.0/1 0.0 (IBRD/GFCO). Consulting services to be determined. Im plementing agency(ies) t o be determined. Finance, Competitiveness and Innovation Su pport the Development and Competitiveness of Small and Growing Businesses in Iraq: The project will pro- m ote entrepreneurship and contribute to job creation by supporting the development, early -stage financing and participation of innovative small and growing businesses in targeted value chains. Identification completed on 17 December 2018. US$50.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 133 Monthly Operational Sum m ary April 2019 Governance (N) St rengthening Public Financial Management Oversight and A ccountability Institutions in Iraq: The pro- ject development objective is to strengthen systems of accountability and oversight over the use and management of public financial resources in Iraq at both federal and regional levels. Identification completed on 4 April 2019. US$ 17.6 (IPFM). Con sulting services to be determined. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice In ternally Displaced People Support Project: To support the social and econom ic integration of IDPs. Identification com pleted on 17 January 2018. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Em ergency Operation for Development Project - Additional Financing: The Project is to support the Republic of Ir a q in the r econstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal A reas. Approval completed on 31 October 2017. Environmental Assessment Category B. Project: P161515. US$400.0 (IBRD). Con sultants will be required. Im plementing agency(ies) to be determined. Transport T ransport Corridor Project - A dditional Financing: The Project Development Objective is to improve road transport connectivity and safety on selected road sections along Expressway 1and the North-South transport corridor in Iraq. Identifi- ca tion completed on 19 February 2019. Environmental Assessment Category A. US$300.0 (IBRD). Consultants will be re- qu ired. Im plementing agency(ies) to be determined. Jordan Agriculture Jor dan Climate Smart Agribusiness Development Project: Proposed DO is to promote climate sm art agriculture and a gribusiness in Jordan Identification com pleted on 1 4 June 2018. Consulting services t o be determined. Im pl ementing a g ency(ies) to be determined. Environment & Natural Resources Jor dan Ozone Depleting Substances HCFC Phase-Out (ODS3) Phase 2: The project development objective is to su pport Jordan in its overall efforts to meet its Montreal Protocol HCFC phase-out obligations, and to strengthen the capacity of r esponsible government entities to continue t o effectively implement and comply with the Montreal Protocol. Approval com pleted on 21 November 2017. Environmental Assessment Category B. Project: P1 60103. US$ 2.5 (MPIN). Consulting services t o be determined. Min istry of En v ironment; Min istry of En v ironment T el: 9 62777289112, E-m ail: g hazi.odat@MOENV.GOV.JO, Contact: Eng. Ghazi Odat, Head National Ozone Unit. Finance, Competitiveness and Innovation (N) Youth, Technology, and Jobs: Provide economic opportunities for Jordanian and Syrian youth in technology -enabled services Identification completed on 12 March 2019. US$200.0 (IBRD). Consulting services to be determined. Im plementing a g ency(ies) to be determined. Health, Nutrition & Population (N) Jor dan Emergency Health Project Additional Financing: The Project development objective (PDO) is to support t h e Government of Jordan in maintaining the delivery of primary and secondary health services to poor unin sured Jordanians a n d Syrian refugees at Ministry of Health facilities. Identification completed on 20 March 2019. Environmental Assessment Category C. US$138.5/61.5 (IBRD/CFF). No consultants are required. Im plementing agency(ies) to be determined. April 2019 Middle East And North Africa PAGE 134 Social, Urban, Rural and Resilience Global Practice Em ergency Services and Social Resilience Project AF: The project development objective is to help Jordanian munic- ipa lities and host communities address the immediate service delivery impacts of Syrian refugee inflows and strengthen mu- n icipal capacity t o support local economic development. Approval com pleted on 30 December 2016. Environmental Assess- m ent Category B. Project: P1 61465. US$ 10.8 (MNAF). Consulting services t o be determined. Ministry of Planning and Inter- n ational Cooperation; Ministry of Municipal Affairs. Jor dan Urban and Municipal Program for Balanced and Inclusive Growth: The proposed Development Objective is t o strengthen institutional capacity to promote more sustainable urban growth in participating urban centers, and improve a ccess to basic services in selected ‘lagging regions’. Concept com pleted on 22 June 2018. Project: P166577. US$200.0 (IBRD) . Con sulting services to be determined. Ministry of Planning and International Cooperation. Transport (N) Amman Development Corridor Project II - PPP: To crowd in private sector investments in Jordan’s transport sector through piloting the first road/econom ic corridor PPP Identification completed on 10 April 2019. US$150.0 (IBRD). Con sulting services to be determined. Im plementing agency(ies) to be determined. Lebanon Agriculture Lebanon Climate Smart Agribusiness Development Project: Proposed DO is to promote climate smart agriculture a n d agribusiness in Lebanon Identification completed on 14 June 2018. Consulting services to be determined. Im plementing a g ency(ies) to be determined. Energy & Extractives Lebanon Gas to Power Generation Project: Increased availability of gas-fired power generation in Lebanon and reduce t echnical and non-technical losses on the grid Concept completed on 16 July 2018. Environmental Assessment Category A. Pr oject: P166423. US$5 00.0 (IBRD). Consulting services to be determined. Ministry of Energy and Water. (R) Lebanon Energy Sector Reforms Program: Im prove the operational, commercial and financial performance of the pow er sector, and strengthen the governance of Electricite du Liban Concept completed on 4 April 2019. Project: P170506. US$300.0 (IBRD). Consultants will be required. Ministry of Energy and Water; Electricite du Liban. (N) Lebanon Electricity Transmission Project: To expand capacity and reliability of the south loop of the transmission n etwork and t o facilitate implementation of private-sector led financing and im plementation of the planned power plants Identification completed on 9 April 2019. US$100.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Environment & Natural Resources Litani River Catchment Comprehensive Environmental Management Project: The proposed Project Development Objective (PDO) is to reduce pollution and improve natural resource management in the Litani River Basin (LRB) for enhanced liv elihoods. Con cept com pleted on 9 Ju ly 2 018. En v ironmental A ssessment Ca tegory A . Pr oject: P1 6781 8. US$400.0/90.0/10.0 (IBRD/GFF/LSCT). Consulting services to be determined. Council for Development and Reconstruction (CDR). Finance, Competitiveness and Innovation Cr eating Economic Opportunities - Lebanon National Jobs Program: The Program Development Objective (PDO) is t o im prove economic opportunities for Targeted Beneficiaries in Lebanon. PAGE 135 Monthly Operational Sum m ary April 2019 T o a chieve this objective an integrated approach is used, leveraging synergies across the Results Areas. Im plementation of key policies in Results Area 1 unlocks opportunities for job-creating investments through the demand-side interventions in Results A rea 2. These demand-side interventions create economic opportunities for Targeted Beneficiaries of the supply -side inter- v entions in Results Area 3 (and these beneficiaries can contribute to productive investments in Results Area 2). Approval com pleted on 27 June 2018. Environmental Assessment Category B. Project: P1 63576. US$329.9/70.1 (IBRD/CFF). Consult- in g services t o be determined. Presidency of Council of Ministers; Ministry of Labor; Ministry of Economy and Trade; Tripoli Special Economic Zone; High Council for Privatization and PPP; Ministry of Telecommunication; Higher council of Customs; Na tional Em ployment Office. Governance LB Digital Economy Project: Im prove access, quality and efficiency of selected e -services and strengthen the foundations of t he digital economy. Concept completed on 30 October 2018. Environmental Assessment Category C. Project: P167643. US$200.0 (IBRD). Consultants will be required. Office of the Minister of State for Administrative Reform. St r engthening Fiscal Governance: To improve budget realism and transparency, cash management, public debt manage- m ent, MoF e-services and the efficiency of public procurement. Concept com pleted on 19 November 2017. Environmental A ssessment Category C. Project: P165324. US$50.0 (IBRD). Consultants will be required. Ministry of Finance. Social Protection & Labor Social Promotion And Protection Project: The development objective of SPPP is to increase access to social development services at the community level, im prove the coverage and targeting of the National Poverty Targeting Program (NPTP), and bu ild the capacity of the Ministry of Social Affairs (MOSA) at the central and the Social Developmen t Center (SDC) levels. A pproval completed on 17 May 2013. Environmental Assessment Category B. Project: P124761. US$30.0 (IBRD). No consult- a nts are required. Ministry of Social Affairs, Contact: Bashir Osmat, Advisor to the Minister; Lebanese Republic, Contact: Alain Bifani, Ministry of Finance Director General. Social Safety Net System Project: The project development objective is to provide income support and improve access to social services for poor and vulnerable Lebanese and Syrian refugees, increase employment opportunities for the extreme poor Lebanese, and develop the building blocks of Lebanon’s Social Safety Net (SSN) sy stem. Concept completed on 5 December 2 018. Environmental Assessment Category B. Project: P167101. US$300.0/1 00.0 (IBRD/ZBIL). Consultants will be required. Min istry of Social Affairs. A dditional Financing for Emergency National Poverty Targeting Program: The objective of the Projectis to expand t h e coverage and enhance the social assistance package of the National Poverty Targeting Program (NPTP) to Lebanese af- fected by the Syrian crisis and all Lebanese households under the extreme poverty line, as well as to assess the effectiveness of a graduation pilot. Approval completed on 30 June 2016. Environmental Assessment Category C. Project: P158980. US$ 10.0 (LSCT). Consulting services to be determined. Im plementing agency(ies) t o be determined. Social, Urban, Rural and Resilience Global Practice Mu nicipal Investment Program: The proposed Program Development Objective is to address municipal infrastructure a n d service delivery deficits in selected cities of Lebanon while laying the foundation for municipalities to mobilize privat e sector finance for m unicipal services. Concept completed on 24 October 2018. Environmental Assessment Category B. Project: P1 66580. US$100.0 (IBRD). Consultants will be required. Council for Development and Reconstruction (CDR). La nd Administration System Modernization: To im prove access t o land use and value data, property rights data, and g eospatial information through the Land Registry and Cadastre system modernization. A pproval completed on 8 June 2018. Environmental Assessment Category B. Project: P159692. US$43.0 (IBRD). Consultants w ill be required. General Directorate of Land Registration and Cadastre. April 2019 Middle East And North Africa PAGE 136 Transport Lebanon Economic Development Corridor: The proposed Project Development Objective (PDO) is to enhance local economic development in Northern Lebanon and to expand economic activity between Lebanon and Syria by improving con- n ectivity along the corridor. Identification completed on 23 May 2018. Environmental Assessment Category A. US$550.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. (N) Civil Aviation Reforms and Airport Expansion: To improve the gov ernance, efficiency, and capacity of Lebanon's civ il aviation sector Identification completed on 8 March 2019. US$150.0/1 00.0/5 0.0 (IBRD/EBRD/GUAR). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Water A dditional Financing for the Greater Beirut Water Supply Project: The project development objective is to increase t h e provision of potable water to the residents in the project area within the Greater Beirut region, including those in the low- in come neighborhoods of Southern Beirut, and to strengthen the capacity of the Beirut Mount Lebanon Water Establishment in utility operations. Approval completed on 15 June 2018. Environmental Assessment Category A. Project: P165711. US$90.0 (IBRD). Consultants will be required. Council for Development & Reconstruction. Morocco Agriculture Mor occo Digital and Climate Smart Agriculture Program: The Morocco Digital and Climate Smart Agriculture Pro- g ram aims at leveraging digital and climate sm art technologies to increase the efficiency, equity, and environmental sustaina- bility of agri-food value chains in Morocco. Identification completed on 5 February 2019. US$200.0 (IBRD). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Education (R) Mor occo Education Support Program: To establish an enabling environment for quality ECE service delivery, sup- por t improved teaching practices in basic education, and strengthen management capabilities and accountability along the education service delivery chain in the Program Areas. Appraisal completed on 24 April 2019. Environmental Assessment Category C. Project: P167619. US$500.0 (IBRD). Con- s ultants will be required. Ministry of Education; Minister of Economy and Finance. Energy & Extractives Mor occo - Noor Solar Power Project Additional Financing: The PDO is to increase innovative solar power generation in Mor occo. A pproval com pleted on 8 June 2 018. Env ironmental A ssessment Ca tegory A . Pr oject: P1 64288. US$1 00.0/240.0/25.0/420.0/1 80.0/852.0 (IBRD/AFDB/CCTF/EUIB/GFRC/KFW). No consultants are required. MASEN. Governance Mor occo Public Sector Performance (ENNAJAA) Program: The objective of this program is to improve public sector per formance. This will be done through: improved transparency, evidence-based policy making; and efficient public expendi- t ures. Identification completed on 11 October 2018. US$200.0 (IBRD). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Mu nicipal Performance Program: The Program Development Objective is (i) to im prove the institutional performance PAGE 137 Monthly Operational Sum m ary April 2019 of participating municipal governments and (ii) t o strengthen inter -municipal coordination for local service delivery in se- lected urban agglomerations. Concept completed on 17 January 2019. Project: P1 68147. US$300.0/1 14.0 (IBRD/FRDE). Con- su lting services to be determined. Ministry of Interior. Su pporting the economic inclusion of youth: The project development objective is t o increase access t o economic op- por tunities for youth in the project area. Negotiations authorized on 25 February 2019. Environmental Assessment Category B. Pr oject: P151169. US$55.0 (IBRD). Consultants will be required. Ministry of Labor and Professional Insertion. Transport Mor occo Second Rural Roads Project - AF2: The proposed additional financing is a follow -up to the Second Rural Roads Pr oject approved in May 2006 and to the first additional financing approved in April 2010. It will continue to support the Gov ernment's Second National Program of Rural Roads (NPRR2). T h e proposed additional financing will be used to finance a funding gap for activities appraised as part of the NPRR2, but for w hich no other financier has been identified. It will allow the Borrower (Caisse pour le Financement Routier) to finalize the la st tranche of its borrowing plan for the NPRR2. Approval com pleted on 9 June 2014. Environmental Assessment Category B. Pr oject: P1 48003. US$96.6 (IBRD). Consultants will be required. Caisse pour le financement routier, Contact: Ahmed Im - zel, Director. MA North-East Economic Development project: The PDO is t o facilitate inclusive and sustainable development in Nor th East Morocco by im proving transport and communications connectivity and promoting private sector development in t h e immediate and expanded hinterland of the maritime gateway and logistics com plex of Nador West Med. Identification com pleted on 28 August 2018. Environmental Assessment Category B. US$200.0/300.0 (IBRD/AFDB). Consulting services t o be determined. Im plementing agency(ies) to be determined. Tunisia Energy & Extractives (R) En ergy Sector Improvement Project: The Project Development Objective (PDO) is to: (i) strengthen Tunisia’s elec- t r icity transmission system; and (ii) improv e STEG’s commercial performance. Appraisal completed on 25 April 2019. Envi- r onmental Assessment Category B. Project: P168273. US$151.0 (IBRD). Consulting services to be determined. STEG. Environment & Natural Resources T N-Sustainable Oasis Landscape Management Project: To strengthen integrated management of oasis landscapes in t argeted governorates in Tunisia. Concept com pleted on 20 February 2019. Project: P1 69955. US$50.0 (IBRD). Consultants w ill be required. Ministry of Local Affairs anb Environment - DGEQV. Finance, Competitiveness and Innovation (R) T unisia Innovative Startups and SMEs Project: The Project Development Objective is to increase access to finance a n d support the growth of innovative start-ups and small and medium enterprises Appraisal completed on 17 April 2019. Env ironmental Assessment Category F. Project: P1 67380. US$75.0 (IBRD). Consulting services t o be determined. Caisse de Depot s et de Consignations. Governance (R) Digital Transformation for User-Centric Public Services: The project development objective(PDO) is to increase a ccess t o and improve the quality of selected digital services •A ccess” will be m easured in terms of: (i) increased usage of the selected services; and (ii) number of new functioning access points. Access measurement will also be disaggregated for selected target groups: (a) low -income groups (including non-sala- r ied agricultural workers);(b) women in rural areas; (c) illiterates; and (d) disabled groups. April 2019 Middle East And North Africa PAGE 138 •Quality” will be measured in terms of: (i) time/efficiency gains for users; and (ii) user satisfaction. •“ Digital services” refers to services wholly or partially digitalized by the operation. Users will access the services digitally a n d/or physically. This includes multi-channel delivery of those services to enable service usage and address the digital divide, su ch as via digital integrated access points. Appraisal completed on 25 April 2019. Project: P1 68425. US$100.0 (IBRD). Consultants will be required. Ministry of Tech- n ology Information and Communication. Social, Urban, Rural and Resilience Global Practice T unisia : Urban Development and Local Governance Program - A dditional Financing: The objectives of the Pro- g ram are to: a) strengthen local g overnments’ (LGs) performance to deliver municipal infrastructure; and (b) improve access t o services in targeted disadvantaged neighborhoods. A pproval com pleted on 15 June 2018. Environmental Assessment Category C. US$130.0 (IBRD). