Ratings for the National Slum Upgrading Project (NSUP) for Indonesia were as follows: outcome and Bank performance was highly satisfactory and monitoring and evaluation (M and E) quality was substantial. Some lessons learned included: delivering complex integrated infrastructure at scale requires effective planning tools and technical capacity on the ground. Sustainability of the slum alleviation agenda requires a long-term incremental and adaptive...
Voir la suite
INFORMATION
-
2024/01/24
-
Bilan de fin d’exécution et de résultats
-
ICR4528
-
1
-
2024/01/26
-
Disclosed
-
Indonesia - National Slum Upgrading Project