The development objectives West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project are (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase the technical integration of the WAPP network. Some of the negative impacts include:...