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Transport T unisia Economic Development Corridor Project: The PDO is to improve transport and logistics efficiency and support t h e development of economic activities a long the Kasserine-Sidi Bouzid-Sfax corridor. Concept completed on 30 September 2 018. Environmental Assessment Category A. Project: P1 67900. US$200.0 (IBRD). No consultants are required. Direction Générale des Ponts et Chaussées (DGPC). Water T unisia Water Sector Reform Program: To improve SONEDE’s financial viability and strengthen its autonomy and op- er ational capacity to deliver continuous water supply services in Greater Tunis and Greater Sfax. Concept completed on 22 September 2018. Environmental Assessment Category B. Project: P1 62165. US$100.0/5 0.0 (IBRD/EUIB). No consultants are r equired. SONEDE. T unisia - Northern Tunis Wastewater Project Additional Financing: The project development objective is to provide a n environmentally safe disposal system for the treated wastewater in the North of Tunis, and increase availability for its r euse in the Project Area. Approval completed on 31 August 2016. Environmental Assessment Category A. Project: P154713. US$18.0 (IBRD). No consultants are required. Im plementing agency(ies) to be determined. T unisia Sanitation PPP Support Project: The proposed objectives of the Project are t o: (i) provide improved sanitation services under the PPP contracts; and (ii) strengthen ONAS’s capacity t o m anage PPP contracts in delivery of sanitation ser- v ices. Concept completed on 16 November 2017. Environmental Assessment Category B. Project: P1 62957. US$130.0 (IBRD). Con sultants will be required. Office National de l'Assainissement (ONAS). West Bank and Gaza Education t o Work Transition Project Additional Financing: The Education to Work Transition Project seeks to improve edu- ca tion t o work transition of young Palestinians attending participating tertiary education institutions (TEIs) by: (i) fostering pa rtnerships between TEIs and employers in order t o make TEIs’ study programs more relevant to the needs of the labor m arket; and (ii) enhancing the capacity of the MOEHE and TEIs to collect, analyze and disseminate data collected through the T EIs’ graduate tracking system to monitor the outcomes of TEIs’ study programs, and t o inform education policy formulation a n d implementation. Approval completed on 2 December 2016. Environmental Assessment Category C. Project: P1 58951. US$ 5 .0 (SPF). No consultants are required. Ministry of Education and Higher Education. Im proving Early Childhood Development in the West Bank and Gaza: Improve the coverage and quality of early PAGE 139 Monthly Operational Sum m ary April 2019 ch ildhood development services for children from gestation until age 5 in the West Bank and Gaza. Concept completed on 12 February 2019. Project: P1 68295. US$ 9.0 (SPF). No consultants are required. Ministry of Education and Higher Education; Min istry of Health. Energy & Extractives Ga za Emergency Response for Electricity Network Rehabilitation (AF): The Project objective is to restore and im- pr ove basic electricity services in Gaza. Approval com pleted on 30 October 2014. Environmental Assessment Category B. Pr oject: P152411. US$ 15.0 (SPF). Consultants will be required. Palestinian Energy and Natural Resources Authority (PENRA) T el: 97097222986192, E-m ail: chairman@menr.org, Contact: Harry Kuma, Secretary of Finance. (N) A dvancing Sustainability in Performance, Infrastructure and Reliability of Energy Sector: T o im prove fi- n ancial and operational performance of electricity sector institutions and increase share of independent power producers Identification completed on 22 April 2019. US$ 27.0/3.0 (PIDM/SPF). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. El ectricity Sector Performance Improvement Project - Additional Finance: The Project Development Objective is t o im prove operational performance of electricity sector institutions, and pilot a new business model for solar energy in Gaza. A pproval completed on 15 January 2019. Environmental Assessment Category B. Project: P167914. US$ 7.0/5.0 (PIDM/SPF). Con sultants will be required. Palestinian Energy and Natural Resources Authority (PENRA). Finance, Competitiveness and Innovation In novative Private Sector Development: To improve economic opportunities for individuals and firms in the West Bank a n d Gaza. Approval completed on 1 June 2018. Environmental Assessment Category C. Project: P1 64412. US$ 13.0 (SPF). Con sulting services to be determined. Ministry of National Economy through a private sector implementing agency. Finance for Jobs II Additional Financing: To test the effectiveness of selected financial interventions in incentivizing pr ivate sector investment and job creation. Approval completed on 1 0 August 2018. Environmental Assessment Category B. Pr oject: P1 67675. US$ 5 .0 (SPF). Consultants will be required. Ministry of Finance and Planning; Project Im plementing A g ency (DAI). Social, Urban, Rural and Resilience Global Practice WBG In clusive Livelihoods Project: The Project will increase opportunities for social and economic inclusion of margin- a lized groups in the West Bank and Gaza, with a specific focus on a territorial approach that leverages private sector expertise t o increase the sustainability of livelihoods. Identification completed on 22 August 2018. US$ 10.0 (SPF). Consulting services t o be determined. Im plementing agency(ies) to be determined. Rea l Estate Registration Project: The development objective is to improve services to businessesand citizens in real estate r egistration. Concept completed on 31 December 2018. Environmental A ssessment Category B. Pr oject: P1 68576. US$ 4.6/3.0/5.0 (GPBA/PIDM/SPF). No consultants are required. Land and Water Settlement Commission (LWSC); Palestine La nd Authority (PLA). (R) A dditional Financing for Emergency Labor-intensive Gaza Municipal Services: The project development ob- jective (PDO) is t o enhance the institutional capacity of m unicipalities in the West Bank and Gaza for mor e accountable and su stainable service delivery. Negotiations authorized on 9 April 2019. Environmental A ssessment Category B. Project: P1 68544. US$ 5.0/10.0 (PIDM/SPF). Consultants will be required. Municipal Development Lending Fund (MDLF). GZ-Second Municipal Development Project AF: The PDO is "to improve the Recipient's municipal management prac- t ices for better municipal transparency and service delivery, and to restore priority municipal services following the conflict in Ga za". Approval completed on 22 March 2016. Environmental Assessment Category B. Project: P1 55268. US$ 6.9 (PWUD). Con sultants will be required. Im plementing agency(ies) to be determined. April 2019 Middle East And North Africa PAGE 140 Water Ga za Central Desalination Program: Associated Works Phase I: The proposed development objectives of the Water Security Development Project (WSDP) are to improve quality of water supply services in the project areas; and strengthen the ca pacity of selected institutions. Concept completed on 24 January 2019. Environmental Assessment Category A. Project: P1 68739. US$ 27.0/15.0 (PIDM/SPF). Consultants will be required. Palestinian Water Authority. Yemen, Republic of Education Restoring Education and Learning: The proposed project development objective is to restore the delivery of basic edu- ca tion services in selected areas affected by the conflict. Identification completed on 9 November 2017. US$ 5 00.0 (IDA Grant). Consulting services t o be determined. Im plementing agency(ies) to be determined. Health, Nutrition & Population Yemen Emergency Health and Nutrition Project Second Additional Financing: To contribute to the provision of ba sic health, essential nutrition, water and sanitation services for the benefit of the population of the Republic of Yemen. A pproval completed on 25 August 2017. Environmental Assessment Category B. Project: P1 64466. US$ 200.0 (IDA Grant). Con sulting services to be determined. Im plementing agency(ies) to be determined. (R) Yemen Emergency Health and Nutrition Project Third Additional Financing: To contribute to the provision of ba sic health, essential nutrition, water and sanitation services for the benefit of the population of the Republic of Yemen. Negotiations authorized on 10 April 2019. Environmental Assessment Category B. Project: P167195. US$ 200.0 (IDA Grant). Con sulting services to be determined. United Nations Children's Fund; World Health Organization. Yemen Emergency Health and Nutrition Project Additional Financing: T o contribute t o the provision of basic h ealth and essential nutrition services for the benefit of the population of the Republic of Yemen. Approval completed on 1 9 May 2017. Environmental Assessment Category B. Project: P1 63741. US$ 83.0 (IDA Grant). Consulting services t o be deter- m ined. Im plementing agency(ies) to be determined. Social Protection & Labor Yemen Emergency Crisis Response Project - Second Additional Financing: The Project Development Objective is t o pr ovide short-term employment and access to selected basic services t o the most vulnerable; preserve existing implemen- t a tion capacity of two service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response t o t he food crisis. Approval completed on 19 May 2017. Environmental Assessment Category B. Project: P1 63729. US$ 75.0 (IDA Grant). Consulting services to be determined. Im plementing agency(ies) to be determined. (R) Em ergency Crisis Response Project Fourth Additional Financing: The Project Development Objective is to pro- v ide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation ca pacity of service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food cr isis. Negotiations authorized on 5 April 2019. Environmental Assessment Category B. Project: P170241. US$ 200.0 (IDA Grant). Consulting services t o be determined. UNDP; UNICEF. Yemen Emergency Crisis Response Project - Third Additional Financing: The Project Development Objective is to pr ovide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation ca pacity of two service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food cr isis. A pproval completed on 1 4 December 2018. Env ironmental A ssessment Category B. Pr oject: P1 64564. US$ 1 40.0/8.6 (IDA Grant/MSC1). Consulting services to be determined. UNDP; UNICEF. Em ergency Crisis Response Project Additional Financing: The Project Development Objective is to provide short- t erm employment and access to selected basic services to the most vulnerable; and preserve existing implementation capacity of t wo service delivery programs. Approval completed on 17 January 2017. Environmental Assessment Category B. Project : PAGE 141 Monthly Operational Sum m ary April 2019 P1 61806. US$ 250.0 (IDA Grant). No consultants are required. United Nations Development Programme. Transport Yemen Transport Rehabilitation and Infrastructure Project: The Project Dev elopment Objective is t o restore t ransport connectivity to enable and improve mobility, and delivery and access to emergency relief, social services, markets a n d jobs. Identification completed on 9 November 2017. Environmental Assessment Category B. Consulting services to be det ermined. Im plementing agency(ies) t o be determined. South Asia Afghanistan Agriculture Secon d Additional Financing for the Afghanistan Rural Enterprise Development Project: Increased income and su stainable employment opportunities for men and women through supported rural enterprises. Approval completed on 21 Nov ember 2017. Environmental Assessment Category B. Project: P1 63525. US$ 5.0 (ARTF). Consultants will be required. Im plementing agency(ies) to be determined. National Horticulture and Livestock Project (NHLP) - Additional Financing: To promote adoption of improved pr oduction practices by target farmers, with gradual rollout of farmer-centric agricultural services sy stems and investment su pport. Service delivery centered on farmers will promote in practice increased participation of beneficiaries both in defining the t ype of services required and in the delivery itself. The project would also promote improved ratio of ov erall costs reaching benefi- ciaries as direct investments. The aim is thus t o promote sustainability, effectiveness and efficiency. Approval completed on 2 9 June 2016. Environmental A ssessment Category B. Project: P157997. US$ 90.0 (ARTF). Consulting services t o be deter- m ined. Im plementing agency(ies) to be determined. Opportunity for Maximizing Agribusiness Investments and Development: The PDO is to enhance the competitive- n ess of key agri-value-chains in Afghanistan for increased market access and value-addition for farmers and agri-entrepre- n eurs. Concept completed on 24 October 2018. Environmental Assessment Category A. Project: P1 68179. US$ 25.0/150.0 (IDA Grant/ARTF). Consultants will be required. Ministry of Agriculture, Irrigation and Livestock; Ministry of Industry and Commerce. Education (R) A dditional Financing for the Higher Education Development Project: The project development objective is to in crease access to, and improve the quality and relevance of, higher education in Afghanistan. A pproval completed on 17 September 2018. Environmental Assessment Category B. Project: P163845. US$ 5.0 (ARTF). Con- su lting services to be determined. Ministry of Higher Education. Energy & Extractives Ka jaki Hydroelectric Dam Addition: The development objective (DO) is to increase the supply of domestically generated hy droelectricity at the Kajaki Hydroelectric Plant (KHP). Identification com pleted on 6 September 2017. US$ 15.0 (GUID). Con sulting services to be determined. Im plementing agency(ies) to be determined. April 2019 South Asia Region PAGE 142 Ma zar-e-Sharif Gas-to-Power Project: Objective to be Determined. Identification completed on 28 October 2015. Envi- r onmental Assessment Category A. Project: P157827. US$ 25.0/45.0 (GUID/ZPCI). Consulting services to be determined. Im plementing agency(ies) to be determined. (N) Scaling-up Solar in Afghanistan Guarantee: The project development objective is to increase solar generation in A fghanistan. Identification com pleted on 28 March 2019. US$ 100.0 (GUID). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Sh eberghan Gas to Power Project: The Development Objective is (i) t o increase the amount of reliable electricity gener- a t ed in Afghanistan and (ii) to build a track record for the country in developing and implementing PPP transactions. Concept com pleted on 29 October 2018. Environmental Assessment Category B. Project: P1 66405. US$ 12.8 (GUID). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. A fghanistan Power System Development Project Additional Financing: The development objective of the project is t o increase the number of electricity connections for the urban centers of Charikar, Gulbahar and Jabul-es-Seraj and Pul-e- Kh umri and to improve the availability of power from Naghlu and Mahipar switchyards. Approval completed on 7 July 2015. Env ironmental Assessment Category B. Project: P152975. US$ 15.0 (ARTF). Consultants will be required. Im plementing a g ency(ies) to be determined. A fghanistan:Extractives for Development Project: To assist the GoIRA to implement extractives sector reforms and operationalize mining and gas sector development opportunities Concept completed on 1 December 2016. Environmental A ssessment Category A. Project: P1 59402. US$ 25.0/5 .0 (IDA Grant/ARTF). Consulting services to be determined. Ministry of Min es and Petroleum; Ministry of Information and Culture; Afghanistan EITI Secretariat, Ministry of Finance. Finance, Competitiveness and Innovation A dditional Financing to Financial Sector Rapid Response Project: This project is t o assist DAB to improve its core fu nction of banking supervision and regulation, and to help improve access to formal banking services by establishing key in itial building blocks for further financial sector reform. Over its five-y ear implementation period, FSSP aims to strengthening DA B's capacity through: (i) strengthening of the off-site supervisory functions of DAB, (ii) strengthening of DAB's accounting a n d internal audit capabilities, and (iii) establishment of an effective human resource management sy stem, and (iv) develop- m ent of a n effective information t echnology sy stem. The project also a ssists in developing financial sector infrastructure t hrough: (i) establishment of a Public Credit Registry, (ii) establishment of a Collateral Registry, and (iii) supporting the phys- ical development of the Afghanistan Institute of Banking and Finance (AIBF). Approval completed on 26 November 2013. Env ironmental Assessment Category C. US$ 6.7 (IDA Grant). Consulting services to be determined. Ministry of Finance, E- m ail: m aqa2005@yahoo.com, Contact: Adris Walli, Aide Coordination Specialist; Da Afghanistan Bank Tel: (93-7 9) 722-3340, E-m ail: zalmei.sherzad@centralbank.gov.af, Contact: Zalmie Sherzad, Project Director. Financial Sector Rapid Response - Additional Financing: To assist DAB to develop action plans for improved banking su pervision and to establish key building blocks of financial sector infrastructure: payment system, movable collateral registry, a n d public credit registry. Approval completed on 27 October 2016. Environmental Assessment Category C. Project: P160073. US$ 20.0 (IDA Grant). Consultants will be required. Im plementing agency(ies) to be determined. (R) Pa yments Automation and Integration of Salaries in Afghanistan (PAISA): The PDO is to support the devel- opm ent of digital government-to-person payments in Afghanistan. Approval completed on 25 April 2019. Environmental A ssessment Category C. Project: P168266. US$ 10.0/35.0 ( IDA Grant/ARTF). Consulting services to be determined. Ministry of Finance; Da Afghanistan Bank. Governance Secon d Public Financial Management Reform Project (PFMRP II) - Additional Financing: To further strengthen t h e efficiency and effectiveness of Afghanistan’s procurement, treasury, and audit sy stems. Approval completed on 1 0 Febru- a ry 2016. Environmental A ssessment Category C. Project: P1 50632. US$ 41.1 (ARTF). