Skip to Main Navigation

Botswana - Emergency Water Security and Efficiency Project : Environmental Assessment (Vol. 5 of 6) : Revised Environmental and Social Management Plan for the Accommodation Camp for Staff at the Contractor’s Construction Camp in Mmadinare (anglais)

The development objective of the Emergency Water Security and Efficiency Project is to improve operational performance of the Mambo Wastewater Treatment Plant (WWTP) and limit pollution of downstream water sources. Some of the negative impacts and mitigation measures are include : (i) povide for required onsite and offsite training for various WUC personnel to enable independent operation of Mambo WWTP beyond contract operation period. Training to...
Voir la suite

INFORMATION

  • 2022/08/31

  • Évaluation environnementale

  • SFG3031

  • 5

  • 6 (Voir tous les volumes)

  • Botswana,

  • Eastern and Southern Africa,

  • 2022/10/18

  • Disclosed

  • Revised Environmental and Social Management Plan for the Accommodation Camp for Staff at the Contractor’s Construction Camp in Mmadinare

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.