Skip to Main Navigation

INFORMATION

  • 2022/12/01

  • Évaluation environnementale

  • SFG4428

  • 14

  • 10 (Voir tous les volumes)

  • Argentine,

  • Amérique latine et Caraïbes,

  • 2023/01/25

  • Disclosed

  • Environmental and Social Management Plan : Renewal of the Network of Low Voltage Power Supply in the Massif of Barrio Padre Carlos Mugica - Lot 2

This document is being processed or is not available.