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 143 Monthly Operational Sum m ary April 2019 Health, Nutrition & Population SEHA T Additional Financing: The proposed AF to the SEHAT project (P129663) will finance the delivery of the Basic Pa ckage of Health Services (BPHS) and Essential Package of Hospital Services (EPHS) in the 13 provinces currently supported by USAID. As outlined in its 2/2/1 4 letter, USAID intends t o provide an estimated total program contribution to ARTF in the a m ount of US$ 227.6 million for the 5 year SEHAT program. In addition to supporting BPHS and EPHS (SEHAT component 1 ), the USAID contribution will support the provision of technical assistance to strengthen the stewardship capacity of MOPH a n d program management activities, (SEHAT components 2 and 3, respectively). Approval completed on 25 May 2015. Envi- r onmental Assessment Category B. Project: P152122. US$ 248.0 (ARTF). Consulting services to be determined. Im plementing a g ency(ies) to be determined. M acroeconomics, Trade and Investment A DDITIONAL FINANCING FOR SECOND CUSTOMS REFORM AND TRADE FACILITATION PROJECT: To im prove the release of legitimate goods in a fair and efficient manner. Approval completed on 11 Jun e 2015. Environmental A ssessment Category B. Project: P155443. US$ 21.5 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Social Protection & Labor A fghanistan Placing Labor Abroad and Connecting t o Employment Domestically: Im prove labor market out- com es for Afghan jobseekers through managed international labor migration and improved labor market intermediation ser- v ices domestically; and im prove youth access and pathways to existing development programs in line with youth aspirations. Con cept completed on 20 September 2018. Environmental Assessment Category B. Project: P161728. US$ 10.0/40.0 (IDA Grant/ARTF). Consultants will be required. Ministry of Labor, Social Affairs, Martyrs and Disabled. Social, Urban, Rural and Resilience Global Practice (R) A fghanistan Land Administration System Project: The Project Development Objective is (a) to support the devel- opm ent of the Afghanistan land administration system; and (b) to provide the population in selected areas with improved land r egistration services, including issuance of Titles and Occupancy Certificates. Approval completed on 25 April 2019. Environmental A ssessment Category B. Pr oject: P1 64762. US$ 25.0/10.0 (IDA Grant/ARTF). Consultants will be required. Ministry of Urban Development and Land. T hird National Solidarity Project: T o build, strengthen, and maintain Community Development Councils (CDCs) as ef- fective institutions for local governance and social-economic development. Approval completed on 29 June 2016. Environ- m ental Assessment Category B. Project: P1 59307. US$ 57.3 (ARTF). Consultants will be required. Im plementing agency(ies) t o be determined. Citizens' Charter Afghanistan Project - Emergency Regional Displacement Response Additional Financing: T h e Project Development Objective for the Citizens Charter Afghanistan Project is t o improve the delivery of core infrastruc- t ure, emergency support, and social services to participating communities through strengthened Community Development Councils (CDCs). Approval com pleted on 1 3 June 2017. Environmental Assessment Category B. Pr oject: P1 63468. US$ 8 5 .8/44.3 (IDA Grant/ARTF). Consultants will be required. Im plementing agency(ies) to be determined. Transport A dditional financing for Afghanistan Rural Access Project: The PDO is to enable (a) rural communities to benefit fr om all-season road access to basic services and facilities and (b) an early emergency response in the event of an eligible crisis or em ergency. Approval completed on 13 June 2017. Environmen tal Assessment Category B. US$ 105.0 (ARTF). Consultants w ill be required. Im plementing agency(ies) to be determined. Water A fghanistan Water Supply and Sanitation Services and Institutional Support Program: The proposed Project April 2019 South Asia Region PAGE 144 Dev elopment Objective (PDO) is to improve coverage and quality of water supply service in Kandahar city and selected peri- u rban areas, and strengthen the performance of AUWSSC and Kandahar utility. Identification completed on 17 December 2 018. US$ 50.0/180.0 (IDA Grant/ARTF). Consulting services to be determined. Im plementing agency(ies) to be determined. A F Additional Financing: Irrigation Restoration and Development: Im prove access to irrigation in targeted areas a n d strengthen capacity for water resources management. Approval completed on 23 May 2016. Environmental Assessment Ca tegory A. Project: P152892. US$ 70.0 (ARTF). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Bangladesh Agriculture A dditional Financing For Modern Food Storage Facilities Project: The ov erall Project development objective is to in crease the grain reserve available to households to meet their post-disaster needs and improve the efficiency of grain storage m anagement. Appraisal completed on 26 February 2019. Environmental Assessment Category B. Project: P1 68484. US$ 2 80.0 (IDA Credit). Consulting services to be determined. Directorate General, Ministry of Food. Cl imate-Smart Agriculture and Water Management Project: To enhance climate resilience and productivity of irri- g ated agriculture in targeted schemes Negotiations authorized on 22 February 2018. Environmental Assessment Category B. Pr oject: P161534. US$ 1 20.0 (IDA Credit). Consultants will be required. Bangladesh Water Development Board; Department of A gricultural Extension; Department of Fisheries. National Agricultural Technology Project - Additional Financing: The United States Agency for International De- v elopment (USAID) has proposed to provide a grant to improve agricultural productivity and farm incomes in the country t hrough research into appropriate technology, increased adoption of low risk-high reward technologies in marginalized areas, a n d fostering farmers’ links to markets. T h e project will build on the lessons learned and g ood practices develop ed in the World Bank financed Bangladesh National A gricultural Technology Project and the Bangladesh Integrated Agricultural Productivity Project. Approval completed on 4 Ma rch 2014. Environmental Assessment Category B. Project: P133251. US$ 23.7 (FSCO). Consultants will be required. Minis- t ry of Agriculture (MOA), Contact: S.M. Nazm ul Islam, Secretary in charge. Digital Development BD: In tegrated Digital Government Project: The development objective is to improve digital integration across GOB a g encies, and catalyze digital public services. Appraisal completed on 29 January 2018. Environmental Assessment Category C. Project: P161086. US$ 300.0 (IDA Credit). Consultants will be required. Bangladesh Computer Council. BD: A F for Leveraging ICT for Growth, Employment, Governance Project: The PDO is to (i) catalyze the growth of Ba ngladesh’s IT/ITES industry for employment creation and export diversification; and(ii)establish basic e -Government foun- da tions to support public sector modernization. Approval completed on 24 October 2016. Environmental Assessment Cate- g ory C. Project: P159497. US$ 39.0 (IDA Credit). Consulting services to be determined. Bangladesh Computer Council. Education A dditional Financing: Skills and Training Enhancement Project: The Additional Financing will support the original fou r com ponents of the Skills and Training Enhancement Project to further contribute towards scaling up ongoing institutional g rants to additional public and private institutions to m eet the ongoing demand and to fill in the funding gap in the stipend a ctivities. Following are the components under the Additional Financing: Component 1: Im prove the Quality and Relevance of T raining This com ponent will be implemented through two (2) windows. Window I will support selected additional private in stitutions offering diploma level programs. These institutions will be chosen on the basis of well-defined eligibility and se- lection criteria. Window II will support selected additional institutions providing short-term vocational and technical training. T h ese institutions will be chosen based on similar eligibility and selection criteria employed under Window I. Com ponent 2 - PAGE 145 Monthly Operational Sum m ary April 2019 Pilots in Technical and Vocational Education and Training Developing pilot activities aimed at strengt hening the ov erall tech- n ical and vocational educational training sy stem: Supporting Industry Skills Councils (ISC) and the National Skills Develop- m ent Council (NSDC) by providing a grant financing and operational cost support to finance establishment of specific offices t o a bout two to four ISCs and NSDC who will guide the ov erall regulatory and legislative framework for Vocational Education a n d Training and skills development. Component 3 - Institutional Capacity Development Strengthening the capacity of the Recipient in managing the TVET sector as a whole by way of institutional capacity development of the Directorate of Technical Edu cation (DTE), the Bangladesh Technical Education Board (BTEB) under the Ministry of Education (MoE), and the Bureau of Ma n power Em ployment a nd T raining (BMET ) under the Min istry of Ex patriate W elfare and Ov erseas Em ployment (MOEWOE). (RPL) program. Component 4 - Project Management, Communications, Monitoring and Ev aluation Support for pr oject management, monitoring and evaluation of Project progress and outcomes. Approval completed on 26 September 2 013. Environmental Assessment Category B. US$ 16.7 (FSSA). Consulting services to be determined. Ministry of Education T el: (88-02) 911-0664, E-m ail: t echedu09@gmail.com, Contact: Directorate of Technical Education, Director General. Higher Education Acceleration and Transformation Project: To enhance graduate employability, improve govern- a nce of higher education and establish a regional network of higher education institutions. Concept completed on 4 December 2 018. Project: P1 68961. US$ 200.0 (IDA Credit). Consultants will be required. Ministry of Education Bangladesh. A dditional Financing for Reaching Out of School Children II: The key project development objective is to improve equ itable access, retention and completion in quality primary education for out-of-school children in selected under-served a r eas. Approval completed on 19 September 2018. Environmental Assessment Category B. US$ 4.2/20.8 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Primary and Mass Education (MoPME). A F Bangladesh - Primary Education Development Program III: Additional Financing (AF) in the amount of US$400 m illion to scale up the Bangladesh Third Primary Education Development Program (PEDP3: P1 50669). In addition, Level 2 Restructuring comprising: (i) modification of the project scope of work; (ii) revision of the results framework to m easure th e ou tcomes associated with the revised scope of work; and (iii) extension of the project c losing date from December 31, 2015 to December 31, 2017. The Project Development Objective in the proposed AF operation will remain unchanged and will continue t o be to: “(i) increase participation and reduce social disparities in primary education, (ii) i ncrease the number of children com pleting primary and improve the quality of the learning environment and measurement of student learning, and (iii) im- pr ove effectiveness of resource use for primary education.” The proposed Additional Financing would help to finance the cost of t h e scale-up activities and subsequent restructuring of the project to respond effectively to changes in the Bangladesh pri- m ary education sector due t o ongoing nationalization of the previous "Registered Non -Government Primary Schools" (RNGPS), scale-up and expansion of interventions of the original PEDP3 project in order to implement a further set of reforms by 2017; and join government’s efforts t owards achieving universal primary education specifically by improving scaled up efforts targeting the remaining, hardest-to-reach population groups to overcome the barriers to education for those still out of sch ool, while also tackling emerging concerns related to the quality of learning (such as low t eacher -student contact hours of in struction in schools). The original project is well performing, and the recent Mid -Term Review (MTR) rates the progress t owards development objectives and implementation satisfactory. Approval completed on 16 December 2014. Environmental A ssessment Category B. Project: P150669. US$ 400.0 (IDA Credit). Consultants will be required. Directorate of Primary Ed- u cation, Contact: .. BD Higher Education Quality Enhancement Pr oject - A F: T he Higher Education Quality Enhancement Project (HEQEP) was approved in March 2009 and the main objective of the project is to improve the quality and relevance of the t eaching and research environment in higher education institution through encouraging both innovation and accountability w ithin universities and by enhancing the technical and institutional capacity of the higher education sector. Additional Fi- n ancing has been proposed to fill the funding gap to effectively complete the agreed project activities; expansion of project in terventions in order to scale up project impact and development effectiveness is warranted based on the likelihood of achiev- in g project objective and strong project performance. The following components/activities have been proposed with additional financing of US$60.0 million: (i) Component 1: Prom oting Academic Innovation; (ii) Component 2: Building Institutional Ca pacity of Tertiary Education Sector; (iii) Component 3: Raising the Connectivity Capacity in the Higher Education Sector (BdREN & Digital Library); (iv) Component 4: Establishment of Quality A ssurance Mechanism; and (v) Component 5: Project Ma nagement and Monitoring and Evaluation. Component 1: Promoting Academic Innovation Sub-Component 1.1 - Financing t o cover the shortage of funds for the 1st and 2nd rounds AIF . The additional financing will provide funds for the first and second rounds AIF sub-projects which are under implementation. The shortage was created when the Project needed to tem- por arily reallocate the funds to the BdREN activities under Component 3 during the restructuring. Sub-Component1.2 - Third r ound of AIF The AIF will allocate its resources through three competitive windows: (i) improvement of teaching and learning; (ii) enhancement of research capabilities; and (iii) university -wide innovations which include campus network In order to April 2019 South Asia Region PAGE 146 place additional emphasis on innovation for teaching and learning (Window 1) and research (Window 2), selection criteria will be m odified. Established proposal evaluation process will be followed with minor modifications based on the lessons learned fr om the first and second rounds AIF which will be reflected in a revised AIF Operations Manual. Component 2: Building In st itutional Capacity of Tertiary Education Sector This component aims to further strengthen the capacity of UGC, MOE and Higher Education Institutions for the future development of the sector. To this end, the project will support the policy for- m ation based on the studied carried out under the original project. Component 3: Raising the Connectivity Capacity of the Higher Education Sector Sub-component 3.1: Strengthening BdREN connectivity: Basic connectivity through ov erhead dark fibre would be established by December 2013. To use the full potential of the connectivity campus network would be estab- lished for the r emaining 20 public universities. In addition, VC facilities using the BdREN connectivity could be established in the Ministry of Education, ERD, and Planning Commission. Provisions would be made available for add-on software in- cluding cloud-computing and equipment for performance enhancement. Sub-component 3.2: Awareness building and kn owledge exchange: Awareness raising and knowledge exchanges on best practice for the ownership, governance and exploi- t a tion of an NREN for the stakeholders of BdREN. The exchange programs could include: (a) Policy level knowledge exchange a m ong the "South" and "North" countries; (b) a cademic and t echnical level knowledge exchange with the neighboring coun- t r ies in Asia Pacific mainly on grid computing, climate modeling, medical imaging etc. Sub-component 3.3: Capacity building (t echnical and financial management): Additional staffing and technical training of IT personnel at network and campus level - Local training programs for university IT staff on campus networking in association with international providers to create a n ational capacity to provide such training. A system of scholarships/fellowship or international placements would be provided for specialist training of IT personnel in campus networking with the aim of building a training team for the country. Sub- com ponent 3.4: Application development to maximize the utilization of BdREN: Additional support would be necessary for en suring (a) enhancement of digital library access, (b) partnership with regional and continental RENs, and (c) ut ilization "pum p-priming" activities in (1) education, (2) research collaboration, and (c) campus safety. Component 4: Establishment of Quality Assurance Mechanism To build on the momentum generated under the first two rounds of AIF and the recent efforts m ade in developing a national quality a ssurance mechanism, the Project would support the following activities with the pro- posed additional financing: (i) establishment of Quality Assurance and Accreditation Council of Bangladesh (QAAC); and (ii) est ablishment of Institutional Quality Assurance Cells (IQAC). Sub-component 4.1: Establishment Quality Assurance and Ac- cr editation Council of Bangladesh The objective of this sub-component is to provide funds for the establishment of Quality A ssurance and Accreditation Council of Bangladesh and the development of Regulations, Qualification Framework, and Qual- ity Assurance Manual. Additional funds will be also provided for awareness campaigns and necessary capacity building activ- it ies. Sub-component 4.2: Establishment of Institutional Quality Assurance Cells The Fund will finance the establishment and operation of (i) Institutional Quality Assurance Cells (IQACs); (ii) establishment of institutional data collection and analy sis m echanism for sy stematic collecting, processing and dissemination of reliable data concerning higher education quality as- su rance as well as graduates' performance in the labor market, (iii) preparation of self-assessment, process facilitation and n ecessary training, external peer reviewers' visits, and preparation and implementation of Institutional Im provement Plan. Det ails of the implementation mechanism for this Fund will be laid out in the Operations Manual. Component 5 : Project Ma nagement and Monitoring and Ev aluation The objective of this component is to ensure proper implementation, manage- m ent, and monitoring and evaluation of scaled up activities under the project. It would comprise two sub-components, aiming t o r each this objective namely: (i) project management; and (ii) monitoring and evaluation. Approval completed on 3 Decem- ber 2013. Environmental Assessment Category B. Project: P1 45749. US$ 125.0 (IDA Credit). Consulting services to be deter- m ined. University Grants Commission of Bangladesh Tel: (88-02) 818-1631, E-mail: chairmanugc@yahoo.com, Contact: Uni- v ersity Grants Commission, Chairman. A dditional Financing Skills and Training Enhancement Project: The project development objective is to strengthen selected public and private training institutions to improve training quality and employability of trainees, including those from disadvantaged socioeconomic backgrounds. Approval completed on 30 October 2015. Environmental Assessment Category B. Pr oject: P155389. US$ 100.