DETAILS
-
2015/03/01
-
Environmental Assessment
-
E4489
-
8
-
2015/03/27
-
Disclosed
-
environmental report - second CSP plant : non-technical summary
-
mitigation measure
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 337
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 8 of 13) : environmental report - second CSP plant : non-technical summary (English). Washington, DC : World Bank Group. http://documents.worldbank.org/curated/en/938511468274274705