Egypt - Second National Drainage Project (anglais)

Ratings for the Second National Drainage Project for Egypt were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. Some lessons learned included: integrated management of irrigation and drainage (I and D) on sound institutional and financial arrangements should not be left as an unresolved issue. This requires...
Voir la suite

INFORMATION

  • 2015/09/30

  • Bilan de fin d’exécution et de résultats

  • ICR3268

  • 1

  • 1

  • Égypte, République arabe d’,

  • Moyen-Orient et Afrique du Nord,

  • 2016/01/05

  • Disclosed

  • Egypt - Second National Drainage Project

  • Egyptian Public Authority for Drainage Projects

This document is being processed or is not available.