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Secon dary Education Quality and Access Enhancement Project - A F: The Project Development Objective in the pr oposed AF operation will remain unchanged and will continue to be "to improve the quality of secondary education, system- a t ically monitor learning outcomes, and to increase access and equity in project upazilas". The four project components will be the same as in the original project. The proposed AF would: (i) support the implementation of the expanded project activi- t ies (across more schools and students within SEQAEP upazilas) to deepen the impact of a well -performing project; (ii) allow a dequate time for MOE t o ev aluate and institutionalize successful interventions from the ongoing project under a more har- m onized secondary education sector program that GOB is planning to initiate by early 2017; and (iii) initiate replication of su ccessful activities beyond 125 SEQAEP upazilas in a phased manner for a smoother institutionalization of SEQAEP inter- v entions. The AF would also extend the Closing Date of the current SEQAEP project from June 30, 2014 to December 31, 2016 in order to carry out the proposed activities. Approval completed on 3 December 2013. Environmental Assessment Category PAGE 147 Monthly Operational Sum m ary April 2019 B. US$ 265.0 (IDA Credit). Consultants will be r equired. Ministry of Education, E-m ail: seqaep@bdcom.net, Contact: Min- ist ry of Education, Project Director, SEQAEP Project. Energy & Extractives (R) Ba n gladesh Scaling-up Renewable Energy Project: The Project Development Objective is to increase installed g eneration capacity of, and mobilize financing for, renewable energy in Bangladesh. Approval completed on 1 March 2019. Env ironmental Assessment Category B. Project: P161869. US$156.0/26.4/2.9/5 9.0 (IDA Credit/CSCC/CSCF/ZBIL). Consult- a nts will be required. In frastructure Development Company Limited (IDCOL); Sustainable and Renewable En ergy Develop- m ent Authority (SREDA); Electricity Generation Company of Bangladesh (EGCB). RERED II Additional Financing: To increase access to clean energy in rural areas through renewable energy. Approval com pleted on 19 June 2014. Environmental Assessment Category B. Project: P150001. US$ 48.4/30.0/15.0 (IDA Credit/IDA Grant/GPBA). Consultants will be required. Power Cell, Contact: Mr. Mohammad Hossain, Director General; Infrastructure Dev elopment Company Limited T el: (880-2) 910-2171, E-m ail: mmalik@idcol.org, Contact: Mr. Mahmood Malik, Executive Dir ector and CEO. A dditional Financing II for Rural El ectrification and Renewable Energy Development II: Increase access to clean energy through renewable energy in rural areas. Approval completed on 10 April 2018. Environmental Assessment Ca tegory B. Project: P1 65400. US$ 55.0 (IDA Credit). Consultants will be required. Power Cell; Infrastructure Dev elopment Com pany Limited (IDCOL). Environment & Natural Resources Cl ean Air and Sustainable Environment Project - Additional Financing: To improve air quality and safe mobility in Dhaka through the implementation of demonstration initiatives in urban transport and brick m aking Approval completed on 1 3 January 2017. Environmental Assessment Category B. Project: P1 60014. US$ 35.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation Modernization of State-Owned Financial Institutions Project: The proposed project development objective is to con- t r ibute to the modernization, transparency and efficiency of state -owned banks. Approval completed on 30 June 2016. Envi- r onmental Assessment Category C. Project: P155363. US$ 150.0 (IDA Credit). Consultants will be required. BFID, Contact: Mr . Md. Eunusur Rahman, Secretary; PEOPLE'S REPUBLIC OF BANGLADESH, Contact: Md. Eunusur Rahman, Secretary. (N) Bangladesh Private Investment & Digital Entrepreneurship Project: The PDO is to promote private investment a n d job creation in economic zones and digital entrepreneurship in hi-tech parks. Identification completed on 5 March 2019. US$ 5 00.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Pr ivate Sector Development Support Project Additional Financing: Facilitate private investment and job creation a n d promote compliance with international quality standards, building codes, and good social and environmental practices in economic zones supported by PSDSP. Approval completed on 5 April 2016. Environmental Assessment Category A. Project: P1 5 6242. US$ 130.0 (IDA Credit). Consultants will be required. People's Republic of Bangladesh; Economic Relations Division (ERD). Governance Secon d Additional Financing to Public Procurement Reform Project II: The Project Development Objective (PDO) is t o improve performance of the public procurement system progressively in Bangladesh, focusing largely on the target agen- cies. The PDO would be achieved by strengthening the ongoing reform process and moving it further along with the following ou t puts: (i) enhanced capacity in creating a sustained program to develop skilled procurement professionals, (ii) strengthened m anagement and monitoring of procurement in target agencies, (iii) introduction of e-government procurement in CPTU and t h e target agencies on a pilot basis, and (iv) creation of greater public awareness of a well-functioning public procurement sy stem by engaging civil society, think tanks, beneficiaries, and the private sector. All these actions are key elements in effec- t iv e im plementation of the procurement law/ regulations. Approval completed on 6 June 2016. Environmental Assessment April 2019 South Asia Region PAGE 148 Ca tegory C. Project: P158783. US$ 10.0 (IDA Credit). Consulting services to be determined. People's Republic of Bangladesh, Contact: Md. Fa ruque Hossain, Dir ector General; Econ omic Relations Div ision T el: 8 8029180675, E-m ail: ksa zam@gmail.com, Contact: Kazi Shofiqul Azam, Additional Secretary. (R) Ba n gladesh Strengthening PFM Program to Enable Service Delivery: The Program Development Objective (PDO) is to improve fiscal forecasting, budget preparation and execution, financial reporting and transparency to enable better r esource availability for service delivery in selected Ministries, Departments, and Agencies. Approval completed on 1 March 2019. Project: P1 67491. US$ 100.0 (IDA Credit). No consultants are required. Ministry of Finance. Health, Nutrition & Population A dditional Financing for Health Sector Support Project: The Project Dev elopment Objective (PDO) is to strengthen t h e health, nutrition and population (HNP) sector's core management sy stems and delivery of essential HNP services with a focus on selected geographical areas. Approval completed on 28 June 2018. Environmental Assessment Category B. Project: P1 67672. US$ 8.0/42.0 (IDA Credit/IDA Grant). No consultants are required. Ministry of Health and Family Welfare. HSDP A dditional Finance: To enable the Government of Bangladesh to strengthen health systems and improve health services, particularly for the poor. Approval completed on 24 June 2016. Environmental Assessment Category B. Project: P1 51070. US$ 150.0 (IDA Credit). No consultants are required. Ministry of Health and Family Welfare. Social Protection & Labor Sa fety Net Systems for the Poorest (Additional Financing): The Objective of the Project is to improve the equity, efficiency and transparency of major Safety Net Programs to benefit the poorest households. Approval completed on 15 De- cem ber 2017. Environmental Assessment Category B. Project: P163677. US$ 245.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) Dh aka City Neighborhood Upgrading Project: To enhance public spaces and improve urban services in selected n eighborhoods in Dhaka. Approval completed on 29 March 2019. Environmental Assessment Category B. Project: P1 65477. US$ 1 00.5 (IDA Credit). Consultants will be required. Dhaka South City Corporation. Em ergency 2007 Cyclone Recovery and Restoration Project-- A F II: The primary rationale for the proposed Addi- t ional Financing is for IDA to continue its support to the Government of Bangladesh for improving and strengthening critical disaster prevention infrastructure in the coastal areas of Bangladesh. At the t ime of Cyclone Sidr, damages were estimated at US$1 .2 billion, with significant needs in the further strengthening of coastal embankments as well as the rehabilitation and con struction of im proved m ulti-purpose cyclone shelters. The additional financing would be primarily used to: (a) meet the financing gap of about of about US$4.2 million that exist since the inception of the project and also a gap created due to ex change rate between SDRs t o USD (about USD 6.2 Million are lost at this stage); and (b) to scale up the construction and r ehabilitation of critical infrastructure in particular the disaster shelters in the coastal areas. In addition, part of the proposed cr edit would be used to carry out necessary repairs/improvement to about ten polders. Approval completed on 30 December 2 013. Environmental Assessment Category B. Project: P1 46500. US$ 140.0 (IDA Credit). Consulting services to be deter- m ined. Ministry of Disaster and Relief Tel: (880-1 8) 1 911-7754, E-mail: cms@dmb.gov.bd, Contact: Syed Ashraful Islam, Com- m unication Media Specialist. (R) Em ergency Multi-Sector Rohingya Crisis Response Project: To strengthen the Government of Bangladesh sys- t em s to improve access to basic services and build disaster and social resilience of the displaced Rohingya population. Ap- proval completed on 7 March 2019. Environmental Assessment Category A. Project: P167762. US$ 1 65.0 (IDA Grant). Con- su ltants will be required. Local Government Engineering Department; Ministry of Disaster Management and Relief; Depart- m ent of Public Health Engineering. Transport Western Economic Corridor and Regional Enhancement Program: Contribute towards sustainable economic de- v elopment and regional integration of the Western region of Bangladesh through improvement of targeted primary, secondary PAGE 149 Monthly Operational Sum m ary April 2019 a n d tertiary road connectivity and socio-economic infrastructure Identification completed on 18 December 2018. US$ 400.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Dh aka Public Transport Improvement Project: The proposed project development objective is to enhance the accessi- bility, efficiency, and safety of transportation in one of the main public transport corridors of Dhaka and im prove its connec- t iv ity with surrounding areas. Concept completed on 17 May 2018. Environmental Assessment Category A. Project: P1 66435. US$ 475.0 (IDA Credit). Consultants will be required. Roads and Highways Department (RHD); Dhaka North City Corporation (DNCC); Road Transport and Highways Division (RTHD); Bangladesh Police (BP). A dditional Financing for Second Rural Transport Improvement Project: The proposed Project Development Ob- jective is: T o im prove rural accessibility in project areas (covering 26 districts) and strengthen institutional capacity for sus- t a inable rural road maintenance. Approval completed on 5 October 2018. Environmental Assessment Category A. Project: P1 66295. US$ 100.0 (IDA Credit). Consulting services to be determined. Local Government Engineering Department (LGED). Water Dh aka Sanitation Improvement Project: The Proposed Project Development Objective (PDO) is to provide improved sa nitation services in select areas of Dhaka city. Concept completed on 30 June 2017. Environmental Assessment Category A. Pr oject: P1 61432. US$ 150.0/150.0 (IDA Credit/AIIB). Consulting services to be determined. Dhaka Water Supply and Sew- er age Authority. A dditional Financing to Chittagong Water Supply Improvement and Sanitation Project: The revised PDO is to in crease access to safe water and improve CWASA’s institutional capacity and investment planning for sa nitation and drainage in Chittagong City. Approval completed on 23 June 2017. Environmental Assessment Category B. Project: P1 61566. US$ 47.5 (IDA Credit). No consultants are required. Im plementing agency(ies) to be determined. Leveraging Microfinance for Improved Sanitation and Water Supply in Bangladesh: Expanding access to safe sa nitation and water supply with private sector support and micro financing services Identification completed on 7 October 2 018. US$ 300.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. Ba n gladesh Municipal Water Supply and Sanitation Project: The Project Development Objective (PDO) is to increase a ccess t o improved water supply and sanitation services in selected municipalities, and strengthen the municipalities’ institu- t ional capacities for delivering water and sanitation services. Negotiations authorized on 11 February 2019. Environmental A ssessment Category B. Project: P1 61227. US$ 100.0/100.0 (IDA Credit/AIIB). Consultants will be required. Department of Pu blic Health Engineering. Bhutan Health, Nutrition & Population (N) Bh utan Pandemic Preparedness Project: The objective of this project is to improve the resilience of Bhutan to pa ndemics, and disease outbreaks with pandemic potential. Identification completed on 11 March 2019. Consulting services t o be determined. Im plementing agency(ies) to be determined. India Agriculture St ate of Maharashtra's Agribusiness and Rural Transformation Project: The project development objective is to su pport the development of inclusive and competitive agriculture value chains , focusing on small holder farmers and agri- en trepreneurs in Maharashtra. This would be achieved by expanding access t o new and organized markets for producers and en terprises with complementary investments in technical services and risk management capabilities. Concept completed on 1 7 October 2018. Environmental Assessment Category B. Project: P1 68310. US$210.0/10.0 (IBRD/ZFOU). Consulting ser- v ices to be determined. Department of Agriculture, Government of Maharashtra. April 2019 South Asia Region PAGE 150 National Rural Economic Transformation Project ( Additional Financing to National Rural Livelihoods Pro- ject ): To establish efficient and effective institutional platforms of the rural poor to enable them to increase household income t hrough sustainable livelihood enhancements, and improved access to financial and selected public services. Approval com- pleted on 26 April 2018. Environmental Assessment Category B. Project: P166745. US$250.0 (IBRD). No consultants are r equired. Ministry of Rural Development; Ministry of Rural Development. Food Processing and Value Addition Project: The main objective of the proposed program is to modernize and enhance t h e competitiveness of the unorganized segment of the food processing industry in selected States and districts of India. Con- cept completed on 8 October 2018. Environmental Assessment Category B. Project: P167559. US$225.0 (IBRD). Consulting services to be determined. Ministry of Food Processing Industries, Government of India. In tegrated Project for Source Sustainability and climate Resilient Rain-fed Agriculture in Himachal Pra- desh: The project development objective is to improve farm-system resilience and prom ote source sustainability of springs a n d streams in selected Gram Panchayat. Identification completed on 24 August 2017. US$80.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. (N) Chhattisgarh Inclusive Rural and Accelerated Agriculture Growth Project: To increase productivity and access t o m arkets for small farmers and producers of non-timber forest products, and increase the share of m arginalized communities pa rticipating in social protection programs in selected districts of Chhattisgarh Identification completed on 21 March 2019. US$1 60.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be determined. West Bengal Accelerated Agriculture Transformation Project: To enhance the competitiveness of key agri-value- chains for increased value-added and market access; benefiting producers and agri-entrepreneurs in West Bengal. Concept com pleted on 16 October 2018. Environmental Assessment Category B. Project: P168999. US$300.0 (IBRD). Consultants will be r equired. Department of Agriculture. Odisha Integrated Irrigation Project for Climate Resilient Agriculture: The Project Development Objective is to in tensify and diversify agricultural production, enhance climate resilience and improve water productivity in selected cascades of Odisha. Concept completed on 3 October 2018. Environmental Assessment Category B. Project: P1 63533. US$164.4 (IBRD). Consultants will be required. Odisha Community Tank Development and Management Society. Education St r engthening Teaching-Learning And Results for States: The Program Development Objective (PDO) is to improve st udent outcomes in select states and enhance governance of school education in India Concept com pleted on 11 October 2 018. Environmental Assessment Category B. Project: P1 66868. US$500.0 (IBRD). No consultants are required. Ministry of Human Resource and Development. Energy & Extractives A dditional Financing for Shared Infrastructure for Solar Parks Project: The proposed development objective is "to in crease solar generation capacity through the establishment of large-scale solar parks in the country". Identification com- pleted on 20 August 2018. Environmental Assessment Category F. US$75.0/25.0 (IBRD/CCTF). No consultants are required. Im plementing agency(ies) to be determined. (R) In novation in Solar Power and Hybrid Technologies: The Project Development Objectives (PDO) are to demon- st rate the operational and economic feasibility of utility -scale innovative renewable energy technologies and battery energy st orage solutions, and t o strengthen institutional capacity t o facilitate scale-up of such technologies on a commercial basis in In dia. Approval completed on 29 March 2019. Environmental Assessment Category B. Project: P1 60379. US$150.0/49.8 ( IBRD/CCTF). Consultants will be required. Solar Energy Corporation of India Limited. Pr epare: Program to Establish Pilots for Access through Renewable Energy: To demonstrate renewable energy ba sed decentralized models of im proving energy a ccess in target states of UP & Bihar. Concept completed on 20 May 2013. Env ironmental Assessment Category B. Project: P144678. US$ 12.9/15.3 (GEFU/ZPCO). Consulting services to be determined. Min istry of New and Renewable Energy, Contact: Tarun Kapoor, Joint Secretary; UPNEDA, Contact: Anamika Singh, Director; PAGE 151 Monthly Operational Sum m ary April 2019 BREDA T el: 0612-2507734, E-m ail: breda@breda.in, Contact: Dayanidhi Pradhan, Director. In dia Energy Efficiency Scale-Up Program Guarantee: The PDO is t o enhance EESL’s f inancial and institutional ca- pa city and to scale up energy savings in residential and public sectors A pproval completed on 17 May 2018. Project: P1 65488. US$ 80.0 (GUAR). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. (N) West Bengal Electricity Distribution Grid Modernization Project: The program’s development objective is to im prove the availability, efficiency and reliability of electricity supply in selected areas of West Bengal Identification completed on 1 6 April 2019. US$280.