Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment (Vol. 6 of 6) : Étude de faisabilité de la ligne HT Nouakchott-Tobene et des postes HT associés : phase I - Sénégal (français)

The objective of the Banda Gas-to-Power Guarantee Operation Project for Mauritania is to involve the drilling and installation of two gas production wells, and their connection to an onshore gas processing facility, via a sub-sea pipeline. Negative impacts include: interference with shipping and navigation of other sea users, loss of access to fishing grounds, water and sediment contamination, discharges of commissioning fluids, noise, impacts to...
Voir la suite

INFORMATION

  • 2014/03/01

  • Évaluation environnementale

  • E4276

  • 6

  • 6 (Voir tous les volumes)

  • Sénégal, Mauritanie, Mali,

  • Western and Central Africa,

  • 2014/04/17

  • Disclosed

  • Étude de faisabilité de la ligne HT Nouakchott-Tobene et des postes HT associés : phase I - Sénégal

This document is being processed or is not available.