Laos - Nam Theun 2 Hydropower Project : tenth report of the international environmental and social panel of experts (anglais)

This is the tenth report of the International Environmental and Social Panel of Experts (POE) for the Nam Theun 2 Hydropower Project in the Lao People's Democratic Republic. NTPC (National Thermal Power Corporation) act firmly to ensure that there is effective interaction, including consultation and timely preparation and review of environmental documents and plans, between and among the Head Contractor, the sub-contractors and the NTPC Construction...
Voir la suite

INFORMATION

  • 2006/10/30

  • Document de travail

  • 70880

  • 1

  • 1

  • République démocratique populaire lao,

  • Asie de l’Est et Pacifique,

  • 2012/07/05

  • Disclosed

  • Laos - Nam Theun 2 Hydropower Project : tenth report of the international environmental and social panel of experts

  • reservoir

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.