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. Environment & Natural Resources En hancing Coastal and Ocean Resource Efficiency Project: To strengthen integrated coastal zone management in selected States and Union Territories Concept completed on 3 October 2018. Environmental Assessment Category A. Project: P1 67804. US$300.0 (IBRD). Consultants will be required. Society of Integrated Coastal Management. A dditional Financing for Financing Energy Ef ficiency at MSMEs Project: To increase demand for energy efficiency inv estments in target micro, sm all and m edium enterprise clusters and t o build their capacity to access commercial finance. T h e Project Development Objective supports the global environmen tal agenda of stabilizing atmospheric concentrations of g r eenhouse gases (GHG) through an increase in Energy Efficiency investments and resulting energy savings. Approval com- pleted on 4 November 2016. Environmental Assessment Category B. Project: P158033. US$ 5.2 (GEFU). Consultants will be r equired. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation A griculture Risk Resilience and In surance Access Program: The Program Dev elopment Objective is to enhance fa rmer access and improve service delivery of the PMFBY crop insurance scheme in select states in India. Negotiations au- t h orized on 10 January 2019. Environmental Assessment Category B. Project: P165923. US$201.0 (IBRD). No consultants a r e required. Department of Agriculture, Cooperation & Farmers Welfare. Governance (R) Ut tarakhand Public Financial Management Strengthening Project: The project development objective is to en- h ance accountability in public finances and increase effectiveness of revenue management systems in Uttarakhand Approval completed on 7 March 2019. Environmental Assessment Category C. Project: P1 66923. US$31.6 (IBRD). Consultants will be r equired. Finance Department, Government of Uttarakhand. Health, Nutrition & Population National Nutrition Mission (also known as ICDS Systems Strengthening and Nutrition Improvement Project: A dditional Financing): T o improve the coverage and quality of ICDS nutrition services to pregnant and lactating wom en a n d children under 3 years of age Approval completed on 30 March 2018. Environmental Assessment Category C. Project: P1 65493. US$200.0 (IBRD). Consulting services to be determined. Ministry of Women and Child Development. Ut tar Pradesh Health Systems Strengthening Project – Additional Financing: The Project Development Objective of UPHSSP is to improve the efficiency, quality and accountability of health service delivery in Uttar Pradesh by strengthening t h e State Health Department's m anagement and sy stems capacity. Negotiations authorized on 13 December 2018. Environ- m ental Assessment Category B. Project: P1 67580. US$105.0 (IBRD). No consultants are required. Uttar Pradesh Health Sys- t em s Strengthening Project (UPHSSP); Uttar Pradesh Medical Supplies Corporation Ltd. (R) Pr ogram T owards Elimination of Tuberculosis: To improve the coverage and quality of TB control interventions in the private and public sector in targeted states of India Approval completed on 29 March 2019. Project: P167523. US$400.0 (IBRD). No consultants are required. Ministry of Health and Family Welfare. April 2019 South Asia Region PAGE 152 (R) T amil Nadu Health System Reform Program: The Program Development Objective (PDO) is to improve quality of ca re, strengthen management of non-communicable diseases and injuries, and reduce inequities in reproductive and child h ealth services in Tamil Nadu. Approval completed on 19 March 2019. Environmental Assessment Category B. Project: P1 66373. US$287.0 (IBRD). No con sultants are required. Department of Health and Family Welfare, Government of Tamil Nadu. A ndhra Pradesh Health Systems Strengthening Project: The Project Development Objectives are to improve the qual- ity and r esponsiveness of public health services and increase access of the population to an expanded package of primary h ealth services. Negotiations authorized on 21 February 2019. Environmental A ssessment Category B. Project: P1 67581. US$328.0 (IBRD). No consultants are required. Department of Health, Medical and Family Welfare, Govt. of Andhra Pradesh. Poverty and Equity National Programme for Improving the Quality of Statistics in India: To improve the efficiency and user relevance of st atistical production at MOSPI, and enhance its role in statistical coordination across states and sectors. Identification com pleted on 30 October 2018. US$30.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) to be de- t ermined. Social, Urban, Rural and Resilience Global Practice (N) Pu njab Ur ban Governance and Water Supply Improvement Program: T o su pport t he State of Punjab in st r engthening urban g overnance and finance and delivery of sustainable water supply services in Amritsar and Ludhiana. Identification completed on 2 April 2019. US$250.0 (IBRD). Consulting services to be determined. Implementing agency(ies) t o be determined. West Bengal Transport and Logistics Improvement Project: Im prove the efficiency and environmentally responsible operation of the logistics sector in the targeted area, including through private sector participation. Concept completed on 26 September 2018. Environmental Assessment Category A. Project: P1 66020. US$100.0 (IBRD). No consultants are required. W est Bengal Transport Infrastructure Development Corporation. In dia Climate Change Mitigation Action Support: The development objective is to strengthen the readiness of the Gov- er nment of India for the assessment, design, preparation and implementation of new and existing carbon pricing instruments. A ppraisal com pleted on 25 January 2019. Environmental Assessment Category C. Project: P1 62119. US$ 5.2 (PMR). No con- su ltants are required. Ministry of Environment, Forests, and Climate Change. Ut tarakhand Disaster Recovery Project Additional Financing: To restore housing, rural connectivity and build resil- ience of communities in Uttarakhand and increase the technical capacity of the State entities t o respond promptly and effec- t iv ely to an eligible crisis or emergency. Approval completed on 21 February 2019. Environmental Assessment Category B. Pr oject: P164058. US$96.0 (IBRD). Consultants will be required. Government of Uttarakhand; Uttarakhand State Disaster Ma nagement Authority, Government of Uttarakhand. A maravati Sustainable Infrastructure and Institutional Development Project: The project development objectives a r e to provide select urban infrastructure in designated locations of Amaravati Capital City, and to support the initial develop- m ent of its institutional and governance structure. Negotiations authorized on 24 January 2019. Environmental Assessment Ca tegory A. Project: P1 59808. US$300.0/200.0 (IBRD/AIIB). Consultants will be required. Andhra Pradesh Capital Region Dev elopment Authority (APCRDA); Amaravati Development Corporation (ADC). T amil Nadu Housing and Habitat Development: To strengthen the institutional performance of Tamil Nadu’s housing sector and improve housing conditions of eligible low-income households in Chennai. Concept completed on 3 December 2 018. Environmental Assessment Category A. Project: P168590. US$245.0 (IBRD). Consultants will be required. Tamil Nadu Slum Clearance Board (TNSCB); Tamil Nadu Infrastructure Fund Management Corporation Limited. Ker ala Urban Service Delivery Project: To strengthen the institutional and service delivery systems of Urban Local Bod- ies in Kerala Concept completed on 6 November 2018. Environmental Assessment Category B. Project: P1 68633. US$300.0 (IBRD). Consultants will be required. Local Self Government Department, Government of Kerala. PAGE 153 Monthly Operational Sum m ary April 2019 Jh arkhand Municipal Development Project: The Project Development Objective (PDO) is to provide improved access t o ba sic urban services and m anagement capacity in participating Urban Local Bodies (ULBs) in Jharkhand. Approval com- pleted on 1 2 December 2018. Environmental A ssessment Category A. Project: P158502. US$147.0 (IBRD). Consultants will be r equired. Urban Development and Housing Department, Government of Jharkhand. Transport Gr een National Highways Corridor Project: The proposed Project Development Objective is to enhance the institutional ca pacity of Ministry of Road Transport and Highways in improving transport connectivity through adopting green and climate r esilient construction methods for the National Highway network and implementing them in pilot sections of the Network. Con cept completed on 8 October 2018. Environmental Assessment Category A. Project: P167350. US$500.0 (IBRD). Con- su ltants will be required. Ministry of Road Transport and Highways. Mu mbai Urban Transport Project 3: The Project’s Development Objective is to improve the network connectivity, service qu ality and safety of Mumbai’s suburban railway sy stem with particular attention t o female passengers, and better integrate t h e system with the Mumbai Metropolitan Region Plan both at the network level and through transit oriented development in itiatives at specific stations. Concept completed on 19 September 2017. Environ mental Assessment Category A. Project: P1 5 9782. US$500.0/5 00.0 (IBRD/AIIB). Consultants will be required. Mumbai Railway Vikas Corporation (MRVC). A dditional Financing for PMGSY Rural Roads Project: The objective is to strengthen the systems and processes of the n ational PMGSY rural roads program for the expansion and maintenance of all-season rural access roads. The result will en- h ance the road connectivity to economic opportunities and social services for beneficiary communities in the participating st ates. Approval completed on 25 May 2018. Environmental Assessment Category A. Project: P1 65402. US$500.0 (IBRD). Con sultants will be required. National Rural Road Development Agency. A ssam Inland Water Transport Project: The Projects Development Objectives are to: (a) improve the passenger and v ehicle accessibility across the Brahmaputra and t o its islands with ferry System in Assam; and (b) improve the institutional fr amework a nd st rengthen the capacity of t h e st ate institutions, which a dminister, r egulate and pr ovide Inland Water T ransport. Concept completed on 29 July 2016. Environmental Assessment Category A. Project: P157929. US$120.0 (IBRD). Con sultants will be required. Transport Dept., Govt. of Assam, Dispur, Guwahati (Assam), India. (R) Ra jasthan State Highways Development Program II: The PDO is to build capacity for better management of state h ighways and to improve traffic flows on selected state highways in the state of Rajasthan. Approval completed on 29 March 2019. Environmental Assessment Category B. Project: P157141. US$250.0 (IBRD). Consultants will be required. The State of Ra jasthan. Himachal Pradesh State Roads Transformation Program: The proposed PDO is to improve logistics for horticultural dev elopment, and enhance safety and resilience of state roads in Himachal Pradesh, whilst strengthening state level transpor- t a tion and logistics institutions. Identification completed on 1 6 March 2017. Environmental Assessment Category A. US$200.0 (IBRD). Consulting services to be determined. Im plementing agency(ies) t o be determined. (R) Ut tar Pradesh Core Road Network Development Project: The Project Development Objective is to build capacity for r esults-focused road safety management in Uttar Pradesh and to improve traffic flows and safety for a ll road users on selected corridors of the state core road network Approval completed on 29 March 2019. Environmental Assessment Category A . Project: P147864. US$400.0 (IBRD). Consultants will be required. UP-PWD, Contact: Mr. Kishan Singh Atoria, Principal Secretary; UP Police T raffic Directorate, Contact: Mr. Anil A grawal, A DG Traffic; Transport Commissioner Tel: 91 -522- 2 613978, E-m ail: tc-up@nic.in, Contact: Mr K. Ravinder Naik, Transport Commissioner. Meghalaya Integrated Transport Project: The development objective is to improve transport connectivity and efficiency a n d modernize transport institutions in Meghalaya. Concept completed on 26 November 2018. Project: P168097. US$120.0 (IBRD). Consultants will be required. Meghalaya In frastructure Development Finance Corporation. April 2019 South Asia Region PAGE 154 Water A tal Bhujal Yojana (Abhy)-National Groundwater Management Improvement: Objective t o be Determined. Ap- pr oval completed on 5 June 2018. Environmental Assessment Category B. Project: P158119. US$450.0 (IBRD). Consulting services to be determined. The Ministry of Water Resources, River Development and Ganga Rejuvenatio. (R) Da m Rehabilitation & Im provement Project - Restructuring and Additional Financing: To improve the sa fety and operational performance of selected existing dams in the t erritory of the participating states. The PDO will be a chieved through rehabilitation and im provement of dams and improvement in central and state-level institutional capacity t o sustainably manage dam safety administration and operation and maintenance. Approval completed on 28 February 2019. Env ironmental Assessment Category B. Project: P166977. US$137.0 (IBRD). Consultants will be required. Central Water Com- m ission under the Ministry of Water Resources; Damodar Valley Corporation (DVC); Uttarakhand Jal Vidyut Nigam Limited; Odisha Water Resource Department; Tamil Nadu Water Resources Department; Madhya Pradesh Water Resources Depart- m ent; TANGEDCO Tamil Nadu; Kerala Water Resources Department; Kerala State Electricity Board; Karnataka Wat er Re- sou rces Development Organization. National Ganga River Ba sin Project 2: The objective of the project is to assist NGC (National Ganga Council) in: (a) bu ilding capacity of its nascent operational-level institutions to enable them to manage the long-term Ganga clean-up and con servation program; and (b) implementing a set of investments for purposes of r educing point-source pollution loads in a su stainable manner at priority locations on the Ganga. Concept completed on 28 September 2018. Environmental Assessment Ca tegory A. Project: P169111. US$560.0 (IBRD). Consulting services to be determined. National Mission for Clean Ganga, Min istry of Water Resources, River Development and Ganga Rejuvenate. West Bengal Major Irrigation and Flood Management Project: The Project Dev elopment Objectives are to improve ir rigation service delivery, strengthen flood risk management and improve climate change resilience in the Project area. Im proving irrigation services includes management r eforms as pursued under Component A, and infrastructure moderniza- t ion to reinforce the management improvements under Component B. Strengthening flood risk management is addressed u nder Component C. These improvements will help improve the resilience of the Project area to climate change. Appraisal com pleted on 11 February 2019. Environmental Assessment Category B. Project: P1 62679. US$144.7/144.7 (IBRD/AIIB). Con sultants will be required. Irrigation and Waterways Department. Maldives Education (R) Ma ldives: Enhancing Employability and Resilience of Youth Project: The Project Development Objective (PDO) is t o improve the relevance of technical and vocational skills and foster entrepreneurship to promote youth employment in pr iority sectors. Negotiations authorized on 22 April 2019. Environmental Assessment Category B. Project: P163818. US$ 1 0.0/1 0.0 (IDA Credit/IDA Grant). No consultants are required. Ministry of Higher Education. Environment & Natural Resources Ma l dives Environmental Management Project Additional Financing: The main aim of the Project is to provide the Republic of Maldives with the capacity to effectively manage environmental risks and threats to fragile coral reefs as well as m arine habitats resulting from tourism development, increased solid waste disposal, fisheries and global climate change. Ac- cor dingly, this Project has two development objectives. The first Project Development Objective is that a solid waste manage- m ent sy stem is established and that inhabitants on targeted islands use solid waste management facilities, reducing the risks of contamination associated with accumulated wastes and sea dumping. The second Project Development Objective is to build h uman and technical capacity for environmental management so that the environmental dimension is integrated in the plan- n ing process using information and expertise developed in the Project. Approval completed on 22 April 2015. Environmental A ssessment Category A. Project: P153958. US$ 3.3 (IDA Grant). No consultants are required. Ministry of Environment and En ergy Tel: 9603004323, E-mail: memp@environment.gov.mv, Contact: Project Manager, PMU. PAGE 155 Monthly Operational Sum m ary April 2019 Governance Ma l dives Public Financial Management Systems Strengthening Project: The PDO (project development objectives) for the proposed AF is to enhance budget credibility, transparency, and financial reporting of public sector finances. The PDO r em ains relevant and the likelihood of achieving it remains high in view of the project’s implementation progress, disburse- m ent performance, and r esults achieved t o date. A pproval completed on 7 June 2018. Environmental Assessment Category C. Project: P164322. US$ 6.0/6.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Finance and Treasury. Social, Urban, Rural and Resilience Global Practice Ma l dives Urban Development and Resilience Project: To enhance urban services and strengthen resilience in Hulhu- m ale. Concept completed on 19 July 2018. Environmental Assessment Category B. Project: P1 63957. US$ 10.0/10.0 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of National Planning and Infrastructure; National Disaster Ma nagement Authority. Nepal Agriculture Ru ral Economic and Enterprise Development Project: To strengthen the market linkages of sm all scale farmers and ot h er rural entrepreneurs and to enhance the ecosystem of services supporting those value chains Identification completed on 23 January 2019. US$ 100.0/60.0 ( IDA Credit/IFAD). Consulting services to be determined. Implementing agency(ies) to be determined. Education (R) Nepal: Additional Financing for School Sector Development Program: The Program Dev elopment Objective is t o improve the quality, equitable access, and efficiency of basic and secondary education in Nepal by supporting the Gov- er nment's School Sector Development Program. Negotiations authorized on 11 April 2019. Environmental Assessment Cate- g ory B. Project: P1 67047. US$ 24.0 (EFAF). Consulting services t o be determined. Ministry of Education, Science and Tech- n ology. Energy & Extractives Nepal: Private Sector-Led Mini-Grid Energy Access Project: The Project Development Objective (PDO) is to increase electricity generation capacity from renewable energy mini-grids in selected areas by mobilizing ESCOs. Approval completed on 30 January 2019. Environmental Assessment Category F. Project: P149239. US$ 2.0/5.6 (CSCC/CSCF). Consultants w ill be r equired. Alternative Energy Promotion Centre (AEPC). Environment & Natural Resources (N) Investing in Forests for Prosperity at a Time of Transformation: The project development objective (PDO) is to im prove the governance and sustainable management of forests and increase the income of forest-dependent communities in selected forest landscapes. Identification completed on 26 March 2019. US$ 17.9/6.1 (CSCC/CSCF). