Skip to Main Navigation

Egypt - El-Ain Al-Sokhna 2x650 MWe Gas and Oil Thermal Power Project : environmental assessment (Vol. 2 of 12) : Executive summary (English)

The objective of the El-Ain Al-Sokhna 2x650 MWe Gas and Oil Thermal Power Project for Egypt is to identify the environmental and social impacts of construction and operation of the project. Negative measures include: noise, air pollution, water quality, solid and hazardous wastes, traffic and local roads, and flora and fauna. Mitigation measures include: (a) with respect to noise generated from ground traffic and equipment, the predication should...
See More

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Engineering Consultants Group; Eco Con Serv.

Egypt - El-Ain Al-Sokhna 2x650 MWe Gas and Oil Thermal Power Project : environmental assessment (Vol. 2 of 12) : Executive summary (English). s.l. ; s.n.. http://documents.worldbank.org/curated/en/834851468247490644

This document is being processed or is not available.