Skip to Main Navigation

Uganda - Roads Development Program Fourth Phase : environmental impact assessment (Vol. 2 of 4) : Feasibility study and detailed engineering design for upgrading to paved (Bitumen) standard of the Soroti-Lira road (anglais)

The objective of the Roads Development Program Fourth Phase Project is divided in to two parts. The objective of the each part of the project is: (i) to determine the technical and economic feasibility of strengthening the existing paved road and upgrading the existing murram road to paved standards; and (ii) to undertake detailed engineering design, depending on the results of the feasibility study, and prepare standard bidding documents for bidding...
Voir la suite

Document also available in : anglais, anglais, anglais

INFORMATION

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.