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Finance, Competitiveness and Innovation (R) Su stainable Tourism Enhancement of Nepal’s Protected Areas (STENPA): To establish favorable conditions t o enhance the value creation, sustainability and inclusiveness of the tourism sector at selected destinations. Concept com- pleted on 19 July 2018. Environmental Assessment Category B. Project: P1 65130. US$ 70.0 (IDA Credit). Consultants will be r equired. Ministry of Culture, Tourism and Civil Aviation; Ministry of Forest and Environment. April 2019 South Asia Region PAGE 156 Health, Nutrition & Population Nepal: Improved Delivery of Local Social Services: The Development Objective of the project is to help children reach t h eir full potential for development. This will be achieved by providing an integrated sy stem of benefits, interventions and social protection services related to health, nutrition and education to support the child and her/his family. Identification com pleted on 21 May 2018. US$ 50.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Social Protection & Labor Youth Employment Transformation Initiative: To create quality jobs and enhance labor market outcomes for youth. Con cept com pleted on 9 October 2018. Environmental Assessment Category B. Project: P160696. US$ 100.0 (IDA Credit). Con sultants will be required. Ministry of Labor, Em ployment and Social Security. Social, Urban, Rural and Resilience Global Practice NP: A dditional Financing Earthquake Housing Reconstruction: The Project Development Objective (PDO) is to r estore affected houses with multi-hazard resistant core housing units in targeted areas and to enhance the government's a bility t o improve long-term disaster resilience. A pproval completed on 1 5 December 2017. Environmental A ssessment Category B. Project: P1 63593 . US$ 300.0 (IDA Cr edit). Consultants will be required. Im plementing agency(ies) to be determined. Federalization of Earthquake Reconstruction and Disaster Risk Management: To support Government of Nepal's Housing Reconstruction Program and facilitate federalization of DRM responsibilities among all the levels of government. Identification com pleted on 29 January 2019. US$ 300.0 (IDA Credit). Consulting services to be determined. Im plementing a g ency(ies) to be determined. (R) Nepal Urban Governance and Infrastructure Project: The Project Development Objective is to expand municipal in frastructure and strengthen institutional & financial systems in participating urban local governments in Nepal. Concept com pleted on 20 November 2018. Environmental Assessment Category B. Project: P1 63418. US$ 150.0/150.0 (IDA Cr edit/AIIB). Consultants will be required. Ministry of Urban Development. (N) Second Additional Financing Earthquake Housing Reconstruction Project: The Project Development Objec- t iv e (PDO) is to restore a ffected houses with multi-hazard resistant core housing units in target areas and to enhance the g ov ernment's ability to im prove long-term disaster resilience. Identification completed on 4 March 2019. Environmental Assessment Category B. US$ 75.0 (IDA Credit). Consultants will be r equired. Im plementing agency(ies) to be determined. Transport A dditional finance to Road Sector Development Project: The Project Development Objective is for the residents of beneficiary districts to have all season road access thereby reducing travel time and improving access to economic centers and social services. Approval completed on 25 August 2016. Environmental Assessment Category B. Project: P157607. US$ 5.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. (N) Nepal Strategic Road Connectivity Improvement Program: To catalyze economic growth through improving the st rategic road network connectivity within and across the borders of Nepal. Identification completed on 28 February 2019. US$ 175.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 157 Monthly Operational Sum m ary April 2019 Pakistan Agriculture Ba l ochistan Livelihoods and Entrepreneurship Project: Promote socio-economic development by im proving access t o services for rural communities in selected districts of Balochistan. Concept completed on 3 August 2017. Environmental A ssessment Category B. Project: P159292. US$ 21.0/1 4.0/15.0 (IDA Credit/IDA Grant/PKNF). Consultants will be required. Planning and Development Department, Government of Balochistan. PK: A dditional Financing & Restructuring for FATA RLCIP: To improve livelihoods and access to basic service infra- st ructure in selected Agencies in FATA. Approval completed on 28 March 2017. Environmental Assessment Category B. Pro- ject: P154777. US$ 8.1 (PKNF). Consultants will be required. FATA Secretariat; Islamic Republic of Pakistan. Kh yber Pakhthunkhwa Irrigated-Agriculture Improvement Project: To improve the performance of irrigated agri- cu lture for farmers in the project area Concept completed on 4 June 2018. Environmental Assessment Category B. Project: P1 63474. US$ 175.0 (IDA Credit). Consultants will be required. Department of Agriculture, Government of Khyber Pukhthu- khwa. Education Ba l ochistan Education Project: T o increase school enrollment and retention in project supported schools, with a special focus on g irls; participation, and to develop m echanisms for information collection and use for improved management of education. Identification c ompleted on 4 February 2019. Environmental Assessment Category B. US$ 1 0.7 (MSC1). Consultants will be r equired. Im plementing agency(ies) to be determined. Pa kistan: Fulfilling the Youth Promise: KP Host Communities and Refugee Human Development Project: To im prove delivery of social services and increase the skills level and employability of KP youth (for both refugee and host com- m unities). Concept com pleted on 28 September 2 018. Environmental A ssessment Category B. Pr oject: P1 66309. US$ 5 8.4/41.7 (IDA Credit/IDA Grant). Consultants will be required. Government of Khyber Pakhtunkhwa, Planning and Dev el- opm ent. (R) Higher Education Development Project: To support research excellence in strategic sectors of the economy, im- pr ove teaching and learning and strengthen governance, in the higher education sector. Negotiations authorized on 28 April 2019. Environmental Assessment Category B. Project: P1 61386. US$ 400.0 (IDA Credit). Consulting services to be deter- m ined. Higher Education Commission. PK: Im proving Skills of Out of School Youth (ISOSY): The project development objective is to increase access to basic lit eracy and skills development for out-of-school youth. Identification completed on 4 February 2019. US$ 15.0/1 0.0 (IDA Cr edit/MSC1). Consulting services t o be determined. Im plementing agency(ies) to be determined. Energy & Extractives Kh yber Pakhtunkhwa Hydropower Development Project: Increase installed hydropower capacity and build institu- t ional capacity for further hydropower development in Khyber Pakhtunkhwa. Concept completed on 7 November 2017. Envi- r onmental Assessment Category A. Project: P163461. US$ 200.0 (IDA Credit). Consultants will be required. Pakhtunkhwa En ergy Development Organization. (N) El ectricity Distribution Efficiency Improvement Project: Create a financially healthy distribution sector that pr ovides cost-effective and reliable electricity services t o customers by im proving distribution companies' operational and commercial efficiencies. Identification completed on 8 April 2019. US$ 500.0 (IDA Credit). Consulting services t o be deter- m ined. Im plementing agency(ies) to be determined. A dditional Financing Dasu Hydropower Project Transmission Line & Stage II: The ov erall project development objective is to facilitate the expansion of electricity supply of hydro-power in Pakistan. The Project would also improve access April 2019 South Asia Region PAGE 158 t o socio-economic services for local communities in the project area and build WAPDA’s capacity to prepare future hydropower pr ojects. This would be achieved by installing a 2,160 MW hydropower plant on the main Indus River, which can be expanded t o 4 ,320 MW in future at very low cost. The Project is a “high -risk-high reward” operation aimed at providing low cost non - ca rbon r enewable energy. Identification completed on 1 8 September 2018. Environmental Assessment Category A. US$ 6 00.0/300.0/480.0 (IDA Credit/AIIB/ZEXP). Consultants will be required. Im plementing agency(ies) to be determined. A dditional Financing to PK: Tarbela 4th Extension Hydropower Project: The overall project development objective is t o fa cilitate a sustainable expansion in Pakistan's electricity generation capacity. The Project would also strengthen WAP- DA 's capacity to develop the country's hydropower resources. Approval completed on 20 September 2016. Environmental A ssessment Category A. Project: P1 57372. US$390.0/300.0 (IBRD/ZMUL). Consultants will be r equired. PMU T4HP, W APDA. Environment & Natural Resources T ransformation and Revitalization of the Fisheries Sector in Sindh - T RIFISH: The Development Objective is to im prove management and increase productivity and consumption of marine and inland fisheries and aquaculture in Sindh pr ovince. Concept com pleted on 1 8 February 2019. Environmental A ssessment Category A . Pr oject: P1 66887. US$ 1 5 0.0/1 0.0/10.0 (IDA Credit/GFRC/PFSH). No consultants are required. Department of Livestock and Fisheries. Finance, Competitiveness and Innovation Econ omic Revitalization of Khyber Pakhtunkhwa and Federally Administered Tribal Areas: To support the Gov ernment of Pakistan in creating sustainable employment opportunities, generating private sector investment, and laying t h e foundations for the future development of selected economic sectors in Khyber Pakhtunkhwa and Federally Administered T r ibal Areas. Approv al completed on 28 March 2017. Environmental Assessment Category B. Project: P160445. US$ 19.0 (PKNF). Consultants will be required. Economic Affairs Division; Government of Khyber Pakhtunkhwa; FATA Secretariat; Sm all and Medium Enterprise Development Authority (SMEDA). Pu njab Agribusiness Competitiveness and Transformation: The development objective is to support agriculture v alue chains and increase agriculture finance for farmers and agribusinesses in Punjab Identification com pleted on 30 July 2 018. US$ 150.0 (IDA Credit). Consulting services t o be determined. Im plementing agency(ies) to be determined. (R) Khyber Pakhtunkhwa Integrated Tourism Development Project: The project development objective is to im- pr ove tourism-enabling infrastructure, enhance tourism assets, and strengthen destination management for sustainable tour- ism development in Khyber Pakhtunkhwa. Appraisal completed on 2 April 2019. Environmental Assessment Category B. Pr oject: P163562. US$ 100.0 (IDA Credit). Consultants will be required. Communication and Works Department; Department of T ourism, Culture, Sports, Archeology & Youth Affairs. Sin dh Jobs and Competitiveness Program: Objective to be Determined. Identification completed on 31 October 2017. Env ironmental Assessment Category C. Project: P165765. US$200.0 (IBRD). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Governance Kh yber Pakhtunkhwa Revenue Mobilization and Public Resource Management: To increase the collection of Khy- ber Pakhtunkhwa's own source revenues and improve the management of public resources Negotiations authorized on 16 December 2018. Environmental Assessment Category C. Project: P1 62302. US$ 118.0 (IDA Credit). Consultants will be re- qu ired. Finance Department - Khyber Pakhtunkhwa. Pu njab Revenue Mobilization Program: The Program Development Objective is increase Punjab’s own-source revenues by broadening the tax base and strengthening revenue administration. Concept completed on 10 January 2018. Environmen- t a l Assessment Category C. Project: P166371. US$ 100.0 (IDA Credit). Consulting services to be determined. Excise, Taxation, a n d Narcotics Department; Finance Department, Government of Punjab; Punjab Board of Revenue; Punjab Revenue Author- ity . (R) Pa kistan Raises Revenue: Contribute to a sustainable increase in domestic revenue by broadening the tax base and PAGE 159 Monthly Operational Sum m ary April 2019 fa cilitating compliance Negotiations authorized on 26 April 2019. Environmental Assessment Category C. Project: P165982. US$ 400.0 (IDA Credit). No consultants are required. Federal Board of Revenue. Secon d Punjab Public Management Reform Program: The PDO is to improve public resource management of targeted departments of the Province of Punjab. Resu lts areas are expected to include the following: 1 . Automation of core business processes in the public administration 2 . Public Investment Management 3 . Performance management 4 . E-procurement and consolidated procurement Identification completed on 7 December 2016. Environmental Assessment Ca tegory C. US$ 110.0 (IDA Credit). Consulting services to be determined. Planning and Development Department, Punjab pr ovince. Su pporting Policies and Institutions for Managing Afghan Refugees in Pakistan: To support the design and im- plem entation of policy and institutional arrangements for the inclusive management of Afghan Refugees and undocumented A fghan nationals. Concept completed on 1 2 April 2018. Environmental A ssessment Category B. Pr oject: P1 65542. US$ 2 5 .0/25.0 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of States and Frontier Regions. Health, Nutrition & Population En abling Social Sectors for Growth: Sindh Human Capital Project: The Project Development Objective is to improve delivery and utilization of reproductive, maternal and child health and nutrition services, as well as early childhood, primary a n d secondary education services, for women and girls in targeted areas of Sindh Province. Concept completed on 3 October 2 018. Environmental Assessment Category B. Project: P167962. US$ 400.0 (IDA Credit). No consultants are required. De- pa rtment of School Education and Literacy, Sindh; Nutrition Support Program; Department of Population Welfare, Sindh; Department of Health, Sindh. Pa kistan: Balochistan Host Communities and Refugees Human Development Project: The proposed project aims t o im prove access to quality health and education services in selected districts and enhance employable skills for young people. Con cept completed on 28 September 2018. Environmental Assessment Category B. Project: P166308. US$ 37.9/27.1 (IDA Cr edit/IDA Grant). Consulting services to be determined. Planning and Development Department, Government of Balochi- st an. A dditional Financing to Khyber Pakhtunkhwa: Enhanced Nutrition to Mothers and Children Project: The dev elopment objective for the project is to increase the coverage, in Project areas, of interventions that are known to improve t h e nutritional status of children under two years of age, of pregnant and of lactating women. Approval completed on 22 De- cem ber 2017. Environmental Assessment Category C. Project: P161703. US$ 14.8 (PPIN). Consultants will be required. Im - plem enting agency(ies) to be determined. A dditional Financing for Pakistan National Immunization Support Project: The project development objective is t o in crease the equitable coverage of services for immunization against vaccine preventable diseases (VPD), including polio- m y elitis, for children between 0 and 23 months in Pakistan. Appraisal completed on 18 September 2018. Environmental A ssessment Category B. Project: P167312. US$ 8.1 (GAVI). No consultants are required. Federal EPI Cell, Ministry of National Health Services, Regulations and Coordination’s (MONHSRC); Benazir Income Support Program (BISP). M acroeconomics, Trade and Investment (R) Pa kistan Goes Global: An Initiative for a Global & Technology-Driven Pakistan: To enhance the effectiveness of policy reforms in trade and investment and improve firms’ access t o export markets. Concept completed on 22 April 2019. Pr oject: P170271. US$ 350.0 (IDA Credit). Consulting services t o be determined. Ministry of Commerce. April 2019 South Asia Region PAGE 160 Social Protection & Labor FATA Temporarily Displaced Persons Emergency Recovery Project: The Project Development Objective is to sup- por t the early recovery of families affected by the militancy crisis, promote child health, and strengthen em ergency response sa fety net delivery systems in the affected areas of FATA. A pproval completed on 21 September 2017. Environmental A ssessment Category B. Project: P1 60941. US$ 1 14.0 (IDA Cr edit). Consultants will be required. Economic Affairs Division; National Database & Registration Authority. Pa kistan: Khyber Pakhtunkhwa (KP) and Federally Administered Tribal Areas (FATA) Emergency Recovery Pr oject: The objective is t o a ssist the Gov ernment of Pakistan/KP/FATA restore social protection through income transfers a n d cash for work opportunities t o the most affected households and vulnerable groups in the areas affected by military oper- a t ion against militants and floods. Approval completed on 20 January 2011. Environmental Assessment Category C. Project: P1 21394. US$ 250.0/35.0 (IDA Credit/PKNF). Consulting services to be determined. Provincial Relief Rehabilitation and Set- t lement Authority (PaRRSA) Tel: (92-91) 921-3855, E-m ail: shakeelqadir@pdma.gov.pk, Contact: Shakee Qadir Khan, Direc- t or General. (R) Pu njab Human Capital Investment Project: The Project Development Objective (PDO) is to increase access to hu- m an capital investment for poor and vulnerable populations. Concept completed on 3 October 2018. Environmental Assess- m ent Category B. Project: P1 64785. US$ 200.0 (IDA Credit). Consulting services to be determined. Punjab Social Protection A uthority. Citizen-Centered Service Delivery Program: To advance citizen-centered service delivery through establishment of Cit- izen Facilitation Centers (CFC) across the Merged Areas (formerly FATA) to promote child health, strengthen service delivery sy stems and improve state-citizen relationship. Identification completed on 27 September 2018. Environmental Assessment Ca tegory B. Project: P1 69107. US$ 15.0 (PKNF). Consultants will be required. Im plementing agency(ies) t o be determined. Social, Urban, Rural and Resilience Global Practice Kh yber Pakhtunkhwa Cities and Digital Transformation Project: Create the enabling environment for digital trans- form ation and improve livability in project areas, by improving city infrastructure, access to high-speed internet, and manage- m ent of cities. Concept completed on 2 October 2018. Environmental Assessment Category B. Project: P167230. US$ 150.0 (IDA Credit). Con sulting services to be determined. Khyber Pakhtunkhwa In formation Technology Board; Urban Policy Unit P&D Depart- m ent Government of Khyber Pakhtunkhwa; Local Government, Elections and Rural Development Department. Pa kistan CASA 1000 Community Support Program: The proposed Project Development Objective is to provide access t o electricity or other social and economic infrastructure services to communities in the project area in order to strengthen community support for CASA-1 000 transmission line. Concept completed on 13 February 2015. Environmental Assessment Ca tegory B. Project: P1 51075. US$ 2.0/1 3.0 (CASA/PKNF). Consultants will be required. Economic Affairs Division, Contact: Sy ed Zahid Aziz, Managing Director; National Transmission and Dispatch Company (NTDC), Contact: Muhammad Arshad Chaudhry, Managing Director. Pa kistan Hydromet and DRM Services Project (PHDSP): To strengthen Pakistan’s public sector delivery of reliable a n d timely hydro-meteorological and disaster risk management services. Approval completed on 25 May 2018. Environmental A ssessment Category B. Project: P163924. US$ 188.0 (IDA Credit). Consultants will be required. Pakistan Meteorological De- pa rtment; National Disaster Management Authority. Com petitive and Livable City of Karachi Project: T o enhance institutional performance and management capacity of t h e Karachi Metropolitan Corporation and District Municipal Corporations; and improve provision of m unicipal infrastructure in Karachi. Concept completed on 25 May 2018. Environmental Assessment Category A. Project: P161402. US$230.0 (IBRD). Con sulting services to be determined. Local Government Department, Government of Sindh; Excise & Taxation Department, Gov ernment of Sindh; Investment Department, Government of Sindh; Sindh Solid Waste Management Board. PAGE 161 Monthly Operational Sum m ary April 2019 Transport (R) Ka rachi Urban Mobility Project: The Project Development Objective is t o improve mobility, accessibility and safety a long selected corridors in Karachi. Concept completed on 13 March 2019. Environmental Assessment Category B. Project: P1 66732. US$404.5 (IBRD). Consultants will be required. Sindh Mass Transit Authority. Kh yber Pass Economic Corridor Project: The PDO is to expand economic activity between Pakistan and Afghanistan by im proving regional connectivity and promoting private sector development along the Khyber Pass corridor. Approval com- pleted on 14 June 2018. Environmental Assessment Category A. Project: P1 59577. US$ 460.6 (IDA Credit). Consultants will be r equired. National Highways Authority (NHA). Water PK A dditional Financing for Sindh Water Sector Improvement Phase 1: To improve Ghotki and Fulili canals. Ap- pr oval completed on 16 December 2014. Environmental Assessment Category A. Project: P1 31325. US$ 138.0 (IDA Credit). Con sulting services to be determined. Sindh Irrigation and Drainage Authority (SIDA) Tel: (92-301) 837-8787, E-m ail: zahi- djunejo@hotmail.com, Contact: Junejo Zahid Hussain Wa ter Sector Capacity Building and Advisory Services: The project objective is to improve the management and in- v estment planning of water resources in the Indus River Basin. Approval completed on 21 December 2015. Environmental A ssessment Category B. Project: P1 55226. US$ 35.