Skip to Main Navigation

Mali - Interim Transport Project : environmental assessment (Vol. 2 of 7) : Etudes diagnostique et techniques et dao des travaux d'entretien periodique de la route Sevare-Gao (French)

This is an environmental assessment for the Interim Transport Program for Mali, which improves railway infrastructure and the road network to facilitate accessibility to the Northern section of the country, while mitigating the social impact of railway concessioning. Some of the negative environmental impacts and their mitigations include: Fuels used and all hydrocarbon products will be collected and stored in waterproof tanks and disposed of. The...
See More

DETAILS

  • 2003/10/01

  • Environmental Assessment

  • E807

  • 2

  • 7 (See all volumes)

  • Mali,

  • Western and Central Africa,

  • 2010/07/01

  • Etudes diagnostique et techniques et dao des travaux d'entretien periodique de la route Sevare-Gao

  • Air pollution control

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Scetauroute International; RRI Beller GmbH Consulting Engineers; AGEFORE; SCC International.

Mali - Interim Transport Project : environmental assessment (Vol. 2 of 7) : Etudes diagnostique et techniques et dao des travaux d'entretien periodique de la route Sevare-Gao (French). S. l. : s. n.. http://documents.worldbank.org/curated/en/227161468756905880

This document is being processed or is not available.