Brazil - Green and Resilient São Paulo Metro Line 2 Extension Project (anglais)

The development objective of the Green and Resilient São Paulo (SP) Metro Line 2 Extension Project for Brazil is to improve low-carbon mobility, increase job accessibility, and enable social housing in the Catchment Area of Line 2 - Green. The project comprises of two components. The first component, systems consists of following sub-components: (i) communication-based train control (CBTC) signaling system for the extension of line 2 and upgrade of...
Voir la suite

INFORMATION

  • 2025/02/25

  • Document d’évaluation du projet

  • PADHI00555

  • 1

  • Brésil,

  • Amérique latine et Caraïbes,

  • 2025/03/18

  • Disclosed

  • 2025/03/18

  • Brazil - Green and Resilient São Paulo Metro Line 2 Extension Project

This document is being processed or is not available.