DETAILS
-
2003/01/01
-
Environmental Assessment
-
E807
-
1
-
2010/07/01
-
Etudes techniques de renforcement de la route Bamako - Bougouni
-
Air pollution control
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 1140
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Scetauroute International; RRI Beller GmbH Consulting Engineers; AGEFORE; SCC International.
Mali - Interim Transport Project : environmental assessment (Vol. 1 of 7) : Etudes techniques de renforcement de la route Bamako - Bougouni (French). S. l. : s. n.. http://documents.worldbank.org/curated/en/489881468776976052