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. (R) Ka rachi Water and Sewerage Services Improvement Project (KWSSIP): The Project’s Development objectives a r e to: (i) raise KWSB’s operational capacity to deliver t o all of its customers safe and reliable water service on a sustain able a n d predictable basis; (ii) restore KWSB’s operations to financial stability; and (iii) esta blish an enabling environment for fu ture private sector investments in water supply and wastewater treatment. Concept completed on 9 April 2019. Environ- m ental Assessment Category A. Project: P164704. US$40.0/40.0 (IBRD/AIIB). Consulting services to be determined. Karachi W ater and Sewerage Board; Government of Sindh - Planning and Development Department. Sin dh Water and Agriculture Climate Resilience Project: The development objective of the project is to transform w ater management and agriculture production toward more efficiency and climate resilience in Sindh province. Concept com- pleted on 2 8 September 2 018. Env ironmental A ssessment Category A . Pr oject: P1 67596. US$ 35 0.0/1 00.0 (IDA Cr edit/MSC1). Consulting services t o be determined. Im plementing agency(ies) to be determined. Pu njab Rural Sustainable Water Supply and Sanitation Project: To provide safe, sustainable and continuous water su pply for drinking and sanitation in select districts of rural Punjab. T h e proposed Project’s objectives are to improve the service standards of the rural water and sanitation systems by: 1 . Reform led improvement through governance and institutional improvements associated with technical assistance through st udies/assessments 2 . Infrastructure development and improvement to enable 24x7, metered, affordable and safe drinking water at household lev el 3 . Infrastructure development for improvement of safe and healthy sanitation 4 . Capacity development to improve the rural water supply and sanitation management by introducing responsibility, account- a bility and transparency at the community level and for the public sector. Concept com pleted on 3 October 2018. Environ- m ental Assessment Category B. Project: P1 69071. US$ 1 00.0 (IDA Cr edit). No consultants are required. Public Health Engi- n eering Department. Sin dh Barrages Improvement Project AF: The PDO will be revised to strengthen the Sindh Irrigation Department’s ca pacity to operate and manage barrages and improve the reliability and safety of Guddu and Sukkur Barrages in the Province of Sindh. Approval completed on 25 May 2018. Environmental Assessment Category A. Project: P162117. US$ 140.0 (IDA Cr edit). Consulting services to be determined. Sindh Irrigation Department; Irrigation Department, Government of Sindh. April 2019 South Asia Region PAGE 162 Sri Lanka Education Sr i Lanka: Additional Financing for the Early Childhood Development Project: The project development objective is t o enhance equitable access t o and improve the quality of ECD services. Identification completed on 25 September 2018. Environmental Assessment Category B. US$ 50.0 (IDA Credit). Consultants w ill be required. Im plementing agency(ies) to be determined. Environment & Natural Resources Ecosystem Conservation and Management Project - A dditional Financing: The project development objective (PDO) is to improve the management of ecosystems in selected locations in Sri Lanka for conservation and community bene- fit s. Identification com pleted on 18 September 2018. Environmental Assessment Category B. US$22.6 (FSSA). No consultants a r e required. Im plementing agency(ies) to be determined. Finance, Competitiveness and Innovation Sr i Lanka Sustainable Tourism Development Project: The PDO is to support the creation of conditions for increased pr ivate investment and sustained growth in Sri Lanka's t ourism sector. Concept completed on 5 June 2018. Environmental A ssessment Category A. Project: P1 67055. US$75.0 (IBRD). Consulting services to be determined. Sri Lanka Tourism Devel- opm ent Authority. Governance Sr i Lanka Public Sector Efficiency Strengthening Project: To contribute to improve transparency and the efficiency of pu blic programs and selected services Concept completed on 1 November 2017. Environmental Assessment Category C. Pr oject: P162949. US$25.0/6.0 (IBRD/ECEU). No consultants are required. Ministry of Finance and Media. M acroeconomics, Trade and Investment Sr i Lanka Enhancing Fiscal Response Capacity to Natural Disasters: The project development objective is to en- h ance the financial and t echnical capacity of GoSL to increase the resilience of the budget to natural disasters by limiting contingent liabilities, so as to smooth fiscal expenditure and improve access to rapid response financing and disbursements t o beneficiaries in response to disasters. Identification completed on 10 April 2018. US$120.0 (IBRD). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Social Protection & Labor El der Care Improvement Project: The Project Dev elopment Objective is t o increase the availability and scope of quality ca re and support services for the elderly in Sri Lanka, for the benefit of elderly Sri Lankans and their families. Concept com- pleted on 28 September 2018. Environmental Assessment Category B. Project: P1 68696. US$100.0 (IBRD). Consultants will be r equired. Ministry of Social Welfare and Primary Industries. Social, Urban, Rural and Resilience Global Practice (R) Cl imate Resilience Multi-Phase Programmatic Approach: The Project Development Objective of the first phase is t o enhance the capacity of the Government to deliver improved weather and climate forecasting and early warning; and to r educe flood risks in the lower Kelani basin (Hanwella to Kaduwela). Negotiations authorized on 7 April 2019. Environmental A ssessment Category A. Project: P1 60005. US$310.0 (IBRD). Consultants will be required. Ministry of Agriculture, Rural Econ omic Affairs, Livestock Development, Fisheries, Aquatic Resources; Ministry of Public Administration and Disaster Man- a g ement. PAGE 163 Monthly Operational Sum m ary April 2019 St rategic Cities Development Pr oject - A dditional Financing: Im prove selected urban services and public urban spa ces in the Participating City Regions of Sri Lanka. Approval completed on 27 May 2016. Environmental Assessment Cate- g ory A. Project: P1 57427. US$ 55.0 (IDA Credit). Consultants will be required. Im plementing agency(ies) to be determined. (R) Loca l Development Su pport Project: T o strengthen local government authorities' capabilities to deliver services to communities in a responsive and accountable manner, and to support economic infrastructure development in participating pr ovinces. Approval completed on 14 March 2019. Environmental Assessment Category B. Project: P163305. US$ 70.0/23.7 (IDA Credit/ECEU). Consultants will be required. Ministry of Internal and Home Affairs and Provincial Councils and Local Gov ernment. Cl imate Resilience Improvement Project Additional Financing: The Project Development Objective (PDO) is to re- du ce the vulnerability of exposed people and assets to climate risk and to improve Government’s capacity to respond effec- t iv ely to disasters. Approval completed on 21 March 2016. Environmental Assessment Category B. Project: P157392. US$ 42.0 (IDA Credit). No consultants are required. Ministry of Finance, Contact: R. H. S. Samaratunga, Dr. North East Local Services Improvement Project - Additional Financing: The primary development objective of the pr oject is to improve the delivery of local infrastructure services by local authorities in the Northern and Eastern Provinces of Sr i Lanka in an accountable and responsive manner. Approval com pleted on 26 August 2015. Environmental Assessment Ca tegory B. Project: P1 52623. US$ 20.0 (IDA Credit). No consultants are required. Im plementing agency(ies) t o be deter- m ined. Transport Sr i Lanka Western Pr ovince Ur ban Transport Efficiency Pr oject: T o improve t ransport mobility, accessibility, sa fety, and the quality of public transport service in the Western Province through enhanced urban transport infrastructure a n d service provision. Identification completed on 28 August 2018. Environmental Assessment Category B. US$200.0/40.0 (IBRD/MCC). Consulting services to be determined. Im plementing agency(ies) to be determined. Water Ur ban Sanitation and Wastewater Project: To extend district-wide inclusive water supply and sanitation in selected a r eas, support new financing mechanisms, and related policy and institutions for service delivery Identification completed on 27 September 2018. US$130.0 (IBRD). Consulting services t o be determined. Im plementing agency(ies) to be determined. LK: A F Dam Safety WRP - Addl Fin.: The Government of Sri Lanka has requested Additional Financing (AF) to: (i) cover cost overruns t o complete the original project scope as described in the PA D for P093132; and (ii) scale-up successful project a ctivities and rehabilitate and modernize additional dams, including some dams in the East and North-east of the country that cou ld not be part of the project area under the original project. The m ain component under the AF will be the original com- pon ent 1 - Dam Safety and Operational Efficiency Im provement, that may include some rehabilitation works on linked irriga- t ion conveyance systems. Limited activities will be included under the original component 2 - Hydro-meteorological Infor- m ation System Im provement and Component 3 - Multi-sectoral Water Resources Planning. Component 4 - Project Manage- m ent and Monitoring and Ev aluation will continue under the AF. The AF complies with the relevant provisions of OP/1 3.20 w hich stipulates that the Bank provides AF when it is satisfied that: (i) implementation of the project, including substantia l com pliance with legal covenants, is satisfactory; and (ii) the additional financing is economically justified. Approval completed on 5 May 2014. Environmental Assessment Category B. Project: P1 48595. US$ 83.0 (IDA Credit). Consulting services to be det ermined. Ministry of Irrigation and Water Resources Management Tel: (94-1 1) 267-5315, E-m ail: pddswrpp@sltnet.lk, Contact: Chandanie Wijayawardene, Director General. Sr i Lanka Integrated Watershed and Water Resources Management Project: The development objective of the pr oject is t o im prove water resources planning, development, and management in Sri Lanka. Concept completed on 30 Sep- t em ber 2018. Environmental Assessment Category A. Project: P1 66865. US$170.0 (IBRD). Consultants will be required. Min- ist ry of Mahaweli Development and Environment. April 2019 South Asia Region PAGE 164 Regional Energy & Extractives (R) A dditional Financing for the Central Asia South Asia Electricity Transmission and Trade Project: The objective of the project is t o create the conditions for sustainable electricity trade between the Central Asian countries of Ta- jikistan and Kyrgyz Republic and the South Asian countries of Afghanistan and Pakistan. Negotiations authorized on 12 April 2019. Environmental Assessment Category A. Project: P1 67898. US$ 65.0 (IDA Credit). Consultants will be required. Da Af- g hanistan Breshna Sherkat; National Electric Grid of Kyrgyzstan; Barki Tajik; National Transmission and Dispatch Company (NT DC). Central Asia South Asia Electricity Transmission and Trade Guarantees: The objective of the project is to create t h e conditions for sustainable electricity trade between the Central Asian countries of Tajikistan and Kyrgyz Republic and the South Asian countries of Afghanistan and Pakistan. Concept completed on 14 February 2019. Project: P1 69978. US$ 80.0 (IDA Credit). Consulting services to be determined. Im plementing agency(ies) to be determined. PAGE 165 Monthly Operational Sum m ary April 2019 Guarantee Operations Africa Angola Water, Sanitation and Waste M anagement Lu anda Bita Water Supply Project Guarantee: The Project Dev elopment Objective (PDO) is to improve access to potable water service in selected areas of Luanda by mobilizing commercial financing for the Government of Angola. The Project Dev elopment Ob- jective is to im prove access to potable water service in selected areas of Luanda. T he Project is to be supported through an IBRD guarantee currently estimated at US$150m, tentatively complemented by a MIGA g uarantee. Identification com pleted on 30 March 2017. Environmental Assessment Category B. US$ 500.0 (GUAR). Consulting services t o be determined. Em preza Publica de Aguas de Luanda, E.P. (EPAL); Ministry of Energy and Water. Cameroon Energy and Extractives ENEO Liquidity and Performance Incentivization Guarantee: The Project Development Objective is to enhance ENEO's ability t o im prove the quality of electricity supply, by providing access to cost-effective financing for a CAPEX program and incentivizing ENEO t o m eet its performance requirements. Concept completed on 11 December 2018. Project: P1 69915. US$ 75.0 (GUAR). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. Cote d'Ivoire Energy and Extractives Cot e d'Ivoire: CI-ENERGIES Guarantee Project: The proposed development objective is to improve the electricity sectors fina n cial performance by refinancing the short-term liabilities of CI-ENERGIES. Approval completed on 29 June 2018. Environmental A ssessment Category B. Project: P164145. US$ 280.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be det ermined. Ethiopia Energy and Extractives Ren ewable Energy Guarantees Program: Objective t o be Determined. Appraisal completed on 24 May 2017. Environmental A ssessment Category B. Pr oject: P1 62607. US$ 10.0/800.0 (GUID/ZPCO). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. April 2019 Guarantee Operations PAGE 166 Kenya Energy and Extractives Ken Gen Guarantee Program: The proposed project development objective is to enhance KenGen's ability to attract long-term pri- v ate capital for the sustainable development of renewable energy. Approval completed on 26 April 2018. Environmental Assessm ent Ca tegory C. Project: P1 62422. US$ 1 80.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Transportation Lon g-term Finance for PPP/ Nairobi-Nakuru Toll Road Guarantee: Crowd in long term local currency financing into PPP In frastructure projects Concept completed on 8 February 2018. Project: P1 65545. US$ 80.0 (GUID). Consulting services t o be deter- m ined. Im plementing agency(ies) to be determined. Liberia Transportation Liberia South Eastern Corridor Road Asset Management Guarantee Project: The Project Development Objectives (PDOs) a r e to support the Recipient's effort to reduce m otorized v ehicles' travel time along the selected sections of South Eastern Ganta-Zwedru- Harper corridor and to improve institutional arrangements and capacity in the road sector. Approval completed on 18 December 2018. US$ 48.0 (GUID). Consulting services to b e determined. Im plementing agency(ies) to be determined. Madagascar Energy and Extractives MG - Sca ling Solar Guarantee Project: The project development objective is t o increase solar electricity generation capacity and div ersify electricity generation resources in Ma dagascar. Identification completed on 27 February 2018. US$ 2.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Malawi Water, Sanitation and Waste M anagement Lil ongwe Bulk Water Supply Guarantee: To increase access to improved water services and safely managed sanitation services in Lilongwe City Concept completed on 22 October 2018. Environmental Assessment Category B. Project: P1 67859. US$ 8.4 (GUID). Con sulting services to be determined. Im plementing agency(ies) to be determined. Mali Energy and Extractives FCS RE Segou Solaire Mali Project: The Project Development Objective is to promote the introduction of grid-connect ed renew- a ble energy in Mali through an IPP Approval completed on 8 June 2017. US$ 8.2/6.2 (AFDB/GUID). Consulting services to be det er- m ined. Im plementing agency(ies) to be determined. Energy and Extractives Ba n da Gas to Power Guarantee: The Gas To Power Projectwill use natural gas discovered offshore of Mauritania for a power station PAGE 167 Monthly Operational Sum m ary April 2019 t o be built near Nouakchott. The power will be sold t o SOMELEC in Mauritania, SENELEC in Senegal and EDM in Mali using the ex isting OMVS regional grid. A PRG is required to guarantee gas payments to the producer Tullow Oil estimated at $104m. Government of Ma li needs to provide a counter-guarantee to cover the proportion of the energy that will be exported to EDM estimated at $17m (equivalent to IDA allocation of $4.25m given 1:4 leverage for IDA PRGs). Approval completed on 29 May 2014. Environmental A ssess- m ent Category A. Project: P1 45664. US$ 32.