The development objective of the Green and Resilient São Paulo (SP) Metro Line 2 Extension Project for Brazil is to improve low-carbon mobility, increase job accessibility, and enable social housing in the Catchment Area of Line 2 - Green. The project comprises of two components. The first component, systems consists of following sub-components: (i) communication-based train control (CBTC) signaling system for the extension of line 2 and upgrade of...
Voir la suite
INFORMATION
-
2025/02/25
-
Document d’évaluation du projet
-
PADHI00555
-
1
-
2025/03/18
-
Disclosed
-
2025/03/18
-
Brazil - Green and Resilient São Paulo Metro Line 2 Extension Project