The Jaguara Power Project will assist in financing the Jaguara hydroelectric project (400 MW). The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Program Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures will be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc.
Information
-
Date du document
1966/12/05
-
Type de document
Mémorandum et recommandation du Président
-
Numéro du rapport
P515
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Date de publication
2010/06/24
-
Disclosure Status
Disclosed
-
Titre du rapport
Brazil - Power, Tranmission and Hydroelectric Projects
-
Mots clé
transmission and distribution system;negative real interest rate;balance of payment;federal holding company;revaluation of asset;market for power;debt service payment;debt service ratio;debt service obligation;event of default;demand for power;procurement of equipment;commercial interest rate;basis of information;system of price;source of financing;cost of equipment;cost equipment;multiple exchange rate;prospective borrower;power company;Fixed Assets;exchange reserve;import restriction;wage policy;wholesale price;price control;grace period;price stability;private investor;Economic Policy;domestic price;external indebtedness;Population Growth;industrial demand;cash deficit;reserve position;free market;Exchange Rates;legal redress;utility rate;real income;power rate;fair representation;aggregate cost;bank lending;low-voltage distribution;hold equity;autonomous entity;normal market;price inflation;bank claim;special interest;net operating;Electric Power;bank borrower;financial policies;adverse changes;tariff regime;power tariff;national power;distribution network;loan fund;investment program;investment process;appraisal reports;electricity rate;monetary program;coffee crop;gradual approach;external financing;
- Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- Version officielle (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.