Skip to Main Navigation

Brazil - Fortaleza Metropolitan Transport Project : resettlement plan (Vol. 1 of 3) : Plano de reassentamento involuntario - Metro de Fortaleza (Portuguese)

The Fortaleza Urban Transport Project was designed within the framework that the transport system is a key element for the development of the city's metropolitan region, and, assumes: 1) continuation of the right of way of those lines currently operated by the Brazilian Urban Train Company (CBTU), reducing the number of properties affected for resettlement; 2) maintenance of the metric gauge, to maximize the use of existing infrastructure; 3) upgrading...
See More

Document also available in : English, Portuguese

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Avante Engenharia e Consultoria.

Brazil - Fortaleza Metropolitan Transport Project : resettlement plan (Vol. 1 of 3) : Plano de reassentamento involuntario - Metro de Fortaleza (Portuguese). Brazil, Fortaleza ;Avante Engenharia e Consultoria. http://documents.worldbank.org/curated/en/881341468743641306

This document is being processed or is not available.