Skip to Main Navigation

Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 5 of 4) : Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line (anglais)

The development objective of the Tanzania-Zambia Transmission Interconnector Project for Africa is to establish cross-border transmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power trade. Some of the negative impacts and mitigation measures are includes : (i) prepare and implement erosion and sediment control plans,particularly in areas identified as having high erosion potential; (ii)...
Voir la suite

Document also available in : anglais, anglais, anglais, anglais

INFORMATION

  • 2022/03/11

  • Évaluation environnementale

  • SFG4014

  • 5

  • 4 (Voir tous les volumes)

  • Eastern Africa, Afrique,

  • Afrique,

  • 2022/04/05

  • Disclosed

  • Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line

This document is being processed or is not available.