Ghana - Thermal Power Project : resettlement action plan (Vol. 1 of 2) : Resettlement action plan (English)

The Prestea-Obuasi Transmission Line project erected a 114.6114.6 km long, 161 kV line that parallels an existing line, but has its own right-of-way (ROW). POTL involved erecting pylons approximately every 300 meters along the route. This work required access roads, where these did not already exist, as well as staging areas to erect the pylons and string the wire. The Volta River Authority (VRA) subscribes as a matter of policy and practice to the...