This report is an annex of to the main modelling report (Output 5 - Report on advice provided to MWF in the preparation of draft FHRMs) in which the methodologies applied for hazard and risk mapping are described. The main modelling report highlights particular agreements that were considered additionally during the modelling activity. Each annex report summarizes per RBA and for the Danube River the water system and the models that were developed...
Voir la suite
INFORMATION
-
2024/03/06
-
Rapport
-
188171
-
1
-
2024/03/07
-
Disclosed
-
ANNEX 1 – RO02 Jiu Rba Report
TÉLÉCHARGER
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
-
Total Downloads** : 76
*La version texte est une version à reconnaissance optique de caractères non-corrigée. Cette version est fournie uniquement pour accommoder les utilisateurs disposant de connections lentes.