Indonesia - Dam Operational Improvement and Safety Project (DOISP) (anglais)

Ratings for the Dam Operational Improvement and Safety Project (DOISP) for Indonesia were as follows: outcome was satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation (M and E) quality was modest. Some lessons learned included: even though the project decided against programmatic loan instruments at the outset, there was a clear intention from the start for follow-on engagement, which allowed the project to incrementally...
Voir la suite

INFORMATION

  • 2024/06/27

  • Bilan de fin d’exécution et de résultats

  • ICR6592

  • 1

  • Indonésie,

  • Asie de l’Est et Pacifique,

  • 2024/07/10

  • Disclosed

  • Indonesia - Dam Operational Improvement and Safety Project (DOISP)