Etudes d’Impact Environnemental et Social pour la Construction de Trois Nouveaux Châteaux d’Eau (Prabis, Safim, Bor, et Antula-Pime) et la Réhabilitation des Autres Châteaux d’Eau Existants
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 128
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Guinea-Bissau.
Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : Additional Financing : Environmental Assessment (Vol. 2 of 5) : Etudes d’Impact Environnemental et Social pour la Construction de Trois Nouveaux Châteaux d’Eau (Prabis, Safim, Bor, et Antula-Pime) et la Réhabilitation des Autres Châteaux d’Eau Existants (French). Guinea-Bissau : s.n.. http://documents.worldbank.org/curated/en/287341621854575881