DETAILS
-
2006/05/01
-
Environmental Assessment
-
E1432
-
2
-
2010/07/01
-
Disclosed
-
Environmental management plan for Xeset-1 to Saravan 115 kv transmission line system and associated substation in Saravan
-
kv transmission line
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 284
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Cambodia - Greater Mekong Subregion - Power Trade Phase 1 Project : environmental assessment (Vol. 2 of 2) : Environmental management plan for Xeset-1 to Saravan 115 kv transmission line system and associated substation in Saravan (English). S. l. : Tokyo Electric Power Co. Inc. (TEPO). http://documents.worldbank.org/curated/en/845531468054847597