The Haripur Power Project concerns the construction and operation of a land-based thermal power plant in the Village of Haripur. Minimal environmental and socio-economic impacts are anticipated due to the project design, fuel type, and location. Environmental issues and concerns arising from construction include: a) dredging: disruption of aquatic habitats, fishery resources, siltation, and river traffic; b) site filling: alteration of surface drainage...
Voir la suite
Document also available in :
anglais
INFORMATION
-
1999/03/31
-
Évaluation environnementale
-
E330
-
1
-
1
-
2010/07/01
-
Disclosed
-
Main Report
-
Public Consultation and Disclosure Plan