Skip to Main Navigation

Botswana - Integrated Transport Project (anglais)

Ratings for the Integrated Transport Project for Botswana were as follows: outcome was moderately satisfactory, Bank performance was moderately unsatisfactory, and monitoring and evaluation (M and E) quality was negligible. Some lessons learned included: capacity development for the client should be better integrated into the project design to ensure that the client can institutionalize the relevant training and adequately take over new systems post...
Voir la suite

INFORMATION

  • 2023/02/28

  • Bilan de fin d’exécution et de résultats

  • ICR5871

  • 1

  • Botswana,

  • Eastern and Southern Africa,

  • 2023/02/27

  • Disclosed

  • Botswana - Integrated Transport Project

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.