Nepal - Narayani III Irrigation Project, Sunsari Morang Irrigation II Project, and Sunsari Morang Headworks Project (anglais)

This audit rates the performance of the Narayani III Irrigation, Sunsari Morang Irrigation II, and Sunsari Morang Headworks Projects for Nepal. The Narayani III Irrigation Project was rated highly unsatisfactory, sustainability is unlikely, institutional development was negligible, and the performance of the Bank was highly unsatisfactory while the Borrower's was unsatisfactory. The Sunsari Morang Irrigation II Project was rated satisfactory, sustainability...
Voir la suite

INFORMATION

  • 1998/08/21

  • Rapport d'évaluation rétrospective

  • 18377

  • 1

  • 1

  • Népal,

  • Asie du Sud,

  • 2017/11/15

  • Disclosed

  • Nepal - Narayani III Irrigation Project, Sunsari Morang Irrigation II Project, and Sunsari Morang Headworks Project

  • acre-feet