DETAILS
-
2017/03/09
-
Environmental Assessment
-
SFG3118
-
8
-
2017/03/09
-
Disclosed
-
Restoration and internal repairing works in train station and local self government building, andrestoration of small size pedestrian bridges in Tskaltubo
-
construction site
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 230
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Georgia.
Georgia - Second Regional Development Project : Environmental Assessment (Vol. 8 of 10) : Restoration and internal repairing works in train station and local self government building, andrestoration of small size pedestrian bridges in Tskaltubo (English). Georgia : s.n.. http://documents.worldbank.org/curated/en/956981489466837404