The project objective of the Power Engineering Project for Argentina was to assist the Government in implementing measures to improve the efficiency of electricity distribution by providing the utilities with modern methodologies and supporting equipment for planning and design of the distribution system.The project made an important contribution to the power sector by assisting the Government in identifying and addressing some key organizational, functional and technical problems which impeded the coordinated and efficient development of distribution facilities. Another project achievement was that it provided the most important distribution utilities in the country with modern equipment, computer hardware and software, and methodologies to improve their planning and design capabilities. The lending program was focused upon: (a) technical assistance to strengthen the Government's analytical and administrative ability to design and implement economic reform programs; (b) financial assistance to support the process of structural reform and growth; and (c) playing a catalytic role in increasing external resource flow.
Information
-
Date du document
1994/11/04
-
Type de document
Rapport d’achèvement du projet
-
Numéro du rapport
13682
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Date de publication
2010/06/18
-
Disclosure Status
Disclosed
-
Titre du rapport
Argentina - Power Engineering Project
-
Mots clé
efficiency of resource use;access to electricity service;privatization of distribution company;planning and design;provincial utility;hydroelectric power plant;condition of effectiveness;system of accounts;system Accounts;cost of living;weights and measure;technical assistance program;thermal power plant;expansion of transmission;channels of communication;regulation of concession;abundant natural gas;efficiency of electricity;distribution and transmission;difficulties due;quality and efficiency;procurement of computer;institutional development impact;total energy consumption;cost of service;Oil and Gas;Oil & Gas;economic reform program;per capita consumption;cost of distribution;allocation of resource;regional power distribution;transmission and distribution;price of oil;demand side management;lack of knowledge;distribution facility;expansion plan;operational planning;distribution network;counterpart fund;foreign consultant;engineering planning;load curve;pilot program;loan condition;inventory control;borrower performance;loss reduction;statistical data;metering equipment;modern equipment;successful privatization;project execution;local costs;computer hardware;store management;electricity distribution;budget control;technical standard;investment restriction;financial control;distribution investment;aggregate distribution;regional preferences;distribution business;electrical system;statistical tool;regional distribution;electrical utility;electrical generation;financial covenant;electricity tariff;hydroelectric plant;qualified professional;privatization process;transmission expansion;electricity bill;rural system;generation system;distribution concessionaire;supply situation;meter reading;consulting service;real benefits;political decision;technical equipment;exchange rate;Exchange Rates;demand forecast;load characteristic;Consulting services;legal aspect;magnetic storage;optimization model;adequate records;pricing policy;residential load;temperature variation;power utilities;national industry;distribution loss;warehouse management;consumption pattern;project costing;consumer demand;tariff policy;foreign exchange;equipment purchase;supply capacity;loan approval;power utility;external support;national utility;adequate participation;information dissemination;process information;reporting procedure;accounting procedure;skill base;financial situation;financial gap;constitutional autonomy;financial rule;lending strategy;modest increase;external resource;lending priority;energy development;private enterprise;energy resource;guarantee agreement;financing mechanism;liquid fuel;electrical power;power supply;energy loss;self-financing capacity;institutional relationship;distribution level;medium-term plan;project studies;foreign expenditure;project finance;project administration;upper management;functional classification;investment loan;provincial distribution;Labor Union;administrative support;sector work;labor problem;
- Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- Version officielle (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.