The Naftagas Pipelines Project includes: (a) the procurement and installation of gas compressors at the Mokrin and Tilva fields with a total capacity of about 5,000 hp; (b) the procurement and installation of pipelines for gas supply, gas transmission, and gas distribution; (c) the procurement and installation of approximately 45 control and metering main stations, including buildings, at city limits, with about 270 km of low pressure distribution...