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be deter- m ined. Mauritania Energy and Extractives MR-Ba nda Gas to Power Guarantee: The gas to power project will use natural gas discovered offshore for a power station to be bu ilt near Nouackchott. The power will be sold to SOMELEC in Mauritania, Senelec in Senegal and EDM in Mali using the existing OMV S regional grid Approval completed on 29 May 2014. Environmental Assessment Category A. Project: P107940. US$130.0 (GUID). Con sultants will be required. Ministry of Energy Tel: (222-46) 431-537, E-m ail: kane@acces.mr, kane@hydraulique.gov.mr, Contact: Ma m adou Amadou Kane, Directeur General de l'Electricite. Nigeria Energy and Extractives Nigeria Electricity and Gas Improvement Project Additional Financing: Additional financing t o the Nigeria Electricity and g a s improvement project t o cover additional PRGs for Gas supply to government owned power plants, in particular the Sapele, O lo- r unsogo and Alaoji plants held by the NIGER DELTA POWER HOLDING COMPANY. The NDPHC is scheduled to commission power g eneration units in three of the NIPP plants at Sapele, Olorunsogo and Alaoji. The units to be commissioned will have a combined in itial g eneration capacity of 575 MW. The 3 plants will have a final generation capacity of 1,974 MW upon completion. These plants u rgently r equire executed Gas Sales Supply Agreements (GSAs) with prospective gas suppliers and IOCs who have emphasized the need for a payment guarantees t o enter into long t erm supply agreements for the fuel deliveries. In accordance with World Bank PRG g uidelines, t h e Federal Ministry of Finance on behalf of the Federal Government of Nigeria is required to nominate parties with whom the World Ba nk Gan enter into negotiations on PRGs. Therefore, I am writing to request that the World Bank extends the coverage of NEGIP to in clude NDPHC's NIPP plants and to nominate the NDPHC as a party with whom the World Bank can enter into formal negotiations on t he potential provision of PRGs for the individual projects. Approval completed on 19 June 2012. Environmental Assessment Cate- g ory B. Project: P1 26190. US$ 200.0 (GUID). Consulting services to be determined. Power Holding Company of Nigeria Tel: (234-9) 4 13-6684, E-mail: maganiyu@nepapmu.org, Contact: Mansuru A. Ganiyu, Project Manager. Sierra Leone Energy and Extractives SL_Bumbuna II Hy dropower Project: The project development objective is t o provide a ffordable clean energy and mobilize pri- v ate and development finance Identification completed on 5 April 2018. US$ 120.0/80.0 (IDA Credit/GUID). Consulting services to be det ermined. Im plementing agency(ies) t o be determined. Uganda Energy and Extractives IDA Guarantee for Renewable Energy Development Program: The project will provide for amongst others counterpart risk g uarantee to cover the payment risk from Uganda Electricity Transmission Company Approval completed on 18 March 2014. Environ- m ental Assessment Category B. Project: P1 33318. US$ 1 60.0 (GUID). Consultants will be required. Ministry of Energy and Mineral Dev elopment Tel: (256-41) 434-9342, E-m ail: info@energy.go.ug, Contact: Hon. Irene Muloni, Minister. April 2019 Guarantee Operations PAGE 168 Zambia ZM-Guarantee for Scaling Solar (Round 2): T o increase solar electricity generation capacity and diversify electricity generation r esources in Zambia. Identification completed on 3 October 2017. Environmental Assessment Category B. US$ 15.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Zambia Power Sector Financial Recovery Guarantee Project: The Project development objective (PDO) is to enhance Zambia pow er sector financial and operational viability. Identification completed on 24 April 2018. US$ 300.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be determined. Energy and Extractives Secon d Scaling Solar Guarantee: To increase solar electricity generation capacity and diversify electricity generation resources in Zam bia. Approval completed on 20 December 2017. Environmental Assessment Category B. Consulting services to be determined. Im plementing agency(ies) to be determined. Regional Energy and Extractives (N) T emane Regional El ectricity Project: The Project Development Objectives is t o enhance transmission capacity for dom estic a n d regional markets and increase electricity generation capacity through private sector participation. Concept completed on 18 April 2 019. Project: P1 70397. US$ 270.0/30.0/1 20.0 (IDA Grant/FSCO/GUID). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. East Asia And Pacific Vietnam Energy and Extractives V ietnam Scaling Up Energy Efficiency Guarantee: The Project Development Objective is to improve energy efficiency in Vi- et nam’s industrial sector through the mobilization of commercial financing. The project would thereby contribute to achieving the gov- er nment’s energy efficiency and GHG r eduction objectives. Concept completed on 31 August 2017. Project: P1 64909. US$ 11.3 (GCF) . Con sulting services to be determined. Im plementing agency(ies) to be determined. PAGE 169 Monthly Operational Sum m ary April 2019 Europe And Central Asia Armenia Energy and Extractives Ut ility Scale Solar Power Project: Objective to be Determined. Appraisal com pleted on 16 November 2017. Environmental Assess- m ent Category B. Project: P155662. US$4.0 (GUAR). Consulting services to be determined. Im plementing agency(ies) to be determined. Croatia Transportation Modernization and Restructuring of the Road Sector: Objective to be Determined. Approval completed on 28 April 2017. En- v ironmental Assessment Category B. US$23.3/265.0/370.7/424.3 (IBRD/EBRD/GUAR/ZPCO). Consulting services to be determined. Im plementing agency(ies) to be determined. Georgia Energy and Extractives En ergy Supply Reliability and Financial Recovery Guarantee: The project development objective is to increase electricity sup- ply reliability and improve the financial viability of the electricity transmission company. Concept completed on 1 4 February 2019. Pr oject: P170552. US$60.0/5 0.0 (IBRD/GUAR). Consulting services to be determined. Im plementing agency(ies) to be determined. Montenegro Public Administration Mon tenegro Second Fiscal and Financial Sector Resilience PBG: The objective is to provide support to Montenegro in order t o r estore fiscal stability and ensure financial sector resilience to shocks. Concept completed on 22 May 2018. Project: P1 67665. US$ 7 0.0 (GUAR). Consulting services to be determined. Im plementing agency(ies) to be determined. Ukraine Energy and Extractives (N) Municipal Energy Efficiency Guarantee Facility: Scale up commercial financing in municipal energy efficiency investments Con cept completed on 8 April 2019. Project: P170871. US$ 200.0/3.0 (GUAR/SECO). Consulting services to be determined. Im ple- m enting agency(ies) to be determined. Uzbekistan Energy and Extractives (N) Pr ivate Sector Power Generation Support Project: The development objective is to increase electricity generation capacity t hrough private investment in the energy sector. Concept completed on 11 March 2019. Project: P170598. US$ 15.0 (GUID). Consulting April 2019 Guarantee Operations PAGE 170 services to be determined. Im plementing agency(ies) to be determined. Latin America And Caribbean Argentina Energy and Extractives Ren ewable Fund Guarantee: Support the development of r enewable energy in Argentina through private sector investments. Ap- pr oval completed on 15 March 2018. Project: P1 65085. US$ 250.0 (GUAR). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Colombia Energy and Extractives CT F Clean Energy Development Project: The Project Development Objective is t o assist Colombia in increasing electricity y gen- er ation capacity from non-conventional renewable energy sources and energy savings in the industrial sector, through mobilization of pr ivate investment. Approval completed on 16 July 2018. Environmental Assessment Category F. Project: P1 61713. US$ 41.0 (GUAR). Con sulting services to be determined. Im plementing agency(ies) to be determined. Peru Mobilizing Private Long-Term Finance for Infrastructure and Water Security for Lima: Support the Government of Peru in leveraging private sector long-term financing for infrastructure under a fiscally sustainable model through the design and provision of partial project based guarantees Identification completed on 15 September 2017. Environmental Assessment Category A. US$ 200.0 (GUAR). Consulting services t o be determined. Im plementing agency(ies) to be determined. South Asia Afghanistan Ka jaki Hydroelectric Dam Addition: The development objective (DO) is to increase the supply of domestically generated hydroe- lectricity at the Kajaki Hydroelectric Plant (KHP). Identification completed on 6 September 2017. US$ 15.0 (GUID). Consulting services t o be determined. Im plementing agency(ies) to be determined. Sh eberghan Gas to Power Project: The Development Objective is (i) to increase the amount of reliable electricity generated in A fghanistan and (ii) to build a track record for the country in developing and implementing PPP transactions. Concept complet ed on 29 October 2018. Environmental Assessment Category B. Project: P1 66405. US$ 1 2.8 (GUID). Consulting services to be determined. Im - plem enting agency(ies) to be determined. PAGE 171 Monthly Operational Sum m ary April 2019 Energy and Extractives (N) Scaling-up Solar in Afghanistan Guarantee: The project development objective is to increase solar generation in Afghanistan. Identification completed on 28 March 2019. US$ 100.0 (GUID). Consulting services to be determined. Im plementing agency(ies) to be det ermined. Energy and Extractives Ma zar-e-Sharif Gas-to-Power Project: Objective to be Determined. Identification completed on 28 October 2015. Environmental A ssessment Category A . Project: P1 57827. US$ 25.0/45.0 (GUID/ZPCI). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. India Energy and Extractives In dia Energy Efficiency Scale-Up Program Guarantee: The PDO is to enhance EESL’s financial and institutional capacity and t o scale up energy savings in residential and public sectors A pproval com pleted on 17 May 2018. Project: P1 65488. US$ 80.0 (GUAR). Consulting services t o be determined. Im plementing a g ency(ies) to be determined. Regional Energy and Extractives Central Asia South Asia Electricity Transmission and Trade Guarantees: The objective of the project is to create the condi- t ions for sustainable electricity trade between the Central Asian countries of Tajikistan and Kyrgyz Republic and the South Asian coun- t r ies of Afghanistan and Pakistan. Concept completed on 14 February 2 019. Project: P1 69978. US$ 80.0 (IDA Credit). Consulting ser- v ices to be determined. Im plementing agency(ies) to be determined. April 2019 Board Annex DPFs PAGE 172 Board Annex: Listing of DPFs Country Name Pr oject Pr oject Description DecMeeting T otal Definition Am ount T onga P1 5 9263 T onga Third Inclusive Growth Development Policy Operation 03/1 3/2019 5 .50 Guatemala P1 5 9710 Guatemala DRM Development Policy Loan with CAT DDO II 02/1 2/2019 2 00.00 V ietnam P1 60480 Ho Chi Minh City Development Policy Operation 1 09/20/2017 1 25.00 A lbania P1 60594 A lbania Gender Equality in Access to Economic Opportunities DPF 6 6.28 Ca bo Verde P1 60628 Ca bo Verde Disaster Risk Management Dev elopment Policy Credit 1 0/24/2018 1 0.00 a n d Loan with Cat DDO V ietnam P1 60818 Climate Change and Green Growth DPF 2 9 0.00 Bosn ia a nd Her- P1 61190 Bosn ia and Herzegovina Fiscal DPL 5 0.00 zeg ovina Chad P1 62548 FISCAL CONSOLIDATION SUPPORT GRANT 1 1 /1 8/2016 8 0 .00 Colom bia P1 62858 Second Fiscal Sustainability, Competitiveness, and Migration DPF 1 2/03/2018 7 5 0.00 Ma ldives P1 63939 Ma ldives- DRM Dev . Policy Financing with Catastrophe Deferred 1 0.00 Dr awdown Option and Pandemic Em ergency Financing Facility Ma ldives P1 63966 Ma ldives First Fiscal Sustainability and Budget Credibility Develop- 2 0.00 m ent Policy Financing Operation Ma lawi P1 64122 Ma lawi Second Agricultural Support and Fiscal Management DPO 05 /1 6/2018 8 0 .00 Ug anda P1 64178 Ug anda Growth and Fiscal Reform Development Policy Operation 1 00.00 Sa o T om e and P1 64321 T HIRD STRENGTHENING GROWTH AND FISCAL POLICY DE- 5 .00 Pr incipe V ELOPMENT POLICY FINANCING Gambia, The P1 64545 Gambia Fiscal Ma nagement a nd State-Owned En terprise Perfor- 4 0.00 m ance First DPO La o People's P1 64573 Disa ster Risk Management Development Policy Operation with a CAT 4 0.00 Dem ocratic Re- DDO pu blic Serbia P1 64575 Pu blic Sector Efficiency and Growth DPL 2 00.00 Br a zil P1 64588 Ma t o Grosso Fiscal Adjustment and Environmental Sustainability 02/27/2019 2 5 0.00 DPL Ma lawi P1 65056 MA LAWI-Disaster Risk Management Development Policy Financing 7 0.00 w ith Cat DDO St . Vincent and P1 65220 Fir st Fiscal Reform and Resilience Development Policy Credit 03/07/2019 3 0.00 t h e Grenadines Ca bo Verde P1 65631 Ca bo Verde DPO 1 0/24/2018 4 0.00 Congo, Republic P1 65815 Congo Fiscal management, economic and social resilience DPF 1 00.00 of Bu rkina Faso P1 66298 Fir st Fiscal Management, Sustainable Growth and Health Service De- 02/22/2019 1 00.00 liv ery Development Policy Operation Gu inea P1 66322 Gu inea First Rural Development and Energy Reform DPO 1 00.00 T urkey P1 66336 DPL Equ ity and Social Inclusion 4 00.00 A ngola P1 66564 A ngola Growth and Inclusion DPF 04/01/2019 5 00.00 Cam eroon P1 66694 Second Fiscal Consolidation and Inclusive Growth DPO 01 /25/2019 1 00.00 Ma dagascar P1 66752 Fiscal Sustainability and Energy Development Policy Operation 0 3/01/2019 1 00.00 Nepal P1 66788 Nepal DRM Development Policy Credit with CAT DDO 1 00.00 La o People's P1 66839 La o PDR Green Resilient Growth DPO 2 03/26/2019 4 0.00 Dem ocratic Re- pu blic In donesia P1 67297 In donesia Fiscal Reform DPL 3 03/04/2019 1 ,000.00 Guyana P1 67320 Second Programmatic Financial and Fiscal Stability Development Pol- 2 5 .00 icy Credit Ma uritania P1 67348 Ma uritania First Competition and Skills DPO 04/24/2019 5 0.00 PAGE 173 Monthly Operational Sum m ary April 2019 Solom on Islands P1 67465 Solom on Islands Development Policy Operation 1 0.00 Mon golia P1 67485 Second Economic Management Support Operation 4 0.00 Ma li P1 67547 Ma li Energy and Decentralization DPL 1 00.00 Ghana P1 67654 Ghana DPO - 1st in Series (FY19) 5 00.00 Mex ico P1 67674 Mex ico Financial Inclusion DPF 04/05/2019 5 00.00 Gr enada P1 67748 Gr enada Second Fiscal Resilience and Blue Growth Development Pol- 1 5 .00 icy Credit Ma dagascar P1 67941 Disa ster Risk Management Development Policy Operation (DPO) with 6 1 .70 a Catastrophe Deferred Drawdown Option (CAT DDO) Central African P1 68035 Fir st Consolidation and Social Inclusion Development Program 03/1 9/2019 1 00.00 Republic Jor dan P1 68130 Jor dan Second Equitable Growth & Job Creation Programmatic De- 1 ,450.00 v elopment Policy Financing Papua New P1 68148 Pa pua New Guinea - Second Economic and Fiscal Resilience DPO 6 9.90 Gu inea Bh utan P1 68166 St rengthening Fiscal Management and Pr ivate Sector Em ployment 3 0.00 Opportunities My anmar P1 68182 Disa ster Risk Management Development Policy Operation with a CAT 1 00.00 DDO Kenya P1 68204 In clusive Growth a nd Fiscal Ma nagement Dev elopment Policy Fi- 03/21/2019 7 5 0.00 n ancing Liberia P1 68218 Liberia First Inclusive Growth Development Policy Operation 4 0.00 Uzbekistan P1 68280 Su staining Market Reforms in Uzbekistan Development Policy Oper- 04/08/2019 5 00.00 a t ion Cam eroon P1 68332 T h ird Fiscal Consolidation and Inclusive Growth DPO 1 00.00 Ga bon P1 68333 Ga bon DPF New Series 2 00.00 Sa o T om e and P1 68335 ST P DPO New Series 5 .00 Pr incipe A ngola P1 68336 Second Angola Development Policy Operation 2 5 0.00 Congo, Republic P1 68337 Congo Second Fiscal m anagement, economic and social resilience 2 00.00 of DPF Pa nama P1 68338 Fou rth Programmatic Shared Prosperity Development Policy Financ- 1 00.00 in g Fiji P1 68402 Fiji - Second Fiscal Sustainability and Climate Resilience DPO 5 6.00 A fghanistan P1 68446 2 019 Incentive Program Development Policy Operation 4 00.00 Er itrea P1 68571 Er itrea Reengagement and Reform Support Development Policy Op- 1 00.00 er ation Mor occo P1 68580 Mor occo Disaster Risk Management Development Policy Loan with a 03/21/2019 27 5.00 Ca tastrophe Deferred Drawdown Option Chad P1 68606 Chad Second Programmatic Economic Recovery and Resilience Grant 1 00.00 Ben in P1 68668 Ben in first operation in inclusive growth DPO series 1 00.00 Ma dagascar P1 68697 In v esting in Human Capital DPO 5 0.00 Lesotho P1 68701 Lesotho Fiscal Sustainability Program DPO 1 5 .00 A rgentina P1 68713 Second Inclusive Growth Programmatic DPF 04/24/2019 5 00.00 Ba ngladesh P1 68724 Ba ngladesh Second Programmatic Jobs Development Policy Credit 2 5 0.00 V anuatu P1 68749 V anuatu Disaster Risk Management Development Policy Grant with a 1 0.00 Ca tastrophe-Deferred Drawdown Option (CAT-DDO) Nepal P1 68869 Pr ogrammatic Fiscal and Public Financial Management Development 0 4 /11/2019 1 00.00 Policy Credit ( II ) Ben in P1 68987 Ben in Disaster Risk Management Development Policy Credit with Cat 3 0.00 DDO Rw anda P1 69040 T h ird Rwanda Energy Sector Development Policy Operation 1 25.00 Peru P1 69058 Peru - DPL with a Cat DDO III 5 00.00 April 2019 Board Annex DPFs PAGE 174 Kir ibati P1 69179 Kir ibati Sixth Economic Reform Development Policy Operation 5 .00 Pa raguay P1 69505 Pa raguay Development Policy Loan 2 00.00 A lbania P1 69524 A lbania Fiscal Sustainability and Growth DPL 8 0 .00 A rmenia P1 69624 A rmenia Resilience and Competition Development Policy Operation 5 0.00 Ecuador P1 69822 Fir st Inclusive and Sustainable Growth DPF 5 00.00 Cot e d'Iv oire P1 69828 CDI Social Protection, Climate Change, and Digital Economy DPO1 2 00.00 Nig er P1 69830 Nig er First DPO Series 2 5 0.00 T og o P1 69867 T og o DPO New Series 7 5 .00 In dia P1 69907 Resilient Kerala Program 1 5 0.00 Georgia P1 69913 Georgia Economic Governance and Competitiveness Development 5 0.00 Policy Operation Nepal P1 69920 Nepal Maximizing Finance for Development 1 5 0.00 Ph ilippines P1 70052 Pr om oting Competitiveness and Enhancing Resilience to Natural Dis- 4 00.00 a st ers DPL Kosov o P1 70113 Kosov o Public Finances and Growth DPL 4 0.00 Jam aica P1 70223 Jam aica: Greater Economic Resilience DPF 7 0.00 Nepal P1 70248 Second Programmatic Energy Sector Development Policy Credit 1 00.00 Jor dan P1 70273 Jor dan Third Equitable Growth & Job Creation Programmatic Devel- 5 00.00 opm ent Policy Financing Senegal P1 70366 Senegal - T hird Multi-Sectoral Structural Reforms Development Pol- 1 5 0.00 icy Financing Peru P1 70477 In v esting in Human Capital 1 5 0.00 T uvalu P1 70558 T uvalu DPO and DRM CAT-DDO 1 3.50 Pa kistan P1 70568 Pa kistan Securing Investments in Human Capital DPC Series 2 5 0.00 Ch ina P1 70663 Shanxi Energy Transition and Green Growth Development Policy Op- 3 00.00 er ation Colom bia P1 70728 Colom bia Territorial Development DPL 4 00.00 Peru P1 70833 St rengthening Subnational Fiscal Sustainability for Im proved Service 2 00.00 Deliv ery Bu rkina Faso P1 70934 Bu rkina Faso Second Fiscal Management, Sustainable Growth and 1 00.00 Health Service Delivery Development Policy Operation In donesia P1 70940 In donesia Financial Sector Reform Development Policy Financing 3 00.00 Ca bo Verde P1 71080 Ca bo Verde Second DPO 1 5 .00