Skip to Main Navigation

Pakistan - Khyber Pakhtunkhwa Hydropower and Renewable Energy Development Program Project : Resettlement Plan : جبرال کالام پن بجلی منصوبے کے لئے دوبارہ آبادکاری ایکشن پلان (ourdou)

The development objective of the Khyber Pakhtunkhwa Hydropower and Renewable Energy Development Program Project for Pakistan is to increase hydropower and renewable energy generation and strengthen the capacity of associated institutions in Khyber Pakhtunkhwa. Some of the negative impacts and mitigation measures include: (1) cash compensation of off-the-road land at full replacement cost on prevailing market rate through private negotiations free...
Voir la suite

Document also available in : anglais, ourdou, anglais

INFORMATION

  • 2019/12/01

  • Plan de réinstallation

  • SFG5947

  • 1

  • 1

  • Pakistan,

  • Asie du Sud,

  • 2019/12/19

  • Disclosed

  • جبرال کالام پن بجلی منصوبے کے لئے دوبارہ آبادکاری ایکشن پلان

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.